+ All Categories
Home > Documents > HSTH GM AREA CHECKING REPORT

HSTH GM AREA CHECKING REPORT

Date post: 19-Mar-2016
Category:
Upload: hertz
View: 22 times
Download: 0 times
Share this document with a friend
Description:
HSTH GM AREA CHECKING REPORT. TUESDAY, 28 JANUARY 2014. pa D jajaran AREA H ouse phone position unSyMmetrical. PADJAJARAN 1 Electricity Panel not closed properly. Batu tulis area Table cloth color not match and dirty. batu tulis area plant withered. kinanti stair case dirty mirror. - PowerPoint PPT Presentation
Popular Tags:
8
TUESDAY, 28 JANUARY 2014 HSTH GM AREA CHECKING REPORT
Transcript

TUESDAY, 28 JANUARY 2014

HSTH GM AREA CHECKING REPORT

PADJAJARAN AREAHOUSE PHONE POSITION UNSYMMETRICAL

PADJAJARAN 1ELECTRICITY PANEL NOT CLOSED PROPERLY

BATU TULIS AREATABLE CLOTH COLOR NOT MATCH AND DIRTY

BATU TULIS AREAPLANT WITHERED

KINANTI STAIRCASEDIRTY MIRROR

ARCADE 1 ROOMTABLE CLOTH DIRTY

GALUH CORRIDORSPOT ON THE CARPET


Recommended