Old Head Golf Links Kinsale, Co.Cork HOTEL & LEISURE Customer Old Head Golf Links Kinsale, Co.Cork Construction Period October 2018-July 2019 Design Team Scott Tallon Walker, 72 South Mall, Cork Engineers Horgan Lynch & Partners, Telangana House, Blackrock, Cork Service Consultants EDC Engineering Design Consultants, Blackpool Retail Park, Cork Cost Consultant & Quantity Surveyors James Scannell, Glasheen, Cork Description This project involved the strip-out of the entire Accommodation Block at the Old Head Golf Links, so that new & contemporary Suites could be constructed to take advantage of the stunning views and surrounding landscape. The new rooms were designed by Scott Tallon Walker Architects. Particular attention was given to the high quality finishes, to ensure that all guests needs were catered for. The design brief was very much focused on ensuring that guests were able to avail of high quality in a very comfortable environment. Acoustics were of critical importance, so that guests could rest peacefully in their down time. Great care and attention was given to the finishes so that guests could enjoy their stay at the Old Head Golf Links. Key Features High quality acoustic insulation was installed in walls & ceilings to ensure maximum comfort. The rooms were designed & constructed in a manner whereby Guests could easily utilise all Services. Adherence to Programme was critical whilst always being flexible to cater for necessary Design changes Quality workmanship to ensure that the installation would be maintenance free, where possible.
Transcript
Page 1: HOTEL & LEISURE€¦ · Old Head Golf Links Kinsale, Co.Cork. HOTEL & LEISURE. Customer. Old Head Golf Links Kinsale, Co.Cork. Construction Period . October 2018-July 2019. Design

Old Head Golf Links Kinsale, Co.Cork

HOTEL &

LEISURE

CustomerOld Head Golf LinksKinsale,Co.Cork

Construction Period October 2018-July 2019

Design TeamScott Tallon Walker, 72 South Mall, Cork

EngineersHorgan Lynch & Partners, Telangana House,Blackrock,Cork

Service ConsultantsEDC Engineering Design Consultants, Blackpool Retail Park,Cork

Cost Consultant & Quantity SurveyorsJames Scannell,Glasheen,Cork

Description

This project involved the strip-out of the entire Accommodation Block at the Old Head Golf Links, so that new & contemporary Suites could be constructed to take advantage of the stunning views and surrounding landscape. The new rooms were designed by Scott Tallon Walker Architects.

Particular attention was given to the high quality finishes, to ensure that all guests needs were catered for. The design brief was very much focused on ensuring that guests were able to avail of high quality in a very comfortable environment. Acoustics were of critical importance, so that guests could rest peacefully in their down time. Great care and attention was given to the finishes so that guests could enjoy their stay at the Old Head Golf Links.

Key Features• High quality acoustic insulation was installed in walls & ceilings to ensure maximum

comfort.• The rooms were designed & constructed in a manner whereby Guests could easily

utilise all Services.• Adherence to Programme was critical whilst always being flexible to cater for

necessary Design changes• Quality workmanship to ensure that the installation would be maintenance free,