+ All Categories
Home > Documents > Human Resources Strategic Plan 2013-17 · PDF fileThis plan is derived from a full PESTLE and...

Human Resources Strategic Plan 2013-17 · PDF fileThis plan is derived from a full PESTLE and...

Date post: 07-Mar-2018
Category:
Upload: lenguyet
View: 214 times
Download: 1 times
Share this document with a friend
22
Transcript

- 0 - | P a g e

1. Context 1.1 Foreword

UCC’s vision is to be a world-class university connecting our region to the globe. The Department of Human Resources contributes to this vision by delivering an excellent and timely service to prospective, current past and former employees of the University. The Department offers an array of supports and services through dedicated teams in HR Strategy and Organisational Development, HR Business, Employee Relations, Central Services and Staff Welfare and Development. The supports and services of the Department are identified on the HR website (www.ucc.ie/en/hr) and regular updates will soon be published in a new on-line Staff Bulletin Board. The Department attempts to incorporate best practice in programmes and services with feedback from staff and other stakeholders a vital element of this response. This document has been prepared to identify strategic priorities for the Department of Human Resources for the coming years and to outline the contribution of the Department to the achievement of the five strategic objectives [in particular (d)] identified in UCC’s Strategic Plan 2013 - 2017 i.e.:

a) Delivering research-inspired learning and teaching with a world class student experience; b) Being a premier European university for research, discovery, innovation and

commercialisation; c) Being pre-eminent in internationalisation, external engagement and contribution to society; d) Applying best international practice to attract, develop and retain staff of the highest quality

and to enable all staff to reach their full potential and; e) Strengthening our infrastructure and resource base.

This plan is derived from a full PESTLE and SWOT analysis involving all staff members in the Department and priorities have been identified through internal consultation and documented in a project prioritisation matrix. The projects that have been selected are based on analysis of the current situation, key assumptions regarding the University’s finances and staffing and the leading actions required to ensure a positive staff experience in the University. Michael Farrell Corporate Secretary

- 1 - | P a g e

1.2 Introduction University College Cork employs approximately 2700 staff across a range of functional groups – academic, research, teaching, management, administrative, technical and services. Our reputation for research and teaching depends on our academic leaders while the overall success of our institution relies on the contribution of the entire staff. University College Cork’s Human Resources Strategy relates, except where otherwise stated, to all those employed by the University and is designed to support the University’s mission to “inspire creativity and independent thinking in a research-led learning environment (where) our students are our highest priority (and) we create and communicate knowledge to enhance the intellectual, cultural, social and economic life of Ireland, Europe and the world”. It reflects the University’s key values of integrity, accountability and collaboration, as set out in the University’s Strategic Plan. The new HR Strategic Plan is designed to deliver the Human Resource aspects of the University’s Strategic Plan. The HR Strategic Plan aims to support the development of a people-centred culture that provides the conditions necessary for staff development and the achievement of the Plan. 1.3 Purpose of Plan

The HR Strategy 2012- 2014 supports our vision ‘to be a trusted and respected HR Department capable of responsive delivery at an optimal level to support staff and the University’s strategic ambitions’ which is underpinned by the priorities set out in UCC’s Strategy Plan. Therefore this document provides a framework for action for the next two years to ensure insofar as possible that the strategic objectives of the Department are aligned with those of the University and that the energy and focus of the Department is on projects and targets which will enhance UCC as a place to work and reinforces UCC as an employer of choice. Our work will at all times be informed by best practice and relevant legislative frameworks. Protecting and enhancing the University’s reputation will continue to be a major objective in delivering on the commitments as set out in our Strategic Plan through an effective range of policies and practices.

