+ All Categories
Home > Documents > How To Configure and Execute Business Process Flows in SAP BusinessObjects Planning and...

How To Configure and Execute Business Process Flows in SAP BusinessObjects Planning and...

Date post: 10-Oct-2015
Category:
Upload: habib009
View: 28 times
Download: 2 times
Share this document with a friend
Description:
How To Configure and Execute Business Process Flows in SAP BusinessObjects Planning and Consolidation 7.5 Version for SAP NetWeaver.pdf
37
SAP BusinessObjects EPM RIG How-To Guide How To... configure and execute Business Process Flows in SAP BusinessObjects Planning and Consolidation 7.5 version for SAP NetWeaver Applicable Releases: SAP BusinessObjects Planning and Consolidation 7.5 version for SAP NetWeaver 
Transcript
  • SAP BusinessObjects EPMRIGHow-To Guide

    How To... configure and executeBusiness Process Flows in SAPBusinessObjects Planning andConsolidation 7.5 version for SAPNetWeaver

    Applicable Releases:

    SAP BusinessObjects Planning and Consolidation 7.5 version for SAPNetWeaver

  • Copyright 2009 SAP AG. All rights reserved.

    No part of this publication may be reproduced ortransmitted in any form or for any purpose without theexpress permission of SAP AG. The information containedherein may be changed without prior notice.

    Some software products marketed by SAP AG and itsdistributors contain proprietary software components ofother software vendors.

    Microsoft, Windows, Outlook, and PowerPoint areregistered trademarks of Microsoft Corporation.

    IBM, DB2, DB2 Universal Database, OS/2, ParallelSysplex, MVS/ESA, AIX, S/390, AS/400, OS/390,OS/400, iSeries, pSeries, xSeries, zSeries, z/OS, AFP,Intelligent Miner, WebSphere, Netfinity, Tivoli, Informix,i5/OS, POWER, POWER5, OpenPower and PowerPC aretrademarks or registered trademarks of IBM Corporation.

    Adobe, the Adobe logo, Acrobat, PostScript, and Readerare either trademarks or registered trademarks of AdobeSystems Incorporated in the United States and/or othercountries.

    Oracle is a registered trademark of Oracle Corporation.

    UNIX, X/Open, OSF/1, and Motif are registeredtrademarks of the Open Group.

    Citrix, ICA, Program Neighborhood, MetaFrame,WinFrame, VideoFrame, and MultiWin are trademarks orregistered trademarks of Citrix Systems, Inc.

    HTML, XML, XHTML and W3C are trademarks orregistered trademarks of W3C, World Wide WebConsortium, Massachusetts Institute of Technology.

    Java is a registered trademark of Sun Microsystems, Inc.

    JavaScript is a registered trademark of Sun Microsystems,Inc., used under license for technology invented andimplemented by Netscape.

    MaxDB is a trademark of MySQL AB, Sweden.

    SAP, R/3, mySAP, mySAP.com, xApps, xApp, SAPNetWeaver, and other SAP products and servicesmentioned herein as well as their respective logos aretrademarks or registered trademarks of SAP AG inGermany and in several other countries all over the world.All other product and service names mentioned are thetrademarks of their respective companies. Data containedin this document serves informational purposes only.National product specifications may vary.

    These materials are subject to change without notice.These materials are provided by SAP AG and its affiliatedcompanies ("SAP Group") for informational purposes only,without representation or warranty of any kind, and SAPGroup shall not be liable for errors or omissions withrespect to the materials. The only warranties for SAPGroup products and services are those that are set forth inthe express warranty statements accompanying suchproducts and services, if any. Nothing herein should beconstrued as constituting an additional warranty.

    These materials are provided as is without a warranty ofany kind, either express or implied, including but notlimited to, the implied warranties of merchantability,fitness for a particular purpose, or non-infringement.

    SAP shall not be liable for damages of any kind includingwithout limitation direct, special, indirect, or consequentialdamages that may result from the use of these materials.

    SAP does not warrant the accuracy or completeness of theinformation, text, graphics, links or other items containedwithin these materials. SAP has no control over theinformation that you may access through the use of hotlinks contained in these materials and does not endorseyour use of third party web pages nor provide any warrantywhatsoever relating to third party web pages.

