Part I: Company Profile
Transcript
Page 1: Huayu tri pacific

Part I:

Company Profile

Page 2: Huayu tri pacific

One of the largest enterprises of the steel structure engineering in Southern China

Page 3: Huayu tri pacific

  Registered Address : Huanan Industrial Park, Liaobu, Dongguan  Registered Capital : RMB 50,000,000  Established in January 13, 1998, is a subsidiary company to Guangdong

MingCrown Group. Annual turnover 400,000,000 RMB 150,000sqm of Light steel &Heavy steel fabrication area Annual production capacities 60000ton Present Staff 1100 Main Business Scope : Metal structure &Truss structure fabrication, installation,

Steel plant, logistics warehouse

Design of high-rise buildings & villa

Metal materials fabrication &sales

One of the largest enterprises of the steel structure engineering in Southern China

Page 4: Huayu tri pacific

◇ National Grade I qualification for steel structure job. Secondary Grade qualification for special steel structure design.

◇ National Grade I qualification for steel structure manufacturing. Singapore Grade A qualification for steel structure manufacturing.

◇ Light & heavy steel fabrication base, covering a area of 15,000m3.

◇ 8 light & Heavy H Beam production lines, 196 sets of equipment.

◇ 2 sandblasting lines, and 4 large scale enclosed sandblasting house.

Page 5: Huayu tri pacific

Part II:

Capacity and Equipment

Page 6: Huayu tri pacific

Large Production Scale Sustainable Developing Capability

Total scale

Company Total area 150,000M2

Workshop area 43,000M2

Product stocking area 15,000M2

Sandblasting & Painting area 10,000M2

Facilities Equipment 196 sets

Certificates ISO Certificate ISO9001:2008

Production Capacities Annual Capacities 60,000ton

Page 7: Huayu tri pacific

Advanced Manufacturing Equipments1,Lifting Equipments

Gantry craneGantry crane 1 unit

Overhead crane Overhead crane 30T30T 4 units

Overhead crane Overhead crane 20T20T 11 units

Overhead crane Overhead crane 10T10T 10 units

Overhead crane Overhead crane 5T5T 4 units

2,Processing Equipments2,Processing Equipments

Shearing machineShearing machine 4 units

Bending machineBending machine 2 units

Steel plateFlanging machine(4m)Steel plateFlanging machine(4m) 1 unit

Sawing machineSawing machine 3 units

Milling machineMilling machine 4 units

Puching and shearing machinePuching and shearing machine 2 units

Hydraulic punching machineHydraulic punching machine 2 units

Self-control punching machine 160TSelf-control punching machine 160T 2 units

Mechanical pressMechanical press 4 units

Horizontal type press machine 300THorizontal type press machine 300T 4 units

Pneumatic tapping machinePneumatic tapping machine 2 units

Beam drillBeam drill 2 台

Numerical control laser cutting Numerical control laser cutting machinemachine 1 unit

CNC drilling machineCNC drilling machine 2 units

CNC tailor 1 unit

3,Equipments for steel structure's fit up3,Equipments for steel structure's fit up

H section fit up systemH section fit up system 5 units

H section flattening systemH section flattening system 5 units

Large edge miller 12MLarge edge miller 12M 2 units

Box column production lineBox column production line 1 unit

Vertical end-surface millingVertical end-surface milling 1 unit

Numerical control multi-burner Numerical control multi-burner cutting machinecutting machine 6 units

3D CNC drilling machine3D CNC drilling machine 1 unit

Consistent CNC cutting machineConsistent CNC cutting machine 1 unit

Plate flattening machinePlate flattening machine 1 unit

Tube coiling machineTube coiling machine 1 unit

Plate coiling machinePlate coiling machine 1 unit

Manual operation sandblasting Manual operation sandblasting production lineproduction line 2 units

Automatic sandblasting production lineAutomatic sandblasting production line 2 units

Painting production linePainting production line 1 unit

Semi-automatic submerged arc Semi-automatic submerged arc weldingwelding 6 units

Door type automatci welding 6 units

Argon arc weldingArgon arc welding 21units

CO2 weldingCO2 welding 105units

AC welding machineAC welding machine 37units

DC welding machineDC welding machine 25units

Stud welding machineStud welding machine 1 unit

Electroslag welderElectroslag welder 1 unit

Turning rollsTurning rolls 1 unit

The dryer of the welding machine The dryer of the welding machine and electrodeand electrode 5 units

