Domestic Hot Water - Standard Piping Installations ............................................ 41 Water Heater .................................................................................................... 41 Water Heater w/Pipe Cover ............................................................................ 52 Water Heaters .................................................................................................. 63 Water Heaters .................................................................................................. 74 Water Heaters .................................................................................................. 85 Water Heaters .................................................................................................. 96 Water Heaters ................................................................................................ 10
Domestic Hot Water with Optional Freeze Protection ........................................111 Water Heater ...................................................................................................112 Water Heaters ................................................................................................ 123 Water Heaters ................................................................................................ 136 Water Heaters ................................................................................................ 14
Domestic Hot Water with Circulation Systems ................................................... 151 Water Heater .................................................................................................. 151 Water Heater w/Electric Water Heater ......................................................... 162 Water Heaters ................................................................................................ 172 Water Heaters w/Gas or Electric Water Heater .......................................... 183 Water Heaters ................................................................................................ 196 Water Heaters ................................................................................................ 20
Domestic Hot Water with Freeze Protection and Circulation System ............ 211 Water Heater .................................................................................................. 212 Water Heaters ................................................................................................ 223 Water Heaters ................................................................................................ 236 Water Heaters ................................................................................................ 24
Domestic Hot Water with Solar Preheat ............................................................... 251 Water Heater w/Circulation System.............................................................. 251 Water Heater w/Backup Storage Tank ......................................................... 26
Domestic Hot Water with Backup Storage Tanks ............................................... 271 Water Heater .................................................................................................. 271 Water Heater w/Secondary Circulation System........................................... 282 Water Heaters ................................................................................................ 292 Water Heaters w/Secondary Circulation System......................................... 303 Water Heaters ................................................................................................ 313 Water Heaters w/Secondary Circulation System......................................... 326 Water Heaters ................................................................................................ 336 Water Heaters w/Secondary Circulation System......................................... 34
C O N T E N T S
Space Heating Only Applications........................................................................... 351 Water Heater - Zone Pumps ......................................................................... 352 Water Heaters - Zone Pumps ....................................................................... 363 Water Heaters - Zone Pumps ....................................................................... 371 Water Heaters - Air Handlers ....................................................................... 381 Water Heaters - Zone Valves ....................................................................... 391 Water Heaters - Floor Radiant ..................................................................... 401 Water Heaters - Floor Radiant w/Buffer Tank ............................................. 41
Combination Domestic Hot Water/Space Heating Applications ....................... 421 Water Heater - Air Handler/Indirect Water Heating..................................... 422 Water Heaters - Air Handler/Indirect Water Heating ................................... 433 Water Heaters - Air Handler/Indirect Water Heating ................................... 441 Water Heater - Air Handler/Direct Water Heating ....................................... 451 Water Heaters - Radiant Heat/Indirect Water Heating ............................... 461 Water Heaters - Radiant Heat/Direct Water Heating .................................. 471 Water Heaters - Heat Exchanger/Direct Water Heating ............................. 481 Water Heaters - Buffer Tank/Direct Water Heating ..................................... 49
Maintenance Procedures ......................................................................................... 50Scale Flush Procedure...................................................................................... 50
Venting Drawings - Rinnai Indoor Water Heaters ............................................... 51Vent Materials .................................................................................................... 51Standard Vent Kit .............................................................................................. 52Horizontal Venting - Vent Heights under 5 feet .............................................. 53Horizontal Venting - Vent Heights 5 feet to 21 feet ....................................... 54Vertical Venting - Vent Heights under 5 feet .................................................. 55Vertical Venting - Vent Heights 5 feet to 21 feet ........................................... 56
System Sizing Charts ............................................................................................... 57Residential Quick Sizing ................................................................................... 57Residential/Commercial Sizing Instructions ..................................................... 581st Hour Demand Chart.................................................................................... 59System Selection Charts - 2424/2402/2532FFU Water Heaters ................... 60System Selection Charts - 2532W Water Heaters ......................................... 62Residential Sizing Rule of Thumb ................................................................... 63Commercial Sizing Rule of Thumb .................................................................. 64
Pump Sizing Data ..................................................................................................... 65Rinnai 2532 Series Water Heater - Flow Capacity Curves ........................... 65Rinnai 2532 Series Water Heater - Pressure Drop Curves .......................... 66Pump Sizing for Backup Storage Applications................................................ 67
C O N T E N T S
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
4
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
WH-1
Domestic Hot Water - Standard Installation1 Rinnai Water Heater
Preferred Piping Installation
Rinna i C o n t in u u m
3/4" Gas Supply
3/4" Cold Water Supply Line3/4" Hot Water Supply Line
RinnaiWater Heater
RinnaiEquipment List
RinnaiWater Heaters
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
QTY
1
1
September 30, 2002
5
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Rinna i C o n t in u u m
3/4" Gas Supply
3/4" Cold Water Supply Line
3/4" Hot Water Supply Line
RinnaiEquipment List
RinnaiWater Heaters
Recess Box orPipe Cover Box
BC-45 Controller(Included)
MC-45 or BSC-45 Controller Optional
QTY
1
1
1
Recess Box or
Pipe Cover Box
RinnaiWater Heater
WH-1-P
Domestic Hot Water - Standard Installation1 Rinnai Water Heater w/Recess Box or Pipe Cover
Preferred Piping Installation
September 30, 2002
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
6
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
WH-2
Domestic Hot Water - Standard Installation2 Rinnai Water Heater
Preferred Piping Installation
Rinna i C o n t in u u m
Cold Water Supply Line
Rinna i C o n t in u u m
Hot Water Supply Line
Gas Supply Line
RinnaiWater Heater
Sub 1
RinnaiWater Heater
Primary
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
QTY
2
1
2
September 30, 2002
7
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
WH-3
Domestic Hot Water - Standard Installation3 Rinnai Water Heaters
Preferred Piping Installation
R in na i C onti nuum R in na i C onti nuumR in na i C onti nuum
Cold Water Supply Line
Gas Supply
Hot Water Supply Line
RinnaiWater Heater
Sub 1
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
MSA-2S Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
QTY
3
1
1
3
RinnaiWater Heater
Sub 2
RinnaiWater Heater
Primary
September 30, 2002
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
8
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Standard Installation4 Rinnai Water Heaters
Preferred Piping Installation
WH-4
September 30, 2002
R in na i C onti nuum R in na i C onti nuumR in na i C onti nuum
Cold Water Supply Line
Gas Supply
Hot Water Supply Line
R in na i C onti nuum
RinnaiWater Heater
Sub 1
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
MSA-2S Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
QTY
4
1
2
4
RinnaiWater Heater
Sub 2
RinnaiWater Heater
Primary
RinnaiWater Heater
Sub 3
9
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Standard Installation5 Rinnai Water Heaters
Preferred Piping Installation
WH-5
R in na i C onti nuum R in na i C onti nuumR in na i C onti nuum
Cold Water Supply Line
Gas Supply
Hot Water Supply Line
R in na i C onti nuumR in na i C onti nuum
RinnaiWater Heater
Sub 1
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
MSA-2S Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
QTY
5
1
3
5
RinnaiWater Heater
Sub 2
RinnaiWater Heater
Primary
RinnaiWater Heater
Sub 4
RinnaiWater Heater
Sub 3
September 30, 2002
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
10
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Standard Installation6 Rinnai Water Heaters
Preferred Piping Installation
WH-6
R innai C onti nuum Rinnai C onti nuumRinnai C onti nuum
Gas Supply
Rinnai C onti nuumRinnai C onti nuum
Cold Water Supply Line
R innai C onti nuum
Hot Water Supply
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
MSA-2S Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
QTY
6
2
2
6
RinnaiWaterHeater
Primary
RinnaiWaterHeater
Sub 1
RinnaiWaterHeater
Sub 2
RinnaiWaterHeater
Primary
RinnaiWaterHeater
Sub 1
RinnaiWaterHeater
Sub 2
Pressure RegulatorSet to 5 PSI Below
Street Pressue
September 30, 2002
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
12
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Optional Freeze Protection2 Rinnai Water Heaters
Preferred Piping Installation
WH-2-D
September 30, 2002
Rinnai C ont inuum Rinnai C ont inuum
Gas Supply Line
Cold WaterSupply Line
Hot WaterSupply Line
3/4" Normally OpenSolenoid Valve
Normally ClosedSolenoid Valve
(Full size of supply line)
Route to Floor Drain
Cold Water Supply Line
S
S
Vacuum Breaker
NOTE:
ALL pipe and fittings shown below dashed line must be located inside home or building structure.
Vacuum breaker line also to be located inside home or building structure.
Heat trace ALL water pipe and f ittings located outside home or building structure. (ALL water pipe and fittings shown above the dashed line in the drawing.)
IMPORTANT!
With electrical power supplied to the Cont inuum 2424, it will not freeze in environments as cold as -30ºF, when protected from direct wind exposure.
In the event of a power failure at temperatures below freezing, the Continuum 2424 should be drained of all water to prevent freezing damage.
The unit may be drained manually, or through the installation of the Optional solenoid valve drain kit shown.
RinnaiWater Heater
Sub 1
RinnaiWater Heater
Primary
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
Pipe Cover Boxes or Recess Boxes Optional
QTY
2
1
2
NOTE:
Pipe and fitt ings can be installed inside pipeenclosure or recess box and packed withinsulation for added protection.
13
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Optional Freeze Protection3 Rinnai Water Heaters
Preferred Piping Installation
WH-3-D
September 30, 2002
Rinna i C onti nuum
Gas Supply
Hot WaterSupply Line
Rinna i C onti nuumR inna i C onti nuum
Cold Water Supply Line
S
S 3/4" MinimumNormally OpenSolenoid Valve
Normally Closed Solenoid Valve(Full size of Cold Water Supply Line)
Route to Drain
NOTE:
ALL pipe and fittings shown below dashed line must be located inside heated space.
It is recommended that the vacuum breaker lines also to be located inside heated space. If they must be located outside, they must be heat traced and insulated.
NOTE:
Heat trace and insulate ALL water pipe and fittings located outside building or in unheated space.
3/4" Vacuum Breaker
RinnaiWater Heater
Sub 2
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
MSA-2S Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
Pipe Cover Boxes or Recess Boxes Optional
QTY
3
1
1
3
RinnaiWater Heater
Sub 1
RinnaiWater Heater
Primary
NOTE:
Pipe and fittings can be installed inside pipeenclosure or recess box and packed withinsulation for added protection.