- 2 - | P a g e

2. Background to the Plan 2.1 Evolving University Context This HR Strategic Plan was written following examination of the context within which the University currently operates and is predicted to operate for the foreseeable future or at least for the duration of this Plan. Understanding the evolving University context is important to allow informed interpretation of the plan and its impact. At the time of developing this Strategy there have been emerging across the wider HE Sector which provide a specific context requiring a focus on enhancing our organisation’s agility, developing effective leadership and engaging staff. The University has been part of a turbulent and difficult period experienced across Ireland over recent years and has seen its budget and staffing reduced significantly while student numbers have risen. This trend looks set to continue and will place onerous demands on the management and staff of the University at all levels to maintain standards and to deliver a high-quality student and staff experience. Staffing in the University has fallen by c. 12% since 2008 and is set to fall by a further 4% by 2015. As payroll constitutes 76% of University budget some of the greatest impacts of the recession and its consequences for UCC have fallen on staff. The HR Department has a key role to play in ensuring that staff are supported to the greatest extent possible through this period and that fairness and equity pervades every aspect of support for the University’s work. Although the national monitory and societal landscape, and specifically the HE context, is a changing entity there are strong indicators of the future environment UCC will operate within. It is upon these indicators we can make certain assumptions about the demands, limits and opportunities we will encounter over the next few years. The Key Assumptions bearing on the strategy are as follows:

1. The governance framework within which the University works will be changed through a revised Universities Act, Code of Governance for Third Level and further legislation;

2. The HEA Landscape Document and the Hunt Report may have a profound bearing on the shape of Third-level education over the period of this Plan;

3. The requirements for accountability, openness and transparency will increase; 4. There will be a heightened emphasis on risk management as the Irish government

examines the causes of the crisis and plans for the future; 5. The finances of the University are unlikely to improve over the period of the Plan and may

significantly dis-improve; 6. Non-exchequer income generation will become a major focus with implications for

University activity and staffing; 7. Sustainability (i.e. that the University will remain in existence and functional) will be a key

strategic goal for the University; 8. University autonomy will continue to be at issue particularly in relation to the University’s

right/ ability to hire staff; 9. Student numbers will continue to rise due to demographic changes however, competition

with other universities will increase; 10. Staff/student ratios are likely to dis-improve given 1 and 2 above; 11. Staffing across the University will reduce and a key role for HR will be to support University

management in the reassignment of staff in a fair and equitable manner. Salaries will remain frozen and the ability of the University to reward staff for increased responsibility will continue to be restricted;

12. UCC will continue its commitment to Academic Promotion and Administrative Job Grading which is envisaged within the current context to operate on a diminished basis;

- 3 - | P a g e

13. The management of research will continue to be challenging in an uncertain funding environment;

14. The will be an increased emphasis on performance management with the likelihood of greater emphasis on appraisal;

15. The University’s internationalisation agenda will generate new challenges along with the possible privatisation of some University services;

16. The drive to shared services among the Universities / IOT’s will continue and some shared services will likely impact on the HR Department and its role;

17. Greater effort will be required by staff at all levels but particularly at management level to ensure that morale is maintained and improved and that trust is enhanced across the organisation through even-handed practices and transparency in the implementation of policy.

Whilst faced with this complex array of challenges the reaction of the University community has been one of dedication and hard work. Although the above assumptions upon which this strategy has been developed indicate that these challenges will continue, and even further escalate in terms of impact in the foreseeable future, we acknowledge that our strength lies in our community of staff who continue to be central to our reputation and ability to overcome these challenges. 2.2 HR Transformation

The HR Department has undergone a number of transformations in recent years the most notable of which took place c. 2 years ago when the structure of the Department was revised significantly to take account of devolved structures within the University and local HR support was formally put in place for each of the Colleges and Central Administration. These changes arose from the Senior Management Review of 2007 following which the University reviewed the HR Department to ensure that it had the appropriate structures, systems and processes to serve and support the University. Consideration of changes implemented in the past two years and their benefits has been on-going over the past 6 months with a view to refining the internal organisation to provide an improved service to the University Community and to restore some areas such as Staff Welfare. Arising from consideration of the service provided to the University community the key elements of the changes being implemented in the HR Department are as follows: 1. Continuation of the devolved HR Services through HR Managers for the Colleges and Central Administrative areas; 2. Support for the Local HR Managers with responsibility for Colleges provided by staff within the HR Department based on expertise and on the key areas of research, employee relations and contract and recruitment management; 3. Re-establishment of the Staff Welfare function as part of Staff Welfare and Development Section; 4. Re-establishment of Employee Relations as a Section within the Department; 5. Continuation of the important role of the Sections of the HR Department dealing with Staff Development and Organisational Development; 6. The improvement of communication with University Staff which will commence with the launch of an on-line Staff Bulletin. 2.3 An Evolving Role for HR