    SAP NetWeaver How-to Guides are intended to simplifythe product implementation. While specific productfeatures and procedures typically are explained in apractical business context, it is not implied that thosefeatures and procedures are the only approach in solving aspecific business problem using SAP NetWeaver. Shouldyou wish to receive additional information, clarification orsupport, please refer to SAP Consulting.

    Any software coding and/or code lines / strings (Code)included in this documentation are only examples and arenot intended to be used in a productive systemenvironment. The Code is only intended better explain andvisualize the syntax and phrasing rules of certain coding.SAP does not warrant the correctness and completeness ofthe Code given herein, and SAP shall not be liable forerrors or damages caused by the usage of the Code, exceptif such damages were caused by SAP intentionally orgrossly negligent.

    Disclaimer

    Some components of this product are based on Java. Anycode change in these components may cause unpredictableand severe malfunctions and is therefore expressivelyprohibited, as is any decompilation of these components.

    Any Java Source Code delivered with this product is onlyto be used by SAPs Support Services and may not bemodified or altered in any way.

  • Document HistoryDocument Version Description

    1.10 >

    1.00 First official release of this guide

  • Typographic ConventionsType Style Description

    Example Text Words or characters quotedfrom the screen. Theseinclude field names, screentitles, pushbuttons labels,menu names, menu paths,and menu options.

    Cross-references to otherdocumentation

    Example text Emphasized words orphrases in body text, graphictitles, and table titles

    Example text File and directory names andtheir paths, messages,names of variables andparameters, source text, andnames of installation,upgrade and database tools.

    Example text User entry texts. These arewords or characters that youenter in the system exactly asthey appear in thedocumentation.

    Variable user entry. Anglebrackets indicate that youreplace these words andcharacters with appropriateentries to make entries in thesystem.

    EXAMPLE TEXT Keys on the keyboard, forexample, F2 or ENTER.

    IconsIcon Description

    Caution

    Note or Important

    Example

    Recommendation or Tip

  • Table of Contents

    1. Scenario ...........................................................................................................................1

    2. Background Information .................................................................................................1

    3. Step-by-Step Procedure ..................................................................................................2

    3.1 Configuring BPF template .........................................................................................2

    3.2 Configuring BPF instance........................................................................................ 12

    3.3 Executing the BPF .................................................................................................. 14

    3.4 Setting up Email notifications .................................................................................. 27

    4. Appendices .................................................................................................................... 30

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 1

    1. ScenarioIn this guide we will explain how to configure Business Process Flows with SAP Business ObjectsPlanning and Consolidation 7.5, version for SAP NetWeaver. Business Process Flows (BPFs) guideusers through the sequence of tasks within a defined business process. Business process flows arecomprised of steps ans sub steps that must be completed sequentially. We can use BPFs to guideusers, depending upon their roles, through various steps. An example of a business process may bemonth end financial close or yearly budget approval or monthly forecast/projection cycle or financialconsolidation etc. A BPC user may have to perform different roles in different business processes andthus can be assigned to various steps in the business processes that he/she is involved in. Forexample a user may be the reviewer of the monthly forecast step for a region but may be the mainperson doing month end financial close. BPF functionality elucidated here will guide that user throughall the activities that he/she is associated with and can track the completion status of the activities andthe business process as a whole.

    The business scenario considered here consists of three steps. The first step is to seed the plan data;the second step is to enter manual changes and the third step is to execute reports. The second stephas three sub-steps. It requires review and can be reopened. The second step has matched stepregions as the opening criteria and the third step is set up with all step regions as the openingcriteria. While executing the BPF, we will complete the steps and sub steps; while reviewing, we willaccept some steps as well as reject some steps. Also we will reopen the second step after it iscompleted. We will also set up email notifications. Thus this simplistic scenario has the examples ofmany possible options that are available while configuring and executing BPF.

    2. Background Information? Business Process Flow (BPF) functionality has been introduced in SAP Business Objects

    Planning and Consolidation 7.5, version for. The BPF functionality was not available in SAPBusiness Objects Business Planning and Consolidation 7.0, version for SAP NetWeaver

    ? The BPF functionality in SAP Business Objects Planning and Consolidation 7.5, version forSAP NetWeaver has enhanced functionality when compared to what was available in the SAPBusiness Objects Business Planning and Consolidation 7.0, version for Microsoft.

