Review log:
Date Action
7/8/2013 Initial draft sent to IBM
7/9/2013 v1 created
7/10/2013 v2 created
7/16/2013 v3
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 2/69
Comments
Some scenarios such as multiple operational shipments and negative testing not yet
complete
Added test case descriptions at bottom of tabs - added scenarios with multiple operationalshipments and dual tpdocs - ready for IBM to review and comment
Have updated document after initial review with IBM, renumbered test cases and classified
some test cases in basic scenarios tab as "low priority". Low priority test cases are to be
tested last if there is time for it
Added a scenario where an OS is made that later catches up to the original route. See
'catching up scenarios sheet'
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 3/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 4/69
Basic business assumptions:
1. Operational shipments, also referred to as 'short shipped cargo' usually occur due to inter
shipments with 2 containers or more that start the journey together , but for whatever reas
of the cargo going on a different v/v and then cathing up to the other cargo later in the jour
2. Common reasons could be damaged containers, overbooked vessels, etc.
Basic booking principles:
1. Bookings must be made in the past. You cannot make an operational shipment in the futu
2. Issue Original TPDoc tasks must be closed, as well as relevant RKEM tasks (such as Equip
3. You must alternate carrier between MSL, SAF, SGO, MCC (some routes might not have pr
4. Operational shipments must have at least one leg in common and same place of receipt a
5. Operational shipments will occur at the transshipment ports
6. Products must have at least 2 legs for the basic operational shipment scenarios and at lea
shipment or an operational shipment from an operational shipment.
Simple scenarios (1 TPDoc, 1 shipment, 1 OS), 2 Equipments:
In this scenario, the original route is market with R and the operational shipment created for E2 is m
split and goes to P3 and P4 on different vessels.
When the TPDoc for Rop is created, if P3 and/or P4 are compliance ports (for example first port of e
filed separetely from the original TPDoc for R.
R:
Rop:
P1 P2 P3 P4 P5VV1
P1 P2 P3 P4 P5
VV2
Place of
receipt
Place of
delivery
Final discharge
port Transshipment
port
VV3
VV4
Multiple operational shipment scenarios (1 TPDoc, 1 shipment , 2 OS) 3 equipments:
All three containers start out at same place of receipt on Route R and make it to the load port, P2.
At P2, E2 and E3 get short shipped going on VV3 intead of VV1, creating operational shipment Sop1
R:
Rop1:
P1 P2 P3 P4 P5VV2
P1 P2 P3 P4 P5VV2
Place of
receipt
Place of
delivery
Final discharge
port
Rop2: P1 P2 P3 P4 P5VV4
VV1
VV3
VV3
Transshipment
port
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 5/69
,
In order to be able to recreate these scenarios in testing , bookings must be made about 6 weeks in
Dual TPDocs (1 shipment) and operational shipment:
Initially one shipment S with two containers, E1 and E2, where both E1 and E2 contains cargo docum
shipment Sop with route Rop. Altogether this results in:
Notice that T1 covers both E1 and E2, as does T2.
S
Sop
T1
E1
E2
R
Rop
T2
R:
Rop:
P1 P2 P3 P4 P5VV1
P1 P2 P3 P4 P5VV2
Place of
receipt
Place of
delivery
Final discharge
port
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 6/69
nal operational issues and are not at the request of the customer. They involve a
n are split up at a transshipment port - part of the cargo going on the original v/v, part
ey.
re - i.e. where the journey has not begun. This would be a normal split TPDoc instead.
ent pick-up, and OPS out from load port)
duct for all carriers)
nd final place of delivery.
st 3 legs for the complicated scenarios in which you create more than one operational
arked as Rop. As can be seen, the Operational shipment occurs at P2 when the cargo is
ntry into the EU or China) then a compliance for these should be created in Hermes and
ith Rop1 (E1 remains on original route). Then when the cargo reaches P3, E3 gets short
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 7/69
.
the past.
ented by two TPDocs, T1 and T2. Container E2 is short shipped creating operational
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 8/69
Note: Booking should have at least two (water) legs
Type of bookingCompliance
Status in Hermes Action in GCSS and RKEM
Testcase 1 1 TPDoc, 1 shipment, 3Equipments (E1, E2 and E3), ENS
compliance
IE328 Ok to Load Make Operational Shipment for E1 andE2 and complete the route on the
operational shipment. Make sure the
operational shipment will have compliance
as well.
Testcase 2 1 TPDoc, 1 shipment, 2
Equipments (E1 and E2), ENS
compliance, 1 amendment
Amendment Rejected Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
Testcase 3 1 TPDoc, 1 shipment, 2
Equipments (E1 and E2), IE344compliance ONLY. No ENS
compliance (for example Sweden-
Finland)
Sent Make Operational Shipment for E1 and
complete the route on the operationalshipment. Make sure the operational
shipment will have compliance as well.
Testcase 4 1 TPDoc, 1 shipment, 3
Equipments (E1, E2 and E3),
IE344 compliance ONLY. No ENS
compliance
IE328 Ok to Load Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
Testcase 5 1 TPDoc, 1 shipment, 2
Equipments (E1 and E2), IE344-V
compliance ONLY. No ENS
compliance
IE328 Ok to Load Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
Testcase 6 1 TPDoc, 1 shipment, 3
Equipments (E1, E2 and E3),
IE344-V compliance ONLY. No
ENS compliance
Submission error Make Operational Shipment for E1 and
E2 and complete the route on the
operational shipment. Make sure the
operational shipment will have compliance
as well.
Testcase 7 1 TPDoc, 1 shipment, 3
Equipments (E1, E2 and E3),
IE344-V compliance ONLY. No
ENS compliance
IE316- Rejected Make Operational Shipment for E1 and
E2 and complete the route on the
operational shipment. Make sure the
operational shipment will have compliance
as well.
Testcase 8 1 TPDoc, 1 shipment, 2
Equipments (E1, E2 and E3), DIS-
MAN compliance
Ok to Load- happens
automatically two
hours after submission
Make Operational Shipment for E1 and
E2 and complete the route on the
operational shipment. Make sure the
operational shipment will have compliance
as well.
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 9/69
Testcase 9 1 TPDoc, 1 shipment, 2
Equipments (E1 and E2),
CNXSHIP compliance, 2
amendments
Latest amendment in
Submission error with
No ACK/E9999
Make Operational Shipment for E1 and
E2 and complete the route on the
operational shipment. Make sure the
operational shipment will have compliance
as well.