- 4 - | P a g e

The delivery of a high quality, professional and customer focused HR Department requires a collaborative approach where HR staff, managers and senior management of the University work together to provide practical, accessible and appropriate solutions to people management matters. Therefore over the period of this Strategy there will be a focus on enabling all those with people management responsibility to apply University HR policies and procedures consistently and with confidence. We are also focused on maximising the use of our HR information system through self-service and an improved access to strategic management information to support university decision making. Responsibility for people management continues to rest with line managers at all levels of the University as they are the first point of call in managing the staff of the Institution. The role of the HR Department is to enable and support effective people management and lead, as appropriate, on development of strategy. It is our intent to deliver increased value to the University by further development of sound and coherent HR policies, communication and engagement processes that ensure that the University is compliant with legislation, attracts and retains high quality talent and supports the development of the University’s culture in line with the University’s Strategic Plan 2013-2017.

- 5 - | P a g e

2.4 Development of the Strategy In developing the strategy a broad perspective was taken involving consultation, self-assessment of progress so far, University, and National strategic requirements, to ensure that all aspects of HR management which are essential to the achievement of the University’s Strategic Plan were covered. The HR Strategy is therefore a comprehensive strategy designed to cover all key areas of activity. Particular importance was attached to ensuring that the Department’s Plan responds to the requirements of the University Community, the University’s Strategic Plan and to enhancing the staff experience. Significant contribution was made by staff in the Department to respond to the diverse sources of information to produce a coherent strategic statement of planned activity for the coming two years. Apart from the aforementioned inputs, the Department’s Strategic Plan underwent four phases of development as follows:  

Phase   Scope  Time Period  Focus 

Phase 1  Pestle analysis and SWOT analysis   March 2012 Facilitated session and University stakeholder engagement  

Phase 2  HR staff strategy session – Identification of HR priorities and key deliverables  

May 2012 Translating the University strategy to the HR strategy 

Phase 3  Internal consideration of project prioritisation 

May 2012 Identification of the operational delivery of the strategy   

Phase 4  HR staff strategy session – Reviewing the Draft Plan  

July 2012 Reviewing the draft Plan and consideration of dissemination to the University community 

Phase 5  Presentation of draft plan to UMTS  August 2012 Communication of HR strategy and HR infrastructure to support the plan   

Table 1:  Phases involved in the development and approval of the new HR Strategic Plan   

 

- 6 - | P a g e

3. Values, Principles, Vision and Mission of the Department 3.1 Values and Key Principles of the Department

Values

The Department will operate under the values of: Integrity Trust Accessibility Respect

The key principles of the Department in delivering its service are: Proactive support and service Communication and information sharing Promoting staff well being Promoting integrity and respect Taking and promoting ownership and accountability Supporting professional and personal development Supporting organisation development Relationship building Enabling flexibility and adaptability Implementing leaner and more efficient HR processes

- 7 - | P a g e

3.2 Vision and Mission In defining our vision and mission we have been guided and will continue to be influenced by the internal and external environment in which the University operates and the University’s core mission with regard to its staff, organisational ambitions and its culture.

Vision

To be a trusted and respected HR function capable of responsive delivery at an optimal level to support staff and the University’s strategic ambitions.

Mission To support the University’s strategic direction by:

a) Developing and applying an appropriate policy and regulatory framework b) Supporting the development of university staff c) Providing clear information, leadership and direction d) Enabling adaptability and flexibility across the university

To deliver a service that is:

a) Optimal b) Consistent in approach and equitable in application c) Timely in response d) Transparent & confidential

- 8 - | P a g e

4. HR Structure Overview – Delivering the Vision The HR structure, outlined in the chart below, will enable the vision of the Function over the coming years.       

