  • 8/18/2019 Hp by Pass System-modified

    1/21

    Station: NTPC –

    RAMAGU

    NDAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet 1 of 1%

    P'ant A(ea: B!)LER 

    Te*tin# S+&e,'e: HP BPASS SSTEM

    SL. N!.

    1.

    2.

    /.

    %.

    5.

    .

    .

    .

    .

    10.

    L)ST !3 C!NTENTS

    PLANT DETA)LS

    !B4ECT)ES

    PR!P!SALS

    SER)CES RE6U)RED

    SA3ET PRECAUT)!NS

    EMERGENC PR!CEDURES

    STATE !3 THE PLANT

    METH!D

    C!MPLET)!N CR)TER)A

    APPEND)CES

    a7 DRA8)NG

    Si#nat(e*

      NTPC BHEL

  • 8/18/2019 Hp by Pass System-modified

    2/21

    Station: NTPC –

    RAMAGUN

    DAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet 2 of 1%

    P'ant A(ea: B!)LER 

    Te*tin# S+&e,'e: : HP BPASS SSTEM

    1.0 PLANT DETA)LS STATUS

    HP BP System work in conjunction with LP BP System as and when

    necessitated by the system requirements such warming up stage or 

    dumping a large quantity of steam following a heavy load rejection.

    urbine ! "enerator trip.

    #.# HP BP System basically consists of the following items. $%efer to theenclosed drawings&.

    ♦ 'il Supply (nit $with motor and pump&.

    ♦ )ccumulator 

    ♦ *uick opening device

    ♦ +onnection manifold

    ♦ Blocking element

    ♦ Servo valve

    ♦ hrottle valve

    ♦ ,solating ball valve

    ♦ Hp -ilter 

    ♦ Spray +ontrol valve

    ♦ By pass control valve

    ♦ ,solation alve

    ♦ Break down orifice

    ♦ 'ther piping accessories.

    #./ he System is provided with series of pressure switches for automatic

    on!off of motor and for annunciation.

    Si#nat(e

    NTPC BHEL 

  • 8/18/2019 Hp by Pass System-modified

    3/21

    Station: NTPC –

    RAMAGUN

    DAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet / of 1%

    P'ant A(ea: B!)LER 

    Te*tin# S+&e,'e: : HP BPASS SSTEM

    #.0 he oil supply unit and the By pass and spray valves are connected

    through pipe lines and hose pipes.

    #.1 HP BP System is an important item of the Power Plant and it requires

    e2treme precaution in commissioning the system as given in Section 3.4

    $%efer to '56 6anual for echnical Specification of HP BP System.&

    2.0 !B4ECT)E

    he objective of this esting Schedule is to commission the HP BP

    System and make it available for (nit 'peration.

    /.0 PR!P!SAL

    +ommissioning of HP BP System is proposed to be carried out through

    following proposals.

    0.# )cid +leaning of Pipe lines. $"enerally7 pipe lines are not subjected to

    acid cleaning. By visual inspection7 if the internal surface of the pipe

    lines are rusted heavily and pitted7 then the pipe lines are subjected to

    acid cleaning.&

    0./

    0.0

    0.1

    +ommissioning of the HP BP System oil supply units $minus BP and

    Spray alves& and setting up of pressure switches.

    'il -lushing of the HP BP System as per following stages

    Stage , 88 Pressure line $P& and %eturn line $&

    Stage ,, 88 Pressure line $P& and Leakage line $L&

    Stage ,,, 88 Lines of *uick 'pening 9evice

    +ommissioning of HPBP System

    Si#nat(e

    NTPC BHEL 

  • 8/18/2019 Hp by Pass System-modified

    4/21

    Station: NTPC –

    RAMAGUN

    DAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet % of 1%

    P'ant A(ea: B!)LER 

    Te*tin# S+&e,'e: : HP BPASS SSTEM

    STATUS

    %.0 SER)CES RE6U)RED

    1.# )vailability of L.. Power Supply.