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
14
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Optional Freeze Protection6 Rinnai Water Heaters
Preferred Piping Installation
WH-6-D
September 30, 2002
Rinnai C onti nuum Rinnai C onti nuumRinnai C onti nuum
Gas Supply
Rinnai C onti nuumRinnai C onti nuum
Cold Water Supply Line
Rinnai C onti nuum
Hot Water Supply
NOTES:
Heat trace and insulate ALL water pipe and fittings located outside building or in unheated space.
ALL pipe and fittings shown below dashed line must be located inside heated space.
It is recommended that the vacuum breaker lines also to be located inside heated space. If they must be located outside, they must be heat traced and insulated.
3/4" Vacuum Breaker
S
Normally Closed Solenoid Valve (Full size of Cold Water Supply Line)
RinnaiWater Heater
Sub 2
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
MSA-2S Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
Pipe Cover Boxes or Recess Boxes Optional
QTY
6
2
2
6
RinnaiWater Heater
Sub 1
RinnaiWater Heater
Primary
NOTE:
Pipe and fittings can be installed inside pipe cover box or recess box and packed with insulation for added protection.
RinnaiWater Heater
Sub 2
RinnaiWater Heater
Sub 1
RinnaiWater Heater
Primary
Pressure RegulatorSet to 5 PSI Below
Street Pressue
S3/4" MinimumNormally OpenSolenoid Valve
15
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Circulation Systems1 Rinnai Water Heater
Preferred Piping Installation
WH-1-R
September 30, 2002
Rinna i C o n t in u u m
Minimum3/4" Gas Supply
Minimum 3/4" Cold Water Supply Line
Minimum 3/4" Hot Water Supply Line
Building Outlets
(Optional)2-6 GallonStorage Tank(To eliminate cold watersandwich effect caused by frequent On/Off operation)
Pump to run continuously or to be Controlled by Aquastat
Pump to be sized for 3.0 gpm flow @ 12 feet head.Flow Balancing Valve to be adjusted to 3 GPM flow through water heater with no hot water taps open.
Supply and Return lines to be full 3/4" tubing throughout recirculation loop.
Note: Water heater outlet temperature cannot be adjusted when recirc. pump is running.
RinnaiEquipment List
RinnaiWater Heaters
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
QTY
1
1
RinnaiWater Heater
Expansion Tank
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
16
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Circulation Systems1 Rinnai Water Heater w/Electric Storage Tank
Preferred Piping Installation
WH-1-RE
September 30, 2002
Rin nai C ont inuum
Cold Water Supply Line
Gas Supply Line
2-5 GallonElectric Water
Heater120°F Building Flow
Building Return (Not required to be 3/4" Line)
Building Supply
Expansion TankPump to run continuously or to be Controlled by Timer.
Pump to be sized for Pressure Drop through Building Supply and Return Piping.
RinnaiEquipment List
RinnaiWater Heaters
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
QTY
1
1
RinnaiWater Heater
17
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Circulation Systems2 Rinnai Water Heaters
Preferred Piping Installation
WH-2-R
September 30, 2002
Rin nai C o nt inuum Rin nai C ont inuum
Gas Supply Line
Note: Water heater outlet temperature cannot be adjusted when recirc. pump is running.
RinnaiWater Heater
Primary
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
QTY
2
1
2
RinnaiWater Heater
Sub 1
Cold Water Supply Line
Hot Water Supply Line
Building Outlets
(Optional)2-10 GallonStorage Tank(To eliminate cold watersandwich effect caused by frequent On/Off operation)
Pump to run continuously or to be Controlled by Aquastat
Pump to be sized for 3.0 gpm f low @ 12 feet head.Flow Balancing Valve to be adjusted to 3 GPM flow through water heater with no hot water taps open.
Minimum 3/4" Return LineExpansion Tank
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
18
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Circulation Systems2 Rinnai Water Heaters w/Gas or Electric Tank
Preferred Piping Installation
WH-2-RGE
September 30, 2002
Ri nnai C ont inuum Ri nnai C ont inuum
Gas Supply Line
Note: Water heater outlet temperature cannot be adjusted when recirc. pump is running.
RinnaiWater Heater
Primary
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
QTY
2
1
2
RinnaiWater Heater
Sub 1
Cold Water Supply Line
2-30 GallonGas or Electric Water Heater
120°F Building Flow
Building Return (Not required to be 3/4" Line)
Building Supply
Expansion TankPump to run continuously or to be Controlled by Timer.
Pump to be sized for Pressure Drop through Building Supply and Return Piping.
19
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Circulation Systems3 Rinnai Water Heaters
Preferred Piping Installation
WH-3-R
September 30, 2002
R in na i C onti nuum R in na i C onti nuumR in na i C onti nuum
Gas Supply
Note: Water heater outlet temperature cannot be adjusted when recirc. pump is running.
RinnaiWater Heater
Primary
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
MSA-2S Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
QTY
3
1
1
3
RinnaiWater Heater
Sub 1
Cold Water Supply Line
Hot Water Supply Line
Building Outlets
(Optional)2-10 GallonStorage Tank(To eliminate cold watersandwich effect caused by frequent On/Off operation)
Pump to run continuously or to be Controlled by Aquastat
Pump to be sized for 3.0 gpm flow @ 12 feet head. Flow Balancing Valve to be adjusted to 3 GPM flow through water heater with no hot water taps open.
Minimum 3/4" Return LineExpansion Tank
RinnaiWater Heater
Sub 2
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
20
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Circulation Systems6 Rinnai Water Heaters
Preferred Piping Installation
WH-6-R
September 30, 2002
Rinnai C onti nuum Rinnai C onti nuumRinnai C onti nuum
Gas Supply
Rinnai C onti nuumRinnai C onti nuum
Cold Water Supply Line
Rinnai C onti nuum
Hot Water Supply
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
MSA-2S Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
QTY
6
2
2
6
RinnaiWaterHeater
Primary
RinnaiWaterHeater
Sub 1
RinnaiWaterHeater
Sub 2
RinnaiWaterHeater
Primary
RinnaiWaterHeater
Sub 1
RinnaiWaterHeater
Sub 2
Note: Water heater outlet temperature cannot be adjusted when recirc. pump is running.
Minimum 3/4" Hot Water Return Line
Building Outlets
(Optional)5-20 GallonStorage Tank(To eliminate cold watersandwich effect caused by frequent On/Off operation)
Pump to run continuously or to be Controlled by Aquastat
Pump to be sized for 3.0 gpm flow @ 12 feet head.Flow Balancing Valve to be adjusted to 3 GPM flow through water heater with no hot water taps open.
Expansion Tank
Pressure RegulatorSet to 5 PSI Below
Street Pressue
21
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Freeze Protection/Circulation1 Rinnai Water Heater
Preferred Piping Installation
WH-1-D-R
September 30, 2002
Rinna i C o n t in u u m
Minimum 3/4" Gas Supply
S
S 1/4" Minimum Normally Open Solenoid Valve
3/4" Minimum Normally Closed Solenoid Valve
Route to Floor Drain
Vacuum Breaker
NOTE:
ALL pipe and fittings shown below dashed line should be located inside home or building structure.
Vacuum breaker line should be located inside home or building structure.
NOTE:
Heat trace ALL water pipe and f ittings located outside home or building structure. (ALL water pipe and fittings shown above the dashed line in the drawing.)
NOTE:
Pipe and fitt ings can be installed inside pipeenclosure or recess box and packed withinsulation for added protection.
RinnaiWater Heater
RinnaiEquipment List
RinnaiWater Heaters
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
Pipe Cover Box or Recess Box Opt ional
QTY
1
1
Minimum 3/4" Hot Water Supply Line
Building Outlets
(Optional)2-6 GallonStorage Tank(To eliminate cold watersandwich effect caused by frequent On/Off operation)
Pump to run continuously or to be Controlled by Aquastat
Pump to be sized for 3.0 gpm flow @ 12 feet head.Flow Balancing Valve to be adjusted to 3 GPM flow through water heater with no hot water taps open.
Supply and Return lines to
recirculation loop.
Note: Water heater outlet temperature cannot be adjusted when recirc. pump is running.
Minimum 3/4" Cold Water Supply Line
Expansion Tank
IMPORTANT!
With electrical power supplied to a Rinnai water heater, it will not freeze in environments as cold as -30ºF, when protected from direct wind exposure.
In the event of a power failure at temperatures below freezing, the water heater should be drained of all water to prevent freezing damage.
The unit may be drained manually, or through the installation of the Optional solenoid valves as shown shown.
The electrical connections for the two solenoid valves should be tied to the 120V power terminals provided on the PCB of the water heater.
When the electrical power to the water heater fails, the 3/4" solenoid valve closes (stopping the flow of water into the heater) and the 1/2" solenoid valve opens (allowing the water heater and associated piping to drain. Insure that you run the drain for the solenoids to the outside environment to prevent discharging water inside the building, causing water damage.
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
22
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Freeze Protection/Circulation2 Rinnai Water Heaters
Preferred Piping Installation
WH-2-D-R
September 30, 2002
Rin nai C ont inuum Ri nn ai C ont inuum
Gas Supply Line
Cold Water Supply Line
Vacuum Breaker
NOTE:
ALL pipe and fittings shown below dashed line must be located inside home or building structure.
Vacuum breaker line also to be located inside home or building structure.
Heat trace ALL water pipe and f ittings located outside home or building structure. (ALL water pipe and fittings shown above the dashed line in the drawing.)
IMPORTANT!
With electrical power supplied to the Continuum 2424, it will not freeze in environments as cold as -30ºF, when protected from direct wind exposure.
In the event of a power failure at temperatures below freezing, the Continuum 2424 should be drained of all water to prevent freezing damage.
The unit may be drained manually, or through the installation of the Optional solenoid valve drain kit shown.
RinnaiWater Heater
Sub 1
RinnaiWater Heater
Primary
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
Pipe Cover Boxes or Recess Boxes Optional
QTY
2
1
2
NOTE:
Pipe and fitt ings can be installed inside pipeenclosure or recess box and packed withinsulation for added protection.
