Hot Mix Asphalt Advancements

Date post: 16-Apr-2022
Category:
Upload: others
View: 13 times
Download: 0 times
Share this document with a friend
18
Hot Mix Asphalt Advancements April 7 th , 2021 Amy Beise, PE – Materials & Research Justin Ramsey, PE – Environmental &Transportation Services
Transcript
Page 1: Hot Mix Asphalt Advancements

Hot Mix Asphalt AdvancementsApril 7th, 2021

Amy Beise, PE – Materials & Research 

Justin Ramsey, PE – Environmental & Transportation Services

Page 2: Hot Mix Asphalt Advancements

2020 Hot Mix Asphalt Program

$99+ Million

Page 3: Hot Mix Asphalt Advancements

How do we protect our investment?

Density

Page 4: Hot Mix Asphalt Advancements

Rule of Thumb

1% increase in density

results in

10% increase in service life

Page 5: Hot Mix Asphalt Advancements

Density 101

What is it? 

Density = 

m = mixtures = stoneb = binder

Specific Gravity =

Page 6: Hot Mix Asphalt Advancements

Density 101

How it’s Measured

𝑩𝒖𝒍𝒌 𝑺𝑮 𝑭𝒊𝒆𝒍𝒅 𝑪𝒐𝒓𝒆 𝑻𝒉𝒆𝒐𝒓𝒆𝒕𝒊𝒄𝒂𝒍 𝑴𝒂𝒙 𝑺𝑮 𝑴𝒊𝒙𝒕𝒖𝒓𝒆

% Density = 100* 

% Air Voids = 100 ‐% Density 

Examples:

92% Density means 8% Air Voids

95% Density means 5%  Air Voids

Page 7: Hot Mix Asphalt Advancements

Density

What are the benefits? 

Increased Densities Reduce:• Structure Weakening

• Oxidation Aging

• Cracking

• Rutting

• Raveling

• Stripping

Page 8: Hot Mix Asphalt Advancements

Density

How do we improve? 

Specification Changes

Rolling & Paving Operations

Increase Lift Thicknesses

Modifications to Mix Design 

Page 9: Hot Mix Asphalt Advancements

Percent within Limits

Statistical Acceptance

Goal – Reduce Variability

Page 10: Hot Mix Asphalt Advancements

87% 88% 89% 90% 91% 92% 93% 94% 95% 96% 97% 98% 99% 100%

Standard Acceptance

Based on specified average

Disadvantage: Many cores can fall below the desired value  

Specified Average

Page 11: Hot Mix Asphalt Advancements

87% 88% 89% 90% 91% 92% 93% 94% 95% 96% 97% 98% 99% 100%

Upper Spec Limit

Specified Average

Lower Spec Limit

Percent within Limit Acceptance

Statistical percentage between upper and lower spec limit

Advantage:Variability is part of acceptance

Disadvantage: Learning Curve  

Page 12: Hot Mix Asphalt Advancements

87% 88% 89% 90% 91% 92% 93% 94% 95% 96% 97% 98% 99% 100%

Lower Spec Limit

Upper Spec Limit

The future is only as good

as your lowest density areas

Page 13: Hot Mix Asphalt Advancements

Percent within Limits

Pilot Project #1NH‐6‐001(041)162; PCN 2259138,500 Ton FAA 43 RAP 

SS‐2‐046(048)030; PCN 2157852,000 Ton FAA 43 RAP 

Page 14: Hot Mix Asphalt Advancements

Percent within Limits

Pilot Project #1

Percent within Limits

87 88 89 90 91 92 93 94 95 96 97 98 99 100

% Density

SS‐2‐046(048)030

Project Average % Density

Standard Deviation

PWL

SS‐2‐046(048)030 93.7% 1.5 85%

Page 15: Hot Mix Asphalt Advancements

Percent within Limits

Pilot Project #1

87 88 89 90 91 92 93 94 95 96 97 98 99 100

% Density

SS‐2‐046(048)030 NH‐6‐001(041)162

Percent within Limits

Project Average % Density

Standard Deviation

PWL

SS‐2‐046(048)030 93.7% 1.5 85%

NH‐6‐001(041)162 93.8% 1.2 91%

Page 16: Hot Mix Asphalt Advancements

Percent within Limits

Pilot Project #1

87 88 89 90 91 92 93 94 95 96 97 98 99 100

% Density

SS‐2‐046(048)030 NH‐6‐001(041)162 Historical FAA 43

Percent within Limits

Project Average % Density

Standard Deviation

PWL

SS‐2‐046(048)030 93.7% 1.5 85%

NH‐6‐001(041)162 93.8% 1.2 91%

Historical FAA 43 92.7% 1.5 66%

Page 17: Hot Mix Asphalt Advancements

Percent within Limits

Pilot Project #1Observations

• Very few cores fell below the 92%

• Extra Contractor Quality Control

• Reduced Disincentive Paving

Page 18: Hot Mix Asphalt Advancements

Quality is everyone's 

role


Recommended