CompressorCompressor 2 units

GeneratorGenerator 2 units

4,Processing equipments for wall structure 4,Processing equipments for wall structure materialsmaterials

C section steel production lineC section steel production line 1 unit

Z section steel production lineZ section steel production line 1 unit

Chromatic Steel Sheet Production LineChromatic Steel Sheet Production Line 6 units

Roof plate production lineRoof plate production line 1 unit

Sandwich board production lineSandwich board production line 1 unit

Purline machinePurline machine 3 units

Page 8: Huayu tri pacific

Workshop

Advanced Manufacturing Equipments

Page 9: Huayu tri pacific

Gantry Crane

Advanced Manufacturing Equipments

Page 10: Huayu tri pacific

< CNC Flaming Cutting machine

Draw bender>

Advanced Manufacturing Equipments

Page 11: Huayu tri pacific

Advanced Manufacturing Equipments

<5-D Consistent CNC Cutting ( Pipe-Coaster)

Submerge Arc Welding System>

Page 12: Huayu tri pacific

End Section Milling Machine>

<Edge Milling Machine

Advanced Manufacturing Equipments

Page 13: Huayu tri pacific

<Milling Machine

Pneumatic Tapping Machine>

Advanced Manufacturing Equipments

Page 14: Huayu tri pacific

CNC cutting machine>

<Digital controlled 3-D drill

Advanced Manufacturing Equipments

Page 15: Huayu tri pacific

<Laser Cutting machine

Ausrichtmaschine >

Advanced Manufacturing Equipments

Page 16: Huayu tri pacific

< C/Z Section Production System

Roof Plate Production System >

Advanced Manufacturing Equipments

Page 17: Huayu tri pacific

< Sandblasting System

Painting>

Advanced Manufacturing Equipments

Page 18: Huayu tri pacific

<Band Sawing

3-D Drilling Machine>

Advanced Manufacturing Equipments

Page 19: Huayu tri pacific

<Steel Structure Expert Visit and Advise

GE Inspection >

Advanced Manufacturing Equipments

Page 20: Huayu tri pacific

Part III:

Product & Projects Sample

Page 21: Huayu tri pacific

The Fabrication of Build Steel Structure(multi-layer steel structure series)

Pip

eC

ross

Bo

xed steel

Cross

Page 22: Huayu tri pacific

The Fabrication of Build Steel Structure(Heavy steel series)

Grid colum

n Profiled beam

Crane beam

Cross colum

n

Page 23: Huayu tri pacific

The Fabrication of Build Steel Structure(Light steel series)

Colum

n

Colum

nB

arPurlin

Roof plate

Plastic w

indow

Page 24: Huayu tri pacific

The Fabrication of Build Steel Structure(pipe& truss series products)

Square tube truss Circular pipe truss

H section steel truss Circlar pipe arc truss

Page 25: Huayu tri pacific

The Fabrication of Build Steel Structure(bridge series)

Page 26: Huayu tri pacific

Fabrication procedure 1 of T section of curtain wall steel structure

milling drilling tapping

Page 27: Huayu tri pacific

Fabrication procedure 2 of T section of curtain wall steel structure

check straightness adjust the hole location cutting length

check coating thickness intermediate painting final coating

Page 28: Huayu tri pacific

Fabrication procedure 3 of T section of curtain wall steel structure

Check total thickness

Packing label Cover the box

Packing

Page 29: Huayu tri pacific

Pipe process 1 of curtain wall steel structure

Blasting Primer Cutting

Outside tapping Inside tapping Assemble

Page 30: Huayu tri pacific

Assemble Pipe welding Formed weld

Primer Final coating Packing

Pipe process 1 of curtain wall steel structure 2

Page 31: Huayu tri pacific

Process 1 of welded boxed pipe

Install CJP backing Boxed beam assemble

CJP welding Rectify after welding Milling process

Page 32: Huayu tri pacific

CJP NDT checking Pre-assemble Visual finishing

Painting Packing Delivery

Process 2 of welded boxed pipe

Page 33: Huayu tri pacific

Galvanized item packing

Galvanized item

s Packing

Packing Label

Page 34: Huayu tri pacific

HY-830 color board

HY-PC Lighting board

HY-900 color board

HY-FRP830 lighting board

HY-EPS sandwich roof board

HY-688 Floor board HY-373 Hidden Style Wall

HY-EPS sandwich wall board

HY-FRP 380 lighting board HY-475 Roof board

Materials of containment system 1

Page 35: Huayu tri pacific

Materials of containment system 2

HY-430 hidden Roof board

Page 36: Huayu tri pacific

Architectural Structure Projects (Net frame structure)