  

         

 

Central Services 

HR ‘Business’ Employee Relations  Staff Welfare &  Development 

HR Strategy &  Organisational Development 

Recruitment 

Contract Management 

Leave Management 

Pensions 

Research Contract Mg 

Employee InformationSystem 

HR Manager SEFS

HR Manager M&H

HR Manager B&L + ACSSS

Research Advisor

Contracts & Recruit  Advisor 

Employee Relations Advisor 

Industrial Relations

Equality

Compliance 

Dispute Resolution

Staff Development 

Staff Welfare

Leadership & Management Development

Orientation

Staff Recognition 

Coaching

Performance Management 

Promotion & Establishment 

Succession Planning 

Organisational /Job Structural design 

Academic Workload 

Job Evaluation / Grading 

HR Strategy

Corporate Secretary HR Directorate 

- 9 - | P a g e

5. Targets and Operational Plan 2012-2014 This HR strategy identifies seven leading areas of activity in which an extensive array of work will be undertaken. Although the core themes are dealt with individually, it is recognised that multiple interdependencies exist. Consequentially we will adopt an integrated approach to achieving the strategy’s main goals. Equality and diversity principles are not separately identified but integrated throughout the new strategy with the aim of embedding equal opportunities monitoring, evaluation and impact assessment in all aspects of policy development and practice across the University. 5.1 Summary of Project Programmes in Operational Plan Our commitment to delivering a leading HR function will be achieved through the best practice execution of our everyday tasks as well as the delivery of the following list of project programmes:  

Area  Summary of Project Programmes  Number of Programmes  Director Projects   Communication 

Quality Review External Benchmarks  Role and Responsibility of Heads Hourly/ Casual Pay 

HR Strategy & OD  Organisational Resourcing Organisational Structures  Performance Management  Promotion  

HR Central Services   HR Processes IT Researchers 

Employee Relations   Equality Public Service Agreements Grading  

Staff Welfare and Development  Leadership and Management Development Staff Welfare and Well Being Heads and Managers’ Forum 

HR Business   Communication  Skill Development for Line Managers Team Development  

- 10 - | P a g e

Cross Functional   Records Management  Streamlining HR Processes Contract Documentation Qualifications HR Working   

Total Key Project Programmes  

26

  The portfolio of projects being delivered as part of this Strategic Plan can be categorised as delivering:  

Delivering   Code  Number of Project Contributions Enhanced HR service provision and efficiency  1  6 Organisation development  2  5 Compliance and external reporting   3  2 Enhancement of the staff experience  4  5 Development of staff   5  8 Improved communication   6  4 Review and Clarification  7  6 Resourcing  8  1 

 

- 11 - | P a g e

5.2 Detailed Operational Plan  

This section provides a detailed outline of the projects under each project programme being initiated across the HR Function. Key: N = New; UW = Underway; OG = On-going

HR Director’s Projects

AREAS

UNIVERSITYPROJECTS

AIMOFPROJECT PROPOSED/OWNER

COLLABORATORS STATUS

DueQ1‐Q4/Year

Category

Communication

Develop&ImplementStaffCommunicationPlanInternalStaffCommunicationWebsite(6.7UniversityOp.Plan)

Agreeoverallresponsibilityforinternalcommunicationsamongstakeholders&draftstrategy

MlFarrell VPforExternalRelationsComputerCentre

UW Q42012 6

QualityReview QualityReview&relatedactions PlanandconductaQualityReviewintheDepartment

MlFarrell HRManagers N Q12013 7

ExternalBenchmarks

ImplementtheGreatPlacestoWorkprogramme

ToincreasetheemphasisonTrustacrosstheorganisationtherebyimprovingstaffmoraleandcontributingtotheUniversity’sStrategy

AnneGannon HRManagers Q22013 4

RoleandResponsibilityofHeads

Toensurethattherecruitment,responsibilitiesandstatutorypositionofacademicheadsisclarifiedandpromulgatedtoallrelevantstaff

ToenhancethemanagementofacademicunitsthroughincreasedclarityontheroleoftheHead

MichaelFarrell HRManagers N Q42012 7

Hourly/CasualPay

ToexaminecontrolsandpolicywithregardtoHourly/Casualpay,tomakerecommendationsforUniversityPolicyinthatregardandtooverseeimplementationoftherevisedcontrolsandpolicy

ToensureappropriatecontrolsareinplacewithintheUniversityregardingHourly/Casualpaythusensuringthatthenecessarybudgetary

ProjectLeader:HelenO’DonoghueProjectManager:MaeveDoyle

CentralservicesPayroll

UW Q42012 7

- 12 - | P a g e

parametersareappliedtothisexpenditure.