Testcase 10 1 TPDoc, 1 shipment, 3
Equipments (E1, E2 and E3),
CNXSHIP compliance, 1
amendment
Amendment in
Submission error with
E000x
Make Operational Shipment for E1 and
E2 and complete the route on the
operational shipment. Make sure the
operational shipment will have compliance
as well.
Testcase 11 1 TPDoc, 1 shipment, 2
Equipments (E1 and E2) CNXSHIP
compliance
01 or 11 Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
Testcase 12 1 TPDoc, 1 shipment, 2
Equipments (E1 and E2),
CNXSHIP compliance, 2
amendments
Latest amendment in
02
Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 10/69
Testcase 13 1 TPDoc, 1 shipment, 3
Equipments (E1, E2 and E3),
CNXSHIP compliance
03 Make Operational Shipment for E1 and
E2 and complete the route on the
operational shipment. Make sure the
operational shipment will have compliance
as well.
Testcase 14
Low priority
1 TPDoc, 1 shipment, 2
Equipments (E1 and E2), ENS
compliance
Sent Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
Testcase 15
Low priority
1 TPDoc, 1 shipment, 2
Equipments (E1 and E2), ENS
compliance
Submission error Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
Testcase 16
Low priority
1 TPDoc, 1 shipment, 2
Equipments (E1 and E2), IE344
compliance ONLY. No ENS
compliance
Submission error Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
Testcase 17Low priority
1 TPDoc, 1 shipment, 2Equipments (E1 and E2), IE344
compliance ONLY. No ENS
compliance
IE316- Rejected Make Operational Shipment for E1 andcomplete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
Testcase 18
Low priority
1 TPDoc, 1 shipment, 2
Equipments (E1 and E2), IE344-V
compliance ONLY. No ENS
compliance (for example an intra
Europe route)
Sent Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
Testcase 19
Low priority
1 TPDoc, 1 shipment, 2
Equipments (E1 and E2), IE344-V
compliance ONLY. No ENScompliance
IE351 Hold at
discharge
Uploading IE345response as IE351 is
NOT a valid response
Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operationalshipment will have compliance as well.
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 11/69
Testcase 20
Low priority
1 TPDoc, 1 shipment, 3
Equipments (E1, E2 and E3),
CNXSHIP compliance
Sent Make Operational Shipment for E1 and
E2 and complete the route on the
operational shipment. Make sure the
operational shipment will have compliance
as well.
Testcase 21
Low priority
1 TPDoc, 1 shipment, 2
Equipments (E1 and E2),
CNXSHIP compliance
12 or 13 Make Operational Shipment for E1 and
E2 and complete the route on the
operational shipment. Make sure the
operational shipment will have compliance
as well.
How to test: 1. In GCSS, create a booking with ENS compliance, two legs and two containers.
Test case 1 2. Submit the compliance in Hermes and create an IE328 OK to load dummy resp
3. In GCSS, create an operational shipment for E1. Make sure it has an ENS com
4. In Hermes UI, check the following:
4a. Ensure that the original compliance already submitted retains its status and
4b. Ensure that Hermes displays and creates a compliance for the link related t
4c. Check the TPDoc list to ensure the OS compliance is displaying correctly.5. Submit the operational shipment
6. Check Hermes UI to ensure that the compliance for the operational shipment h
7. Check in GCSS that the compliance is also visible in the compliance window
7a. Check the TPDoc list to ensure the OS compliance is displaying correctly.
8. In AMPS, look up the APP*MANIFEST for the operational shipment compliance
8a. Tag HM10 element 13 contains the ORR number (the shipment number cre
8b. TagHM20 contains a reference to the ORR number (the operational shipme
9. Go in AMPS and create a dummy response of Rejected for the OS
10. In Hermes, check the UI screens to ensure that the response is displaying cor
How to test: 1. In GCSS, create a booking with CNXSHIP compliance, two legs and two contaiTest case 11 2. Submit the compliance in Hermes and create a customs dummy response of 01
3. In GCSS, create an operational shipment for E1. Make sure it has an CNXSHIP
4. In Hermes UI, check the following:
4a. Ensure that the original compliance already submitted retains its status and
4b. Ensure that Hermes displays and creates a compliance for the link related t
4c. An amendment for seal change will be created in Ready status for the origin
4d. Check the TPDoc list to ensure the OS compliance is displaying correctly.
5. Submit the operational shipment
6. Check Hermes UI to ensure that the compliance for the operational shipment h
7. Check in GCSS that the compliance is also visible in the compliance window
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 12/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 13/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 14/69
1) Hermes retains the original
compliance and the status it was in.
2) For the China compliance: Detection
made as COLLECTING or CREATED
for DE88 Seal on the original TPDoc
depending on its status (due to
instanceId for equipment and cargo
changed when split) regardless that no
change was made in GCSS for any ofthe DE.
3) Ensure that Hermes creates
compliance for links related to the
Operational Shipment if applicable.
Yes 1) The link displaying in Hermes
with the operational shipment will
be submitted, go to Sent status
Yes Sent with E000x
1) Hermes retains the original
compliance and the status it was in.
2) For the China compliance: Detection
made as COLLECTING or CREATED
for DE88 Seal on the original TPDoc
depending on its status (due to
instanceId for equipment and cargo
changed when split) regardless that nochange was made in GCSS for any of
the DE.
3) Ensure that Hermes creates
compliance for links related to the
Operational Shipment if applicable.
Yes 1) The link displaying in Hermes
with the operational shipment will
be submitted, go to Sent status
Yes Submission error with
ACK/E9999
1) Hermes retains the original
compliance and the status it was in.
2) For the China compliance: Detection
made as COLLECTING or CREATED
for DE88 Seal on the original TPDoc
depending on its status (due to
instanceId for equipment and cargo
changed when split) regardless that no
change was made in GCSS for any of
the DE.
3) Ensure that Hermes creates
compliance for links related to the
Operational Shipment if applicable.
Yes 1) The link displaying in Hermes
with the operational shipment will
be submitted, go to Sent status
Yes 02
1) Hermes retains the original
compliance and the status it was in.
2) For the China compliance: Detection
made as COLLECTING or CREATED
for DE88 Seal on the original TPDocdepending on its status (due to
instanceId for equipment and cargo
changed when split) regardless that no
change was made in GCSS for any of
the DE.
3) Ensure that Hermes creates
compliance for links related to the
Operational Shipment if applicable.
Yes 1) The link displaying in Hermes
with the operational shipment will
be submitted, go to Sent status
Yes 12 or 13
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 15/69
1) Hermes retains the original
compliance and the status it was in.
