+ All Categories
Home > Documents > Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on...

Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on...

Date post: 28-Mar-2015
Category:
Upload: porter-hayton
View: 220 times
Download: 0 times
Share this document with a friend
Popular Tags:
25
http://www.consolidspai n.org
Transcript
Page 1: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

Page 2: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

¿WHY IS IT IMPORTANT THE STABILIZATION AND WATERPROOFING

SOIL?

INDIARainfall of 3 days on a bad embankment stabilization Consequence :Collapse of the railway embakment122 dead people

COLOMBIABad stabilization of the wal of the hillConsequence:Mud Sliding on the town34 dead people

Page 3: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

TRADITIONAL SYSTEMS OF SOIL

STABILIZATION

BINDERS ANDRUBBERS

Products that bind the soil asbinders agents

Cement, Lime, Bitumen, Asphalt, Polymers, Resins

CHEMICALREACTORS

Products that try to change the soil chemically reacting his

propertiesWaterproofing, Geotextile membrane, Clay, Concrete

HYBRID SYSTEMSSystems that combine both

methiods

Page 4: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

BINDERS ANDRUBBERS

Products that bind the soil asbinders agents

Cement, Lime, Bitumen, Asphalt, Polymers, Resins

CHEMICALREACTORS

Products that try to change the soil chemically reacting his

propertiesWaterproofing, Geotextile membrane, Clay, Concrete

HYBRID SYSTEMSSystems that combine both

methiods

PROBLEMS OF TRADITIONAL SYSTEMS

- The reactor needs for the appropriate reaction always the same means, and no soil is identical to another.

- Organic Pollution

- The need for a strict relationship between the specific surface of soil to be treatedand the amount of binder

Page 5: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

PROBLEMS OF THE TRADITIONAL SYSTEMS

The system Does not have these problems, as it is NOT

NOT A BINDER, is not sticking the particles between them

NOT A REACTOR, is not changing the chemical soil structure

¡ It is impossible to predict the outcome of treatment !

Are applicable only under certain conditions more or less stringent

Applicable only in certain soil types and certain soil pellets

Fail due to the fact that a soil rarely presents a homogeneouscomposition point to point

Page 6: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

Sedimentary Rocks

Natural soilSediments

Igneous RockMetamorphic rock

Wear for the atmosferic action,

mechanical and chemical

Hardening

This process takes millions of years…

But there is a small problem…

has achieved to reduce this time to zerO

CONSOLID SYSTEM

Consolid System basics

Page 7: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

Consolid System basics

All cohesive soil has the ability to petrify again, for it needs:

A long periodtime

Very high pressure

Has achieved to reduce this time to zero

Page 8: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

BUT… WHAT IS THE CONSOLID SYSTEM?

CONSOLID® is a stabilization andsealing high tech soil system

CONSOLID ® System makes soil compaction been totally irreversible

Page 9: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

CONSOLID SYSTEM

Available Soil

IMPLEMENTATION OF CONSOLID Liq® + SOLIDRY®

StabilizedMaterial

Page 10: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

TECHNICAL EFFECTS OF THE CONSOLID SYSTEM

SUPPORTING BETTER VALUES BETWEEN 3 AND

5 TIMES

USE OF 75 TO 100% OF LAND AVAILABLE (SAVING ON COLLECTION, REMOVAL OF MATERIAL AND CONTRIBUTION)

RESISTENCE

ECONOMY

Page 11: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

TECHNICAL EFFECTS OF THE CONSOLID SYSTEM

THE IMPROVEMENT OF THEPROPERTIES AND THE LIFT

OF THE SOIL IS PERMANENT

FIRMNESS AND STABILITY OFTHE TREATED SOIL => BEST GROWING DURABILITY

ACTIVE THE COHESIVEFORCES IN ANY TYPE OF SOIL AND REDUCE THE INFLUENCE OF WATER

RESISTENCE

ECONOMY

ECONOMY

ECONOMY

Page 12: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

TECHNICAL EFFECTS OF THE CONSOLID SYSTEM

MORE GROUND LIFT :REDUCING THE ROLLING

LAYERS from 60mm to 20/25mm

SAME QUANTITY OFADDITIVES IN ALMOST ALL

KINDS OF SOIL

RESISTENCE

ECONOMY

ECONOMY

Page 13: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

TECHNICAL EFFECTS OF THE CONSOLID SYSTEM

THE APPLICATION IS MADEWITH THE EXISTING MACHINERY PARK

ASSURED OUTCOME INADVANCE FOR LABORATORY

TESTS

SAFETY ENVIRONMENT ECOLOGY

SIMPLICITY

ECONOMY

Page 14: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

CONSOLID SYSTEM APPLICATIONS

- Rehabilitation of WAYS, ROADS IN DISREPAIR

-ROADS AND ACCESS TO LAND, RURAL AND MOUNTAIN (even -under heavy traffic, allowing its use and preserving the road under any

-weather condition, prolonged rainfall, high humidity, snow and high thermal -amplitude)

- Stabilization of VERGES AND SLOPES

- Construction of BASES Y SUB-BASES

- Construction of AIRPORT RUNWAY

- Construction of NEW ROADS (Motorway, Highway…)

Page 15: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

- Stabilization, Improvement and reuse of LOW QUALITY LANDS

CONSOLID SYSTEM APPLICATIONS

- Construction of DAMS, LANDFILLS AND WATERPROOFING IN IRRIGATION SYSTEMS

- Construction of INDUSTRIAL AREAS, STOWAGE AREAS, , etc.