    ? A list of BPF terminology used in this guide is provided in Appendix A with the definition ofeach term.

    ? This guide is created with SP00 and has some known issues that will be fixed in the latersupport packs. These issues are mentioned in Appendix B. Appendix D lists several BPFConsiderations for implementing this functionality.

    ? In order to configure BPF, there is a task called ManageBPF. This task controls all BPFadministration actions. This does not require a role assignment. Any user with Admin clientinstalled can be assigned the ManageBPF task.

    ? For executing BPF, there is a task called BPFexecute. The user task profile is consideredwhile executing any steps or sub-steps.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 2

    3. Step-by-Step ProcedureHere we will describe the process to configure BPF template, create an instance from that templateand then execute the BPF. The last section explains the set up required for realizing emailnotifications.

    3.1Configuring BPF template...

    1. Log on to the Planning and Consolidation Administration client and click on Business ProcessFlows. Click on Create BPF Template in the action pane.

    2. Enter the name and description of the BPF. Enter the controlling application

    3. Click on Instance identifier and select the dimensions to create BPF instances. Please notethat only time type dimension is preselected by the system and is the only required dimension.However it is a best practice to select at least two dimensions to define an instance.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 3

    4. Click on Set Access to select either the users or teams who should have access to this BPF.

    5. Click Next to create the steps and sub steps. Click Add to add a step. Enter the details asshown below for the step to seed the 2009 plan data from 2008 plan data.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 4

    6. Please note that in this step we have set Allow reopen to No and Opening criteria as All stepregion. Allow reopen will allow that step to be reopened after completion. If this is set to Nothat step cant be reopened during execution. Opening criteria All step regions will enableopening of the next step only after all step regions are complete whereas in case of Matchedstep region when we complete a step region, the next step opens for the same step region. Thefirst step of the BPF always opens regardless of the opening criteria. Defining these options willbe important for the second step onwards. Click on Define Step Region Criteria and enter thedetails as follows.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 5

    7. Please note that we can select any property as the owner property. The property that we selectmust have fully qualified user name as shown below. The same rule applies for the reviewerproperty also that we will use in the next BPF step.

    8. Please note that the Choose reviewer property is grayed out in the screen capture belowbecause we did not check the box Enable Reviewers in the earlier screen. Click OK to goback to the step and OK again to go back to the wizard.

    9. Select the dimension members as shown below. We can select up to 6 dimension membershere. The available selection formulas are SELF, BAS and DEP.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 6

    10. Similarly create another step as shown below. Please note that in this case, we are enablingreview, allowing reopen and setting the opening criteria to Matched Step Region. SelectingMatched Step region will enable opening of the corresponding step region from the next stepafter completing a step region. Please note that here we have to use the same driver dimensionfor this step and the next to avoid a deadlock (referred to in Appendix B).

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 7

    11. Click on Define Step Region Criteria and enter the information as shown below. Please notethat we can choose any property to be the reviewer property. However it is a good practice toname the properties accordingly for easy identification.

    12. Include the dimension members similar to the previous step.

    13. Click on Add new sub-step and add a sub-step to this step as shown below

    14. Enter step 3 as follows. Please note that we have set Allow Reopen to No and OpeningCriteria to All Step Regions.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 8

    15. Click on Define Step Region Criteria and set it up as shown below.

    16. Include dimension members similar to the previous step.

    17. Click OK to go back to the step and OK to go back to the wizard.

    18. Click Next to access the actions. Click on the first step to seed data and select data managerfrom the interface and DATA MANAGER from the task as shown below. Please note that thedefault action is created automatically and we can add more actions if needed.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 9

    19. Click on the sub step Enter changes for US and for the default action, select Interface forExcel in the interface and Schedule library in the task as shown below.

    20. Please note that we can select any previously saved input schedule by clicking the Browsebutton. In this case, we are selecting a dynamic template. For each dimension, note the currentview type. Since we selected Category and Time in the instance identifier, we have an option toinherit those values from the instance. Please note that the P_CC (entity type dimension) isrestricted to only one value US.

    21. Please note that we are entering all these actions in the tab step actions. The review actionsare not available with SP00. As a workaround, we can also use a step or sub step (similar to

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 10

    ones we are creating) for review actions. In this simplistic scenario, we will be skipping thereview actions.