2) For the China compliance: Detection
made as COLLECTING or CREATED
for DE88 Seal on the original TPDoc
depending on its status (due to
instanceId for equipment and cargo
changed when split) regardless that no
change was made in GCSS for any ofthe DE.
3) Ensure that Hermes creates
compliance for links related to the
Operational Shipment if applicable.
Yes 1) The link displaying in Hermes
with the operational shipment will
be submitted, go to Sent status
Yes Submission error with
E000x
1) Hermes retains the original
compliance and the status.
2) Ensure that Hermes creates
compliance for links related to the
Operational Shipment if applicable.
Yes 1) The link displaying in Hermes
with the operational shipment will
be submitted, go to Sent status
Yes Yes- Ok to Load
1) Hermes retains the original
compliance and the status.
2) Ensure that Hermes creates
compliance for links related to the
Operational Shipment if applicable.
Yes 1) The link displaying in Hermes
with the operational shipment will
be submitted, go to Sent status
Yes Yes- IE351 Hold at
Discharge
1) Hermes retains the original
compliance and the status.
2) Ensure that Hermes creates
compliance for links related to the
Operational Shipment if applicable.
Yes 1) The link displaying in Hermes
with the operational shipment will
be submitted, go to Sent status
Yes No- submission erro
1) Hermes retains the originalcompliance and the status.
2) Ensure that Hermes creates
compliance for links related to the
Operational Shipment if applicable.
Yes 1) The link displaying in Hermeswith the operational shipment will
be submitted, go to Sent status
Yes Yes- Ok to Load
1) Hermes retains the original
compliance and the status.
2) Ensure that Hermes creates
compliance for links related to the
Operational Shipment if applicable.
Yes 1) The link displaying in Hermes
with the operational shipment will
be submitted, go to Sent status
Yes Yes- Ok to Load
1) Hermes retains the original
compliance and the status.
2) Ensure that Hermes createscompliance for links related to the
Operational Shipment if applicable.
Yes 1) The link displaying in Hermes
with the operational shipment will
be submitted, go to Sent status
Yes Yes- IE316 Rejected
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 16/69
1) Hermes retains the original
compliance and the status it was in.
2) For the China compliance: Detection
made as COLLECTING or CREATED
for DE88 Seal on the original TPDoc
depending on its status (due to
instanceId for equipment and cargo
changed when split) regardless that no
change was made in GCSS for any of
the DE.
3) Ensure that Hermes createscompliance for links related to the
Operational Shipment if applicable.
Yes 1) The link displaying in Hermes
with the operational shipment will
be submitted, go to Sent status
Yes 01- Pending 24 hours
1) Hermes retains the original
compliance and the status it was in.
2) For the China compliance: Detection
made as COLLECTING or CREATED
for DE88 Seal on the original TPDoc
depending on its status (due to
instanceId for equipment and cargo
changed when split) regardless that no
change was made in GCSS for any of
the DE.
3) Ensure that Hermes creates
compliance for links related to theOperational Shipment if applicable.
Yes 1) The link displaying in Hermes
with the operational shipment will
be submitted, go to Sent status
Yes 01 or 11
nse
liance as well. Get the booking to Ready status.
is still in Sent status.
the operational shipment
s been correctly submitted and is in Sent status with e-view and ICN number
submitted and ensure that:
ated by GCSS for the operational shipment)
nt) and NOT to the original TPDoc
ectly
ers. To make it easier, you can name the containers, E1 and E2or 11
compliance as well. Get the booking to Ready status.
is still in Sent status.
the operational shipment
al compliance even though the seal was not changed - this is a known defect.
s been correctly submitted and is in Sent status with e-view and ICN number
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 17/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 18/69
TP Doc Number
Actual TP Doc Number Used
R26TC0101 R26TC0101
R26TC0201 -
Wasted
R26TC0201
R26TC0301
R26TC0401
R26TC0501 R26TC0501
R26TC0601
R26TC0701
R26TC0801
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 19/69
R26TC0901
R26TC1001
R26TC1101 -
Defect
R26TC1102 -
Retest
R26105872
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 20/69
R26105871
R26105808
OS :510093788
ORR No. :
Y00000412
R26105807 -
Wasted
R26105810
OS No. :510093948
ORR No. :
Y00000430
R26105809
ORR Number :
510093833
ORR Number :
Y00000415
R26105812
OS : 510093853 -
WASTED
R26105813
OS No. :
510093856
ORR : Y00000419
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 21/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 22/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 23/69
Note: Booking should have at least two (water) legs
Type of bookingCompliance Status in
Hermes Action in GCSS and RKEM
Testcase 22 1 TPDoc, 1 shipment, 3Equipments (E1, E2 and
E3), ENS and CNXSHIP
compliance
Both compliances should bein Sent status
Make Operational Shipment for E1 andcomplete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
Testcase 23 1 TPDoc, 1 shipment, 3
Equipments (E1, E2 and
E3), ENS and CNXSHIP
compliance, 1
amendment for China
IE328 Ok to Load for ENS
and Amendment for China in
01- Accepted
Make Operational Shipment for E1 and
E2 and complete the route on the
operational shipment. Make sure the
operational shipment will have
compliance as well.
Testcase 24 1 TPDoc, 1 shipment, 3
Equipments (E1, E2 and
E3), ENS and CNXSHIP
compliance
Both compliances in
Submission error
Make Operational Shipment for E1 and
E2 and complete the route on the
operational shipment. Make sure the
operational shipment will have
compliance as well.
Testcase 25 1 TPDoc, 1 shipment, 2
Equipments (E1 and E2),
ENS and CNXSHIP
compliance, 1
amendment for each
compliance
For ENS amendment status
should be accepted. For
CNXSHIP, amendment
should be in 03- Rejected
Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
Testcase 26 1 TPDoc, 1 shipment, 2
Equipments (E1, E2),
ENS and CNXSHIPcompliance
ENS inIE316- Rejected,
CNXSHIP in Sent with E000x
Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operationalshipment will have compliance as well.
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 24/69
Testcase 27 1 TPDoc, 1 shipment, 3
Equipments (E1, E2 and
E3), ENS and CNXSHIP
compliance
ENS in IE351 Hold at
Discharge, CNXSHIP in 01 or
11
Make Operational Shipment for E2 and
E3 and complete the route on the
operational shipment. Make sure the
operational shipment will have
compliance as well.
Testcase 28 1 TPDoc, 1 shipment, 3
Equipments (E1, E2 and
E3), ENS and CNXSHIP
compliance, 1
amendment for ENS
ENS amendment in Accepted
and CNXSHIP in 12 or 13
Make Operational Shipment for E2 and
E3 and complete the route on the
operational shipment. Make sure the
operational shipment will have
compliance as well.
