    Currency: US Dollars

    Project No:

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Tender Title: Customs and Police Office Buildings

    Original Issue: February 25, 2010

    810

    Customs and Police Office Buildings

    NOTICE TO ALL BIDDERS - COMPLETE PROJECT PRICE:

    3. Eventual claims for extra works are covered by project generaldocumentation of contract.

    1. All bidders MUST examine the complete project documents. These

    documents include the Drawings, BOQ, Schedules and Specifications.

    Any discrepancies between these documents are to be brought to the

    immediate attention of UNOPS Engineer.

    2. Quotation given by the contractor on this BOQ are to cover any and all

    additional materials, labor or associated costs to complete the works as

    documented on the complete project documents.

    UNOPS

    UNITED NATIONS OFFICE FOR PROJECT SERVICES

    BILL OF QUANTITIES

    Ai Khanem Border Crossing Point Facilities

    Takhar, Afghanistan

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    2/24

     

    Ai Khanem Border Crossing Point Facilities

    Takhar, Afghanistan

    Customs Office Building

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    3/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Customs Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost

    1. General

    1.1 Preliminaries  1.1 Occupied Areas, 1.1 ExistingServices Schedule and  1.1 Items

    to be supplied schedules

    1 Pre-construction work, mobilisation activitiesincluding paper/ documentation tasks. LS 1.00  - 

    2 Post construction works and clean up.LS 1.00  - 

    1.2 General Requirements  1.2 Inspection notificationschedule and  1.2 Warranty

    schedules

    1 Testing and Operation/Maintenance Manuals.LS 1.00  - 

    Subtotal General  - 

    2. Site

    2.3 Earthwork  2.1 Identified hazardous materialsand  2.3 Earthwork schedules

    1 Excavation (any soil type) for foundation.This item includes all excavations, disposal andtemporary support or shoring if needed. See

    drawing and schedule for details.CU.M 246.00  - 

    2 Ground improvement under foundations.This includes supplying of filling materials and

    compacting the layers according to schedule

    and drawings. CU.M 110.00  - 

    3 Soil backfilling on RCC math foundation up toground level. This includes supplying of needed

    materials. See drawings and schedules for

    levels/dimensions and details. CU.M 190.00  - 

    4 Gravel compaction, Class 2, at any placesunder the PCC/RCC shown inside the building

    or at sidewalk/ramp. This includes supplying of

    needed materials. See drawing and projectschedules for dimensions and details.

    CU.M 75.00  - 

    Subtotal Site - 

    3. Structure

    3.1 Concrete-General  3.1 Non reinforced concrete, 3.1Reinforced concrete and  3.2

    Concrete- Integral Finishes

    schedules

    1 PCC lean concrete (10 Mpa) under the RCCfoundations. CU.M 13.00  - 

    2 RCC (20 Mpa) foundations, rectangular andtrapezoidal foundation beams. CU.M 140.00  - 

    3 PCC, 40mm thick, lean concrete (10 Mpa) atthe floor over the gravel compaction. CU.M 19.00  - 

    NOTE: Cost for concrete items in this section

    includes reinforcement, steel anchorage embedded

    in concrete, shuttering, concrete, concrete curing

    and all to the complete job.

    Pos.

    UNOPS

    DETAILS OF COMPONENTVertical Structures Unit

     

    3/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    4/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Customs Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.

    4 PCC concrete, 100mm thick, (20 Mpa) at thefloor over the water-proofing layer. This item

    includes the stairs steps at the entrances and

    the ramps. CU.M 47.00  - 

    5 RCC Columns, includes all columns (from -1.65to +3.55) and supporting columns/ring beams

    for trusses on the roof. CU.M 82.00  - 

    6 RCC (20 Mpa) slabs and beams. The itemscovers all slabs, beams and RCC floor for the

    bank. CU.M 86.00  - 

    7 RCC Pavement (20 Mpa), for 1000mm-wideside walks. This includes entrances and ramps.

    The cost includes expansion joint on side walk

    surface as shown and as well as the broomfinish to the side walk/ ramp surfaces.

    CU.M 15.00  - 

    3.3 Pre-cast RC Concrete  3.3 Precast Concrete PrototypesSchedule

    1 Precast RCC (20 Mpa) exterior window sill forall windows as per drawings. This includes all

    work need for complete installation.Lin M 29.00  - 

    3.5 Brickwork  3.5 Brickwork constructionschedule

    1 Second Class Brick masonry with mortar. Thisincludes all brick walls/ brick masonry in the

    entire building. The cost includes steel bars

    shown in the walls and their connection to the

    perimeter RCC elements. CU.M 60.00  - 

    3.9 Light Timberwork  3.9 Light Timberwork schedule,6.6 Interior painting and  6.6

    Exterior painting schedules

    1 Roof timber structure on the trusses. The costincludes 30mm thick wooden planks as shown

    on the drawing. This also cover all auxiliary and

    needed materials and supplying and installation

    of members including painting to make the

    surface ready for folded metal sheet roofing

    according to the drawing, schedule and

    specifications. SQ.M 680.00  - 

    3.10 Concrete Unit Masonry  3.10 Concrete Unit Masonry

    1 CMU masonry with mortar. This item covers allCMU works shown on the drawings for the

    building. The cost includes all needed

    materials, steel bars, anchors etc and works. CU.M 60.00  - 3.11 Structural Steel  3.11 Structural Steel Schedules

    1 Steel support, purlin, at the metal sheet roof as(C-shape 140x65mm + L-shape 50x50mm).

    See drawing for details. Lin M 560.00  - 

    2 Steel truss (TRUSS 1) at the roof. See drawingfor details. No 6.00  - 

    3 Steel truss (TRUSS 2) at the roof. See drawingfor details. No 4.00  - 

    4 Steel truss (TRUSS 3) at the roof. See drawingfor details. No 2.00  - 

    NOTE: Cost for steel related items in this section

    includes supplying materials and installation to the

    complete condition for all members, gussets,

    fasteners, connections, welding and other

    accessories and works needed to complete the job.

