WB Loans Hunan Integrated Economic Development of Small Towns Project Yueshan Waste Water Treatment Plan Environmental Impact Assessment (EIA)
Transcript
Page 1: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

WB Loans Hunan Integrated Economic

Development of Small Towns Project

Yueshan Waste Water Treatment

Plan

Environmental Impact Assessment

(EIA)

Consigned by: WB Loan Project Management Office of Hunan

Page 2: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Provincial Development and Reform Commission

Compiled by: Changsha Environmental Protection Career

Technical College

December, 2011

II

Page 3: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table of Contents

1 GENERAL.....................................................................................................5

1.1 General Background of the Project.................................................................................51.1.1 Origin of the Project.....................................................................................................51.1.2 Significance of the Project Construction.......................................................................61.1.3 Target of the Project.....................................................................................................71.1.4 Contribution of the WB.................................................................................................71.1.5 Organizational Structure of the Project........................................................................8

1.2 Overview of EIA Report....................................................................................................91.2.1 Purpose of Assessment...............................................................................................91.2.2 Type of EIA................................................................................................................... 91.2.3 Preparation of the Environomental Impact Report.....................................................101.2.4 Keys of Assessment...................................................................................................10

1.3 Grading, Scope and Periods of the Assessment and Target of Environmental Protection (Sensitive Points)...............................................................................................11

1.3.1 Grading and Scope of the Assessment......................................................................111.3.2 Periods of the Environmental Assessment.................................................................131.3.3 Target of Environmental Protection (Sensitive Points)................................................13

1.4 Environmental impact Factors and Assessment Factors...........................................151.4.1 Identification of Environmental impact Factors...........................................................151.4.2 Environmental Impact and Selection of Assessment Factors.....................................17

2 Policies, Laws and Regulations and Administration Framework.........21

2.1 Environmental Policies, Laws and Regulations...........................................................212.1.1 Overview.................................................................................................................... 212.1.2 Laws and Regulations on Environmental Protection..................................................212.1.3 Regulations and Requirements and Local Laws in Relation with Environmental protection............................................................................................................................ 222.1.4 Technical Guidelines for Environmental Impact Assessment and the Provisions.......232.1.5 Environment Quality Standards..................................................................................232.1.6 Pollutant Discharge or Emission Standards...............................................................242.1.7 Safeguard Policies of WB...........................................................................................242.1.8 Documents Related to the Project..............................................................................25

2.2 Environment Administration Organizations and Functions........................................25

Page 4: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

3 Description and Analysis of the Project..................................................28

3.1 Project Name and Composition.....................................................................................28

3.2 Construction Proposal of the Project...........................................................................293.2.1 Construction Content and Scale.................................................................................293.2.2 Main Equipment of the Project...................................................................................313.2.3 Technological Introduction..........................................................................................333.2.4 General Layout of Plant Site......................................................................................383.2.5 Service Scope and Wastewater Discharge Forecast.................................................403.2.6 Designed Inflow and Outflow Water Quality...............................................................47

3.3 Pipe Network and Pumping Stations............................................................................48

3.4 Analysis of the Pollution Sources of the Project.........................................................49

3.5 Associated Works with the Project...............................................................................50

3.6 Project Investment Estimate..........................................................................................50

3.7 Schedule of the Project Implementation Progress......................................................523.7.1 Construction Period....................................................................................................523.7.2 Scheduling.................................................................................................................53

4 Profile of the Project Location Environment..........................................55

4.1 Natural Environment Profile...........................................................................................554.1.1 Geographic Location and Traffic................................................................................554.1.2 Geological Features...................................................................................................554.1.3 Weather and Climate..................................................................................................554.1.4 Hydrology................................................................................................................... 554.1.5 Ecological Environment..............................................................................................56

4.2 Social Environment Profile............................................................................................574.2.1 Administrative Division...............................................................................................574.2.2 Economic Status........................................................................................................574.2.3 Infrastructure..............................................................................................................58

4.3 Status Quo of Quality of the Project Area Environment..............................................584.3.1 Atmospheric Environment..........................................................................................584.3.2 Environment of Surface Water...................................................................................604.3.3 Acoustic Environment.................................................................................................62

4.4 Basic Information for Major Concern on Safeguard Policies of the WB....................63

5 Environmental Impact Assessment.........................................................64

II

Page 5: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

5.1 Analysis on Impact of the Project to Human Health....................................................645.1.1 Environmental Benefits Brought by Implementation of the Project.............................645.1.2 Analysis on Impact to Human Health.........................................................................65

5.2 Analysis on Impact to Environment in Construction Period.......................................655.2.1 Analysis on Dust Pollution Source and Environmental Impact...................................655.2.2 Analysis on Impact of Construction Wastewater.........................................................665.2.3 Analysis on Impact of Noise.......................................................................................685.2.4 Analysis on Impact of Solid Waste.............................................................................695.2.5 Impact Analysis of Water Loss and Soil Erosion........................................................705.2.6 Ecological Impact Analysis.........................................................................................715.2.7 Impact on the Traffic...................................................................................................725.2.8 Health and Safety Impact...........................................................................................73

5.3 Analysis on Impact on the Environment during the Operation Period......................735.3.1 Impact of the Project on Water Conditions.................................................................735.3.2 Solid Waste................................................................................................................825.3.3 Impact on Air Quality..................................................................................................895.3.4 Impact on the Acoustic Environment..........................................................................90

6 Countermeasures......................................................................................92

6.1 Countermeasures during the Construction Period......................................................926.1.1 Waste Gas.................................................................................................................926.1.2 Noise..........................................................................................................................936.1.3 Wastewater................................................................................................................946.1.4 Solid Waste................................................................................................................956.1.5 Ecological Environment..............................................................................................956.1.6 Social Environment....................................................................................................96

6.2 Countermeasures during the Operating Period...........................................................976.2.1 Waste Gas.................................................................................................................976.2.2 Wastewater................................................................................................................986.2.3 Noise..........................................................................................................................996.2.4 Solid Waste................................................................................................................996.2.5 Ecological Environment............................................................................................101

7 Environmental Risk Analysis and Mitigation Measures......................103

7.1 Environmental Risk Identification...............................................................................103

7.2 Impact Analysis on Potential Environmental Risk Accidents of the WWTP............1037.2.1 Sudden Accidents....................................................................................................1037.2.2 Equipment Failure....................................................................................................1037.2.3 Inflow Water Quality Impact.....................................................................................104

III

Page 6: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

7.2.4 Risk Accidents during Normal Operation..................................................................104

7.3 Risk Mitigation Measures.............................................................................................1057.3.1 Equipment Security Measures.................................................................................1057.3.2 Protection of Abnormal Wastewater Discharge........................................................1067.3.3 Emergency Measures for Sudden Waste Water Discharge Risk Accident...............1087.3.4 Staff Personal Security Measures............................................................................1087.3.5 Protective Measures for the Impact of Sludge Discharge on Environment...............1097.3.6 Preventive Measures for the Impact of Flood to the WWTP.....................................110

7.4 Emergency Authorities and Assignment of Responsibilities of the WWTP.............110

8 Comparison and Selection of Alternative Proposals...........................112

8.1 Comparison and analysis of Zero Proposal...............................................................112

8.2 Comparison and analysis of Pipe Network Proposals..............................................1138.2.1 Principles for Determining the Pipe Network Proposal.............................................1138.2.2 Wastewater Pipe Network Proposal of the Project...................................................114

8.3 Comparison and analysis of the WWTP Site.................................................................................................................................................................................................................. 114

8.3.1 Principles for Site Selection......................................................................................1148.3.2 Proposal for Site Selection.......................................................................................1158.3.3 Comparison and Determination of the Site Selection Proposals..............................115

8.4 Comparison and analysis of Wastewater Treatment Process Proposals................1198.4.1 Selection Criterion of Wastewater Treatment Process.............................................1198.4.2 Wastewater Treatment Process Proposal.................................................................1198.4.3 Comparison and Determination of Process Proposals.............................................127

8.5 Comparison and Analysis of Disinfection Proposals................................................1298.5.1 Brief Introduction to Disinfection Methods................................................................1308.5.2 Comparison and Determination of Disinfection Methods.........................................131

8.6 Selection and Comparison of Sludge Treatment Proposals.....................................1328.6.1 Comparison and Determination of Wastewater Treatment Processes.....................1328.6.2 Comparison and Determination of Sludge Treatment Processes.............................134

9 Analysis of Gains and Losses of Environment and Economy............137

9.1 Environmental Benefit..................................................................................................1379.1.1 Pollutant Load Cut....................................................................................................1379.1.2 Improved Water Quality............................................................................................1379.1.3 Improvement Benefit of Environmental Management Capability..............................137

IV

Page 7: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

9.1.4 Provision of Good Environmental Conditions for Regional Social and Economic Development..................................................................................................................... 137

9.2 Social Benefits..............................................................................................................1389.2.1 Improvement of Healthy Level of Domestic Citizens and Living Quality in the River Basin................................................................................................................................. 1389.2.2 Addition of Employment Chances............................................................................1389.2.3 Improvement of Residents' Environmental Awareness............................................1389.2.4 Provision of Base Data for Abatement of District Pollution.......................................139

9.3 Economic Benefits........................................................................................................1399.3.1 Economic Benefits from Pollution Control................................................................1399.3.2 Benefits from Revenue Increase..............................................................................139

9.4 Conclusions..................................................................................................................140

10 Public Participation...............................................................................141

10.1 Implementation Arrangement....................................................................................141

10.2 Survey Results and Discussions of Public Participation........................................142

10.3 Information Disclosure...............................................................................................146

11 Migration and Social Impacts...............................................................150

11.1 General Situations......................................................................................................150

11.2 Project Impacts...........................................................................................................150

11.3 Law and Policy Framework........................................................................................15411.3.1 Major Law and Policy Criteria.................................................................................15411.3.2 Main principles.......................................................................................................156

11.4 Compensation Standard for Land Acquisition.........................................................157

11.5 Land Recovery Proposal............................................................................................15811.5.1 Compensation and Arrangement for Permanent Land Acquisition.........................15811.5.2 Recovery of Livelihood of the Farmers Affected By Land Acquisition....................15911.5.3 Resettlement and Recovery of Affected Vulnerable Groups..................................159

11.6 Vulnerable Groups......................................................................................................160

11.7 Institutional Arrangement...........................................................................................160

11.8 Complaint Settlement Mechanism.............................................................................161

V

Page 8: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

11.9 Monitoring and Evaluation.........................................................................................16211.9.1 Internal Monitoring..................................................................................................16211.9.2 External Monitoring.................................................................................................163

11.10 Financing and Implementation Plans......................................................................165

12 Environment Management Plan...........................................................168

12.1 Environment Management System...........................................................................16812.1.2 Environmental Protection Organization during the Construction Period.................17212.1.3 Environment Management Organization during the Operation Period...................176

12.2 Implementation of Environment Management Plan.................................................17712.2.1 Detailed Tasks of Implementation of Environment Management Plan....................17712.2.2 Contract Requirements for Environment Management..........................................18012.2.3 Information Communication and Solution of Unconformities..................................18112.2.4 Training—Necessary Capability Construction and Method Construction...............182

12.3 Environment Monitoring Plan....................................................................................18612.3.1 Monitoring Objective..............................................................................................18612.3.2 Environment Monitoring Institution.........................................................................18612.3.3 Detailed Environment Monitoring Requirements....................................................190

12.4 Environment Management Expenses Estimate and Source of Funds...................19012.4.1 Budget Allocation...................................................................................................19012.4.2 Source of Funds and EMP Budget.........................................................................190

12.5 Information Management of Environment Management Plan.................................19112.5.1 Information Communication...................................................................................19112.5.2 Record Mechanism................................................................................................19212.5.3 Report Mechanism.................................................................................................192

13 Conclusions of Environmental Assessment......................................194

VI

Page 9: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

List of Appendixes

Appendix 1 Environmental Standards for the Project

Appendix 2 Odor Prediction Model and Results

Appendix 3 Materials Related to Public Participation

Appendix 4 Planning and Detailed Budget of Project Environmental Monitoring

Appendix 5 Project Associated Works (Environmental Monitoring Plan of Quanhu Garbage Disposal Plant, Xiangxaing City)

Appendix 6 Summary of Project Environmental Management Plan

List of Figures

Figure 1 Geographic Location of Hunan Province in China

Figure 2 Geographic Location of the Project

Figure 3 Geographic Location of the WWTP

Figure 4 Layout Plan of the Project Area

Figure 5 Pipe Network of the WWTP

Figure 6 Transportation Route Diagram of the Project

Page 10: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

ABBREVIATIONS

缩略语CEA Consolidated Environmental Assessment

环境综合评价CSE Construction Supervision Engineer

建筑监理工程师CSEE Construction Supervision Environmental Engineer

建筑监理环境工程师CSEMP Construction Site Environmental Management Plan

建筑工地环境管理计划DI Design Institute

设计单位EA Environmental Assessment

环境评价EIA Environmental Impact Assessment

环境影响评价

EMC Environmental Manager Coordinator

环境经理协调员EMP Environmental Management and Monitoring Plan

环境管理及监测计划EMS Environmental Monitoring Station

2

Page 11: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

环境监测站EPB Environmental Protection Bureau

环境保护局IA Implementation Agency

项目实施单位PO Project Owner

项目业主PMO Project Management Office

项目管理办公室PRC The People’s Republic of China

中华人民共和国SE Supervision Engineer

监理工程师WB World Bank

世界银行WWTP Wastewater Treatment Plant

污水处理厂HNPMO Hunan Project Management Office

湖南省利用世行贷款项目办公室CSEPCTC Changsha Environmental Protection Career Technical College

长沙环境保护职业技术学院

3

Page 12: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

CURRENCIES & OTHER UNITS

货币及其他单位MU Area Unit (1MU=0.0667ha)

面积单位,1 亩=0.0667ha

RMB Chinese Yuan (Renminbi)人民币元

USD United States Dollar

美元Conversion rate 1 USD=6.3RMB

汇率,1 美元=6.3人民币元CHEMICAL ABBREVIATIONS

化学缩略词ABR Anaetobic Bafflted Reactor

厌氧折流板反应器

A²/O Anaerobic-anoxic-oxic biologic phosphorus & nitrogen

厌氧-缺氧-好氧生物除磷脱氮工艺BOD5 Biochemical Oxygen Demand (5 days)

5日生化需氧量CASS Cyclic Activated Sludge System

4

Page 13: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

循环活性污泥COD Chemical Oxygen Demand

化学需氧量NH3-N Ammonia Nitrogen

氨氮SBR Sequencing Batch Reactor Processing

序批式活性污泥法处理工艺SS Suspended Solids

悬浮固体物TN Total Nitrogen

总氮TP Total Phosphorus

总磷TSP Total Suspended Particulates

总悬浮颗粒物UASB Up-flow Anaerobic Sludge Bed

上流式厌氧生物反应器

5

Page 14: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

1 General

1.1 General Background of the Project

1.1.1 Origin of the Project

As the social and economic development of Yueshan Town, its urbanization

development is further quickened and the township construction takes on a

new look. However, there are still some problems required to be solved

immediately, including the underdevelopment of township economy, the small

size of economic aggregate, the lagging of township basis and public facilities,

the sluggish flow rate of people and goods, the week effect of attraction, the

rather serious environmental pollution, the shortage of construction funds and

so on. The waste water from production and domestic uses, in particular, are

discharged randomly without previous treatment and directly into surrounding

channels through no discharge pipe, the results of which are rather serious

pollution to waters and the surrounding areas and a huge impact on the life of

the surrounding urban residents and further the gradual degrading of urban

residential environment quality. Therefore, to further promote the healthy

sustainable development of social economy of Yueshan Town, to improve

township residential environment quality and to change the insufficient status

of funds for basic facilities, Yueshan Town decides, according to the purpose

of World Bank (“WB”) Loans “to improve the environment and to keep

sustainable development”, to use the WB loans to quicken the construction of

Hunan Integrated Economic Development Demonstration Town Project and to

practically promote the fast development of social economy of Yueshan Town,

on the base of reality and upon the site survey carried out by the development

and reform departments of the province, the city and the town and by experts.

In December2010, Yueshan Town initially finished a discrimination report of

Integrated Economic Development Demonstration Town Project Utilizing WB

Loans. In January2011, to further quicken the development of the Project, the

6

Page 15: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

People’s Government of Yueshan Town consigned Hunan International

Engineering Consulting Center to compile “The Feasibilities Study Report of

Integrated Economic Development Demonstration Town Project Utilizing WB

Loans”. In February2011, an expert team came and made a site survey and,

according to the reality of the Yueshan Town, discussed with the People’s

Government of Yueshan Town, studied and settled down a construction

proposal and the content thereof which is to utilize the WB loans on launching

contraction projects including the construction of a WWTP (WWTP) and the

supporting engineering thereof, the industry development study of a small

town, the administration study of a small town, the personnel training and so

on. Currently, the preparatory work successfully proceeded.

Geographic location of Hunan Province in China is shown in Figure 1, of the

Project in Figure2, and of the WWTP of the Project in Figure 3.

1.1.2 Significance of the Project Construction

The construction and implementation of the Project are full of below

meanings:

(1) The construction of the Project can improve local environment, which is of

benefit to the construction of a livable town.

The construction of the Project will improve the residential environment of

Yueshan Town and complete the basic facilities. The construction of a WWTP

and the supporting engineering thereof will effectively prevent pollutions;

greatly improve people’s living conditions; protect surrounding water sources;

beautify the surrounding environment; construct a more comfortable and

beautiful living environment; improve and raise residential environment;

quicken the construction of a livable town; and lay a better environmental

foundation for quickening urban development.

(2) The construction of the Project is of benefit to improving the livelihood of

the people and optimizing the soft environment necessary for development.

The implementation of the Project is aimed at optimizing regional soft

7

Page 16: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

environment necessary for development and putting forth effort to raise the

livelihood of the people. On the base of the reality of Yueshan Town, via the

construction of the WWTP and the supporting engineering thereof, Yueshan

Town will exert its effort to increase the taste of the town, to optimize the soft

environment, to accelerate the continuous strengthening of town functions

and to improve the quality of people’s life so as to further generate a powerful

cohesion and strong driving force, effect and attraction to accelerate related

industry cluster; to boost investment invitation and capital introduction; to

promote regional industrialization, urbanization and agricultural

industrialization; to quicken the steps of pushing regional economic

development and building a better-off society in an all-around way; to drive

economy and all social undertakings to develop in an all-around, healthy and

harmonious way; and to strive for the construction of a modern livable town of

a new type.

1.1.3 Target of the Project

General Target:

The construction of the Project aims at raising the level of urban basic

facilities of Yuehsan Town, strengthening public service function, improving

investment environment, boosting swift economic growth of Yueshan Town

and ensuring people living and working in peace and contentment, so as to

lay a sound foundation for the all-around, harmonious, sustainable and steady

development of social economic environment of Yueshan Town.

Detailed Target:

(1) To reinforce the pollution prevention and environmental protection of

Xinqiaohe River, to implement a complex pollution prevention and reduction

measure through controlling the pollution from the source, to control the

pollution load on the river and to increase the number of people participating

wastewater treatment so as to improve environmental monitoring, monitoring

frequency and the quality; and

8

Page 17: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(2) To raise the level of urban basic facilities of Yuehsan Town and to enhance

the living standard and the taste of the urban inhabitants, which are favorable

to achieving investment invitation and capital introduction.

1.1.4 Contribution of the WB

The WB actively contributes to the improvement of city environmental basic

facilities and the urbanization level. The Project is to utilize the loans and

technical support of the WB of about USD 5,000,000 to build a WWTP in

Yueshan Town, Xiangtan City, Hunan Province. It will increase a wastewater

treatment capacity of 3,000m3/d, and reform and complete the urban

wastewater collection network at the meantime. Via the implementation of the

Project, the basic facilities and environmental conditions of the Project site

can be effectively improved so as to make new contributions to the realization

of the outline target of the “20th five-year plan”.

1.1.5 Organizational Structure of the Project

Please refer to bellow for the Organizational Structure of the Project.

WB The People’s Government of Hunan Province

Provincial Project Leader Team

Provincial PMO

Xiangxiang City PMO

International Engineering Consulting Center

The People’s Government of Xiangxiang City

Project Team Leader of Xiangxiang City

The People’s Government of Yueshan Town

9

Page 18: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Figure 1-1 Sketch Map of the Organizational Structure of the Project

1.2 Overview of EIA Report

1.2.1 Purpose of Assessment

The purpose of the Environmental Impact Assessment (“the EIA”) is to assess

the positive environment influence brought by the implementation of the

Project, to identify, sieve, predict and analyze the possible negative

environmental impacts, to advance effective mitigation measures and

environmental management plans for the major negative environmental

impacts which are unavoidable, to provide a base for the independent

assessment by the WB to the Project and to provide decision and

management guidance for the governmental integrated management and the

WB The People’s Government of Hunan Province

Provincial Project Leader Team

Provincial PMO

Xiangxiang City PMO

Own

International Engineering Consulting Center

The People’s Government of Xiangxiang City

Project Team Leader of Xiangxiang City

Remark: a real line shows direct relationship. A broken line shows indirect relationship.

The People’s Government of Yueshan Town

Project Leader Team of Yueshan Town

Yueshan Town PMO

10

Page 19: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

environmental management departments, according to the provisions of

Environmental Impact Assessment Law of the PRC, Regulations on the

Administration of Construction Project Environmental Protection and

Notification on Strengthening the Administration of Environmental Impact

Assessment for Construction Projects Funded by the Loan from International

Finance Corporations, the requirements of Safeguard Policies of the WB and

the environmental impact assessment procedures of China and the WB.

1.2.2 Type of EIA

According to the provisions of Notification on Strengthening the Administration

of Environmental Impact Assessment for Construction Projects Funded by the

Loan from International Finance Corporations (Huanjian [1933] No. 324

Document) issued by bureaus including the State Environmental Protection

Administration and the provisions of OP4. 01 Environmental Assessment of

Safeguard Policies of the WB and as per the identification and sieving result

of the environmental assessment factors of the Project, the environmental

assessment type of the Project is determined as Type B, that is “a

construction project, of which the scale and degree of negative impact

possibly caused to the environment is limited and can be effectively mitigated

via the adoption of advanced techniques and mature preventive measures,

and generally, which is required of an environmental impact assessment

specially made according to the major engineering and environmental factors

rather than made according to all aspects” (Huanjian [1933] No. 324

Document) .

Therefore, the EIA of the Project is compiled according to the content and

scope of Type B.

1.2.3 Preparation of the Environmental Impact Report

The People’s Government of Yueshan Town consigns Changsha

Environmental Protection Career Technical College to complete the

environmental impact assess of the Project, according to Environmental

11

Page 20: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Impact Assessment Law of the PRC, Regulations for the Environment

Management of Construction Projects issued by the State Council and the

related provisions of Notification on Strengthening the Administration of

Environmental Impact Assessment for Construction Projects Funded by the

Loan from International Finance Corporations (Huanjian [1933] No. 324

Document) jointly issued by State Environmental Protection Administration,

State Development Planning Commission, Ministry of Finance and People’s

Bank of China.

After accepting the consignment, under the great support from the owner, the

institute has compiled and completed Environmental Impact Assessment of

Hunan Integrated Economic Development Demonstration Town Project

(Yueshan Town Subprojeoct, Xiangxiang City) Utilizing WB Loans (the EIA),

according to relation national laws and regulations, guideline of environmental

assessment and relation requirements of World Bank Operation Manual-

Environmental assessment, on the base of field investigation, site survey and

investigation of public participation, inspection of environmental quality status

and information collection.

1.2.4 Keys of Assessment

According to the national Technical Guidelines for Environmental Impact

Assessment and the requirements of Safeguard Policies of the WB, the EIA of

the Project give a special report on below questions:

(1) The engineering features of the major environmental problems possibly to

be caused by the Project

(2) The feasibility of site selection and major environmental protection targets

of the Project (the sensitive points);

(3) The positive environmental benefits and negative environmental impacts

possibly to be brought by the Project;

(4) The countermeasures adopted to mitigate the negative impacts possibly to

be brought by the Project;

(5) The analysis of alternative proposals; and

12

Page 21: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(6) The environment management plan (EMP)

1.3 Grading, Scope and Periods of the Assessment and Target of

Environmental Protection (Sensitive points)

1.3.1 Grading and Scope of the Assessment

(1) Atmospheric Environmental

According to the policies of assessment grading determination of HJ2.2-2008

Technical Guidelines for Environmental Impact Assessment: Atmospheric

Environment, the Institute determines that the atmospheric environmental

impact of the Project is Grade III, which means it’s possible not to carry out

atmospheric environmental impact prediction but directly take the calculation

result of an estimation mode as the base of prediction and analysis.

With the consideration of the reality of the Project, the assessment scope of

the WWTP of the Project is determined to be a circle taking the discharge

source as the center with a radius of2. 5km and the atmospheric

environmental assessment scope of the supporting pipeline construction to be

an area taking the pipeline as the centerline and extended200m outward from

both sides.

(2) Water Environment

According to the policies of assessment grading determination of HJ2.2-2008

Technical Guidelines for Environmental Impact Assessment: Water

Environment, the Institute determines that the water environmental impact of

the Project is Grade III.

With the consideration of the reality of the Project, the assessment scope of

the water environment of the Project is determined to be the area extended

from the wastewater outlet to Xinqiaohe River.

(3) Acoustic Environment

According to the policies of assessment grading determination of HJ2.2-2009

Technical Guidelines for Environmental Impact Assessment: Acoustic

13

Page 22: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Environment, the Institute determines that the acoustic environmental impact

of the Project is Grade III.

With the consideration of the reality of the Project, the assessment scope of

the acoustic environment of the Project is determined to be an area extended

100mm outward from the boundaries of the WWTP and of the supporting

pipeline construction to be an area taking the pipeline as the centerline

extended 50m outward from both sides.

(4) Ecological Environment

The permanent land occupation is 12. 8Mu (or 0. 85376 Ha). The land to be

occupied is normal farm land with a major crop of rice at present and is

beyond the sensitive ecological environment. According to the requirements of

Technical Guidelines for Environmental Impact Assessment: Ecological

Environment of Nature Source (HJ19-2011), the ecological environmental

assessment is determined as Grade III since the land occupied is larger

than2Km2 but less than2. Km2. Refer to Table 1-1 for grading base of

ecological environmental assessment:

Table 1-1 Grading Base of Ecological Environmental Assessment

Sensitivity Grade of Regional

Ecological Environment

Land Occupation

Area≥20km2

Or Length≥100kmArea:2km2-20km2

Or Length: 50km-100kmArea≤2km2

Or Length≤50km

Special Ecological

Sensitive AreaGrade I Grade I Grade I

Important Ecological

Sensitive AreaGrade I Grade II Grade III

Normal Area Grade II Grade III Grade III

With consideration to the reality of the Project, the assessment scope of the

ecological environment of the Project is determined to be an area extended

500mm outward from the boundary of the Plant.

1.3.2 Periods of the Environmental assessment

14

Page 23: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

The EIA of the Project mainly analyze and assess2 periods of the Project,

namely construction period and operation period.

1.3.3 Target of Environmental protection (Sensitive points)

According to the requirements of national laws and regulations on

environmental impact assessment and Safeguard Policies of the WB, the

target of environmental protection (or sensitive points) concerned in the

environmental assessment of the Project are mainly: areas of social concern

including high-population-density areas, cultural and educational areas,

central office areas, hospitals, etc.

The Project is located in Yingxiongling Group, Xinqiao Village, Yueshan Town,

Xiangxiang City, with pipe network mainly placed within the town. Figure1-2

provides a General of the surrounding of the WWTP of the Project, and Table

1-2 and 1-3 are separately show the environmental protection targets during

the construction of the WWTP and the pipe network.

15

Page 24: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Figure 1-2 General of the Surrounding of the WWTP of the Project

Table 1-2 Environmental Protection Targets of the Surrounding of the WWTP

No. DescriptionLocated at the side of the Plant

Distance Function

1Bailong Village

West Side 130 Village

2Hongyang Village

South-east Side 150 Village

3Xinqiao Village

North-east Side 100 Village

The Project

North

SludgeTreatment

Xinqiao Village (6 Families)

Grain Depot

Hongyang Village (3 families)

Bailong Village (3 Families)

150m

100m130m

15m

Xinqiaohe River

Bridge

River

A Ditch

Inter-communication highways of Xiangtan City

Duck-feeding Household

200m

150m

A broken line shows the distance from the sludge area.

A real line shows the distance from the plant boundary.

16

Page 25: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 1-3 Environmental Protection Target of the Pipe network

No. Description Function

1 Central Hospital of Yueshan TownArea of social concern

2 Xianfeng Middle SchoolArea of social concern

3The first row of buildings of the residential area and administrative organizations

Area of social concern

1.4 Environmental impact Factors and Assessment Factors

1.4.1 Identification of Environmental impact Factors

The implementation of the Project can further facilitate the pollution mitigation

of Xinqiaohe River, improve the basic facilities of Yueshan Town, and is

meaningful to promoting the sustainable development of environment and

social economy of Yueshan Town in an all-around way. Meanwhile, the

implementation of the Project may also bring some negative impacts to the

social and the ecological environment and the environment quality during its

construction and operation periods. The design period mainly centers on such

works as site selection, comparisons among technical proposals and the

study of feasibility. Therefore, this period generally will not cause impacts to

the environment.

Impacts brought during the construction and operation periods are mainly

including:

(1) Social Environmental impact: impacts on the social economy within the

construction areas definitely will be caused to some degreed by the Project,

which are expropriations mostly. The Project will permanently affect 11

families or 46 people. And 12.8 Mu (or 0. 85376 Ha) of collectively-owned

land will be expropriated for long. And the expropriation caused will affect the

daily life of the local people and reduce their the means of production and

subsistence, while the construction of the pipe network will make a difference

to the traveling and safety of the people living along the pipelines and the

traffic conditions along the pipelines.

17

Page 26: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(2) Ecological Environmental impact: the land occupation of the Project will

reduce the quantities of cultivated lands and vegetation cover, change the

features of land use, and alter the local agro ecosystem. During the

construction, the Project will destroy the vegetation of the site, and the

impropriate protection against roads deeply dug and the excavation, filling and

temporary stacking of earth and stones will cause the loss of water and the

erosion of soil easily;

(3) Environment Quality Impact: waters around the construction site will be

polluted by oil leaked, reeked and dripped from construction machines during

the construction period, the domestic wastewater of the construction people

and so on; heavy dust and ashes possibly emitted during the transportation

and mixing of construction materials will pollute the air; the noises caused by

the machines will impact the daily life and work of the people living around the

construction site and along the pipelines; and the frequent coming and going

of the construction trucks and cars will break the current traffic order.

Wastewater discharge, waste gas emitted, solid wastes and machine noise

caused during the operation period will pollute the surrounding environment to

some degree.

To sum up, the major impact factors existing during the construction and

operation periods are:

(1) Social Environment: land expropriation, traffic, city appearance, etc;

(2) Ecological Environment: change of land use, destroy vegetation and loss

of water and erosion of soil, etc;

(3) Water Environment: domestic and production wastewater during the

construction period and tail water at the end of operation period and domestic

wastewater during the operation period;

(4) Acoustic Environment: noise from the construction machine and

transportation during the construction period and machine noise during the

operation period;

18

Page 27: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(5) Atmospheric Environment: dust during the construction period and waste

gas of traffics during the construction period and odor emitted from the WWTP

during the operation period; and

(6) Solid Wastes: garbage and earth and stones left after excavation and

filling during the construction period and sludge and domestic waste

generated during the operation period.

1.4.2 Environmental Impact and Selection of Assessment Factors

According the above analysis, an environmental impact identification matrix is

built as Table 1-4 in the light of the types and features of the Project, and the

identification result of environmental impact factors is shown in Table 1-5.

Table 1-4 Environmental impact Identification Matrix

PeriodConstruction

PeriodOperation

Period

Impact Factors

Natural Environment

Atmosphere -L -MWater -S +L

Acoustic Environment

-L -S

Ecologic Environment

Land Use -L -SWater and Soil Conservation

-M +S

Vegetation -L +SAnimal -S -S

Appearance -L +M

Social Environment

Employment +S +MIncome of Residents

+S +M

Local Economy +S +M

Quality of Life -S +L

Remark: S is equal to light impact, M to middle impact and L to serious

impact; “+” means positive impact and “-” means negative impact.

19

Page 28: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 1-5 Identification Result of Environmental impact Factors

Period

Actions Affecting

Environment Resources and Values

Destruction and Benefits to the

Natural or Social Environment

Base of Environmental Analysis

Site Selection

Effects to the Production

System (Agriculture)

Loss of Production Capacity

Land OccupationType of Production/ Unit Income

Destruction to the Area with Production

Values

Destruction to Vegetation

Vegetation Area/Type/Value

Impact to Surface Water Environment

Hydrological Parameters and Monitoring Values of Water Quality

Construction Period

Removal of Vegetation

Destruction to Cultivated Land

Type/Are/Value of Vegetation Destroyed

Solid Wastes Generated

from Earthworks

Land Erosion and Loss of Grating

Residue

Stones and Earth Excavated, Filled and Disposed and Engineering Site

Temporary Occupation and

Destruction

Location, Scope and Purpose of Occupation

Emission of such Particles as Dust

Location of, Distance to, Wind Direction against the Residential Area and the Engineering Construction Schedule

Transportation of

Construction Material and Engineering Equipment

Particles and Noise, Traffic and

Transportation Safety

Material Size, Traffic Amount and Transportation through Environment

Sensitive Areas

Employment of

Construction People

Employment of Local Labor Force able to Bring Direct Effect to the Local

Residents

No. of People to be Employed and the No. and Rate of the Local Staff

Sanitary and Safety Impacts to

Construction People and Surrounding Residents

No. of People possibly to be Affected and Health Statistics Including the Statistics of Local Infectious and

Epidemic Diseases

20

Page 29: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Pollution to the Surrounding

Surface Water by Domestic

Wastewater

Quality of Surface Water, Standard of Environment Quality and Discharge

Standard

Utilization of Construction Equipment

Impact of Noise and Waste Gas to

Surrounding Residents

Necessary Construction Equipment, Construction Plans, Distance to the Nearest Residential Areas and the

Pollution Density thereof, Wind Direction and Speed and Standards of Noise and

Waste Gas Emitted

Generation of Solid Wastes

Pollution to Earth and River

Types and Quantity of Wastes including Domestic and Construction Wastes and

Earth Residua

Cleaning the Site upon

Construction Completion

Site and Area Temporarily Used and Equipment

Possibly Used and Wastes Generated

The Constructor Responsible for Preparing a “Site Recovery Plan upon Construction Completion” with Recover

Cost Specified in the plan.

Operation Period

Generation of Sludge by the

WWTP

Pollution Caused by Impropriate

Management and Treatment of

Sludge

Quantity and Composition of Sludge and Whereabouts and Treatment thereof

Generation of Waste Gas by

the WWTP

Odor Caused by Impropriate

Management of Sludge

Generation of Odor and the Preventive measures and Health protection

distance

Operation Noise of the WWTP and Wastewater Pump room

NoiseSource and Source Strength of the Noise, Preventive measures and

Emission Standard

On the base of environmental impact identification, environmental

assessment factors are sieved out as Table 1-3

Principles for sieving environmental assessment factors are:

(1) Regular pollution factors;

(2) Those factors which have larger impacts to the environments and are

special pollutants to the Project; and

(3) Those factors with specified limits in national and local environmental

21

Page 30: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

standards.

Table 1-6 Sieving Result of Environmental assessment Factors of the Project

Environmental Assessment Factors Impact DegreeEcologic

Environment

Atmospheric Environmen

t

Surface Waters

Acoustic Environmen

tSolid Wastes

Construction Period

Operation Period

Land Use and

Vegetation

TSP, PM10, NH3, H2S and Odor

COD, BOD5, NH3-N, TP, TN, and SS

Noise within the WWTP, Construction Noise and Noise from Pump room

Earth Residua and

garbage during the

Construction, Sludge and Domestic

waste

-J +Y

Remark: J is equal to larger impact and Y to normal impact and “+” means

positive affect and “-” means negative impact.

22

Page 31: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

2 Policies, Laws and Regulations and Administration

Framework

2.1 Environmental Policies, Laws and Regulations

2.1.1 General

Through the comprehensive analysis of project type and scope, site selection,

environmental sensitivities and the features and size of the possible

environmental impact, the policies, law and regulations as well as standards

mainly based on and related to by the EIA include:

(1) Laws and regulations on environmental protection;

(2) Regulations and requirements and local laws in relation with

environmental protection;

(3) Technical Guidelines for Environmental Impact Assessment and the

provisions;

(4) Environment quality standards;

(5) Pollutant discharge or emission standards; and

(6) Safeguard Policies of the WB.

The above policies, laws and regulations construct the framework guiding and

standardizing the environmental assessment of the Project. Besides, the

environmental assessment of the Project also takes such files, which shows

and implement the above laws and regulations in detail, as Terms of

Reference of Environmental Assessment (TOR), feasibility study report and

administrative examination and approval documents as one of the base of the

environmental assessment.

2.1.2 Laws and Regulations on Environmental Protection

(1) Environmental Protection Law of the PRC, 1989. 12.26

(2) Environmental Impact Assessment Law of the PRC, 2003. 9. 1

(3) Law of the PRC on the Prevention and Control of Water Pollution , 2008. 6.

23

Page 32: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

1

(4) Law of the PRC on the Prevention and Control of Atmospheric Pollution ,

2000. 9. 1

(5) Law of the PRC on Prevention and Control of Pollution from Environmental

Noise, 1997. 3. 1

(6) Law of the PRC on Prevention and Control of Environmental Pollution by

Solid Waste, 2005. 4. 1

(7) Detail Rules for the Implementation of the Law of the PRC on the

Prevention and Control of Water Pollution, 2000. 3.20

(8)Detail Rules for the Implementation of the Law of the PRC on the

Prevention and Control of Atmospheric Pollution, 1991. 5. 8

(9) Water Law of the PRC, 2002. 10. 1

(10) Water and Soil Conservation Law of the PRC, 2011. 3. 1

(11) Land Administration Law of the PRC, 2004. 8.28

(12) Urban and Rural Planning Law of the PEC, 2008. 1.1

(13) Law of the PRC on the Protection of Cultural Relics, 2007. 12.29

2.1.3 Regulations and Requirements and Local Laws in Relation with

Environmental protection

(1) Guiding Catalogue for Structural Adjustment of Industry (2011 Version)

(Document N0. 40 of State Development and Reform Commission ), 2011. 6.