Testcase 29 1 TPDoc, 1 shipment, 2
Equipments (E1 and E2),
ENS and CNXSHIPcompliance
ENS in IE328 Ok to Load and
CNXSHIP in 02 Pending
customs' decision.
Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operationalshipment will have compliance as well.
Testcase 30 1 TPDoc, 1 shipment, 3
Equipments (E1, E2 and
E3), ENS and IE344
compliance, 1
amendment for ENS
ENS amendment Accepted
and IE344 in Ok to Load
Make Operational Shipment for E1 and
E2 and complete the route on the
operational shipment. Make sure the
operational shipment will have
compliance as well.
Testcase 31 1 TPDoc, 1 shipment, 2
Equipments (E1 and E2),
ENS and IE344v
compliance
Both ENS and IE344 in Ok to
Load
Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
Testcase 32 1 TPDoc, 1 shipment, 2
Equipments (E1 and E2),
ENS and IE344v
compliance, 1
amendment for ENS
ENS amendment Accepted
and IE344 in Ok to Load
Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
Testcase 33 1 TPDoc, 1 shipment, 2
Equipments (E1 and E2),
ENS and Arrival
Notification
ENS in IE328 Ok to Load and
Arrival Notification in Sent
status
Make Operational Shipment for E1 and
complete the route on the operational
shipment. Make sure the operational
shipment will have compliance as well.
Testcase 34 1 TPDoc, 1 shipment, 3
Equipments (E1, E2 and
E3), ENS and Arrival
Notification
ENS in IE328 Ok to Load and
Arrival Notification in
Accepted status
Make Operational Shipment for E1 and
E2 and complete the route on the
operational shipment. Make sure the
operational shipment will have
compliance as well.
How to test: 1. In GCSS, create a booking with ENS and CNXSHIP compliance, two legs a
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 25/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 26/69
Expected outcome in Hermes
Submit the
operational shipment
compliance(s)?
Yes/No
1) Hermes retains the original compliances and their status.2) For the China compliance: Detection made as COLLECTING or
CREATED for DE88 Seal on the original TPDoc depending on its
status (due to instanceId for equipment and cargo changed when
split) regardless that no change was made in GCSS for any of the
DE.
3) Ensure that Hermes creates compliance for links related to the
Operational Shipment if applicable.
Yes
1) Hermes retains the original compliances and their status.
2) For the China compliance: Detection made as COLLECTING or
CREATED for DE88 Seal on the original TPDoc (due to instanceId
for equipment and cargo changed when split) regardless that no
change was made in GCSS for any of the DE.3) Ensure that Hermes creates compliance for links related to the
Operational Shipment if applicable.
Yes
1) Hermes retains the original compliances and their status.
2) For the China compliance: Detection made as COLLECTING or
CREATED for DE88 Seal on the original TPDoc (due to instanceId
for equipment and cargo changed when split) regardless that no
change was made in GCSS for any of the DE.
3) Ensure that Hermes creates compliance for links related to the
Operational Shipment if applicable.
Yes
1) Hermes retains the original compliances and their status.
2) For the China compliance: Detection made as COLLECTING or
CREATED for DE88 Seal on the original TPDoc depending on its
status (due to instanceId for equipment and cargo changed when
split) regardless that no change was made in GCSS for any of the
DE.
3) Ensure that Hermes creates compliance for links related to the
Operational Shipment if applicable.
Yes
1) Hermes retains the original compliances and their status.
2) For the China compliance: Detection made as COLLECTING or
CREATED for DE88 Seal on the original TPDoc depending on its
status (due to instanceId for equipment and cargo changed when
split) regardless that no change was made in GCSS for any of the
DE.
3) Ensure that Hermes creates compliance for links related to the
Operational Shipment if applicable.
Yes
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 27/69
1) Hermes retains the original compliances and their status.
2) For the China compliance: Detection made as COLLECTING or
CREATED for DE88 Seal on the original TPDoc depending on its
status (due to instanceId for equipment and cargo changed when
split) regardless that no change was made in GCSS for any of the
DE.
3) Ensure that Hermes creates compliance for links related to the
Operational Shipment if applicable.
Yes
1) Hermes retains the original compliances and their status.
2) For the China compliance: Detection made as COLLECTING or
CREATED for DE88 Seal on the original TPDoc depending on its
status (due to instanceId for equipment and cargo changed when
split) regardless that no change was made in GCSS for any of the
DE.
3) Ensure that Hermes creates compliance for links related to the
Operational Shipment if applicable.
Yes
1) Hermes retains the original compliances and their status.
2) For the China compliance: Detection made as COLLECTING or
CREATED for DE88 Seal on the original TPDoc depending on its
status (due to instanceId for equipment and cargo changed when
split) regardless that no change was made in GCSS for any of the
DE.
3) Ensure that Hermes creates compliance for links related to the
Operational Shipment if applicable.
Yes
1) Hermes retains the original compliances and their status.
2) Ensure that Hermes creates compliance for links related to the
Operational Shipment if applicable.
Yes
1) Hermes retains the original compliances and their status.
2) Ensure that Hermes creates compliance for links related to the
Operational Shipment if applicable.
Yes
1) Hermes retains the original compliances and their status.
2) Ensure that Hermes creates compliance for links related to the
Operational Shipment if applicable.
Yes
1) Hermes retains the original compliances and their status.
2) Ensure that Hermes creates compliance for links related to the
Operational Shipment if applicable.
Yes
1) Hermes retains the original compliances and their status.
2) Ensure that Hermes creates compliance for links related to the
Operational Shipment if applicable.
Yes
d three containers
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 28/69
nd CNXSHIP compliance as well. Get the booking to Ready status.
and is still in Sent status.
ted to the operational shipment
a on the original compliance even though the seal was not changed - this is
y.
nts have been correctly submitted and is in Sent status with e-view and ICNow
y.
nce submitted and ensure that:
r created by GCSS for the operational shipment)
ment) and NOT to the original TPDoc
K E9999 for the CNXSHIP compliance
correctly
d as the compliance has gotten an E9999.
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 29/69
Expected outcome in HermesCheck AMPS
Yes/No
Create dummy customs
response for operational
shipment(s)?