Truss Structure Project of Youyi supermarket at southern part of Dongcheng District Truss Structure Project of Youyi supermarket at southern part of Dongcheng District Diameter:65.2m Project Feature Diameter:65.2m Project Feature :: Shell-shaped networked frameworkShell-shaped networked framework

Page 37: Huayu tri pacific

Architectural Structure Projects(Truss structure)

ZhongshanZhongshan exposition center Areaexposition center Area :: 21384M21384M22 Feature Feature :: pipe truss structurepipe truss structure

Page 38: Huayu tri pacific

Shooting range for the Asian Gamesthe Asian Games (Guangzhou flying disk training center) (Guangzhou flying disk training center) Construction: 12260MConstruction: 12260M22

Architectural Structure Projects(Truss structure)

Page 39: Huayu tri pacific

Architectural Structure Projects(Truss structure)

XuWen gymnasium Construction Feature : The canopy is the steel structure, covered steel purlin, steel roof panel systems. Canopy steel structure is space frame system, space size is cutting oblique elliptic cylinder, and plane projection is the lunate shape.

Page 40: Huayu tri pacific

GuangDong daye motor technical co.,ltd Area:60000MGuangDong daye motor technical co.,ltd Area:60000M22 Construction feature Construction feature :: 80M single 80M single slope without connection roof.slope without connection roof.

Architectural Structure Projects(Light steel structure)

Page 41: Huayu tri pacific

Invista fibie (foshan) Co., Ltd. Architectural Characteristics: Six completely steel Invista fibie (foshan) Co., Ltd. Architectural Characteristics: Six completely steel structure plantstructure plant

Architectural Structure Projects(Light steel structure)

Page 42: Huayu tri pacific

Guangdong Huaguan steel jiangmen new factory Architectural Characteristics: Bridge Guangdong Huaguan steel jiangmen new factory Architectural Characteristics: Bridge Crane 50tCrane 50t ~~ 100t100t

Architectural Structure Projects(Light steel structure)

Page 43: Huayu tri pacific

Lian zhong stainless steel plant (second period) AreaLian zhong stainless steel plant (second period) Area :: 62000 M62000 M2 2 Feature: 100T crane heavy steel Feature: 100T crane heavy steel structurestructure

Architectural Structure Projects(Heavy steel structure)

Page 44: Huayu tri pacific

China Longxue shipbuilding basement project AreaChina Longxue shipbuilding basement project Area :: 15000 M15000 M2 2 construction featureconstruction feature :: large-large-spanspan 、、 grid type heavy steel plantgrid type heavy steel plant

Architectural Structure Projects(Heavy steel structure)

Page 45: Huayu tri pacific

Architectural Structure Projects(Heavy steel structure)

Brunei Imperial Navy Base Repair Factory Steel consumption: 5450 T Architectural Characteristics: Mainly combining by the section steel, with structure type of lattice truss,gantry steel frame, main features: high space, large span 。

Page 46: Huayu tri pacific

Wuhan sentosa mansionWuhan sentosa mansion Architectural Characteristics:Concrete filled steel tubular Architectural Characteristics:Concrete filled steel tubular structure (28 floor)structure (28 floor)

Architectural Structure Projects(Multi-layer structure)

Page 47: Huayu tri pacific

Architectural Structure Projects(Multi-layer structure)

Guangdong GoTone building (New address) Construction Area: 140000M2 Architectural Characteristics: 41 layer, box type, beam, and column

Page 48: Huayu tri pacific

Architectural Structure Projects(Multi-layer structure)

Pearl River New Town Project Construction Area: 440000M2

Architectural Characteristics: Building structure use concrete filled steel tube huge oblique lattice outer cylinder and the reinforced concrete shear wall structure system.

