+ All Categories
Home > Documents > Hold Setup Manual - Satellite Climbing · 2020. 11. 3. · *On the back of all SBM holds a...

Hold Setup Manual - Satellite Climbing · 2020. 11. 3. · *On the back of all SBM holds a...

Date post: 29-Jan-2021
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
11
A B C D E F G H I J K L M N O P 11 Q 1 2 3 4 5 6 7 8 9 10 13 12 15 14 17 16 18 Hold Setup Manual *On the back of all SBM holds a designated letter and number is written. When adjusting the angle of each hold please refer to the diagrams below. *Required Bolts: 95 x 40mm, 4 x 50mm, 3 x 90mm, 2 x 120mm, 1 x 140mm
Transcript
  • A B C D E F G H I J K L M N O P

    11

    Q

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    13

    12

    15

    14

    17

    16

    18

    Hold Setup Manual*On the back of all SBM holds a designated letter and number is written.

    When adjusting the angle of each hold please refer to the diagrams below.

    *Required Bolts: 95 x 40mm, 4 x 50mm, 3 x 90mm, 2 x 120mm, 1 x 140mm

  • TORON Xl1I-5 O-4

    C-4

    monoka 1I-8 I-2

    G-5 K-5

  • Shark M1

    LOGO JUG + Round Jug

    E-1 M-1 G-7

    K-7 I-11

    I-1 I-4 C-1

    O-1

  • Shinka BOlt XsA-3 E-5 H-3

    J-3 A-5 H-6

    C-7 J-6 M-5 I-10

    Q-3 Q-5 O-7 O-9

    C-9

  • Shark Round Jug

    G-3 K-3 B-2 P-2

    N-8 D-6 N-6 K-1

    F-12 L-12 D-8 G-1

    C-11 O-11 I-12

  • G-10 K-10

    M-4 E-4 K-6 G-6

    Shark Round Jug

  • Camabocco sE-11 M-11 H-9 D-2

    L-8 J-9 F-8 E-3

    B-6 E-6 M-6 I-3

    P-6 H-4 J-4 F-5

  • M-3 N-2 I-15

    Camabocco sL-5

    I-7

  • DIAMOND s A-10 E-9 M-9

    Q-10 P-8 K-8

    G-8 G-2 K-2B-8

  • Perfect Footpack 2A-17 E-17 I-17 M-17

    Q-17 D-16 N-16 C-15

    G-15 K-15 O-15 A-14

    E-14 I-14 M-14 Q-14

  • C-13 G-13 K-13 O-13

    A-12 Q-12

    Perfect Footpack 2


Recommended