+ All Categories
Home > Documents > Home | Benary - 306 Program for Landscape/Retail Sales · bed with color BIG® in front of the...

Home | Benary - 306 Program for Landscape/Retail Sales · bed with color BIG® in front of the...

Date post: 16-Aug-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
2
306 Program for Landscape/Retail Sales BIG® Begonia x benariensis Hold an extra 1+ weeks in plug tray, setting flower buds prior to transplanting. Apply Cycocel (chlormequat) at 250-300 ppm prior to transplanting. Repeat Cycocel (chlormequat) at 250-300 ppm 1-2 weeks after transplanting. Minimize NH4+ in feeding program using a Ca based fertilizer at a low rate (60-100ppm N). If using slow release fertilizer (not recommended), do not apply any additional fertilizer. Keep temperatures cool during finishing: ≤ 56 ˚F / 13 ˚C. Soil moisture level should approach dry (2) before resaturating to wet (4) during finishing. Cultural techniques to control growth during pack production: Tray Size Plug Time (wks.) 306 Finish Time (wks.) Total Crop Time (wks.)* 288 8 6 14 128 10 4 14 144 10 4 14 * may require 1 extra week in early spring From young plant to prolific blooming For complete cultural recommendations go to: www.benary.com
Transcript
Page 1: Home | Benary - 306 Program for Landscape/Retail Sales · bed with color BIG® in front of the White House, Washington D.C. Ernst Benary of America, Inc. 2759 Wagner Court, Suite

306 Program for Landscape/Retail SalesBIG® Begonia x benariensis

Hold an extra 1+ weeks in plug tray, settingflowerbudspriortotransplanting.

Apply Cycocel (chlormequat) at 250-300ppmpriortotransplanting.

Repeat Cycocel (chlormequat) at 250-300 ppm 1-2 weeks after transplanting.

Minimize NH4+ in feeding program usingaCabasedfertilizerata lowrate(60-100ppmN).

If using slow release fertilizer (not recommended), do not apply any additionalfertilizer.

Keeptemperaturescoolduringfinishing: ≤56˚F/13˚C.

Soil moisture level should approach dry(2)beforeresaturatingtowet(4) duringfinishing.

Cultural techniques to control growth during pack production:

Tray Size

Plug Time (wks.)

306Finish Time (wks.)

Total Crop Time (wks.)*

288 8 6 14

128 10 4 14

144 10 4 14

*mayrequire1extraweekinearlyspringFromyoungplanttoprolificblooming

Forcompleteculturalrecommendationsgoto:

www.benary.com

Page 2: Home | Benary - 306 Program for Landscape/Retail Sales · bed with color BIG® in front of the White House, Washington D.C. Ernst Benary of America, Inc. 2759 Wagner Court, Suite

BIG® consumer planting

BIG® Landscape in Vienna, Austria

Easy to grow

Better show of color– flowers on top of the foliage

Two weeks earlier than Dragon Wing

Thrives in full sun to full shade

High impact color all season until frost

Get BIG® Results!

Red Bronze Leaf Red Green Leaf Rose Bronze Leaf Pink Green Leaf

3”/8cmblooms saturate your bedwithcolor

BIG® in front of the White House, WashingtonD.C.

Ernst Benary of America, Inc.2759 Wagner Court, Suite CDeKalb,IL60115-8609,USAPhone:+18157564546 Fax: +18157569128E-Mail: [email protected]

Create a BIG® Impression!

BIG® in a patio container

BIG® at O´Hare Airport, Chicago

2014_LT_USA/

Anyliabilityfor

missprintsexcluded.


Recommended