    1./ )vailability of lighting7 communication and clear access in the test area.

    1.0 )vailability of recommended oil $ S:%'. +';)L 1

    1.>.#

    1.>./

    1.>.0

    1.>.1

    1.>.=

    )vailability of chemicals for acid cleaning.

    88 H+L

    88 %odine

    88 Sodium ;itrate

    88 Liquor )mmonia

    88 Lime Powder 

     ;ote? *uantities of above chemical to be worked out at site.

    5.0 SA3ET PRECAUT)!NS

  • 8/18/2019 Hp by Pass System-modified

    5/21

    =.#

    =./

    =.0

    =.1

    =.=

    )vailability of -irst aid bo2 containing dilute ammonium hydro2ide7

    =4@ sodium bicarbonate solution7 :ye lotion7 Bandage7 incture

    ,odine7 +otton7 Burnol etc should be ensured.

    )vailability of suitable type portable fire e2tinguishers should be

    ensured.

    )vailability of following should be ensured?

    "um boots 8 0 Pairs

    %ubber "loves 8 = Pairs

    )pron 8 0 ;os.

    ransparent -ace 6ask 8 0 ;os.

    )vailability of running service water near the activity area is ensured.

    Suitable and safe place for draining and neutraliAation of used chemicals

    should be kept identified.

  • 8/18/2019 Hp by Pass System-modified

    6/21

    Si#nat(e

    NTPC BHEL 

    Station: NTPC –

    RAMAGUNDAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet 5 of 1%

    P'ant A(ea: B!)LER 

  • 8/18/2019 Hp by Pass System-modified

    7/21

    Te*tin# S+&e,'e: : HP BPASS SSTEM

      .0 EMERGENC PRECAUT)!NS STATUS

    ./ )ctuators of BP and Spray alves and : 1=s are serviced $if 

    necessary& and fitted back in position.

    >.0 )ll joints are properly tightened and pipe line clamped with proper 

    supports.

    >.1 'il tank of 'S( thoroughly cleaned and ready for oil filling.

    >.= )ll the local ,!c inputs and remote ,!c inputs7 control panel and

    console insert and the required control and power cabling completed

    and ready of charging.

    .0 METH!D

    .1 A+i, C'eanin# in 9i9e 'ine*

    3.#.#

    3.#./

    3.#.0

    3.#.1

    he disassembled pipeline pieces are filled with 96 water and flushed

    few times. )lso ensure that there is no leakage through the wooden plug

     provided at one end of the pipe.

     =@ Hydrochloric acid with 4./@ inhibitor $%odine /#0 spl& is filled in

    the pipes. :fficiency test of the inhibitor is to be done prior to its use as

     per ;)+: procedure.

    he solution is allowed to soak in the pipes for 1 $four& hours and then

    drained in a safe place and neutraliAed. his is then disposed off with

     plenty of service water.

    he pipes are flushed with 96 water for =8#4 minutes.

    he pipes are again filled with / @ sodium nitrite and =.4 @ liquor 

  • 8/18/2019 Hp by Pass System-modified

    8/21

    3.#.=

    3.#.<

    3.#.>

    ammonia solution. he solution is allowed to soak for 04 minutes.

    )nd then drained.

    he pipe is rinsed ! flushed with 96 water till pH is >.=

    $appro2imately&.

    he internal surface of pipes is dried with dry compressed air.

    he lines are filled with lube oil and uniform oil film is achieved

    through out the internal surface of the pipes.

    Si#nat(e

    NTPC BHEL 

    Station: NTPC –

    RAMAG

    UNDAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet of 1%

    P'ant A(ea: B!)LER 

    Te*tin# S+&e,'e: HP BPASS SSTEM

    STATUS

    .2 Co""i**ionin# of HP BP S*te"; !i' S99' Unit*.