Yes/No
Other Comments
1) The link(s) displaying in Hermes withthe operational shipment will be submitted,
go to Sent status
Yes Yes- IE328 for ENS and VA ACK E9999 for CNXSHIP
1) The link(s) displaying in Hermes with
the operational shipment will be submitted,
go to Sent status
Yes Yes- IE328 for ENS and 01 for
CNXSHIP
1) The link(s) displaying in Hermes with
the operational shipment will be submitted,
go to Sent status
Yes Yes- IE351 for ENS and 03 for
CNXSHIP
1) The link(s) displaying in Hermes with
the operational shipment will be submitted,
go to Sent status
Yes Yes- IE316 for ENS and 02 for
CNXSHIP
1) The link(s) displaying in Hermes with
the operational shipment will be submitted,
go to Sent status
Yes Yes- IE328 for ENS and 12 OR
13 FOR CNXSHIP
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 30/69
1) The link(s) displaying in Hermes with
the operational shipment will be submitted,
go to Sent status
Yes Yes- IE316 for ENS and VA
ACK E000X for CNXSHIP
1) The link(s) displaying in Hermes with
the operational shipment will be submitted,
go to Sent status
Yes No- Let them fall into
submission error
1) The link(s) displaying in Hermes with
the operational shipment will be submitted,
go to Sent status
Yes No- Let them fall into
submission error
1) The link(s) displaying in Hermes with
the operational shipment will be submitted,
go to Sent status
Yes Yes- IE328 for both ENS and
IE344
1) The link(s) displaying in Hermes with
the operational shipment will be submitted,
go to Sent status
Yes No- Let them fall into
submission error R26105801
510093612
Operational route reference
Y000004031) The link(s) displaying in Hermes with
the operational shipment will be submitted,
go to Sent status
Yes Yes- IE316 for both ENS and
IE344v TP Doc Number :R26105803
OS 510093620 - Wasted
TP Doc Number : R26105806
OS : 510093689
ORR : Y00000410
1) The link(s) displaying in Hermes with
the operational shipment will be submitted,
go to Sent status
Yes Yes- IE328 for both ENS and
Arrival Notification
1) The link(s) displaying in Hermes with
the operational shipment will be submitted,
go to Sent status
Yes No- Let them fall into
submission error
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 31/69
known defect.
umber
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 32/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 33/69
In Progress
Passed
Defect Raise
Defect
667
UI Issue
Passed
Passed
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 34/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 35/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 36/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 37/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 38/69
Testcase 40 1 TPDoc, 1 shipment, 3 Equipments (E1,
E2 and E3), CNXHIP compliance
Route should preferably have 2
transshipment ports
01 or 11
Testcase 41 1 TPDoc, 1 shipment, 3 Equipments (E1,
E2 and E3), CNXHIP compliance
Route should preferably have 2
transshipment ports
12 or 13
Testcase 42 1 TPDoc, 1 shipment, 3 Equipments (E1,
E2 and E3), CNXHIP compliance
Route should preferably have 2
transshipment ports
VA ACK E000x
How to test: 1. In GCSS, create a booking with ENS compliance, two legs a
Test case 36 2. Submit the compliance in Hermes and create An IE 328 OK
3. In GCSS, create an operational shipment for E1 at the first tr
4. In Hermes UI, check the following:
4a. Ensure that the original compliance already submitted re
4b. Ensure that Hermes displays and creates a compliance f
4c. Check the TPDoc list to ensure the OS compliance is dis
5. Do not submit the compliance. Leave it in Ready
6. In GCSS, create a second operational shipment for E2 at th
7. In Hermes UI, check the following:
7a. Ensure that the original compliance already submitted re
7b. Ensure that Hermes still displays the first operational shi
7c. Ensure that Hermes displays and creates a compliance f
7d. Check the TPDoc list to ensure the OS compliance is dis
8. Submit the second operational shipment
9. Check Hermes UI to ensure that the compliance for the oper
10. Check in GCSS that the compliance is also visible in the c
10a. Check the TPDoc list to ensure the OS compliance is di
11. In AMPS, look up the APP*MANIFEST for the operational s11a. Tag HM10 element 13 contains the ORR number (the
11b. TagHM20 contains a reference to the ORR number (th
Scenarios creating an operational shipment from an operationNote: Booking needs to have 3 water legs
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 39/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 40/69
8d. Check the TPDoc list to ensure the OS compliance is dis
9. Submit the second operational shipment
10. Check Hermes UI to ensure that the compliance for the op
11. Check in GCSS that the compliance is also visible in the c
11a. Check the TPDoc list to ensure the OS compliance is di
12. In AMPS, look up the APP*MANIFEST for the operational s
12a. Tag HM10 element 13 contains the ORR number (the
12b. TagHM20 contains a reference to the ORR number (th
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 41/69
d, a product with 2 water legs can be used.
at eact port. If uing a product with 1 transshipment port, both operational shipments will be done at t
Action in GCSS and RKEM Expected outcome in Hermes
Submit first
operational
shipmentcompliance(s)?
Yes/No At the first transshipment port, make first
operational Shipment for E1 and complete the
route on the operational shipment. Make sure
the operational shipment will have
compliance as well.
1) Hermes retains the original compliance and its status.
2) Ensure that Hermes creates compliance for links related to
the Operational Shipment if applicable.
Yes
At the first transshipment port, make first
operational Shipment for E1 and complete theroute on the operational shipment. Make sure
the operational shipment will have
compliance as well.
1) Hermes retains the original compliance and its status.
2) Ensure that Hermes creates compliance for links related tothe Operational Shipment if applicable.
No
At the first transshipment port, make first
operational Shipment for E1 and complete the
route on the operational shipment. Make sure
the operational shipment will have
compliance as well.
1) Hermes retains the original compliance and its status.
2) Ensure that Hermes creates compliance for links related to
the Operational Shipment if applicable.
Yes
At the first transshipment port, make first
operational Shipment for E1 and complete the
route on the operational shipment. Make sure
the operational shipment will have
compliance as well.
1) Hermes retains the original compliance and its status.
2) Ensure that Hermes creates compliance for links related to
the Operational Shipment if applicable.
Yes
At the first transshipment port, make first
operational Shipment for E1 and complete the
route on the operational shipment. Make sure
the operational shipment will have
compliance as well.
1) Hermes retains the original compliance and its status.
2) For the China compliance: Detection made as
COLLECTING or CREATED for DE88 Seal on the original
TPDoc (due to instanceId for equipment and cargo changed
when split) regardless that no change was made in GCSS for
any of the DE
3) Ensure that Hermes creates compliance for links related to
the Operational Shipment if applicable.
Yes
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 42/69
At the first transshipment port, make first
operational Shipment for E1 and complete the
route on the operational shipment. Make sure
the operational shipment will have
compliance as well.