Page 49: Huayu tri pacific

Guangzhou express busGuangzhou express bus (( BRTBRT )) pedestrian bridge. Featurepedestrian bridge. Feature :: arc boxed structurearc boxed structure

Architectural Structure Projects(bridge)

Page 50: Huayu tri pacific

Shenzhen Guangming Gaoxin technical industrial park of administration overbridgeShenzhen Guangming Gaoxin technical industrial park of administration overbridge

Architectural Structure Projects(bridge)

Page 51: Huayu tri pacific

Singapore MBS project FeatureSingapore MBS project Feature :: complicated curtain wall steel structurecomplicated curtain wall steel structure

Curtain wall main steel structure projects

Page 52: Huayu tri pacific

CCRC Project Curtain wall area nearly 60,000MCCRC Project Curtain wall area nearly 60,000M22 which main is frame glass curtain wall. which main is frame glass curtain wall.

Curtain wall main steel structure projects

Page 53: Huayu tri pacific

Curtain wall main steel structure projectsSingapore Sentosa project FeatureSingapore Sentosa project Feature :: Curtain wall steel structure are pipe purlin, bent steel bearing, Curtain wall steel structure are pipe purlin, bent steel bearing, package arc main structure beam ,angle steel ,frames and so on. As the monolithic structure is two-package arc main structure beam ,angle steel ,frames and so on. As the monolithic structure is two-way curved surface’s,so every purlin’s steel bearing bending angle is different, steel bearing qty here way curved surface’s,so every purlin’s steel bearing bending angle is different, steel bearing qty here are more than 1000pcs.are more than 1000pcs.

Page 54: Huayu tri pacific

Tobacco Mansion of ZhuJiang District in Guangzhou Tobacco Mansion of ZhuJiang District in Guangzhou Project feature: The whole project is about 210 thousands square meter ,curtain wall part is about Project feature: The whole project is about 210 thousands square meter ,curtain wall part is about 90 thousands square meter, main building is steel structure and 90 thousands square meter, main building is steel structure and Steel concrete composite structureSteel concrete composite structure ..

Curtain wall main steel structure projects

Page 55: Huayu tri pacific

Dongguan Forest Lake, Lanxi Valley Project Architectural Characteristics: Environmental leaves club, attractive appearance , complex spatial structure, a twisted type, the mainstay is the steel wall; The primary member ,the box beam is twisted component, the main part is steel structure roof

Curtain wall main steel structure projects

Page 56: Huayu tri pacific

Equipment steel structure projectsFabrication of GE generate component

GE finished pulse filter house component Exhaust Duct

GE Semi-circle component of finished packageGE Finished large-scale component

GE Cone componentGE power plant equipmentGE power plant equipment

Page 57: Huayu tri pacific

Equipment steel structure projectsFabrication & Pre-assemble of GE large-scale generator

Page 58: Huayu tri pacific

Equipment steel structure projectsDelivery process of GE generate component

Page 59: Huayu tri pacific

Equipment steel structure projectsALSTOM large-scale generate electricity equipment

Page 60: Huayu tri pacific

Equipment steel structure projectsSIEMENS large-scale generate electricity equipment

Page 61: Huayu tri pacific

Equipment steel structure projects & fabrication processNan hai generator equipment

Page 62: Huayu tri pacific

Equipment steel structure projects & fabrication processXingsheng machine walking set of offload machine

Page 63: Huayu tri pacific

Equipment steel structure projects & fabrication processCuntian project mechanical equipment platform

Page 64: Huayu tri pacific

Equipment steel structure projects & fabrication processChemical plant 、 oil 、 coal mine equipment platform

Page 65: Huayu tri pacific

Part IV Staff Status

Page 66: Huayu tri pacific

Staff Status

■ ■ Total 1150, Inc.Total 1150, Inc.

■■    Lead Civil / Structural / Architectural Engineer Lead Civil / Structural / Architectural Engineer 22

■■    Junior and Senior engineer 2Junior and Senior engineer 2 55 ( ( 2 2 Professional Specialist)Professional Specialist)

■■    National First-grade & Secondary-grade Registered Construction Engineer National First-grade & Secondary-grade Registered Construction Engineer 88

■■    Personnel for Managing (Inc. for Design, Procedure control, QA, Site Personnel for Managing (Inc. for Design, Procedure control, QA, Site