    3./.# -illing the oil tank with hydraulic fluid.

    3./.#.#

    3./.#./

    :nsure that the entire system is clean and also connections are tight.

    -ill the tank upto the level 6a2C $on the dip stick& with

    recommended "rade of oil $-ig. /& through 0 micron filter. PresentlyServo +onval81< of ,'+ used or as per the recommendation given in

    the '56 manual.

    3././ +heck the ,% value using =44 megger for power cables and for 

    motor of 'S( is :nsure the healthiness and record the value.

    3./.0 :2tend power supply to both incomers of the control panel up to the

     breakers and check the correctness. +heck the voltage in the respective

    B and also ensure proper polarity.

    3./.1 :2tend supply to +P by switching ';C the incomer breakers.

    :nergise the +P by switching '; the power supply modules one by

  • 8/18/2019 Hp by Pass System-modified

    9/21

    one and check the correctness.

    3./.= ,solate all the outgoing leads and charge each rack by switch on the

    respective breakers and check all the out going voltages are as per the

    requirement.

    3./.< :nsure availability of all cards and are placed in respective position.

    3./.> (sing test kit7 calibrate the cards and set the valves as per the

    recommendation wherever possible $)nne2 B&

    3./.3 ,solate the power supply to 'S(86otors. :nergise the 6odule for 

    +ontrol and 6onitoring of 'S( and check power contactor packing

    and also drops when local stop PB pressed.

    Si#nat(e

    NTPC BHEL 

    Station: NTPC –

    RAMAGUN

    DAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet 2 of 1%

    P'ant A(ea: B!)LER 

    Te*tin# S+&e,'e: : HP BPASS SSTEM

    STATUS

    Si#nat(e

    NTPC BHEL 

    Station: NTPC –

    RAMAG

    UNDAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet of 1%

    P'ant A(ea: B!)LER 

  • 8/18/2019 Hp by Pass System-modified

    10/21

    Te*tin# S+&e,'e: HP BPASS SSTEM

    3./.D :nsure the readiness of 'S(7 switch on the motor and check whether 

    the oil pressure is developed as per the requirement by keeping thecock valve of EPF line closed. ,f pressure is not developing7 slowly

    open the drain screw provided on the manifold and on seeing the

     pressure building up close the drain screw.

    3./.#4 Geep the ball8valve of pressure line $P& in closed condition and

     pressurise the accumulator appro2. /4 bar above the stamped gas

    filling pressure. Switch off the pump motor. %educe the pressure

    from the accumulator via the drain screw in the supply manifold .

    he oil pressure drop to Aero as soon as the gas pressure reached.

    "as pressure $;/& can be checked with ;/ charging device7 which is

    supplied along with the system.

    3./.## +harging with accumulator with ;itrogen

    -i2 the special charging device and verify the gas pressure in the

    )ccumulator bladder. ,f the pressure is less than the recommended

    value7 i.e. 34 kg ! sq.cm.7 recharge the bladder using commercial

    quality ;itrogen storage bottle at high pressure.

    3./.#/ +heck the tripping pressure of safety relief valve

    he tripping pressure of the safety relief valve is set at higher  pressure than that of Switch off pressureC for oil pump and also the

    Pressure too highC alarm. he set pressure can be rechecked as

    follows?

    3./.#/.#

    3./.#/./

    3./.#/.0

    3./.#/.1

      88 +lose the ball valve in pressure line $P& in 'S(.

      88 +heck the oil level in tank and lower the level to /4 cm below the

      maintenance opening in the tank.

    88 %emove the cover of the maintenance opening

    88 Bridge the micro switch for Pump motor offC

    Si#nat(e

    NTPC BHEL 

    Station: NTPC –

    RAMAGUNDAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet of 1%

    P'ant A(ea: B!)LER 

  • 8/18/2019 Hp by Pass System-modified

    11/21

    Te*tin# S+&e,'e: HP BPASS SSTEM

    3./.#/.=

    3./.#/.<

    3./.#/.>

    88 Start the oil pump and switch off as soon as relief valve trips. ;otethe tripping pressure. )djust the tripping pressure if necessary by

    adjusting the set screw on the valve.

