Human Resources Development Plan
And
Small Plant for Sustainable Treatment
of Medical Waste
Beetle Engineering Co.,Ltd
SHIHO NARITA
名前またはロゴ 2
Incineration Technology for Medical Waste
名前またはロゴ 3
【Treatment Flow】
Incineration Technology for Medical Waste
Incineration Gas Treatment
Cooling tower Cyclone fabric filter
Chimney
Slaked lime
Multi stage Incinerator
Reburning
Tanki Bahan Bakar Tanki Air
Gedung A
Gedung B
名前またはロゴ
焼却炉(多段式プッシャータイプ)
Incineration system(Carry in Conveyor → Multi stage Incinerator)
Gas treatment system(Reburning →Cooling tower →Cyclone →Slaked lime→fabric filter →Chimney)
Incineration Technology for Medical Waste
名前またはロゴ
Training Plan for Human Resources
Kitakyushu Plant
Local
Over
seas
Maintenance / Operating Control■Knowledge transfer■Human resource development
Medical
Waste
Industrial
Waste
名前またはロゴ
1.3R Plant from 2013SUPER DEPO @Surabaya
2.Compost Center from 2014@Surabaya
3.Next Plan from 2022Eco Park Plan @Balikpapan
Introduction of Our Project in Indonesia
名前またはロゴ
Thank you for your attention
Shiho NaritaBeetle Engineering Co.,Ltd
Email : [email protected] : +818058082484
Event Hub : Narita/成田 Shiho/詩歩