+ All Categories
Home > Documents > HOM Experiences at the SNS SCL SPL HOM Workshop CERN June 26, 2009 Sang-ho Kim SNS SCL Area Manager...

HOM Experiences at the SNS SCL SPL HOM Workshop CERN June 26, 2009 Sang-ho Kim SNS SCL Area Manager...

Date post: 18-Jan-2018
Category:
Upload: paula-griffith
View: 215 times
Download: 0 times
Share this document with a friend
Description:
3Managed by UT-Battelle for the U.S. Department of Energy SPL HOM Workshop at CERN, June 25-26, 2009 SNS Accelerator Complex 945 ns 1 ms macropulse Current mini-pulse Current 1ms Front-End: Produce a 1-msec long, chopped, H- beam 1 GeV LINAC Accumulator Ring: Compress 1 msec long pulse to 700 nsec Chopper system makes gaps Ion Source 2.5 MeV1000 MeV87 MeV CCL SRF,  = 0.61 SRF,  = MeV387 MeV DTL RFQ Accumulator Ring RTBT Target HEBT InjectionExtraction RF Collimators Liquid Hg Target

If you can't read please download the document

Transcript

HOM Experiences at the SNS SCL SPL HOM Workshop CERN June 26, 2009 Sang-ho Kim SNS SCL Area Manager SNS/ORNL 2Managed by UT-Battelle for the U.S. Department of Energy SPL HOM Workshop at CERN, June 25-26, 2009 Outline SNS Intro HOM concerns in SNS SRF cavity Reminder of past histories HOM coupler issue Re-evaluation HOM frequency statistics SNS beam Beam induced signal Summary 3Managed by UT-Battelle for the U.S. Department of Energy SPL HOM Workshop at CERN, June 25-26, 2009 SNS Accelerator Complex 945 ns 1 ms macropulse Current mini-pulse Current 1ms Front-End: Produce a 1-msec long, chopped, H- beam 1 GeV LINAC Accumulator Ring: Compress 1 msec long pulse to 700 nsec Chopper system makes gaps Ion Source 2.5 MeV1000 MeV87 MeV CCL SRF, = 0.61 SRF, = MeV387 MeV DTL RFQ Accumulator Ring RTBT Target HEBT InjectionExtraction RF Collimators Liquid Hg Target 4Managed by UT-Battelle for the U.S. Department of Energy SPL HOM Workshop at CERN, June 25-26, 2009 SNS SRF cavity Fundamental Power Coupler HOM Coupler HOMB HOM Coupler HOMA Field Probe Tuner Helium Vessel Major Specifications: E a =15.9 MV/m at =0.81 E a =10.2 MV/m at =0.61 & Q o > 5E9 at 2.1 K 5Managed by UT-Battelle for the U.S. Department of Energy SPL HOM Workshop at CERN, June 25-26, 2009 Designed to operate at 2.1 K (superfluid helium) Fundamental power couplers Return end can Helium vessels Space frame Supply end can SNS Cryomodule 11*Medium beta 12*High beta 81 cavities 6Managed by UT-Battelle for the U.S. Department of Energy SPL HOM Workshop at CERN, June 25-26, 2009 Beam power history Summer 2007 Winter 2007 Summer 2008 Spring 2007 Fall 2006 Winter 2008 Summer 2009 7Managed by UT-Battelle for the U.S. Department of Energy SPL HOM Workshop at CERN, June 25-26, 2009 ParametersDesign Individually achieved Highest production beam Beam Energy (GeV) Peak Beam current (mA) Average Beam Current (mA)2624 Beam Pulse Length ( s) Repetition Rate (Hz)60 Beam Power on Target (kW) Linac Beam Duty Factor (%) Beam intensity on Target (protons per pulse)1.5 x x x SCL Cavities in Service8180 Major Parameters achieved vs. designed 8Managed by UT-Battelle for the U.S. Department of Energy SPL HOM Workshop at CERN, June 25-26, 2009 SCL status SCL is providing a very reliable operation for neutron production following SNS power ramp-up Down time < 5 min/day (


Recommended