20
JSC “Institute Hydroproject” experience in design and construction of high RCC dams JSC “Institute Hydroproject” experience in design and construction of high RCC dams
Transcript
Page 1: HPI experience in high RCC Dams

JSC “Institute Hydroproject” experience in design and 

construction  of  high RCC dams

JSC “Institute Hydroproject” experience in design and 

construction  of  high RCC dams

Page 2: HPI experience in high RCC Dams

2June, 2014

JSC “INSTITUTE HYDROPROJECT” (Moscow)

HIGH RCC HIGH RCC

DAMSDAMS

Page 3: HPI experience in high RCC Dams

3

HPI & RusHydro International AG in India

Main Features of HEPs  

designed by HPI and HEPs for bidding jointly with RHI (India) 

  

Features 

 Tehri HPP (India) 

 Son La HEP (Vietnam) 

 Lay Chao 

HEP (Vietnam) 

Upper Subansiri 

HEP (India) 

 Sawalkote 

HEP (India) 

 Bunakha HEP 

(Bhutan) 

 Sankosh HEP 

(Bhutan) 

Upper Siang HEP stage II (India) 

Upper Siang HEP stage I (India) 

Dam (type and height, m) 

CCRD 260,5 

RCC 138 

RCC 120 

RCC 237 

RCC 193 

RCC 197 

RCC 285 

RCC 140 

RCC 240 

 HPP Type (N inst) 

Underground 1000 MW (4x250) 

Surface 2400 MW (6x400) 

Surface 1200 MW (3x400) 

Surface 1800 MW (6x300) 

Underground 1856 MW  

Surface 180 MW (3x60) 

Underground 4060 MW 

Underground or Surface 3750 MW 15x250 

Underground 6000 MW 16x375 

Scope of Consultancy services 

From FS up to putting into operation 

From FS up to putting into operation

FS, DPR (Under construction)

Finalizing of DPR 

Bidding  for PMC 

  Participation in FS for  RCC design

   

Date of putting into operation 

2006  2012  Planned 2016  ‐  ‐  ‐  ‐  ‐  ‐ 

 

Page 4: HPI experience in high RCC Dams

The Capanda dam is sited on the middle reaches of the Kwanza river inMelange province.It comprises the following features:110 m high RCC gravity dam with crest length of 1450 m, concrete volume is 882 700 m3, including RCC 680 000 m3.

Capanda Dam in Angola

Maximum discharge capacityof spillways – 9030 m3/s.Power house located at damtoe. Installed capacity is 520MW.The main purpose of thedevelopment is electricitygeneration.Commissioning of theCapanda HPC units wasstarted in 2007.

Client: Committee on Development of the Middle Kwanza River (GAMEC)

Page 5: HPI experience in high RCC Dams

Son La HPP in Vietnam

Son La HPP is sited on the Dariver. It comprises the following features:138 m high RCC gravity dam with crest length of 964 m, RCC volume is 1 500 000 m3

Client: Son La Hydropower Project Management Board (SLaMB)

Spillway designed to pass 38000 m3/s.2400 MW (6 x 400 MW) – installed capacity of Power house . Commissioning of the Son La HPP units was started in 2012.

Page 6: HPI experience in high RCC Dams

Son La HPP in Vietnam

Page 7: HPI experience in high RCC Dams

Son La HPP in Vietnam

Page 8: HPI experience in high RCC Dams

Upper Subansiri HPP in Arunachal Pradesh

Upper Subansiri HPP is sited on the Subansiri river. It comprises the following features:237m high RCC gravity dam with crest lengthof 533 m, RCC volume is 3 500 000 m3,1800 MW (6 x 300 MW) – installed capacity of Power house .

Client: KSK Group (India)

Preparation of DPR – 2014

Page 9: HPI experience in high RCC Dams

Upper Subansiri HPP in Arunachal Pradesh

Page 10: HPI experience in high RCC Dams

Lay Chao HPP on the Da river in Vietnam

Client: Electricity of Vietnam (EVN)

Lay Chao HPP is sited on the Da river. It comprises the following features:

- 120 m high RCC gravity dam , - RCC volume is 890 000 m3

- 1200 MW (3 x 400 MW) –installed capacity of HPP

Page 11: HPI experience in high RCC Dams

Recommended technology of the non-stop manufacturing, transportation and placing of RCC illustrated through the Construction of the Gibe-III HEP

Telescopic placing conveyor mounted on tracked chassis, typically used on the surface of RCC dams for final placing of material with "all-conveyor" systems

Gibe III HEP comprises the following features:246 m high RCC gravity dam with crest length of 580 m, RCC volume is 6144000 m3

Termination of the HEP construction -2014

This technology allows in two working shifts to provide RCC placing within the intensity between 12000 to 150000 m3/month

Gibe-III HEP (1870 MW) in Ethiopia

Page 12: HPI experience in high RCC Dams

Sankosh Hydro-Electric Project in Bhutan

Page 13: HPI experience in high RCC Dams

Sankosh Hydro-Electric Project in Bhutan

Page 14: HPI experience in high RCC Dams

14

Upper Siang Project (Stage I) in Arunachal Pradesh State

Page 15: HPI experience in high RCC Dams

15

Upper Siang Project (Stage I) in Arunachal Pradesh

Page 16: HPI experience in high RCC Dams

Upper Siang Project (Stage I) in Arunachal Pradesh

16

RCCRCC

Page 17: HPI experience in high RCC Dams

Tehri Project on the Bhagirathi River in India

General layout

Main dam section

View of the project

Salient features of the projectReservoir 3.54 km3

Rockfill dam 260.5 mChute spillway 5490 m3/sShaft spillway 4 pcs. 7560 m3/sHPP 1000 MW (4 x 250 MW)Years of construction 1997 – 2007PSP 1000 MW (4 x 250 MW)

Salient features of the projectReservoir 3.54 km3

Rockfill dam 260.5 mChute spillway 5490 m3/sShaft spillway 4 pcs. 7560 m3/sHPP 1000 MW (4 x 250 MW)Years of construction 1997 – 2007PSP 1000 MW (4 x 250 MW)

RusHydro

Page 18: HPI experience in high RCC Dams

Chute

Tehri project on the Bhagirathi River in India RusHydro

Page 19: HPI experience in high RCC Dams

Shaft spillway

Tehri project on the Bhagirathi River in India RusHydro

Page 20: HPI experience in high RCC Dams

Institute Hydroproject

Phone +7 (495)727-36-84

Fax +7 (499)158-04-89

125993, Moscow, Volokolamskoye shosse, 2

www.hydroproject.ru

[email protected]

THANK YOU!THANK YOU!