S 3/4" Minimum Normally Open Solenoid Valve
Route to Floor Drain
Hot Water Supply Line
Building Outlets
(Optional)2-10 GallonStorage Tank(To eliminate cold watersandwich effect caused by frequent On/Off operation) Pump to run continuously or
to be Controlled by Aquastat
Pump to be sized for 3.0 gpm flow @ 12 feet head. Flow Balancing Valve to be adjusted to 3 GPM flow through water heater with no hot water taps open.
Minimum 3/4" Return Line
Note: Water heater outlet temperature cannot be adjusted when recirc. pump is running.
Expansion Tank
Normally Closed Solenoid Valve
(Full size of Cold Water Supply Line)
S
23
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Freeze Protection/Circulation3 Rinnai Water Heaters
Preferred Piping Installation
WH-3-D-R
September 30, 2002
R inna i C onti nuum
Gas Supply
R inna i C onti nuumRinna i C onti nuum
NOTE:
ALL pipe and fittings shown below dashed line must be located inside heated space.
It is recommended that the vacuum breaker lines also to be located inside heated space. If they must be located outside, they must be heat traced and insulated.
NOTE:
Heat trace and insulate ALL water pipe and fittings located outside building or in unheated space.
3/4" Vacuum Breaker
RinnaiWater Heater
Sub 2
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
MSA-2S Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
Pipe Cover Boxes or Recess Boxes Optional
QTY
3
1
1
3
RinnaiWater Heater
Sub 1
RinnaiWater Heater
Primary
NOTE:
Pipe and fittings can be installed inside pipeenclosure or recess box and packed withinsulation for added protection.
S3/4" Minimum Normally Open Solenoid Valve
Route to Floor Drain
Hot Water Supply Line
Building Outlets
(Optional)2-30 GallonStorage Tank(To eliminate cold watersandwich effect caused by frequent On/Off operation)
Pump to run continuously or to be Controlled by Aquastat
Pump to be sized for 3.0 gpm flow @ 12 feet head. Flow Balancing Valve to be adjusted to 3 GPM flow through water heater with no hot water taps open.
Minimum 3/4" Return Line
Note: Water heater outlet temperature cannot be adjusted when recirc. pump is running.
Expansion TankNormally Closed Solenoid Valve
(Full size of Cold Water Supply Line)
Cold Water Supply LineS
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
24
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Freeze Protection/Circulation6 Rinnai Water Heaters
Preferred Piping Installation
WH-6-D-R
September 30, 2002
Rinnai C onti nuum Rinnai C onti nuumRinnai C onti nuum
Gas Supply
Rinnai C onti nuumRinnai C onti nuum
Cold Water Supply Line
Rinnai C onti nuum
NOTES:
ALL pipe and fittings shown below dashed line must be located inside heated space.
It is recommended that the vacuum breaker lines also to be located inside heated space. I f they must be located outside, they must be heat traced and insulated.
Heat trace and insulate ALL water pipe and fittings located outside building or in unheated space.
Water heater outlet temperature cannot be adjusted when recirc. pump is running.
3/4" Vacuum Breaker
RinnaiWater Heater
Sub 2
RinnaiEquipment List
RinnaiWater Heaters
MSA-2M Controls
MSA-2S Controls
BC-45 Controller(Included)
MC-45 and BSC-45 Controllers Optional
Pipe Cover Boxes or Recess Boxes Optional
QTY
6
2
2
6
RinnaiWater Heater
Sub 1
RinnaiWater Heater
Primary
NOTE:
Pipe and fittings can be installed inside pipe cover box or recess box and packed with insulation for added protection.
RinnaiWater Heater
Sub 2
RinnaiWater Heater
Sub 1
RinnaiWater Heater
Primary
Pressure RegulatorSet to 5 PSI Below
Street Pressue
S3/4" Minimum Normally Open Solenoid Valve
Route to Floor Drain
Hot Water Supply Line
Building Outlets
(Optional)2-30 GallonStorage Tank(To eliminate cold watersandwich effect caused by frequent On/Off operation) Pump to run continuously or
to be Controlled by Aquastat
Pump to be sized for 3.0 gpm flow @ 12 feet head. Flow Balancing Valve to be adjusted to 3 GPM flow through water heater with no hot water taps open.
Minimum 3/4" Return Line
Expansion TankNormally Closed
Solenoid Valve(Full size of Cold
Water Supply Line)
Cold Water Supply LineS
25
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Circulation w/Solar Preheat1 Rinnai Water Heater
Preferred Piping Installation
WH-1-SR
September 30, 2002
RinnaiEquipment List
RinnaiWater Heaters
BC-45 Controller(Included)
QTY
1
1
Gas Supply Mixing Valve Set to DeliverBuilding Hot Water @ 120 °F
R inna i C onti n uum
RinnaiWater Heater
Set @ 120°F
Solar Water Heater
Cold Water Supply Line
NOTE:
Installation of the Solar Water Heater, Storage Tank, and all interconnecting pipe and fittings must be installed per the solar water heater manufacturer and all local building codes.
Minimum 3/4" Cold Water Supply Line
Minimum 3/4" Hot Water Supply Line
Building Outlets
(Optional)2-6 GallonStorage Tank(To eliminate cold watersandwich effect caused by frequent On/Off operation)
Pump to run continuously or to be Controlled by Aquastat
Pump to be sized for 3.0 gpm f low @ 12 feet head.Flow Balancing Valve to be adjusted to 3 GPM flow through water heater with no hot water taps open.
Supply and Return lines to be full 3/4" tubing throughout recirculation loop.
Expansion Tank
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
26
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Backup Storage w/Solar Preheat1 Rinnai Water Heater
Preferred Piping Installation
WH-1-SB
September 30, 2002
RinnaiEquipment List
Rinnai Commercial Water Heaters
MCC-45 Controller(Included)
QTY
1
1
Gas Supply
Mixing Valve Set to DeliverBuilding Hot Water @ 120 °F
Rinna i C onti nuum
RinnaiWater Heater
Set @ 140°F
Storage Tank
(No Burner or Heating Element)
SubmersibleAquastat
(set @ 120 °F)
Pump sized for 5 gpm @ 24' head
Solar Water Heater
Cold Water Supply Line
NOTE:
Installation of the Solar Water Heater, Storage Tank, and all inter- connecting pipe and fittings must be installed per the solar water heater manufacturer and all local building codes.
Expansion Tank
27
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Backup Storage1 Rinnai Water Heater
Preferred Piping Installation
WH-1-B
September 30, 2002
RinnaiEquipment List
Rinnai Commercial Water Heaters
MCC-45 Controller(Inc.uded)
QTY
1
1
Gas Supply
Building Hot WaterSupply Line
Rinna i C onti nuum
RinnaiWater Heater
Set @ 140°F
Storage Tank
(No Burner or Heating Element)
SubmersibleAquastat
(set @ 120 °F)
Cold Water Supply Line
Pump sized for 5 gpm @ 24' head
Pump/Aquastat Control Wire
Expansion Tank
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
28
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Backup Storage/Circulation1 Rinnai Water Heater
Preferred Piping Installation
WH-1-B-R
September 30, 2002
RinnaiEquipment List
Rinnai Commercial Water Heaters
MCC-45 Controller(Inc.uded)
QTY
1
1
Gas Supply
Building Hot WaterSupply Line
R inna i C onti nuum
RinnaiWater Heater
Set @ 140°F
Storage Tank
(No Burner or Heating Element)
SubmersibleAquastat
(set @ 120 °F)
Cold Water Supply Line
Pump sized for 5 gpm @ 24' head
Building Hot WaterReturn Line
Secondary Pump
Pump/Aquastat Control Wire
Expansion Tank
29
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Backup Storage2 Rinnai Water Heaters
Preferred Piping Installation
WH-2-B
September 30, 2002
Gas Supply
Building Hot WaterSupply Line
R inna i C onti nuumR inna i C onti nuum
Cold Water Supply Line
Storage Tank
(No Burner or Heating Element)
Pump sized for 10 gpm @ 24' head
RinnaiEquipment List
Rinnai Commercial Water Heaters
MCC-45 Controller(Inc.uded)
QTY
2
2
RinnaiWater Heater
Set @ 140°F
RinnaiWater Heater
Set @ 140°F
Pump/Aquastat Control Wire
SubmersibleAquastat
(set @ 120 °F)
Expansion Tank
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
30
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Backup Storage/Circulation2 Rinnai Water Heaters
Preferred Piping Installation
WH-2-B-R
September 30, 2002
Gas Supply
Building Hot WaterSupply Line
Rinnai C onti nuumRinna i C onti nuum
Cold Water Supply Line
Storage Tank
(No Burner or Heating Element)
Pump sized for 10 gpm @ 24' head
RinnaiEquipment List
Rinnai Commercial Water Heaters
MCC-45 Controller(Inc.uded)
QTY
2
2
RinnaiWater Heater
Set @ 140°F
RinnaiWater Heater
Set @ 140°F
Pump/Aquastat Control Wire
SubmersibleAquastat
(set @ 120 °F)
Building Hot WaterReturn Line
Secondary Pump
Expansion Tank
31
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Backup Storage3 Rinnai Water Heaters
Preferred Piping Installation
WH-3-B
September 30, 2002
Rinna i C onti nuum
Gas Supply
Building Hot WaterSupply Line
Rinna i C onti nuumR inna i C onti nuum
Cold Water Supply Line
Storage Tank
(No Burner or Heating Element)
Pump sized for 21 gpm @ 35' head
RinnaiEquipment List
Rinnai Commercial Water Heaters
MCC-45 Controller(Inc.uded)
QTY
3
3
RinnaiWater Heater
Set @ 140°F
Pump/Aquastat Control Wire
SubmersibleAquastat
(set @ 120 °F)
RinnaiWater Heater
Set @ 140°F
RinnaiWater Heater
Set @ 140°F
Expansion Tank
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
32
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Backup Storage/Circulation3 Rinnai Water Heaters
Preferred Piping Installation
WH-3-B-R
September 30, 2002
Rinna i C onti nuum
Gas Supply
Building Hot WaterSupply Line
Rinna i C onti nuumRinna i C onti nuum
Cold Water Supply Line
Storage Tank
(No Burner or Heating Element)
Pump sized for 21 gpm @ 35' head
Building Hot WaterReturn Line
RinnaiEquipment List
Rinnai Commercial Water Heaters
MCC-45 Controller(Inc.uded)
QTY
3
3
RinnaiWater Heater
Set @ 140°F
Pump/Aquastat Control Wire
SubmersibleAquastat
(set @ 120 °F)
RinnaiWater Heater
Set @ 140°F
RinnaiWater Heater
Set @ 140°F
Expansion Tank
33
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Backup Storage6 Rinnai Water Heaters
Preferred Piping Installation
WH-6-B
September 30, 2002
Rinnai C onti nuum Rinnai C onti nuumRinnai C onti nuum
Gas Supply
Building Hot WaterSupply Line
Rinnai C onti nuumRinnai C onti nuum
Cold Water Supply Line
Rinnai C onti nuum
500 GallonStorage Tank
(No Burner or Heating Element)
Pump sized for 42 gpm @ 35' head
RinnaiEquipment List
Rinnai Commercial Water Heaters
MCC-45 Controller(Inc.uded)
QTY
6
6
RinnaiWater Heater
Set @ 140°F
Pump/Aquastat Control Wire
SubmersibleAquastat
(set @ 120 °F)
RinnaiWater Heater
Set @ 140°F
RinnaiWater Heater
Set @ 140°F
RinnaiWater Heater
Set @ 140°F
RinnaiWater Heater
Set @ 140°F
RinnaiWater Heater
Set @ 140°F
Expansion Tank
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
34
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Domestic Hot Water - Backup Storage/Circulation6 Rinnai Water Heaters
Preferred Piping Installation
WH-6-B-R
September 30, 2002
Rinnai C onti nuum Rinnai C onti nu umRinnai C o nti nuum
Gas Supply
Building Hot WaterSupply Line
Rinnai C onti nuumRinnai C onti nuum
Cold Water Supply Line
Rinnai C on ti nuum
500 GallonStorage Tank
(No Burner or Heating Element)
Pump sized for 42 gpm @ 35' head
RinnaiEquipment List
Rinnai Commercial Water Heaters
MCC-45 Controller(Inc.uded)
QTY
6
6
RinnaiWater Heater
Set @ 140°F
Pump/Aquastat Control Wire
SubmersibleAquastat
(set @ 120 °F)
RinnaiWater Heater
Set @ 140°F
RinnaiWater Heater
Set @ 140°F
RinnaiWater Heater
Set @ 140°F
RinnaiWater Heater
Set @ 140°F
RinnaiWater Heater
Set @ 140°FExpansion
Tank
Building Hot WaterReturn Line
Secondary Pump
Expansion Tank
35
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Space Heating - Zone Pumps1 Rinnai Water Heater
Preferred Piping Installation
SH-1-ZP
September 30, 2002
Gas Supply
Zone 1Space HeatingZones
TT
Zone 2T
Zone 3T
Zone 4T
R in n a i C onti nuum
NOTES:
Primary Pump sized for6 gpm @ 30' head.