    The cost also includes painting according to the

    schedules and specifications for steel member

    painting, which is at least on coat of anti-rust

    followed by 2 other coats of oil-based painting for all

    surfaces and sides of the steel members.

    4/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    5/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Customs Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.

    5 Steel truss (TRUSS 4) at the roof. See drawingfor details. No 8.00  - 

    6 Steel truss (TRUSS 5) at the roof. See drawingfor details. No 2.00  - 

    7 Steel truss (TRUSS 6) at the roof. See drawingfor details. No 2.00  - 

    8 Steel truss (TRUSS 7) at the roof. See drawingfor details. No 8.00  - 

    9 Steel truss (TRUSS 8) at the roof. See drawingfor details. No 2.00  - 

    10 Steel truss (TRUSS 9) at the roof. See drawingfor details. No 4.00  - 

    11 Steel truss (TRUSS 10) at the roof. See

    drawing for details. No 4.00  - 12 Steel truss (TRUSS 11) at the roof. See

    drawing for details. No 1.00  - 

    13 Steel frame fixed ladder inside the toilet as theaccess way to the roof. The work and the cost

    includes construction of fixed later to the wall

    and the opening pane, its hardware and other

    accessories to complete the installation as per

    drawing and schedule. This also includes

    painting according to the schedules and

    specifications for steel surfaces painting.LS 1.00  - 

    Subtotal Structure - 

    4. Enclosure

    4.1 Waterproofing  4.1 Waterproofing systemschedule

    1 Bitumen water-proofing coat. This is a 3-5mmthick hot bitumen painting coats on dried PCC

    surface. The item applies on 40mm PCC at the

    floor beneath the 20 Mpa, 100mm thick PCC

    layer. This cost includes supplying and applying

    the coats with all needed accessories and work

    to do the job as per manufacturer's data and to

    the full satisfaction of UNOPS engineer.SQ.M 470.00  - 

    2 Single layer bitumen membrane at the floor andwalls of toilets/kitchen. This includes

    preparation of base layers shown on the

    drawings. Refer to schedule/drawing for details.

    SQ.M 55.00  - 4.2 Roofing  4.2 Roofing materials, and  4.2

    Gutter and Down pipe Schedules

    1 Standing seam metal roofing (using GI sheetgauge 24). This includes all accessories

    required for installation of roof on the prepared

    timber plank (see item 3.9.1 for the cost of

    timber plank on roof). The cost also includes all

    flashings, capping etc needed on the metal roof.SQ.M 680.00  - 

    2 Metallic gutter around the roof (using GI sheetgauge 20). The cost includes all accessories

    required for complete installation of gutter such

    as supplying, fixing and others as per drawing

    and schedules.Lin M 116.00  - 

    3 Down pipes, PVC pipe class-B. This includesall accessories required for complete installation

    such as supplying, fixing and others as per

    drawing and schedules.Lin M 45.00  - 

    5/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    6/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Customs Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.

    4.3 Windows and Window Hardware  4.3 Window, 4.3 WindowHardware, 4.5 Annealed Glasses,

    and  4.6 Glassblock work

    schedules

    1 Wooden frame windows. The work includesmaking, transportation, installation, hardware,

    glazing, glass-block work around window,

    insect screen, 3 coats of oil-based painting, and

    other accessories required for complete

    installation as per drawings and schedule.SQ.M 63.00  - 

    4.4 Doors and Door Hardware  4.4 Joinery doors 4.4 PVC doors,4.4 Steel doors and  4.5 Annealed

    Glasses schedules

    1 Wooden frame doors. The work includesmaking, transportation, installation, hardware,

    glazing, and other accessories required for

    complete installation as per drawings and

    schedule. SQ.M 76.00  - 

    2 PVC frame doors. The work includes making,transportation, installation, hardware, glazing,

    and other accessories required for complete

    installation as per drawings and schedule.SQ.M 6.00  - 

    3 Steel frame doors. The work includes making,transportation, installation, hardware, glazing, 1

    coat of anti-rust followed by 2 other coats of oil-

    based painting, and other accessories required

    for complete installation as per drawings and

    schedule.SQ.M 2.00  - 

    4.5 Glazing  4.5 Mirrors schedules

    1 Mirrors (40x60cm) at toilets. This includescomplete installation. No 5.00  - 

    4.7 Insulation and Vapour Barriers  4.7 Insulation Schedules

    1 Glasswool thermal insulation on RCC roof,beneath roof structure. See drawings and

    schedules for details. SQ.M 640.00  - 

    4.8 Exterior Insulation and Finish System  4.8 EFIS Schedules

    1 External wall insulation system, STOTHERMCLASSIC, (expanded polystyrene foam and

    organically bound render) "or equivalent ". See

    drawing and schedule for location and detail.

    The cost includes one preparation layer of

    cement render and all other process required for

    a complete job as per product's manufacturer

    data and UNOPS engineer satisfaction.SQ.M 310.00  - 

    Subtotal enclosure - 

    5. Interior5.4 Suspended Ceiling  5.4 Suspended Ceiling Schedule

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    6/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    7/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Customs Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.