 HR Strategy & OD

AREAS

UNIVERSITYPROJECTS

AIMOFPROJECT PROPOSED/OWNER

COLLABORATORS STATUS

DueQ1‐Q4/Year

Category

OrganisationalResourcing

ImplementSchemeforre‐distributionofSupportStaff

ToimplementPolicyonReassignmentacrosstheUniversityinordertoachievemaximumefficienciesinsupportstaffacrosstheUniversity

AngelaO’Donovan EmployeeRelations&HRManagers

N Q12013

8

OrganisationalStructures

TemplateforOrganisationalStructure(6.5UniversityOp.Plan)MaporganisationalStructures&Establishment

To identifyandmapthestaffingoftheUniversity

AngelaO’Donovan HRBusiness UW Q42012

2

SupportthedevelopmentofSchoolstructures

Tosupport‘schoolification’withinacademicunits

AngelaO’Donovan HRBusiness/UMT UW Q42014

2

PerformanceManagement

ConsultandImplementCapabilitypolicyandprocedure

Toprovideaframeworktodefine&addressunderperformance

AngelaO’Donovan ER&HRManagers UW Q42012

2,5

EnhancedPerformanceManagement&DevelopmentSystem(6.3UniversityOp.Plan)toincludeImplementationofe‐performancePlatform

TodevelopanenhancedperformancemanagementprocessintheUniversityandtoimplemente‐performance

AngelaO’Donovan ERandHRManagers N Q42013

2,5

Promotions

CompleteReviewofAcademicPromotionsandIntroducePromotiontoFullProfessor

ReviewandupdatetheAcademicpromotionschemes

AngelaO’Donovan&AnneGannon

HRManagers N Q42012

7,5

- 13 - | P a g e

 HR Central Services

AREAS

UNIVERSITYPROJECTS

AIMOFPROJECT PROPOSED/OWNER

COLLABORATORS STATUS

DueQ1‐Q4/Year

Category

HRProcesses

ImplementCoreEmployeeSelfServiceCompleteITImplementationofHRModel&EIS(6.2UniversityOp.Plan)

TheuseofEmployeeSelfService(ESS)toenablethedeliveryofpayslipsonline,personaldetailsonlineandlongtermaimofmovingtoonlineapprovals

SusanO’Callaghan PayrollComputerCentre

UW Projectplancurrentlybeingdrafted

1

IT PensionmasterUpgrade Enablestafftoavailoftheon‐linefacilitytodoadditionalcalculationsandqueries

ProjectLeader:SusanO’CallaghanProjectManager:SineadHackett

N Q42012 1

ImproveStaffRecruitmentProcesses(6.1UniversityOp.Plan)Consultwithpartiesandupdateregulationsaccordingly

ToattractthebestpossiblestafftoUCCandenabletheidentificationofthebestcandidateforeachposition

SusanO’Callaghan HRBusinessManagers

OG/newfocus

ReviewofregulationsendQ12012

1,2

Researchers ImplementResearchCareerStructure* ToenabletheUniversitytoattractthebestpossibleresearchersandtohelpthoseresearcherstodeveloptheircareers

AlisonO’Connell StaffWelfare&DevelopmentPayrollResearchAccountsVPResearch

UW InitialalignmentofallresearcherstobecompletedbyendQ1/2013.On‐goingimplementationandreviewofpolicythereafter

4,5

*This project is being delivered in the context of an Institutional HR Strategy for Researchers which is currently in development in collaboration with the Research Office.

- 14 - | P a g e

Employee Relations

AREAS

UNIVERSITYPROJECTS

AIMOFPROJECT PROPOSED/OWNER

COLLABORATORS STATUS

DueQ1‐Q4/Year

Category

Equality ImplementtheLEAD(LivingEquality&Diversity)Project

Raiseawarenessofequalityanddiversityissues

KieranCreedon StaffWelfare&Development/HRBusiness

UW Q42012 4

PublicServiceAgreements

PublicService(CrokePark)Agreement2010‐2014relatedprojects

ToimplementUCCPlanundertheCPA

PaulRyanandKieranCreedon

ERandHRManagers

UW 2012‐2014

3

Grading

CompleteReviewGradingSchemes(6.4UniversityOp.Plan)