- Construction of URBANIZATIONS

- Construction of GOLF COURSES

- Construction of RAIL ROADS

- Construction of SOIL EROSION

Page 16: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

APPLICATION SYSTEM FOR STABILIZATION AND / OR WATERPROOFING

1. Analysis of soil samples in laboratory

Determine the optimal mixture

2.Mixture of products with the local soil

3. Compacting

Page 17: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

PERFORMANCE EXAMPLES WITH CONSOLID SYSTEM

Rehabilitation of a paved road on a levee in Kraayensteinsedijk, Sommelsdijk, Netherlands

- Improvement of the base and sub-base through CONSOLID system- Paved by asphalt application with layer of 8 cms- Performance of 3.5 Kms in lenght . Touch area 12.250 sqm

¡ The time taken for the whole performance was 3 days!

Conventional Road Construction Example of road construction withCONSOLID system

Page 18: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

PERFORMANCE EXAMPLES WITH CONSOLID SYSTEM

Bulding roads and ways in a Cotton Plantation in Prov. Del Chaco, Argentine

- Making roads with CONSOLID system- Use of itself existing machinery in the cotton plantation (grinders and rotary disc harrows)- Performance surface : 100.000m²

Outcome: Easy access to the markets on the production obtained

Page 19: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

PERFORMANCE EXAMPLES WITH CONSOLID SYSTEM

Heavy Road Transport. Army General Headquarter in Pakistán, Karachi

- Making roads with CONSOLID System- Using 80% of the existing sand (cohesionless) + 20% clay-.Improved C.B.R. from 6% and 7% to 40% and 45%. Increased C.B.R. in a 650%

Outcome: Cost Saving of 30%

Page 20: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

PERFORMANCE EXAMPLES WITH CONSOLID SYSTEM

Main Railway Line Budapest-Viena Embankment Hegyeshalom, Hungary

-Base stabilized by Consolid System- Treated surface : 40.000 m²-Increases obtained from the pressure plate (MPa increased 5 times):> 100N/

Outcome: Cost Saving of 40%

Page 21: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

PERFORMANCE EXAMPLES WITH CONSOLID SYSTEMEmbankment stabilization of Czech railways

- Base stabilized by Consolid System- Average load of 18 Millon TON/Year- The Saving around 40% of the conventional cost

Outcome: Radical Increase of the bearing capacity

0

20

40

60

80

100

120

Buatrico Povidin Modrice Petrovico Cesky Brod 94

Compression Capacity MPa (N/mm²)

Previous Situation

Customer Expectations

Measurement in 1993

Measurement in 1994

Page 22: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

PERFORMANCE EXAMPLES WITH CONSOLID SYSTEM

Heavy Industrial Area. Aluminium & Chemi BV, Rotterdam

- Dynamic pressure of the untreated plate: 42 Mpa (N / mm ²). After treatment: 179 MPa (N / mm ²)- Use: Storage of aluminum anodes transported on trailers of 70 tons. Pressure of 23 tons per axle- Savings of 50% over the prior use of concrete slabs that were replaced every 2 years.

Outcome: Radical Increase of the bearing capacity and durability

Page 23: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

PERFORMANCE EXAMPLES WITH CONSOLID SYSTEM

Waste disposal area. Kaposvár, Nyíregyháza, Dunakezi, Dömsöd. Hungary

- Performance Surface of CONSOLID system: 80.000m²

- Implementation of Consolid System to prevent leakage of waste through the soil bases- K value of land: 1 * 10-5m ³ / s. After the application improves the impermeability 100 times with k = 1 * 10-7m ³ / s

Outcome:Substantial improvement in the impermeability of the soil

Page 24: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

PERFORMANCE EXAMPLES WITH CONSOLID SYSTEM

Reconstruction of artificial lake Ziegeleipark Heilbronn-Böckingen. Germany

- Performance surface of Consolid System : 14.000m²- With values of k = 1 * 10-6m ³ / s reached the lake never filled due to the loss be higher than the contribution- After application of Consolid System: 100 times improved impermeability with k = 1 * 10-8m ³ / s and the lake is always full with many types of plants, frogs and fish to grow and swim in the lake.Outcome: Improved soil impermeability and safety to the environment

Outcome: Improved soil impermeability and safety to the environment

Page 25: Http://. ¿WHY IS IT IMPORTANTTHE STABILIZATION AND WATERPROOFING SOIL? INDIA Rainfall of 3 days on a bad embankment stabilization.

http://www.consolidspain.org

EcoSoil de Compactaciones, S.L.&

Procesos y Aplicación de Césped y Consolid, S.L.

BARCELONA (Barcelona) - EspañaContacto: Francisco Pac - Telf: +34.638 277 500

E-mail: [email protected]


Recommended