1;

(2) Regulations on the Administration of Construction Projects Environmental

Protection, 1998. 11.29;

(3) Provisional Measure for Public Participating in Environmental Impact

Assessment, 2006. 02.22;

(4) Disclosure of Environmental Information (Provisional); 2007. 04.21;

(5) Notification on Strengthening the Administration of Environmental Impact

Assessment for Construction Projects Funded by the Loan from International

Finance Corporations, 1993. 06.21;

(6) Notification on Strengthening Classified Approval on Environmental Impact

24

Page 33: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Assessment, 2004. 12. 02;

(7) Notification on Strengthening the Supervision and Management of

Environmental Impact Assessment of Urban Construction Project, 2008. 9. 18;

(8) Categorized list of Environmental impact assessment of urban

Construction Project, (Announcement No.2 of Ministry of Environmental

Protection of the PRC);

(9) Notification on Strengthening Sludge Pollution Prevention and Treatment

of Urban WWTPs (Huanban [2010] Document No. 157) issued General office

of Ministry of Environmental Protection of the PRC, 2010. 11.26;

(10) Technical Policies for Sledge Treatment and Disposal for Urban WWTPs

(Provisional), 2009.2. 18;

(11) Technical Policies for Urban Wastewater Treatment and Pollution

Prevention (Chengjian [2000] Document No. 124), 2000. 5.29; and

(12) Notifications on Further Strengthening Construction Management of

Provincial Urban Wastewater Treatment Facilities (Xiangjiancheng [2008]

Document No. 160) issued by Hunan Provincial Construction Department

2.1.4 Technical Guidelines for Environmental Impact Assessment and

the Provisions

(1) Technical Guidelines for Environmental Impact Assessment: General

Principles HJ/T2. 1-1993;

(2) Technical Guidelines for Environmental Impact Assessment: Atmosphere

Environment, HJ/T2.2-2008;

(3) Technical Guidelines for Environmental Impact Assessment: Surface

Water Environment, HJ/T2. 3-1993;

(4) Technical Guidelines for Environmental Impact Assessment: Acoustic

Environment, HJ/T2. 4-2009;

(5) Technical Guidelines for Environmental Impact Assessment: Ecological

Environment of Nature Source, HJ19-2011 and

(6) Technical Guidelines for Environment Risk Assessment on Project

Construction, HJ/T169-2004.

25

Page 34: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

2.1.5 Environment Quality Standards

(1) Ambient Air Quality Standard (GB3095-1996) Grade II;

(2) Environmental Quality Standards for Surface Water (GB3838-2002), Type

IV;

(3) Acoustic Environment Quality Standard (GB3096-2009), Type II; and

(4) Industrial Corporation Sanitary Standard (TJ36-79).

2.1.6 Pollutant Discharge or Emission Standards

(1) Monitoring concentration threshold of fugitive emission of Integrated

Emission Standard of Air Pollutants (GB16297-1996) is carried out during the

construction period;

(2) Emission densities of nitrogen, sulfurated hydrogen and odor comply with

Type II standard (for new, rebuild and extension projects) of Emission

Standard for Odor Pollutants (GB14554-93) during the operation period;

(3) Tail water discharge complies with Primary standard - standard B of

Pollutants Discharge Standard for Urban WWTPs (GB18918-2002) during the

operation period;

(4) Noise emission complies with the limit regulations of Noise Limits for

Construction Sites (GB12523-90) during the construction period;

(5) Noise emission complies with Type II standard of Noise Limits for

Industrial Corporation Sites (GB12348-2009) during the operation period; and

(6) Standard for Pollution Control on the Storage and Disposal Site for

General Industrial Solid Wastes (GB18599-2001)

2.1.7 Safeguard Policies of WB

(1) OP/BP4.01 Environmental Assessment;

(2) OP/BP4.04 Natural Habitats;

(3) OP4.09 Pest Management;

(4) OP4.37 Safety of Dams;

(5) OP4.11 Physical Cultural Resources;

(6) OP/BP4.12 Involuntary Resettlement;

(7) OD4.20 Indigenous Peoples;

26

Page 35: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(8) OP7.50 Projects on International Waterways;

(9) BP17.50 Information Disclosure. (Information Disclosure).

The safety guarantee policies of the WB with respect to the Project consist of

items (1), (6) and (9).

2.1.8 Documents Related to the Project

(1) Feasibilities Study Report on Hunan Integrated Economic Development

Demonstration Town Project (Yueshan Town Subprojeoct, Xiangxiang City)

Utilizing WB Loans (2011. 10) compiled by Hunan International Engineering

Consulting Center;

(2) Resettlement Plan for Hunan Integrated Economic Development

Demonstration Town Project (Yueshan Town Subprojeoct, Xiangxiang City)

(2011. 10);

(3) General Planning of Yueshan Town, Xiangxaing City (2006-2020) (2009.

8); and

(4) Feasibility Study Report of Renovation Demonstration of Continuous Rural

Environment of Yueshan Town, Xiangxiang City (2010. 8).

2.2 Environment Administration Organizations and Functions

The Central Government of PRC and each province (or municipality directly

under the jurisdiction of the Central Government or autonomous regions) and

each of its cities (or autonomous prefectures) and Counties (or districts) all

establish an environment administration organization according to the law to

carry out relation functions. And the environment administration organizations

related to the Project mainly include: Xiangtan City Environmental Protection

Bureau and Xiangxaing City Environmental Protection Bureau.

(1) Xiangtan City Environmental Protection Bureau

Xiangtan City Environmental Protection Bureau, established in the year of

1975, is the government department responsible for the city environmental

protection works. Its major functions include: to implement national

environmental protection policies, laws and regulations, to put in effect the

27

Page 36: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

related laws and regulations, policies and institutions of the principal

government and the provincial environmental protection department, to set

down environmental protection rules and policies of the city and to monitor the

implement thereof, to be responsible for the prevention and control

environmental protection from the sources and to take responsibilities for

environment destruction, to take charge of achieving emission reduction

targets of the city, environment supervision and enforcement of the

environmental protection laws and regulations, to prevent and handle

environmental pollution of the city, to direct, cooperate and monitor the

ecological environmental protection of the city, to monitor and manage nuclear

safety and radiation safety; to take care of environment monitoring and

information disclosure, to carry out technological works about environmental

protection, to organize, direct and cooperate the promotion and education of

environmental protection within the city, to set down, organize and implement

the promotion and education planning of environmental protection of the city,

to deal with promotion and education works related to ecological civilization

construction and friendly social construction, to drive the participation of the

public and social organizations into environmental protection, to carry on the

international cooperation and communication of environmental protection, to

advance advice about the problems coming up during the international

cooperation and communication, to carry out international information

exchange of environmental protection, to participate foreign environmental

protection affairs and to undertake other items instructed by the people’s

government of the city.

(2) Xiangtan City Environmental Protection Bureau

The major functions of Xiangtan City Environmental Protection Bureau are: to

implement national environmental protection policies, laws and regulations, to

put in effect the related laws and regulations, policies and institutions of the

principal government and the provincial environmental protection department,

28

Page 37: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

to monitor and execute the environmental protection policies and regulations

of Xiangxiang City; to be responsible for the prevention and control

environmental protection from the sources and to take responsibilities for

environment destruction, to take charge of environment supervision and

enforcement of the environmental protection laws and regulations, to handle

prevention and treatment of environmental pollution of the city, to direct,

cooperate and monitor the ecological protection of the city, to take care of

environment monitoring and information disclosure, to carry out technological

works about environmental protection, to organize, direct and cooperate the

promotion and education of environmental protection within the city, to drive

the participation of the public and social organizations into environmental

protection and to undertake other items instructed by the people’s government

of Xiangxiang City.

29

Page 38: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

3 Description and Analysis of the Project

3.1 Project Name and Composition

Project name: Hunan Integrated Economic Development Demonstration Town

Project (Yueshan Town Subproject, Xiangxiang City) Utilizing WB Loans.

Construction nature: new construction.

Construction unit: Yueshan Town Government, Xiangxiang City.

Construction site: lies at Yingxiongling Group, Xinqiao Village, Yueshan Town,

Xiangxiang City.

Project investment: total project investment is RMB 41,046,900, among which,

the construction unit plans to apply for World Bank loans of USD 5 million,

and the remaining capital will be self financed by auxiliary and project units at

provincial, municipal and county levels.

Project composition: the Project, to be constructed in two phases, covers an

area of 8,529 m2 (equivalent to 12.8mu), with a design scale of 6,000m3/d.

The construction scale for this phase is determined to be 3,000m3/d, with

auxiliary wastewater pipe network of 13,520m, which can meet the

requirement on development plan of Yueshan Town, Xiangxiang City. The

underground DEST (Oligodynamic bio-membrane process as full name,

hereinafter referred to as DEST) is adopted in the design. The main economic

and technical indexes of the Project are shown in Table 3-1.

Table 3-1 Main Economic and Technical Indexes of the Project

No. Index Unit Quantity Remarks

1 Total Floor Coverage Area

m2 8,529 Reserved Land Scale 3,000m3/d

2 Construction Scale m3/d 3,000 /

3 Urban Wastewater Pipeline

m 13,520 /

4 Greening Rate % 32.7 Greening Area 2,793m2

30

Page 39: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

5 Total Investment of the Project

Ten Thousand Yuan

4,104.29 /

6 Manpower of the Whole Plant

Person 13 /

7 Actual Annual Calendar Days

Day 365 /

8 Construction Period Year 5 From July 2012 to June 2017

3.2 Construction Proposal of the Project

3.2.1 Construction Content and Scale

The Project covers an area of 8,529m2 (equivalent to 12.8mu), and the

construction scale for this phase is 3,000m3/d, and auxiliary wastewater pipe

network 13,520m. The main construction content and scale of the Project are

shown in Table 3-2 and Table 3-3.

Table 3-2 Project Construction Status

Term of Constructio

n Sub-Phase

Design Service

Population (Person)

Estimation Quantity of Wastewater in Service

Area (m3/d)

Design Scale (m3/d)

Discharge System Discharge Direction

Status Quo Post-CompletionStatus Quo

Post-Completion

Short Tem 2013

15,600 2,941 3,000

Confluence Incomplete Separate System

Xinqiaohe River

Xinqiaohe RiverLong Term

202025,500 5,880 6,000

Note: the construction content of the year of 2020 in the long term in the Table

belongs to Phase II, beyond the scope of this assessment.

Table 3-3 Main Construction Content and Scale of the Project

No. Name Unit Quantity Remarks1 Construction Scale m3/d 3,000 Reserved Land Scale 3,000m3/d

2 Urban Wastewater Pipeline

m 13,520 /

3 Area of Road and Turn Round Pad

m2 1,840 Off-Site Road including Enclosing Wall

4 Sidewalk Area m2 76 /

5 Greening Area m2 2,793 Greening Rate 32.7%

6 Solidification Area m2 440 /

31

Page 40: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

7 Pavage Site m2 820 /

8 Complex Building m2 324 Second Floor, 21.6×7.5×6m

9 Air Blower Room m2 75.6 12.6×6×3.5m

10 Dewatering Room m2 135 15×9×4.5m

11 Power Distribution Room m2 75.6 12.6×6×3.5m

12 Grating Well m2 20 8×2×4m

13 Pump Room m2 29.6 7×4×4m

14 Collecting Well m2 29.6 7×4×6m

15 DEST Tank m2 632.8 35.5×17.6×6.8m

16 Sludge Storage Tank m2 9.9 3×3×3m

17 Ultraviolet Disinfecting Tank

m2 19.3 3×5×2m

From Table 3-2 and Table 3-3, it can be concluded that:

(1) The WWTP of the Project is to be constructed in short-term and long-term

phases, and its design scale shall be determined based on status quo and

growth rate of the population. To ensure effective treatment of domestic

wastewater, the treatment scale of the WWTP shall be designed to be more

than or equivalent to the predicted wastewater production. Meanwhile,

auxiliary construction shall be carried out in respect of interceptor sewer,

wastewater main pipe, discharge pipe, storm sewer, recession pipe, etc.,

which shall in line with the stipulation that ‘Determine the ultimate scale for

construction of urban wastewater treatment facilities in accordance with the

long-term plan, and determine the short-term scale on the basis of status quo

of water quantity' indicated in (Chengjian [2000] Document No. 124) Technical

Policies for Urban Wastewater Treatment and Pollution Prevention.

(2) With implementation of the Project, the discharge direction will change

from current way of direct discharging into surface water body to such way

that prior to be discharged to surface water body, the discharge will be first

collected by pipe network and then disposed by urban WWTP until up to

standard. This move will greatly reduce total pollutant amount entering into

32

Page 41: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

surface water body, which will be conducive to the improvement of water

environmental quality.

3.2.2 Main Equipment of the Project

The main equipment of the Project is shown in Table 3-4.

33

Page 42: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 3-4 Main Equipment List of the WWTP

Installation Position

SN. Name of Equipment

Performance Parameters

Unit Quantity Remarks

Pretreatment System

1 Square Gate and Hoist

600×800 N=1.1kw Set 2 /

2 Rotary Drum Grating Cleaner

B=600mm, b=4mm, N=1.5kw

Set 2 /

3 Submersible Wastewater

Q=125 m3/h, H=8m, N=5.5kw

Set 2 /

4 Electric Butterfly Valve

DN150 Set 2 /

5 Check Valve DN150 Set 2 /

6 Rotational Flow Sand deposit

Pulp Board Mixer, N=0.55 kw

Set 1

7 Spiral Grit Water

Q=12L/s, N=0.37kw Set 1 /

DEST Tank

1 Mixed liquor Reflux Pump

Q=100m3/h, H=4.5m, N=2.2kw

Set 4 One Backup for Warehouse 2 Atmolysis Bag / Piece 2 /

3 Gate Valve DN150 Piece 11

4 Electromagnetic Valve

DN32 Piece 10

5 I-Steel 110×6 Meter 180 /

6 Round Steel Ø12 L=5,400 Piece 690 /

Air Blower Room

1 Air Blower Q=5.2m3/min,

Pressure 58.8Kpa, N=11kw

Set 3 /

2 Electric Butterfly Valve

DN100mm Set 3 /

3 Check Valve DN100mm Set 3 /

Sludge Dewatering

Room

1Sludge

Thickening and Dewatering Set

B=1,000mm, N=1.5kw

Set 1 /

2 Band Conveyor B=500mm L=5m, N=1.5kw

Set 1 /

3 Static Mixer DN100×500mm Set 1 /

4 Sludge Feed Pump

Q=6m3/h Pressure 0.4MPa N=2.2kw

Set 2 /

Sludge Storage

1 Submersible Mixer

Impeller Diameter 320mm, n=904r/min

Set 1 /

34

Page 43: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Disinfecting Tank

1 UV Light Tube N=4kw Set 1 /

General Layout Pipeline

1 COD Online Monitoring

Set 1

2 Continuous Online

/ Set 1 /

Transport Equipment

1 Transportation Vehicle

1 Vehicle5T (Self Lighting Type)

2 Van 1 Vehicle /

3.2.3 Technological Introduction

3.2.3.1 Process Flow Sheet

Table 3-1 DEST Process Flow Sheet

3.2.3.2 Process Design

(1) Grating Chamber

Taking the interception ratio: n0=1.0 into account, we will build the grating

chamber together with the collecting tank, and complete both at once

according to the long-term scale of 6,000m3/d. The grating adopts rotary drum

grating cleaner, which integrates pollutant interception, tine harrow

deslagging, spiral hoisting, and squeeze dewatering into one. The grating is

automatically started or stopped according to the time interval and water head

between fore-grating and rear-grating, with main parameters as follows:

Design flow: drought flow: Q=6,000m3/d =250m3/h; confluence flow:

Q=12,000m3/h =500m3/h;

Gratings Inflow Pump Room

DEST Tank

Entry of Residual sludge into the Sludge Treatment System

Sand Deposit Tank

Wastewater

Transportation of Grating Residues

Transportation of Grating Residues

Blower

Disinfection Tank

Discharge to Xinqiaohe River

35

Page 44: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Grating bar clearance: b=4mm

Flow velocity through grating: v=1m/s

Fore-grating water depth: h=0.5m

Grating obliquity: α=35º

Diameter of rotary drum: 600mm

Main equipment: 2 rotary drum grating cleaners, with single power of 1.5kW

Auxiliary equipment: 2 square gates, and 2 hoists, with single power of 1.1kW

Plan view size: 8×2m

(2) Pump Room

Taking the interception ratio: n0=1.0 into account, we will build the pump room

together with the grating chamber, complete the civil engineering at once

according to the long-term scale of 6,000m3/d, and install equipment

according to the short-term scale of 3000m3/d. The pump room, which adopts

submersible pump with automatic coupling installation, is equipped with

electric hoisting equipment and the corresponding valves. Control on the

pump room can be realized by PLC and on-site mode, with main design

parameters as follows:

Auxiliary design: drought flow Q=3,000m3/h=125m3/h;

Confluence flow: Q=6,000m3/h =250m3/h

Capacity of collecting tank: effective capacity 120m3

Main equipment: 2 submersible pumps, with single flow Q=125m3/h, pumping

head of 8m, and power of 5.5kW. In dry season, both operating pump and

backup pump will be put into operation. 2 submersible pumps will be added in

Phase II.

Auxiliary equipment: 2 electric butterfly valves, with single power of 0.1kW,

and another 2 electric butterfly valves will be added in Phase II; 2 check

valves, and another 2 will be added in Phase II; 1 set of water-level controller;

1 hand-drive hoist; and 1 set of H2S monitoring and alarming device.

(3) Rotational Flow Sand deposit tank

Taking the interception ratio: n0=1.0 into account, we will adopt steel structure

36

Page 45: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

equipment in sand deposit tank, and equip it with auxiliary equipment

according to the short-term scale of 3,000m3/d, and design to adopt rotational

flow sand deposit tank, which features the advantages of small space

demand, low operating cost, convenient installation and service, etc.

Transcendent functions are taken into account in the course of design, to

facilitate equipment maintenance, with main design parameters as follows:

Design flow: 250m3/h

Quantity: 1; and another 1 will be added in Phase II.

Diameter of sand deposit tank: D=1.63m

Depth of sand deposit tank: H=1.12m

Diameter of sand hopper: D=0.91m

Depth of sand hopper: H=1.52m

Surface loading of hydraulic power: q=120m3/m2•h

Auxiliary equipment: one set of pulp board mixer, with single power of 0.55kW,

and another 1 will be added in Phase II; 1 spiral grit water separator, with

single power of 0.37kW.

(1) DEST Tank

DEST tank includes anoxia and anaerobic tanks, contact oxidation tank and

vertical flow grating residue tank which constitute a group of processing

structures.

a) Anoxia and Anaerobic Tank

The wastewater with the process of de-slagging and sand deposit enters into

the anoxia and anaerobic tank and mixes with the return wastewater, which

begins the anaerobic biochemical reaction and de-nitrification. The anaerobic

phase includes anaerobic fermentation, anaerobic corrosion and anaerobic

biochemical filtration. Anaerobic tank adopts the water the horn-shaped

distributor to distribute water equably which makes full use of Effective

capacity.

Design scale: 3,000m3/d =125m3/h

Grating (tank) number: 9

37

Page 46: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Single grating size: 5.6×5.6×6.5m with a mean depth of 5.95m

Effective capacity: 1679m3

Retaining period for waterpower: 13.4h

Filler number: 1,200m3 with the polyethylene elasticity plastic filler of Ø150

b) Aerobic Tank

Through the anoxia and anaerobic process, quantities of BOD and CODcr are

wiped off from the wastewater which then is processed by the “nitration” and

phosphorus removal mainly in the aerobic tank where a further step is made

to remove the organic load. The aerobic tank is biological treatment

equipment that relies mainly on biofilm process, combining the activated

sludge one. The microorganism absorbs the phosphorus forcefully from the

phase of anaerobic process to aerobic one.

Design scale: 6,000m3/d =125m3/h

Grating (tank) number: 6

Single grating size: 5.6×4.3×6.5m with a mean depth of 5.78m

Effective capacity: 835m3

Retaining period for waterpower: 6.68h

Filler number: 612m3 with the polyethylene elasticity plastic filler of Ø150

Main equipment: 4 reflux pumps (1 for reserve in the storage) with a flux of

100m3/h, lift of 4.5m and power of 2.2kW for each one. 3 more shall be added

in the phase II.

c) Vertical Flow Grating residue Tank

Grating residue tank adopts the vertical flow one that is jointly built with DEST

biochemical tank. The mixed liquor exhausted from the DEST tank will firstly

enter into the water-distributor tube set in the center of the vertical flow grating

residue tank, then rise with the density current due to the density difference of

the clear water and will be finally discharged into outflow canal by the overflow

around when in the upper layer. The residual sludge in the bottom of grating

residue tank will be discharged into the deposition tank through the sludge

pipe by the gas stripping.

38

Page 47: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Design scale: 3,000m3/d =125m3/h

Grating (tank) number: 3

Single grating size: 5.6×8×6.5m

Surface Load: 0.93m3/m2•h

Retaining period for waterpower: 5h

(5) Sludge Storage Tank

For disposal of the residual sludge in the DEST tank

Effective capacity: 22.5m3

Size: 3.0×3.0×3.0m

Auxiliary equipment: 1 Diving Mixer with the impeller diameter of 320mm and

power of 2.2kw

(6) Blower Room

The civil engineering is built in one time on the long-term scale of 6,000m3/d

with single-deck frame construction which is mainly used for the offer of

enough air to biological contact oxidation tank. The assorted high-speed

centrifugal blower with single stage ensures the effect of nitrogen phosphorus

removal through the dissolved oxygen detector to adjust the operation

parameter in blower automatically by frequency control device. Following are

the main design parameter:

Plan view size: 12.6×6m

Main equipment: 3 Roots Blowers (2 for use and 1 for reserve) with flux of

5.2m3/min, wind pressure of 58.8Kpa and power of 11kW. 2 more will be

added in the phase II.

Auxiliary equipment: 3 Electric butterfly valves, with single power of 0.1kW

and another 2 will be added in Phase II; 3 check valves and another 2 will be

added in Phase II; 2 air purifiers with both thick and thin ones.

(7) Dewatering Room

The civil engineering is built in one time on the long-term scale of 6,000m3/d,

with single-deck brick-concrete structure which is used to dehydrate water of

the residual sludge and compress its volume to the minimum. Dewatering

39

Page 48: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

room will be equipped with sludge concentration and dewatering machine,

belt conveyor, flocculent preparation and addition system with the storage

space for flocculent.

Plan view size: 15×9m

Residual sludge Amount: 248kg/d (dry sludge) (the first stage)

Main equipment: 1 draper-type dewaterer with the belt of 1.0m wide; 1 board-

type dewaterer. None is needed to add in the phase II except the work

duration.

Auxiliary equipment: 1 drug preparation and delivery system, with single

power of 1.5kW; 1 belt conveyor with the belt of 500mm wide, 5m long and

the power of 1.5kW; 2 air compressors (1 for use and 1 for reserve), with

single power of 1.5kW; 2 sludge treatment pumps (1 for use and 1 for

reserve) with the flux of 6m3/h, lift of 40m and power of 2.2kW; 1 electric

traveling crane with the lifting weight of 5t and power of 3kW.

(8) Ultraviolet Disinfecting Tank

1 tank is set in reinforced concrete structure for disinfection before the

wastewater drains into Xinqiaohe River.

Design scale: 3,000m3/d

Plan view size: 3×5m

Auxiliary equipment: ultraviolet tube, with single power of 4kW

(9) Power Distribution Room

Power Distribution Room shall be set with power distribution cabinets and

transformers, which is jointly built with blower room. Its advantages lies in

short layout line, simple and easy installation and convenient operation

management, etc.

Plan view size: 12.6×6m

(10) Complex Building

The Complex Building assembles the office and laboratory as a whole with 2

layers.

Plan view size: 1.6×7.5m

40

Page 49: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

3.2.4. General Layout of Plant Site

3.2.4.1. General Layout Principles

General Layout Principles of Plant Site:

(1) Connection properly with the general planning of the city and coordinating

with the surrounding environment;

(2) Clear functionality of each area and compact arrangement striving to use

land economically and reduce area;

(3) Short and smooth process to avoid circuitous repeat;

(4) Well combination and concentration arrangement of short- and long-term

structures, forming an integrated whole and giving room for the long-term

development;

(5) The layout of the buildings facing south-north as much as possible;

(6) A certain width of health protection distance between the Plant structures

and surrounding buildings to reduce the influence of the WWTP on the

surrounding environment;

(7) Convenient transportation for flow and logistics, and clear division of

primary and secondary roads to meet fire safety requirements;

(8) Smooth flow of traffic facilitating the construction and management.

In addition to the above mentioned principles, the layout of the Plant site shall

be based on the direction of prevailing wind and water inlet, position of water

discharge, characteristics of process as well as other factors, such as the

Plant site topography, geological conditions etc. and many other factors shall

be considered. For example, the process shall be reasonable, easy

managing, economic and practical, and the architectural style and plant

greening shall be in harmony with the surrounding environment.

3.2.4.2. General Layout

The general layout plan of the Project is shown in Figure 4.

The land acquisition of the Plant area is disposable for the long-term

development, and the total land area is 8,529 m2 (the effective land area

within the walls). Wastewater treatment of the Plant covers an area of 1.42m2.

41

Page 50: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

According to different functions, the Plant is divided into three areas: life and

auxiliary production area (front area of the Plant), wastewater treatment area

and sludge treatment area (production areas).

The front area of the Plant, located in the southeast corner of the Plant, is

mainly made up of the Complex Building (with office, laboratory, dormitory,

dining hall) and guard house. Between the production area and the front area,

a greenbelt area is designed to ensure a good ecological environment for the

front area.

In accordance with the process, in the west of the production area, the inflow

pump room, grit separator, sludge tank and sludge dewatering room are

designed to reduce the influence on the front area of the Plant and the

surrounding environment; in front of the sludge dewatering room, the terrace

designed to meet the requirements of stacking and transportation of sludge; in

the area, the disinfecting tank, blower housing and power distribution room

arranged from north to south; the DEST reaction tank is arranged in the

centre; and the long-term land reserved in south central.

3.2.5. Service Scope and Wastewater Discharge Forecast

3.2.5.1. Design Life and Discharge System of the Plant

(1) Design Life

According to the General Planning of Yueshan Town, Xiangxiang City (2006-

2020), in combination with the Code for Urban Water Supply Engineering

Planning, and in consideration of the town development level and the water

supply and discharge facilities and other factors, the design life of the Project

is:

Short-term: 2013

Long-term: 2020 (belong to the Phase II construction, not within this scope of

evaluation)

(2) Discharge System

The present status of Yueshan Town is that the production and domestic

wastewater discharge is free, and there aren’t unified discharge pipes, and

42

Page 51: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

the wastewater is drained directly into the surrounding channels. In

combination of planning, the center township of Yueshan Town adopts the

mixture of rainwater and wastewater system for the short-term, while for the

long-term incompletely separate system for rainwater and wastewater is

adopted.

3.2.5.2. WWTP Service Scope

The service scope of this wastewater treatment project is the center township

of Yueshan Town. According to the general planning, the construction land of

2010 is 1.34 square kilometers, and the construction land of 2020 is 3.22

square kilometers. Until the end of 2010, the center township has a built up

area of 1.5 square kilometers, which is basically consonant with the planed

construction land area. The construction land area mainly expands to the

north-east of the existing land, and it is forecasted that the construction land in

2013 is 2.03 square kilometers and 3.22 square kilometers in 2020.So the

service scope of the Project is 2.03 square kilometers in the short-term and

3.22 square kilometers in the long-term.

The WWTP only accepts domestic wastewaters and similar industrial

wastewaters, or industrial wastewaters in line with national discharge

standards after pre-treatment and being treated with domestic wastewaters.

3.2.5.3. WWTP Service Population

According to the general planning, the population scale of the center township

of Yueshan Town is 10,000 in 2010, and 25,500 in 2020.And according to

statistics provided by the town government, the population of the center

township of Yueshan Town in 2010 is 9,105, slightly less than the planned

population. Refer to the forecasted population growth rate described in the

General Planning of Yueshan Town, Xiangxiang City. According to the

population base of 2010, the average annual natural growth rate of the

township population is 0.2%, and the mechanical growth rate is 1. 8%. And

taking the population of surplus labor changing to urban population into

43

Page 52: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

consideration, the population scale calculated therefrom is 15,600 in 2013,

and 25,500 in 2020.The population growth statistics of the center township of

Yueshan Town in the latest three years is shown in Table 3-5.

Table 3-5 Statistic Table of the Population Growth of the Center Township of

Yueshan Town in the Latest Three Years

Year

Total Population of the Center Township(Person)

Floating Population of the Center Township

(Person)

Net Increase of Population (Person)

Annual Growth Rate

(%)

2005 7295 45 / /

2006 7692 47 397 0.54

2007 8069 48 377 0.49

2008 8434 50 365 0.45

2009 8771 55 347 0.41

2010 9105 59 324 0.37

3.2.5.4. Wastewater Discharge Forecast

Wastewater discharge forecast is closely related to the development of the

urban economy, the population, the development and construction scale of

the planning area, the layout, land area, population density, industrial

distribution, etc. Commonly used wastewater forecasting methods are the

comprehensive quota method, the sub-item quota method, urban construction

land indicator method, etc. The Project adopts the sub-item quota method and

urban construction land indicator method to forecast the wastewater

discharge.

(1) Sub-item Indicator Method

Domestic Wastewater Discharge

According to the requirements of national water saving policy and the

Technical Specification of Water Supply Engineering for Town and Village

(CJJ123-2008), and with consideration of the water supply and discharge

sanitary facilities and showers equipped indoor, the daily domestic water

consumption indicators (maximum) of Yueshan Town is 130~190L/cap·d. and

in combination of the demand of domestic water supply and the domestic

44

Page 53: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

wastewater generated of the latest three years, the domestic water

consumption indicator of 2013 is 130L/cap·d, and the domestic water

consumption indicator of 2020 is 150L/cap·d. The domestic wastewater

discharge calculated is shown in Table 3-6; the statistics of demand of

domestic water supply in the latest three years is shown in Table 3-7, and the

actual domestic wastewater generated in Table 3-8.

Table 3-6 Statistical Table of Demand of Domestic Water Supply in the Latest

Three Years

Year

Aggregate Demand

on Domestic Water

Supply (m3/d)

Demand on Commercial

Water Supply (m3/d)

Demand of Public Institutions on

Domestic Water Supply (m3/d)

Demand on Resident Water Supply (m3/d)

2008 1200 220 230 750

2009 1400 250 250 900

2010 1600 280 290 1030

Table 3-7 Statistical Table of Actual Domestic Wastewater Generated in the

Latest Three Years

YearCommercial

Discharge (m3/d)Domestic Discharge by Public Institutions (m3/d)

Domestic Discharge by Residents (m3/d)

2008 100 120 600

2009 130 150 720

2010 180 180 850

Table 3-8 Domestic Wastewater Discharge Forecast Table

No. Indicator 2013 20201 Planned Population (Person) 15600 25500

2 Standard of Water Consumption Per Capita (Per Day L/cap•d)

130 150

3 Forecast Water Consumption (m3/d) 2028 3825

4 Converted Discharge Coefficient 0.9 0.9

5 Wastewater Collection Rate 90% 95%

45

Page 54: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

6 Wastewater Treatment Amount (m3/d) 1642 3270

Industrial Wastewater Discharge

Industrial water consumption is related to the production process. According

to the general planning of Yueshan Town, the central part of the town centers

on developing agricultural products processing industry, commerce, tourism

the detailed data of theses enterprises is absent, and it is impossible to

forecast based on the enterprises category, so the industrial output is used for

forecast. In 2010, the total industrial output of Yueshan Town is RMB

229,580,000.According to the development plans, the annual economic

growth rate is 10%, so in 2013 the total industrial output is RMB 305,570,000,

and in 2020 RMB 595,470,000.And according to the requirements of national

water saving policy and with the current situation and developing trends,

referring to the wastewater discharge for unit output of towns and counties

with similar industries, the average wastewater discharge per thousand RMB

output is 15m3. The forecasted industrial water supply demand is shown in

Table 3-9, and the industrial wastewater discharge of wastewater in Table 3-

10.

Table 3-9 Table of Industrial Water Supply Demand

YearDemand of Food Processing

Industry (m3/d)Demand of Other Industries (m3/d)

2008 300 100

2009 420 150

2010 550 200

Table 3-10 Industrial Wastewater Discharge Forecast Table

No. Indicator 2013 2020

1Industrial Output (RMB Ten

Thousand )30557 59547

46

Page 55: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

2

Wastewater Discharge for RMB Ten

Thousand Output (m3/RMB Ten

Thousand )

10 10

3Forecasted Industrial Wastewater

Discharge (m3/d)837 1631

4 Wastewater Collection Rate 80% 83%

5 Wastewater Treatment Amount (m3/d) 670 1353

According to the material provided by the environmental protection

department of Yueshan Town, Xiangxiang City, there are mainly four polluting

enterprises to Xinqiaohe River at present, and the wastewater discharge

statistics of the latest five years are shown in Table 3-11.

Table 3-11 Present Status Table of Industrial Waste Water

Name of EnterpriseDischarge (m3/d)

Spring WoodRea Sea Wood

Xiangxiang Weaving Factory

Total

2006 100 90 60 250

2007 110 90 60 260

2008 120 100 70 290

2009 130 100 70 300

2010 140 100 70 310

Synthesizing Tables 3-9 and 3-11, and in consideration of the water discharge

of some small family businesses are not included in the statistics, so the

industrial waste water discharge uses the data in Table 3-9.

Total Wastewater Discharge

Total Wastewater Discharge = Domestic Wastewater Discharge + Industrial

Wastewater Discharge + Public Building Wastewater Discharge + Unforeseen

Water Discharge

The public building wastewater discharge is 15% of the domestic water

consumption, the unforeseen water consumption includes watering the green

land and roads, pipeline leakage, etc., and the wastewater discharge

generated is equal to 15% of the sum of the industrial wastewater discharge,

public building wastewater discharge and domestic wastewater discharge.

47

Page 56: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

The prediction results of the total wastewater discharge are shown in Table 3-

12.

48

Page 57: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 3-12 Wastewater Treatment Amount Forecast Table

No. Indicator 2013 20201 Domestic Wastewater Discharge (m3/d) 1642 3270

2Public Buildings Wastewater Discharge

(m3/d)246 490

3 Industrial Wastewater Discharge (m3/d) 670 13534 Unforeseen Wastewater Discharge (m3/d) 383 7675 Total Wastewater Discharge (m3/d) 2941 5880

(2) Public Institutions Construction Land Comprehensive Water Consumption

Indicator Method

The public institutions construction land comprehensive water consumption is

related with the local industrial structure, residential density and the degree of

wastewater collection. Referring to the Code for Urban Water Supply

Engineering, the public institutions construction land comprehensive water

consumption indicators of the medium and small cities is: 0.4 ~ 0.8 (ten

thousand m3/ km2·d). In consideration of the water saving ideas and policy, the

long-term population scale of the Project is 25,500; considering that the short-

term water consumption per unit area is 4,000 m3/ km2·d, and the long-term is

4,000 m3/ km2·d, the water consumption and wastewater discharge prediction

calculated are shown in Table 3-13.

Table 3-13 Wastewater Discharge Forecast Table

No. Indicator 2013 20201 Effective Land Area 2.03 3. 22

2 Indicators of Water (Ten Thousand

m3/ km2·d)

0.4 0.4

3 Maximum Daily Water Consumption

(m3/d)

8120 12880

4 Discharge Coefficient 0.8 0.8

5 Wastewater Collection Rate 90% 95%

6 Wastewater Treatment Amount

(m3/d)

5846 9788

(3) Construction Scale of the Project

According to the results of the prediction of the wastewater discharge and

comparing Table 3-12 and Table 3-13, the wastewater discharge land

indicators obtained by both prediction methods are slightly higher. Because

there is no public institutions construction land comprehensive water

49

Page 58: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

consumption indicator data specified in the town and village water supply

standard, the indicator referred is the urban water supply indicators, in which

the value is relatively higher. This report uses the prediction results of the sub-

item indicator method and reserves room for development appropriately. So,

the construction scale of the proposed WWTP is determined as Q=6,000m3/d.

The construction is divided in two phases, of which the year 2013 is the first

phase with construction scale of Q=3,000m3/d, and the year 2020 year of the

Phase II with the construction scale of Q=3,000m3/d.

3.2.6. Designed Inflow and Outflow Water Quality

3.2.6.1. Inflow Water Quality of the Designed WWTP

According to the Code for Design of Outdoor Sewerage Engineering

(GB50014-2006), the designed water quality of urban wastewater water can

adopt the following criteria: in general, BOD5 refers to 25~50g/d per person,

SS refers to 40~65g/d per person, TN refers to 5~11g/d per person, TP refers

to 0.7~1.4g/d per person. CODcr is analyzed by statistics, common urban

wastewater CODcr〈2.3 (BOD5). Wastewaters accepted to the Project WWTP

mainly are domestic wastewaters, the ratio of industrial wastewaters is

relatively low, and industrial wastewaters must be under appropriate pre-

treatment measures to meet the relevant discharge standards before entering

the WWTP. After pre-treatment, industrial wastewaters are basically similar to

domestic wastewaters. Refer to wastewater water quality of similar towns.

The determined designed inflow water quality of the WWTP is shown in Table

3-14.

Table 3-14 Designed Inflow Water Quality of the WWTP Unit: mg/L

Item CODcr BOD5 SS TN NH3-N TPInflow Water Quality

240 130 200 30 25 2.8

3.2.6.2. Designed Outflow Water Quality and Removal Rate of the WWTP

According to the requirements of the Pollutants Discharge Standard for Urban

50

Page 59: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

WWTPs (GB18918-2002), the outflow water quality of the WWTP shall meet

the primary standard - standard B. Specific data of outflow water quality and

removal rate are shown in Table 3-15.

Table 3-15 Designed Outflow Water Quality and Removal Rate of the WWTP

Unit: mg/L

Item CODcr BOD5 SS TN NH3-N TPInflow Water Quality

240 130 200 30 25 2.8

Outflow Water Quality

≤60 ≤20 ≤20 ≤20 ≤8 ≤1. 0

Removal Rate %

≥75 ≥84. 6 ≥90 ≥33. 3 ≥68 ≥64. 3

3.3. Pipe Network and Pumping Stations

(1) Laying of Pipe Network

The layout of the discharge pipes shall take into consideration the

characteristic of topography, road direction, construction conditions and other

factors, and the discharge areas shall be reasonable divided; gravity

discharge shall be adopted as much as possible to reduce project investment;

the Project pipe network horizontal distribution chart is shown in Figure 5.

The main pipeline A lies in the north roads of the fire station, and for the

diameter of some branch pipes, water amount for the long-term development

shall be considered. The pipe diameter is DN300~DN600.

The main pipeline B lies in the south roads of the planning land, and the water

amount of the reserved alternative land for long-term industrial development

in the eastern part of the town flows into the WWTP basically through line B.

At this stage, long-term water amount isn’t considered, and it will be taken into

account until further construction in the future. The pipe diameter is

DN600~DN800.

The main pipeline C lies along the north river of the inner river in this town,

and for the diameter of some branch pipes, water amount for the long-term

51

Page 60: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

development shall be considered. The pipe diameter is DN400~DN500.

Table 3-16 Statistical Table of Pipe Diameters and Pipe Lengths

No. Pipe Diameter Unit Length Remarks

1Wastewater Pipe

D300m 4260

Pre-stressed Concrete Pipe

2Wastewater Pipe

D400m 3980

Pre-stressed Concrete Pipe

3Wastewater Pipe

D500m 2610

Pre-stressed Concrete Pipe

4Wastewater Pipe

D600m 1870

Pre-stressed Concrete Pipe

5Wastewater Pipe

D700m 400

Pre-stressed Concrete Pipe

6Wastewater Pipe

D800m 400

Pre-stressed Concrete Pipe

7 Total m 13520

(2) Pumping Stations

The layout of the discharge pipes of the Project shall take into consideration

the characteristic of topography, road direction, construction conditions and

other factors, and the discharge areas shall be reasonable divided; gravity

discharge shall be adopted to reduce project investment; no lifting pumping

stations.