Toenhancejobevaluationscheme

PaulRyan ER N Q42012 7,5

Staff Welfare & Development

AREAS

UNIVERSITYPROJECTS

AIMOFPROJECT PROPOSED/OWNER

COLLABORATORS STATUS

DueQ1‐Q4/Year

Category

LeadershipandManagementDevelopment

Enhanceleadershipandmanagementdevelopmentviaanumberofdedicatedprogrammes.LeadershipDevelopmentinSchools&AdminUnits(1.10UniversityOp.Plan)

Enhanceleadership&managementdevelopment.MandatoryforHeadsofSchools&Departments.NewLeadershipDevelopmentProgrammesfor:

1. PIs2. SeniorStaff

notcurrentlyinleadershippositions

3. TechnicalProfessionals

4. SeniorAdministrativeHeads

MaeveLankford HRBusinessManagers&OD&Strategy

UW On‐goingthroughout2012–2013

5

- 15 - | P a g e

StaffWelfareandwell–being

Developmentofthestaffwelfareagenda&relatedPlan

ImprovedSchemeofStaffWelfare&Well‐Being

CatherineMaguire

OD&Strategy&HRBusinessManagers

N Q42012 4

HeadsandManagersForum

TocreateaHeadsandManagersForumwhichwillmeetatleastthreetimesannuallytobebriefedondevelopmentsandbeconsultedonproposedinitiatives–Universitywide–inaccordancewithUMTSdecision

TobringtogethertheseniormanagersoftheUniversity–academic,researchandadministrativetoensurethattheyhaveappropriateandaccurateinformationandhaveanopportunitytoprovideaninputtosignificantUniversityinitiatives

MaeveLankford HRmanagers UW Q22012 6

 

- 16 - | P a g e

HR Business

AREAS

UNIVERSITYPROJECTS

AIMOFPROJECT PROPOSED/OWNER

COLLABORATORS STATUS

DueQ1‐Q4/Year

Category

Communication

EstablishacommunicationsprogrammecoveringHRforSchools,unitsetc.

Toinform,influenceandengagelocallytoencourageclearunderstandingofcurrentHRmattersinfurtheranceofHRgoalsandobjectives

HelenO’Donoghue/HRBusinessManagers

HROperations

N Q22012 6

Communication

CreationofaSchool/DeptManagersCoachingandDevelopmentforum

Participateinthedevelopmentofkeypeoplemanagementinitiativestosupportimplementationofstrategyandplanslocally.ToprovideguidancetoandcoachmanagerstoensurethattheyareequippedtoeffectivelycommunicateandimplementUniversityHRpoliciesandprocedure

MaryWard/HRBusinessManagers

N Q22012 5,6

SkillsDevelopmentforLineManagement

ToengagewithlinemanagementthroughouttheUniversitytoenablenetworkingopportunities,sharingofexperiencesanddevelopmentofactionbasedlearninginrelationtoHR

AnneGannon/HRBusinessManagers

StaffWelfareandDevelopment

UW 5

 

- 17 - | P a g e

Cross Functional Projects

AREAS

DEPARTMENTALPROJECTS AIMOFPROJECT PROPOSED/OWNER COLLABORATORS STATUS

DUEQ1‐Q4/Year

Category

RecordsManagement

RecordManagement‐ThoroughlyanalyseRecordsManagementprocesseswithintheDepartmentanddesign/re‐designthesystem.ConsiderthepossibilityofanElectronicFilingSystem

Analyseexistingrecordsmanagementsystemandmodifyinlightofbest‐practice.Researchelectronicfilingsystems

GraceConway/SylviaCurran

AllHR N Q22013 1

StreamliningHRprocesses

InvestigateleantechnologiesforthepurposesofstreamliningHRprocesses

ToexamineopportunitiesforimplementingsystemimprovementsinrelationtotheexecutionofHRprocesses.