Operation managingOperation managing )) About 154About 154

■■    Welder 290Welder 290

■■    fitters 280fitters 280

■■    Operator in Other Workplace 359Operator in Other Workplace 359

■ ■ Quality Inspector 32Quality Inspector 32

Page 67: Huayu tri pacific

Production Capability

NO Product Description Staff Output per Month Remark

1 Equipment Structure 283 300T Equipment Structure

2 light steel structure 72 900T ~ 1,200T Ordinary factory structure

3 Heavy steel structure (1) 116 900T Vary as per welding requirement

4 Heavy steel structure (2) 109 600T ~ 900T Cross beam, box column structure

5 Pipe truss structure 39 900T Vary as per pipe size

6 H beam truss structure 63 1,100T Ordinary factory structure

7 Color Steel Sheet 5 60,000 M  

8 C section 3 27,000 M  

9 Z section 3 36,000 M  

10 Roof plate 3 45,000 M  

Page 68: Huayu tri pacific

Part V

Company Qualification

Page 69: Huayu tri pacific

Qualification

●● 工商营业执照工商营业执照●● 钢结构专业承包壹级资质钢结构专业承包壹级资质●● 钢结构制造壹级资质钢结构制造壹级资质●● 钢结构专项设计乙级资质钢结构专项设计乙级资质●● 新加坡钢结构制造新加坡钢结构制造 S1S1 级级●●ISO9001:2008ISO9001:2008 认证企业认证企业●● 道路运输经营许可证道路运输经营许可证●● 质量、服务、信誉质量、服务、信誉 AAAAAA 级企业级企业●● 中国建筑金属结构协会会员中国建筑金属结构协会会员●● 广东省空间结构协会理事单位广东省空间结构协会理事单位●● 国税、地税登记证国税、地税登记证●● 安全生产许可证书安全生产许可证书●● 组织机构代码证组织机构代码证●● 中国质量服务诚信单位中国质量服务诚信单位●● 卫生许可证卫生许可证●● 进出口资格证书进出口资格证书●● 商标注册证商标注册证●● 消防合格证消防合格证

● ● Industrial and commercial business licenseIndustrial and commercial business license ● ● Steel Professional Contract of Grade 1Steel Professional Contract of Grade 1 QualificationQualification● Steel Structure Manufacturing of Grad 1 Qualification● Steel Structure Manufacturing of Grad 1 Qualification● ● Grade B qualification of Special design for steel structureGrade B qualification of Special design for steel structure●● S1 Qualification for Singapore Steel Structure ManufacturingS1 Qualification for Singapore Steel Structure Manufacturing● ● ISO9001: 2008 Certified Company ISO9001: 2008 Certified Company ● ● Road transport operation licenseRoad transport operation license● ● Quality, Service, Reputation AAA level enterpriseQuality, Service, Reputation AAA level enterprise● ● Member of China Construction Metal Structure AssociationMember of China Construction Metal Structure Association● ● Guangdong Provincial Association unit of spatial structureGuangdong Provincial Association unit of spatial structure● ● Tax, Land tax registration certificate Tax, Land tax registration certificate ● ● Safety Production License Safety Production License ● ● Organization Code Certificate Organization Code Certificate ● ● China Quality Service Integrity UnitChina Quality Service Integrity Unit ● ● Health LicenseHealth License ● ● Import and Export CertificateImport and Export Certificate ● ● Trademark RegistrationTrademark Registration certificatecertificate● ● Fire safety certificateFire safety certificate

Page 70: Huayu tri pacific

Qualification

Page 71: Huayu tri pacific

Part VI:

Workshop Layout and Quality Control Procedure

Page 72: Huayu tri pacific

■■Contract ValuationContract Valuation  Design Ability Design Ability Procurement Ability Procurement Ability Production capacityProduction capacity equipment,equipment,Quality control, Quality control, Installation. Installation. Stocking capacity Stocking capacity Resource Allocation Resource Allocation . . .. . .

■■project management project management

drawings Design, drawings Design, Materials Materials Procurement, Procurement, Production Process, Production Process, Production schedule, Production schedule, Product shipments, Product shipments, Quality Problems, Quality Problems, Communication and Communication and co-ordination between co-ordination between departments, departments, communication and communication and co-ordination with co-ordination with Client Client . . . . . .         