    88 %epeat the checking until the tripping pressure is correct. he

    tripping pressure of safety relief valve should be set at #34 kg !

    sq.cm.

    88 Set the tripping pressure of the second 'S( also as described

    above.

    3./.#0 +heck the accumulator operating pressure

    he accumulator operating pressure is set with four pressure switches

     provided in the bo2 . he pressure at any instant can be read

     provided on the manifold from the manometer which is provided

     before the pressure reducing valve in the manifold. he set pressure

    of the individual micro switches should be checked and resetting is to

     be done if necessary by adjusting the screws. urning the set screw in

    clockwise results in a lower value. he purpose of each micro switch

    setting is as follows?

    Switch ;o. #? Pump motor offC. he ma2. operating pressure in

    accumulator at which the pump motor is switched off $i.e.&

    #4 kg ! sq.cm. and also used to stop

    the pump in case of failure of switch ;o. #.

    )fter the setting7 the individual setting must be rechecked for its

    correctness.

    Si#nat(e

    NTPC BHEL 

  • 8/18/2019 Hp by Pass System-modified

    12/21

    Station: NTPC –

    RAMAG

    UNDAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet of 1%

    P'ant A(ea: B!)LER 

    Te*tin# S+&e,'e : HP BPASS SSTEM

    3. 0

    3.0.#

    'il -lushing

    he oil flushing operation is to be carried out to clean the complete

    system of pipe work. -or the normal operating system7 the flushing is

    to be done in two stages. -irst stage includes the pressure line $P& and

    the return line $& and second stage includes pressure line $P& and the

    leakage line $L&.

    ./.2 Sta#e ) 3'*&in#

    3.0./.#

    3.0././

    3.0./.0

    3.0./.1

    3.0./.=

    +onnect the pressure line $P& and the return line $& with high

     pressure hose at actuator $-ig. 0& for all valves.

    %emove the 0 micron -ilter in EPF lines near all the actuators

    he filtering elements for suction strainer in 'S(7 air filter and the

      pressure filter must remain in place.

    ,nstall the flushing filter in return line between supply manifold

    and the ball cock 

    ,nstall /= micron filter element into the flushing filter.

    3.0./.<

    3.0./.>

    Geep open all ball cocks in EPF and EF lines near the actuators and

    EF line near 'S(.

    Start the oil pump. hen the pressure in accumulator reached the

    motor offC limit the ball valve is opened $while charging the linefor the first time the valve is to be opened slowly and watched

    for any oil leakage& and then closed when the pressure reduced

    to Pump motor onC limit.

    Si#nat(e

    NTPC BHEL 

  • 8/18/2019 Hp by Pass System-modified

    13/21

    Station: NTPC –

    RAMAGU

    NDAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet 10 of 1%

    P'ant A(ea: B!)LER 

    Te*tin# S+&e,'e: : HP BPASS SSTEM

    STATUS

    3.0.0 his process of flushing is to be continued for not less than 04

    minutes per loop or till such time no dirt or iron filling is observed in

    the bowl of flushing filter. ,f observed7 the filter and the bowl should

     be cleaned with petrol and the filter is blown with instrument air and

    flushing should be continued till the filter and the bowl is clean.

    3.0.1 ,f more than one 'S( feed the same system we can install flushingfilter in the return line of each unit. his will enable us to use the

    'S( alternatively for flushing purpose.

    3.0.= %emove the /= micron filter element and install 0 micron filter 

    element in flushing filter. +ontinue the flushing operation as

    described above for minimum 04 minutes per loop or till such time

    no dirt or iron filling is observed in the howl of flushing filter. ,f 

    observed7 cleaning of the flushing bowl and filter as e2plained in the

    case of /= micron flushing should be repeated till such time the oil

    in the flushing bowl is clean.