GraceConway/SylviaCurran

HRCentralServices N Q32013 1

ContractDocumentation

Areviewofallcontractsissuedtoallnewuniversityemployees

ToensurethattheUniversitymeetsalllegislativerequirementsandisreflectiveofbestpracticeinthearea

SusanO’Callaghan N Q12013 7

Qualifications GeneratethecapacitytoreportonallPhDandlevel10qualificationsforacademicstaff

DevelopmentofcapacitysystemcapacityinHRIS

GraniaO’Brien/MarionO’Donovan

N Q12013 3

HRWorking AnoverviewofTeamworkingwithintheHRDepartment

ToreviewandenhanceteamworkingwithintheHRDepartment

MaeveDoyle

StaffWelfare&Development

UW Q42012–Q12013

1,4

- 18 - | P a g e

6. Risk Assessment All the above projects have been assessed for the risk of non-delivery. The overall risks in the non- delivery of this HR Strategy can be summarised as leading to:

A deficit in service provision Conflicting application of HR policies and practices Inaccurate representation of the organisation An impact on delivery to staff and students A lack of coherence and accountability Lack of compliance under Croke Park Lack of management of the full spectrum of staff performance UCC falling behind other Universities Increased administrative burden UCC losing the best possible candidates for positions A failure to attract best possible researchers Lack of competitiveness as a university Delays in recruitment and other processes which may result in a failure to attract best

people Lack of compliance with legislation and requirements of best practice Inability to report accurately A negative impact on staff morale Legal exposure due to lack of awareness of policy and procedure A compromising of the University’s ability to live within staff numbers and budgetary

restrictions A reduced ability to report progress to the ESIG and relevant government department

Reinstatement of a grading scheme that is deemed as not fit for purpose

- 19 - | P a g e

7. Implementing Our Strategy/ Measuring Progress: It is recognised that to ensure the on-going effectiveness of this two year plan that periodic reviews will be required. Stakeholders including UMTS, Heads of College, Governing Body Committee on Staff and other interested parties will be consulted and involved as each major element of the Strategy is being initiated and implemented. Each of the HR strands is supported by key performance indicators which define how we can assess out progress and the on-going impact of our HR practices. We are committed to monitoring our progress against the Plan and will provide clear, measurable indicators of progress against HR targets. Progress will be measured using relevant institutional key performance indicators (KPIs) and defined human resource KPIs – both internal and external. As a Department we will continue to audit ourselves against best practice models and relevant external benchmarks when developing strategy and policy. We will simultaneously seek to improve our internal business processes, to redefine our professional focus and to develop a rigorous project management methodology. We are committed to developing further the Human Resources Department through fostering appropriate structures, capabilities, skills and resources to support the successful implementation of the HR Strategy. 6.1 Key Performance Indicators: The following indicators will be used to measure our performance in delivering the Operational Plan as articulated in this Strategy:  

No.  Indicator  Owner Not Started / Behind Schedule 

Started and In line with Schedule 

Completed

1  Staff Bulletin in place and regularly updated  

2  Quality Review Completed in line with timetable  

3  Great Places to Work implemented with improving annual scores 

 

4  Policy Revised and Controls in Place for Hourly casual pay 

 

5  Effective measures to ensure resource and budgetary compliance for Hourly‐Casual Pay in place and operational   

 

6  Policies and procedures that are fit for purpose and legally compliant in place 

 

7  Clarity in relation to administrative support and necessary re‐assignments completed 

 

8  Job Grading Scheme revised  

9  Employee Information System fully operational  

10  Pension Master Upgrade completed   

11  Staff recruitment process revised and changes to Regulations completed 

 

12  Clarified role and responsibilities of Heads    

13  Career Structure for researchers in place   

14  LEAD implemented   

15  Staff re‐assignment policy embedded   

16  Leadership Development Scheme in place and valued [Survey Data] 

 

17  Staff Welfare and Well‐being Plan in place and valued [Survey Data] 

 

18  Heads and Managers Forum in place and values [Survey Data] 

 

19  Skills Development for Line Managers in place and   

- 20 - | P a g e

valued [Survey Data] 

20  School Team Development in place and valued [Survey Data] 

 

21  Department Records management in line with best practice 

 

22  LEAN analysis and process re‐engineering completed 

 

23  Review of all contract documents completed  

24  All qualification records reviewed and regularly updated for academic staff 

 

25  Enhanced Team Behaviours within the HR Department [Survey Data] 

 

26  Improved staff satisfaction with our HR service year on year from commencement of this Plan (2012) 

 

27  Reported increased awareness/ engagement of staff due to implementation of communication initiatives 

 

28  At least 10% increase in number of staff rating trust in UCC and reporting an enhanced morale from baseline measurement  

 

29  Robust framework for managing and developing performance initiated 

 

30  Achievement of appropriate staffing distribution levels  

 

       


Recommended