    1 Lasani wooden board, 16mmm, fixed ceiling forall soffits around the building. The cost includes

    all framing, fixing, oil based painting and

    needed work for a complete job to the full

    satisfaction of Engineer. SQ M 152.00  - 

    2 Gypsum board, 16mmm, reflected ceiling forthe side entrances of the building. The cost

    includes all framing, fixing, and needed work for

    complete job. SQ M 4.00  - 

    5.5 Joinery  5.5 Joinery fixtures schedule

    1 Wooden frame, MDF finish, wall mountedcabinet at the kitchen. See drawings for details.

    The cost includes making, installation, framing,

    hardware, finish, 3 coats oil-based painting and

    all to the complete job.LS 1.00  - 

    2 Wooden frame, MDF finish, floor mountedcupboard at the kitchen. See drawings for

    details. The cost includes making, installation,

    framing, finish, hardware, stone table top,

    splash back, 3 coats oil-based painting and all

    to the complete job. LS 1.00  - 

    5.6 Metalwork  5.6 Metal Fixtures Schedule

    1 Metallic plaster beads for outer corners at thecorridors only, including edge of walls. This

    includes any needed work for complete

    installation. See schedules and drawings for

    details. Lin M 70.00  - 

    2 Toilet roll holders. This also includes installation.No 3.00  - 

    3 Grab rail for handicap toilet. One complete set.This includes supplying and complete

    installation. LS 1.00  - 

    4 Soap dishes. This also includes installation.No 4.00  - 

    5.8 Fire Extinguishers and Blankets  5.8 Fire Extinguishers Schedule

    1 Extinguishers, wall mounted, powder-type (9kg).No 4.00  - 

    Subtotal Interior  - 

    6. Finish

    6.1 Plastering  6.1 Plastering Schedule

    Internal surfaces

    1 Cement render medium CRM followed bycement render fine CRF on all internal surfaces

    of walls/ ceilings/ beams/ columns/ reveals. See

    schedule for detail. SQ.M 1,100.00  - 

    External surfaces

    2 Gypsum board, decorative finish, at both mainentrances foreheads. The cost includes

    supplying, making, installation and all to the

    complete condition as per Engineer's approval.

    SQ.M 40.00  - 

    6.2 Cementitious Toppings  6.2 Cementitious Toppings

    ScheduleNOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    7/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    8/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Customs Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.

    1 In situ colored chips, colored mortar terrazzo,including marble trims for joints, for all floors as

    shown on the drawing. See schedule for details.

    The cost also includes stainless steel nosing at

    the outer edges of the stair steps at the

    entrances. SQ.M 510.00  - 

    6.3 Tiling  6.3 Wall tiling and  6.3 Floor tilingschedules

    1 Ceramic wall tiles for toilets, kitchen, around thedrinking water fountain and any place shown.

    The cost includes bed preparation, bedding and

    grout. SQ.M 70.00  - 

    2 Ceramic floor tiles for toilets including bedpreparation, bedding and grout. SQ.M 35.00  - 

    3 Marble skirting for all rooms and halls where didnot receive ceramic tiles. The cost includes

    bedding and grout. Lin M 450.00  - 

    6.6 Painting  6.6 Interior/Exterior paintingschedule

    Internal surfaces

    1 Flat water based: Interior, on all surfaces thatreceive cement plaster. The cost includes wall

    putty (gypsum filling) layer before painting and

    all needed preparation of the surfaces for

    painting. See schedule for detail on this paint

    system SQ.M 1,100.00  - 

    Subtotal Finishes - 

    8. Water Services

    8.1 Water Services  8.1 Water services samples, 8.1Water system piping, 8.1 Sanitary

    fixtures, 8.1 Water heater

    schedules and  8.1 Water

    Services Testing schedules

    NOTE: The cost for all pipes exposed to

    weather includes glass wool thermal insulation

    cover. The cost given for all GI and PVC pipes

    with diameter less than 60mm includes all

    required fittings, accessories and work for

    complete system installation.

    Water supply piping

    1 GI water supply pipe D=32mm, includingfittings and installation. Lin M 30.00  - 

    2 GI water supply pipe D=25mm, includingfittings and installation. Lin M 22.00  - 

    3 GI water supply pipe D=20mm, includingfittings and installation. Lin M 25.00  - 

    4 GI water supply pipe D=15mm, includingfittings and installation. Lin M 50.00  - 

    5 Water supply bronze Valve D=32mm, includingfittings and installation. No 2.00  - 

    6 Water supply bronze Valve D=20mm, including

    fittings and installation. No 1.00  - 7 Damp proof Insulation rubber tape for all GI

    Piping. Lin M 150.00  - 

    8 Water supply inspection manhole less than1200mm deep. This includes excavation and

    any needed work to make the manhole as per

    drawings and schedule. No 3.00  - 

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    8/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    9/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Customs Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.