1) Hermes retains the original compliance and its status.
2) For the China compliance: Detection made as
COLLECTING or CREATED for DE88 Seal on the original
TPDoc (due to instanceId for equipment and cargo changed
when split) regardless that no change was made in GCSS for
any of the DE
3) Ensure that Hermes creates compliance for links related to
the Operational Shipment if applicable.
Yes
At the first transshipment port, make first
operational Shipment for E1 and complete the
route on the operational shipment. Make sure
the operational shipment will have
compliance as well.
1) Hermes retains the original compliance and its status.
2) For the China compliance: Detection made as
COLLECTING or CREATED for DE88 Seal on the original
TPDoc (due to instanceId for equipment and cargo changed
when split) regardless that no change was made in GCSS for
any of the DE
3) Ensure that Hermes creates compliance for links related to
the Operational Shipment if applicable.
No
At the first transshipment port, make first
operational Shipment for E1 and complete the
route on the operational shipment. Make sure
the operational shipment will have
compliance as well.
1) Hermes retains the original compliance and its status.
2) For the China compliance: Detection made as
COLLECTING or CREATED for DE88 Seal on the original
TPDoc (due to instanceId for equipment and cargo changed
when split) regardless that no change was made in GCSS forany of the DE
3) Ensure that Hermes creates compliance for links related to
the Operational Shipment if applicable.
Yes
nd three containers.
o Load response
ansshipment port. Make sure it has an ENS compliance as well. Get the booking to Ready status.
ains its status and is still in Ok to Load status.
or the link related to the operational shipment
playing correctly.
second transshipment port (or first if you are using a 2-leg product). Make sure it has an ENS compliance a
ains its status and is still in OK to load status.
ment in Ready status
or the link related to the second operational shipment
playing correctly.
ational shipment has been correctly submitted and is in Sent status with e-view and ICN number
mpliance window
isplaying correctly.
hipment compliance submitted and ensure that:hipment number created by GCSS for the operational shipment)
operational shipment) and NOT to the original TPDoc
al shipment:
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 43/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 44/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 45/69
at port.
Expected outcome in HermesCheck AMPS
Yes/No
Create dummy
customs response for
first operational
shipment(s)?
Yes/No1) The link(s) displaying in Hermes with the operational shipment
will be submitted, go to Sent status
No No
1) The link(s) displaying in Hermes with the operational shipment
will stay in Ready status
N/A N/A
1) The link(s) displaying in Hermes with the operational shipment
will be submitted, go to Sent status
No Yes- Ok to Load
1) The link(s) displaying in Hermes with the operational shipment
will be submitted, go to Sent status
No No
1) The link(s) displaying in Hermes with the operational shipment
will be submitted, go to Sent status
No No
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 46/69
1) The link(s) displaying in Hermes with the operational shipment
will be submitted, go to Sent status
No Yes- 03
1) The link(s) displaying in Hermes with the operational shipment
will stay in Ready status
N/A N/A
1) The link(s) displaying in Hermes with the operational shipment
will stay in Ready status
No Yes- 11
well. Get the booking to Ready status.
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 47/69
Expected outcome in HermesCheck AMPS
Yes/No
Create dummy
customs response for
operational
shipment(s)?
Yes/No1) The link(s) displaying in Hermes with the operational shipment
will be submitted, go to Sent status
Yes Yes- Rejected
1) The link(s) displaying in Hermes with the operational shipment
will be submitted, go to Sent status
Yes No
1) The link(s) displaying in Hermes with the operational shipment
will be submitted, go to Sent status
Yes Yes- 03 Rejected
1) The link(s) displaying in Hermes with the operational shipment
will be submitted, go to Sent status
Yes No
. Get the booking to Ready status.
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 48/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 49/69
Second Action in GCSS and RKEM Expected outcome in Hermes
At the second transshipment port, make second
operational Shipment for E2 and complete the route
on the operational shipment.
Note: If you are using a route that only has 2 legs
and 1 transshipment port, complete this step at that
port.
1) Hermes retains the original compliance and its status as
well as the first operational shipment compliance submitted
earlier.
2) Ensure that Hermes creates compliance for links related to
the latest created Operational Shipment if applicable.
At the second transshipment port, make second
operational Shipment for E2 and complete the route
on the operational shipment.
Note: If you are using a route that only has 2 legs
and 1 transshipment port, complete this step at that
port.
1) Hermes retains the original compliance and its status as
well as the first operational shipment compliance in Ready
status.
2) Ensure that Hermes creates compliance for links related to
the latest created Operational Shipment if applicable.
At the second transshipment port, make second
operational Shipment for E2 and complete the route
on the operational shipment.
Note: If you are using a route that only has 2 legsand 1 transshipment port, complete this step at that
port.
1) Hermes retains the original compliance and its status as
well as the first operational shipment compliance submitted
earlier.
2) Ensure that Hermes creates compliance for links related tothe latest created Operational Shipment if applicable.
At the second transshipment port, make second
operational Shipment for E2 and complete the route
on the operational shipment.
Note: If you are using a route that only has 2 legs
and 1 transshipment port, complete this step at that
port.
1) Hermes retains the original compliance and its status as
well as the first operational shipment compliance submitted
earlier.
2) Ensure that Hermes creates compliance for links related to
the latest created Operational Shipment if applicable.
At the second transshipment port, make second
operational Shipment for E2 and complete the route
on the operational shipment.
Note: If you are using a route that only has 2 legs
and 1 transshipment port, complete this step at that
port.
1) Hermes retains the original compliance and its status as
well as the first operational shipment compliance submitted
earlier.
2) For the China compliance: Detection made as
COLLECTING or CREATED for DE88 Seal on the original
TPDoc (due to instanceId for equipment and cargo changed
when split) regardless that no change was made in GCSS for
any of the DE
3) Ensure that Hermes creates compliance for links related to
the latest created Operational Shipment if applicable.
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 50/69
At the second transshipment port, make second
operational Shipment for E2 and complete the route
on the operational shipment.
Note: If you are using a route that only has 2 legs
and 1 transshipment port, complete this step at that
port.
1) Hermes retains the original compliance and its status as
well as the first operational shipment compliance submitted
earlier.
2) For the China compliance: Detection made as
COLLECTING or CREATED for DE88 Seal on the original
TPDoc (due to instanceId for equipment and cargo changed
when split) regardless that no change was made in GCSS for
any of the DE
3) Ensure that Hermes creates compliance for links related tothe latest created Operational Shipment if applicable.
At the second transshipment port, make second
operational Shipment for E2 and complete the route
on the operational shipment.