    22. Enter a second action in the same sub-step to recheck and send the data. Please note the taskselected (SEND ACTIVE WORKSHEET).This is an example of entering multiple actions for thesame step/sub-step.

    23. Click Back to go to earlier screen to define steps and sub-steps. Click on the sub-step Enterchanges for US and click on Copy button. Enter the name as Enter changes for Canada andclick OK. Similarly copy the sub-step to enter changes for Germany.

    24. Click Next to go to actions. Click on the sub-step Enter rates for Canada and change theP_CC member from US to Canada as shown below. Similarly for the sub-step Enter changesfor Germany change the P_CC member to Germany.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 11

    25. Click Save to save the BPF template. You may receive messages as shown below. SelectYes to save the template.

    26. Click on the BPF template that was saved and click on Validate BPF template.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 12

    27. Answer Yes to the following question.

    28. You may receive validation errors if you have missed a step or mistyped it or if there is someother inconsistency. Otherwise, you will receive a message as follows.

    3.2Configuring BPF instance...

    1. In the previous section, we created a template. In this section, we will use that template tocreate a BPF instance that we will execute in the next section.

    2. Click on the BPF validated in the above step and then click on Create BPF Instance.

    3. Please note that the dimensions that we set as the instance identifiers are displayed in the firststep. Select the pertinent dimension members.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 13

    4. In the next step, we select the instance owner. The instance owner can reopen a stepregardless of involvement in the step.

    5. Click on Create BPF instance.

    6. We will be presented with a preview as shown below. We can update the owner or reviewerhere.

    7. Click Finish to end the process.

    8. Click on Manage BPF instance. The default filter setting is to show active BPF instances andthe one that we created in the above step may not show up here.

    9. Change the filter setting to inactive and click refresh. The newly created BPF instance will nowbe displayed as shown below.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 14

    10. Click the checkbox next to the instance and click on the Activate button to activate it. Changethe filter setting to Active and click Refresh again. The newly activated instance shows up inthe list of active instances.

    11. Now we are ready to execute this BPF instance.

    3.3Executing the BPF...

    1. Click on Interface for the Web

    2. Click on Business Process Flows

    3. The business process flow opens up with the first step already opened.

    4. Click on the step and that will take us to the next screen as shown below.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 15

    5. Click on the step name Seed and that will launch Excel interface with the Data Manageractions as per the settings in the BPF action.

    6. . Please note that the values that we hard coded in the action screen of the BPF template havebeen passed correctly (for example P_Activity = A005, P_CC = US etc).

    7. However the values that we set as inherit from BPF instance have not been inherited properly -this is a known issue which will be corrected in future support packs.

    8. We can change the current view suitably and then execute the step to copy data from 2008 to2009

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 16

    9. After completing the step, we can click Back to BPF to take us back to the BPF.

    10. Clicking complete will complete this step now.

    11. Click on back to my activities to go back and view the status of our activities.

    12. Please note the status of the steps now. Only Maintenance price data region is open forentering changes. The Personnel price data region is not yet open for entering changes. This isbecause we created the enter changes step with matched step region criteria for opening thestep.

    13. Click on the open step for enter changes for maintenance price and we will get the screen asshown below.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 17

    14. We get the three sub-steps as we had created. Please note that the description of the sub-stepthat we created was Enter changes for US but the sub-step displayed truncates the for USpart. This is something that we should be aware of while entering descriptions of the sub steps.

    15. Click on the first sub-step and that will open the interface for Excel with the template that weprovided in the action setting as shown below.

    16. Please note the available tasks are as per the action settings. In this step we can make thechanges to the seeded plan data and send the data after verifying the values as the sub stepsuggests.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 18

    17. Click on Back to BPF after sending the data. Please note that this step should be reportedcomplete only after all the three sub steps are done. Click on the second sub step and that willopen up the input schedule to make the changes for Canada. Make the necessary changes andsend the data.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 19

    18. Similarly complete the sub step 3 for Germany.

    19. Since we are done with all the sub steps here, we can complete this step.

    20. Click complete and then the status will change to submitted as shown below.

    21. This step requires review and hence the reviewer will get the screen as shown above wherehe/she can accept or reject the changes entered by the planner in the above step.