3.4. Analysis of the Pollution Sources of the Project

Construction Period:

(1) Waste gas: dust and vehicle exhaust.

(2) Waste water: domestic wastewater and construction waste water.

(3) Solid waste: construction waste, cubic meter of earth and stone produced

by excavation and fill, domestic waste.

(4) Noise: construction vehicle noise, construction machinery noise, etc.

Operating period:

(1) Waste gas: bad smell from the WWTP.

(2) Solid waste: after the running of the adjusting tank, grating residue tank,

aeration tank, SBR reaction tank and other structures for some time, the

52

Page 61: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

sludge will be produced, which is needed to be cleared; domestic waste.

(3) Wastewater: tail water, domestic wastewater and sludge wash water.

(4) Noise: when the water pumps, aerators and other pump work, noise will be

produced.

3.5. Associated Works with the Project

The main associated problem of the Project is the handling of residual sludge.

The final disposal of sludge is to deliver the dewatered sludge cake to the

waste transfer station, then compress it with urban domestic waste, and at

last send it to the Quanhu Garbage Disposal Plant in Xiangxiang City.

Therefore, the associated works with the Project is the waste transfer station

and the Quanhu Garbage Disposal Plant in Xiangxiang City, the detailed

description of which is shown in Chapter 5.

3.6. Project Investment Estimate

The investment estimate of the Project is shown in Table 3-17.

Table 3-17 Project Investment Estimate Table

No.Name of Project or

Cost

Estimated Value (RMB Ten Thousand )

ConstructionPurchase

of Equipment

Installation

Other

FeesTotal

I Cost of Project 382.3 440.002027. 60

2849. 90

1 WWTP 382.30 440.00112.6

0934. 90

1. 1 Pre-treatment System 12.10 48. 7010.5

071. 30

1. 2 DEST Tank 129. 10 23. 30 6. 10158. 50

1. 3 Blower Housing 8. 50 22.30 4. 8035. 60

1. 4Sludge Dewatering

Room19. 60 44. 20 9. 50

73. 30

1. 5 Sludge Storage Tank 1. 00 2.90 0.604. 50

53

Page 62: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

1. 6 Disinfecting Tank 2.00 20.00 4. 3026. 30

1. 7 Complex Building 44. 40 20.30 0.8065. 50

1. 8 Reception Office 2.50 2.50

1. 9Power Supply and

Distribution8. 50 90.00

22.10

120.60

1. 10 Automatic Control 35. 2011. 30

46. 50

1. 11Process Piping and Indoor and Outdoor

Plumbing121. 10

39. 50

160.60

1. 12Ventilation and Air

Conditioning12.00 3. 10

15. 10

1. 13General Plan and

Transportation154. 60

154. 60

1. 14 Other Projects

2Urban Wastewater

Pipes1915. 00

1915. 00

2.1Wastewater Pipe

D300366. 40

366. 40

2.2Wastewater Pipe

D400469. 60

469. 60

2.3Wastewater Pipe

D500420.20

420.20

2.4Wastewater Pipe

D600426. 40

426. 40

2.5Wastewater Pipe

D700106. 00

106. 00

2.6Wastewater Pipe

D800126. 40

126. 40

IIOther Costs of

Project Construction

694. 70

694. 70

1Soft Environment

Construction Costs200.00

200.00

2Land Acquisition and

Demolition143. 80

143. 80

3Management Fees of

Construction Unit47. 70

47. 70

4Project Preliminary

Work Fees15. 90

15. 90

54

Page 63: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

5Survey and Design

Fees131. 10

131. 10

6Project Supervision

Fees87. 40

87. 40

7Consultation Service

Fees about Environmental Impact

6. 006. 00

8 Bidding Fees13. 90

13. 90

9Construction Drawing

Review Fees2.70 2.70

10Construction Project Transaction Services

Fees1. 80

1. 80

11Project Quality Inspection Fees

3. 403. 40

12Project Insurance

Fees5. 30

5. 30

13Project Cost

Preparation and Review Fees

11. 90

11. 90

14

Joint Commissioning Fees and Application Fees for Construction

Approval

23. 80

23. 80

III Budget Reserve466. 80

466. 80

IVInterest and Front-

end Fees of the Construction Period

93. 29

93. 29

1 Loan Interest85. 29

85. 29

2 Front-end Fees 8. 008. 00

VFixed Assets Investment

382.3 440.002027. 60

1254. 79

4104. 69

3.7. Schedule of the Project Implementation Progress

3.7.1. Construction Period

The Hunan Integrated Economic Development Demonstration Town Project

55

Page 64: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(Yueshan Town Subprojeoct, Xiangxiang City) Utilizing WB Loans has been

included in the List of Candidate Projects of World Bank Loan in Fiscal Year

2009 to 2011 in the end of 2008. According to the requirement of World Bank

Project construction period, by analysis of the construction content, scale,

type and the Project complexity, the construction conditions, the management

level and the quality of personnel, etc. of the proposed project, and by

referring to the construction schedule of similar projects, the construction

period of the Project is intended to be 5 years, that is 60 months.

3.7.2. Scheduling

The preliminary work of the Project, Hunan Integrated Economic Development

Demonstration Town Project Utilizing WB Loans, was planed to complete in

August 2011. The construction period of the Project lasts 5 years, which is

from July 2012 to June 2017. Civil construction of the Project is 3 years, 36

months in total, from July 2012 to June 2015.

February 2011-August 2011: Preparation and approval of the Project

feasibility study report;

September 2011: Preliminary design tender;

October 2011-December 2011: Preliminary design;

January 2012: Construction bidding;

February 2012-June 2012: Construction design;

July 2012-June 2015: Project construction;

July 2012-June 2017: Sub-annual training, inspection and related activities;

The end of June 2017: Project acceptance; the schedule of the Project

implementation progress is shown in Table 3-18.

56

Page 65: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 3-18 Schedule of the Project Implementation Progress

No. Project

Preliminary Work Project Construction Period

2011 2012 2013 2014 2015 2016 2017

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2

1 Declaration and Approval

2 Initial Design

3 Construction Design, Approval and Tendering

4Construction and Equipment Procurement

and Installation

5 Training

6 Completion of the Project and Acceptance

7 Production Preparation

57

Page 66: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

4. Profile of the Project Location Environment

4.1 Natural Environment Profile 4.1.1 Geographic Location and TrafficYueshan Town, situated at north-central of Xiangxiang City, is 28Km east of its

urban area. As a small-town development superiority area centered on

Xiangxiang City, it enjoys prominent economic location advantages. The

township is easily accessible, with Fan River to the east, Tanshi to the south,

bordered by Yuduan to the north and Baitian to the west, 28km from

Xiangxiang City, via Provincial Highway S311 and Huiyu Line passing through.

The administrative region of town is easily accessible via Provincial Highway

S311 which joins the east to the west, directly to urban area of Xiangxiang

City and Yiyang City, and connects Shangrui Highway; the country roads

Yuebai Line and Tanyue Line connect such townships as Jinshi, Baitian,

Yueshan, Tanshi, etc.

The Project is located at Yingxiongling Group, Xinqiao Village, Yueshan Town,

Xiangxiang City.

4.1.2 Geological Features Yueshan Town belongs to South China fold system, which is characterized by

intra Eurasian plate, ancient and stable stratum, and inactive faulting.

However, Yueshan Town, for its loose soil, was once struck by mud-rock flows

in some villages such as Qunle and Baolu Villages.

4.1.3 Weather and Climate Yueshan Town of Xiangxiang City belongs to monsoon wet climate area of

middle subtropics, featuring four distinct seasons, hot summer and cold

winter, abundant rainfall, and long sunshine. In recent years, its annual

average temperature is around 17.3°C, an average temperature in January,

the coldest month of year, is around 5°C and in July, the hottest month of

year, is around 29.5 °C. The annual precipitation is 1100-1400mm, mostly

concentrated in spring and autumn. Annual sunshine duration is more than

1300 hours.

4.1.4 Hydrology Upon treatment, the tail water of the Project which is up to standard will be

discharged into Xinqiaohe River.

Xinqiaohe River originates from the rainwater of hills near Yueshan Town, and

58

Page 67: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

merges into Lianshui River in Tanshi Town, with primary functions of irrigation

and flood discharge.

Lianshui River, as the first level branch of Xiangjiang River, originates from

upper stream of Guanyinshan of Xinshao County and Zhadu Town of Xinhua

County, for an overall length of 232Km, flowing through Lianyuan, Loudi,

Xiangxiang and Xiangtan into Xiangjiang River, with a total catchment area of

7,089Km2. Xiangxiang City lies in the middle stream of Lianshui River, around

45Km away from the mouth of river. Lianshui River has a trunk stream with

overall length of 97Km and a total of 14 tributaries streams within the territory

of Xiangxiang City, with catchment area of 1,786Km2. According to Xiangxiang

hydrological station, the hydrological data from actual measurement is as

follows:

Maximum flow rate: 7,100m3/s; minimum flow rate: 0.14 m3/s;

Average flow rate: 113 m3/s;

Highest water level: 50.44m; lowest water level: 41.28m;

Average water level: 42.31m;

Average grating residues transport rate: 39.2%;

Average water temperature: 18.8°C;

Maximum flow rate over years: 0.68m/s; minimum flow rate over years:

0.1m/s;

4.1.5 Ecological Environment (1) Mineral Resource

Xiangxiang City boasts abundant mineral resources. Considerable stone

materials are discovered in Shizhu Area and Yueshan Area, and large-

quantity and high-content dolomite resources are discovered in Malong Area;

however, large scale mining and processing never become reality due to

deficiency in infrastructure like road transport and mining technology, etc.

(2) Land Resource

Yueshan Town, as the largest town in Xiangxiang City, has a total area of

149.8 square kilometers, of which, the cultivated land covers an area of

4,550ha, and the forestry land covers an area of 8,763ha.

(3) Tourism Resource

Culture tourism resource is also of particular features. Yueshan Town

possesses such tourism resources as Baozhong Mountain, known as “No. 1

Mountain in Central Hunan Province”, Hongri Reservoir and Baiyun Temple,

59

Page 68: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

etc., which are all in the undeveloped state for lack of auxiliary facilities.

4.2 Social Environment Profile 4.2.1 Administrative Division Yueshan Town covers an administrative region area of over 140 square

kilometers, having jurisdiction over 58 administrative villages and 2

neighborhood communities for a total of 70,000 persons, with population

density of 465.1 persons per square meter, and urbanization level of 13.07%.

4.2.2 Economic StatusIn recent years, Yueshan Town has experienced rapid development,

substantially accelerated the pace of industrialization, urbanization and

agricultural industrialization, and effectively advanced social undertakings. In

2010, its GDP reached RMB 630 million. From 2006 to 2010, it witnessed

rapid economic development, with average annual growth rate of around

13.3%, realizing total industrial output of RMB 236.74 million, total agricultural

output of RMB 346.09 million, and per capita net income of RMB 4,770. The

town highlights the mainstay status of industrial economy, and gives top

priority to speed up the development of industrial economy, with a view to

realizing rapid development of industrial economy and steady progress of new

industrialization. Relying on the advantages of abundant agricultural products

and stone materials, the industries and enterprises are expanding on an

annual basis. At present, Yueshan Town is home to over 20 enterprises, of

which 4 are of large scale. It specializes in derivative industry chain for deep

processing of agricultural products like rice industry, forming an industrial

cluster. Meanwhile, it vigorously implements the industrial management mode

of “leading enterprise+ base+ farmer”, and focuses on processing of

agricultural and sideline products in developing agricultural industrialization,

and traditional agriculture is keeping a robust growth. In addition, it has

gradually shaped the development pattern of tertiary industry dominated by

commerce and trade, food and beverage service, and tourism.

60

Page 69: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 4-1 National Income of Yueshan Town

Year Total Agricultural Output (RMB Ten

Thousand)

Total Industrial Output (RMB Ten

Thousand)

Per Capita Net Income (Yuan)

2006 21152 8153 33062007 24142 12385 36302008 29065 17439 40602009 33555 22958 41402010 34609 23674 4770

4.2.3 Infrastructure (1) Power Supply

There is 110kv Jinping transformer and power station within the Project Area

with service area as follows: 19,000 household users distributed in whole area

over 59 administrative villages (Qingpi Village of Tanshi) with voltage class of

110kv, annual output power supply volume: 18 million kwh, power supply unit:

Yueshan Office of Xiangxiang Electric Power Bureau, annual gateway electric

quantity around 18 million kwh, rated power around 6,300kw, the distance

between Project Area and transformer station is around 4km, the distance

between Project Area and 306 mainline of 10kv Jinxin Line is around 1.2km,

and project-use power is guaranteed.

(2) Water Supply

There is one water plant within the Project Area, with water supply scale of

1,000m3/d, covering Xinqiao Village, Hongyang Village and Hengjiang Village.

The construction of the Plant area and main pipeline has been completed.

The water source of the water plant is from Hongri reservoir in Hongri Village,

adopting underground pipeline for delivery. The distance between the

reservoir and Project Area is 6km.

4.3 Status Quo of Quality of the Project Area Environment4.3.1 Atmospheric Environment To explain the status quo of environmental quality of the Project Area, we

adopt the on-site monitoring data about Xiangxiang City Hutie Hotel and

Yangjin Village recorded by Xiangxiang City Environmental Monitoring Station

from June 29, 2010 to July 6, 2010 for assessment analogy.

(1) Monitoring Time

The on-site monitoring time is from June 29, 2010 to July 6, 2010 for

consecutive 7 days.

(2) Sampling and Analytical Approaches

61

Page 70: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

It shall be implemented in accordance with relevant state standard and

technical specification. The specific sampling and analytical approaches are

shown in the following Table 4-2. Table 4-2 Sampling and Analytical Approaches for Environmental Air Monitoring

Project

Monitoring Project

Sampling Instrument

Analytical Instrument

Sampling and Analytical Approaches

Inhalable Particles (PM10)

2031 Type Intelligent High-

Flow TSP (PM10) Sampler

Analytical Balance Millipore Filtration Absorption Gravimetric Method

Sulfur Dioxide (SO2)

2031 Type Intelligent High-

Flow TSP (PM10) Sampler

722 Spectrophotometer

Formaldehyde Absorbing- Pararosaniline Hydrochloride

Method

Nitrogen Dioxide (NO2)

2031 Type Intelligent High-

Flow TSP (PM10) Sampler

722 Spectrophotometer

N (1-naphty1) -ethylenediamine Dihydrochloride

Spectrophotometric Method (3) Monitoring Result

The monitoring result is shown in Table 4-3.

62

Page 71: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 4-3 Statistics Table for Monitoring Result of Status Quo of Atmospheric Environment (Unit: mg/m3)

Monitoring Point Item (mg/m3) NO2 SO2 PM10

Hutie Hotel

Concentration Range Per Hour

0.021-0.035

0.040-0.056 /

Out of Gauge Rate 0 0 /Maximum Times Out of

Gauge 0 0 /

Average Daily Concentration Range

0.017-0.028

0.027-0.041

0.036-0.052

Average Value for Seven Days 0.019 0.031 0.040

Out of Gauge Rate 0 0 0Maximum Times Out of

Gauge 0 0 0

Yangjin Village

Concentration Range Per Hour

0.003-0.013

0.008-0.026 /

Out of Gauge Rate 0 0 /Maximum Times Out of

Gauge 0 0 /

Average Daily Concentration Range 0.04-0.010 0.012-

0.0200.056-0.125

Average Value for Seven Days 0.008 0.017 0.068

Out of Gauge Rate 0 0 0Maximum Times Out of

Gauge 0 0 0

Assessment Standard (Average Daily/Hour) 0.12/0.24 0.15/0.50 0.15/-(4) Result Analysis

From Table 4-3, it can be concluded that both hour concentration of SO2 and

NO2 and average daily concentration of SO2, NO2, and PM10 at two monitoring

points in Hutie Hotel and Yangjin Village meet the requirement of second level

standard of GB3095-1996 Ambient Air Quality Standard (AAQS), without out

of gauge. The Project is located at Yingxiongling Group of Xinqiao Village,

Yueshan Town. Like Yangjin Village, without large scale air pollutant emission

enterprises, it has identical environmental quality status quo and analogy.

Upon analogy, it shows that the status quo of air quality of the Project Area

environment is sound, and there is a certain environmental capacity.

4.3.2 Environment of Surface Water (1) Distribution Points of Monitoring Section

Upon disposal by WWTP of the Project, the tail water which meets the primary

standard - standard B of Pollutants Discharge Standard for Urban WWTPs

(GB18918-2002) will be discharged into Xinqiaohe River. Therefore, 3

monitoring sections for surface water are set in this time. The distribution

63

Page 72: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

points of the section are shown in Table 5-7.

Table 4-4 Section Distribution Points for Monitoring Status Quo of Water Environment

Section Rivers Section Positions 1#

Xinqiaohe River 500m above Upper Stream of WWTP Outlet

2# 800m below Down Stream of WWTP Outlet 3# 2,000m below Down Stream of WWTP Outlet

(2) Monitoring Frequency and Project

Environmental Monitoring Center of Changsha Environmental Protection

Career Technical College is entrusted to make a 3-day monitoring on the

foresaid sections from October 21, 2011 to October 23, 2011, sampling once a

day.

The monitoring project covers pH, ammonia nitrogen, COD, BOD5, SS, oil

type, plant animal oil, total phosphorus, total nitrogen, and fecal coliforms

number, as well as water temperature, water depth, river width, flow velocity

and flow rate.

(3) Monitoring Approach

The foresaid indexes shall be implemented in accordance with Environmental

Monitoring Technical Specification and Selective and Analytical Approach for

Environmental Quality Standard of Surface Water released by State

Environmental Protection Administration.

(4) Assessment Approach

Adopt single gene index approach to make assessment to the status quo of

water environmental quality.

(5) Monitoring Result and Assessment

The monitoring result is shown in Table 4-5.

64

Page 73: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 4-5 Monitoring Result for Status Quo of Surface Water Environment

No.

Monitored Item

Monitored Value (Unit of Fecal Coliforms: one/L, units for any other indexes are mg/L, except for pH)

1# 2# 3#

10.21 10.22 10.23 10.21 10.22 10.23 10.21 10.22 10.231 pH 6.5~6.7 6.5~6.8 6.5~7.0

2 SS 22 18 18 14 14 17 15 14 12

3 CODCr 13.2 12.4 16.4 12.6 11.2 12.6 12.2 10.8 11.5

4 BOD5 3.6 3.2 3.9 3.3 3.3 3.0 3.3 3.1 2.8

5 Ammonia Nitrogen 0.52 0.56 0.57 0.44 0.52 0.48 0.40 0.42 0.40

6 Total Nitrogen 1.12 1.40 1.46 0.95 1.14 1.32 0.89 1.25 1.30

7 Total Phosphorus 0.28 0.29 0.28 0.26 0.28 0.28 0.26 0.26 0.26

8 Oil Type 0.01L 0.01L 0.01L 0.01L 0.01L 0.01L 0.01L 0.01L 0.01L

9 Animal Plant Oil 0.26 0.25 0.25 0.26 0.26 0.22 0.24 0.25 0.22

10Fecal

Coliforms Number

3500 3800 3800 3200 3600 3600 2000 3000 3200

From the above table, it can be concluded that all monitoring values of pH,

ammonia nitrogen, COD, BOD5, oil type, total phosphorus, total nitrogen and

fecal coliforms number at 3 monitoring sections of Xinqiaohe River meet IV

class standard of Environmental Quality Standards for Surface Water

(GB3838-2002).

4.3.3 Acoustic Environment (1) Monitoring Distribution Points

The Project sets one monitoring point respectively at East Plant Boundary,

South Plant Boundary, West Plant Boundary, North Plant Boundary, Xinqiao

Village, Hongyang Village, Xianfeng Middle School and Township Central

Hospital.

(2) Monitoring Time and Monitoring Approach

The Monitoring Center of Changsha Environmental Protection Career

Technical College performed the measure round the clock on October 23,

2011, and implemented the monitoring and analytical approaches in

accordance with relevant state standards and technical specifications.

(3) Statistics and Assessment on Monitoring Result

The monitoring result is shown in Table 4-6. We adopt equivalent consecutive

A sound level LAeq, and compare the class 2 standard of Acoustic Environment

Quality Standard (GB3096-2008), and conclude that the monitoring results of

65

Page 74: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

all 8 noise monitoring points meet the standard requirement, which shows

sound quality of acoustic environment. Table 4-6 Assessment Result Table for Status Quo of Acoustic Environment (Unit:

dB (A)

Monitoring Location

Day and Night Leq (dB) of Monitoring Date

Day and Night Leq (dB) of Monitoring Date

2011.10.23 2011.10.23East Plant Boundary 42.7 36.9

South Plant Boundary 44.1 37.0

West Plant Boundary 44.9 37.4

North Plant Boundary 42.1 36.8

Xiaoqiao Village 44.7 37.3

Hangyang Village 43.5 37.1

Xianfeng Middle School 50.8 38.5

Township Central Hospital

46.1 37.6

Standard Value 60 50Assessment

Result Up to Standard Up to Standard

4.4 Basic Information for Major Concern on Safety Safeguard

Policies of the WBUpon analysis, we find the Project doesn't involve dam safety (OP 4.37),

international watercourse (OP 7.50), natural habitat (OP/BP 4.04) and

material culture resource (OP 4.11), etc., and therefore we make no

corresponding elaboration in the assessment

66

Page 75: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

5. Environmental Impact AssessmentThe implementation of the Project will improve the infrastructure of Yueshan

Town, whereas, it will inevitably impose undesirable impact to ambient

environment, which are mainly reflected in construction and operation periods.

Among those, the Project content which imposes major impact to ambient

environment during construction period is the dust and noise from WWTP and

auxiliary pipe network construction. While major impact in operation period is

the affection of tail water from WWTP to water environment, and disposal of

undesirable odor and wastewater sludge.

5.1 Analysis on Impact of the Project to Human Health The primary purposes for making assessment on human health impact lie in

analyzing and preventing diseases brought from the Project and putting

forward countermeasures to improve hygiene environment.

5.1.1 Environmental Benefits Brought by Implementation of the Project After completion of the Project, the status quo that the raw wastewater of the

Project location is directly discharged into adjacent surface water will be

changed, and the raw wastewater will be collected, disposed by WWTP until

up to standard and discharged, which is in favorable of protecting the quality

of receiving water of Xinqiaohe River, and improving the environmental

hygiene condition of the Project location to some extent, bettering living

quality of local residents, and promoting social progress. The expected

environmental benefits of the Project are shown in Table 5-1. Table 5-1 Expected Environmental Benefits of the Project Unit: t/a

Period BOD5 COD SS NH3-N TN TP Pre-implementation

of the Project 142.35 262.8 219 27.375 32.85 3.066Post-

implementation of the Project 21.9 65.7 21.9 8.76 21.9 1.095

Abatement Quantity 120.45 197.1 197.1 18.615 10.95 1.971Abatement Rate (%) 85 75 90 68 33 64With the growing of population, expanding of urban size, and accelerating of

urbanization pace, environmental pollution problem of Yueshan Town has

evolved into an impediment to the development of social economy and

improvement of people’s livelihood. Implementation of the Project will relieve

the contradiction between economic development and environmental pollution

to some extent, improve the life quality and health level for the people of the

67

Page 76: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Project location, and promote sustainable development of local social

economy.

5.1.2 Analysis on Impact to Human Health Some environmental hygiene problems, e.g. offensive odor of WWTP, and

spread of aerosol germ, etc. exist in the construction of WWTP project. They

will bring adverse impact to human health. Therefore, the environmental

assessment puts forward that the following countermeasures shall be adopted

to relieve or eliminate these adverse impacts:

(1) Eliminate the four pests (mosquito, fly, mouse and cockroach);

(2) Remove the wastewater salvage and wreck;

(3) Clean the structure in respect of sidewall of tank, guardrail, stairs,

sidewalk, air duct and etc. on a periodical basis;

(4) Remove domestic waste, and collect, pack and classify the waste; the

Environmental Hygiene Department shall clean up and dispose the sanitation

trash can filled with waste on a daily basis;

(5) Plant high forest around the site for deodorizing;

(6) Set up a health protection distance. After calculation in light of relevant

state regulations, the WWTP site for the Project is selected at least 50m

distance from the resident settlement.

5.2 Analysis on Impact to Environment in Construction PeriodThe environmental impact during the construction period of the Project comes

mainly from noise, dust, construction wastewater, construction waste, traffic

environmental impact, landscape ecology impact, water loss and soil erosion,

and other environmental issues.

5.2.1 Analysis on Dust Pollution Source and Environmental Impact According to relevant research, the dust from construction site mainly comes

from running of transportation vehicle, which approximately accounts for 60%

of total dust, and is related to the road surface and vehicle running speed.

Under normal circumstances, the influence sphere of dust from construction

site and road is within 100m under the action of natural wind. In windy day,

the dust quantity and influence sphere will somewhat expand. The spoil, sand

and lime in construction period, if improper stored or scattered in loading or

delivery process, will give rise to dust with influence sphere of around 100m.

Another case which will give rise to dust is air storage of earth excavation,

68

Page 77: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

with primary feature that the operation will be affected by the speed of wind. In

addition, due to the relationship between dust quantity of road and running

speed of vehicle, the faster speed of vehicle, the more dust quantity.

According to the analog investigation result, it shows that sprinkling water to

roads for 4-5 times every day will cut dust by around 70%. Table 5-2 gives the

practical measurement results of sprinkling water to suppress dust on

construction site. Table 5-2 Measurement Result of Sprinkling Water to Suppress Dust

Distance from Construction Source (m) 5 20 50 100

TSP (Average Hour/mg. m3) No Water Sprinkling 10.14 2.89 1.15 0.86

Water Sprinkling 2.01 1.40 0.67 0.6

From data of the Table, it can be concluded that after adopting the

countermeasure of sprinkling water to suppress dust (for 4-5 times every day),

we greatly reduce the dust concentration (calculated in TSP), and cut the

influence sphere from 5-100m to 5-50m.

In light of the identification and screening results of environmental protection

target, along two sides of the Project pipe network, there are such sensitive

points as school, hospital and residential area, and the spacing distance

between the construction site and residential area is 10-100m. Therefore, the

impact of construction dust to ambient environment still exists. Although the

influence is temporary and dies away with construction period, we have to

take effective measure to relieve the adverse impact from construction dust to

the sensitive points of ambient environment during construction period.

5.2.2 Analysis on Impact of Construction Wastewater (1) Pipeline Construction

Most of pipe network construction for WWTP is underway in the buildup area

of Yueshan Town, and the construction people may make use of the existing

living facilities around construction site, which does not established within the

construction site. Therefore, the construction wastewater is mainly from the

industrial wastewater.

The industrial wastewater is mainly from the flushing and maintenance water

of vehicle and mechanical equipment, with principal pollutants of SS and oil

type. If the wastewater is untreated, the direct discharge of raw wastewater

will have a certain impact on the quality of surface water. Therefore, we put

forward the following disposal requirements on the construction wastewater:

69

Page 78: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

To minimize the construction floor area, the chase-digging width shall be

subject to the construction range of 5-10m distance along pipe distance line. It

is unfavorable to set up grating residue tank within this range to dispose the

flushing water of vehicle and mechanical equipment. In view of that, the

environmental assessment suggests that the vehicle and mechanical

equipment be flushed in a special flushing site instead of in the construction

site. Meanwhile, the construction shall avoid rainy season.

The construction unit may face oil leakage in mechanical equipment

maintenance. In light of National Hazardous Waste List, the waste oil belongs

to a hazardous waste (with series No. of HW08). Therefore, the construction

unit shall adopt special plastic bucket to collect and recover the leaked oil,

pour the collected oil to the waste oil storage tank, then the waste oil

procurement department will make onsite acquisition; if the waste oil is

dripped to the ground, it shall be wiped it out with cotton yarn in a timely

manner. After foresaid measures are taken, the waste oil generated from

maintenance of mechanical equipment will have little impact on the external

environment.

(2) Construction in the Plant area

During the building construction period, field cleaning, concrete preparation

and maintenance, construction and installation, and implementation of other

project will create a certain amount of construction wastewater. In addition, a

large number of construction people will create a certain amount of domestic

wastewater during construction period.

Principal pollutants contained in the construction wastewater consist of

suspended substance, oil type and etc., which are, however, in low

discharge value. The wastewater grating residue tank will be set up in the

construction site for collection and grating residue of various industrial

wastewaters, which will be recycled in the site for water sprinkling and

dust suppression, instead of being discharged to surface water.

The domestic wastewater of construction people will be recycled in the

site for water sprinkling and dust suppression upon simple grating residue

treatment, instead of being discharged to surface water.

5.2.3 Analysis on Impact of Noise (1) Pipeline Construction

The construction noise in the course of pipe network construction comes

70

Page 79: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

mainly from transportation vehicle and construction mechanical equipment,

e.g. excavator, bulldozer, and stirring machine, etc. In light of relevant

document, the common noise level of construction mechanical equipment and

transportation vehicle are shown in Table 5-3.

Table 5-3 List of Noise Level of Construction Mechanical Equipment

Name of Equipment Noise Level dB (A) Monitoring Distance (m) Pavement Roller 73-88 15

Scrapper 72-93 15Bulldozer 67 30Grader 80-90 15Paver 82-92 15Truck 70-95 15

Vibrator 69-81 15The attenuation changes of noise with distance for principal machinery are

shown in Table 5-4.

Table 5-4 List of Attenuation Changes of Noise with Distance for Single Principal

Construction Machinery

Mechanical Equipment Distance from Nosie source (m) 15 50 100 150 200

Scrapper 72-93 41-62 33-54 29-50 27-48Grader 80-90 49-59 41-51 37-47 35-45Vibrator 69-81 38-50 30-42 26-38 24-36Paver 82-92 51-61 43-53 39-49 37-47

From Table 5-4, it can be concluded that the nose level of single construction

machinery from over 100m away, will basically reach the noise limit for the

construction site. For the ongoing construction of pipe network Project, the

distance between both sides of pipeline and residential area varies from 5 to

100m. Upon the research, the closest distance between residential area and

the pipeline is 5m, and the closest school hospital 8m, which are both under

great influence of the noise during the construction period. In order to reduce

the impact, we put forward the following alleviating measures: arrange the

operation time of various construction mechanical equipment on a reasonable

basis, avoid large number of equipment of high-noise level put into operation

simultaneously, reduce night transport, and forbid night construction (22:00-

6:00). For the construction which has to be carried out in night, the

construction unit shall get prior approval from local environmental department

concerned and set up noise barrier between sensitive points and the noise

source; for the construction in school section, in parallel to making negotiation

with the school, and trying to arrange the construction of high-noise level in

winter vacation, summer vacation, two-day weekend or after school, the

71

Page 80: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

construction unit shall also quicken the pace, shorten the duration, reduce the

influence time, and make high-noise construction overtime on two-day

weekend, so as to avoid interfering with school academic environment; for the

construction in hospital section, the construction unit shall make negotiation

with the hospital, and set up movable noise barrier.

(2) Construction in the Plant area

For the construction in the Plant area, in order to minimize the impact of noise,

especially the noise generated from construction machinery and

transportation vehicles, the construction unit shall arrange the operating time

of construction machinery on a reasonable basis during the construction

period, and the high-noise construction is prohibited in night; meanwhile, for

various construction stages, the construction unit shall carry out the

construction as stipulated in Noise Limits for Construction Sites (GB12523-

90), and adopt such measures as setting fence and using low-noise

equipment to strictly control the noise during the construction period.

The impact of construction period is temporary and will die away as the

construction period ends. After adopting relevant measures, the construction

unit may control the noise within acceptable range during the construction

period.

5.2.4 Analysis on Impact of Solid Waste The solid waste generated during the construction period mainly consists of

muck and macadam, etc. excavated in the course of earthwork; supplies

consumed in the delivery course, including sand, stone and concrete, etc.;

and domestic waste of the construction people. According to the document

provided by the Project Feasibility Report, the excavated volume of stone and

earthwork during the pipe network construction period is calculated to be

32,000m3, earthwork volume 25,000m3, and residual spoil of 7,000m3, which

can be delivered and used for leveling land of WWTP area.

Primary impact of solid waste during the construction period covers:

(1) If overloaded, the vehicle will scatter the soil everywhere along the way;

the wheels are covered with soil, which will overspreads to the transport

highway; a road, which is dusty in a sunny day and sloppy in a rainy day, will

affect the passersby and vehicles and environmental quality.

(2) If the spoil disposal land is unknown or the spoil is stacked at random, it

will affect land utilization, and destroy the natural and ecological environment.

72

Page 81: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(3) The spoil requires a large number of vehicles in terms of transport, if

transported in the daytime, it will definitely have an impact to local traffic,

giving rise to heavy traffic.

(4) If the domestic waste can’t be disposed in a timely manner on a

reasonable basis, the environmental hygiene problems will bring negative

impact to human health.

All delivered spoils from pipe network construction, which are ordinary solid

waste without toxic ingredients, may be recycled to fill in the WWTP. Then the

construction unit may also consider delivering the spoil to the construction

project designated by the municipal administration and planning department

for embankment foundation and depression filling, or comprehensively use it

for landscaping along river. Therefore, the spoil disposal won’t have adverse

impact on the environment; and the domestic wastes, which are collected,

packed, and classified by the construction people, will be delivered by the

Environmental Hygiene Department for disposal, exerting little influence on

ambient environment.

5.2.5 Impact Analysis of Water Loss and Soil Erosion(1) Pipeline Construction

In the pipe network construction, the earthwork excavation is adopted and the

remaining vegetation is to be eliminated, which will extend negative impact on

the existing vegetation in the district. The destruction to the vegetation during

the construction period cannot be avoided, causing surface soil bareness in

the Project district; the original terrain and landform will be changed in places

for excavating earthwork, storing useful wasted soils, and low laying filling,

causing soil erosion and water loss and soil erosion in the rainy season.

Therefore, the Contract shall strictly carry out the measures for keeping water

and soil and tamp the bare surface soil in time during the Project construction

period, ensuring not to give rise to water loss and soil erosion. The earthwork

shall be stored reasonably in the construction site. The sewer and the

watercourse shall be separated for certain distance. Construction materials

and wasted earthwork that fail to be carried away shall be covered with

tarpaulin in windy and rainy days.

There shall be places appropriate for the storage of the wasted earthwork

without storage at will after the excavation of the pipe network. With the water

and soil conservation scheme and the managerial measures strictly obeyed,

73

Page 82: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

the water loss and soil erosion arising from the pipe network construction

during the construction period can be within the controllable range.

(2) Construction therein Area

Water loss and soil erosion in the construction of the WWTP Area mainly

reflect in the two aspects below: the vegetation that was destroyed in the

surface excavation is flushed and eroded in rains; various temporary

structures destroy the original vegetation, worsening the local water loss and

soil erosion. For example, the inappropriate management in the raw material

plant and the temporary storage plant of wasted earthwork may easily cause

sheet erosion and shallow ridge erosion. The construction phase inclined to

water loss and soil erosion in the Project is mainly in the construction of the

Plant Area. Generally, the experience formula (for not obviously eroded

areas) is adopted to estimate the potential water loss and soil erosion amount

during the construction period, with the amount to be 232t/a.

The engineering construction will destroy the original landform and vegetation,

change the natural movement of surface water, reduce the anti-erosion

capacity of the surface soil, and increase the surface runoff and washing

strength. The water loss and soil erosion arising from the engineering

construction, if not prevented in time and appropriately, will cause certain

harms.

5.2.6 Ecological Impact Analysis(1) Impact on Landscape Ecology

During the pipe network construction, the pipe network laying area will be in a

mess due to the earth excavation and earthwork storage, which will always

leave people an impression of disorder though it’s separated with fences; the

leakage of wasted earthwork during the transportation stains the road and

raised dust, which also extends negative impact on the surrounding

landscape. Therefore, it’s of great importance to clean the construction site.

The negative impact on the landscape during the construction period is short-

term and can be recovered.

(2) Impact on Temporary Land Occupancy

The pipe network construction belongs to the temporary land occupancy.

Strict measures shall be taken during the temporary land occupancy

construction to protect the surface soil and avoid unrecoverable impact. After

the excavation, the surface soil (with a recommended thickness between 30

74

Page 83: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

and 50cm) shall be collected and stored separately, and water loss and soil

erosion preventive measures shall be taken. After the completion of the

excavation, refill the underground soil, cover the surface soil evenly on the

surface, and tamp the site to reduce the impact on the soil quality. With

careful planning during the construction period and timely site cleaning and

greening after the completion of construction, the negative impact can be

controlled effectively.

(3) Impact on Permanent Land Occupancy

The WWTP belongs to the permanent land occupancy. First, elimination of

crops and sod reduces the vegetation cover ratio, and will cause small

amount of water loss and soil erosion. Second, the earthwork excavation or

filling changes the soil structure, reduces the soil-ripening degree, and affects

the soil productivity after reclamation yet without affecting the land utilization

modes. Farmland is generally for the permanent land occupancy of various

WWTPs, which reduces farmers’ land. The local government has formulated

compensation plans to readjust the Planting land, and the land owners shall

pay certain economic compensation to the farmers subject to the state

stipulations.

5.2.7 Impact on the TrafficThe impact extended by the pipe network net construction on the traffic can

be obvious. Although the stage construction method is available, some

earthworks need to be stored temporarily during the construction, which

affects the traffic in the roads along the line. When the pipe network crosses

the road, the traffic will be jammed with slotting adopted, which extends

relatively large impact on the traffic condition. Therefore, if permitted under

the geological and soil conditions, tube type construction may reduce the

impact of the road excavation. However, the bearing capacity (supporting

power) of the road drops, and cargo trucks shall be prohibited for short term,

both of which will affect the urban traffic. It’s estimated that the construction

for over 20 days are necessary with pipelines crossing each road, with the

impact on the traffic lasting for 20 days or so. Pipeline construction on high

streets has obviously impact on the traffic. Therefore, we shall make careful

plans, keep a firm grasp on the construction, adopt the pipe-jacking for

construction as far as possible, meanwhile, negotiate with the local

transportation administration authorities and formulate temporary traffic routes

75

Page 84: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

prior to the construction, inform the local residents of the construction impact,

set up nameplate on the construction site, and allocate special persons for

dredging the traffic. Moreover, further measures for prevention of traffic jam

shall be taken to reinforce the management during the construction period

and reduce the construction period.

The transport of raw materials (sands, cements, etc.) and wasted earth during

the construction period will increase the vehicle flow in short term. Therefore,

the transport shall avoid the traffic peaks, especially the rush hours.

5.2.8 Health and Safety ImpactThe Project is with small project amount and construction people. But the poor

living conditions and hygiene conditions in the site and large labor intensity

may easily cause diseases. In order to ensure the construction safety, the

construction people shall have an overall physical inspection, people with

communicable diseases are prohibited entering the site, the staff of the

canteen shall have regular physical inspection, and people with epidemic

diseases shall be treated in time and transferred from the canteen to prevent

the spreading. Central water supply devices shall be set up and medical

health facilities and medical staff shall be allocated in the construction site.