Note: If you are using a route that only has 2 legs
and 1 transshipment port, complete this step at that
port.
1) Hermes retains the original compliance and its status as
well as the first operational shipment compliance submitted
earlier.
2) For the China compliance: Detection made as
COLLECTING or CREATED for DE88 Seal on the original
TPDoc (due to instanceId for equipment and cargo changed
when split) regardless that no change was made in GCSS for
any of the DE
3) Ensure that Hermes creates compliance for links related to
the latest created Operational Shipment if applicable.
At the second transshipment port, make second
operational Shipment for E2 and complete the routeon the operational shipment.
Note: If you are using a route that only has 2 legs
and 1 transshipment port, complete this step at that
port.
1) Hermes retains the original compliance and its status as
well as the first operational shipment compliance submittedearlier.
2) For the China compliance: Detection made as
COLLECTING or CREATED for DE88 Seal on the original
TPDoc (due to instanceId for equipment and cargo changed
when split) regardless that no change was made in GCSS for
any of the DE
3) Ensure that Hermes creates compliance for links related to
the latest created Operational Shipment if applicable.
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 51/69
Second Action in GCSS and RKEM Expected outcome in Hermes
At the second transshipment port, make a second
operational Shipment from the one you created
earlier, by opening the OS in GCSS and creating anOS for E2. Complete the route on the operational
shipment.
1) Hermes retains the original compliance and its status as
well as the first operational shipment compliance submitted
earlier.2) Ensure that Hermes creates compliance for links related to
the latest created Operational Shipment if applicable.
At the second transshipment port, make a second
operational Shipment from the one you created
earlier, by opening the OS in GCSS and creating an
OS for E2. Complete the route on the operational
shipment.
1) Hermes retains the original compliance and its status as
well as the first operational shipment compliance submitted
earlier.
2) Ensure that Hermes creates compliance for links related to
the latest created Operational Shipment if applicable.
At the second transshipment port, make a second
operational Shipment from the one you created
earlier, by opening the OS in GCSS and creating an
OS for E2. Complete the route on the operational
shipment.
1) Hermes retains the original compliance and its status as
well as the first operational shipment compliance submitted
earlier.
2) For the China compliance: Detection made as
COLLECTING or CREATED for DE88 Seal on the original
TPDoc depending on its status (due to instanceId for
equipment and cargo changed when split) regardless that no
change was made in GCSS for any of the DE.
3) Ensure that Hermes creates compliance for links related to
the latest created Operational Shipment if applicable.
At the second transshipment port, make a second
operational Shipment from the one you created
earlier, by opening the OS in GCSS and creating an
OS for E2. Complete the route on the operational
shipment.
1) Hermes retains the original compliance and its status as
well as the first operational shipment compliance submitted
earlier.
2) For the China compliance: Detection made as
COLLECTING or CREATED for DE88 Seal on the original
TPDoc depending on its status (due to instanceId for
equipment and cargo changed when split) regardless that no
change was made in GCSS for any of the DE.
3) Ensure that Hermes creates compliance for links related to
the latest created Operational Shipment if applicable.
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 52/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 53/69
Submit the second
operational
shipment
compliance(s)?Yes/No
Check AMPS
Yes/No
Create dummy
customs response for
second operational
shipment(s)?Yes/No
TP Doc Number
Yes Yes Yes- IE328
Yes Yes No
Yes Yes Yes- Ok to Load
First OS : 510093676
Y00000406
Second OS : 510093678
Y00000407 - DEFECT RAISED
RETEST :
TP Doc No. R26105827
OS No. 510093909
First ORR : Y00000421Yes Yes Yes- IE316 Rejected
R26105828
1st OS No. : 510093926
ORR Number: Y00000425
2nd OS No. : 510093928
2nd ORR No. : Y00000426
Defect 666
Yes Yes Yes- 01
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 54/69
Yes Yes Yes- 03
Yes Yes Yes- 01
Yes Yes Yes- 12 or 13
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 55/69
Submit the second
operational
shipment
compliance(s)?
Yes/No
Check AMPS
Yes/No
Create dummy
customs response for
operational
shipment(s)?
Yes/No
TP Doc Number
Yes Yes Yes- IE328
R26105829
First OS No. : 510093936
1st ORR No. : Y00000427Yes Yes Yes- IE328
R26TC4801
First OS :510093967
First ORR : Y00000431Yes Yes Yes- 01/11
R26TC4901Yes Yes Yes- 03
R26TC5001
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 56/69
Note: Booking should have at least two (water) legs
Type of booking
Testcase 51 1 shipment, 2 Equipments (E1 and E2), where
both E1 and E2 contains cargo documented by
two TPDocs, TP1 and TP2.
ENS compliance.
Testcase 52 1 shipment, 2 Equipments (E1 and E2), where
both E1 and E2 contains cargo documented by
two TPDocs, TP1 and TP2.
ENS compliance.
Testcase 53 1 shipment, 2 Equipments (E1 and E2), where
both E1 and E2 contains cargo documented by
two TPDocs, TP1 and TP2.
CNXSHIP compliance.
Testcase 54 1 shipment, 2 Equipments (E1 and E2), where
both E1 and E2 contains cargo documented by
two TPDocs, TP1 and TP2.
CNXSHIP compliance.
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 57/69
Compliance Status in Hermes Action in GCSS and RKEM
The compliance on both TPDocs should be in
Sent
Make Operational Shipment for E1 and complete
the route on the operational shipment. Make
sure the operational shipment will have
compliance as well.
The compliance on both TPDocs should be in
Ok to Load
Make Operational Shipment for E1 and complete
the route on the operational shipment. Make
sure the operational shipment will have
compliance as well.
The compliance on both TPDocs should be in
Sent
Make Operational Shipment for E1 and complete
the route on the operational shipment. Make
sure the operational shipment will have
compliance as well.
The compliance on both TPDocs should be in 01 Make Operational Shipment for E1 and complete
the route on the operational shipment. Make
sure the operational shipment will have
compliance as well.
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 58/69
Expected outcome in HermesSubmit the operational shipment
compliance? Yes/No
1) Hermes retains the original compliance and
the status on both TPDocs
2) Ensure that Hermes creates compliance for
links related to the Operational Shipment if
applicable on both TPDocs
Yes
1) Hermes retains the original compliance and
the status on both TPDocs
2) Ensure that Hermes creates compliance for
links related to the Operational Shipment if
applicable on both TPDocs
Yes
1) Hermes retains the original compliance and
the status on both TPDocs
2) For the China compliance: Detection made as
COLLECTING or CREATED for DE88 Seal onthe original TPDocs (due to instanceId for
equipment and cargo changed when split)
regardless that no change was made in GCSS
for any of the DE.