    Sanitation Piping

    9 PVC pipe D=100mm, including supply andinstallation. This also includes supply and

    installation of PVC pipe from GI sheet

    downpipes to the open channel collector at the

    side walks. Lin M 34.00  - 

    10 PVC pipe D=50mm, including fittings andinstallation. Lin M 50.00  - 

    11 Ventilation PVC pipes D=100mm (from toiletsto roof). This also includes supplying and

    installation of PVC screen at the pipe inlets

    inside the toilets. See drawing and schedule for

    details. Lin M 15.00  - 

    12 Ventilation PVC pipes D=50mm (from toilets toroof). This also includes supplying and

    installation of PVC screen at the pipe inlets

    inside the toilets. See drawing and schedule for

    details. Lin M 10.00  - 

    13 PVC Elbow D=100x100,45 , including supplyand installation. No 4.00  - 

    14 PVC Tee D=100x100, 45 , including supply andinstallation. No 8.00  - 

    15 Sanitation Grease Trap less than 1200mmdeep. This includes excavation and any needed

    work to make the manhole according to the

    drawings and schedules. No 1.00  - 

    Sanitary and other fixtures

    16 Western toilet, including supply, installation and

    accessories. No 3.00  - 17 Water fountain , including supply, installation

    and accessories. No 2.00  - 

    18 Ceramic sink at toilets and labs, including mixerand all accessories, supplying and installation.

    No 4.00  - 

    19 Floor trap D=50mm, including supply andinstallation. No 6.00  - 

    20 Stainless steel sink, including supply andinstallation. No 1.00  - 

    21 Ventilation cap D=100mm, including supplyand installation. No 2.00  - 

    22 Ventilation cap D=50mm, including supply andinstallation. No 1.00  - 

    23 Service Sink, including supply and installation.No 1.00  - 

    24 Electrical water boiler with capacity of 50 Liter,including supply and installation. No 2.00  - 

    25 Electrical water boiler with capacity of 30 Liter,including supply and installation. No 1.00  - 

    26 Sewer Manholes More than 1200mm deep.This includes excavation and any needed work

    to make the manhole according to the drawings

    and schedules. No 2.00  - 

    Subtotal Water Services - 

    9. Electrical Services

    9.1 Electrical Services  9.1 Electrical systems, 9.1Electrical supply mains, 9.1

    Electrical switchboard design, 9.1

    Main 380VAC DistributionSystem, 9.1 Panel Construction,

    9.1 Power accessories, 9.1

    Lighting control and fittings, 9.1

    Fire Detection Equipment

    Schedule Schedules and  the

    Attachments

    9/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    10/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Customs Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.

    Note: for all items below the cost includes

    complete/installations with all needed

    accessories and works.

    Switchboard and sub boards

    1 Sub distribution panel, 750x500x250 mm,powder coated, weatherproof, outdoor mounted

    metal. With Digital Measurement equipments.No. 1.00  - 

    2 Main circuit breaker, MCCB, 3x160Amps, Type-C. No. 1.00  - 

    3 Circuit breaker, MCB, 1x32Amps, Type-CNo. 16.00  - 

    4 Circuit breaker, MCB, 1x20Amps, Type-C

    No. 38.00  - Distribution wiring

    5 3 (1X6mm2) wires pulled in 24mm PVCConduit, assorted colors as per phase

    requirement RST/UVW, white color for neutral

    and green color for grounding. Lin M 600.00  - 

    6 3 (1X4mm2) wires pulled in 24mm PVCConduit, assorted colors as per phase

    requirement RST/UVW, white color for neutral

    and green color for grounding. Lin M 1,500.00  - 

    Fittings/Fixtures

    7 Single pole/double pole or two way light switch.No 42.00  - 

    8 32W circular surface ceiling mount, IP54fluorescent light fixture. No 35.00  - 

    9 60W circular Pendant ceiling mount, IP54fluorescent light fixture with all accessories. No 21.00  - 

    10 60W Circular Surface ceiling mount, IP54fluorescent light fixture with all accessories. No 7.00  - 

    11 2x36W pendant ceiling mounted fluorescentlight fixture, IP-44.with all accessories. No 25.00  - 

    12 1x36W pendant ceiling mounted fluorescentlight fixture, IP-56. with all accessories. No 2.00  - 

    13 16 Amp Duplex power receptacle.No 98.00  - 

    14 16 Amp single water proof power receptacle.No 9.00  - 

    15 25 Amp single water proof power receptacle forelectrical water heater and kitchen. No 9.00  - 

    AC/Split Units and Exhaust fans

    16 12000 BTU AC/ Split unit 220 V, 50 HZ

    Samsung made in Italy with all accessories. No 15.00  - 17 Roof mounted exhaust fans .

    No 3.00  - 

    18 25 Amp single electrical non-fuse disconnectingswitch for AC/ Split unit. No 15.00  - 

    Emergency evacuation lighting

    19 2x10 watt IP-65 wall mounted Emergency LightFixture. No 7.00  - 

    20 1X10W surface mounted IP-40 Exit light.No 4.00  - 

    Fire alarm system (including all associated

    cabling, wiring, mounting, etc)

    21 Addressable fire alarm panel, with allaccessories, to the complete and functioning

     job. LS 1.00  - 

    22 Fire alarm push button, double action type, ULListed No 4.00  - 

    23 Fire alarmNo 4.00  - 

    24 Photoelectric type smoke detectors, UL ListedNo 22.00  - 

    Electrical Grounding and Lightning

    Protection.

    10/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    11/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Customs Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.

    25 Lightening protection as mentioned in lighteningprotection drawing with air terminal, electrodes,

    tape, connectors, clamp and grounding cableSet 1.00  - 

    26 Grounding system as mentioned in groundingdrawing with electrodes, tape, connectors,

    clamp and grounding cable Set 1.00  - 

    Labeling

    27 Proper and correct all circuits numbering, cablecircuit drawings, cable and switchboard labeling

    to the full satisfaction of UNOPS engineer.LS 1.00  - 

    Subtotal Electrical Services - 

    11/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    12/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Customs Office Building

    Original Issue: February 25, 2010

    Work Type

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    Total for General

    Total for Site

    UNOPS

    SUMMARY OF COMPONENT

    Vertical Structures Unit

    Total for Customs Office Building 0.00

    Total for Electrical Services

    Total for Structure

    Total for Enclosure

    Total for Interior

    Total for Finish

    Total for Water Supply Services

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    13/24

     

    Ai Khanem Border Crossing Point Facilities

    Takhar, Afghanistan

    Police Office Building

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    14/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Police Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Unit Quantity Unit Cost Total Cost

    1. General

    1.1 Preliminaries  1.1 Occupied Areas, 1.1 ExistingServices Schedule and  1.1 Items to be

    supplied schedules

    1 Pre-construction work, mobilisation activities

    including paper/ documentation tasks.LS 1.00  - 

    2 Post construction works and clean up.LS 1.00  - 

    1.2 General Requirements  1.2 Inspection notification schedule and1.2 Warranty schedules

    1 Testing and Operation/Maintenance Manuals.LS 1.00  - 

    Subtotal General  - 

    2. Site

    2.3 Earthwork  2.1 Identified hazardous materials and2.3 Earthwork schedules

    1 Excavation (any soil type) for foundation.This item includes all excavations, disposal

    and temporary support or shoring if needed.See drawing and schedule for details.