The construction staff shall have labor protection to guard their health and

safety and ensure the smoothness of the Project.

5.3 Analysis of Impact on the Environment during the Operation

PeriodImpact on the surrounding environment during the Project’s operation period

includes the impact of the WWTP on the water conditions, the treatment of

odor and sludge, etc.

5.3.1 Impact of the Project on Water ConditionsThe qualified inflow and outflow water quality of the WWTP under normal and

full load is shown in Table 5-5. Table 5-5 List of Inflow and Outflow Water Quality Designed for WWTP

Item CODcr BOD5 SS TN NH3-N TPInflow Water Quality 240 130 200 30 25 2. 8

Outflow Water Quality ≤60 ≤20 ≤20 ≤20 ≤8 ≤1. 0

(1) Tail water

According to the expected construction inflow water quality, with the discharge

water quality meeting the Standard B in the Pollutants Discharge Standard for

76

Page 85: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Urban WWTPs (GB18918-2002), the business accounting is subject to the full

load. The estimate result of load Cut of the WWTP is shown in Table 5-6. Table 5-6 Pollutant Load Cut of WWTP Unit (t/a)

Period BOD5 COD SS NH3-N TN TPWater Amount 1095000Before Treatment 142. 35 262. 8 219 27. 375 32. 85 3. 066After Treatment 21. 9 65. 7 21. 9 8. 76 21. 9 1. 095Cut 120. 45 197. 1 197. 1 18. 615 10. 95 1. 971Cut Ratio (%) 85 75 90 68 33 64From the above table, it can be concluded that after the operation of the

WWTP, the wastewater is treated collectively to the Plant through organized

pipe network, and the tail water that has been biochemical treated, deposited,

and disinfected is discharged. The pollutant concentration and discharge

amount in the Xinqiaohe River will drop largely, which has a favorable effect

on the alleviation of the pollution in the river, obviously improves the water

environment in the Xinqiaohe River, and extends a positive environmental

effect.

According to the Document [1999] No. 24 Notification on Development of

Pollutant Outlet Standardization and Regulation issued by the State

Environmental Protection Administration (SEPA), a signboard shall be set at

the wastewater outlet, an automatic monitor and a flow meter shall be

installed at the outflow, the standardized wastewater outflow shall be

constructed for the convenience of sample collection and daily monitoring and

management, the automatic online signal shall be connected to the

environmental system of Xiangtan City, and the assessing construction unit

shall entrust relevant qualified organizations to formulate the demonstration

report on drain outflow setting and submit it to the water administrative

authority for approval according to No. 22 Order Measures for the Supervision

and Control of Wastewater Outflows on Rivers issued by the Ministry of Water

Resources of People’s Republic of China.

(2) Analysis of Secondary Pollution Impact of Wastewater during the

Operation Period

The secondary pollution of wastewater during the operation of the Project

mainly includes the industrial wastewater arising from the sludge

dewatering equipment and the domestic wastewater in the Plant. According

to the feasibility report, the fixed number of staff needed for the Project is

21, and the domestic water is supplied by the deep-well pump in the Plant.

77

Page 86: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

The amount of domestic water therein is 3. 1m3/d with the water yield

subject 100L/person · d, and the discharge amount of the whole plant is

1.79m3/d (i.e. 653.4m3/a) with the pollutant creation coefficient subject to

0.85. If the sludge dewatering equipment operates twice per day with the

water as the tail water treated by the wastewater treatment device and

15m3 of water per time, the production wastewater discharging amount is

30m3/d (i.e. 10,950m3/a). The total wastewater amount is 31.79m3/d (i.e.

11,603.4m3/a) which can enter the wastewater treatment equipment

through the wastewater pipelines therein and be discharged along with the

treated and standard project wastewater.

(3) Prediction on the quality of receiving water in Tixinqiaohe river

basic conditions of Xinqiaohe River①Xinqiaohe River is originated from the hill near Yueshan Town. The water

source is rain. Its main function is irrigation and floods discharge. It runs into

Lianshui River at Tanshi Town. According to the Environmental Quality

Standards for Surface Water ( GB3838-2002 ) and its actual function,

Xinqiaohe River is confirmed to be IV class by Environmental Quality

Standards for Surface Water (GB3838-2002).

prediction on section②The background section is confirmed by this assessment to be the section at

500m upper reaches of the WWTP outlet (section 1). The prediction sections

are at 800m lower reaches (section 2) and 2000m lower reaches of the

WWTP outlet (section 3).

prediction factors③The factors for the prediction of Honghe water quality are COD, BOD5 and

NH3-N.

prediction time period④It is planned to start prediction in 2017 and in low water period.

prediction model⑤According to the prediction river's features in hydrology and pollutants,

suitable prediction models for water quality are selected. Xinqiaohe River is

a small sized river and can be simplified to be a rectangle and straight

river. The waste water of this project is domestic sewage, rich in organic

pollutants, and not persistant. The mixing process reach applies two-

78

Page 87: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

dimensional stable-state mixing & attenuation model, and the total mixed

reach applies one-dimensional stable-state S-P model. The prediction

model are as below: See table 5-7 for the schedule of symbols and units in

the formula.

A. two-dimensional stable-state mixing & attenuation model

B. one-dimensional stable-state S-P model

Discharge at bank

79

Page 88: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 5-7 List for Meaning of Symbols and Units in the Formula

No. Symbol Meaning Unit

1 a Distance from the outlet to the bank m

2 B River width m

3 CPollutant concentration, vertical concentration, section average

concentrationmg/L

4 C0 Pollutant concentration at starting point mg/L

5 Ch Pollutant concentration at upper reaches mg/L

6 Cp Pollutant discharging concentration mg/L

7 D Oxygen deficiency mg/L

8 D0 Section oxygen deficiency at starting point mg/L

9 Dh Oxygen deficiency at upper reaches mg/L

10 g Acceleration of gravity m/s2

11 H Average depth m

12 K1 Oxygen consumption coefficient 1/d

13 K2 Reoxygenation coefficient 1/d

14 My Lateral mixing coefficient m2/s

15 Qp Waste discharging volume m3/s

16 Qh River flow rate m3/s

17 x、y Coordinate in cartesian coordinate system m

18 xcDistance from the oxygen maximum deficiency point to the

starting pointm

19 u Speed at X direction m

selection of prediction parameters⑥Based on the Xinqiaohe River monitoring report from the environment

monitoring center of Changsha Environment Protection Vocational College

from Oct 21 to Oct 23, 2011, the hydrological parameters are as below:

Water temperature: 28.3 speed:0.3m/s flow rate℃ :1.3m3/s water

depth:0.5m

Water width:6m distance from the outlet to the bank:1m K1=0.6/d,

K2=0.8/d

80

Page 89: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Pollutant concentration at upper reaches:COD 14mg/l BOD5 3.57mg/l NH3-

N 0.55mg/l

See table 5-8 for the selection of the prediction parametersTable 5-8 List for Prediction parameters of the Project Water Environment

Discharging

situation

Waste

volume(t/a)COD

concentration(mg/L)

BOD5

concentration(mg/L

)NH3-N

concentration(mg/L)

In normal 1095000 60 20 8

In accident 1095000 240 130 25

predict⑦ ed length of the mixing process reach

The predicted length of the mixing process reach is referred to the formula

stipulated in the Technical Guidelines for Environmental Impact Assessment:

Surface Water Environment, HJ/T2. 3-1993, which is as below:

From the above formula, the length of the mixing process reach where the

waste water of the project discharges into Xinqiaohe River is around 26m.

30m is taken to facilitate the calculation.

prediction results and assessment⑧Take the outlet as the base point, river flow direction as X axis and the river

width as Y axis. The hydrological situation in the monitoring period is referred.

Two-dimensional stable-state mixing & attenuation model and one-

dimensional stable-state S-P model are employed to predict how the COD,

BOD5 and NH3-N, which are from the waste water of this project, affect

Xinqiaohe River in the mixing process reach and total mixed reach

respectively. See table 5-9 and 5-16 for the prediction results.

81

Page 90: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 5-9 Impact Value of the Wastewater on Xinqiaohe River on Condition that

COD is normal(mixing process reach) Unit:mg/l

y

xy=0 y=1 y=2 y=3 y=4 y=5 y=6

x=10 15.0781 15.0824 15.0846 15.0847 15.0828 15.0789 15.0729

x=20 14.7642 14.7658 14.7667 14.7668 14.7661 14.7647 14.7625

x=30 14.6162 14.6171 14.6175 14.6176 14.6172 14.6164 14.6152

Table 5-10 Impact Value of the Wastewater on Xinqiaohe River in Case of COD

Accidents (mixing process reach) Unit:mg/l

y

xy=0 y=1 y=2 y=3 y=4 y=5 y=6

x=10 18.3368 18.3538 18.3627 18.3633 18.3556 18.3397 18.3157

x=20 17.1055 17.112 17.1154 17.1158 17.1131 17.1074 17.0986

x=30 16.5375 16.5411 16.543 16.5432 16.5418 16.5386 16.5338

Table 5-11 Impact Value of the Wastewater on Xinqiaohe River on Condition that

BOD5 is normal(mixing process reach) Unit:mg/l

/ y=0 y=1 y=2 y=3 y=4 y=5 y=6

x=10 3.8596 3.8612 3.8621 3.8621 3.8613 3.8597 3.8573

x=20 3.778 3.7786 3.7789 3.779 3.7787 3.7781 3.7772

x=30 3.7393 3.7397 3.7398 3.7399 3.7397 3.7394 3.7389

Table 5-12 Impact Value of the Wastewater on Xinqiaohe River in Case of BOD5

Accidents (mixing process reach) Unit:mg/l

/ y=0 y=1 y=2 y=3 y=4 y=5 y=6

x=10 5.46 5.4706 5.476 5.4761 5.4709 5.4606 5.4451

x=20 4.937 4.9411 4.9433 4.9435 4.9417 4.9379 4.9322

x=30 4.6932 4.6955 4.6967 4.6969 4.6959 4.6938 4.6907

82

Page 91: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 5-13 Impact Value of the Wastewater on Xinqiaohe River on Condition that NH3-N is normal(mixing process reach) Unit:mg/l

/ y=0 y=1 y=2 y=3 y=4 y=5 y=6

x=10 0.6662 0.6668 0.6672 0.6672 0.6669 0.6662 0.6653

x=20 0.6339 0.6341 0.6343 0.6343 0.6342 0.6339 0.6336

x=30 0.6187 0.6189 0.619 0.619 0.6189 0.6188 0.6186

Table 5-14 Impact Value of the Wastewater on Xinqiaohe River in Case of NH3-N

Accidents (mixing process reach) Unit:mg/l

/ y=0 y=1 y=2 y=3 y=4 y=5 y=6

x=10 0.9135 0.9156 0.9166 0.9166 0.9156 0.9136 0.9106

x=20 0.813 0.8138 0.8142 0.8142 0.8139 0.8132 0.8121

x=30 0.7662 0.7666 0.7668 0.7669 0.7667 0.7663 0.7657

Table 5-15 Impact Value of the Wastewater on Xinqiaohe River on Normal Conditions (complete mixed reach) Unit:mg/l

Pollutant

Distance(m) COD BOD5 NH3-N

100 15.14 4.01 0.74

200 15.08 3.99 0.74

300 15.03 3.98 0.74

400 14.97 3.97 0.74

500 14.92 3.95 0.73

600 14.86 3.94 0.73

700 14.80 3.92 0.73

800 14.74 3.91 0.72

900 14.69 3.89 0.72

1000 14.63 3.88 0.72

1500 14.35 3.80 0.70

2000 14.08 3.73 0.69

3000 13.5 3.56 0.66

4000 13.03 3.43 0.64

83

Page 92: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

5000 12.5 3.30 0.61

Table 5-16 Impact Value of the Wastewater on Xinqiaohe River on Condition of Accident (complete mixed reach) Unit:mg/l

pollutant

distance(m) COD BOD5 NH3-N

100 19.85 6.86 1.19

200 19.77 6.83 1.18

300 19.70 6.81 1.18

400 19.62 6.78 1.17

500 19.54 6.75 1.17

600 19.47 6.72 1.16

700 19.40 6.70 1.16

800 19.32 6.68 1.15

900 19.25 6.65 1.15

1000 19.17 6.62 1.15

1500 18.80 6.50 1.12

2000 18.45 6.37 1.10

3000 17.75 6.13 1.06

4000 17.08 5.90 1.02

5000 16.43 5.68 0.98

From the prediction results, it can be found that under the hydrological

conditions during the monitoring period, the COD 、 BOD5 and NH3-N

concentration in the mixing process and total mixed reaches are all within the

IV class standard of Environmental Quality Standards for Surface

Water(GB3838-2002)after the waste water of this project discharged into

the Xinqiaohe River in normal situation; but in accidental situation, the BOD5

concentration of the total mixed reaches exceeds the IV class standard of

Environmental Quality Standards for Surface Water(GB3838-2002)a little

within the 4km scope of the lower reaches of the outlet.

impact analysis of the sensitive points at lower reaches⑨According to date collection and on-site inspection, Xinqiaohe River is mainly

84

Page 93: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

used for irrigation and discharging floods. There is no central drinking water

source and water environment sensitive and protective target, but a few

irrigation sources, within 5000m scope of the lower reach of the outlet. From

the prediction results, the waste water of the project ensures the Xinqiaohe

River water to meet the requirements of Farmland Irrigation Water

Standard(GB5084-92) in both normal and accidental situations. As a result,

the waste water discharging of this project does not change the function of

Xinqiaohe River and hardly affects the lower reaches of the outlet.

Based on the research, Xinqiaohe River runs into Lianshui River at the lower

reaches and is 25km from the outlet of this project. According to the

stipulation of Water Environment Function Classification for Human Province

Main Surface Water, the water course from the inter section of Lianshui

Shuangfeng Town and Xiangxiang to the 1000m upper reaches of Xiangxiang

Second Water Plant is for landscaping and recreation and complies with III

class standard of Environmental Quality Standards for Surface Water

(GB3838-2002). It will not exert significant adverse impact to the Lianshui

water or affect negatively to the water quality of the resource of Lianxiang

Second Water Plant; the waste water discharged in accidental situation can

meet the III class standard of Environmental Quality Standards for Surface

Water (GB3838-2002) even at 5000m lower reaches of the outlet, so it will not

exert significant adverse impact to the Lianshui water or affect negatively to

the water quality of the resource of Lianxiang Second Water Plant.

Based on the prediction results and analysis conclusion, the waste water of

the project discharged in accidental situation has some adverse impact to the

water quality of the lower reaches of Xinqiaohe River, but does not affect the

use of the lower reaches water. The construction unit should strengthen the

management of construction and operation of the project, maintain the

equipment well, make measures for such as emergencies, and take every

effort to reduce the accident rate and undesirable effects.

5.3.2 Solid WasteThe solid waste during the operation of the Project mainly includes sludge and

domestic waste.

5.3.2.1 Sludge

85

Page 94: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

The solid waste in the WWTP mainly comprises grating residues, sand

deposit tank residues, dewatered sludge, and domestic waste, all of which are

easy to decay and odor with microorganism actions in certain temperature

and humidity, especially in sultry days. The dewatered sludge has the worst

impact on the surrounding environment featuring ① high water content

(≤80%) and easy discharge; ② fine and smooth grains and poor water

permeability; ③ potential breeding place for flies, thus, a potential spreading

source for diseases; and ④ potential source of percolate which will pollute the

surface water and underground water.

(1) Sludge Component Analysis

Wastewater collected in the pipe network net of the Project WWTP mainly

includes the domestic and industrial wastewater in the town with the latter

mainly coming from the Spring Wood, the Rea Sea Wood, and Xiangxiang

Weaving Factory. According to the developmental plan of Yueshan Town, the

priority lies in the industrial line derived from agricultural deep processing

industry such as the crop industry to form an industrial colony. Meanwhile,

great efforts are made to push the business operation mode of “leading

enterprises+ bases+ farmers”, to develop agriculture industrialization centered

with agricultural and sideline product processing, and the traditional

agriculture has been on the rise. Moreover, the development trend of the third

industry centered with trading, accommodation, and tourism is coming into

being. It can be seen that the industrial development in Yueshan Town mainly

lies in the agriculture processing and food processing, and the quality of

wastewater from enterprises of this kind is relatively simple mainly including

organic high-concentration wastewater without heavy meal generally.

Therefore, it’s confirmed through analogy that the sludge from the WWTP is

generally ordinary industrial solid wastes free of heavy metals which can go

for sanitary land fill in the landfill site after stabilization treatment such as

concentration, and dewatering.

(2) Environmental Impact of the Sludge Treatment Plant

① Impact of Sludge Dewatering on the Environment

The sludge is generally concentrated prior to dewatering. It odors in the

concentration, and there is fluid mud on the tank which is a breeding bed for

flies especially in hot summer.

86

Page 95: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

The dewatering room may odor in the dewatering of the concentrated sludge;

the leakage in the process will cause environmental pollution.

② Impact of Sludge Storage on the Environment

The dewatered sludge shall be cleaned away in time, and the sludge that fails

to be transported in time shall be stored in temporary sites. The dewatered

sludge will turn into thick liquid easily if caught in water with high mobility and

easy to flow away; with the rain flushing, the leaching water with a large

amount of pollutants dissolved will pollute the surface and underground water.

Therefore, the dewatered sludge cannot be stored in clutters but in temporary

storage sites equipped with impermeable layer specially for the processing

and covered with canopy. Moreover, since the dewatered sludge isn’t

stabilized completely, it will have anaerobic digestion with a long time of

storage with odorants such as H2S affecting the air quality. The sludge

storage site is a breeding bed for flies, which extends negative impact on the

environmental sanitation. As for these concerns, the dewatered sludge shall

be cleaned away in time rather than being stored in the Plant.

③ Impact of Sludge Transport on the Environment

Currently, the sludge is mainly transported in trucks. If the trucks and wheels

are stained with a lot of sludge in the load and unload, or the trucks are with

poor sealing performance, the sludge will be leaked on the road along,

causing pollution. The dewatered sludge shall be prevented from leaking and

scattering in the transport, and the trucks shall be covered and not overloaded

to avoid the impact on the road sanitary and surrounding environment.

Therefore, closed carrier vehicles for the special purpose shall be used to

transport the sludge to the landfill sites regularly. Meanwhile, the sludge

transport time shall be controlled strictly with rush hours avoided as far as

possible. All in all, the transport of sludge is an issue of great importance.

(3) Sludge treatment Method

According to the survey, the sludge arising from the WWTP is characterized

by: ① the water content as high as 99%, large volume, and difficulties in

disposal and transport. It shall be treated with decrement for the convenience

of transport and follow-up treatment; ② high content of organics that are

unstable and easy to decay. The content needs to be reduced to stabilize the

sludge; ③ some disease germs and parasitic ovum which are the media of

epidemic diseases. They can affect the public hygiene and the health safety,

87

Page 96: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

and shall be disposed appropriately; ④ necessity of avoiding secondary

release of phosphorous. All in all, the sludge, if not treated properly, will

create secondary pollution and increase the costs of chemical

dephosphorization in the filtration liquid. Therefore, the sludge shall be

pretreated prior to the final treatment.

The sludge in the Project, after going through three pre-treatment procedures

of concentration and dewatering, has its water content dropping below 60%,

and reaches a stable state in the end. The final disposal of sludge is to deliver

the dewatered sludge cake to the waste transfer station, then compress it with

urban domestic waste, and at last send it to the Quanhu Garbage Disposal

Plant in Xiangxiang City, 28km away from the WWTP, in a sanitary and safe

way. The sludge transport route chart is shown in Figure 6.

(4) Feasibility and Reliability Analysis of Sludge treatment Methods

① Feasibility Analysis of Sludge Stabilization

The process for the stabilization of sludge in common use includes: anaerobic

digestion, aerobic digestion, heat treatment, heating to dry, heating

stabilization, etc. The sludge treatment adopts DEST Process in the Project

since the sludge age is long and the residual sludge has been approximately

stable. According to the Code for Design of Outdoor Sewerage Engineering

GB50014-2006, when the wastewater is treated with biological phosphorous

and nitrogen removal, the residual sludge shall be concentrated mechanically

without digestion.

The sludge dewatering is to further reduce the water content and the sludge.

The ways of the dewatering of the sludge are nature air drying, mechanical

dewatering, sludge drying, incineration, etc. The widely used way of

dewatering in WWTPs at home and abroad is mechanical dewatering with

mainly centrifugal dewaterer, belt dewaterer and board-box dewaterer etc.

The sludge water content is within 75-85% after the above three treatments,

which dose not meet the requirement for landfill and is a prevailing problem in

WWTPs at home. At present, some domestic companis, based on the existing

dewatering method, have developed the new technology of Deep Dewatering

with Sludge Treatment and Board & Frame Compression and Filtration, which

is successfully applied in the WWTPs in eatern coastal area (such as

Guangzhou, Xiamen, Hangzhou, Wuxi, Shanghai etc.) . The key technics of

this technology is to treat the sludge with medicament (such as inorganic or

88

Page 97: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

organic substance and active bacteria), break cell membrane, release bound

water, absorption water, cell water, and improve the dewatering performance

of the sludge, making the sludge water content lower than 60% after

treatment. The detail treatment technics is as below:

After deep dewartering treatment, the sludge could be 40% lower in

concentration than that treated by traditional mechanic dewatering. It is noted

that since the water content of the sludge is reduced to 80% with belt

dewaterer, the medical dosage put in the following treatment is less than that

in non-dewatering process at a proportion of 3%; the smell value of the sludge

is around 3 degrees which is acceptable basically; the quality of the

dewatered sludge is quite sturdy and fundamentally stabilised; the lost

organics is less than 2%.

The above sludge treatment technology is practiced in the Xiaoshan Linjiang

WWTP and Qige WWTP in Hangzhou. According to the on-site inspection and

research, the above two WWTPs are well operated with the water content of

the sludge after treatment kept below 60%, meeting the state and local

requirements for landfills.

Considered the conditions of the project, incineration is not fit for the project

as it needs large investment, easily causes secondary pollution, and demands

highly for management; there is no suitalbe farmland found near the project to

absorb the sludge, and if managed improperly the sludge recycled to use in

the farmland will easily cause earth contamination, therefore the safe and

stabilisation treatment of the sludge to use in farmland is not fit for the project

too. The technological and operational cost of the deep dewatering technicis

with sludge treatment and board & frame compression and filtration is larger

than that of the traditional sludge treatment technics. However it has a higher

dewateing efficiency and meets the state and local requirements for landfills,

moreover there is a landfill near the project. As a result, the measure to

employ the deep dewatering technics with sludge treatment and board &

The sludge with the water content of 99.3%

Reach 80% after belt dewatering

Treat with the dehydrant (mixed 75% organics and 25% inorganics)

Reach the water content of around 55% after board & frame dewatering

Blend for 5h

89

Page 98: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

frame compression and filtration and then ship to landfill for buring is quite fit

for the project.

② Feasibility Analysis of the Final Sludge treatment

The final disposal of sludge is to deliver the dewatered sludge cake to the

waste transfer station, then compress it with urban domestic waste, and at last

send it to the Quanhu Garbage Disposal Plant in Xiangxiang City, 28km away

from the WWTP, in a sanitary and safe way.

According to the Notification on Strengthening Sludge Pollution Prevention

and Treatment of Urban WWTPs (Huanban [2010] Document No. 157) issued

by General Office of Ministry of Environmental Protection, local environmental

protection authorities at all levels shall connect the reality, formulate specific

embodiment, reinforce the supervision over the whole process including the

sludge creation, transfer, and disposal, strictly strike illegal dumping and

disposal, adjust measures to local conditions, push forward the

comprehensive utilization of land filling, incineration, building materials, and

the current industrial kilns (e. g. utility boilers, cement kilns, etc.), and promote

the harmless treatment ratio. Meanwhile, according to the requirements on

land filling wastes in the Standard for Pollution Control on the Landfill Site of

Municipal Solid Waste (GB16889-2008), the water content in the sludge after

treatment shall be less than 60% before being sent to the domestic waste

landfill.

The scope of services of the Project covers the center township of Yueshan

Town with the following objective: The WWTP only accepts domestic

wastewaters and similar industrial wastewaters, or industrial wastewaters in

line with national discharge standards after pre-treatment and being treated

with domestic wastewaters. Therefore, the Project is a domestic WWTP with

the sludge components generally identical with those of other plants.

According to the Notification on Strengthening Sludge Pollution Prevention

and Treatment of Urban WWTPs (Huanban [2010] Document No. 157) and

the Standard for Pollution Control on the Landfill Site of Municipal Solid Waste

(GB16889-2008), the sludge in the Project, after the pre-treatment, can be

sent to the Xiangxiang Quanhu Garbage Disposal Plant for the final treatment

with the water content below 60%. Meanwhile, compared with the practical

operation experience of Hengshan County WWTP, the sludge arising from the

90

Page 99: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

WWTP is to be disposed in the garbage landfill site, which is feasible

technically.

According to the General Planning of Yueshan Town, Xiangxiang City (2006-

2020) and Project Feasibility Study Report of Rural Environmental Connecting

Sectors Regulation Demonstration Area in Yueshan Town, Xiangtan City and

Xiangxiang City, the waste transfer station of Yueshan Town is located

Yemaotuo Group of Yuntian Village, at the junction of Hongyang Village and

Yuntian Village, occupying a total volume of 32m3 and a total investment of

RMB890,000, including a buried horizontal garbage compressor, a vertical

garbage compressor, and a garbage transfer truck. The domestic waste is

sent to the landfill site after being compressed and dewatered in the transfer

station. It is after on-site survey that the waste transfer station, around 7km

away from the Project, has been generally built and yet come into use.

Xiangxiang Quanhu Garbage Disposal Plant, built for the domestic waste of

Xiangxiang residents, is located in Quanhu Village, Longdong Town,

Xiangxiang City, around 28km away from the Project. The landfill site is

divided into two districts, the District I with a volume of 2,540,000m3

approaching to the completion and the District II with an investment of RMB

59,800,000, a floor area of 254. 76mu (1mu=667m2), a volume of

2,540,000m3, and daily capacity of 400t. The District II adopts harmless

disposal including the wastewater treatment system, landfill gas combustion

system, the management system, the landfill system, etc. The sludge is

planned to be sent for sanitary land fill in the District II after the completion of

the Project.

To sum up, it is feasible for the sludge arising from the operation of the

WWTP, after the pre-treatment in the Plant, to be mixed with the urban

domestic waste and compressed in the waste transfer station, and then sent

to the Xiangxiang Quanhu Garbage Disposal Plant for sanitary land fill mixing

with the urban domestic waste.

5.3.2.2 Domestic waste

The fixed number of staff needed in the operation period of the Project is 21,

and the domestic waste generated therefrom is 21kg/d, i.e. 7.665t/a. The

domestic waste, if not disposed properly, will breed a large amount of flies,

leading to epidemic diseases and affecting staff’ hygiene safety and health.

5.3.3 Impact on Air Quality

91

Page 100: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

The impact caused by the sludge treatment devices on the air is mainly the

odors. In the wastewater treatment, the organics in the sludge resolves to

create odors under anaerobic condition with the content related to the

temperature. The odor is severe in summer, mainly blending NH3 and H2S. It

mainly originates from gratings, the sand deposit tank, the gas exposal pond,

the sludge dewatering plant, and the sludge storage pond, and the DEST

reaction district is in the buried type. Therefore, the unorganized odor

discharge mainly originates from the sludge dewatering plant and the sludge

pond.

The WWTP has a relatively small scale and is the buried type with a small

amount of odor. Therefore, the impact on the surrounding environment cased

by the odor is not to be predicted but explained by means of setting health

protection distance in the EIA. The formula of the health protection distance,

the calculating process, and the parameters are shown in Appendix 2.

92

Page 101: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 5-17 Calculation Result of the Project’s Health Protection Distance and Its

Relation with the Sensitive Points

Calculation Result of Health

Protection Distance (m)

Protection Distance in the Respective Plant

Boundary (m)

Sensitive Point

Direction and Distance (m)

Meet the Requirements of the Health

Protection Distance or

Not

50

East Plant

Boundary

0 Xinqiao Village

North-east Side, 100 Yes

West Plant

Boundary

45 Bailong Village

West Side, 130 Yes

South Plant

Boundary

24 Hongyang Village

South-east Side, 150 Yes

North Plant

Boundary

37 / / Yes

It has been calculated that the health protection distance of the projected

WWTP is 50m. It is in accordance with the “Urban Wastewater Treatment

Project Standards”, which stipulates that the wastewater and the sludge

treatment facilities which create odors “shall be far away from the residential

area outside the Plant, and correspond to the relevant regulations. When it

can not meet the requirement, the distance between the residential area

outside the Plant and the production facility which create odors in the WWTP

shall not be less than 50~100m”.

Due to the fact that the distance between the WWTP under construction and

the main environmental protection targets meets the requirement of the health

protection distance, the odor resulting from the operation of the WWTP has

less impact on the main protection targets.

5.3.4. Impact on the Acoustic EnvironmentThe acoustic source of the WWTP mainly originates from various pumps,

which concentrate in the inflow pump room, sludge dewatering room, return

sludge pump and air blower housing. The Noise intensity is shown in Table 5-

18.

93

Page 102: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 5-18 Analysis of the Noise Impact

Name of EquipmentNoise Intensity (dB (A) )

Before the Protective Measures

After the Protective Measures

Wastewater Pump 90~100 80Sludge Pump 90~100 80

Air Compressor 95~105 85Transportation vehicle 75~80 /

Air Blower 80~90 80As seen from Table 5-8, if the noise control and noise countermeasures are

not taken, the noise intensity can reach 105dB (A). However, the intensity

drops to around 20dB (A) after the installation of the silencer and the

construction being airtight.

The main equipments that cause noise in the project are water pumps, air

compressor, air blower, etc. The air blower in the generator room is 80~90 dB

(A). After the noise elimination and noise insulation measures have been

taken, the noise will reduce to 80dB (A). The pumps are often placed in the

Plant, and the noise level is 90~100dB (A). After the noise elimination and

noise insulation measures have been taken, the noise will reduce to 80dB (A).

After the outdoor and distance attenuation, the noise in the Plant Boundary

can meet the “Emission Standard for Industrial Enterprises Noise at

Boundary” (GB12348-90) Category 2 (daytime: 60dB (A); and night-time:

50dB (A)).

94

Page 103: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

6. CountermeasuresAccording to the analysis of the environmental impact, the Chapter describes

the countermeasures for two periods, inclusive of the construction period and

the operation period respectively.

6.1. Countermeasures during the Construction Period6.1.1 Waste Gas6.1.1.1 Construction of the Pipe Network

During the process of the wastewater network and pipeline construction,

because the construction site is close to the residential area, the construction

dust pollution will exist. The following countermeasures may be taken:

a. Strengthen the construction management to achieve civilized construction.

Load and discharge the construction materials lightly;

b. Cover the vehicles which transport lime, sand and stone material, cement,

etc. That cause dust easily with tarpaulins;

c. Surround and enclose the construction site with colorful steel plates;

d. Water and cover the temporary stockpiling place of the earthwork with

overlay network to prevent dust.

6.1.1.2 Construction of the Plant Area

During the construction of the WWTP, it is inevitable to generate construction

dust. So in order to reduce the impact it causes to the surrounding

environment, the following countermeasures may be taken:

a. Strengthen the transportation management; put ceilings on the vehicles;

and make sure that overloading is not allowed;

b. Water the road frequently to decrease the dust pollution;

c. Prohibit piling up the construction waste, especially discarding them outside

the property line;

d. Surround and enclose the construction site with colorful steel plates;

e. Watered and cover the temporary stockpiling place of the earthwork with

overlay network to prevent dust;

f. Strengthen the construction management to achieve civilized construction.

The construction materials shall be loaded and discharged lightly;

g. Do not overload. Make sure that there’s no spatter from the soil loading

vehicles. Wipe out the soil before the vehicle leaving the construction site to

prevent it from falling along the road;

95

Page 104: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

h. Carry out labor protection for construction people. Wear the dusk mask.

6.1.2 Noise6.1.2.1 Construction of the Pipe Network

The noise generated from the process of construction will cause certain

impact on the surrounding environment. In order to reduce it, the following

countermeasures may be taken:

a. Arrange the schedules properly for the various machines. Avoid the

simultaneous work of a large number of high-noise equipment, which shall be

arranged at day time. Decrease the transportation at night. Prohibit

constructing at night (22:00~6:00). For the construction work that must be

done at night, obtain the approval from the relevant environmental protection

department and set the sound-proof protective screen between the acoustic

source and the sensitive points;

b. When constructing on the section of the road where a school locates, the

construction unit must negotiate with the school to arrange the high-noise

construction in winter and summer holidays, weekends or after school time

within the construction period. At the same time, pick up the speed to shorten

the construction time, thus reduce the influencing time. Carry out the high-

noise work intensively to avoid disturbing the study environment;

c. When constructing on the section of the road where a hospital locates, the

construction unit shall consult with the hospital and set the movable sound-

proof screen.

6.1.2.2 Construction of the Plant Area

During the construction period, the noise is mainly from the construction

machinery and transportation vehicles. In order to reduce the noise impact on

the lowest, the following measures may be taken:

a. Arrange the working time properly for the various construction machines.

Prohibit the usage of high-noise machinery at night.

b. For the different construction period, construct in accordance with the

regulation of “Noise Limits for Construction Site” (GB12523-90). Take the

countermeasures of setting the protective screen, choosing the low-noise

equipment, etc. To control the noise strictly.

c. Choose the low-noise equipment, such as hydraulic machinery instead of

fuel machinery. Install silencer to the blender.

d. Reduce the noise of the fixed mechanical equipment and earth cutting and 96

Page 105: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

moving equipment, like bulldozers, etc. by installing exhaust pipe silencer and

isolating engine vibration components.

e. Maintain and conserve the power generating machine on a regular basis.

6.1.3 Wastewater6.1.3.1 Construction of the Pipe Network

The Wastewater in the construction of the pipe network period is mainly

industrial wastewater, which mainly comes from wash water of vehicles and

mechanical equipment as well as the maintenance of the machinery. The

major pollutants are SS, petroleum. In order to ease the impact they cause to

the surrounding environment, the following measures may be taken:

a. On the basis of the physical truth of the construction of the pipe network,

the washing of the vehicle and mechanical equipment will not be done in the

construction site, but specialized washing site.

b. The construction time shall avoid the raining season.

c. Recycle the leaking oil using the barrel catching method. Use the special

plastic barrel to catch the oil and pour them into the waste oil storage tank.

The purchase department will drop by and purchase the waste oil. If the waste

oil drops on the ground, use the cotton yarn to rub-up.

6.1.3.2 Construction of the Plant Area

During the WWTP construction period, the Wastewater is mainly construction

wastewater generated from the site washing, concrete preparation and the

process of the maintenance and installation, as well as the constructors’

domestic wastewater. In order to ease the impact it causes to the surrounding

environment, the following measures may be taken:

a. The Construction of the Plant Area unit shall set the grating residue basin,

so the raining wastewater, ponding etc. can be used for washing and watering

after processed by grating residue method and reach the standard.

b. Build simple and easy domestic installation in the construction site. The

kitchen wastewater needs to be oil-removed, sedated and then used for

watering. Build temporary pit rest rooms; clean and transport the waste out on

a regular basis.

6.1.4 Solid WasteThe solid waste during the construction period mainly include: the residue soil

and gravels dug from the earthwork; the material wastage during transporting,

including sandstone, concrete etc.; the construction people’s domestic waste. 97

Page 106: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

If they are disposed improperly, the ecological environment will be damaged,

and harmful impact will be brought to the human body. The following

measures may be taken:

a. The domestic waste shall be collected into bags, classified and transported

together by the environmental protection department.

b. Establish a pit rest room in the construction site of the WWTP. Hollowed

them out on a regular basis and transported the excrement out as the fertilizer

of the nearby farmland.

c. The construction waste shall be classified. Those which may be recycled

shall be recycled in time by a specially-assigned person, while those non-

recyclable ones shall be used as the refill of the WWTP.

d. The construction unit shall dispose the construction waste according to the

“City Construction Waste Management Regulation”. Before disposition, put

forward an application to the environmental protection department and

transport the waste according to the provided route and time. Reduce the

amount of the waste, detoxicate them and made them useful. According to the

city construction condition, consult the city construction department and the

environmental protection department to use those waste as the preferential

refill material. If they can not be disposed fully, they shall be transported out of

town and piled up properly.

6.1.5 Ecological Environment(1) Choose the proper waste soil, residue site, and bank them up reasonably.

It’s best to use them directly. Carry out each project section in different stages

to reduce the impact on the scenery.

(2) The digging and refilling of the earthwork shall avoid the raining season.

Finish the refill and the side slope disposition before the raining season;

(3) Dug discharge ditches around the spoil area to avoid the soil erosion in

raining seasons. Cover the temporary stock dump with soil after construction.

(4) Set up environmental protection and supervising institute and appoint

specially-assigned persons. Strengthen the management and environmental

protection publicity to remind people of protecting the environment. Prohibit

the deforestation of the construction people. In the contract, the contractor

must construct in the boundary of the land and transport the spoil to the

appointed location.

98

Page 107: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

6.1.6 Social Environment(1) Inform the residence along the area about the construction of the pipe

network in advance. Ask for instructions of the relevant department about the

notification of vehicles’ route change due to the construction of the pipe

network in advance and inform the residence.

(2) If the construction of the pipe network crosses and conflicts with the public

facilities of city water supply, electric power, communication, etc., discuss and

exchange ideas with the relevant departments and authorities concerned in

advance. Draw up construction plans for different sections. Explicate with the

construction unit the possibility of the damage of the public facilities as well as

avoiding and solving measures.

(3) Negotiate with the police officer and the traffic control administrative

department the organization of the city transportation. Take the

countermeasures of sending specially-assigned persons to assist the traffic

control and shortening the construction period to ease the pressure to the

fullest

(4) Set up the crosswise extraditing board and guardrail to reduce the impact

it causes to the traffic.

(5) In order to guarantee the city discharge unobstructed, take the diversion

and pump using measure. In the section where the condition allowed, use the

diversion measure, otherwise use the pump to drain away the water to make

sure the discharge unobstructed.

(6) Formulate a scientific construction plan; arrange the construction activities

properly. Separate the network transformation into sections. Take the scheme

of digging a section, recovering a section, which can avoid excavating and

reduce the due caused visual pollution, traffic blocking and harmful impact to

commercial activities. Get the citizens’ understanding by enhancing the

publicity of the construction. Revegetate the area at the end of the

construction.

(7) Treat the road section that has sensitive point like schools, hospitals, etc.

as intensive protection section. Water the road to make the dust fall; prevent

the noise and evacuate the traffic.

(8) Improve the condition of the temporary occupying of the roads: Optimize

the design scheme and construction route; decrease the temporary occupied

land as much as possible in the project design; reduce the treading and press 99

Page 108: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

of the green belt. Transplant the turfs and trees on the land instead of damage

at will. Afforest the surface of the refill land in time.