    22. If we want to see the status of the BPF at this stage, we can click on back to my activities. Thestatus of the BPF in My activities will be as follows at this stage

    23. Please note that the upper portion of the my activities screen will show the overall progress ofthe BPF as shown below.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 20

    24. If the reviewer wants to reject the changes, he or she can click on the reject button. That willchange the status of the step to Rejected as shown below.

    25. The my activities screen will also show this status as shown below.

    26. At this stage, the planner can review the changes he/she has made, and complete the step sothat it is resubmitted for review.

    27. If the reviewer now accepts the changes by clicking accept button, the status will change asfollows

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 21

    28. The my activities screen will show the status as follows:

    29. Please note that the step execute reports for maintenance price data region is still pendingthough the preceding steps for that data region are complete. This is because the executereports step is created with all criteria. Hence it will open up only after the preceding step iscomplete for all data regions and not just the matching data regions.

    30. We can now complete the seed and enter changes steps for personnel price data region issimilar way.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 22

    31. After the reviewer accepts the changes for personnel price data region, the execute reportsstep will open up as shown below.

    32. Click on the execute reports step for Maintenance price and that will open up the step asshown below. Please notice the action re-open step at the right hand top corner. We are able tosee this because the earlier step was created with allow re-open as yes.

    33. We will now see the re-open feature of BPF. The business scenario is that we have completed astep and proceeded to the next step (as we have proceeded to Step 3) and then we want to goback to the completed step (step 2 in our case) and make changes. Please note that we can goback only one step at a time here. So, if we have say 6 steps in the BPF, out of which steps2,3,4,5 are re-open enabled and we want to reopen step 2 after we have completed step5, thenin that case, we have to go back sequentially. Hence in that situation, we will re-open step 5,4,3and then 2 in that order. In our example here, we are opening only one step.

    34. Click on re-open step. This will open the earlier step of enter changes and change the status ofthe current step of execute reports to delayed as shown below.

    35. The status of the BPF in my activities will now be as shown below.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 23

    36. Please note that the status of enter changes is reopened and not just open.

    37. The planners can now enter changes and the reviewer can review those changes as we did inthe earlier step.

    38. After the step execute reports is open again, click on execute reports for maintenance priceregion

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 24

    39. Click on execute reports. That will open up the report as per the action settings for that step.

    40. After verifying the reports, click complete button to complete that step. The status of the BPF isnow as shown below.

    41. Similarly execute reports for personnel price also and complete the step.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 25

    42. The top portion of the BPF now shows that all the steps are complete.

    43. After all the steps of the BPF are complete, the BPF owner has an option to Finalize the BPF. Inorder to do that, click on Monitor.

    44. The BPF instance owner will have the option to Finalize the BPF by clicking the Finalizeprocess button.

    45. Once the BPF is finalized, it can be seen in the monitor and in My activities screen with statusfilter set to Finalized.

    46. Once the BPF is finalized, it is no longer active. The finalized BPF can be archived from theManage BPF instance action in the BPC Admin console.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 26

    47. Please note that BPF cant be deleted. They can only be archived to remove them from the BPCAdmin console.

    48. The archived BPFs are available for reporting if needed. In order to report on archived BPF,click on Archived instances report

    49. It will show the BPF instances by template.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 27

    3.4 Setting up Email notifications1. In order to maintain the email notification template, go to transaction se38 in SAP GUI and enter

    program name UJB_MAINTAIN_EMAIL_TMPL

    2. Click execute and enter the template id, the email template type C and Is active as Y.

    3. Maintain the email template for the email notification

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 28

    4. The available variables in the email template include %INSTANCE_NAME%, %STEP_NAME%,%URL%, %STEP_REGION_NAME%. These variables will be replaced at run time with realvalues.

    5. The email server name to send the email notifications is maintained in the server manager

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 29

    6. The email notification is received as shown below. The URL in the email can be used to accessthe BPF directly. It takes us to the my activities screen.

    7. The conditions for email notifications as well as recipients for each condition are listed inAppendix C.

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 30

    4. Appendices

    4.1Appendix A BPF TerminologyTerm Definition

    Business ProcessFlow

    A specific business process customized for a customer within the context ofSAP Business Planning and Consolidation (BPC).