    ./. Sta#e )) 3'*&in#

    3.0.

  • 8/18/2019 Hp by Pass System-modified

    14/21

    Station: NTPC –

    RAMAGU

    NDAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet 11 of 1%

    P'ant A(ea: B!)LER 

    Te*tin# S+&e,'e: : HP BPASS SSTEM

    ./.

    3.0.>.#

    3.0.>./

    3.0.>.0

    3.0.>.1

    3.0.>.=

    3.0.>.<

    3.0.>.>

    3.0.>.3

    !i' f'*&in# fo( 'ine* of i+e ?SSB nit7

    +lose the isolating ball valves in the pressure and return line near 

    'S(.

    )dditional accumulator connection block $S)B& should be

    isolated from the flushing circuit.

    %emove the filter elements fitted in pressure line before the

    additional accumulators.

    ,nstall the flushing device in oil return line of SSB unit near 'S(.

    +onnect the supply line and return line as shown in -ig. = 5 <

    respectively using suitable fittings7 hoses7 etc.

    +arry out the flushing operation as described in 3.0./. he

    isolating valve in pressure line to additional accumulator near 

    'S( is to be used to carry out flushing operation.

    )fter completing the flushing7 connect the oil line as shown in

    -ig. #4 for flushing the additional accumulator drain line to tank.

    +arry out the flushing as per the procedure in 3.0

    %emove the flushing device and restore the oil pipe line

    connections after declaring the completion of flushing operation

    to carry out flushing operation.

    Si#nat(e

    NTPC BHEL 

  • 8/18/2019 Hp by Pass System-modified

    15/21

    Station: NTPC –

    RAMAGU

    NDAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet 12 of 1%

    P'ant A(ea: B!)LER 

    Te*tin# S+&e,'e: : HP BPASS SSTEM

    ./.

    3.0.3.#

    3.0.3./

    3.0.3.1

    3.0.3.=

    3.0.3.<

    .%

    3.1.#

    3.1./

    3.1.0

    3.1.1

    3.1.=

    Re*to(ation

     %emove the flushing filter unit from the oil supply unit $'S(&.

    %estore all piping connection in the original condition.

    ,nstall 0 micron filter elements.

    %emove the pressure filter in both the pump discharge lines and clean

    them7 remove the dirty oil remaining in the filter bowl. Put the filter 

     back in position and put back the cover of these filters.

    he oil in the tanks should be drained and the man hole cover of the

    tanks should be opened. he suction filter in both the oil tanks are to be

    removed and cleaned. he tanks should be cleaned and visually

    inspected for its cleaniness. he suction filter and the man holes covers

    are put back in position and properly tightened . Both the oil tanks are

    to be filled with clean S:%' +';)L 1< oil to the ma2 level and

    keep open the isolating valve in the interconnection line. he drum of 

    Servo +onval 1< shall be kept vertical for allowing any setteliment to

    settle for a certain period$at least a week& before oil flushing in to the

    tank.

    C!MM)SS)!N)NG

    +heck the operation of bypass valves $BP&7 emperature control valves

    $BP:& and the ,solation valve :1= S from control desk $(+B&.

    )djust the stroke locally for full open!close $1 to /4 m)&.

    +alibrate the position feedback transmitters $BP& bypass valves as wellas $BP:& temperature control valves

    Set for valve opening time of BP 5 BP: valves at #4 seconds for full

    open by adjusting the throttle valve located in EF line near the actuator 

    of each valve.

    +harge the oil in fast opening system. +heck the operation of BP valves

    from (+B8+ontrol desk -ast openC push button.