(9) The protection of the material culture resources: If culture relics, ancient

tomb, etc. being discovered, stop the site operation temporarily. Inform the

relevant Cultural relics department; send specialized personnel to investigate

on site to decide whether to save or unearth them.

6.2 Countermeasures during the Operating Period6.2.1 Waste GasThe mainly waste gas in the operating period is odor. The wastewater

treatment measure is land filling. In order to alleviate the impact that the odor

caused to the surrounding environment, the following countermeasures may

be taken:

(1) Take into consideration that the smell is heavy in summer and the

characteristic of the prevailing wind direction, optimize the plane layout. Built

the main facility like sludge tank, dehydrating room in the down wind direction

or side wind direction to keep the health protection distance between those

sensitive points.

(2) After the completion and operating of the project, strengthen the

production management. Control the respective productive technology link

that create odors; establish and perfect the system of personnel responsibility

and supervising.

(3) Safety management. After the completion and operating of the project,

carry out the staff accident management training. Maintain the monitoring

instruments on a regular basis, so that they can operate normally and fully

perform the monitor and control function. If any persons come into the pump

room, pay attention to the ventilation to avoid the excessively sedated H2S

and NH3 which cause harm to the human body.

(4) Plan well. In accordance with the health protection distance, the planning

department shall re-plan the land in those areas; explicitly prohibit the

construction of sensitive facilities like new residential area, schools, medical

establishment, etc.

(5) Strengthen the forestation. It is inevitable that the WWTP has odor,

therefore the forestation plan is very important in the improving of the

environment quality. The afforest design and construction drawing design

100

Page 109: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

shall be completed at the same time. The principal of the forestation is to

eliminate the bareness land, plant the flowers and plants on a large scale.

Plant arbor, bushes, pine trees, etc. on the both sides of the road; plant tall

and big trees like poplar and locust trees on the boundary of the Plant to form

a multilayer protective forest and to reduce the impact of the odor pollution.

6.2.2 WastewaterIn order to guarantee the effluent index of the WWTP meets the requirement,

the following countermeasures may be taken:

(1) Before the industrial wastewater flowing into the WWTP, pre-treat them to

reach the “Discharge Standard for Municipal Waste Water” (CJ18-86) and

“Integrated Wastewater Discharge Standard” (GB8978-1996) Third level. In

the mean time, the harmful, toxic first category pollutants which can

accumulate in the animal body and cause harm to the human body must be

confined and processed in the workshop. Only when it reaches the standard,

can it be discharged into the WWTP.

(2) Before the discharged water flowing into the network of the medical

establishment, they must reach the relevant scale pollutant index limit

requirement in GB18466-2005 “Discharge Standard of Water Pollutants for

Medical Organization”.

(3) Strengthen the project construction and operating management. Make

sure the wastewater treatment facility and efficiency meet the design standard

and requirement. Guarantee long term, stable, normal operation and the

wastewater reaching the standard before discharging.

(4) Establish and perfect the respective environmental management rules and

regulations; implement comprehensively the staff professional training plan.

(5) Maintain and conserve the equipment carefully. Reduce and get rid of the

abnormal circumstances; avoid the discharge that exceed the standard;

prevent the accidentally risk discharge.

(6) Strengthen the standardized management of the wastewater draining exit.

Set the wastewater automatic metering mechanism, automatic ratio sampling

apparatus at the terminal exit. Install online monitor device to control the main

water quality index like pH, water temperature, COD, etc.

(7) Setting up standby equipment; establish an emergency pre-arranged

planning to prevent the bad consequence from happening when problems

101

Page 110: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

occur.

(8) Domestic wastewater and sludge wash water shall follow the wastewater

conduit into the wastewater treatment facility. Discharge them along with the

construction wastewater after reaching the standard.

6.2.3. NoiseIt is proposed to take the following control measures for noise during the

operation period of the Project:

(1) Select low-noise standard products in the production workshops with big

noise such as wastewater pump, sludge pump, air blower and dewatering

rooms, with noise reduction measures such as shock pad or flexible joint

being taken when installing.

(2) Conduct noise insulation treatment to the partition between the operating

room and equipment room, and to the doors and windows of the equipment

room, so as to reduce the impact of direct noise on the human body.

(3) Use the acoustic range principle to reduce the noise impact, with the

space between acoustic source and building being kept to the maximum in

the general layout, so as to provide the staff in the WWTP with a good

working environment.

(4) In combination with the Project construction, plant tall trees and shrubs

which together form the mixed shelter belt to expand the green area therein,

so as to achieve the acoustic absorption and noise reduction effect with

vegetation.

6.2.4. Solid WasteThe solid waste generated during the operation period of the Project mainly

includes domestic waste and sludge, among which the domestic waste is

collected and transported to the landfill site, while the sludge treatment is

conducted in accordance with the Notification on Strengthening Sludge

Pollution Prevention and Treatment of Urban WWTPs (Huanban [2010]

Document No. 157) issued by General Office of Ministry of Environmental

Protection, with the following preventive measures proposed to be taken:

(1) The solid waste in the WWTP, especially the sludge, shall not be

indiscriminately disposed, but shall be properly collected, stored and

transported to the landfill site on a regular basis in a sanitary and safe way.

(2) The Project sludge is prohibited to be discharged to the ground water body

and non-specialized general solid waste fields such as coast, valley, lowland, 102

Page 111: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

karst cave and farmland.

(3) Measures to prevent loss and secondary pollution such as the prevention

of foundation seepage, of rain eluviation and scouring, and of obnoxious gas

from gathering in the shed and sending out concentratively shall be taken in

the temporary sludge storage of WWTP.

(4) The WWTP shall earnestly fulfill the sludge treatment and disposal

responsibility, to conduct the whole process management on the production,

transportation, storage, disposal and treatment of sludge, to set up special

monitoring department or full-time (part-time) Personnel, to ensure proper

disposal and treatment of sludge, and to strictly prohibit unauthorized

dumping, stacking, discarding and fly-tipping of sludge.

(5) The sludge treatment and disposal shall comply with the principle of

reducing amount, stabilizing and harmlessness, with the sludge treatment

facilities being planned, constructed and put into operation concurrently with

the wastewater disposal facilities.

(6) To establish the sludge management ledger and the manifest system. The

WWTP shall establish the sludge management ledger, so as to make detailed

record on the amount of output, transfer, treatment and disposal, and the

place where it goes, and report to Xiangtan City Environmental Protection

Bureau on a regular basis; shall establish the sludge manifest system, with

the manifest being filled in truthfully and accurately when the WWTP transfers

out the sludge.

(7) Standardize the sludge transportation. The unit engaged in the sludge

transportation shall have relevant road cargo operation qualification, and

individual and the units without access to relevant operation qualification are

prohibited to engage in the sludge transportation, meanwhile, seal,

waterproof, anti-leakage and fly-tipping preventive measures shall be taken

for the sludge transportation vehicle.

(8) Add a rain shelter on the top of sludge storage hall in the WWTP, make

thorough hardening treatment to the storage hall floor, and set cofferdam,

discharge ditch and collection well near the storage hall, so as to deliver the

water discharge generated during the sludge stockpiling back to the

wastewater treatment system for treatment.

(9) Closed tanker transportation shall be adopted when transporting the

sludge outward. 103

Page 112: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(10) For the measures on reducing the amount of sludge, advanced sludge

concentration dewatering techniques shall be selected to dewater the sludge

to have the water content below 60%, thus to reduce the output amount of the

sludge.

(11) Ensure the sludge treatment rate to amount to 100%.

(12) After bagging and separate collection, the domestic waste shall be

cleaned up and carried away by the Environmental and Personal Health

Department.

6.2.5. Ecological Environment (1) Pay attention to the combination of trees, shrubs and vegetation for the

greening therein area, which shall be planned according to a certain

proportion, and a certain hierarchical structure shall be kept. Try to use native

species, and reduce the introduction of foreign species. Take priority to select

such species as preferred tree (grass) species when greening.

(2) Strengthen management. The Plant site shall send special personnel to do

the campus greening and management work, and formulate corresponding

rules and regulations to protect the green belt and the ecological environment.

(3) After the wastewater pipeline is covered with soil, the hardening treatment

shall be conducted within the town range, while timely greening and rush-

planting shall be made outdoor, so as to have the vegetation be restored as

quickly as possible at the exposed ground surface caused by the pipeline

construction. Select local preponderant grass seed for the vegetation.

Meanwhile, use the wire netting to enclose key areas, and perform

management in a timely manner to prevent from the trample of flocks and

herds or intentional destruction.

(4) Strengthen the inspection and management on the sludge pipeline, and

perform inspection on the sludge pipeline on a regular basis, so as to timely

discover and dispose the pipeline leaks to avoid the possibility of ground

water pollution caused by the seepage of the sludge pipeline.

104

Page 113: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

7 Environmental Risk Analysis and Mitigation Measures 7.1 Environmental Risk Identification According to the characteristic analysis of pollution effects of the Project

engineering, the main environmental risk identification results are as follows:

(1) In case of any sudden accidents such as power outage and sudden

natural disasters, which causes the wastewater treatment facilities to stop

operating, and a large amount of wastewater untreated to be directly

discharged;

(2) As the inflow water quality and amount suddenly change, the wastewater

treatment efficiency drops, finally leading to the deteriorative outflow water

quality, with the discharge going beyond the discharge standard requirements

as specified by the State, and exerting great negative impact on the water

environment and ecosystem;

(3) The environmental risks caused by the pipeline damage or rupture, and

the river water's seepage into the pipeline to dilute the wastewater, resulting in

the environmental risk that the WWTP tail water fails to reach the standard. It

is mainly that the ground water seepage under the riverbed or the seepage of

the river water in the riverway to dilute the wastewater, resulting in low

efficient treatment rate of the WWTP.

7.2 Impact Analysis on Potential Environmental Risk Accidents of

the WWTP 7.2.1 Sudden AccidentsThe quality problem or inappropriate maintenance of the wastewater

treatment equipment and facilities will cause failure of them, leading to the

drop of wastewater treatment efficiency, even the direct discharge without

being treated; or some irresistible external reasons such as power outage or

sudden natural disasters, will cause the wastewater treatment facilities to stop

operating and a large amount of untreated wastewater to be discharged

directly, which will be the limit case of the abnormal discharge of the WWTP.

When the wastewater treatment facilities fail to operate normally due to power

failure, the wastewater may only be discharged to the surface water, which will

cause serious pollution to the rivers.

7.2.2 Equipment FailureThe equipment failure of the wastewater or sludge treatment system will

105

Page 114: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

reduce the wastewater treatment capacity, and make the outflow water quality

index fail to reach the design requirement, or the sludge’s failure to be

condensed or dewatered will cause the sludge to ferment, and the sludge

storage pool to be packed, giving out foul smell.

7.2.3 Inflow Water Quality ImpactThe treatment effect of the urban WWTP is greatly impacted by the change of

parameters such as the original wastewater amount or quality. According to

the state environmental regulations, the industrial waste water shall reach

national standards before being discharged, with the requirements for

entering the WWTP being reached. When sudden accidents such as

emergency power outage occur to the enterprise WWTP, the wastewater may

be discharged to the urban wastewater pipeline without being treated, and to

the newly-built WWTP. In case that the waste water into the Plant has

excessive impact load, with the pH value exceeding the range of 6~9 and the

abnormal conditions such as organic toxicants exceeding standard being

difficult to be degradated, which will cause the biochemical microbial activity of

the WWTP to drop, even cause the damage of the biological phase and the

sludge bulking, finally resulting in that the outflow water quality deteriorates,

the discharge standard requirements specified by the state are exceeded, and

the great negative impact on the water environment and ecosystem is

exerted.

7.2.4 Risk Accidents during Normal Operation Sudden risk of the wastewater treatment system accident will bring great

damage to the staff maintaining the system, even threaten the life for serious

ones. When the environmental risk accidents occur, the health and safety of

the staff in the WWTP are first affected.

7.2.4.1 Risk Impact Analysis on Personnel Poisoning Caused by Toxic Gas

When accidents occur to some structure of the wastewater treatment system,

they must be eliminated immediately, at such time the maintenance staff

needs to access to the wastewater pipeline, water-collecting well or

wastewater pool to operate, where high-concentrated toxic gases such as

hydrogen sulfide, methane and carbon dioxide are easy to generated and

accumulated. Once protective measures are not taken during maintaining, the

maintenance personnel will get dizzy or breathing impeded due to poor

ventilation and the breathing in of toxic fumes, and even death. 106

Page 115: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

It is reported that dozens of accidents occurred to more than 20 domestic

urban wastewater pipelines and combined discharge pipelines, including that

the maintenance personnel got poisoned or hurt due to toxic gas in the

pipeline, and the personal safety was endangered by the explosion caused by

the flammable gas methane’s contact with open fire in the pipeline. Therefore,

it is essential to prevent toxic gas from causing harm to people by taking

personal security measures to operators, and taking ventilation measures to

completely dissipate toxic and harmful gases is the most effective way for

preventing poisoning. In case of failure to be fully ventilated, it shall be

avoided to access to dangerous space, and effective personal protective

equipment must be worn when it is required to access to. Personal protective

equipment includes gas mask, air supply mask, etc., and detection equipment

includes gas detection instrument and detection test paper.

7.2.4.2 Risk Impact Analysis on the Harm of Pathogen-caused Diseases to

Personal Health

There are various pathogens and parasite ova in the wastewater or sludge,

and the mist and steam generated from the wastewater treatment facilities

can spread bacteria and viruses, so the staff of the WWTP exposed to the

micro organisms of the wastewater and sludge may be infected and got

disease. The infection may be caused by direct breathing in of gas or

indirectly the waterdrop attached to the skin or clothes. Aeration pool, effluent

weir, irrigative spray nozzle, blower room, and dewatering room will condense

such gases. At the places with high condensation of water, using gauze-type

respirator may reduce the inhalation of toxic substance. Such environmental

risks are mainly that the operators may be directly infected by pathogen and

get disease, while the probability that people outside are infected and get

disease is low. However, if it fails to be controlled and causes the spread of

disease, the personal health outside may be threatened.

7.3 Risk Mitigation Measures 7.3.1 Equipment Security Measures The equipment such as mechanical pump, valve, electrical appliance and

instrument used in the treatment facilities system, when going wrong, will

cause the waste water treatment efficiency to reduce or cause the WWTP to

stop operating, with the probability being high. The emergency measures for

107

Page 116: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

such accidents are mainly:

(1) In the process design, consider to leave a certain backflow treatment

buffer capacity and facilities (for example, add corresponding accident

handling buffer pool) in the treatment system, and provide considerable

treatment equipment (such as return pump, return pipeline, valve and

instrument), in case when the equipment failure impacts the normal operation

of the treatment system, the system buffer and return equipment shall be

enabled to re-handle unqualified outflow water until to satisfy the discharge

standard.

(2) Multiple spare equipment shall be equipped with for easily-damaged

equipment, and enough spare parts shall be ensured for maintenance and

update. At least adopt the one-up means for electromechanical equipment in

the treatment system.

(3) Select high-quality equipment. For various mechanical, electrical and

instrumental equipment in the treatment facilities, products with high quality,

low fault rate, meeting the design requirement, suitable for long-term

operation and facilitating maintenance and service shall be selected.

(4) During operation, the on-guard operators shall operate strictly in

accordance with the rules and regulations on the treatment facilities, perform

patrol inspection to the equipment frequently, timely conduct maintenance and

service, and reduce the equipment fault rate.

(5) The electrical equipment is as required by the grounding protection

specification; and automatic tripping circuit shall be installed, with the

operation of main equipment adopting computer data monitoring, timely giving

an alarm and recording the location, nature and time of accident, so as to

organize people to repair in a timely manner. The installation and protection of

all electrical equipment shall satisfy relevant safety rules on electrical

equipment.

(6) Adopt double-loop power supply to ensure the normal operation of power

supply facilities and lines.

7.3.2 Protection of Abnormal Wastewater Discharge Take the emergency measures on the water amount’s instability due to

various factors into full consideration during design, so as to ease the adverse

situation.

(1) Regulatory Requirements for Pollution Discharge Enterprises 108

Page 117: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

For the enterprises with daily discharge greater than 500m3 and heavy

pollution load, install the on-line monitor meter, and implement the system on

irregular sample check and enterprise pollution discharge reporting under the

municipal environmental supervision, so as to ensure the waste water to

reach national standards before being discharged; national standards shall

also be reached for other enterprises’ discharge of waste water;

Set accident reservoir for heavy pollution industrial enterprises;

In case of unnormal operation of waste water treatment facilities, causing

the discharge of waste water to fail to reach the national standards, the

problem shall be solved and notified to the WWTP.

(1) Operation Technology Management Measures of WWTP

Establish the operation management and responsibility system;

Train the management and operation personnel, and create technical

examination file, with unqualified ones being not allowed to take up the post;

Engage professional technicians with rich experience to take charge of

the technical management work therein;

Select professional technicians to receive technical training at home and

abroad;

Strengthen the patrol to waterline, and find and solve problems in a

timely manner;

Strengthen the maintenance and management to the equipment and

facilities, with spare ones for key equipment, and ensure the double-loop

power supply;

Close the doors and windows when the wastewater pump room is

working, and ensure the noise at the Plant boundary to meet the standard

requirement;

In order to reduce the impact of the pump room’s giving out bad smell,

the collection well shall be closed, and the wastewater shall be pumped into

the wastewater mains and then delivered to the WWTP timely; the grating

residues shall be cleaned up promptly after being dewatered;

Perform rainwater and wastewater shunting work in the WWTP, so as to

prevent the wastewater from overflowing without treatment under heavy rain;

Conduct greening around the Plant, choosing the Plants with high

efficient purification to odor substance;

Visit the residents around the wastewater plant on a regular basis to 109

Page 118: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

listen to their opinions.

(2) Strengthen the power station management, and ensure the normal

operation of the power supply facilities and lines.

7.3.3 Emergency Measures for Sudden Waste Water Discharge Risk Accident Once sudden waste water discharge accident occurs to the WWTP, the

following measures shall be taken:

(1) Strive to ensure that the grating and sand deposit tank are in normal

operation, making the SS and COD in the inflow water be reduced to a certain

degree;

(2) Locate the reason(s) from main pollution sources in the water catchment

system, with the emergency measures being taken by relevant enterprises to

control the discharge of toxic substance harmful to micro organism;

(3) Irresistible external reasons such as double-loop power outage and

sudden natural disasters will result in that, when the wastewater is discharged

without treatment, discharge enterprises in part or whole shall be required to

stop discharging the wastewater into the pipeline, so as to ensure the safety

of water body;

(4) During the occurrence and processing of accident, warning signs shall be

hanged in the water area near the discharge outlet to remind each side to

take precautions.

7.3.4 Staff Personal Security Measures (1) Before the operation of the WWTP, it is necessary to conduct safety

education to the operating and management personnel, and formulate safety

operation specification and management system, which shall be strictly

performed and checked after the operation.

(2) Sanitary requirements such as water supply & discharge, heating and

ventilation, and lighting illumination shall be considered for the design of

buildings, and air-conditioning facilities shall be provided at the places where

staff works for long. For some operation places with sealed structure and poor

ventilation, mechanical ventilation shall be adopted.

(3) The Plant area is equipped with labor protection articles such as life jacket,

life buoy, safety belt and safety helmet. It is necessary for the operators

conducting inspection or operation to the underground pipeline to wear

necessary protective equipment, such as protective clothing, gas mask, air 110

Page 119: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

supply mask, gas detection instrument and detection test paper, in case of

being poisoning, and there must be at least two people on the spot.

(4) The edge of poor body aisle shall be equipped with hand rail and lighting

facilities, so as to ensure the safety of pedestrians.

(5) The installation and protection of all electrical equipment shall satisfy

relevant safety rules on electrical equipment, with the grounding protection

work for high-pressure equipment being made well.

(6) The dangerous parts of mechanical equipment such as driving belt, gear

and abrasion wheel shall be equipped with protective device.

(7) It is necessary to strengthen the safety work management, formulate post

responsibility system, set warning signs at the striking places of all dangerous

areas therein, and build hand rail for the platforms above 1.2m; to provide

ventilation equipment at the places where toxic or harmful gases may

accumulate, establish safety labor protection agency being responsible for the

safety production and labor protection.

(8) According the actual need and convenience at each working section,

production health rooms (rest room, bathroom, dressing room, etc.) shall be

set; in addition to strengthen ventilation and provide shelter at the working

sections with bad environment and outdoor operation places, rest rooms shall

also be provided. Concentrated bathrooms are provided therein.

(9) For the staff directly exposed to wastewater, sludge and domestic waste,

physical examination shall be performed and relevant vaccine (hepatitis A,

hepatitis B, etc.) shall be injected on a regular basis.

7.3.5 Protective Measures for the Impact of Sludge Discharge on Environment The sludge in the WWTP shall be cleaned up and transported to the waste

landfill site after being dewatered, meanwhile, special airtight transportation

vehicles shall be used to prevent from giving out bad smell, spilling and

polluting the environment, with the specific treatment and disposal referring to

Chapter 6.2.4. In addition, once abnormal sludge discharge occurs to the

WWTP, the equipment shall be maintained in a timely manner, with efforts

being made in good repair to the extent that the sludge pool stores the sludge,

and add agent (such as lime) without delay, so as to prevent from the sludge

fermentation, and reduce the discharge of obnoxious gas.

111

Page 120: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

7.3.6 Preventive Measures for the Impact of Flood to the WWTP (1)Take the flood impact into full consideration during design, including the

impact of design year and check flood according to relevant regulations of the

state.

(2)Build Flood dike around the WWTP.

7.4 Emergency Authorities and Assignment of Responsibilities of

the WWTP The emergency authorities of the WWTP mainly consist of subordinate offices

and incident response teams of the Leading Group. Incident response teams

include the Rescue Group, the Liaison Group, Logistics Group and Vehicle

Group. Their respective responsibilities are shown in Figure 7-1.

(1) The Leading Group shall organize and set up the emergency treatment

plan, carry it out according to the environmental risks, take charge of overall

command work on the spot and coordinate with the external parties.

(2) The responsibility of the office is to assist the Leading Group in assigning,

supervising and checking the work.

(3) Under the unified command of the Leading Group, the Rescue Group

takes charge of concrete implementation when handling the perils and

maintains relevant equipment.

(4) The Liaison Group takes charge of coordinating the work among the

Rescue Group, the Logistics Group and the Vehicle Group.

(5) The Logistics Group takes charge of assisting in rescuing the poisoned

personnel, carrying out corresponding emergency measures, registering for

observation and treatment in the hospital, and mustering relevant rescue

items.

(6) The Vehicle Group takes charge of the redeployment of vehicles, such as

transporting the poisoned personnel to the hospital, rescue items and so on.

112

Page 121: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Figure 7-1 Setup Diagram of Emergency Authorities of the WWTP

The Leading Group

The Office

Rescue Group

Liaison Group Logistics Group

Vehicle Group

113

Page 122: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

8 Comparison and Selection of Alternative ProposalsThe comparison and analysis of alternative proposals of the Project is carried

out in these three aspects: 1. Comparison and selection of No-project

Proposals; 2. Comparison and selection of the construction site; 3.

Comparison and selection of technical proposals.

The general principles for analyzing the comparison and selection of

alternative proposals:

(1) Quantization comparison and selection principle: Try to quantize the

impact of the environment where the Project is implemented in every

alternative proposal.

(2) Comprehensive comparison and selection principle: Do a comprehensive

comparative analysis from aspects like environment, technology, economy

and society.

(3) Conformity comparison and selection principle: the proposal selected shall

conform to the related development planning and standard requirement, and

adapt to the local conditions.

8.1 Comparison and analysis of Zero ProposalThe assessment of the environmental impact of the Project is to be

considered from the prospective of environmental profit and loss, as well as

social economy. After the comparison and analysis of WWTP proposals, the

result is shown in the Table 8-1.

114

Page 123: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 8-1 Comparison and analysis of Zero Proposal

Category Implementation Plan of the Project No-project Proposal (Zero Proposal)

Major Advantages

(1) Conform to the National policies with regard to the urban domestic

wastewater treatment, pollution prevention and control technology

(2) Conform to the “twelfth five-year” plan of Hunan Province and the

Xiangxiang City;(3) Be beneficial to protecting the water

quality of Xinqiaohe Rive; and(4)Further improve the city’s

infrastructure.

(1) Maintain the current situation, such as leaving the vegetation

undestroyed;(2) Maintain the land use value (not

occupying any land); and(3) Do not cause any environmental

issue such as vegetation deterioration and dust-raising during

the construction period

Major Disadvantages

(1) Occupy much land: of 8,529 square meters;

(2) Cause vegetation deterioration and dust-raising during the construction

period; and(3) Result in negative impacts on

environment such as equipment noise, sludge and wastewater during operation.

(1) Discharge the wastewater directly to surface water, making it seriously

polluted; and(2) Fail to solve the current outdated

wastewater collection system.

Comprehensive Analysis

From the prospective of society and environment, the implementation of the Project Plan is better than No-project Proposal.

From Table 8-1, it can be concluded that although the No-project Proposal

has no environmental issues, wastewater will undoubtedly pollute surface

water because it comes directly into the environment without any treatment.

The implementation of the Project Plan will unavoidably bring to its

surroundings some impacts, among which many ones can be avoided or

reduced with corresponding environmental protection, except for the

irreversible permanent occupation of land (about 8,529m2). Moreover, the

environmental impact is temporary during the construction period. The

implementation and operation of the Project will bring long-term benefits to the

society and environment, especially for protecting and improving the quality of

the water in Xinqiaohe Rive, and improving the city’s infrastructure. So from

the prospective of society and environment, the implementation of the Project

Plan is better than Zero Proposal, proving the necessity to carry out the

Project.

8.2 Comparison and analysis of Pipe Network Proposals8.2.1 Principles for Determining the Pipe Network ProposalThe wastewater pipe network shall be constructed on the basis of the local

wastewater control plan as the local terrain and the emission characteristics

may be, so as to ensure the wastewater collection efficiency on an economic

and affective basis. The following factors shall be taken into consideration:

115

Page 124: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(1) Use gravity flow to the best extent;

(2) Try to avoid the environmental protection targets (sensitive points). If the

can't be avoided, the countermeasures may be taken;

(3) Be beneficial to wastewater collection and transmission;

(4) Facilitate the construction and future maintenance overhaul;

(5) Reserve the space for expansion;

(6) Ensure that the geological environmental conditions are good enough to

conform to the requirement of the specifications of pipeline construction;

(7) Save investment and operating costs; and

(8) Conform to various local plannings.

8.2.2 Wastewater Pipe Network Proposal of the ProjectThe main pipeline A lies in the north roads of the fire station, and for the

diameter of some branch pipes, water amount for the long-term development

shall be considered. The pipe diameter is DN300~DN600.

The main pipeline B lies in the south roads of the planning land, and the water

amount of the reserved alternative land for long-term industrial development

in the eastern part of the town flows into the WWTP basically through line B.

At this stage, long-term water amount isn’t considered, and it will be taken into

account until further construction in the future. The pipe diameter is

DN300~DN600.

The main pipeline C lies along the north river of the inner river in this town,

and for the diameter of some branch pipes, water amount for the long-term

development shall be considered. The pipe diameter is DN400~DN500.

Best consideration shall be given to the pipe network laying of the Project for

the need of further development and terrain, reserving some space for

expansion. At the same time, the landform features, roads, and construction

conditions of Yueshan Town shall be comprehensively considered to rationally

divide the discharge areas, trying to apply the gravity discharge, and reducing

the cost of the Project.

8.3 Comparison and analysis of the WWTP Site 8.3.1 Principles for Site SelectionThe selection of the site for urban wastewater treatment shall comply with the

general town planning and discharge engineering planning, as well as ensure

the site is:

116

Page 125: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(1) In the downstream water and with the leeward of summer prevailing wind

direction thereof;

(2) Convenient for the water reuse and safety discharge;

(3) Convenient for the collective sludge treatment and disposal;

(4) With good engineering geological condition;

(5) With less removal and rebuilding, less farmland-occupying, and a certain

health protection distance;

(6) Probable to be expanded;

(7) Immune to the influence of flood disasters and with a good discharge

condition, with the flood control standards thereof not lower than urban flood

control standard; and

(8) With convenient traffic, transportation and hydropower conditions.

8.3.2 Proposal for Site SelectionAccording to the General Planning of Yueshan Town, Xiangxiang City (2006—

2020), wastewater will be discharged into Xinqiaohe River after reaching the

standard of the concentrated wastewater treatment.

The service scope of the WWTP is in the center township of Yueshan Town,

with a population scale of 13,500 in 2013 in the short term and of 25,500 in

the long run.

According to the town construction and the development plan of Yueshan

Town, the WWTP site has two proposals available:

Proposal I: Xinqiao Town to be selected as the site (Yingxiongling Group),

located on the west side of the provincial road Jinzhong Line, west to

Xinqiaohe Rive.

Proposal II: Hongyang Town to be selected as the site (Maowuwan Group),

located on the south side of the provincial road Jinzhong Line, west to

Xinqiaohe Rive.

8.3.3 Comparison and Determination of the Site Selection ProposalsThe Site Selection Proposals are shown in Table 8-2.

117

Page 126: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 8-2 Comparison and Selection of Site Selection Proposals

Selection Proposal

Comparative Items

Proposal I (Recommended

Proposal)Proposal II Comparison Results

Geographic Location

The border of Xinqiao Village and Bailong Village is the WWTP site of town planning,

west to Xinqiaohe Rive, with open terrain on the east, south and north sides. It is a wide and

flat terrain, with no residential houses.

Located near Yangjiawan of

Hongyang Village, the site has

residential houses on both east and north sides and a

fishpond in the middle. It is a narrow

field.

Proposal I is preferred.

Pollutant-Holding Capacity and the

Discharge Direction

The main pipeline for pollution cutting can

directly lead wastewater into the

WWTP; the site is next to Xinqiaohe River and

the disposed wastewater can be

directly discharged into Xinqiaohe River with a

discharge outlet located in the

upstream.

The main pipeline for pollution cutting can

directly lead wastewater into the WWTP; the site is next to Xinqiaohe

River and the disposed wastewater

can be directly discharged into

Xinqiaohe River with a discharge outlet

located in the downstream

Proposal II is preferred.

Plant Conditions

① The terrain elevation is 87.8~89.8m, the site ground level is 87.8m, and the flood control conditions are good.② With a flat terrain, it has a relatively smaller

earthwork volume of 13,000m3

③ It does not affect the city development and conform to the urban

planning.

① The terrain elevation is

85.5~88.2m, the site ground level is

85.5m, and the flood control conditions are not as good as

those of the Proposal I.

② With a fishpond therein, it has a relatively larger

earthwork volume of 21,000 m3.

③ It does not affect the city development and conform to the

urban planning.

Proposal I is preferred.

Environmental Impact

The site is located in the urban planned area in Yueshan Town with a downwind direction of

prevailing wind in summer. It is within the

planned land for the WWTP, with no

residential houses thereof.

The site is located in urban planned area

in Yueshan Town with a downwind

direction of prevailing wind in

summer. It is within the planned land for

the town, with no residential houses

Two proposals are almost the same.

Housing No housing demolition No housing Two proposals are

118

Page 127: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Demolition and Relocation

and relocation in the width of the health protection distance

demolition and relocation in the

width of the health protection distance

almost the same.

Traffic, Water Supply, and

Power Supply

The traffic is convenient. Roads are unobstructed inside,

with the provincial road Jinzhong Line to the east. The water and

power supply is convenient inside,

relatively coming from the urban pipe network

and substation.

The traffic is convenient. Roads are unobstructed inside, with the provincial road

Jinzhong Line to the north. The water and

power supply is convenient inside, relatively coming

from the urban pipe network and substation.

Two proposals are almost the same.

Work Amount of Main Pipeline For Pollution-Cutting

About 13.5 km About 14.2 km Proposal I is preferred.

Gross Investment 41.0469 million RMB 41.1232 million RMB Two proposals are almost the same.

Environmentally Sensitive Points

There are no environmentally

sensitive points 100m far away from the site.

There are no environmentally sensitive points

100m far away from the site.

Two proposals are almost the same.

119

Page 128: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 8-3 Comprehensive Analysis Result on Comparison Proposals for the Project

Comparison and Selection Proposal

Name Descriptions on Site Selection

Comparison and Selection of Proposals

Major Advantages Major Disadvantages

Proposal I (Recommended)

Xinqiao Village (Yingxiongling Group)

The border of Xinqiao Village and Bailong Village is the WWTP site of town planning, west to Xinqiaohe Rive, with open terrain on the east, south and north sides. It is a wide and flat terrain, with no residential houses.

1. Next to Xinqiaohe Rive and convenient for tail water discharging; 2. Without any removal and rebuilding; 3. With a flat terrain, which is convenient for construction; 4. Of a relatively smaller work amount than Proposal II; 5. Of a relatively lower work amount with regards to the main pipeline for pollution-cutting than Proposal II; and 6. With a less gross investment than Proposal II.

1. With a relatively higher terrain elevation, higher delivery head of the lift pump and relatively higher operating cost; 2. With a discharge outlet located in the upstream; and3. With individual residents in Xinqiao Village, Hongyang Village, and Bailong Village respectively on the sides of northeast, southeast and west.

Proposal II

Hongyang Village (Maowuwan Group)

Located near Yangjiawan of Hongyang Village, the site has residential houses on both east and north sides and a fishpond in the middle. It is a narrow field.

1. Next to Xinqiaohe Rive and convenient for tail water discharging;2. Without any removal and rebuilding; 3. With a flat terrain, which is convenient for construction;4. With a relatively lower terrain elevation, lower delivery head of the lift pump and relatively lower operating cost than Proposal I.5. With a discharge outlet located in the downstream of Xinqiaohe Rive.

1. A fishpond is in the middle of the site, needing filling and more construction than Proposal I.

From the table 8-2 and table 8-3, it can be concluded, after comparison and

selection, that: from the aspects of gross investment, the interior plant terrain

conditions, pipeline distance, and flood control condition, Proposal I is better

than Proposal II; but from the pollutant-holding capacity, Proposal II is better

than Proposal I. From the comprehensive comparison of these conditions, it is

determined that the general location conditions of Proposal I in Xinqiao Village

120

Page 129: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(Yingxiongling Group) is better than those of Proposal II in Hongyang Village

(Maowuwan Group). Therefore, it is recommended to locate the Project in

Xinqiao Village (Yingxiongling Group), as indicated under Proposal I.

8.4 Comparison and analysis of Wastewater Treatment Process

Proposals8.4.1 Selection Criterion of Wastewater Treatment ProcessThe wastewater treatment process in the WWTP shall be selected following

the principles below:

(1) Safe, reliable, and advanced technology: Advanced technology shall be

adopted actively, on the basis of the previous exploration by predecessors, as

well as the scientific summarization;

(2) Less land occupied: The land resources are precious, so try to save the

land.

(3) Saved investment: The state and local financial resources are quite

limited, so try to give full play to the benefit of investment and apply the most

economical process, under the premise of satisfying the demand for good

outflow water quality.

(4) Convenient management and low operating cost: The local management

level and the annual operating cost after the production shall be considered.

Convenient-management and low-operating-cost proposal shall be selected.

8.4.2 Wastewater Treatment Process ProposalSelection of wastewater treatment process shall be based on an overall

consideration of the quality of the outflow, treatment requirements, land area,

project scale and other factors. Appropriate wastewater treatment process can

not only reduce the engineering investment, but also facilitate the operation

and management of the WWTP and reduce the operating cost of the WWTP

to ensure the water quality. According to the urban the WWTP operation

experience at home and abroad, activated sludge process is most economic

and effective for urban wastewater treatment, thus being widely adopted.

Conventional activated sludge process can only be effective in removing

BOD5, COD and SS, but limited for the removal of nitrogen and phosphorus,

with approximately 20~30% of nitrogen removal rate and approximately

12~19% of phosphorus removal rate. According to the wastewater removal

rate determined by the Chapter 4, the Project has higher requirements on

121

Page 130: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

removal of nitrogen and phosphorus rate, therefore the Project has to adopt

enhanced secondary treatment with nitrogen and phosphorus removing

function.

At present, the commonly used wastewater treatment processes with nitrogen

and phosphorus removal in urban the WWTP include A2/O method, DEST

tank, SBR and its improved process, improved oxidation ditch, etc. , and apply

to the oxidation ponds and constructed wetlands of small towns. All these

processes have their applicability and advantages and disadvantages.

According to the Notifications on Further Strengthening Construction

Management of Provincial Urban Wastewater Treatment Facilities

(Xiangjiancheng [2008] Document No. 160) issued by Hunan Provincial

Construction Department, as for the WWTP, the scale of which is below 0.

5~2 m3/d, recommended processes are DEST, sequencing batch reactor

activated sludge process and its improved process. Current land of the

WWTP is industrial land in the planning and a piece of flat land. Due to the

large area of oxidation ponds and constructed wetlands and there

ineffectiveness in nitrogen and phosphorus removing, they are not applicable

to the Project. Combining the water quality of Yueshan Town and taking into

account the safety operation of the WWTP, processing costs, management

level and other factors, CASS and DEST apply to the Project, therefore these

two proposals are selected for comparison.

8.4.2.1 CASS

(1) Technical Principles

CASS (Cyclic Activated Sludge System) is the improvement of SBR and a

type of Cyclic Activated Sludge Technology (CAST). The process is developed

by Professor Coronszy and his colleagues on the basis of SBR technology.

Now it has been promoted and applied in the United States, Australia, the

United Kingdom, France, Germany, Austria, Canada, Thailand and other

countries step by step.

CASS refers particularly to batch activated sludge treatment process with

biological selector and variable volume reactor which is both the oxygen area

and major reacting area, in the mode of sequencing batch aeration - non-

aeration and filling - running, completing processing functions of biological

degradation and sludge-water separation of organic pollutants in a reactor. Its

cyclic operation includes the following four phases:

122

Page 131: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

a) Fill – Aeration: During the aeration, inflow is received (limited aeration

mode is also applicable) and the sludge of the main rector reflows to the

selector. The reflux is 20% of the inflow.

b) Fill – Settlement: Stop aeration and settle to separate the sludge and water.

Different from SBR, CASS does not stop the inflow water during the settling

period. This is because that the stirring brought by the inflow can lead to

better settling.

c) Decant (Outflow Removal): During the decant phase, CASS reactor stops

inflow (or not), and at this time wastewater enters into another reactor. During

the decant phase, sludge reflowing continues as usual. During the sludge

reflowing, de-nitrification of nitrate nitrogen is completed and phosphorus is

relieved, thus then nitrogen and phosphorus are removed.

d) Idle practice: During the actual operation, decanting will always be less

than 1 hour, and the residual time is designated as IDLE in the reactor and

restoring sludge absorption capacity. During the idle phase, sludge reflowing

continues as usual. The discharge of residual sludge is at decant and idle

phase.