    CU.M 190.00  - 

    2 Ground improvement under foundations.This includes supplying of filling materials and

    compacting the layers according to schedule

    and drawings. CU.M 85.00  - 

    3 Soil backfilling on RCC math foundation upto ground level. This includes supplying of

    needed materials. See drawings and

    schedules for levels/dimensions and details.CU.M 147.00  - 

    4 Gravel compaction, Class 2, at any placesunder the PCC/RCC shown inside the building

    or at sidewalk/ramp. This includes supplying

    of needed materials. See drawing and project

    schedules for dimensions and details.CU.M 60.00  - 

    Subtotal Site - 

    3. Structure

    3.1 Concrete-General  3.1 Non reinforced concrete, 3.1Reinforced concrete and  3.2 Concrete-

    Integral Finishes schedules

    1 PCC lean concrete (10 Mpa) under the RCCfoundations. CU.M 10.00  - 

    2 RCC (20 Mpa) foundations, rectangular andtrapezoidal foundation beams. CU.M 108.00  - 

    3 PCC, 40mm thick, lean concrete (10 Mpa) atthe floor over the gravel compaction. CU.M 15.00  - 

    NOTE: Cost for concrete items in this section

    includes reinforcement, steel anchorage embedded

    in concrete, shuttering, concrete, concrete curing

    and all to the complete job.

    Pos.

    UNOPS

    DETAILS OF COMPONENTVertical Structures Unit

     

    14/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    15/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Police Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Unit Quantity Unit Cost Total CostPos.

    4 PCC concrete, 100mm thick, (20 Mpa) at thefloor over the water-proofing layer. This item

    includes the stairs steps at the entrances and

    the ramps. CU.M 36.00  - 

    5 RCC Columns, includes all columns (from -1.65 to +3.55) and supporting columns/ring

    beams for trusses on the roof. CU.M 66.00  - 

    6 RCC (20 Mpa) slabs and beams. The itemscovers all slabs, beams and RCC floor for the

    bank. CU.M 66.00  - 

    7 RCC Pavement (20 Mpa), for 1000mm-wideside walks. This includes entrances and

    ramps. The cost includes expansion joint on

    side walk surface as shown and as well as thebroom finish to the side walk/ ramp surfaces.

    CU.M 12.00  - 

    3.3 Pre-cast RC Concrete  3.3 Precast Concrete PrototypesSchedule

    1 Precast RCC (20 Mpa) exterior window sill forall windows as per drawings. This includes all

    work need for complete installation.Lin M 23.00  - 

    3.5 Brickwork  3.5 Brickwork construction schedule

    1 Second Class Brick masonry with mortar. Thisincludes all brick walls/ brick masonry in the

    entire building. The cost includes steel bars

    shown in the walls and their connection to the

    perimeter RCC elements. CU.M 46.00  - 

    3.7 Light Steelwork  3.7 Light Steelwork, 6.6 Interior painting

    and  6.6 Exterior painting schedules

    NOTE: The following steel items include

    painting according to the schedules and

    specifications for steel member painting for

    complete installation. See drawing for details.

    1 Steel frame cabinet for First-Aid-Kits at thehall of Police Office Building. The item and its

    cost include making, transportation,

    installation, hardware, finishes and all other

    accessories and work required for a complete

    cabinet to the full satisfaction of the Engineer.

    LS 1.00  - 

    2 Steel frame cabinets for W eapon Storages atthe hall of Police Office Building. The item and

    its cost include making, transportation,

    installation, hardware, finishes and all other

    accessories and work required for a complete

    cabinet to the full satisfaction of the Engineer.

    LS 1.00  - 

    3.9 Light Timberwork  3.9 Light Timberwork schedule, 6.6Interior painting and  6.6 Exterior

    painting schedules

    1 Roof timber structure on the trusses. The costincludes 30mm thick wooden planks as

    shown on the drawing. This also cover all

    auxiliary and needed materials and supplying

    and installation of members including painting

    to make the surface ready for folded metal

    sheet roofing according to the drawing,

    schedule and specifications.

    SQ.M 495.00  - 

    3.10 Concrete Unit Masonry  3.10 Concrete Unit Masonry

    15/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    16/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Police Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Unit Quantity Unit Cost Total CostPos.

    1 CMU masonry with mortar. This item coversall CMU works shown on the drawings for the

    building. The cost includes all needed

    materials, steel bars, anchors etc and works.

    CU.M 46.00  - 

    3.11 Structural Steel  3.11 Structural Steel Schedules

    3.7 Light Steelwork Schedule

    1 Steel support, purlin, at the metal sheet roofas (C-shape 140x65mm + L-shape

    50x50mm). See drawing for details. Lin M 440.00  - 

    2 Steel truss (TRUSS 1) at the roof. Seedrawing for details. No 3.00  - 

    3 Steel truss (TRUSS 2) at the roof. Seedrawing for details. No 4.00  - 

    4 Steel truss (TRUSS 3) at the roof. Seedrawing for details. No 2.00  - 

    5 Steel truss (TRUSS 4) at the roof. Seedrawing for details. No 8.00  - 

    6 Steel truss (TRUSS 5) at the roof. Seedrawing for details. No 2.00  - 

    7 Steel truss (TRUSS 6) at the roof. Seedrawing for details. No 2.00  - 

    8 Steel truss (TRUSS 7) at the roof. Seedrawing for details. No 8.00  - 

    9 Steel truss (TRUSS 8) at the roof. Seedrawing for details. No 2.00  - 

    10 Steel truss (TRUSS 9) at the roof. Seedrawing for details. No 4.00  - 

    11 Steel truss (TRUSS 10) at the roof. Seedrawing for details. No 4.00  - 

    12 Steel truss (TRUSS 11) at the roof. Seedrawing for details. No 1.00  - 

    13 Steel frame fixed ladder inside the toilet as theaccess way to the roof. The work and the cost

    includes construction of fixed later to the walland the opening pane, its hardware and other