Primary Pump to be Interlocked with Room T'Stats
Primary Pump
RinnaiWater Heater
RinnaiEquipment List
Rinnai CommercialWater Heaters
MCC-45 Controllers(Included)
QTY
1
1
PressureReducing Valve(As Required)
Expansion Tank
Cold Water Supply
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
36
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Space Heating - Zone Pumps2 Rinnai Water Heater
Preferred Piping Installation
SH-2-ZP
September 30, 2002
R in n a i C onti nuum
Gas Supply
Zone 1Space HeatingZones
TT
Zone 2T
Zone 3T
Zone 4T
P-2 P-3 P-4 P-5
R in n a i C onti nu um
NOTES:
Primary Pump sized for12 gpm @ 30' head.
Primary Pump to be Interlocked with Room T'Stats
Primary Pump
RinnaiWater Heater
RinnaiEquipment List
Rinnai CommercialWater Heaters
MCC-45 Controller(Included)
QTY
2
2
RinnaiWater Heater
PressureReducing Valve(As Required)
Expansion Tank
Cold Water Supply
37
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Space Heating - Zone Pumps3 Rinnai Water Heater
Preferred Piping Installation
SH-3-ZP
September 30, 2002
Rinna i C onti nuum Rinnai C onti nuumRinna i C onti nuum
Gas Supply
Zone 1
Zone 4
Zone 3
Zone 2
Space Heating
ZoneT
T
T
T
Bypass Line
Primary Pump
NOTES:
Primary Pump sized for18 gpm @ 30' head.
Primary Pump to be Interlocked with Room T'Stats
RinnaiWater Heater
RinnaiEquipment List
Rinnai CommercialWater Heaters
MCC-45 Controller(Included)
QTY
3
3
RinnaiWater Heater
RinnaiWater Heater
PressureReducing Valve(As Required)
Expansion Tank
Cold Water Supply
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
38
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Space Heating - Air Handlers1 Rinnai Water Heater
Preferred Piping Installation
SH-1-AH
September 30, 2002
R in n a i C onti nuum
Gas Supply
Bypass Line
AirHandler
T
NOTES:
Primary Pump sized for6 gpm @ 30' head.
Primary Pump to be Interlocked with Room T'Stats
RinnaiEquipment List
Rinnai CommercialWater Heaters
MCC-45 Controller(Included)
QTY
1
1
RinnaiWater Heater
Primary Pump
AirHandler
T
Expansion Tank
Cold Water Supply
39
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Space Heating - Zone Valves1 Rinnai Water Heater
Preferred Piping Installation
SH-1-ZV
September 30, 2002
R in n a i C onti n uum
Gas Supply
S
S
S
S
Zone 1
Zone 4
Zone 3
Zone 2
Space Heating
Zone
T
T
T
T
Pressure Bypass Valve
NOTES:
Primary Pump sized for6 gpm @ 30' head + Head Loss through Heating Zones.
Primary Pump to be Interlocked with Room T'Stats
RinnaiEquipment List
Rinnai CommercialWater Heaters
MCC-45 Controller(Included)
QTY
1
1
RinnaiWater Heater
PressureReducing Valve(As Required)
Expansion Tank
Cold Water Supply
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
40
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Space Heating - Floor Radiant Heating1 Rinnai Water Heater
Preferred Piping Installation
SH-1-RH-ZP-MV
September 30, 2002
R in n a i C onti nuum
Gas Supply
Zone 1
Space HeatingZones
T
Zone 2T
M
NOTES:
Primary Pump sized for6 gpm @ 30' head.
Primary Pump to be Interlocked with Room T'Stats
RinnaiEquipment List
Rinnai CommercialWater Heaters
MCC-45 Controller(Included)
QTY
1
1
RinnaiWater Heater
Primary Pump
PressureReducing Valve(As Required)
Expansion Tank
Cold Water Supply
41
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Space Heating - Floor Radiant Heating w/Buffer Tank1 Rinnai Water Heater
Preferred Piping Installation
SH-1-BT-RH-ZP-MV
September 30, 2002
R in n a i C onti nuum
Gas Supply
Zone 1
Space HeatingZones
T
Zone 2T
M
Primary Pump Controlled by Aquastat
Water Heateror
StorageBuffer Tank
(No Burner or Heating Element)
SubmersibleAquastat
(set @ 120 °F)
Pump/AquastatControl Wiring
RinnaiWater Heater
@ 140°F
RinnaiEquipment List
Rinnai CommercialWater Heaters
MCC-45 Controller(Included)
QTY
1
1
NOTES:
Primary Pump sized for5 gpm @ 24' head.
Primary Pump to be Interlocked with Storage Tank Aquastat.
PressureReducing Valve(As Required)
Expansion Tank
Cold Water Supply
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
42
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
R in n a i C onti nuum
Gas Supply
AirHandler
T
AirHandler
T
Indirect Water Heater
Dom
estic
Hot
Wat
er S
uppl
y
Dom
estic
Col
dW
ater
Sup
ply
Primary Pump
NOTES:
Primary Pump sized for6 gpm @ 30' head.
Primary Pump to be Interlocked with Room T'Stats and Indirectwater heater pump.
RinnaiEquipment List
Rinnai CommercialWater Heaters
MCC-45 Controller(Included)
QTY
1
1
RinnaiWater Heater
Expansion Tank
Cold Water Supply
Combination Systems - Air Handlers/Indirect Hot Water1 Rinnai Water Heater
Preferred Piping Installation
CH-1-AH-IWH
September 30, 2002
43
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
R in n a i C onti n uum
Gas Supply
R in n a i C onti n uum
AirHandler
T
AirHandler
T
Indirect Water Heater
Dom
estic
Hot
Wat
er S
uppl
y
Dom
estic
Col
dW
ater
Sup
ply
Primary Pump
NOTES:
Primary Pump sized for12 gpm @ 30' head.
Primary Pump to be Interlocked with Room T'Stats and Indirectwater heater pump.
RinnaiEquipment List
Rinnai CommercialWater Heaters
MCC-45 Controller(Included)
QTY
2
2
RinnaiWater Heater
RinnaiWater Heater
Expansion Tank
Cold Water Supply
Combination Systems - Air Handlers/Indirect Hot Water2 Rinnai Water Heaters
Preferred Piping Installation
CH-2-AH-IWH
September 30, 2002
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
44
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
R in n a i C o nti nuum
Gas Supply
R in n a i C on ti nuum
AirHandler
T
AirHandler
T
Indirect Water Heater
Dom
estic
Hot
Wat
er S
uppl
y
Dom
estic
Col
dW
ater
Sup
ply
Primary Pump
NOTES:
Primary Pump sized for18 gpm @ 30' head.
Primary Pump to be Interlocked with Room T'Stats and Indirectwater heater pump.
RinnaiEquipment List
Rinnai CommercialWater Heaters
MCC-45 Controller(Included)
QTY
3
3
RinnaiWater Heater
RinnaiWater Heater
RinnaiWater Heater
R in n a i C o nti nuum
Expansion Tank
Cold Water Supply
Combination Systems - Air Handlers/Indirect Hot Water3 Rinnai Water Heater
Preferred Piping Installation
CH-3-AH-IWH
September 30, 2002
45
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
R in n a i C onti nuum
Gas Supply
AirHandler
T
Building HotWater Supply Outlets
NOTES:
Primary Pump sized for6 gpm @ 30' head + Head Loss through Air Handler and Piping System.