(2) Features of CASS Process

a) Small area and low investment. In CASS, biological degradation and

sludge-water separation of organic pollutants are completed in a reactor with

no need to set primary settling tank, secondary settling tank, residual sludge

pumping station and other structures, which can save the land covered by

these structures and much project investment.

b) Good outflow water quality and stable operation. According to biological

selection principles, utilizing the separating and integrating of primary reaction

zone, the release of phosphorus by the biological selector located in front of

the system, the de-nitrification and the rapid adsorption of organic substrate in

the inflow, the stability of the system operation is enhanced and the volume

utilization is improved. After highly effective treatment, the wastewater can

definitely achieve the national Level-1 outflow water quality standard.

C) High utilization of oxygen and low operating cost. CASS tank is relatively

deep and uses the micro-porous high efficiency aeration device, effectively

improving oxygen utilization. At the same time, during the operation, through

on-line dissolved oxygen measuring instrument, it uses IPC to allow the

oxygenating equipment to work at peak performance, maximizing energy

123

Page 132: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

saving and minimizing operating cost.

d) Strong shock load resistance. Variable volume increases the adaptability of

the system to the change of water quantity and quality and the flexibility of

operations. Actual operating experience has shown that CASS tank can run

under short-term shock load which is 2 to 3 times of normal load, with very

little change of water quality.

e) High volume utilization. According to bio-reaction dynamics principle, the

adoption of series operation of the tanks allows the overall plug flow of

wastewater in the process of the reactor and complex completely-mixed flow

patter in different zones, which ensures a stable effect and improves volume

utilization.

f) Effective removal of nitrogen and phosphorus. Through the control of

biological speed, the reactor runs in the sequencing batch of anaerobic-

anoxic-aerobic-anoxic-anaerobic, so that it is excellent in removing nitrogen

and phosphorus and reducing operating cost.

Process Flow Diagram is shown in Figure 8-1.

124

Page 133: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Figure 8-1 CASS Process Flow Diagram

8.4.2.2 DEST

(1) Technical Principles

DEST is an improved urban wastewater treatment system developed on the

basis of UASB process and characterized by multi hypoxia, anaerobic aerobic

tanks. It is a process dominated by anaerobic biochemistry and supported by

aerobic biochemistry. The treatment system consists of down-flow anaerobic

biological contact tank, up-flow anaerobic biological contact oxidation tank

and biological contact oxidation tank. By setting high specific surface area

filler in the anaerobic biological contact oxidation tank, the attached biomass

is much more than the suspended biomass, dramatically increasing treatment

capacity and reducing treatment cycle. It adopts recirculation system, which

increases job stability. The wastewater after anaerobic treatment flows into the

biological contact oxidation tank. The tank is a biological treatment device

dominated by biofilm technology and supplemented by activated sludge

process. With the oxygen source provided by the blower, the organic

compounds in the device is adsorbed and degraded by microorganisms and

further purified the water. Set polyethylene elastic filler inside the biological

contact oxidation tank and use perforated pipe for aeration.

DEST is dominated by anaerobic and supported by aerobic. The essence of

the above anoxic and anaerobic reaction tank consists of a number of

relatively independent sludge bed (UASB) systems. Series connection of

Gratings Inflow Pump Room

CASS Tank

Entry of Residual sludge into the Sludge Treatment System

Sand Deposit Tank

Wastewater

Transportation of Grating Residues

Transportation and Disposal of Deposited Sand

Blower

Disinfecting Tank

Discharge to Xinqiaohe River

125

Page 134: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

UASB forms multi-phase anaerobic process in stages. Due to baffling, several

independent reaction chambers are formed in anoxic and anaerobic zones,

and microbial communities suited to the environmental conditions are cultured

in each reaction chamber. In each reaction chamber, the phase of microbial

communities is changed along with the process gradually, and the graduation

rule is identical with the degradation process of organic compounds so as to

ensure that the corresponding microorganisms have the best work activity.

With wastewater and returned nitrification liquid in the above work

environment, facultative anaerobes in hypoxia area have the priority in getting

carbon source, and conduct micro-aerobic or anaerobic respiration with nitrate

as electron acceptor and carbon source as electron donor. During the

reduction of nitrate nitrogen for N2, a large amount of organic compounds are

oxidized to benefit follow-up growing of autotrophic nitrification bacteria in

aerobic zone and improve nitrification degree.

As anti-nitrification continues, due to the exhaustion of dissolved oxygen and

nitrate in the back divisions of ABR biological reactor, the system enters

anaerobic stage in the strict sense and phosphorus accumulating organisms

is on top. It effectively suppresses the growth of filamentous bacteria and

makes the anaerobic entering hydrolytic acidification stage, which hydrolysis

macromolecules organic in the wastewater into low molecular fermentation

products. Phosphorus accumulating organisms absorb these low molecular

fermentation products, and transport them into the cell to assimilate them as

carbon energy store property within the cells and release phosphorus. In the

anaerobic zone, due to the hydrolysis of organic compounds into low

molecular organic compounds absorbed by phosphate accumulating

organisms, its concentration will continue to be reduced. The concentration of

NH4-N will also be reduced due to the cell synthesis, while there is no change

to the content of NO3-N, the content of P is increased due to the release of

phosphate accumulating organisms.

Wastewater enters contact oxidation tank by baffling through anoxic and

anaerobic biochemical reactions. In contact oxidation tank, using inorganic

carbon compounds such as CO2, and CO32-, and HCO3- as carbon sources,

autotrophic aerobic microorganisms oxidize the ammonia nitrogen brought by

original wastewater and the ammonia nitrogen generated by assimilation

during anti-nitrification process with NH3, NH4+ and NO2- for nitrate. At the

126

Page 135: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

same time, phosphate accumulating organisms get the energy from the

degradation and absorption of dissolved organic compounds to absorb

phosphorus, thus removing phosphate from the liquid. The generated

phosphate accumulating organism cells are removed in the form of high-

phosphorus sludge through emission of residual sludge, thus removing

phosphorus from the system and realizing nitrogen and phosphorus removal.

In aerobic zone, the organic compounds reduced with the aerobic

degradation, the content of NH4-N and p falls at a fast rate due to de-

nitrification and phosphorus absorption of phosphate accumulating organisms,

while the content of NO3-N rises due to nitrification. The above processes

repeated so as to achieve the purpose of effective biological nitrogen and

phosphorus removal.

(2) DEST Process has the following advantages:

a) Small area and low investment.

DEST process can complete the biological degradation and sludge-water

separation in a reacting tank without primary settle tank, which can save the

land covered by these structures and much project investment.

b) Effective nitrogen removal.

The core of the system is biochemical part. The biochemical stages include

hypoxia tank, anaerobic tank and aerobic tank and the processes include

hydrolysis, nitrification and de-nitrification, forming a reversed A2/O process on

the whole. Apart from removing COD and BOD5 effectively, the system can

adapt to the degradation requirement, which is significantly better than current

conventional treatment process.

c) Stable operation and convenient management.

The oxygen source of the system is provided by the blower, through on-line

monitoring and dissolved oxygen detector, fan operation parameters are

automatically adjusted so as to achieve good performance.

d) Strong shock load resistance.

The system has a strong water quantity and quality shock load resistance.

The system is connected by a number of relatively independent sludge bed

(UASB) in series, forming multi-phase anaerobic process in stages, and it has

strong water and organic shock load resistance, especially Ammonia nitrogen

shock. Even when the water quality and quantity have large fluctuations, the

water quality maintains stable.

127

Page 136: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

e) Low operating cost

The entire process is dominated by anaerobic and anoxic process. Saving

blower aeration is effective in reducing operating cost.

f) The tank is a closed structure with small impact on the environment, which

reduces the investment in and operating cost of deodorization of the WWTP.

(3) DEST process also has disadvantages as follows:

a) Sludge recirculation system and inflow system shall be set up, and the

control of inflow is complex, which requires higher level of management.

b) The tank is a closed structure, so the installation and replacement of metal

frame components and filler requires much time and work and the maintaining

work load is larger.

c) Due to less sludge emission and poor phosphorus removal, chemical

phosphorus removal facilities shall be adopted normally at the end.

(4) Process Flow Diagram is shown in Figure 8-2.

Figure 8-2 DEST Process Flow Diagram

Gratings Inflow Pump Room

CASS Tank

Entry of Residual sludge into the Sludge Treatment System

Sand Deposit Tank

Wastewater

Transportation of Grating Residues

Transportation and Disposal of Deposited Sand

Blower

Disinfecting Tank

Discharge to Xinqiaohe River

128

Page 137: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

8.4.3 Comparison and Determination of Process Proposals The comprehensive technical and economical comparison of the two

proposals and the comparison of main technical parameters are shown in

table 8-4 and 8-5.

Table 8-4 Comprehensive Technical and Economical Comparison Table

No. Comparison Content Item CASS Process DEST Process

Proposals Compariso

n

1Investment

Ten Thousand Yuan

Quantity of Civil Engineering 440. 3 480. 2 Proposal I

is preferred.

2 Facilities and Instruments 342. 3 228. 6 Proposal II

is preferred.

3 Direct Expense of the Project 782. 6 708. 8 Proposal II

is preferred.

4 Operating Costs / 0. 44 Yuan per

ton0. 28 Yuan per

tonProposal II is preferred.

5Electricity

Consumption Index

/ 0. 35kw/m3 0. 2kw/m3 Proposal II is preferred.

6 Output of Sludge / 463kg/d 247kg/d Proposal II

is preferred.

7 Covering Area / 9416m2 8529m2 Proposal II is preferred.

8

Process Effectiveness

Process Flow Simple Simple

9 Water Quality Good Good

Two proposals are almost the same.

10Nitrogen and Phosphorus

RemovalGood Satisfied Proposal I

is preferred.

11 Shock Load Resistance. Strong Strong

Two proposals are almost the same.

12

Operation Management

Automation Requirement Higher Lower Proposal II

is preferred.

13

Requirement on Technique of

Operating Personnel

Higher Lower Proposal II is preferred.

14 Maintenance Management

Usually large work amount of

maintenance and high automation

degree

Usually small work amount of maintenance but large work load

of filler replacement

Proposal II is preferred.

15

Environmental Impact

Odor

The odor has significant impact

on the surrounding environment

The odor has small impact on the surrounding

environment

Proposal II is preferred.

16 Noise The blower produces noise

The blower produces noise

Two proposals

129

Page 138: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

to the surrounding environment

to the surrounding environment

are almost the same.

Table 8-5 Main Technical Parameters Comparison Table

Technical ParametersCASS Process DEST Process

WWTP (3000m3/d)

Intake PumpQuantity of Wastewater Pump (set) 1 set is for the usage and 1set is for the backup.

Performance Parameter Q=125m3/h, H=8m, N=5. 5kW

Grid

Amount of Wide Grid (set) 2 (mechanic)

Diameter of Drum (m) 0. 6

Distance between Grids (mm) 4

Settling Tank

Amount of Settling Tank 1 set

Diameter (m) 1. 63

Depth of Settling Tank (m) 1. 12

Sand Hopper Depth (m) 1.52

CASS or DEST Reacting Tank

Amount 1 set 1 set

Net Plane Size × Depth of the Tank (m) 40. 6 × 16. 9 × 5. 5 35. 5 × 17. 6 × 6. 5

Effective Volume (m3) 3000 3266

Residual Sludge Amount (kg/d) 463 247

Maximum Oxygen Demand (kg/d) 398. 5 189. 5

130

Page 139: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Amount of Fan (set)2 sets are for the usage

and 1set is for the backup.

2 sets are for the usage and 1set is for the

backup.

Air Volume of a Fan (m3/min) 6. 79 5. 2

Power of a Fan (kw) 15 11

Secondary Settling Tank

Amount of Secondary Settling Tank (set) N/A Integrated with DEST

Sterilization Tank

Technical ParametersCASS Process DEST Process

WWTP (3000m3/d)

Amount of Sterilization Tank (set) 1 1

Plane Size (m) 3 × 5 3 × 5

From the comparison of the above two tables, it can be concluded that both

proposals have advantages and disadvantages and they are widely used in

domestic wastewater treatment with mature technology, stable process

operation and stable and qualified water quality.

Comprehensive technical and economic comparison of Table 8-4 has made a

comparison of 16 aspects of the two processes. As can be seen from the

table, 5 items are basically the same, CASS has 2 items better than DEST

process and DEST process has 9 items better than CASS. DEST process is

superior to CASS in terms of investment, operating cost and electricity

consumption. Merely from the point of view of operating cost, DEST process

can save RMB 0.16 Yuan per ton, totaling 175,000 a year. And electricity

consumption per ton water can save 0.15kw·h, totaling 164,300kw·h per year.

The annual saving of standard coal is 20. 2 ton based on the coefficient of 0.

1229kg standard coal per kw·h electricity.

Give comprehensive consideration to the embedded tank of DEST process

and three major factors, i. e. small impact on the surrounding environment,

low costs of equipment operation and low requirements on the quality of

operating personnel, it is recommended to use DEST process for Yueshan

Town WWTP.

131

Page 140: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

8.5 Comparison and Analysis of Disinfection ProposalsAccording to the regulations of Pollutants Discharge Standard for Urban

WWTPs (GB18918-2002), the WWTPs shall be disinfected.

8.5.1 Brief Introduction to Disinfection MethodsThe common methods of disinfection are chlorination disinfection, CIO,

oxidation disinfection, UV disinfection, and so on.

(1) Chlorination Disinfection

Chlorination works through adding liquid chlorine or chlorine compound. The

liquid chlorine is the most common method so far, for its low cost, mature

technology, and stable performance. Due to the requirement of chlorination of

over 30min contact time, the capacity of the contact tank is big. Since chlorine

is highly toxic and dangerous, and the steel cylinder containing chlorine is a

high-pressure vessel with potential threat, the build-up of the chlorine

reservoir and the chlorination room need to be based on the safety

requirement. Chlorination will generate harmful organic chlorides, therefore,

the residual chlorine quantity in the outflow water shall be strictly regulated

and chlorine take-off equipment shall be built when needed, if there are the

fish forages nearby the wastewater outlet.

Chlorinated compounds include sodium hypochlorite, bleaching powder,

chlorine dioxide, and so on. They have the similar features with liquid chlorine,

while they are less dangerous and have less environmental impact with higher

operating cost.

(2) Oxidation Disinfection

Oxidant can be used as the disinfectant of the secondary outflow water, the

most common one of which is ozone. The advantages of ozone disinfection

are downright sterilization, low lethality, basically no side-effect to environment

and shorter contact time than chlorination. The disadvantages are more

investment on capital constructions and higher operating cost. Oxidation

disinfection is generally used on the disinfection of swimming pool water and

drink water right now.

(3) UV Disinfection

The main advantages of UV disinfection include high efficiency on

sterilization, short reactive time, low lethality, and no secondary pollution.

There is no need to set up large contact tank instead of disinfection canal, for

132

Page 141: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

the time of disinfection is short. Thus, the floor space and the cost of civil

engineering are much lower. The disadvantages are high investment on

equipment, complicated management and maintenance, no constant ability of

sterilization, bad competence of resisting suspended solid interference, and

strict requirements of SS concentration in the water.

The comparison on disinfection methods above are shown in Table 8-6.Table 8-6 Comparison of Disinfection Methods

Performance Nitrogen Dioxide, Liquid Chlorine, and Bleaching Powder Ozone Uv Radiation

Bacteria Sterilizing Excellent (HOCL) Excellent Good

Virus Sterilizing Excellent (HOCL) Excellent Good

Alive Microbe Sterilizing The Second The First /

Effect of PH

The efficiency of disinfection will decrease with the increase of ph,

and when ph is 7, it is the right time to add chlorine.

The effect of ph is small. When ph is small, o3 left

will last longer.

Not Sensitive to the

Change of PH

Surplus Disinfection Yes No Need to Add Chlorine

No Need to Add Chlorine

Byproduct THM Basically No Impossible Impossible

Other Intermediate Products

Chloride and chlorinated intermediate products are

generated, like chloramine and chlorinated organics.

Intermediate products are aldehyde, aromatic

dicarboxylic acid, phthalate, and so on.

Not Clear

Domestic Application Widely Not Common Widely

General Quantity (Mg/L) 5~10 1~3 /

Contract Time 30mins Seconds to about 10 Mins /

8.5.2 Comparison and Determination of Disinfection MethodsAll the methods above can reach the goal of disinfection. As far, the

chlorination is the widely used way to disinfect the outflow water of large

WWTPs in our country, while most WWTPs abroad choose UV disinfection

which has been employed by more and more WWTPs at home. Chlorine

dioxide disinfection and UV disinfection are selected as the alternative

proposals of the WWTP in the Project, which will be compared

comprehensively in Table 8-7.Table 8-7 Comparison of the Disinfections of Outflow Water

Item Chlorine Dioxide Disinfection UV Disinfection

Main Buildings Contact Disinfection Tank and Chlorination Room UV Disinfection Trough

Main Equipment Chlorine Dioxide Generator UV Disinfection Module

Floor Space Big Very Small

Operating Management Automatic Running and Easy Management Maintenance Workload

133

Page 142: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Environmental Impact Little No

Total Civil Engineering Costs High Low

Cost of Equipment Ordinary High

Investment Ordinary Ordinary

Cost of Reagents High No

Electric Charge Low High

Cost of Maintenance Low High

According to the comprehensive comparison in Table 8-7, UV disinfection has

the advantages of small floor space, maturity, stability, no new chlorine-adding

workshop, no intermediate product, and so forth. Based on the consideration

of all elements, UV disinfection is recommended as the disinfection of the

outflow water of WWTPs in the Project.

8.6 Selection and Comparison of Sludge Treatment ProposalsWWTPs will extract and generate a plenty of sludge during the process of

wastewater treatment. The water content of the sludge is up to 90% and the

bulk of sludge is enormous, therefore the management of sludge is very hard.

Thus, the sludge needs to be reduced in volume for easier transport and post

treatment. The organics in sludge are high in content, unstable and easily

rotted, so that it is needed to decrease the content of sludge to stabilize the

sludge. Some pathogenic bacterias and parasitic ovum contained in the

sludge are the mediums of the infection of epidemic diseases, which will affect

the public health and safety, and need to be well handled. Meanwhile the

secondary release of phosphorus shall be voided. All in all, the improper

management of the sludge will generate the secondary pollution, and increase

the cost of chemic phosphorus removal in the filtration liquid. Therefore, the

sludge shall be coped with before the final treatment.

8.6.1 Comparison and Determination of Wastewater Treatment Processes(1) Comparison of Sludge Treatment Processes

The typical sludge treatment process of urban WWTPs has been showed as

follows:

134

Page 143: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Figure 8-3 Typical Sludge Treatment Process

The sludge in the Project, after going through three pre-treatment procedures

of concentration, digestion, and dewatering, has its water content dropping

below 60%, and reaches a stable state in the end.

Sludge concentration includes gravity concentration, suspension

concentration, and mechanical concentration. The gravity concentration may

trigger the second release of phosphorus in the sludge. Since the reinforced

biochemical phosphorous removal is adopted in the Project, the phosphorous

content is high in the sludge at around 2.5%, if the sludge is concentrated in

the concentration tank for a long time, the polyphosphate accumulation

bacteria in the sludge will release a large amount of phosphorous in an

anaerobic condition, which increases the phosphorous content in the liquid

supernatant and the phosphorous removal cost. As a result, the gravity

concentration is inappropriate for the residual sludge arising from the

biological phosphorous removal. The suspension concentration requires of

many devices and operation costs. Moreover, the above two sludge

concentrations cover large areas; therefore, the mechanical concentration

which covers less space and has favorable effects is adopted in the Project.

The process for the stabilization of sludge in common use includes: anaerobic

digestion, aerobic digestion, heat treatment, heating to dry, heating

stabilization, etc. The sludge treatment adopts DEST Process in the Project

since the sludge age is long and the residual sludge has been approximately

stable. According to the Code for Design of Outdoor Sewerage Engineering

GB50014-2006, when the wastewater is treated with biological phosphorous

and nitrogen removal, the residual sludge shall be concentrated mechanically

without digestion. The sludge dewatering is to further reduce the water

content and the sludge. It includes natural air drying, mechanical dewatering,

sludge heat drying and incineration, etc. The ways of the dewatering of the

sludge are nature air drying, mechanical dewatering, sludge drying,

incineration, etc. The widely used way of dewatering in WWTPs at home and

abroad is mechanical dewatering with mainly centrifugal dewaterer, draper-

type dewaterer and board-box dewaterer etc. The sludge water content is

within 75-85% after the above three treatments, which dose not meet the

Residual sludge Sludge Concentration Sludge Digestion Sludge DewateringSludge Cake

135

Page 144: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

requirement for landfill and is a prevailing problem in WWTPs at home. At

present, some domestic companies, based on the existing dewatering

method, have developed the new technology of Deep Dewatering with Sludge

Treatment and Board & Frame Compression and Filtration, which is

successfully applied in the WWTPs in eastern coastal area (such as

Guangzhou, Xiamen, Hangzhou, Wuxi, Shanghai etc.).

(2) Determination of Sludge Treatment Process

The sludge treatment in the Project is planned to adopt the deep dewatering

technology with sludge treatment and board & frame compression and

filtration. This tcchnology is practiced in the Xiaoshan Linjiang WWTP and

Qige WWTP in Hangzhou. According to the on-site inspection and research,

the above two WWTPs are well operated with the water content of the sludge

after treatment kept below 60%, meeting the state and local requirements for

landfills.

8.6.2 Comparison and Determination of Sludge Treatment Processes(1) Comparison of Sludge Treatment Process

Sludge treatment refers to the final disposal of sludge, specific to stably

processed sludge. Sludge hygiene is not definitely stipulated by Pollutants

Discharge Standard for Urban WWTPs (GB18918-2002), but hygiene issues

will has a direct impact on the final destination of sludge. Indiscriminate

disposal of sludge without necessary process still will contaminate the

surrounding environment. As a result, suitable disposal of sludge is required

for its harmlessness. When choosing ways of disposing sludge, people shall

combine the actual conditions, considering technical feasibility and

development in the future. Now the main sludge treatment methods are as

follows:

① Landfill

Landfill, similar to urban waste landfill, is the main technology to dispose of

sludge at present in China for its relatively lower operating cost and plentiful

management experience on it. Disadvantages: occupying land, a waste of

land resources; and causing a secondary pollution if sludge is mishandled.

② Incineration

Incineration is uneconomical for its consuming of large number of heavy oil,

and the thermal energy released therefrom is hard to be effectively used

because of present technology and equipment. It is also difficult to effectively

136

Page 145: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

control the plenty of toxic and harmful substances (such as Dioxin) Released

therefrom, which will cause air pollution. Besides, for the reason that industrial

wastewaters take a big portion in urban wastewater in our country, and

organics takes a small portion in residual sludge, the combustion heat value is

low and economic benefit of incineration is bad.

③ Direct Drying

Sludge with 80% water content is dried by pneumatic drier with over 100°C

temperature, killing all sorts of germs and then be land-filled or reprocessed.

The disadvantage is energy consuming and increasing disposal cost.

④ Anaerobic Digestion

Anaerobic digestion was adopted for most activated sludge before 1980s,

killing microbial bacteria and producing some usable wastewater gas. Three

disadvantages of anaerobic digestion: 1. The equipment investment for

anaerobic digestion can, wastewater gas recovery and preservation is quite

high; 2. Although sludge is stabilized through biochemical reaction of various

anaerobes, and the total number decreases by about 25%, landfill is also

needed; 3. It requires complex system operation, high demand of operation

management, high cost and many hidden dangers. Relative data displays

that: construction investment of sludge anaerobic digestion system is about

RMB 1-2 million/t dried sludge, including sludge concentration, dewatering,

mesophilic digestion, digested sludge re-concentration, dewatering and

transport, and its daily operating cost is about RMB 700-850 yuan/t dried

sludge.

⑤ Biological Treatment

Biological compost method imports aerobic bacteria and oxygen, to make

sludge undertake thermophilic fermentation of aerobic bacteria. High

temperature compost was developed by the developed countries at the

beginning of the 20th century, and now in the United Kingdom, America,

Germany, Japan, etc, the compost method has been widely used for bio-

safety disposal of urban sludge. Since the end of 1980s, some cities in our

country have established composting sites, but operations of most of these

composting sites have get into difficulties because of low quality of composts

and market, etc.

The comparison of the common sludge treatment methods is showed in

Figure 8-8.

137

Page 146: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Figure 8-8 Comparison of Common Sludge Treatment Methods

No. Methods Advantages Disadvantages

1 Landfill

With low cost and rich management experience, employing the main skills

for sludge treatment in China

Waste land resources and cause secondary pollution if handled

inappropriately

2 Incineration

Completely dispose of harmful organics

Have poor economic benefit and easily cause air pollution

3 Direct Drying

Kill bacteria before landfill and re-treatment, having

good environmental benefit

Consume energy and increase cost

4 Aerobic Digestion

Kill microbial bacteria and produce some usable

wastewater gas

Have high cost of equipment investment, need landfill after

handling, have high requirements on operation management, high cost and many hidden dangers.

5 Biological Treatment

With comprehensive utilization, realize the safe treatment and

recycling

Have low quality of composts, with insignificant economic benefit

(2) Determination of Sludge Treatment Methods

According to General Planning of Yueshan Town, Xiangxiang City (2006-

2020) and local actual conditions, The final disposal of sludge is to deliver the

dewatered sludge cake, then compress it with urban domestic waste, and at

last send it for landfill in a sanitary and safe way. If there is market demand,

cooperation with relative technical section can be take into consideration to do

biological compost research on sludge to make waste valuable, and reduce

the possibility of pollution.

138

Page 147: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

9 Analysis of Gains and Losses of Environment and Economy

9.1 Environmental BenefitThe Project belongs to an urban WWTP, the most important benefit of which

is environmental benefit, including pollutant load cut, water quality

improvement benefit, environmental management improvement benefit, etc.

9.1.1 Pollutant Load CutAccording to the sludge treatment project, it is possible to effectively reduce

the pollutant load of domestic wastewater and industrial wastewater of

Yueshan Town, which can protect local environment and play a significant

role in protecting the environment of lower reaches. Quantity of pollutants

reduced is in Figure 9-1.

Figure 9-1 Quantity of Pollutant Reduced in Yueshan Town Unit: t/a

Period BOD5 COD SS NH3-N TN TPAmount of

Water1095000

Before Treatment 142.35 262.8 219 27.375 32.85 3.066

After Treatment 21.9 65.7 21.9 8.76 21.9 1.095

Cut 120.45 197.1 197.1 18.615 10.95 1.971Cut Rate 85 75 90 68 33 64

9.1.2 Improved Water QualityAfter the implementation of the Project, it is possible to control pollution

sources of the river, purify water quality, reserve moisture and enormously

reduce pollutants discharged into Xinqiaohe River; as a result, it can weaken

the impact of pollutants on local surface water to improve water quality, a

fundamental protection of water, making environmental conditions of Yueshan

Town improve obviously.

9.1.3 Improvement Benefit of Environmental Management CapabilityThe environmental monitoring and operating project provides strong technical

measures and supervision for local environmental protection, promotes

healthy development of local environmental efforts, effectively prevents

environmental pollution, reduces environmental risks, decreases the pollution

of surface water and improves regional environmental conditions to the

largest degree in multiple aspects such as management and technology.

9.1.4 Provision of Good Environmental Conditions for Regional Social and Economic DevelopmentThe Project accelerates local urban infrastructure construction, establishes

139

Page 148: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

and completes environmental infrastructure network system, further alleviates

the conflict between the city development of the river basin and region and

environmental constrains, improves environmental quality of the river basin

where the Project is implemented, increases functions of water environment,

and promotes urban function, providing suitable environmental conditions for

sound and fast social and economic development of the local region and the

whole province.

9.2 Social Benefits9.2.1 Improvement of Healthy Level of Domestic Citizens and Living Quality in the River BasinThe Project effectively solves issues about backward infrastructure of local

environment. On one side, it can purify water and air; on the other side, it also

can promote health of citizens and increase living quality by eliminating

propagation environment, providing protection and improvement of living

conditions, and reducing disease incidence.

9.2.2 Addition of Employment ChancesWith the commencement of the Project, employment chances will be

provided. At first, some short-term and odd jobs can be offered during the

construction of the Project; secondly, some long-term and stable jobs can be

available when the Project is in the service period, including technical and

administrative staff who are directly engaged in the Project; and last but not

least, because of the Project, industrial and agricultural development will be

accelerated as a result of improving investment environment and attracting

funds, at the same time, it will also drive the development of the service

sector, adding much more employment chances.

9.2.3 Improvement of Residents' Environmental AwarenessProject construction is also a process of profound and active propaganda of

environmental protection. Specific environmental protection campaigns can

enable people to recognize the importance of environmental protection, and

understand the serious consequences of environmental disruption, including

economic losses, injuries of health, resource losses etc. Such campaign is

more effective than simple propaganda and is more easily accepted by

people. Besides, it can also develop into an environmental education

demonstration place to propagandize environmental protection knowledge to

140

Page 149: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

the public for a long time; this will be of great benefits to improve the public's

environmental awareness.

9.2.4 Provision of Base Data for Abatement of District PollutionImplementation of the construction project through environmental monitoring

and management can meet the society's increasing demands for

environmental monitoring and offer better services for regional economic

construction. Besides, it can also provide base data for the further explanation

of pollution sources, provide scientific criteria for the integrated abatement

policies of district pollution as well as the accurate assessment of regional

pollution abatement project, provide effective means for the government

functional department to supervise the operation of pollution abatement

facilities in accordance with the law, and intensify the management of regional

river basin environment.

9.3 Economic BenefitsThe Project is about the construction of urban WWTP, which is a public

welfare project without obvious direct benefit on investment. Its economic

benefits are mainly indirect ones, including:

9.3.1 Economic Benefits from Pollution ControlIt's mainly reflected by reducing the economic losses of society caused by the

pollutants in wastewater, from:

Industrial enterprises: It can reduce the investment and operation

management fees imposed on industrial enterprises to dispose wastewater

separately and alleviate enterprise's pressure;

Agriculture, animal husbandry, and fishery: water pollution may cause the

decline of output and quality of cereal crops, animal products and fishery

products and cause economic losses;

Health: water pollution may cause the rise of people's incidence, increase

people's health expenditures and reduce labor productivity.

9.3.2 Benefits from Revenue IncreaseWith the improvement of urban infrastructures and environment, value of land

in urban areas will correspondingly increase, especially land in towns, where

part of the loans can be subsidized through the benefits from the land.

9.4 Conclusions The Project is part of the staged proposal to improve the environmental status

141

Page 150: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

of Yueshan Town and promote the process of urbanization and

implementation of the sustainable development strategy in the whole

province. Disposal of town wastewater will bring important impact on the

urban infrastructure construction and ecological environmental protection in

the Project area and even the national and social economic development.

Implementation of the Project is: Instrumental in consolidating the results of①

environment improvement within the Project area and further improving the

quality of local environment; Good for improving the production and living②

conditions of local residents and improving people's quality of life and health

level; Good for facilitating the infrastructure construction and mercerization③

of management of Yueshan Town and realizing the independent and positive

development of urban infrastructure construction through introducing and

borrowing domestic and overseas advanced technologies and management

experience; Good for promoting the urbanization construction of the whole④

province, ensuring the sustainable development of society and economy

through the sustainable development of environment, and creating favorable

conditions for the sustainable development of Hunan province and building of

a well-off society in an all-round way. The Project can generate favorable

environmental, social and economic benefits, and comply with the state's

cause to build a well-off society in an all-round way and WB's purpose to

promote China's sustainable development through its China aid strategy.

142

Page 151: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

10 Public Participation

10.1 Implementation Arrangement Hunan Integrated Economic Development Demonstration Town Project

(Yueshan Town Subprojeoct, Xiangxiang City) Utilizing WB Loans is

conducted to improve the residential environment and infrastructures of

Yueshan Town. The construction of a WWTP and the supporting engineering

thereof will effectively prevent pollutions; greatly improve people’s living

conditions; protect surrounding water sources; beautify the surrounding

environment; construct a more comfortable and beautiful living environment;

improve and raise residential environment; quicken the construction of a

livable town; and lay a better environmental foundation for quickening urban

development. Project construction and operation may affect the environment

of surrounding areas, which is directly involved with the vital interests of

nearby residents, so according to the state environmental regulations and

regulative statutes as well as WB's safety protection policy (OP4.01), the

public is invited to the Project twice. The first time was during the compilation

of the Project environmental impact assessment outline and the second time

was when the first draft of the environmental impact assessment was

completed. The first round was aimed to collect the relevant information about

the public's concern of the Project construction. In the second time, the public

was organized to discuss the environmental problems and corresponding

countermeasures put forward in the first time in the hope of getting the public

understanding about the countermeasures taken in the Project.

The first round public participation was during the compilation of the

environmental impact assessment outline. The first round public participation

was mainly conducted through questionnaire survey and collective interview.

Participants include both the residents in the affected areas and the

government agencies and companies involved with the Project. Participants

include people of different ages, sexes, educational background and

occupations. During the survey, the environmental assessment unit showed

the Project’s general situations, including the major environmental impacts

possibly generated during project construction, to the public clearly, so that

the public could understand the existing environment of the Project area and

the possible negative influence of project construction on neighboring

143

Page 152: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

environment; finally, the assessment unit collected participants' opinions and

suggestions of project construction and the issues they concern, and

organized discussions about the environmental issues cared by the public and

corresponding countermeasures in the hope of getting the nearby units and

public’s understanding about the Project construction and relevant

environmental impacts caused by it, and encouraged them to give

suggestions to the Project construction and timely feedback all their

suggestions and good ideas, so that the construction proposal can be further

improved and the Project’s impact on environment can be reduced to the

minimum.

The second round public participation was organized when the first draft of

the environmental impact assessment was finished; public participation was

conducted through informal discussions, interviews and questionnaire survey

given by Yueshan Town Government and the environmental assessment unit.

Participants were mainly experts, government agencies and representatives

of the affected people. The second round public participation was mainly

about the feedback of the issues cared by the public, and at the same time,

the abridged edition of the environmental impact assessment was placed at

an obvious place for the public to read. Such places include the compilation

unit of environmental impact assessment, project management office, and

office of Yueshan Town etc.

Relevant materials about the public's participation is in appendix 3 (including

the sign-in Table of informal discussions, meeting minutes, meeting photos

and sample form for the questionnaires of these two times).

10.2 Survey Results and Discussions of Public Participation Major issues put forward by the affected crowds during public participation

include: Impacts of construction noise, fugitive dust, and material transport

noise on living environment as well as treatment and disposal of sludge in the

wastewater plant. Besides, compensation on land acquisition is also one of

the most concerned issues by the public.

During environmental assessment, the environmental assessment unit makes

relevant analysis of the issues concerned by the public and gives relevant

countermeasures so as to make sure the impact on environment caused by

project construction can be reduced to an acceptable level; main measures

144

Page 153: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

include:

(1) Waste soil at the construction site shall be timely removed and backfill

shall be filled timely. In dry seasons, soilmund, soil shovel and transport shall

be watered timely so as to keep its surface wet and reduce the amount of

flying dust.

(2) Strengthen management and dispatch, improve work efficiency, strengthen

maintenance of equipment, and try to assemble the noisy machinery to work

intensively, and optimize the construction time, so as to shorten the time of

construction noise and reduce its influence; Set up movable sound insulated

screen barriers at the affected sensitive points near the pipe network and

reduce the impact on these points as much as possible.

(3) Strengthen the management, planning and dispatch during construction,

avoid transporting earth and construction materials at rush hours so as to

reduce the possibility of the Project's impact on traffic congestion;

(4) During the operation period, sludge shall be dewatered within the Plant

and then transported to landfill through closed tank cars and buried cleanly.

(5) Local administrative department for environmental protection shall

strengthen the supervision of companies, and urge the construction unit to

carry out all environmental protection measures during project construction

and operation. During project construction, the administrative department

shall pay attention to implement the environmental protection measures and

make sure all pollution prevention funds are put in the right place. After the

Project is put into service, it shall ensure the failure-free operation of

environmental protection facilities, discharge pollutants according to the

standards after treatment and make sure the river water won't be polluted.

(6) Isolate the major pollution sources; build the sludge hovel indoor;

dewatered sludge shall be carried away timely; clean the water extractor

timely and remove and transport the residues timely; set up 6~ 8m green

isolation belt at the Plant boundary; set the width of health protection distance

according to the specifications.

(7) Project construction shall be in strict accordance with pertinent state laws

and regulations; the construction unit shall make appropriate arrangements

for the production and life of affected residents after land procurement and

relocation, and give reasonable compensations and can't ignore their

145

Page 154: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

livelihood.

Table 10-1 is a summary about the Project name, the public participation time

and ways, organization unit, participants, main concerned issues and the

feedback of environmental assessment about the public's concerned issues.

Table 10-1 Summary of the Public's Participation With Project Environmental

Assessment

Way of Participation

Organization Unit Time Participants Main Issues

Concerned

Feedback of Environmental Assessment

1st Round: Questionnaire

Survey and Interviews

Changsha Environmenta

l Protection Career

Technical College and

Yueshan Town

Government

August 2011

Government officials,

technicians of

competent authorities,

experts, residents

around the Plant area

and residents,

schools and hospitals along the pipelines

(1) Environmental

problems including flying dust and noise

during the construction

period (2)

Compensations for land

procurement and relocation (3) Treatment

and disposal of sludge during the operation

period

(1) Waste soil at the construction

site shall be timely removed and

backfill shall be filled timely. In dry

seasons, soilmund, soil shovel and

transport shall be watered timely so

as to keep its surface wet and

reduce the amount of flying dust.(2) Strengthen

management and dispatch, improve work efficiency,

strengthen maintenance of

equipment, and try to assemble the

noisy machinery to work intensively, and optimize the construction time, so as to shorten

the time of construction noise

and reduce its influence; Set up movable sound insulated screen

barriers at the affected sensitive points near the

pipe network and reduce the impact on these points as much as possible. (3) Strengthen the

management, planning and

dispatch during

2nd Round: Informal

Discussions and

Questionnaire Survey

October 2011

146

Page 155: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

construction, avoid transporting earth and construction materials at rush

hours so as to reduce the

possibility of the Project's impact on traffic congestion;

(4) During the operation period, sludge shall be

dewatered within the Plant and then

transported to landfill through

closed tank cars and buried cleanly.

(5) Local administrative department for environmental protection shall strengthen the supervision of

companies, and urge the

construction unit to carry out all

environmental protection

measures during project

construction and operation. During

project construction, the

administrative department shall pay attention to implement the environmental

protection measures and make sure all

pollution prevention funds

are put in the right place. After the

Project is put into service, it shall

ensure the failure-free operation of environmental

protection facilities, discharge pollutants

according to the standards after

147

Page 156: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

treatment and make sure the river

water won't be polluted

(6) Isolate the major pollution

sources; build the sludge hovel

indoor; dewatered sludge shall be carried away

timely; clean the water extractor

timely and remove and transport the

residues timely; set up 6~8m green

isolation belt at the Plant boundary; set the width of

health protection distance according

10.3 Information Disclosure According to the regulations of Provisional Measure for Public Participating in

Environmental Impact Assessment, Measures for the Disclosure of

Environmental Information (for Trial Implementation), World Bank OP/ BP4.01

Environmental Assessment and BP17.50 Information Disclosure, the Project

discloses information about environmental assessment through bulletin and

notification. Summary of the Project information disclosure is in Table 10-2;

148

Page 157: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

summary of the public's participation is in Table 10-3.