    accessories to complete the installation as per

    drawing and schedule. This also includes

    painting according to the schedules and

    specifications for steel surfaces painting.LS 1.00  - 

    Subtotal Structure - 

    4. Enclosure

    4.1 Waterproofing  4.1 Waterproofing system schedule

    1 Bitumen water-proofing coat. This is a 3-5mmthick hot bitumen painting coats on dried PCC

    surface. The item applies on 40mm PCC at

    the floor beneath the 20 Mpa, 100mm thick

    PCC layer. This cost includes supplying and

    applying the coats with all needed accessories

    and work to do the job as per manufacturer's

    data and to the full satisfaction of UNOPS

    engineer. SQ.M 360.00  - 

    NOTE: Cost for steel related items in this section

    includes supplying materials and installation to the

    complete condition for all members, gussets,

    fasteners, connections, welding and other

    accessories and works needed to complete the

     job. The cost also includes painting according to

    the schedules and specifications for steel memberpainting, which is at least on coat of anti-rust

    followed by 2 other coats of oil-based painting for

    all surfaces and sides of the steel members.

    16/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    17/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Police Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Unit Quantity Unit Cost Total CostPos.

    2 Single layer bitumen membrane at the floorand walls of toilets/kitchen. This includes

    preparation of base layers shown on the

    drawings. Refer to schedule/drawing for

    details. SQ.M 55.00  - 

    4.2 Roofing  4.2 Roofing materials, and  4.2 Gutterand Down pipe Schedules

    1 Standing seam metal roofing (using GI sheetgauge 24). This includes all accessories

    required for installation of roof on the prepared

    timber plank (see item 3.9.1 for the cost of

    timber plank on roof). The cost also includes

    all flashings, capping etc needed on the metal

    roof. SQ.M 495.00  - 2 Metallic gutter around the roof (using GI sheet

    gauge 20). The cost includes all accessories

    required for complete installation of gutter

    such as supplying, fixing and others as per

    drawing and schedules.Lin M 98.00  - 

    3 Down pipes, PVC pipe class-B. This includesall accessories required for complete

    installation such as supplying, fixing and

    others as per drawing and schedules.Lin M 38.00  - 

    4.3 Windows and Window Hardware  4.3 Window, 4.3 Window Hardware, 4.5Annealed Glasses, and  4.6 Glassblock

    work schedules

    1 Wooden frame windows. The work includesmaking, transportation, installation, hardware,

    glazing, glass-block work around window,

    insect screen, 3 coats of oil-based painting,

    and other accessories required for complete

    installation as per drawings and schedule.SQ.M 50.00  - 

    4.4 Doors and Door Hardware  4.4 Joinery doors 4.4 PVC doors, 4.4Steel doors and  4.5 Annealed Glasses

    schedules

    1 Wooden frame doors. The work includesmaking, transportation, installation, hardware,

    glazing, and other accessories required forcomplete installation as per drawings and

    schedule. SQ.M 60.00  - 

    2 PVC frame doors. The work includes making,transportation, installation, hardware, glazing,

    and other accessories required for complete

    installation as per drawings and schedule.SQ.M 6.00  - 

    3 Steel frame doors. The work includes making,transportation, installation, hardware, glazing,

    1 coat of anti-rust followed by 2 other coats of

    oil-based painting, and other accessories

    required for complete installation as per

    drawings and schedule.SQ.M 2.00  - 

    4.5 Glazing  4.5 Mirrors schedules

    1 Mirrors (40x60cm) at toilets. This includescomplete installation. No 5.00  - 

    4.7 Insulation and Vapour Barriers  4.7 Insulation Schedules

    1 Glasswool thermal insulation on RCC roof,beneath roof structure. See drawings and

    schedules for details. SQ.M 495.00  - 

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    17/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    18/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Police Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Unit Quantity Unit Cost Total CostPos.