Primary Pump to be Interlocked with Room T'Stats
RinnaiEquipment List
Rinnai CommercialWater Heaters
MCC-45 Controller(Included)
QTY
1
1
RinnaiWater Heater
Expansion Tank
Cold Water Supply
Primary Pump
Combination Systems - Air Handlers/Direct Hot Water1 Rinnai Water Heater
Preferred Piping Installation
CH-1-AH-DHW
September 30, 2002
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
46
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
R in n a i C onti nu um
Gas Supply
Zone 1
Space HeatingZones
T
Zone 2T
M
Indirect Water Heater
Dom
estic
Hot
Wat
er S
uppl
y
Dom
estic
Col
dW
ater
Sup
ply
Primary Pump
NOTES:
Primary Pump sized for6 gpm @ 30' head.
Primary Pump to be Interlocked with Room T'Stats and Indirect Water Heater Pump.
RinnaiEquipment List
Rinnai CommercialWater Heaters
MCC-45 Controller(Included)
QTY
1
1
RinnaiWater Heater
PressureReducing Valve(As Required)
Expansion Tank
Cold Water Supply
Combination Systems - Radiant Heat/Indirect Hot Water1 Rinnai Water Heater
Preferred Piping Installation
CH-1-ZP-MV-IWH
September 30, 2002
47
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
R in n a i C onti n uum
Gas Supply
Zone 1
Space HeatingZones
T
Zone 2T
PressureReducing
Valve(As required) M
Building HotWater Supply Outlets
Primary Pump
NOTES:
Primary Pump sized for6 gpm @ 30' head.
Primary Pump to run continuously.
RinnaiEquipment List
Rinnai CommercialWater Heaters
MCC-45 Controller(Included)
QTY
1
1
RinnaiWater Heater
Expansion Tank
Cold Water Supply
Combination Systems - Radiant Heat/Direct Hot Water1 Rinnai Water Heater
Preferred Piping Installation
CH-1-ZP-MV-DWH
September 30, 2002
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
48
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
R in n a i C onti nuum
Gas Supply
Water to Water Heat Exchanger
T
Primary Pump
Domestic Hot Water Taps
RadiantHeating
NOTES:
Primary Pump sized for6 gpm @ 30' head + Head Loss through Heat Exchanger.
Primary Pump to run continuously.
RinnaiEquipment List
Rinnai CommercialWater Heaters
MCC-45 Controller(Included)
QTY
1
1
RinnaiWater Heater
Expansion Tank
Cold Water Supply
Combination Systems - Heat Exchanger/Direct Hot Water1 Rinnai Water Heater
Preferred Piping Installation
CH-1-DWH-HX
September 30, 2002
49
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Gas Supply
Storage Tank
(No Burner or Heating Element)
Rinna i C onti nuum
Pump sized for 5 gpm @ 24' head
Zone 1
Space HeatingZones
T
Zone 2T
M
Building HotWater Supply Outlets
BackflowPreventers
Pump sized for system head losses.
Pump/Aquastat Control Wire
SubmersibleAquastat
(set @ 120 °F)
RinnaiEquipment List
Rinnai Commercial Water Heaters
MCC-45 Controller(Inc.uded)
QTY
1
1
RinnaiWater Heater
Set @ 140°F
Expansion Tank
Cold Water Supply
Combination Systems - Buffer Tank/Direct Hot Water1 Rinnai Water Heater
Preferred Piping Installation
CH-1-B-DWH
September 30, 2002
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
50
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Maintenance - Scale Flush Procedure1 Rinnai Water Heaters
Preferred Piping Installation
M-1-F
September 30, 2002
Rinna i C o n t in u u m
Gas Supply
RINNAI Water Heater Flush Procedure
1. Disconnect power to Rinnai water heater.2. Close valves V3 and V4.3. Connect pump outlet hose H1 to service valve V2.4. Connect drain hose H3 to valve V1.5. Pour approximately 4 gallons of virgin, food grade, white vinegar (or virgin, food grade, citric acid) into pail.6. Place free ends of hose H2 and H3 into pail.7. Open valves V1 and V2.8. Turn on power to circulating pump and allow solution to circulate through water heater for 45 minutes.9. Turn off power to circulating pump.10. Remove free end of hose H3 from pail.11. Close valve V2 and open valve V4, only. Do NOT open valve V3 at this time.12. Allow water to flow out of hose H3 for 5 minutes, rinsing cleaning solution from water heater.13. Close valve V1 and open valve V3.14. Disconnect hoses H1 and H3 from service valves.15. Remove in-line filter from water heater cold water inlet and clean out any residue. Place filter back into unit.16. Restore power to water heater.
V1
V3
V2
V4
H1
H2
H3
Circulating Pump
5 gallon pail of virgin, food grade, white vinegar (or virgin, food grade, citric acid).
Cold Water LineHot Water Line
In-lineFilter
51
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Rinnai Venting MaterialsIndoor Water Heaters
Vent Parts and Dimensions
V-PTS
September 30, 2002
Standard Vent Discharge Kit(Order Part No: STD-KIT)
Wall Discharge Terminal (35" Length)Part No: 50223098B
Horizontal Discharge AdapterPart No: 50710327
Vertical Discharge AdapterPart No: 224064
Note: Required where vent height is greater than 5 feet vertical.
Roof Flashing AssemblyFlat Roof
Part No: 1461411/12 to 6/12 Pitch (5-25 deg)
Part No: 501719486/12 to 12/12 Pitch (25-45 deg)
Part No: 501719608/12 to 16/12 Pitch (35-55 deg)
Part No: 50171953
Miscellaneous Parts
Condensate CollectorPart No: 224069
Roof Discharge TerminalPart No: 184118
39" Vent Pipe ExtensionPart No: 224053
19.5" Vent Pipe ExtensionPart No: 224052
10" Vent Pipe ExtensionPart No: 224051
90 Degree Vent Pipe ElbowPart No: 224063
45 Degree Vent Pipe Elbow (Quantity of 2)
Part No: 224050
Vent Pipe ClampPart No: 169044
2'-6"
9 1/8"4
7/8"
4 7/
8"
4 7/
8"
19 1/8" 38 3/4"
5 3/16"
5 3/16"
5 3/16"
18"
26"
6"
7"
6 1/
2"
3"
25"6" 4"
7 3/4"
8"
9 3/4"
8 1/8"
3/4" dia.
Note: When installed, each connecting vent pipe joint will have 1 1/4" of overlap.
Rubber Wall Plate (Qty in STD-KIT)Part No: 710342
7"
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
52
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Rinnai VentingIndoor Water Heaters
Standard Vent Kit
V-STD
September 30, 2002
Notes: 1. Install 1 pipe clamp adjacent to each joint in the venting system.
2. Total "Equivalent Length" of vent system is limited to 41' Equivalent Length, where a 90 deg elbow is equivalent to 6' of vent pipe and a 45 deg elbow is equivalent to 1.5' of vent pipe.
3. Regardless of the calculated "Equivalent Length" of vent system, the Maximum Height from the top of the water heater to the top of the highest point in the vent system is limited to 21 feet.
Horizontal Discharge Adapter
Wall Discharge Terminal(Cut to Length)
Horizontal Discharge Adapter
Wall Discharge Terminal(Cut to Length)
53
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Rinnai VentingIndoor Water Heaters
Horizontal Venting - Vent Heights under 5 feet
V-H-L5
September 30, 2002
Vertical Discharge Adapter
Wall Discharge Terminal(Cut to Length)
3'-2 1/2"Max. Height of 5' without Condensate Collector Installed.
(As Shown)
90 Deg Elbow
Vent Extension
Vent Extensions
Notes: 1. Install 1 pipe clamp adjacent to each joint in the venting system.
2. Total "Equivalent Length" of vent system is limited to 41' Equivalent Length, where a 90 deg elbow is equivalent to 6' of vent pipe and a 45 deg elbow is equivalent to 1.5' of vent pipe.
3. Regardless of the calculated "Equivalent Length" of vent system, the Maximum Height from the top of the water heater to the top of the highest point in the vent system is limited to 21 feet.
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
54
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Rinnai VentingIndoor Water Heaters
Horizontal Venting - Vent Heights 5 feet to 21 feet
V-H-G5
September 30, 2002
Vertical Discharge Adapter
Notes: 1. Install 1 pipe clamp adjacent to each joint in the venting system.
2. Total "Equivalent Length" of vent system is limited to 41' Equivalent Length, where a 90 deg elbow is equivalent to 6' of vent pipe and a 45 deg elbow is equivalent to 1.5' of vent pipe.
3. Regardless of the calculated "Equivalent Length" of vent system, the Maximum Height from the top of the water heater to the top of the highest point in the vent system is limited to 21 feet.
Wall Discharge Terminal(Cut to Length)
4'-0"
90 Deg Elbow
Vent Extensions
Vent Extensions
Condensate Collector
3/4" CPVC Drain Line (Provided by others)
Maximum Height = 21' For Vent Heights Greater Than 5', but less than 21' the Condensate Collector
Must Be Installed.
55
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Rinnai VentingIndoor Water Heaters
Vertical Venting - Vent Heights under 5 feet
V-V-L5
September 30, 2002
3'-10 1/2"MAXIMUM 5'
(Without Condensate Collector Installed)
Horizontal Discharge Adapter
Vent Extension
90 Deg Elbow
Roof Terminal Assembly
Roof Flashing Assembly
Roof Terminal Assembly
Roof Flashing Assembly
Vertical Discharge Adapter
3'-3"MAXIMUM 5' (Without Condensate Collector Installed)
Notes: 1. Install 1 pipe clamp adjacent to each joint in the venting system.
2. Total "Equivalent Length" of vent system is limited to 41' Equivalent Length, where a 90 deg elbow is equivalent to 6' of vent pipe and a 45 deg elbow is equivalent to 1.5' of vent pipe.
3. Regardless of the calculated "Equivalent Length" of vent system, the Maximum Height from the top of the water heater to the top of the highest point in the vent system is limited to 21 feet.
Drawing Number:
Drawing Date:
RINNAI 2532 SERIES WATER HEATERSThis drawing is intended only as a guide and not as a replacement for professionally engineered project drawings. It does not imply compliance with local building codes. Installation may vary, depending on installation location, and must be done in accordance with all local building codes. Confer with local building officials before installation.