Table 10-2 Summary Sheet of Project Information Disclosure

Project Name

EIA(Yes/N

o)

EMP(Yes/N

o)

Chinese (C)

/English (E)

Disclosure Time

Disclosure Duration

Disclosure Ways and Inquiry Place

Hunan Integrated Economic Developm

ent Demonstration Town Project

(Yueshan Town

Subprojeoct,

Xiangxiang City)

Utilizing WB Loans

Y N C

2011-8-18 2011.8.19-2011.8.28

Paste up notice in different sensitive

points (Xinqiao Village, Hongyang

Village, Bailong Village, Town Government,

Xianfeng Middle School, Central

Hospital and town area)

2011-10-20

2011.10.21-2011.10.30

Paste up notice in different sensitive

points (Xinqiao Village, Hongyang

Village, Bailong Village, Town Government,

Xianfeng Middle School, Central

Hospital and town area)

149

Page 158: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 10-3 Summary Sheet of Project Participation

Way of Participatio

n

Organization Unit Time Participant

sMain Issues Concerned

Feedback of Environmental Assessment

1st Round: Bulletin and Notice

Changsha Environmental Protection Career Technical College and Yueshan Town Government

August 2011

Residents around the Project area and residents, schools and hospitals along the pipelines

Environmental problems including flying dust and noise during the construction period

(1) Waste soil at the

construction site shall be

timely removed and backfill

shall be filled timely. In dry

seasons, soilmund, soil

shovel and transport shall

be watered timely so as to

keep its surface wet

and reduce the amount of flying dust.

(2) Strengthen management and dispatch, improve work

efficiency, strengthen

maintenance of equipment, and try to

assemble the noisy

machinery to work

intensively, and optimize the construction time, so as to shorten the

time of construction noise and reduce its

influence; Set up movable

sound insulated

screen barriers at the affected sensitive points near the pipe network and reduce the impact on

these points as much as

150

Page 159: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

possible. (3) Strengthen the management, planning and dispatch during construction, avoid transporting earth and construction materials at rush hours so as to reduce the possibility of the Project's impact on traffic congestion;

Treatment and disposal of sludge during the operation period .

During the operation period, sludge shall be dewatered within the Plant and then transported to landfill through closed tank cars and buried cleanly.

2nd Round: Bulletin and Notice

Changsha Environmental Protection Career Technical College and Yueshan Town Government

October 2011

Compensations for land procurement and relocation

Project construction shall be in strict accordance with pertinent state laws and regulations; the construction unit shall make appropriate arrangements for the production and life of affected residents after land procurement and relocation, and give reasonable compensations and can't ignore their livelihood.

151

Page 160: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

11 Migration and Social Impacts

11.1 General Situations The Project is about the construction of the WWTP and its supporting pipe

networks; affected areas include: three Groups, namely, Yingxiongling Group,

Pumenkou Group and Xinqiao Group of Xinqiao Village, Yueshan Town,

covering 11 households, 46 people in all.

11.2 Project Impacts With the assistance and cooperation of local governments at all levels,

administrative Villages, Group cadres, and migration and project design unit,

the Project Owner investigates the specific targets one by one according to

the preliminary land acquisition area, including populations, housings and

appurtenant works, lands, and special facilities which are affected by the

Project. Then it rechecks and surveys the specific targets according to the

latest feasibility study results. Based on field investigation, the consulting unit

and project design unit discuss with the Project Owner to consider the impacts

of project construction on local district and economy as much as possible

while selecting and optimizing the proposal, and take it as the key factor in

proposal optimization and selection. In order to reduce land acquisition and

migration as much as possible, the design unit and Owner have taken some

effective measures, and try to avoid the population centers in proposal

determination and arrangement of other supporting facilities, reduce the

number of immigrants and the area of occupied lands, and comply with the

local planning and local government's suggestions.

Affected areas in the Project include three Groups, namely Yingxiongling

Group, Pumenkou Group and Xinqiao Group of Xinqiao Village, Yueshan

Town. List of affected areas is shown in Table 11-1; impact on land ownership

and relevant units by land acquisition are shown in Table 11-2.

152

Page 161: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 11-1 List of Affected Areas

Project Area

Permanent Land Acquisition Temporary Land Occupation

Total Land Acquisition Area (Mu)

Total Number of Peasant

Households Affected

(Household)

Total Number of Peasant

Households Relocated

(Household)

Number of Commercial

Tenants Affected

(Household)

Agricultural Acreage

(Mu)

Total Number of Peasant

Households Affected

(Household)

Number of Residents Relocated

(Household)

Number of Commercial

Tenants Affected

(Household)

Xinqiao Village

(Yingxiongling Group)

12.8 11 0 0 0 0 0 0

Table 11-2 Summary of Affected Cases

Project Name

State Land Occupied (Mu)

Collective Land Occupied (M

u)

Demolition Area (M2)

Enterprises and

Institutions Affected

(Unit)

Stores Affected Temporarily (Stor

e)

Relocated Households/Person

s (Household/Person)

Number of Households/Person

s Having Land Occupied

WWTP of

Yueshan Town

0 12.8 0 0 0 0 11/46

As shown in Table 11-1 and 11-2, base data of land acquisition in the Project

are: Conditions of land acquisition: collective lands 12.8mu, all of which are

cultivated lands, having no uncultivated lands; 11 households, 46 persons are

affected by land acquisition.

(1) According to the survey, the WWTP occupies a land area of 12.8mu; all

the lands occupied are rural collective lands, and there are no state lands. All

the collective lands occupied are cultivated lands (including fertile lands),

having no uncultivated lands.

According to the investigation of immigrant's resettlement, 12.8mu collective

lands are occupied in the WWTP project of Yueshan Town, and the lands

occupied respectively belong to Yingxiongling Group, Pumenkou Group and

Xinqiao Group.

153

Page 162: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 11-3 Type and Quantity of the Collective Lands Occupied (Mu)

Project Affected Village Type of Land Occupied Area

(Mu)

Number of Households

Affected (Household

)

Affected Population (Person)

WWTP of

Yueshan Town

Xinqiao Village

Cultivated Land

Dry Land (Cotton and Rape Rotation)

0 0 0

Paddy Field 12.8 11 46Fruit Garden 0 0 0

Vegetable Plot 0 0 0Subtotal 12.8 11 46

Uncultivated Land Uncultivated Land 0 0 0(2) Rural Housings Relocated

No rural housings will be demolished and relocated in the Project.

(3) Stores Affected

No stores will be affected in the Project.

(4) Impact on Temporarily Occupied Land

In the wastewater treatment project of Yueshan Town, all the temporary

facilities are stored within the Project area (planed landscaping area

2,783m2), so there are no temporarily occupied lands.

(5) Affected Populations

Hunan Integrated Economic Development Demonstration Town Project

(Yueshan Town WWTP Project, Xiangxiang City) Utilizing WB Loans directly

affects 11 peasant households, 46 populations in all. As to the form of impact,

all of them are affected by land acquisition. Direct influence of the Project only

refers to the influence on populations by land acquisition, with no reference to

demolition and relocation of housings and stores, excluding the affected

enterprises and institutions either. Populations directly affected in the Project

are shown in Table 11-4.

154

Page 163: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 11-4 Populations Affected Directly by the Project

Impacts WWTP of Yueshan Town

Land Acquisition Households 11Persons 46

Housings Demolished and Relocated

Households 0Persons 0

Demolition and Relocation of Stores Rebuilt By Peasant Housings

Households 0

Persons 0

Operation of Stores Households 0Persons 0

Demolition of Stands Built on Pedestrian Access

Households 0Persons 0

(6) Vulnerable Groups Affected

According to the relevant regulations of WB's business policy OP4.10 Ethnic

Minorities,: a. having the intentions to identify itself as a unique cultural group

of ethnic minorities and such identification is also accepted by others; b.

relying on the residential district or ancestral domains with unique features in

the Project area collectively, and relying on the natural resources in these

residential districts and domains; c. having traditional cultures, economy,

social or political systems different from those of the mainstream society and

culture; d. having minor languages different from the state or local official

language. Xinqiao Village does not meet the requirements of items b, c and d,

and it does not belong to the ethnic minority specified by WB, so WB's policy

on ethnic minorities is not applicable to it.

All the people in the Project area are of Han nationality. Residents within the

Project area have no obvious traditional cultures, economy, and social or

political systems different from those of the mainstream society and culture;

Residents within the Project area neither think they have the features of ethnic

minorities nor have such intentions. Therefore, no ethnic minorities are

involved in the Project.

① Determination of Affected Vulnerable Groups

Vulnerable Groups mean the crowds that are most easily affected and have

no abilities to adapt to the changes caused by the Project construction among

the affected populations. Vulnerable Groups mainly include:

● Lonely old people: the elderly who are single and over 65, and have no

legal family supporters.

● Single parent family: the family of which the householder is single and has

minor children

155

Page 164: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

● Orphan: children under 16 years old and having no parents

● Poor family: the family having Subsistence Allowances Acquisition

Certificate for Rural Populations in Xiangxiang City in urban areas and rural

family recognized to be particularly poor

● The handicapped: the people whose certain organs or functions are

disabled or lost or abnormal in psychology, physiology or body, or having lost

all or part of the abilities to engage in certain activities in a normal way

● Family having other special difficulties

Determination of Vulnerable Groups will be based on relevant policies and

statues as well as field investigations. During implementation of the Project,

the Immigrant Resettlement Department will decide it through indoor

investigation, visit to neighbors, confirmation by neighborhood committee etc.

② Affected disadvantaged family

According to indoor investigation and Villagers' comment, among the affected

populations, only one household belongs to disadvantaged group and the

family can enjoy the subsistence allowances. List of the disadvantaged family

affected by the Project is shown in Table 11-5.Table 11-5 Information about the Affected Disadvantaged Family

Name Number of Family Members

Description of Difficulties Source of Income

Gan Shixiang 4

63 years old; divorced; having one daughter living with him and is married

and has a daughter; he is weak and sick, and can't live on himself; the

family is poor. (his family status is poor according to the Villagers' comments)

All the families are engaged in agriculture;

main source of income is planting; having no other

incomes

Note: the above stated disadvantaged group is decided through the interview of Village committee and the three Groups

(7) Affected Surface Auxiliary Structures and Special Facilities

There are no surface auxiliary structures and special facilities in the Project.

11.3 Law and Policy Framework11.3.1 Major Law and Policy Criteria(1) Central policies

● Law of Land Administration of the People’s Republic of China,

implemented in January 1999; revised and put in force on August 28, 2004;

● Decision on Intensifying Reform and Strengthening Land Administration;

issued by the State Council on October 21, 2004;

156

Page 165: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

● Notice on Strengthening Land Regulation and Control, issued by the State

Council on August 31, 2006;

● Regulations for Government Information Disclosure of the People’s

Republic of China; put in force on May 1, 2008;

● State Council’s Regulations on Intensifying and Reforming Land

Administration; No. 28 decree, 2006;

● Notice of the Ministry of Land and Resources about the Further

Management of Land Acquisition, released by the Ministry of Land and

Resources on June 26, 2010

(2) Laws and Regulations and Policies Released by Hunan Provincial

People’s Government and Relevant Departments

● Land Administration Enforcement Method of Hunan Province (2000)

● Notice on Releasing the Compensation Standard for Land Acquisition in

Hunan Province (XZF [2009] No. 43) (2009)

● Subsistence Allowances Method in Rural District of Hunan Province

(provincial people’s government No. 21)

● Notice of the General Office of Hunan Provincial People’s Government on

Responding the Provincial Labor Security Bureau’s Opinions on the

Employment Training and Social Security of Farmers Involved with Land

Acquisition

● Notice on Strengthening the Supervision and Administration of the

Distribution and Use of Compensation Fees for Land Acquisition of Collective

Economic Organizations in Rural District (XZF [2008] No. 15)

(3) Laws and regulations and policies released by Xiangtan municipal

people’s government and relevant departments

● Notice of Xiangtan municipal people’s government about printing and

distributing the Method of Compensation and Resettlement of Land

Procurement and Relocation in Xiangtan (XZF [2005] No. 27)

● Notice of the General Office of Xiangtan Municipal People’s Government

about Printing and Distributing the Method for Determining the Low Income

Families in Urban and Rural Areas of Xiangtan City (Trial Implementation)

(XZBF [2011] No. 32)

(4) Laws and Regulations and Policies Released By Xiangxiang Municipal

People's Government and Relevant Departments

● Notice of the General Office of Xiangxiang Municipal People's

157

Page 166: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Government about Printing and Distributing the Pilot Scheme for Employment

Training and Social Security of Farmers Involved with Land Acquisition in

Xiangxiang City (XZBF [2010] No. 20)

● Notice of the General Office of Xiangxiang Municipal People's

Government about Printing and Distributing the Management Method of

Social Security Funds of Farmers Involved with Land Acquisition in

Xiangxiang City (XZBF [2010] No. 21)

● Notice of the General Office of Xiangxiang Municipal People's

Government about Printing and Distributing the Executive Plan of

Employment Training and Social Security of Farmers Involved with Land

Acquisition in Xiangxiang City (XZBF [2010] No. 22)

● Follow-up Notice of the General Office of Xiangxiang Municipal People's

Government about Implementing Social Security of Farmers Involved with

Land Acquisition in Xiangxiang City (XZBF [2010] No. 67)

(5) WB's Policy for Settling Involuntary Resettlement

● WB business policy OP4.12 Involuntary Resettlement and its appendixes;

executed on January 1, 2002;

● WB business procedure BP4.12 Involuntary Resettlement and its

appendixes; executed on January 1, 2002;

11.3.2 Main Principles According to the above policy framework, immigrant resettlement of the

Project is aimed to reduce the negative influence caused by land procurement

and relocation as much as possible. Property of the persons suffering from

negative influence will be compensated based on the replacement price, and

assistance will be offered to help them return to or exceed the original living

standard; main principles are:

① Take measures to reduce the negative influence to the minimum as much

as possible;

② The compensation proposal can ameliorate the immigrants' living standard

or at least help them return to the original living standard;

③ Discuss seriously with the affected people and give opportunities to

participate in the plan and enforcement of the compensation proposal;

④ All the affected property will be compensated according to the overall

replacement cost;

⑤ The borrower is responsible for raising the compensation costs, including

158

Page 167: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

contingency cost;

⑥ Try to build new housings before removal. Before land procurement and

relocation, the people involved with land acquisition will get all the

compensations for their losses; that's compensations shall be granted to them

before land acquisition and use of relevant property.

11.4 Compensation Standard for Land Acquisition The compensation standard for land procurement and relocation listed in this

report is formulated upon appropriate consultations with the affected units,

individuals and relevant local government departments based on the in-depth

survey and investigation, following the relevant laws and regulations of the

People's Republic of China and Hunan province as well as WB's business

guide for involuntary resettlement, with the purpose to recover and improve

the living standard of affected people within a short period after resettlement.

(1) Compensation Standard for Acquisition of Rural Collective Lands

Compensation costs for acquisition of rural collective lands include

compensations for land and taxes and dues paid to the state.

During investigation of immigrant resettlement and the establishment of

resettlement plan, Yueshan Town Government and land and resources

bureau exchanged ideas thoroughly with the Villages affected by land

acquisition and discuss the land acquisition compensation base suitable for

the Project. A uniform compensation base is made for the occupied land

according to the occupied land type, output, land position, agricultural land

class, per capita quantity of cultivated land, relation between land supply and

demand, local economic development level etc.

According to the Notice of the General Office of Xiangxiang Municipal

People’s Government on Releasing the Land Acquisition Compensation

Standard for Xiangxiang Section of the Passenger Dedicated Line of

Shanghai-Kunming High Speed Railway (XZBF [2010] No. 77), upon thorough

consultations between Yueshan Town Government and local Villagers,

compensations will be made following the standard of paddy fields, which is

31857yuan/mou.

(2) Compensations for State Land

There is no permanent occupancy of state land in the Project.

(3) Compensation Standard for Demolition and Relocation of Rural

159

Page 168: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Residences

No rural residence housings will be demolished and relocated in the Project.

(4) Compensations for Other Attached Facilities

There are no attached facilities in the Project.

(5) Compensations for Temporary Land Occupation

There is no temporary occupation of land in the Project.

11.5 Land Recovery Proposal 11.5.1 Compensation and Arrangement for Permanent Land Acquisition(1) Analysis of Land Acquisition Impact

In the Project, 12.8mu collective lands in Xinqiao Village, Yueshan Town will

be occupied permanently, and 11 households, 46 persons in all are involved.

Based on field survey, although most of the lands occupied by the Project are

cultivated land, most occupied lands are barren, and farmers no long plough

these lands, so there is no severe impact on the households involved with

land acquisition. Besides, the Project area has achieved a relevantly high

state of economic development and its nonagricultural sectors are developed;

there are few labors engaged in agricultural production; although the affected

persons have agricultural household register, agricultural income is no longer

their major source of income, so land acquisition will make no big difference

on the income of affected households.

(2) Resettlement Proposal

In the affected area, there are fewer labors engaged in farm work, so labors

affected by land acquisition of the Project have basically solved the problem

of employment now. Besides, Yueshan Town and four affected administrative

Villages organize expertise training to farmers every year, and provide them

with employment information and employment opportunities, which can

promote the employment of the labors affected by land acquisition.

After the collective lands are occupied, the Owners can enjoy retirement

insurance after approved by the land and resource bureau of district level or

above. Occupied land of the households in two subprojects of Yueshan Town

is about 1mu per capita. Per capita occupied land is above 0.1mu, so

according to the Notice of the General Office of Xiangxiang Municipal

People's Government about Printing and Distributing the Pilot Scheme for

Employment Training and Social Security of Farmers Involved with Land

160

Page 169: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Acquisition in Xiangxiang City (XZBF [2010] No. 20), the Owners need not join

in the retirement insurance.

11.5.2 Recovery of Livelihood of the Farmers Affected By Land AcquisitionThere are 11 farm households that are affected by land acquisition;

agricultural income takes up 10% of their gross income; in general, the Project

will make no difference on the livelihood of these farmers within a short time;

for these farmers whose lands are occupied, Yueshan people's government

and Villagers have achieved agreement on the following resettlement

methods:

(1) After the WWTP of Yueshan Town is completed, it will first of all provide

job opportunities for the farmers having their lands occupied; those without

special skills and are willing to engage in farm work will be arranged to

participate in service jobs of the Project; At present, Xinqiao Village committee

and Yueshan people's government have made preliminary agreement on this.

(2) Xiangxiang Municipal Government and Yueshan Town Government set up

perfect labor service system to give help to the affected Villagers. Before land

acquisition, they set up relevant labor service institutions for the immigrants

and offer difference assistances with their employment. for example, open up

the personnel market free of charge; offer charge-free vocational and

technical training and so on.

11.5.3 Resettlement and Recovery of Affected Vulnerable GroupsThere are 4 persons of one family are recognized as disadvantaged crowd

during land acquisition in the construction of WWTP of Yueshan Town. The

immigrant resettlement department and basic level government will give

special help and cares to this family. Main measures are:

As to the disadvantaged family determined in the Project, the Project

management office will offer the following guarantee measures:

(1) Gan Shixiang, whose family is in distress, is weak and sick, and can't live

on himself. His family is poor and can enjoy subsistence allowances. Besides,

the Project management office actively discusses with civil administration

department to offer him rural cooperative medical service free of charge and

give relevant subsidies for his difficulties;

(2) After the Project is completed, Yueshan people's government promises to

offer job opportunity for poor family members in the WWTP.

161

Page 170: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

11.6 Vulnerable GroupsAmong the Villages affected by land acquisition, the Project management

office will offer special financial and material supports to the crowds weak in

economy, including solitary old persons, families whose householder is a

woman, and extremely poor families. Among the affected populations, there is

only one disadvantaged family. After land acquisition, the standard of living of

such farmers (residents) affected by the Project will be ensured not to affected

by land acquisition.

The populations who have lost the work ability will enjoy living allowance

through the social security system; Those with the ability of work will be

provided with job opportunity, and receive training of employability skills, so

that they can have stable sources of income; Members of disadvantaged

family will be recruited to engage in some jobs requiring no special skills. In

addition, the government and Owner will also provide subsidies for their

difficult life and help them to return to normal living and production standard.

After land acquisition, the standard of living of such farmers (residents)

affected by the Project will be ensured not to affected by land acquisition.

The populations who have lost the work ability will enjoy living allowance

through the social security system; Those with the ability of work will be

provided with job opportunity, and receive training of employability skills, so

that they can have stable sources of income; Members of disadvantaged

family will be recruited to engage in some jobs requiring no special skills. In

addition, the government and Owner will also provide subsidies for their

difficult life and help them to return to normal living and production standard.

11.7 Institutional Arrangement In order to do well in immigrants' resettlement, all levels of governments will

first of all ensure the smooth progression of project preparation and

immigrants' resettlement by setting up organizations and strengthening

abilities. Since November 2010, they have set up relevant organizations for

the Integrated Economic Development Demonstration Town Project Utilizing

WB Loans formally and defined the responsibilities of all organizations. Major

organizations relating to the resettlement of immigrants include:

Leading group of Integrated Economic Development Demonstration Town

Project (Yueshan Town Subproject) Utilizing WB Loans

162

Page 171: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Office of Integrated Economic Development Demonstration Town Project

(Yueshan Town Subproject) Utilizing WB Loans

Immigrants’ resettlement department of Integrated Economic Development

Demonstration Town Project (Yueshan Town Subproject) Utilizing WB Loans

Technical support group of Integrated Economic Development Demonstration

Town Project (Yueshan Town Subproject) Utilizing WB Loans

External monitoring institution of resettlement of immigrants

11.8 Complaint Settlement Mechanism Although the immigrants are encouraged to participate in the compilation and

implementation of the Immigrant Resettlement Plan, there are some problems

arising in real jobs more or less. In order to solve these problems timely and

effectively and ensure the smooth progression of project construction and

land acquisition, besides the current complaint channel through letters in local

governments at all levels, another transparent and effective complaint channel

is also established for the immigrants in the Project from time to time. In order

to solve problems effectively and ensure the smooth progression of project

construction and land acquisition, a transparent and effective complaint

channel is established for the Project; general complaint channels are as

follows:

Stage 1 If the immigrants' rights are damaged during land acquisition or

resettlement, they can reflect the problem to the Village committee; the Village

committee or immigrant can directly consult the township resettlement office

or district (county) Resettlement office; when the resettlement office receives

the complaint, it shall make a record and solve the problem within two weeks

through consultations with the Village committee and immigrant.

Stage 2 If the complainant is not satisfied with the decision made in stage 1,

he/she can lodge a complaint to the leading group of Integrated Economic

Development Demonstration Town Project (Yueshan Town Subproject)

Utilizing WB Loans, which will deal with the complaint within 2 weeks.

Stage 3 If the immigrant is still dissatisfied with the decision of the leading

group of Integrated Economic Development Demonstration Town Project

(Yueshan Town Subproject) Utilizing WB Loans, he/she can lodge a complaint

and file an arbitration to the jurisdictional administrative organ level by level

according to the Administrative Procedure Law of the People's Republic of

163

Page 172: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

China.

Stage 4 If the immigrant is still dissatisfied with the arbitral decision, he/she

can institute a suit to the civil court according to the civil procedure law.

Immigrant can institute a suit about any aspects of resettlement, including

compensation standard.

The immigrants will be informed of the above stated complaint channels

through meetings or other ways, so that they can fully understand their rights

of petition. Besides, relevant information will be propagandized or reported

through media, and complaints and suggestions about resettlement will be

made into written articles to be studied and dealt with by the resettlement

institutions at all levels.

Institutions receiving immigrants' complaints will not charge any fees, and

relevant expenses incurred by complaint will be deducted by the Project office

from the contingency cost.

11.9 Monitoring and AssessmentIn order to ensure the smooth implementation of the Immigrant Resettlement

Plan and fulfill the goal of appropriate resettlement, the Project office will

make regular monitoring and assessment of land procurement and relocation

according to the requirements of WB business policy OP4.12 Involuntary

Resettlement and Guidance on Immigrant Monitoring and Assessment of

WB's China Loan Project. The monitoring is divided into two parts, namely,

internal monitoring by the resettlement institution and external independent

monitoring.

11.9.1 Internal Monitoring(1) Method of Internal Monitoring

Internal monitoring is the monitoring of the implementation process of

resettlement inside the resettlement institution from top to bottom layer; it

requires the Project Owner and resettlement institutions at all levels to set up

standard and smooth resettlement implementation information management

system from top to bottom layer to track and reflect the progress of

resettlement in different districts. The land acquisition departments at all levels

shall report the progression, funds and results of resettlement using the

information management system from bottom to top layers, and take

measures and make analysis.

164

Page 173: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(2) Period and report of internal monitoring

Internal monitoring is a continual process; overall monitoring activity shall be

conducted once a quarter at least; at the critical period of resettlement,

frequency of monitoring will be increased.

During the preparation of project, internal monitoring institutions will compile

regular or irregular internal work report according to WB's review; its format

will be different for different projects and stages according to WB's

requirements. After implementation, simple weekly report, monthly report,

detailed quarterly report, semi-yearly report and annual report shall be made

for influential projects; the Projects having small influence only need simple

quarterly report and detailed semi-yearly report and annual report. Special

report will be made according to the requirements of project management. A

concluding report shall be made at the end of project implementation. The

internal monitoring report shall be submitted by the immigrant resettlement

institutions at all levels to the people's government of the same level and

immigrant resettlement department of higher levels, and the Project Owner.

The Project Owner shall submit an internal monitoring report to WB

semiannually.

11.9.2 External Monitoring(1) External Monitoring Method

The external monitoring institution will monitor immigrant’s resettlement by

following means:

① Establish a database of affected population and carry out regular in-home

interview based on the immigrant’s resettlement investigation. The external

monitoring institution will make full use of the social and economic

investigation materials and the resettlement information management system

created by the Project office to perform dynamic management of basic

situation of those households involved with land acquisition and keep

informed of the immigrant situation. Make use of the situation reflected by the

database and carry out face-to-face interview at the affected families to know

progress of the resettlement and listen to their complaints, dissatisfaction, and

suggestions, as well as promote related national policies, related

requirements of the World Bank, and information on engineering construction.

The external monitoring institution will carry out the in-home interview

independently and obtain the list and information of the affected population

165

Page 174: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

from grassroots organization, without accompany by the personnel of local

resettlement organization or local administrative personnel. For in-home

interview by the external monitoring institution, the interviewer shall be

relatively fixed, which means one person shall interview the same affected

area as many times as possible, so as to build a mutual trust relationship and

be favorable for performance of the work.

② Organize forums for affected population irregularly in the regions where

affected population gathers. The external monitoring institution will hold

forums in regions where affected population gather and listen to the opinions

of affected population on major issues affected by the Project. The forum can

be either formal or informal; can either invite the personnel of grassroots

resettlement organization or not, as the case may be.

③ Field observation. Personnel of the external monitoring institution will

interview the immigrant’s resettlement areas regularly and irregularly and

observe immigrant’s resettlement situation on site.

④ Individual investigation. Give emphasis to the analysis of individual

prominent cases during immigrant’s resettlement. Analyze source of the

problem, find out the solution, and propose reference opinions.

⑤ Questionnaire. Carry out sampling investigation on production and life

recovery of the immigrants and opinions on immigrant’s resettlement and

analyze the results timely. Solve existing problems and provide references for

immigrant’s resettlement of the next year.

(2) Reporting System for External Monitoring

The external monitoring institution will prepare external monitoring reports

based on the materials obtained by observation and investigation. With two

main purposes: the first is to present the progress and existing problems of

the immigrant’s resettlement objectively to the World Bank and Owner of the

Project; and the second is to evaluate the social and economic effect of the

immigrant’s resettlement, propose constructive opinions and suggestions, and

improve the immigrant’s resettlement work.

Intervals for the external monitoring institution to report to the World Bank and

Owner of the Projects are as follows:

Submit a interim annual monitoring report of immigrant’s resettlement

situation of first half of the year to the World Bank and the Owner every year;

Submit the monitoring report of previous year to the World Bank and the

166

Page 175: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Owner every year;

Submit a comprehensive post immigrant’s resettlement assessment report

half a year after completion of all immigrant’s resettlement work.

The contents of ordinary monitoring report shall at least include the followings:

① monitoring objects of this report; ② progress of immigrant’s resettlement

work; ③ main findings of the monitoring institution; ④main existing problems;

⑤ basic assessment opinions and suggestions of external monitoring.

Reports of the external monitoring institution shall be submitted to the Project

office and immigrant’s resettlement expert of the World Bank in Chinese.

Before formal submission, inform related personnel of the immigrant’s

resettlement office and ask for their opinions, and communicate on the

contents and form of the report.

11.10 Financing and Implementation Plans Expenses of the Project include land expropriation compensation, other

expenses related to land expropriation compensation, administrative

expenses for immigrant’s resettlement, and unpredictable expenses. In

accordance with the compensation standards and statistical numbers

affecting the Project, the World Bank loan for immigrant’s resettlement of

Yueshan Integrated Economic Development Demonstration Town Project of

WWTP and Matching Pipe network Construction is RMB 1,074,082.77. Refer

to the Table for specific budgets.

167

Page 176: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 11-6 Budget Sheet of Yueshan Town Immigrants Resettlement

Category Unit Quantity Compensation Standard

(RMB) Amount (RMB)

I. Basic Expenses

Charges

Related to Land Expropriatio

n

1.1 Farmland Expropriation Compensation

Mu 12.8 31857 407769.6

1.2 Compensation of Crops Mu 12.8 1800 23040

1.3 Farmland Use Tax m2 8533.3 25 213332.5

1.4 Land Cultivation Expenses Mu 12.8 20000 256000

1.5 Land Management

Expenses

In accordance with XJF No. [2003] 42, charge at 4% of total land

expropriation compensation 16310.78

II. Other Expenses

1

Agency Fees for

Resettlement in Land

Expropriation

Charge at 1.8% of the basic immigrant expenses 16496.15

2

Monitoring and Assessment

Fees for Immigrants

Resettlement

Estimate at 0.4% of the basic immigrant expenses 3665.81

III. Administrative Expenses

1

Administrative Expenses for Immigrants

Resettlement

Charge at 5% of the basic immigrant expenses 45822.64

IV. Unpredictable Expenses

1 Unpredictable Expenses

Charge at 10% of the basic immigrant expenses 91645.29

Total 1074082.77The World Bank loan for immigrant’s resettlement of Yueshan Integrated

Economic Demonstration Town Project shall be raised by the Urban

Construction Fund Office under the control of the people’s government. Funds

granting during the immigrant’s resettlement is done by issuing the funds to

the compensation objects through exclusive accounts without any

intermediate steps to prevent withholding and misappropriation.

Transfer of the immigrant’s resettlement fund of the Project shall comply with

the following principles:

All expenses related to land expropriation shall be incorporated into general

estimate of the Project, and the land expropriation compensation for each sub

item shall be approved by implementation unit of the sub item, and the

168

Page 177: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

compensation shall be paid by the people’s government directly to related units

and persons through exclusive accounts.

Compensations paid to individual families shall be paid to the affected

families through exclusive accounts.

Land compensation shall be paid before the expropriation;

All the funds must be paid under the supervision and management of internal

monitoring institution and monitored by external monitoring institution.

Establish financial and supervision organizations of various levels to ensure

timely payment of all funds.

169

Page 178: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

12 Environment Management Plan 12.1 Environment Management System In accordance with the management authority under the Environmental

Protection Law of the People’s Republic of China and Regulations for

Management of Environmental Project in Construction Projects,

environmental impact assessment report of the Project is to be approved by

the Xiangtan City Environmental Protection Bureau. The Xiangtan City

Environmental Protection Bureau is the environment management

organization of the Project and is responsible for proposing environmental

protection requirements based on the contents of the environmental impact

assessment report of the Project and coordinating the environmental

protection management among different departments, and for organization

the “three simultaneousness” acceptance of environmental protection

facilities. Under the general administrative organizations of the Project, Hunan

World Bank Loan Project Office takes charge of implementation of the whole

project under the lead of Hunan Provincial Government. To ensure successful

implementation of the environment management of the Project, Hunan Project

Office will entrust specialized environment management organization to

cooperate with the Project office, owner, contractor, and operator to

implement the environment management plan during construction stage and

operation stage of the Project.

Hunan World Bank Loan Project Office shall be responsible for planning and

design of the Project and supervising and managing environmental protection

procedures of the Project, and organizing province-wide environment

management skill trainings of the Project; Xiangtan City Environmental

Protection Bureau is mainly responsible for routine supervision of environment

management of the Project; Xiangxiang City Environmental Monitoring Station

is entrusted by the Owner to monitor environment quality of the Project Area

during construction and operation periods of the Project; the environment

supervision engineer entrusted by the Owner shall be responsible for the

environment supervision during construction of the Project.

The Owner plans to appoint specialized environment management personnel

to take charge of the environment management of each stage of the Project;

and implement the environmental protection regulations and plans; check the

170

Page 179: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

execution of environmental protection measures of the Project; promote

advanced applied environmental protection technologies and experiences;

and organize environmental protection technology training for related

personnel of the Project to improve quality of the personnel. There are great

differences in environment management of the construction period and the

operation period of the Project, and the two distinguish from each other in

time limit, one of which is temporary and the other is long-term. Therefore, the

contractor and the operator establish different organizations for different

stages and adopt the means of phased management. At the end of the

construction period, corresponding management organization shall be

dismissed, and the management organization for the operation period starts

operating. A certain period of intercrossing is allowed as the case may be.

Organization structure is as shown in Figure 12-1. Refer to Table 12-1 for the

Project environmental protection supervision plan.

171

Page 180: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Figure 12-1 Schematic Diagram of Project Environmental Protection Organization Structure

Environmental Protection Bureau of Xiangxiang

Owner

Local Environment Monitoring Station

Environmental impact Assessment Unit

Design Unit

Construction Contractor

Environment supervision engineer

Local environment monitoring station

Owner or operator

Environment management and execution organizations during design and construction periods

Environment management and execution organizations during operation period

County Level

Hunan Project Office

Xiangxiang Project Office

Hunan Province Level

World Bank

Enterprise Level

Environmental Protection Bureau of Xiangtan

City Level

172

Page 181: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 12-1 Project Environmental Protection Supervision Plan

Stage Organization Supervision Contents Supervision Objective

Feasibility Research

Stage

Xiangtan City Environmenta

l Protection Bureau

World Bank Project Office

Review and reply environmental impact assessment documents

1. Ensure that the environmental impact assessment is overall, with proper topics and prominent key points;2. Ensure that possible major and potential problems of the Project are reflected;3. Ensure that measures for mitigating environmental impact has specific feasible implementation plan.

Design and Construction Stages

Hunan Provincial

Government, Hunan Project

Office, Xiangtan City Environmenta

l Protection Bureau

1. Review preliminary design of environmental protection measures;2. Check the reinstatement of temporary construction land, recovery of vegetation, and recovery of environment;3. Check the dust and noise pollution control measures and determine the time of construction;4. Check the emission of air pollutants;5. Check the discharge and disposal of domestic wastewater and construction waste water of the construction site.

1. Strictly execute the three-simultaneousness;2. Ensure the compliance of these sites with the environmental protection requirements;3. Reduce the affect of construction on surrounding environment, and execute related environmental protection regulations and standards;4. Reduce the affect of construction on surrounding environment, and execute related environmental protection regulations and standards;5. Prevent water and soil losses.

Operation Stage

Hunan Project Office,

Xiangtan City Environmenta

l Protection Bureau,

Xiangtan City Environmenta

l Protection Bureau

1. Check the implementation of monitoring plan;2. Check the sensitive points requiring further environmental protection measures (there may be environment problems ignored);3. Check whether environment quality of the environment sensitive points meets corresponding quality standard requirements;4. Strengthen supervision, prevent accidents and prepare emergency response plans to eliminate dangers timely in case of any accident.

1. Implement the monitoring plan; 2. Protect the environment; 3. Strengthen environment management and protect public health; 4. Ensure that emission of the pollutants complies with the emission standard.

173

Page 182: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

12.1.2 Environmental Protection Organization during THE Construction Period12.1.2.1 Duties and Responsibilities of Environmental Protection Organization

Technical level: on technical level of environment management, the Provincial

Project Office shall engage experts for project management.

Project office level: the Provincial Project Office shall appoint a project

environment manager to supervise implementation of the management plan,

who will be responsible for all problems of the World Bank in connection with

the environment, and in the meantime, the Provincial Project Office shall

entrust a specialized environment management organization to cooperate in

supervising implementation of the environment management plan.

City level: Xiangtan City Environmental Protection Bureau is responsible for

the approval of environmental impact assessment document and for routine

environment supervision and management.

County level: Xiangtan City Environmental Protection Bureau is responsible

for routine environment supervision and management of construction period

and operation period of the Project and for completion environmental

protection acceptance and routine monitoring after completion of the Project;

Xiangxiang Project Office shall appoint a project environment manager to

supervise implementation of the environment management plan and make

records and report to the Project environment manager of the Provincial

Project Office of the implementation of environment management plan.

Contractor level: appoint 1~2 environment management coordinators to

supervise implementation of the environmental protection measures of the

construction and negotiation and solve environment problems with

surrounding residents, and to communicate with the Project office and

environment supervision organizations.

Operator level: Each enterprise shall establish an environment management

office which is composed of two full-time environmental protection personnel,

and ordinary personnel of the company shall provide assistances to these two

engineers to accomplish environment management of operation stage of the

company. The company shall equip such communication facilities as internet

and telephone to keep in touch with the environment management

supervision organizations.

Environment supervision engineer level: Each Owner shall engage an

174

Page 183: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

environment supervision engineer for the Project and supervise on-site

environment management during the construction.

12.1.2.2 Posts and Responsibilities of Personnel

(1) Technical Environment Experts

Technical environment expert is the technical support of Hunan Project Office

and shall perform whole process tracking during preliminary stage of the

Project and provide regular service for 4 years after implementation of the

Project, two weeks for each quarter.

The technical environment expert shall ensure that all necessary

requirements must be met at beginning of the Project and ensure that the

environment management system is fully and effectively implemented in

accordance with the environment laws and regulations and the security

regulations of the World Bank.

A. Provide necessary trainings to environment manager of the Project,

environment management personnel of the contractor and operator and the

environment supervision engineer.

B. Provide expert consultancy to the Project office, owner, contractor, and

operator.

C. Provide assistances to environment management personnel of the

enterprise to organization monitoring activities.

(2) Project office: Environment manager

The Provincial Project Office shall appoint an environment manager who shall

report to the World Bank and supervise environment experts of the Project.

The environment manager shall provide assistances to the land management

organization and immigrant resettlement organization to prevent the above

from holding back implementation plan of the Project, and the responsibilities

are as below:

A. Provide trainings to the environment management manager with the help of

the assistant.

B. Establish a monitoring plan with the help of the assistant.

C. Communicate with the environment management manager and

construction staff by following means:

--Provide routine monitoring reports to the Project office and World Bank

--In case of the second and third cases, provide special unconformity report

--Communicate with personnel of the construction unit and operation unit

175

Page 184: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

orally and agree on the solution if any solution is found

--Propose correction measures with the environment management engineer

and environment management manager in case of any unconformity

D. Environment engineer, environment management manager of project office

of the company and the construction unit and operation unit shall all attend

the meeting.