Customer Feedback collection

Analysis

Improvement planning

feasibility

Action

Effect Assessment

■■Customer’ FeedbackCustomer’ Feedback

Customer Management

Page 73: Huayu tri pacific

ProductionProduction procedureprocedureTo CreateTo Create

ProductionProduction procedureprocedureTo CreateTo Create

As Per As Per “Material Preparation Desgin" “Material Preparation Desgin"

"Steel Construction Quality"Steel Construction QualityAcceptance Standards" Acceptance Standards"

GB50205-2001GB50205-2001

As Per As Per “Material Preparation Desgin" “Material Preparation Desgin"

"Steel Construction Quality"Steel Construction QualityAcceptance Standards" Acceptance Standards"

GB50205-2001GB50205-2001

welding instructionswelding instructionswelding instructionswelding instructions

Cutting instructionsCutting instructionsCutting instructionsCutting instructions

Fit-up & Flattening instructionsFit-up & Flattening instructionsFit-up & Flattening instructionsFit-up & Flattening instructions

Assembly instructionsAssembly instructionsAssembly instructionsAssembly instructions

Sandblasting instructionsSandblasting instructionsSandblasting instructionsSandblasting instructions

................

Production procedure

Page 74: Huayu tri pacific

Raw materials Raw materials (supplies) (supplies)

Quality InspectionQuality Inspection

Raw materials Raw materials (supplies) (supplies)

Quality InspectionQuality Inspection

ProductionProduction processprocess

QualityQuality

InspectionInspection

ProductionProduction processprocess

QualityQuality

InspectionInspection

FGFGQuality Quality

InspectionInspection

FGFGQuality Quality

InspectionInspection

SuppliersSuppliers

YES

NG

YES

YES

YES

YES

YES

YES

YES

YES

Rework and

repair

Rework and

repairYESYES

Raw materialsRaw materials (supplies)(supplies)

Raw materialsRaw materials (supplies)(supplies)

WarehousingWarehousingWarehousingWarehousing

BlankingBlankingBlankingBlanking

Group legislature,Group legislature, and correctand correctGroup legislature,Group legislature,

and correctand correct

RivetingRivetingRivetingRiveting

AssemblyAssemblyAssemblyAssembly

WeldingWeldingWeldingWelding

SurfaceSurface TreatmentTreatmentSurfaceSurface

TreatmentTreatment

PaintingPaintingPaintingPainting

Finished Finished warehousingwarehousingFinished Finished

warehousingwarehousingProductProduct

shipmentsshipmentsProductProduct shipmentsshipments

NGNGScrappedScrapped

EngineeringEngineering InstallationInstallationEngineeringEngineering

InstallationInstallation

Quality InspectionQuality InspectionAfter InstallationAfter Installation

Quality InspectionQuality InspectionAfter InstallationAfter Installation

Inspect as per Inspect as per “Material Preparation Desgin" “Material Preparation Desgin" "Process operating guidelines" "Process operating guidelines"

“Incoming Mat. Test Regulation" “Incoming Mat. Test Regulation" “Inspect.. regulation during fabrication" “Inspect.. regulation during fabrication"

"Final Inspect. regulation" "Final Inspect. regulation" "Steel Construction"Steel Construction Quality AcceptanceQuality Acceptance

Standards" GB50205-Standards" GB50205-20012001

Inspect as per Inspect as per “Material Preparation Desgin" “Material Preparation Desgin" "Process operating guidelines" "Process operating guidelines"

“Incoming Mat. Test Regulation" “Incoming Mat. Test Regulation" “Inspect.. regulation during fabrication" “Inspect.. regulation during fabrication"

"Final Inspect. regulation" "Final Inspect. regulation" "Steel Construction"Steel Construction Quality AcceptanceQuality Acceptance

Standards" GB50205-Standards" GB50205-20012001

Quality Control Procedures

Page 75: Huayu tri pacific

Workshop Layout

Page 76: Huayu tri pacific

Convenient Transportation

Xinhuiport

HuangpuPort

Humen

port

Yantianport

HUAYU STEEL

Shekou Port

Note: 1) The Company from Dongguan Humen port about 40 km, 30 minutes by car;             2) The Company from Shenzhen Yantian Port mouth about 80 km, 60 minutes by car;             3) The Company from Guangzhou Huangpu port about 90 km, 70 minutes by car;             4) The Company from Jiangmen the new port about 160 kilometers, the journey 120 minutes.

Page 77: Huayu tri pacific

HuangpuPort

HUAYU STEEL

Page 78: Huayu tri pacific

Thank youThank you !