How much are unnecessary RFIs costing you? You could save over $30,000 per year on admin costs with ARC linked Mobile Project Dashboards Hyperlinking LOG NUMBER DESCRIPTION STATUS 00001 First Floor Mens and Womens Restroom Paint Color Closed 00002 Basement Structural Beam Measurement Changes Closed 00003 Building F 4th Floor Patio Floor and Decking Closed 00004 Floor Joist Gauge and Bearing Studs Closed 00005 Building H Tube Steel Columns below TOC @ SOG Closed 00006 Building H Concrete Stem Wall Closed 00007 Building H Patio SOMD Beams Closed 00008 Slab Dowels at Shear Walls Closed 00009 Building M Roof Mechanical Pads Closed 00010 Site Plumbing Subsurface Drainage Detail Closed 00011 Metal Deck at Roof Penthouses Closed 00012 Condiment Dispenser Closed 00013 Food Service Equipment with Casters and Stoveshoes Closed RFI Log Sheet UNION PLAZA 2400 Bedford Ave., Dallas, TX 75202 AS-BUILT
Transcript
Page 1: How much are unnecessary RFIs costing you? · Source: Impact & Control of RFIs on Construction Projects, Navigant Construction Forum $1,080 AVG TOTAL COST PER RFI REVIEW & RESPONSE

How much are unnecessary RFIs costing you?

You could save over $30,000 per year on admin costs with ARC linked Mobile Project Dashboards

Hyp

erlinking

LOG NUMBER DESCRIPTION STATUS

00001 First Floor Mens and Womens Restroom Paint Color Closed

00002 Basement Structural Beam Measurement Changes Closed

00003 Building F 4th Floor Patio Floor and Decking Closed

00004 Floor Joist Gauge and Bearing Studs Closed

00005 Building H Tube Steel Columns below TOC @ SOG Closed

00006 Building H Concrete Stem Wall Closed

00007 Building H Patio SOMD Beams Closed

00008 Slab Dowels at Shear Walls Closed

00009 Building M Roof Mechanical Pads Closed

00010 Site Plumbing Subsurface Drainage Detail Closed

00011 Metal Deck at Roof Penthouses Closed

00012 Condiment Dispenser Closed

00013 Food Service Equipment with Casters and Stoveshoes Closed

RFI Log Sheet

UNION PLAZA240 0 Bedford Ave., Dallas, TX 7520 2

AS-BUILT

Page 2: How much are unnecessary RFIs costing you? · Source: Impact & Control of RFIs on Construction Projects, Navigant Construction Forum $1,080 AVG TOTAL COST PER RFI REVIEW & RESPONSE

How much are unnecessary RFIs costing you?Saving as much as 2 hours daily, saves you over $30,000 in labor costs over the lifetime of the project!

Our discrepancy log will identify design and construction issues in the plan set, driving down the need

for RFIs later in the project.

Hyperlinking

Discrepancy logs find

errors in design and

construction documents

Identify issues earlier in

the project to reduce

the number of RFIs

Mobile Project

Dashboards increase

efficiency, saving 60-70

hours of review time

Mitigate your risk with ARC HyperlinkingFree up time to pre-plan and detect

issues early. Reduce risk and increase

compliance, while meeting project budget

and deadlines

Source: Impact & Control of RFIs on Construction Projects,

Navigant Construction Forum

$1,080AVG TOTAL COSTPER RFI REVIEW

& RESPONSE 9.7MEDIAN DAYS

FOR RFI RESPONSE

PERCENTAGE OF RFIs WITH NO

RESPONSE

21.9%

Page 3: How much are unnecessary RFIs costing you? · Source: Impact & Control of RFIs on Construction Projects, Navigant Construction Forum $1,080 AVG TOTAL COST PER RFI REVIEW & RESPONSE

Eliminate delays by digitizing & linking all your project documents• ARC helps thousands of customers

save weeks on construction projects

by digitally linking useful information

like project plans, specifications, RFIs,

ASIs, As-Builts, bulletins, and critical

closeout project documentation

• Accessing these documents through

a powerful, yet user-friendly Mobile

Project Dashboard helps you access

the project information in seconds;

anywhere, anytime

Document Management

Hyperlinking Process

Dashboards

Deliverable

How it's doneThe simple stages to hyperlinking success!

1.2.3.4.

Complete file and document audit

Auto-hyperlink and correct files

Custom project dashboard created

Files uploaded to cloud

Page 4: How much are unnecessary RFIs costing you? · Source: Impact & Control of RFIs on Construction Projects, Navigant Construction Forum $1,080 AVG TOTAL COST PER RFI REVIEW & RESPONSE

Hyperlinking

Mitigate risks

Reduce RFIs neededMake your project more compliant

Identify errors & omissions in a set

of plans

HYPE-PO-0618-01

To find out more about ARC linked Mobile Project Dashboardscall us today 855 500 0660

Copyright © ARC Document Solutions, LLC 2018.ARC, ARC Document Solutions and the ARC logo are registered trademarksof ARC Document Solutions, LLC in the U.S. and/or other countries.