    BPF Template The definition to achieve a specific business process including, steps,actions and data regions

    BPF Instance The iteration of a BPF template (i.e, budget 2008.TOTAL)

    BPF Step Region An instance of a BPF step which represents the smallest common region ofdata to perform a business process step

    BPF Identifiers The dimension which defines a unique BPF instance

    BPF DriverDimension OwnerProperty

    An named property to define the owner of a specific Step Region (bestpractice would be to prefix the property name with BPFO_)

    BPF DriverDimensionReviewerProperty

    An optionally named property to define the reviewer of a specific StepRegion (best practice would be to prefix the property name with BPFR_)

    Only required if review for the step is required.

    BPF Monitor A global view of all BPF instances and a detailed view of any selected BPFinstance with all steps and step regions.

    BPF My Activities BPF steps/sub-steps for a BPF instance:? The process flow is displayed within a Web interface with the

    sequential BPF steps? BPF Step Regions can be selected? In addition any applicable sub-steps are shown? Each step has a visual indicator of its status

    Admin BPFassistant

    The preparation/definition dialog interface required to establish a BPFtemplate

    Action Pane Presentation of SAP BPC functional tasks (actions) that are state or BPFsensitive - for example when the user has a schedule open, the action panewill reflect the option to send data

    BPF Action Pre-defined BPC tasks and its associated parameters? BPF launch action = action taken at the time of step/sub-step

    selection? BPF non-launch action = action available in action pane when

    step/sub-step is active

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 31

    4.2Appendix B Recipients of Email notifications

    No. Condition Who Shall beNotified Link

    1 THE BPF INSTANCE "%INST_NAME%" ISACTIVATED. Instance ownerInstancemonitor

    2 THE BPF INSTANCE "%INST_NAME%" ISINACTIVATED. Instance ownerInstancemonitor

    3 THE BPF INSTANCE "%INST_NAME%" ISWAITING FINALIZATION. Instance ownerInstancemonitor

    4 THE BPF INSTANCE "%INST_NAME%" IS RESET. Instance owner Instancemonitor

    5 THE STEP REGION %STEP_REGION_NAME% ISOPENED.Step regionowner

    MyActivities(singleview)

    6 THE STEP REGION %STEP_REGION_NAME% ISCOMPLETEDStep regionowner

    MyActivities(singleview)

    7 THE STEP REGION %STEP_REGION_NAME% ISREOPENED.Step regionowner

    MyActivities(singleview)

    8 THE STEP REGION %STEP_REGION_NAME%NEEDS REVIEW.Step regionreviewer

    MyActivities(singleview)

    9 THE STEP REGION %STEP_REGION_NAME% ISCHANGED INTO PENDING STATUS.Step regionowner

    MyActivities(singleview)

    10 THE STEP REGION %STEP_REGION_NAME% ISREJECTED.Step regionowner

    MyActivities(singleview)

    11 THE BPF INSTANCE "%INST_NAME%" ISFINALIZED. Instance ownerInstanceMonitor

  • How To... configure and execute Business Process Flows in SAP Business Objects Planning andConsolidation 7.5 version for the Netweaver platform

    January 2010 32

    4.3Appendix C BPF ConsiderationsWe have the following BPF considerations for using Business Process Flows in SAP Business ObjectsPlanning and Consolidation 7.5, version for SAP NetWeaver with SP00. These considerations can becategorized into three categories namely sizing, BPF template and BPF instance.

    ? Considerations regarding sizing restrictions? Up to 1 million step regions per BPF instances can be defined. The step regions can be

    calculated as a product of the number of steps and number of regions.

    ? Up to 1 thousand steps per BPF template/instance can be defined.

    ? Up to 100 BPF templates per appset can be defined.

    ? Up to 24 BPF instances per BPF template can be allowed

    ? Considerations regarding BPF templates? The controlling application governs both the time dimension for BPF instances and the

    available dimensions for step regions.

    ? We have to define the BPF instance identifier separately and it will not default to thecurrent view

    ? Considerations regarding BPF instance? The end-user can use reopen in the user interface to reset a BPF instance step.

    ? Only end-user tasks are available to define a BPF and not administrative tasks.

    ? The first step will always be opened, regardless of how the opening criterion for the stepis defined in the BPF template.

    ? Reopen function is available only for the prior step than the current one. Hence the laststep of a process cant be reopened once that step is completed.

    ? We can deactivate and archive a BPF instance to manage the display of active andinactive BPF instances.


Recommended