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
Key
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
56
103 International DrivePeachtree City, GA 30269
ANSI Z21.10.3CSA 4.3
Rinnai VentingIndoor Water Heaters
Vertical Venting - Vent Heights 5 feet to 21 feet
V-V-G5
September 30, 2002
Notes: 1. Install 1 pipe clamp adjacent to each joint in the venting system.
2. Total "Equivalent Length" of vent system is limited to 41' Equivalent Length, where a 90 deg elbow is equivalent to 6' of vent pipe and a 45 deg elbow is equivalent to 1.5' of vent pipe.
3. Regardless of the calculated "Equivalent Length" of vent system, the Maximum Height from the top of the water heater to the top of the highest point in the vent system is limited to 21 feet.
5'-1 3/4"
Maximum Height = 21' For Vent Heights Greater Than 5', but less than 21' the Condensate Collector
Must Be Installed. Vent Extension
Condensate Collector
Roof Terminal Assembly
Roof Flashing Assembly
3/4" CPVC Drain Line (Provided by others)
Vent Extension
Vent Extension
Vent Extension
90 Deg Elbow90 Deg Elbow
90 Deg Elbow
Roof Terminal Assembly
Condensate CollectorMust Be Installed within 5'
of Continuum 2402
Roof Flashing Assembly
90 Deg Elbow
Condensate Collector
Vertical Discharge Adapter
3/4" CPVC Drain Line (Provided by others)
Vertical Discharge Adapter
5'-1 1/2"
Maximum Height = 21' For Vent Heights Greater Than 5', but less than 21' the Condensate Collector
Must Be Installed.
57
Notes: 1.multiple plumbing systems using combinations of bathrooms and fixtures found in the chart below. Otherwise,
2.capacity, use the Rinnai "Residential/Commercial Sizing Charts".
3.
1 - 1.5 Bath 2 - 2.5 bath 3 - 3.5 Bath 4 - 4.5 Bath 5 - 5.5 Bath 6 - 6.5 Bath1 Rinnai WH 1 Rinnai WH 1 Rinnai WH 2 Rinnai WHs 2 Rinnai WHs 2 Rinnai WHs
1 - 1.5 Bath 2 - 2.5 bath 3 - 3.5 Bath 4 - 4.5 Bath 5 - 5.5 Bath 6 - 6.5 Bath1 Rinnai WHs 1 or 2 Rinnai WHs 1 or 2 Rinnai WHs 2 or 3 Rinnai WHs 2 or 3 Rinnai WHs 2 or 3 Rinnai WHs
1 - 1.5 Bath 2 - 2.5 bath 3 - 3.5 Bath 4 - 4.5 Bath 5 - 5.5 Bath 6 - 6.5 Bath2 Rinnai WHs 2 or 3 Rinnai WHs 2 or 3 Rinnai WHs 3 or 4 Rinnai WHs 3 or 4 Rinnai WHs 3 or 4 Rinnai WHs
2. Determine if any baths have multi-head shower/body spray systems or large tubs (garden, jetted, etc. above 60 gallons).3. Determine if the multi-head shower/body spray system has 1/2" shower valves or 3/4" shower valves.4. Use the appropriate section of the table below to determine the number of Rinnai Water Heaters Required.
120+ gallon tub (garden, jetted, etc.). All other baths having 1 tub/shower combo with 1/2" shower valve and 2.5 gpm shower.
B. High End Residential Applications – Master bath having multi-head shower/body spray system with 1/2" shower valve and/or
Residential Quick Sizing Chart Rinnai Residential Water Heaters
(Applications without Storage Tanks)
A. Standard Residential Applications – Each bath having 1 tub*/shower combo with 1/2" shower valve and 2.5 gpm shower. * tub sizes (garden, jetted, etc.) up to 60 gallon size.
For very large homes, including those with 7 or more bathrooms, plumbing systems may be separated into
use the Rinnai "Residential/Commercial Sizing Charts".
40°F, the Rinnai Water Heater outlet flow rate may vary.The sizing chart below is based upon a 40°F groundwater temperature. For ground water temperatures below
For homes with more than 1 multi-head shower/body spray systems, or multiple tubs greater than 60 gallon
Residential Quick Sizing Instructions1. Determine the Number of Bathrooms in Home.
60 to 120 gallon tub (garden, jetted, etc.). All other baths having 1 tub/shower combo with 1/2" shower valve and 2.5 gpm shower.
C. Custom Residential Applications – Master bath having multi-head shower/body spray system with 3/4" shower valve and/or
Notes: 1.
2.
3.
4.
5.
6. If you are designing a system with space heating, move over to the 2nd Hour Rating column and find the Rating equal to or greater than the Total Hourly Hot Water Demand calculated in step 1. Now move to the column on the far left of the chart to find the number of Rinnai Water Heaters that will be required with your storage tank OR move to the column on the far right of
the chart to find the number of Rinnai Water Heaters that will be required for your application without using a storage tank.
2. Multiply the Total Hourly Hot Water Demand by 0.2 to determine the amount of storage capacity required.
4. Using the Hourly Demand – System Selection Chart, go to the "Storage Tank Capacity" Column and go down in the
5. If you are designing a system without space heating, move over to the 1st Hour Rating column and find the Rating equal to or (Note: DO NOT select a storage tank with a capacity smaller than the storage capacity calculated.)
the chart to find the number of Rinnai Water Heaters that will be required for your application without using a storage tank.
column until you find the section having a storage capacity equal to or greater than the storage capacity calculated in step 2.
3. Select the correct "Hourly Demand – System Selection Chart" for the Rinnai Water Heater and ground water temperature.
When using Rinnai Water Heaters for residential systems having a space heating load, you MUST use Rinnai
1. Determine the Total Hourly Hot Water Demand using the 1st Hour Hot Water Demand Chart (add space heating hourly demandResidential/Commercial Sizing Instructions
Residential/Commercial Sizing Charts Rinnai Residential and Commercial Water Heaters
(Applications with or without Storage Tanks)
"Commercial" water heaters (i.e. 2532W-C, 2532FFU-C, etc.
The Hot Water Demand Chart that follows is based upon data obtained from the 1999 ASHRAE Applications Handbook, building codes, and water heater manufacturers.
For Restaurant applications having a commercial dishwasher, a hot water circulating loop feeding the
load if applicable – to calculate space heating hourly demand, use the hourly demand values found at the bottom of the chart.)
circulating loop having a minimum circulating flow of 3 gpm.Rinnai water heaters cannot be used in applications requiring 180-195°F water at a DISHWASHER or OTHER EQUIPMENT, unless a booster heater capable of producing 180-195°F water is provided at the
heater in these applications.
greater than the Total Hourly Hot Water Demand calculated in step 1. Now move to the column on the far left of the chart to find the number of Rinnai Water Heaters that will be required with your storage tank OR move to the column on the far right of
When sizing commercial applications without storage, piping systems should be designed with a hot water
commercial dishwasher must be installed.
DISHWASHER or OTHER EQUIPMENT – The Rinnai water heaters are NOT to be used as a booster water
58
Residential – 1 to 1.5 Bathroom Home (Add demand for any specialty fixtures)
– 3 to 3.5 Bathroom Home (Add demand for any specialty fixtures)– 4 to 4.5 Bathroom Home (Add demand for any specialty fixtures)– 5 to 5.5 Bathroom Home (Add demand for any specialty fixtures)– 6 to 6.5 Bathroom Home (Add demand for any specialty fixtures)– Additional Bathrooms (for homes with seven or more bathrooms)
Residential Specialty Fixtures– Tubs (Garden, Jetted, etc.) Capacities over 60 gallons– Shower/Body Spray System with 1/2" Shower Valve– Shower/Body Spray System with 3/4" Shower Valve (126 gallons per hour) X (Number of Shower/Body Spray Systems)
– Business/Convention Center
– Assisted Care Facilities (9.2 gallons per hour) X (Number of Beds)
– Whirlpool Tubs, etc.
Space Heating Applications (for All Building Occupancies)– Total Space Heating Load for 10°F ∆T Hydronic Systems (0.005 gallons per hour) X (Btuh of Space Heating Load)– Total Space Heating Load for 20°F ∆T Hydronic Systems (0.0025 gallons per hour) X (Btuh of Space Heating Load)– Total Space Heating Load for 30°F ∆T Hydronic Systems (0.00167 gallons per hour) X (Btuh of Space Heating Load)
– Three Bedroom (4/5 Persons) (29.1 gallons per hour) X (Number of Rooms)
Apartment Buildings
1st Hour Hot Water Demand ChartResidential/Commercial Sizing
Rinnai Residential and Commercial Water Heaters
– One Bedroom (2 Persons) (13.2 gallons per hour) X (Number of Rooms)
Restaurants
(40 gallons per hour) X (Number of fixtures)
(8 gallons per hour) X (Number of fixtures)
Laundries
– Lavatory
– Wash Basin (30 gallons per hour) X (Number of fixtures)
(35 gallons per hour) X (Number of fixtures)
Building Occupancy Hot Water Demand (Gallons per Hour)
60 gallons per hour– 2 to 2.5 Bathroom Home (Add demand for any specialty fixtures) 72 gallons per hour
– Two Bedroom (3 Persons) (19.8 gallons per hour) X (Number of Rooms)
90 gallons per hour
(0.8 gallons per hour) X (gallons of tub capacity)(74 gallons per hour) X (Number of Shower/Body Spray Systems)
152 gallons per hour172 gallons per hour192 gallons per hour(20 gallons per hour) X (Number of additional bathrooms)
(0.8 gallons per hour) X (gallons of tub capacity)
Hotel/Motel
(45 gallons per hour) X (Number of fixtures)
Hospitals, Health Clubs, Schools, Correctional Facilities
– Arm or Sitz Bath– Leg Bath (100 gallons per hour) X (Number of fixtures)– Hydrotherapeutic Shower (400 gallons per hour) X (Number of fixtures)
– Penthouse with 2 Suites and Spa (39.6 gallons per hour) X (Number of Rooms)
– Shower (30 gallons per hour) X (Number of fixtures)
(19.8 gallons per hour) X (Number of Rooms)
– 3 Star Accommodation
– Retirement Community – One Bedroom Units – Retirement Community – Two Bedroom Units
(13.2 gallons per hour) X (Number of Rooms)
– Triple Pot Sink (90 gallons per hour) X (Number of fixtures)– Double Pot Sink (60 gallons per hour) X (Number of fixtures)
– Kitchen or Service Sink
(416 gallons per hour) X (Number of fixtures)
– 4 & 5 Star Vacation/Resort Accommodation (18 gallons per hour) X (Number of Rooms)
– Bar Sink (30 gallons per hour) X (Number of fixtures)
– Prewash (closed type) (240 gallons per hour) X (Number of fixtures)– Recirculating prewash
(3.0 gallons per hour) X (Total Pounds Capacity of all washers)– Commercial/Industrial (Must know Machine Poundage)
– Lavatories (each) (5 gallons per hour) X (Number of fixtures)
– Coin Operated (with residential and commercial machines) (18.5 gallons per hour) X (Number of washers)
(32 gallons per hour) X (Number of Rooms)
– Vegetable Sink
(12 gallons per hour) X (Number of Rooms)Nursing Homes, Convalescence Homes, etc.