3) Ensure that Hermes creates compliance for
links related to the Operational Shipment if
applicable on both TPDocs
Yes
1) Hermes retains the original compliance and
the status on both TPDocs
2) For the China compliance: Detection made as
COLLECTING or CREATED for DE88 Seal on
the original TPDocs (due to instanceId forequipment and cargo changed when split)
regardless that no change was made in GCSS
for any of the DE.
3) Ensure that Hermes creates compliance for
links related to the Operational Shipment if
applicable on both TPDocs
Yes
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 59/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 60/69
Create dummy customs response for
operational shipment?
Yes/No
TP Doc
Number
Yes- Ok to Load
R26TC5101,R26TC5111Yes- 316 Rejected
R26TC5201,R26TC5211Yes- VA ACK E9999
R26TC5301,R26TC5311Yes- 12 or 13
R26TC5401
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 61/69
Note: Booking should have at least three (water) legs. Rerout
Type of bookingCompliance Status in
Hermes
Test case 55 1 TPDoc, 1 shipment, 2 Equipments (E1, andE2), ENS and/or CNXSHIP compliance
Example of route (double compliance):
St. Petersburg (Russia)- Gdansk (P1 --> P2)
Gdansk- Bremerhaven (P2 --> P3)
Bremerhaven- Yantian (P3 --> P4)
Yantian- Yokohama (Japan) (P4 ---> P5)
ENS in OK to Load, CNXSHIP in01/11
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 62/69
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 63/69
Submit first
operational
shipment
compliance(s)?
Yes/No
Expected outcome in
Hermes
Check AMPS
Yes/No
Create dummy
customs
response for first
operational
shipment(s)?
Yes 1) The link displaying inHermes with the operational
shipment will be submitted, go
to Sent status
No No
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 64/69
How to access "Split" options from Shipment?-> Pre-conditions: Atleast 2 containers and the shipment should have only one
TPDoc (be in Shipment Mode)
-> See Attached image
How to perform "Auto Split"?
-> This will create a shipment for each container in the original shipment.
Original shipment will remain with one container. Each of these shipments (with
one container each) will have their won TPDocs.
How to perform "Manual Split"?
-> This will create a shipment for each container selected. You can specify the
shipment number
How to perform "Operational Shipment"?
-> This will create a shipment for each container selected. You can specify the
shipment number
How to perform "Operational Shipment before Issue Original"?
-> This will create a shipment for each container selected. You can specify the
shipment number
How to perform "TPDoc Split"? (TEST CASE 25)
-> To make at TPDoc Split
-> You need to have one shipment SH1 with E1 -C1 and E2-C2 where E1-C1
documented on TPD1 and E2-C2 documented on TPD2.
When you select TPD2 and press 'SPLIT' then GCSS will create one new
shipment with E2-C2 and the cargo will be documented on TPD2.
-> The shipment will get new shipment version id and same applies for
equipment id.
How to perform "Create" new TPDoc from transport document. (TEST
CASE 11 on Negative TEST)
-> one shipmnet SH1 with E1-C1 and E2-C2 where both documented on TPD1.
-> select the E1-C1 and press 'CREATE'This will create a new TPDoc and the selected container/cargo E1-C1 will now
be documented on this new TPDoc. The TPDoc create will not make any
changes to the shipment, hence shipment will not get new shipment version id
nor will the equipment get new instanceId.
What is Split Shipment?
If all the containers in a shipment cannot be loaded at the first port, and if the orig
customer yet, depending on customer preference, Maersk can opt to split the shi
that the containers that can be loaded will proceed. Left over containers can com
next available vessel.
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 65/69
Testcase 6 shipment with 3 equipment and autosplit
1. Where only Consignee changed before the split.
2. 11, 22 and 33 all 3 equipmnet will be shown as AmendItem on the original
where the EquipInstanceId referres to the 'old' EquipInstanceId which is the id
before the split was performed.
3. Hermes will detect that 11, 22 and 33 has been removed (the 'old'
EquipInstanceId not on shipment after the split), hence orig value 11, 22 and 33
and new value for all 'space'4. Hermes will detect that 22 has been added (the 'new' EquipInstanceId that 22
got after the split), hence orig space and new value = '22'
Example of a split scenario :
When split performed in GCSS - GCSS will create new shipment(s) for equipmen
The original shipment (510088881) will get new Version ID as SJXMNBJBWWGI
The InstanceId of the equipment that remain on the original Shipment will also ge
GDS - Shipment
Shipment No: 510088881
GDS - Equipment Container No: SJ1111
Instance ID: V2VD9BEBWWGIB
GDS - TPDoc TPDoc Number: 510088881
GDS - Equipment Container No: SJ2222
Instance ID: VRLC9BEBWWGIB
GDS - Shipment
Shipment No: 5100
GDS - Equip
Container No:
Instance ID:
GDS - TPDoc TPDoc Number: 510088
GDS - Equip
Container No:
Instance ID:
GDS - Shipment
Shipment No: 51008
GDS - TPDoc TPDoc Number: 510088
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 66/69
Note: Once you create a new booking, it may
be difficult to find the actual booking that was
newly created. Follow the steps suggested
below to easily find the new bookings created.
inal TPDoc has not been issued to the
ment in to two or, multiple shipments so
e on a different route hopefully taking the
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 67/69
t that is removed from the original Shipment
B
t new InstanceId's 02JCQBJBWWGIB the container with SJ1111
8881
ent SJ1111 02JCQBJBWWGIB
81
ent SJ2222
8OPVZBJBWWGIB
886
86
8/13/2019 How+to+test+RQ1058+%26+1059_TP DOcs
http://slidepdf.com/reader/full/howtotestrq1058261059tp-docs 68/69
510093174
R26105801 Used
R26105802 R26TC0203
R26105803 Used R26ENS001 Used for P
R26105804 Used R26ENS002 Used for P
R26105805 Used R26ENS003 Used for P
R26105806 Used R26ENS004R26105807 Used R26DEN001 Used
R26105808 Used
R26105809 Used
R26105810 Used
R26105811 Used
R26105812 Used
R26105813 Used
R26105814
R26105827 Used
R26105828 Used
R26105829
R26105830R26105831
R26105832
R26105833
R26105834
R26105835
R26105836
R26105837
R26105838
R26105839
R26105840
R26105841
R26105842
R26105843
R26105844
R26105845
R26105846