    4.8 Exterior Insulation and Finish System  4.8 EFIS Schedules

    1 External wall insulation system,STOTHERM CLASSIC, (expanded

    polystyrene foam and organically bound

    render) "or equivalent ". See drawing and

    schedule for location and detail. The cost

    includes one preparation layer of cement

    render and all other process required for a

    complete job as per product's manufacturer

    data and UNOPS engineer satisfaction. SQ.M 250.00  - 

    Subtotal enclosure  - 

    5. Interior

    5.4 Suspended Ceiling  5.4 Suspended Ceiling Schedule

    1 Lasani wooden board, 16mmm, fixed ceilingfor all soffits around the building. The cost

    includes all framing, fixing, oil based painting

    and needed work for a complete job to the full

    satisfaction of Engineer.SQ M 117.00  - 

    2 Gypsum board, 16mmm, reflected ceiling forthe side entrances of the building. The cost

    includes all framing, fixing, and needed work

    for complete job. SQ M 4.00  - 

    5.5 Joinery  5.5 Joinery fixtures schedule

    1 Wooden frame, MDF finish, wall mountedcabinet at the kitchen. See drawings for

    details. The cost includes making, installation,

    framing, hardware, finish, 3 coats oil-based

    painting and all to the complete job.LS 1.00  - 

    2 Wooden frame, MDF finish, floor mountedcupboard at the kitchen. See drawings for

    details. The cost includes making, installation,

    framing, finish, hardware, stone table top,

    splash back, 3 coats oil-based painting and all

    to the complete job. LS 1.00  - 

    5.6 Metalwork  5.6 Metal Fixtures Schedule

    1 Metallic plaster beads for outer corners at thecorridors only, including edge of walls. This

    includes any needed work for complete

    installation. See schedules and drawings for

    details. Lin M 54.00  - 

    2 Toilet roll holders. This also includesinstallation. No 3.00  - 

    3 Grab rail for handicap toilet. One completeset. This includes supplying and complete

    installation. LS 1.00  - 

    4 Soap dishes. This also includes installation.No 4.00  - 

    5.8 Fire Extinguishers and Blankets  5.8 Fire Extinguishers Schedule

    1 Extinguishers, wall mounted, powder-type(9kg). No 4.00  - 

    Subtotal Interior  - 

    6. Finish

    6.1 Plastering  6.1 Plastering Schedule

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    18/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    19/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Police Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Unit Quantity Unit Cost Total CostPos.

    Internal surfaces

    1 Cement render medium CRM followed bycement render fine CRF on all internal

    surfaces of walls/ ceilings/ beams/ columns/

    reveals. See schedule for detail. SQ.M 880.00  - 

    External surfaces

    2 Gypsum board, decorative finish, at both mainentrances foreheads. The cost includes

    supplying, making, installation and all to the

    complete condition as per Engineer's approval.

    SQ.M 40.00  - 

    6.2 Cementitious Toppings  6.2 Cementitious Toppings Schedule

    1 In situ colored chips, colored mortar terrazzo,including marble trims for joints, for all floors

    as shown on the drawing. See schedule for

    details. The cost also includes stainless steel

    nosing at the outer edges of the stair steps at

    the entrances. SQ.M 390.00  - 

    6.3 Tiling  6.3 Wall tiling and  6.3 Floor tilingschedules

    1 Ceramic wall tiles for toilets, kitchen, aroundthe drinking water fountain and any place

    shown. The cost includes bed preparation,

    bedding and grout. SQ.M 70.00  - 

    2 Ceramic floor tiles for toilets including bedpreparation, bedding and grout. SQ.M 35.00  - 

    3 Marble skirting for all rooms and halls wheredid not receive ceramic tiles. The cost

    includes bedding and grout. Lin M 360.00  - 

    6.6 Painting  6.6 Interior/Exterior painting schedule

    Internal surfaces

    1 Flat water based: Interior, on all surfaces thatreceive cement plaster. The cost includes wall

    putty (gypsum filling) layer before painting and

    all needed preparation of the surfaces for

    painting. See schedule for detail on this paintsystem SQ.M 880.00  - 

    Subtotal Finishes - 

    8. Water Services

    8.1 Water Services  8.1 Water services samples, 8.1 Watersystem piping, 8.1 Sanitary fixtures, 8.1

    Water heater schedules and  8.1 W ater

    Services Testing schedules

    NOTE: The cost for all pipes exposed to

    weather includes glass wool thermal insulation

    cover. The cost given for all GI and PVC pipes

    with diameter less than 60mm includes all

    required fittings, accessories and work forcomplete system installation.

    Water supply piping

    1 GI water supply pipe D=32mm, includingfittings and installation. Lin M 30.00  - 

    NOTE: Prior to work, samples must be approved byUNOPS Engineer.

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    NOTE: Prior to work, samples must be approved by

    UNOPS Engineer.

    19/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    20/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Police Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Unit Quantity Unit Cost Total CostPos.

    2 GI water supply pipe D=25mm, includingfittings and installation. Lin M 22.00  - 

    3 GI water supply pipe D=20mm, includingfittings and installation. Lin M 59.00  - 

    4 GI water supply pipe D=15mm, includingfittings and installation. Lin M 78.00  - 

    5 Water supply bronze Valve D=32mm,including fittings and installation. No 2.00  - 

    6 Water supply bronze Valve D=20mm,including fittings and installation. No 2.00  - 

    7 Damp proof Insulation rubber tape for all GIPiping. Lin M 200.00  - 

    8 Water supply inspection manhole less than

    1200mm deep. This includes excavation andany needed work to make the manhole as per

    drawings and schedule. No 4.00  - 

    Sanitation Piping

    9 PVC pipe D=100mm, including supply andinstallation. This also includes supply and

    installation of PVC pipe from GI sheet

    downpipes to the open channel collector at the

    side walks. Lin M 50.00  - 

    10 PVC pipe D=50mm, including fittings andinstallation. Lin M 45.00  - 

    11 Ventilation PVC pipes D=100mm (from toiletsto roof). This also includes supplying and

    installation of PVC screen at the pipe inlets

    inside the toilets. See drawing and schedule

    for details.Lin M 23.00  - 

    12 Ventilation PVC pipes D=50mm (from toiletsto roof). This also includes supplying and

    installation of PVC screen at the pipe inlets

    inside the toilets. See drawing and schedule

    for details. Lin M 8.00  - 

    13 PVC Elbow D=100x100,45 , including supplyand installation. No 10.00  - 

    14 PVC Tee D=100x100, 45 , including supplyand installation. No 15.00  - 

    15 Sanitation Grease Trap less than 1200mmdeep. This includes excavation and any

    needed work to make the manhole according

    to the drawings and schedules. No 1.00  - 

    Sanitary and other fixtures

    16 Western toilet, including supply, installationand accessories. No 5.00  - 

    17 Water fountain , including supply, installationand accessories. No 2.00  - 

    18 Ceramic sink at toilets and labs, includingmixer and all accessories, supplying and

    installation. No 6.00  - 

    19 Floor trap D=50mm, including supply andinstallation. No 7.00  - 

    20 Stainless steel sink, including supply andinstallation. No 1.00  - 

    21 Ventilation cap D=100mm, including supplyand installation. No 3.00  - 

    22 Ventilation cap D=50mm, including supplyand installation. No 1.00  - 

    23 Service Sink, including supply and installation.No 1.00  - 

    24 Electrical water boiler with capacity of 50Liter, including supply and installation. No 2.00  - 

    25 Electrical water boiler with capacity of 30Liter, including supply and installation. No 2.00  - 

    20/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    21/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Police Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Unit Quantity Unit Cost Total CostPos.