    Si#nat(eNTPC BHEL 

  • 8/18/2019 Hp by Pass System-modified

    16/21

    Station: NTPC –

    RAMAGUN

    DAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet 1/ of 1%

    P'ant A(ea: B!)LER 

    Te*tin# S+&e,'e: : HP BPASS SSTEM

    +heck the timing for full open when the -ast 'penC PB actuated.

    Set 0 seconds for full open by adjusting the throttle valve in the fast

    opening device.

    3.1.< :nsure calibration of pressure and temperature transmitters. :2tend

    supply and adjust for Aero of the span .

    3.1.> +heck for the availability and proper termination of cable for fastopening criteria like $,& "+B open $ii& urbine load shedding relay

    operating $iii& urbine trip $iv& Pressure deviation too high7 etc. and

    also for closing criteria like condenser vacuum low7 etc.

    3.1.3 +heck the over rides and interlocks for the following important

    functions.

    .%. 3!R BP ALES

    3.1.D.#

    3.1.D./

    3.1.D.0

    3.1.D.1

    3.1.D.=

    3.1.D.<

    .%.10

    - BP closing over ride

    -B9 closing over ride

    - B9 opening interlock 

    - BP: auto interlock 

    - -ast opening

    - Protection over ride.

    3!R BPE ALES

    3.1.#4.#

    3.1.#4./

    3.1.#4.0

    -)uto interlock 

    - 'pening signal

    - +losing interlock 

    Geep the HP bypass system on )uto operation when the unit is in

    service and check adjust the autoloops for $,& pressure master 

    controller $ii& temperature controller and $iii& fast opening system?

  • 8/18/2019 Hp by Pass System-modified

    17/21

    Si#nat(e

    NTPC BHEL 

    Station: NTPC –

    RAMAGUNDAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A

      NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01%

    S&eet 1% of 1%

    P'ant A(ea: B!)LER 

    Te*tin# S+&e,'e: HP BPASS SSTEM

    D.4 C!MPLET)!N CR)TER)A

    +ommissioning of HPBP system completed by carrying out the

     proposals successfully and acceptable manner as mentioned in section0.4.

  • 8/18/2019 Hp by Pass System-modified

    18/21

     

    Si#nat(e

    NTPC BHEL 

    Station: NTPC –RAMAGUN

    DAM

      BHEL Ref No. : PS - DC - 202 – 500 – 001A  NTPC Ref No. : C!S-C!MM-R-Co""#.-PR!$01% S&eet 2 of 1%

    P'ant A(ea: B!)LER 

    Te*tin# S+&e,'e: : HP BPASS SSTEM

    1.0

    #.#

    #./

    STATUS

    Si#nat(e

    NTPC BHEL 

  • 8/18/2019 Hp by Pass System-modified

    19/21

    HP BPASS SSTEM

    PROJECT M/S RAMAGUNDAM, UNIT- 7, 500 MW

    PROCEDURE HP BY PASS SYSTEM

    PURPOSE OF

    DOCUMETFOR EXECUTION / INFORMATION

    DOCUMENT PS:TSX:178:00:0

  • 8/18/2019 Hp by Pass System-modified

    20/21

    Copy No:

    Issued to :

    00 KJ MKS KB 08.09.2003

    Rev.No. Prepared by Revieed by !pproved by "ate

    B#!R!$ #%!&' %(%C$RIC!(S (IMI$%"PSSR)$%C#NIC!( S%R&IC%S

    *+*, !--a Saai, Na-da-a/,C&ennai – 00 0/5.

    !)L P)P)NG 3!R HP B PASS

    SSTEM ?TP)CAL7

    RAMAGUNDAM UN)T- 500M8

    RAMAGUNDAM UN)T- 500M8

    RAMAGUNDAM UN)T- 500M8

  • 8/18/2019 Hp by Pass System-modified

    21/21

    RAMAGUNDAM UN)T- 500M8

    RAMAGUNDAM UN)T- 500M8

    RAMAGUNDAM UN)T- 500M8