– Commercial Dishwasher (Door Type) (104 gallons per hour) X (Number of fixtures)IMPORTANT: See Notes 4 and 5 in the Sizing Instructions!
(20 gallons per hour) X (Number of fixtures)
– Automatic Drive Thru Bay (up to 25 gpm system) (600 gallons per hour) X (Number of Bays)
(0.00125 gallons per hour) X (Btuh of Space Heating Load)– Total Space Heating Load for 40°F ∆T Hydronic Systems
Car Wash – Self Service Wash Bay (up to 4 gpm wand) (40 gallons per hour) X (Number of Bays)
– Commercial Dishwasher (Conveyer Type)
(180 gallons per hour) X (Number of fixtures)– Prewash (hand-operated) (45 gallons per hour) X (Number of fixtures)– Prescrapper (open type)
– Single Pot Sink (30 gallons per hour) X (Number of fixtures)
59
Number of Rinnai Water Heaters
(with Storage Tank)
Max. Gas Consumption(1000 Btuh)
Storage Tank Capacity(gallons)
1st Hour Rating (gph)(for Sizing Systems without Space Heat)
2nd Hour Rating (gph)(for Sizing Systems with Space Heat)
Approx. Recovery Time (min.)
Number of Rinnai Water Heaters(w/out Storage)
1 180 20 188 174 7 1
1 180 30 195 174 10 12 360 30 369 348 5 2
1 180 40 202 174 14 22 360 40 376 348 7 3
1 180 50 209 174 17 22 360 50 383 348 9 33 540 50 557 522 6 4
1 180 80 230 174 28 32 360 80 404 348 14 43 540 80 578 522 9 5
1 180 120 258 174 41 32 360 120 432 348 21 43 540 120 606 522 14 54 720 120 780 696 10 6
1 180 160 286 174 55 42 360 160 460 348 28 53 540 160 634 522 18 64 720 160 808 696 14 75 900 160 982 870 11 86 1080 160 1156 1044 9 9
1 180 240 342 174 83 52 360 240 516 348 41 63 540 240 690 522 28 74 720 240 864 696 21 85 900 240 1038 870 17 96 1080 240 1212 1044 14 107 1260 240 1386 1218 12 118 1440 240 1560 1392 10 129 1620 240 1734 1566 9 13
1 180 320 398 174 110 72 360 320 572 348 55 83 540 320 746 522 37 94 720 320 920 696 28 105 900 320 1094 870 22 116 1080 320 1268 1044 18 128 1440 320 1616 1392 14 149 1620 320 1790 1566 12 1510 1800 320 1964 1740 11 1612 2160 320 2312 2088 9 18
1 180 360 426 174 124 72 360 360 600 348 62 83 540 360 774 522 41 94 720 360 948 696 31 105 900 360 1122 870 25 116 1080 360 1296 1044 21 128 1440 360 1644 1392 16 149 1620 360 1818 1566 14 1510 1800 360 1992 1740 12 1612 2160 360 2340 2088 10 1815 2700 360 2862 2610 8 21
1 180 400 454 174 138 82 360 400 628 348 69 93 540 400 802 522 46 104 720 400 976 696 34 115 900 400 1150 870 28 126 1080 400 1324 1044 23 138 1440 400 1672 1392 17 159 1620 400 1846 1566 15 1610 1800 400 2020 1740 14 1712 2160 400 2368 2088 11 1915 2700 400 2890 2610 9 22
1 180 480 510 174 166 92 360 480 684 348 83 103 540 480 858 522 55 114 720 480 1032 696 41 125 900 480 1206 870 33 136 1080 480 1380 1044 28 148 1440 480 1728 1392 21 169 1620 480 1902 1566 18 1710 1800 480 2076 1740 17 1812 2160 480 2424 2088 14 2015 2700 480 2946 2610 11 2318 3240 480 3468 3132 9 26
( at 40 °F Ground Water Temperature and 140°F Supply Water Temperature)2532FFU Series Water Heaters
Hourly Demand – System Selection Chart
60
Number of Rinnai Water Heaters
(with Storage Tank)
Max. Gas Consumption(1000 Btuh)
Storage Tank Capacity(gallons)
1st Hour Rating (gph)(for Sizing Systems without Space Heat)
2nd Hour Rating (gph)(for Sizing Systems with Space Heat)
Approx. Recovery Time (min.)
Number of Rinnai Water Heaters(w/out Storage)
3 540 500 872 522 57 124 720 500 1046 696 43 135 900 500 1220 870 34 146 1080 500 1394 1044 29 158 1440 500 1742 1392 22 179 1620 500 1916 1566 19 1810 1800 500 2090 1740 17 1912 2160 500 2438 2088 14 2115 2700 500 2960 2610 11 2418 3240 500 3482 3132 10 27
3 540 600 942 522 69 134 720 600 1116 696 52 145 900 600 1290 870 41 156 1080 600 1464 1044 34 168 1440 600 1812 1392 26 189 1620 600 1986 1566 23 1910 1800 600 2160 1740 21 2012 2160 600 2508 2088 17 2215 2700 600 3030 2610 14 2518 3240 600 3552 3132 11 2820 3600 600 3900 3480 10 3024 4320 600 4596 4176 9 34
3 540 700 1012 522 80 154 720 700 1186 696 60 165 900 700 1360 870 48 176 1080 700 1534 1044 40 188 1440 700 1882 1392 30 209 1620 700 2056 1566 27 2110 1800 700 2230 1740 24 2212 2160 700 2578 2088 20 2415 2700 700 3100 2610 16 2718 3240 700 3622 3132 13 3020 3600 700 3970 3480 12 3224 4320 700 4666 4176 10 3625 4500 700 4840 4350 10 37
3 540 800 1082 522 92 174 720 800 1256 696 69 185 900 800 1430 870 55 196 1080 800 1604 1044 46 208 1440 800 1952 1392 34 229 1620 800 2126 1566 31 2310 1800 800 2300 1740 28 2412 2160 800 2648 2088 23 2615 2700 800 3170 2610 18 2918 3240 800 3692 3132 15 3220 3600 800 4040 3480 14 3424 4320 800 4736 4176 11 3825 4500 800 4910 4350 11 3928 5040 800 5432 4872 10 42
3 540 1000 1222 522 115 204 720 1000 1396 696 86 215 900 1000 1570 870 69 226 1080 1000 1744 1044 57 238 1440 1000 2092 1392 43 259 1620 1000 2266 1566 38 2610 1800 1000 2440 1740 34 2712 2160 1000 2788 2088 29 2915 2700 1000 3310 2610 23 3218 3240 1000 3832 3132 19 3520 3600 1000 4180 3480 17 3724 4320 1000 4876 4176 14 4125 4500 1000 5050 4350 14 4228 5040 1000 5572 4872 12 4530 5400 1000 5920 5220 11 4732 5760 1000 6268 5568 11 4935 6300 1000 6790 6090 10 52
Hourly Demand – System Selection Chart2532FFU Series Water Heaters
( at 40 °F Ground Water Temperature and 140°F Supply Water Temperature)
61
Number of Rinnai Water Heaters
(with Storage Tank)
Max. Gas Consumption(1000 Btuh)
Storage Tank Capacity(gallons)
1st Hour Rating (gph)(for Sizing Systems without Space Heat)
2nd Hour Rating (gph)(for Sizing Systems with Space Heat)
Approx. Recovery Time (min.)
Number of Rinnai Water Heaters(w/out Storage)
1 199 20 215 201 6 12 398 20 416 402 3 23 597 20 617 603 2 3
1 199 40 229 201 12 22 398 40 430 402 6 33 597 40 631 603 4 4
1 199 50 236 201 15 22 398 50 437 402 7 33 597 50 638 603 5 4
1 199 80 257 201 24 32 398 80 458 402 12 43 597 80 659 603 8 5
1 199 120 285 201 36 32 398 120 486 402 18 43 597 120 687 603 12 54 796 120 888 804 9 6
1 199 160 313 201 48 42 398 160 514 402 24 53 597 160 715 603 16 64 796 160 916 804 12 75 995 160 1117 1005 10 86 1194 160 1318 1206 8 9
1 199 240 369 201 72 52 398 240 570 402 36 63 597 240 771 603 24 74 796 240 972 804 18 85 995 240 1173 1005 14 96 1194 240 1374 1206 12 107 1393 240 1575 1407 10 118 1592 240 1776 1608 9 129 1791 240 1977 1809 8 13
1 199 320 425 201 96 62 398 320 626 402 48 73 597 320 827 603 32 84 796 320 1028 804 24 95 995 320 1229 1005 19 106 1194 320 1430 1206 16 118 1592 320 1832 1608 12 139 1791 320 2033 1809 11 1410 1990 320 2234 2010 10 1512 2388 320 2636 2412 8 17
1 199 360 453 201 107 72 398 360 654 402 54 83 597 360 855 603 36 94 796 360 1056 804 27 105 995 360 1257 1005 21 116 1194 360 1458 1206 18 128 1592 360 1860 1608 13 149 1791 360 2061 1809 12 1510 1990 360 2262 2010 11 1612 2388 360 2664 2412 9 1815 2985 360 3267 3015 7 21
1 199 400 481 201 119 72 398 400 682 402 60 83 597 400 883 603 40 94 796 400 1084 804 30 105 995 400 1285 1005 24 116 1194 400 1486 1206 20 128 1592 400 1888 1608 15 149 1791 400 2089 1809 13 1510 1990 400 2290 2010 12 1612 2388 400 2692 2412 10 1815 2985 400 3295 3015 8 21
1 199 480 537 201 143 92 398 480 738 402 72 103 597 480 939 603 48 114 796 480 1140 804 36 125 995 480 1341 1005 29 136 1194 480 1542 1206 24 148 1592 480 1944 1608 18 169 1791 480 2145 1809 16 1710 1990 480 2346 2010 14 1812 2388 480 2748 2412 12 2015 2985 480 3351 3015 10 2318 3582 480 3954 3618 8 26
Hourly Demand – System Selection ChartRinnai 2532W Series Water Heaters
( at 40 °F Ground Water Temperature and 140°F Supply Water Temperature)
62
Number of Rinnai Water Heaters
(with Storage Tank)
Max. Gas Consumption(1000 Btuh)
Storage Tank Capacity(gallons)
1st Hour Rating (gph)(for Sizing Systems without Space Heat)
2nd Hour Rating (gph)(for Sizing Systems with Space Heat)
Approx. Recovery Time (min.)