    26 Sewer Manholes More than 1200mm deep.This includes excavation and any needed work

    to make the manhole according to the

    drawings and schedules. No 3.00  - 

    Subtotal Water Services - 

    9. Electrical Services

    9.1 Electrical Services  9.1 Electrical systems, 9.1 Electricalsupply mains, 9.1 Electrical switchboard

    design, 9.1 Main 380VAC Distribution

    System, 9.1 Panel Construction, 9.1

    Power accessories, 9.1 Lighting controland fittings, 9.1 Fire Detection

    Equipment Schedule Schedules and  the

    Attachments

    Note: for all items below the cost includes

    complete/installations with all needed

    accessories and works.

    Switchboard and sub boards

    1 Sub distribution panel, 750x500x250 mm,powder coated, weatherproof, outdoor

    mounted metal. With Digital Measurement

    equipments. No. 1.00  - 

    2 Main circuit breaker, MCCB, 3x160Amps,Type-C. No. 1.00  - 

    3 Circuit breaker, MCB, 1x32Amps, Type-CNo. 12.00  - 

    4 Circuit breaker, MCB, 1x20Amps, Type-CNo. 30.00  - 

    Distribution wiring

    5 3 (1X6mm2) wires pulled in 24mm PVCConduit, assorted colors as per phase

    requirement RST/UVW, white color for neutral

    and green color for grounding. Lin M 400.00  - 

    6 3 (1X4mm2) wires pulled in 24mm PVCConduit, assorted colors as per phase

    requirement RST/UVW, white color for neutral

    and green color for grounding. Lin M 900.00  - 

    Fittings/Fixtures

    7 Single pole/double pole or two way lightswitch. No 38.00  - 

    8 32W circular surface ceiling mount, IP54fluorescent light fixture. No 26.00  - 

    9 60W circular Pendant ceiling mount, IP54fluorescent light fixture with all accessories. No 16.00  - 

    10 60W Circular Surface ceiling mount, IP54fluorescent light fixture with all accessories. No 2.00  - 

    11 2x36W pendant ceiling mounted fluorescentlight fixture, IP-44.with all accessories.

    No 16.00  - 

    12 1x36W pendant ceiling mounted fluorescentlight fixture, IP-56. with all accessories.

    No 3.00  - 

    13 16 Amp Duplex power receptacle.No 54.00  - 

    14 16 Amp single water proof power receptacle.No 16.00  - 

    15 25 Amp single water proof power receptaclefor electrical water heater and kitchen.

    No 12.00  - 

    AC/Split Units and Exhaust fans

    16 12000 BTU AC/ Split unit 220 V, 50 HZSamsung made in Italy with all accessories.

    No 8.00  - 

    21/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    22/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Police Office Building

    Original Issue: February 25, 2010

    Description of Work/Items Unit Quantity Unit Cost Total CostPos.

    17 Roof mounted exhaust fans .No 5.00  - 

    18 25 Amp single electrical non-fusedisconnecting switch for AC/ Split unit. No 8.00  - 

    Emergency evacuation lighting

    19 2x10 watt IP-65 wall mounted EmergencyLight Fixture. No 5.00  - 

    20 1X10W surface mounted IP-40 Exit light.No 4.00  - 

    Fire alarm system (including all associated

    cabling, wiring, mounting, etc)

    21 Addressable fire alarm panel, with all

    accessories, to the complete and functioning job. LS 1.00  - 

    22 Fire alarm push button, double action type, ULListed No 4.00  - 

    23 Fire alarmNo 4.00  - 

    24 Photoelectric type smoke detectors, UL ListedNo 16.00  - 

    Electrical Grounding and Lightning

    Protection.

    25 Lightening protection as mentioned inlightening protection drawing with air terminal,

    electrodes, tape, connectors, clamp and

    grounding cable Set 1.00  - 

    26 Grounding system as mentioned in groundingdrawing with electrodes, tape, connectors,

    clamp and grounding cable Set 1.00  - 

    Labeling

    27 Proper and correct all circuits numbering,cable circuit drawings, cable and switchboard

    labeling to the full satisfaction of UNOPS

    engineer. LS 1.00  - 

    Subtotal Electrical Services - 

    22/24

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    23/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Component: Police Office Building

    Original Issue: February 25, 2010

    Work Type

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    Total for Water Supply Services

    Total for Electrical Services

    Total for Structure

    Total for Enclosure

    Total for Interior

    Total for Finish

    Total for Police Office Building 0.00

    Total for General

    Total for Site

    UNOPS

    SUMMARY OF COMPONENT

    Vertical Structures Unit

  • 8/20/2019 https___www.unops.org_ApplyBO_File.aspx_BOQ Office Buildings.pdf

    24/24

    Currency: US Dollars

    Project No: 810

    Project Title: Ai Khanem Border Crossing Point Facilities

    Location: Takhar, Afghanistan

    Tender No: 04

    Tender Title: Customs and Police Office Buildings

    Original Issue: February 25, 2010

    CONTRACT COMPONENTS

    Signature

    Total for Customs Office Building

    Total for Police Office Building

    UNOPS

    SUMMARY BILL OF QUANTITIES

    Vertical Structures Unit

    Signature

    Address and

    Mobile Number

    Name Name

    Position Position

    Agreed on behalf of Contractor UNOPS

    BOQ Value for whole tender in words:

    Zero

     


Recommended