Number of Rinnai Water Heaters(w/out Storage)
3 597 500 953 603 50 114 796 500 1154 804 37 125 995 500 1355 1005 30 136 1194 500 1556 1206 25 148 1592 500 1958 1608 19 169 1791 500 2159 1809 17 1710 1990 500 2360 2010 15 1812 2388 500 2762 2412 12 2015 2985 500 3365 3015 10 2318 3582 500 3968 3618 8 26
3 597 600 1023 603 60 124 796 600 1224 804 45 135 995 600 1425 1005 36 146 1194 600 1626 1206 30 158 1592 600 2028 1608 22 179 1791 600 2229 1809 20 1810 1990 600 2430 2010 18 1912 2388 600 2832 2412 15 2115 2985 600 3435 3015 12 2418 3582 600 4038 3618 10 2720 3980 600 4440 4020 9 2924 4776 600 5244 4824 7 33
3 597 700 1093 603 70 144 796 700 1294 804 52 155 995 700 1495 1005 42 166 1194 700 1696 1206 35 178 1592 700 2098 1608 26 199 1791 700 2299 1809 23 2010 1990 700 2500 2010 21 2112 2388 700 2902 2412 17 2315 2985 700 3505 3015 14 2618 3582 700 4108 3618 12 2920 3980 700 4510 4020 10 3124 4776 700 5314 4824 9 3525 4975 700 5515 5025 8 36
3 597 800 1163 603 80 154 796 800 1364 804 60 165 995 800 1565 1005 48 176 1194 800 1766 1206 40 188 1592 800 2168 1608 30 209 1791 800 2369 1809 27 2110 1990 800 2570 2010 24 2212 2388 800 2972 2412 20 2415 2985 800 3575 3015 16 2718 3582 800 4178 3618 13 3020 3980 800 4580 4020 12 3224 4776 800 5384 4824 10 3625 4975 800 5585 5025 10 3728 5572 800 6188 5628 9 40
3 597 1000 1303 603 100 184 796 1000 1504 804 75 195 995 1000 1705 1005 60 206 1194 1000 1906 1206 50 218 1592 1000 2308 1608 37 239 1791 1000 2509 1809 33 2410 1990 1000 2710 2010 30 2512 2388 1000 3112 2412 25 2715 2985 1000 3715 3015 20 3018 3582 1000 4318 3618 17 3320 3980 1000 4720 4020 15 3524 4776 1000 5524 4824 12 3925 4975 1000 5725 5025 12 4028 5572 1000 6328 5628 11 4330 5970 1000 6730 6030 10 4532 6368 1000 7132 6432 9 4735 6965 1000 7735 7035 9 50
Hourly Demand – System Selection ChartRinnai 2532W Series Water Heaters
( at 40 °F Ground Water Temperature and 140°F Supply Water Temperature)
Residential Rule of Thumb
Combination of Bathroomswith 2.5 GPM Shower/Tubcombos. (No high flow fix-tures in home.)
Combination of Bath-rooms with 7.0 GPMBody Sprays and Whirl-pool Tubs.
⇒⇒⇒⇒⇒
⇒⇒⇒⇒⇒
Combination of Bathroomswith 2.5 GPM Shower/Tubcombos. (No high flow fix-tures in home.)
Combination of Bath-rooms with 7.0 GPMBody Sprays/WhirlpoolTubs and 2.5 GPMShower/Tub combos.
⇒⇒⇒⇒⇒
IMPORTANT: Assumes mixed flow rates shown and 65°F groundwater. One Rinnai water heater will provide hot wa-ter to more fixtures, but at a reduced pressure andflow.
⇒⇒⇒⇒⇒
63
64
Commercial Rule of ThumbExisting or SpecifiedEquipment
Rinnai Replacement Equipment
199,000 Btu/100 gallonWater Heater
250,000 Btu/100 gallonWater Heater
270,000 Btu/100 gallonWater Heater
399,000 Btu/100 gallonWater Heater
⇒⇒⇒⇒⇒
⇒⇒⇒⇒⇒
⇒⇒⇒⇒⇒
⇒⇒⇒⇒⇒
+ 120 gallonstorage
+ 80 gallonstorage
+ 120 gallonstorage
+ 120 gallonstorage
of
or
or
or
65
1 Unit 2 Units 3 Units 4 Units 5 Units140 2.4 4.8 7.2 9.6 11.9135 2.5 5.0 7.4 9.9 12.4130 2.6 5.1 7.7 10.3 12.9125 2.7 5.3 8.0 10.7 13.4120 2.8 5.6 8.4 11.1 13.9115 2.9 5.8 8.7 11.6 14.5110 3.0 6.1 9.1 12.2 15.2105 3.2 6.4 9.6 12.7 15.9100 3.3 6.7 10.0 13.4 16.795 3.5 7.0 10.6 14.1 17.690 3.7 7.4 11.1 14.9 18.685 3.9 7.9 11.8 15.7 19.780 4.2 8.4 12.5 16.7 20.975 4.5 8.9 13.4 17.8 22.370 4.8 9.6 14.3 19.1 23.965 5.1 10.3 15.4 20.6 25.760 5.6 11.1 16.7 22.3 27.955 6.1 12.2 18.2 24.3 30.450 6.7 13.4 20.1 26.7 33.445 7.4 14.9 22.3 29.7 37.140 8.4 16.7 25.1 33.4 41.835 8.5 16.9 25.4 33.8 42.330 8.5 16.9 25.4 33.8 42.325 8.5 16.9 25.4 33.8 42.320 8.5 16.9 25.4 33.8 42.315 8.5 16.9 25.4 33.8 42.310 8.5 16.9 25.4 33.8 42.3
Temperature Rise (°F)
Rinnai 2532 Water Heaters – Manifold Installations
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
0 25 50 75 100 125 150
∆T – Temperature Rise (°F)
Hot
Wat
er F
low
Rat
e (g
pm)
1 Unit
2 Units
3 Units
4 Units
5 Units
SPECIFICATIONS V2532W V2532FFUMaximum/Minimum gas rate (Input BTU's) 199,000 BTU's - 15,000 BTU's 180,000 BTU's - 15,000 BTU'sEnergy Factor (EF) Natural Gas: 0.82 Propane: 0.84 Natural Gas: 0.82 Propane: 0.87Hot water capacity range 0.5 to 8.5 GPM 0.5 to 8.5 GPMMaximum hot water capacity, (35°F rise) 8.45 GPM (507 GPH) 8.45 GPM (507 GPH)Maximum hot water capacity, (77°F rise) 4.26 GPM (256 GPH) 3.87 GPM (232 GPH)Maximum hot water capacity, (90°F rise) 3.64 GPM (219 GPH) 3.30 GPM (198 GPH)NOx Emissions (at 3% O2) less than 40 ppmSetpoint Temperature (without remote) Factory setting - 120°FTemperature range with remoteKeypads connected
MC controller : 96 - 140°FBC and BSC controller : 96 - 120°F
66
Rinnai 2532W and 2532FFU Pressure Drop CurvesPressure Loss vs. Water Flow
0.0
5.0
10.0
15.0
20.0
25.0
30.0
0 1 2 3 4 5 6 7 8 9Water Flow (gpm)
Pres
sure
Los
s (p
si)
0.0
10.0
20.0
30.0
40.0
50.0
60.0
Pres
sure
Los
s (ft
hea
d)
67
345678910
33
5 gpm @ 24' head12
141516171819
238 gpm @ 35' head245 gpm @ 35' head
224 gpm @ 35' head231 gpm @ 35' head
203 gpm @ 35' head210 gpm @ 35' head217 gpm @ 35' head
189 gpm @ 35' head196 gpm @ 35' head
182 gpm @ 35' head
34
168 gpm @ 35' head
35
175 gpm @ 35' head
31
147 gpm @ 35' head
32
154 gpm @ 35' head161 gpm @ 35' head
28
126 gpm @ 35' head133 gpm @ 35' head
30
140 gpm @ 35' head
29
26
112 gpm @ 35' head
27
119 gpm @ 35' head
24
98 gpm @ 35' head
25
105 gpm @ 35' head
70 gpm @ 35' head77 gpm @ 35' head
23
91 gpm @ 35' head
202122
1112 84 gpm @ 35' head
35 gpm @ 35' head42 gpm @ 35' head49 gpm @ 35' head56 gpm @ 35' head
10 gpm @ 24' head
13
21 gpm @ 35' head28 gpm @ 35' head
63 gpm @ 35' head
Pump Sizing Chartfor Backup Storage Applications
Using Rinnai Commercial Water Heaters
Number of Rinnai Water Heaters Pump Flow Requirements
www.rinnai.us
Ask about Rinnai’s other fine products:
The Energy Savers
*Direct Vent Heating with style andperformance
*whisper quiet
*available with multi-step set backthermostats
The Infra-reds
*Vent free radiant heaters
*99.9% efficient
*Heat like the sun
Cooking Products
*Rice Cookers
*Korean Griddle
*Portable one, two and twoburner with broiler models.(Perfect for camping, a picnicor a tailgate party
The Silent Servant
*North America’s only vent-free convectionheater
*99% efficient
*whisper quiet
*perfect for hard to heat areas
ENG.2002.9Printed in U.S.A.