E. Coordinate the communication report of the environment management

expert to the World Bank.

(3) Owner: Environment manager coordinator EMC

The Owner shall appoint a EMC to take charge of environment supervision

and report to the Project office and government organizations of the

implementation of environmental protection by the construction unit and

operation unit. Detailed responsibilities of EMC are:

A. To work out detailed environmental protection rules of the construction unit

and operation unit, detailed supervision rules and environmental protection

procedures of the construction unit and operation unit, and collect the outlines

of project management designers with the help of the technical assistant

during preliminary stage of the Project.

B. To entrust projects requiring special equipments for monitoring, such the

atmosphere and water environment quality monitoring.

C. To provide monthly monitoring report, project and feasibility study

implementation situation and remedial measures to the Project office. Hold

meetings with the Project office every month to make report of the Project

supervision and discuss compliance of the Project.

D. Choose experts and consultants from universities and organizations to

consult the training methodology and technical issues. As the case may be.

E. Organize special research and public investigation in connection with

special construction requirements of the Project or necessary changes.

F. Report to environment manager of the Project office and the environment

supervision organization on solutions of unconformity of the feasibility

research and measures for emergencies.

G. Disclose information through conferences and local media.

(4) Environment Supervision Engineer

The environment supervision engineer shall be responsible for the

construction engineering activities of the supervisor and other related

176

Page 185: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

activities such as: land occupation and ensuring that the above activities

comply with the environmental protection requirements, environmental

protection investment, and environmental protection objectives, and shall be

responsible for coordinating the land management department on site and the

relationship with the environment monitoring department. Main responsibilities

of the environment supervision engineer are:

A. To ensure that all project licenses and requirements and environment

management plans are implemented before commencement of the Project.

B. To check that all personnel of the construction unit and operation unit have

implemented the environmental protection measures as specified under the

contract.

C. To prepare standard monthly statement of the monthly rewards obtained

by the construction unit and operation unit for their efforts and contributions to

environmental protection activities for the Project and in compliance with their

qualifications.

D. To compile environmental protection monitoring documents.

E. To identify the compliance of special research and special activities with the

requirements and communicate with the EMC and to implement special

measures regularly and effectively.

F. To communicate with the construction staff to help explaining site

environment requirements; to provide suggestions on remedial measures and

provide remedial measures to projects deviating from original intention of the

Project; and to issue special official guidelines to the construction unit and

operation unit.

G. To communicate the construction unit and operation unit and the

construction consultant to facilitate communication; to obtain some other

opinions about special problems to present the problems during the

implementation quickly to the construction management engineer to solve

such problems; and to apply for suspension if the Project has potential

damage to the sensitive targets or the Project is significantly inconsistent with

the Project design.

H. To communicate with the Project construction supervision engineer and

construction staff; to prepare regular weekly monitoring report; and to prepare

inconsistency records, and if any inconsistency with the Project design is

found, propose remedial measures to the Project designer if necessary.

177

Page 186: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

12.1.3 Environment Management Organization during the Operation Period(1) Responsibilities of the Environment Management Office

The Project operator shall establish a special environment management office

which shall implement the environment management plan during the

operation period. Detailed responsibilities of the environment management

office are:

a. To manage execution of environmental protection measures of the Project;

b. To coordinate with the environment supervision management department

and surrounding residents on environment problems;

c. To entrust environment monitoring station to perform routine monitoring to

the three pollutants discharged by the Project facilities and environment

quality of the region;

d. To perform environment risk emergency responses in case of any

environment accident;

e. To report to the Xiangtan City Environmental Protection Bureau and Hunan

Project Office of related information on environment management of the

enterprise;

f. Record and documentation of environment management archives of the

enterprise.

(2) Environment Management Organization Structure

Refer to Table 12-2 and 12-3 for environment management organization

structure of the Project.

178

Page 187: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 12-2 Arrangement of Management Personnel of the Project Office

Organization Environment Manager Environment ExpertHunan Project Office 1 1

Xiangxiang Project Office 1 1Yueshan Project Office 1 1

Total 3 3

Table 12-3 Personnel Arrangement of Environment Management Organization

Construction Contractor Operator Environment

Manager Coordinator

Environment Supervision

Engineer

Environment Management

Personnel

Risk Emergency Response Personnel

Subtotal

2 2 2 1 512.2 Implementation of Environment Management Plan 12.2.1 Detailed Tasks of Implementation of Environment Management PlanThere are environmental impacts from the Project during the construction

period and operation period. Corresponding environmental protection

measures shall be taken based on the characteristics of environmental

impacts of the construction period and operation period to reduce the impacts

to an acceptance extent. Environment management and monitoring

procedures have been established to ensure effective function of the

environment measures.

The World Bank Project Office shall track and report the monitoring of

environment measures based on performing its project management function.

General environment measures and responsibilities of related units are

introduced in this chapter. The Project office shall track and report the

implementation of various environment monitoring measures in the Project.

Refer to Table 12-4 for list of actions for environment measures

implementation management and monitoring.

179

Page 188: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 12-4 List of Detailed Activities of Environment Management Organization

Plan Activity Responsibility Remark Implementation Supervision Source Preliminary Construction Stage

One year

Create an environment management design team

and recruit its members

Company PMO PMO/Company

Recruit staff, choose an

office, purchase

transportation equipments,

and raise operation expenses

One year

Each CSE chooses or appoints an environment supervisor

EMD CSE CSE

One year

Each CSE shall

implement environment supervisor

training

EMD CSE CSE

One year

Prepare and implement the training plans to EMD and

PMO environment managers

(TA) Technical assistant PMO PMO/

Company

Carry out part of the global

training for the Project

One year

Prepare work plan for EMD

and environment supervisor

Technical assistant PMO/Company PMO/

Company

Including clear roles and

responsibilities of EMD and environment supervisor

One year

Prepare work documents:

standard, site inspection table, and

report forms of different activities

EMD PIUS/PMO PMO/Company

Adjust the mode of the

original document and adjust it on site

One year

Prepare detailed

procedures for any

inconsistency found in the

monitoring and report

(TA) PIUS/PMO PMO/Company

One year TA assists EMD PMO/WB PMO/

Company One year

Prepare entrusting

EMD Company PMO/Company

Report the consistency of

180

Page 189: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

contract for EMD of the monitoring activities (requiring special

monitoring equipments,

such as water quality and atmosphere monitoring)

the process implementatio

n and work plan with land

use

Construction Period

One year (0

to 3 months)

The environment supervisor discusses

adjustment of the Project

with EMD and improve the documents

and processes

EMD/Environment supervisor

PIUS/PMO

Process adjustment to

increase efficiency

One year (0

to 3 months)

Each project contracting party must

appoint a full-time personnel

with environment responsibility to work with

the environment

supervisor and EMD

Contract PIUS/PMO Contracting party

Approved by the enterprise

One year

Each project construction

unit and operation unit shall organize

its staff to study

elementary environment knowledge

and measures

Contract EMD/

Environment supervisor

Contracting party

The EMD shall introduce site management

and environment

problems

One year

Organize public

communication and provide supporting materials

TA assists EMD Company PMO/Company

Work out communication

regulations and process and prepare postings and presents for onsite and

offsite safety rules and work out regulations

181

Page 190: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

and process to establish

communication on

broadcasting and TV

One year

Standardize the

cooperation with other

provincial and city

organizations

EMD Company PMO/Company

Cooperate with all projects

Operation Period Confirm the

reporting procedures of environment

problems during the operation

period

Owner Xiangtan City Environmental

Protection Bureau

Confirm co centralized

piling and safe disposal of the dirt produced in the Project

Owner, environmental

sanitation department

Xiangtan City Environmental

Protection Bureau

Monitor tail water

discharged by the WWTP

Operation unit Xiangtan City Environmental

Protection Bureau Operation unit

12.2.2 Contract Requirements for Environment ManagementDuring the Project construction, contractor plays a key role in environment

management, pollution control and preventive measures, and therefore the

contractor shall comply with the following requirements:

(1) Choose a competent contractor to ensure effective execution of the

environment management plan;

(2) Contractor and construction supervisor must receive trainings on

environmental protection and environment management before construction;

(3) The above environmental impact mitigation measures during the

construction period shall be included in bidding documents of the contractor

and incorporated into the construction contract as contract requirements for

the Project contractor.

(4) The contractor shall monitor its environment activities and provide

environment performance record and report once a day or a week. The

Project office and construction supervision team shall supervise and review

these records.

182

Page 191: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(5) The contractor shall appoint at least one full-time environment personnel

for the Project. The environment personnel shall receive the training on the

training plan to be competent for their work.

(6) During the construction, the contractor shall communicate and negotiate

with the public of where the Project is located and erect a bulletin board at

each construction unit to notify the public of specific construction activity and

construction time. In the meantime, the contact and telephone shall be

provided so that the public may complain about and provide suggestions for

the construction activities.

(7) The contractor shall reserve and estimate a deposit for environment

management from the contract price, taking up about 3% of the budget.

12.2.3 Information Communication and Solution of UnconformitiesThe information of environment monitoring shall be disclosed to the site

environment supervisor, environment management manager of the enterprise,

and the Project office. To enable the management focus on important issues,

unconformities of the Project are divided into the following three levels based

on their significance.

Level I: definition: such unconformities are defined as inconsistencies with the

original requirements but will not affect especially important resources in the

near future. If no attention is paid to the reoccurrence of level I, level II will be

caused. Measures: solve the situations of level I by proper cooperation and

regular communication. For example, discuss with the personnel of the

construction unit and operation unit to facilitate the implementation of remedial

measures. The formal communication means is typically the weekly report

made by the environment supervision engineer to the environment

management manager and site construction manager of the enterprise.

Level II: definition: such unconformities do not cause significant damage and

irreversible affect to the sensitive and important resources. However, they

must be corrected and solved on site to prevent the above affect. If no

attention is paid to the reoccurrence of level II, level III will be caused.

Measures: In case of any event of level II is found, it must be reported by the

environment management manager of the enterprise to the environment

manager and site construction manager of the Project office, so as to agree

on remedial measures as soon as possible. Generally, remedial measures

shall be proposed within one week after occurrence of the event.

183

Page 192: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Level III: definition: this level includes the damages to sensitive targets with

especial concern or predictable and coming damages. Those behaviors

forbidden internationally are also classified as level III. Measures: In case of

any event of level III is found, it must be reported by the environment

management manager to the environment manager and site construction

manager of the Project office, so as to agree on remedial measures as soon

as possible. Generally, remedial measures shall be proposed within three

days after occurrence of the event. Unless more time is required under special

cases. If necessary, environment management manager of the enterprise

may require the construction manager to stop some special projects to protect

the resources before implementation of the remedial measures.

12.2.4 Training—Necessary Capability Construction and Method Construction12.2.4.1 Training Requirements

Main objects of environment capability construction are the environment

managers and environment supervisors whose training is part of the technical

support of the Project. During implementation of the Project, training courses

are also provided to the construction party and staff. Before commencement

of the Project, all the construction unit, operation unit, and construction

supervisor are required to participate in the compulsory environment, health,

and safety training.

12.2.4.2 Training Contents

(1) Environment Management Personnel and Environment Supervision

Engineer

The training shall be organized by the Provincial Project Office to environment

manager of the Project office, environment manager coordinator and

environment supervision engineer of the Project and executed by environment

technical experts. Refer to Table 12-5 for training contents.

184

Page 193: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 12-5 Training to Environment Management and Environment Supervision

Engineer

Topic Training Contents Duration

Operation Capability (Environment Manager and Environment Supervisor)

Browse and identify hot keys of word, excel, and PowerPoint quickly; study security policies of the World Bank; establish detailed environmental protection rules for the construction party to strengthen the study, and each detailed rules shall include monitoring instructions after the technical consultant prepares the detailed environmental protection rules. Study environmental impact of the Project and environment items to be monitored

4 days

Conformity Monitoring (Environment Manager and Environment Supervisor)

Site monitoring process of the training project includes organization, communication, roles, and responsibilities, decision-making process, report, and standard observation procedures.

1 day

Emergency Aid and Medical Aid (Environment Manager and Environment Supervisor)

The process of looking for medical aid under emergencies and non-emergencies and the process of looking for related medical aid. (Such as toll telephone, medical consultation)

1/2 day

Health and Safety Monitoring and Reporting Process

Health and safety problems; health and safety requirements; how to implement health and safety inspection; and the process of reporting and solving problems

1 day

Water Quality, Air, and Noise Monitoring and Analysis (Environment Manager and Environment Supervisor)

Use of equipments includes standard, testing, method, sample transshipment, data quality control; monitoring and reporting requirements

1/2 day

(2) Contractor and Construction Staff

Trainings shall be organized by the Project office or construction Owner of the

Project at the Project site before implementation of the Project and shall be

implemented by environment management experts or trained environment

manager of the enterprise. Refer to Table 12-6 for specific training contents

and terms.

185

Page 194: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 12-6 Training to Construction Personnel

Training Mode Training Contents Training Term

General environment knowledge of construction staff

Introduce environment related environmental impact factors and environmental protection measures; Introduce environment sensitive areas and problems within the construction area, and introduce surrounding area inside the construction area; Roles and responsibilities of the environment management design engineer, environment supervisor, and construction supervisor, and key points of environment problems to be reported Wastes management of the construction camp and construction site; Pollution control measures of the construction site; Punishment to violations of laws and regulations;

Courses to be held in Yueshan Town for half a day

General health and safety of construction staff

Including means of transmission and protection, prevent HIV/AIDS and STD; No alcohol and drug; The process of looking for medical aid under emergencies and non-emergencies and the process of looking for related medical aid. (Such as STD examination and consultation); General health and safety knowledge includes some basic processes: traffic safety, electricity safety, explosion, fire; Use personal protection devices; Punishments to violations of laws and regulations;

Courses to be held in Yueshan Town for half a day

(3) Operator

Trainings shall be organized by the Project office or construction Owner of the

Project at the Project site before operation of the Project and shall be

implemented by environment management experts or trained environment

manager of the enterprise. Refer to Table 12-7 for specific training contents

and terms.

186

Page 195: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 12-7 Training to Environment Management Personnel of the Operator

Object Training Contents Training Term

Environment Management Personnel

World Bank project management procedures; Environment information documentation, disclosure, communication, and reporting mechanism; Environment risk emergency response; Health and safety examination and reporting process

Courses to be held for one day

Advanced process and environment management investigation

Investigation in domestic leading WWTP

Environment Staff

Use of equipments includes standard, testing, method, sample transshipment, data quality control; monitoring and reporting requirements; Environment risk emergency response: potential leakage and overflow, environment and personal impact of leakage and overflow, and the emergency response includes preferred response, location and use of the response facilities.

Courses to be held for two days

12.2.4.3 Expenses Estimate for Personnel Training

Refer to Table 12-8 for expenses estimate for project capability construction.

Table 12-8 Training Plan of Project Environmental Protection Personnel

Stage Category Number (Person) Time Expenses (ten thousand Yuan)

Construction Period

Project manger training 1

Before implementation of the Project

2

Project Manager Coordinator 2

Before implementation of the Project

2

Environment Supervision

Engineer 2

Before implementation of the Project

2

Construction staff

All staff of the contractor

Before commencement 30

Subtotal 36Operation Period Training to full-

time environment management

personnel of the enterprise

2 Operation period of the enterprise 4

Skill training to environment staff

6 Before operation of the enterprise

6

187

Page 196: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

of the enterprise Subtotal 10

Total expenses 4612.3 Environment Monitoring Plan12.3.1 Monitoring ObjectiveEnvironment monitoring covers the construction period and operation period

of the Project, with the purpose to knowing pollution dynamics of the Project

all-around and timely and knowing the impact extent and scope of the Project

construction on environment quality changes of the area where the Project is

located and feeding back such information to the competent authorities to

provide scientific basis for environment management of the Project.

12.3.2 Environment Monitoring InstitutionThe Project contactor or operator shall entrust the environment monitoring

station of Xiangtan where the Project is located to take charge of environment

monitoring during the construction period and operation period, and the

entrusted unit shall have national environment quality monitoring certification,

complete equipments, sound technologies, and be competent to accomplish

the environment monitoring tasks for which it is responsible.

According to the results of environmental impact predictions, sensitive points

likely to be polluted shall be considered as the monitoring point. Track and

monitor the pollution during construction period and operation period of the

Project. Monitored items are noise, air environment, and surface water

environment which have great impact on the environment. Monitored factors

shall be determined in accordance with the characteristic pollution factors of

the Project. The monitoring and analysis methods shall be those specified for

corresponding items under the Environment Monitoring Technological

Specifications issued by the State Environmental Protection Administration.

The evaluation standards shall be the national standards confirmed by

environmental impact assessment of each sub item.

Refer to Table 12-9 for detailed key procedures required for effective

monitoring of the construction site and activities.

188

Page 197: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 12-9 Monitoring during the Operation Period and Construction Period

Plan Activity Responsibility

Remark Implementation Supervision Fund

Raising Construction Period

One year (1 to 2 months)

Prepare site environment management

plan

Contracting party EMC/PIU/EPB Contractin

g party

Prepare the plan within one

month after signing the contract,

complete the plan within two months, which

shall be reviewed and

approved by the EMC

Construction Period

The construction

unit and operation unit of the Project shall

propose boundary of the Project which

shall be approved

Contracting party EMC/PIU/EPB /

A map shall be compiled as

required by the construction unit

and operation unit before

implementation of the Project

One year (1 to 3 months)

Prepare pollution control

plan, air pollution and

noise

Contracting party EMC/PIU/EPB Contractin

g party

After consulting with concerned agencies and

residents, being reviewed and

approved by the EMC

Construction Period

Air, noise, and water

monitoring Referred to the special part

Construction Period

The pollution control plan and all the pollution

control measured

mentioned in the CSEMP

must be implemented, before which

the construction unit and

operation unit shall

accomplish all mitigation

measures and check all

construction camps and

Contracting party

EMC/PIU/EPB / CSEE shall visit and check

the construction camp and

facilities every day, 2 months

for EMC

189

Page 198: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

facilities every week

Construction Period

Environmental protection

measures of the construction

unit and operation unit

shall be filled in the monthly report and submitted

Contracting party EMC/PIU/EPB /

The suggestions of

CSE is the basis of final payment by PIU/PMO

Construction Period

Observe and report

unconformities of the Project based on the

processes and severity

Contracting party EMC/PIU/EPB /

Level I: EMCLevel II: EMC

and PIULevel III: EMC,

PIU, PMO

Construction Period

Decide to delay or refuse to pay the engineering

cost to the construction

unit and operation unit

Contracting party EMC/PIU/EPB / /

Construction Period

Make sure that the land

expropriation process meets

the needs of the construction

plan

Contracting party POIU / /

Construction Period

Traffic information involved the construction process must be provided

Contracting party EMC/PIU/EPB Contracting

party

Final approval by EMC, the

Project construction party must provide the latest traffic information

which shall be reviewed by CSEE&EMC

and the transportation department and finally

approved by EMC

Construction Period

For temporary interruption of the utilities, a

Contracting party

EPB and concerned Agencies

Contracting party

The construction party shall

190

Page 199: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

notice to reassure the

public shall be posted at least

three days beforehand

submit the latest plan

which shall be jointly reviewed by concerned agencies and

EMC

Construction Period

Report every day

Field siteinspectors EMC/PIU/EPB /

Site weekly report, SRS

monthly report

Construction Period

Report every day, week, and

month

Contracting party EMC/PIU/EPB /

Site weekly report, SRS

monthly report

Construction Period

Report every season

Contracting party To PIU /

Report if required by

organizations involved in the

Project Construction

Period Report half a

year Contracting

party EMC/PIU/EPB /

Completion of

Construction Period

Reinstate the temporary

construction land, and remove all

construction materials and equipments

Contracting party EMC/PIU/EPB Contracting

party /

Completion of

Construction Period

Trees need to be cut for the pipe network

must be replanted

Contractor PIUs Contracting party

At least plant one for one cut

Operation Period

/

After completion of

the construction, namely one year after

reinstatement of the temporary construction

land

Operator, EPB PIU /

No unconformity is reported, claim for the

balance payment

/

Summarize experiences of the Project for similar projects

Operator, EPB / /

Standardize the process and attend the

training course organized by intermediate agency, and

show the results and benefits of

the Project

12.3.3 Detailed Environment Monitoring RequirementsRefer to Appendix 4 for detailed environment monitoring plan and budget of

191

Page 200: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

the Project, and refer to Appendix 5 for environment monitoring plan of project

associated project Xiangxiang Quanhu Urban Garbage Landfill.

12.4 Environment Management Expenses Estimate and Source of

Funds12.4.1 Budget AllocationThe implementation of EMP measures involves in many units, and therefore

sources of funds are different. Most environmental protection activities are

engineering measures, and so shall be provided by the construction unit and

operation unit of the Project and included in the engineering costs which shall

be stated and listed in the bid.

The expenses in EMP are manly used for environment management during

the construction period and operation period, including: Environment

monitoring expenses, environment supervision expenses, personnel training

expenses, operation expenses of environment management organization, and

risk prevention expenses. Activity expenses of EMC, water quality, air, and

noise monitoring expenses and the expenses of CSEE shall be included in

the PMO project management expenses. The local environment monitoring

station as entrusted by the Owner shall monitor the water, air, and noise

during operation of the Project at the cost of the owner. If routine monitoring of

local environmental protection department is simultaneous with the Project,

routine monitoring data of the environmental protection department can be

used.

12.4.2 Source of Funds and EMP BudgetTable 12-10 is the summary of environment management expenses during

construction period and operation period of the Project.

192

Page 201: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 12-10 Summary of Environment Management Budget of the Project

Name

Annual Average Expenses of the Construction Period (ten thousand Yuan)

Personnel Environmental Protection Training

Construction Period

Total Expenses of the Construction Period

Annual Expenses of the Construction Period (ten thousand Yuan)

Personnel Environmental Protection Training

Expenses of the Operation Period (3 years)

Total

PMU Operation Envi

ronment Monitoring

Environment Supervisor

PMU运行 Environment Monitoring

Salary

Office Expenses

Transportation Expenses

Salary

Office Expenses

Transportation Expenses

WWTP 3.6 2 2 0.4 3 36 3 69 3.6 3 2 22 10 101.

8170.8

Source of Funds

PMC

PMC

PMC

PMC

CMSC TAC / PMC PM

CPMC

PMC

PMC PMC PMC PMC

In accordance with the term of the Project and with respect to each

construction period, the annual budget must be assured. Part of the

construction costs in the budget is used as deposit for the construction unit

and operation unit to meet related management requirements. The weights of

deposits for different activities are listed in Table 12-11 as percentage in the

construction contract funds.

Table 12-11 Percentages of Expenses Deposits such as for Environment

Management in the Budget Required by the Construction Party

No. Requirements of Construction Party Percentage in Project Budget (%) Source of Funds

1 Environmental Protection Management 0.5 Construction

contract fund

2Labor Organization and

Occupational Health Management

0.5 Construction contract fund

3 Public Safety Management 1 Construction contract fund

4 Social Management 1 Construction contract fund

12.5 Information Management of Environment Management Plan12.5.1 Information CommunicationThe environment management requires necessary information communication

among different departments and posts of the Project office, owner,

contractor, and operator, as well as disclosing related information to the

outside (concerned parties and social public, etc.). Internal information

193

Page 202: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

communication can be performed by conferences and brief internal report,

etc., however there shall be at least one official conference. All the

communication information shall be recorded and documented. External

information communication shall be performed once half a year or a year, and

information communication with the cooperative unit shall be documented in

the form of minutes.

12.5.2 Record MechanismTo enable effective operation of the environment management system, the

organization must establish a perfect record system and keep the following

records:

(1) Requirements of laws and regulations;

(2) Permission;

(3) Environment factors and related environmental impact;

(4) Training;

(5) Examination, checking, and maintenance activities;

(6) Monitoring data;

(7) Validity of correction and preventive measures;

(8) Information about concerned parties;

(9) Audit;

(10) Assessment.

Besides, the above records must be properly controlled, including

identification, collection, cataloging, documentation, storage, management,

maintenance, inquiry, storage term, and disposal of the records, etc.

12.5.3 Report MechanismThe contractor, operation, monitoring unit, environment supervision engineer,

and project office shall record the Project progress and EMP execution during

implementation of the Project and report to concerned departments timely.

Including the following six items:

(1) The environment supervision engineer of the Project shall make detailed

monthly record of execution of the EMP and submit the weekly and monthly

reports, which shall include execution of the environmental protection

measures, performance of the environment monitoring, and monitoring data,

to the Owner and Xiangtan Project Office timely.

(2) The contractor and operator shall make detailed quarterly records of

project progress and execution of the EMP and submit the quarterly report to

194

Page 203: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Xiangtan Project Office and copy to the Xiangtan City Environmental

Protection Bureau.

(3) The monitoring unit shall submit t he monitoring report to the contractor

(operator) and environment supervision engineer timely after completing the

entrusted monitoring tasks.

(4) The Project office shall submit the Project progress report to the Provincial

Project Office timely and copy to the Provincial Environmental Protection

Bureau. The Project progress report prepared by the Project office (such as

the monthly report, quarterly report, and annual report, etc.) must include the

progress of EMP, such as execution progress and effective of EMP, especially

the environment monitoring results, etc.

(5) In case of any violation of regulations with respect to environmental

protection, the environment supervision engineer and project office shall

report to local environmental protection administration and shall report to the

superior level by level.

(6) The annual EMP execution report of the Project must be completed and

submitted to the World Bank before March 31 of the next year. The EMP

execution report may include the following items:

a. Implementation of the training plan;

b. Project progress, such as the length construction progress of the WWTP

and the pipe network.

c. Execution of the environmental protection measures of the Project,

performance of environment monitoring, and main monitoring results;

d. With or without public complaints, and if there is, record the complaint

contents, solution, and public satisfaction;

e. EMP execution plan of next year.

195

Page 204: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

13 Conclusions of Environmental AssessmentThe following conclusions are made based on the environmental impact

assessment of the Project:

(1) The Project construction will improve living environment and basic

facilities, etc. of Yueshan Town. Construction of the WWTP and the matching

projects will change current situation of discharging untreated wastewater into

nearby surface water in the place where the Project is located and will collect

and treat the wastewater through the WWTP to achieve the discharge

standard, which is helpful to protect water quality of the receiving water,

Xinqiaohe River, improve environment sanitation of the place where the

Project is located and greatly improve living condition of the residents, protect

nearby water resources, beautify surrounding environment, establish a more

comfortable and better living environment, improve the quality of living

environment, facilitate the construction of a livable city, and set up a good

environment basis for facilitating urban development.

(2) Construction of the Project is in compliance with national laws and

regulations and the general urban planning and environmental protection

planning of the place where the Project is located, so that implementation of

the Project is policy and regulations based.

(3) Implementation of the Project may involve in some environmental

protection targets (sensitive points), such as residential area, school, and

hospital, etc. During the feasibility study, the site shall be reasonably far from

the environmental protection targets (sensitive points). During the

environment assessment, further reduce and eliminate the adverse impact of

the Project on the environmental protection targets (sensitive points) by such

means as taking mitigation measures and establishing and implementing

environment management plan, and public participation, and enable possible

impacts to comply with national environmental protection laws and regulations

and standards.

(4) Implementation of the Project may also bring some adverse impacts on

surrounding environment. Such adverse impacts may be either from the

construction period or the operation period.

1) Adverse impacts of the construction period: impact of construction fugitive

dust on air quality, impact of the noise of construction vehicles and machines

196

Page 205: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

on surrounding environment, impact of construction wastewater, water and

soil losses caused by oil taking, oil dumping, excavation, filling, and temporary

piling of earthwork and stonework during the construction, and impact of

wastewater pipe network laying and construction on the traffic, and vegetation

damage by construction, etc.

2) Adverse impacts of the operation period: impact of the odor out from the

WWTP on the air, impact of slurry disposal, impact of the noises of machine

pump on surrounding environment, and impact of the discharge on Xinqiaohe

River, etc.

(5) Extent and scope of the adverse impacts caused by the Project can be

controlled within the limit allowed by national laws and regulations and

standards by taking mitigation measures, implementing environment

management plan, and public participation and negotiation, etc.

To sum up, implementation of the Project is environmentally feasible after

taking such measures as the mitigation measures, environment management

plan, and public negotiation proposed in the Project.

197

Page 206: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Appendix 1 Environmental Standards for the Project

Table 1.1 Air Quality Evaluation Criteria

No.

Name and Standard Number of

Environmental Quality

Pollutant Sample Time

Secondary Standard and Concentration Limit (mg / ㎡)

1GB3095-1996

Ambient Air Quality Standard

Total suspended particles(TSP)

Annual average 0.20Daily average 0.30

Repairable particles (PM10)

Annual average 0.10Daily average 0.15

2

TJ36-79 Hygienic Standards for the

Design of Industrial Enterprises

Ammonia (NH3)A maximum allowable

concentration0.20

Hydrogen sulfide (H2S)

A maximum allowable

concentration0.0l

Table 1.2 Water Quality Evaluation Criteria Unit: mg /L(pH excluded)

Evaluation Factor

Number and Name of Standards

pH COD BOD5 NH3-N TN TP OilNumber of Fecal Coliform

GB3838-2002"Environmental Quality Standards for Surface

Water" Class IV6-9 30 6 1.5 1.5 0.3 0.5 20,000/L

Table 1.3 Acoustic Environmental Quality Standards

TimeCategory of Acoustic Environment Functional Area Day Night

GB3096-2008 "Environmental Quality Standard for Noise" Class 2 60 50

Table 1.4 Air Pollutant Emissions Evaluation Criteria

Number and Name of Standards Pollutant

Item and Standard Limit (mg/ m³)

Concentration Limits Monitored from Fugitive Emission

GBl6297-1996 "Integrated Standard for Emission of Air Pollutants" Particulate matter Highest Concentration Level

outside the Perimeter:1.0

GBl4554-93 "Odor Emission Standards"

PollutantsFactory Standard Value for

Odor Pollutants Class II (new expansion)

Ammonia (NH3) 1.5Hydrogen sulfide

(H2S) 0.06

Odor concentration(1) 20

Note: (1) Dimensionless.

Table 1.5 Municipal WWTP Emission Standards (GB18918-2002)

198

Page 207: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Evaluation FactorType of Pollutants SS CO

D BOD5 NH3-N TP TN

Water pollutants

(daily average mg /L)

Level 1-B 20 60 20 8 (15) 1 20

Maximum concentration allowable for

factory emission (mg /

m³)

Level Ammonia Hydrogen sulfide

Odor concentration (dimensionless)

Methane (maximum density in factory / %)

Level 2 1.5 0.06 20 1

Sludge stabilization

control target

Control project

Organic matter

degradation rate (%)

Organic matter

degradation rate (%)

Water content

(%)

Organic matter

degradation rate (%)

Worm egg

mortality (%)

Value of fecal

coliform bacteria (per L)

Control target > 40 > 40 <65 > 50 > 95 > 0.01

Table 1.6 Noise Emission Standards Unit: dB (A)

Number and Name of the Standards Category Day Night

GB12348-2008 "Emission Standard for Industrial Enterprises Noise at

Boundary"

Class 2 60 50

GBl2523-90 "Noise Limits for Construction Site"

Construction phase

Main noise source Day Night

Cubic meter of earth and stone

Dozers, excavators, loaders, etc.

75 55

Piling Piling machines 85 Construction prohibited

StructureConcrete mixer, vibrator, power

saws, etc.70 55

Decoration Cranes, lifts, etc. 65 55

199

Page 208: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Appendix 2 Odor Prediction Model and Results(1) Computing Model

The odor protection distance model for the Project is the one recommended in

SCREEN 3, which uses the formula in Technical Methods for Developing

Local Air Pollutant Emission Standards.

① Atmospheric environmental protection distance is calculated based on the

recommended model in SCREEN 3 in Environmental Impact Assessment

Guidelines - Atmospheric Environment (HJ2.2-2008).

② Health protection distance is calculated based on GB/T13201-1991

Technical Methods for Developing Local Air Pollutant Emission Standards,

and the health protection distances for industries and companies are

determined by the following formula:

Dc

m

c LrBLAC

Q 5.0225.01

Where: mC - standard concentration limits, mg/m³;

L - Health protection distance required of industrial enterprises, m;r - Equivalent radius of production unit where the fugitive source of harmful

gas emissions is located, m;

A , B , C , D - coefficient for health protect distance calculation, with values

referred to Table 5 in GB/T13201-1991;

cQ - Achievable control level of fugitive harmful gas emission from industrial

enterprises, kg / h.

According to GB/T13201-1991, the maximum health protection distance

required of industrial enterprises with fugitive emission of several harmful

gases is calculated as per m

c

CQ

. When the results of m

c

CQ

calculated for two or

more of the harmful gases are on the same level, the level of health protection

distance for this industrial enterprise shall be raised by one level. Where the

health protection distance is within 100 m, the difference between two closest

levels is 50 m, and if more than 100 m but less than or equal to 1,000 m, the

difference is 100m.

(2) Fugitive Emission of Odor

Compared WWTPs of similar scale in China, the fugitive emission of

obnoxious gas for this project is developed as in Table 2.1, with calculation

200

Page 209: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

parameters for health protection distance shown in Table 2.2.

Table 2.1 Fugitive Emissions of Malodorous Gases

Name of pollutants H2S NH3

Emissions (kg / h) 0.0036 0.006

Table 2.1 Calculation Parameters for Protection Distance

LocationEmission Rate

(kg / h)Length of Nonpoint

Source (m)

Width of Nonpoint Source (m)

Area of Nonpoint

Source (㎡)

Standard Values

(mg / m³)NH3 H2SSludge

treatment area

0.006 0.0036 43 13 559 NH3: 0.2;H2S: 0.01

(3) Determining Health Protection Distance

① Protection Distance for Atmospheric Environment

The protection distance of atmospheric environment is calculated for this

project as per the model recommended in SCREEN 3 in "Guidelines for

Environmental Impact Assessment - Atmospheric Environment" (HJ2.2-2008).

The results are shown in Table 2.3.Table 2.3 Calculated Results of Atmospheric Environmental protection Distance

Location Name of Pollutants

Standard Values (mg / m³) Results

Sludge treatment area

NH3

NH3: 0.2; H2S: 0.01

No excessive point

H2SNo excessive

point

Table 3 shows that the NH3 and H2S calculated as per the atmospheric

environmental protection model exhibit no excessive points. Therefore, no

atmospheric environmental protection distance needs to be set.

② Health Protection Distance

Calculations done as per the formula in GB/T13201-1991 Technical Methods

for Developing Local Air Pollutant Emission Standards are shown in Table 2.4.

Table 2.4 Calculated Results of Atmospheric Environmental protection Distance

Location Name of Pollutants Standard Values (mg / m³) Results

Sludge treatment area NH3 NH3: 0.2; H2S: 0.01 1.7H2S 29.1

After calculation, the health protection distances for the fugitive emissions of

201

Page 210: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

NH3 and H2S are 1.7m and 29.1m respectively. According to Technical

Methods for Developing Local Air Pollutant Emission Standards, the health

protection distance for this project is 50 m. The protection distances for the

factory boundaries are shown in Table 2.5.

Table 2.5 Protection Distances for Factory Boundaries

Factory Boundaries East Boundary

West Boundary

South Boundary

North Boundary

Protection Distance (m) 0 45 24 37

202

Page 211: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Appendix 3 Materials Related to Public Participation

3.1 Information DisclosureUnder the Environmental Impact Assessment Law and the Provisional

Measure for Public Participating in Environmental Impact Assessment, the

environmental evaluator and the constructor put up the first public notice

announcing the Project in sensitive points (Xinqiao Village, Hongyang Village,

Bailong Village, Town Government, Xianfeng Middle School, Central Hospital,

and the town area) on August 18, 2011 (publicity period: August 19 - 28,

2011). Brochures were handed out on the sites. The photos in Figure 1 show

the public notice.

Under the Environmental Impact Assessment Law and the Provisional

Measure for Public Participating in Environmental Impact Assessment when

the Environmental Impact Report was completed, the environmental evaluator

and the constructor put up the first public notice announcing the Project in

sensitive points (Xinqiao Village, Hongyang Village, Bailong Village, Town

Government, Xianfeng Middle School, Central Hospital, and the town area) on

October 21, 2011 (publicity period: October 21 - 30, 2011). Brochures were

handed out on the sites. The photos in Figure 1 show the public notice.

Figure 3.1 Public Notices on Site

3.2 Meeting Minutes(1) Date: October 20, 2011

(2) Venue: meeting Room, Third Floor, Yueshan Town Government

(3) Contents of the meeting: public participation in environmental protection

for WB Loans Yueshan Town Project

(4) Attendees: 20 people, including members of the relevant stations, offices

203

Page 212: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

and institutes, experts from the environmental protection sector, parties

secretaries of Xinqiao Village and Hongyang Village committees, villager

representatives of Yingxiong Ridge and environmental evaluators.

(5) Moderator: Li Bosheng (Mayor of Yueshan Town)

(6) Clerk: Peng Xiaohua (Yueshan Town Office)

(7) Meeting Agenda:

I. Moderator introduces all the participants and hands out simplified versions

of the Project report and questionnaires.

II. Moderator introduces the Project status.

III. Environmental evaluators describe environmental impact and control

measures.

IV. Participants address the meeting (comments or suggestions on for the

feasibility of pollution preventive measures).

V. Environmental evaluators and constructors respond to the comments and

suggestions raised by the participants and initiate discussions.

VI. Meeting concludes.

(8) Minutes of the meeting are as follows:

The attendees were briefed about the Project status, potential environmental

impacts, and environmental protection measures and investment. Discussions

were held about the factors that might have impact on the surrounding

environment. A summary of the meeting is as follows:

First, the participants agreed that the Project's environmental protection

measures to be taken were technically reliable and economically feasible and

pollutant discharge in compliance with standards. Participants supported the

Project and believed that the Project would help promote local economic and

social developments. At the same time, there was also a need to protect the

environment and step up control measures during the construction and

operations and alleviate adverse impact of the Project on the environment.

Second, the participants raised a few questions and suggestions, to which the

constructors and environmental evaluators responded as follows:

1. How to Address the Noise Nuisance?

Constructors and environmental evaluators explained: noise control measures

would be implemented in strict accordance with the relevant provisions

through reasonable scheduling of construction to meet the requirements and

avoid disturbing the residents.

204

Page 213: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

2. How to Address Construction Dust?

Constructors and environmental evaluators explained: construction zones

would be demarcated and the sites would be regularly sprinkled with water to

suppress the dust. Earth and stone on the dumping site would be removed

soon as possible, and construction materials would not be stockpiled for a

long time. Works would be suspended on windy days. Roads would be

hardened and sprinkled with water to minimize the dust impact.

3. How to Address the Odor during Operation?

Constructors and environmental evaluators explained: safety management

would be strengthened during operation and the floor plan would be arranged

in reasonable way to improve greening to minimize the generation and impact

of odor.

4. How to Dispose of the Sludge?

Constructors and environmental evaluators explained: in accordance with the

relevant national regulatory requirements, sludge would be concentrated and

dehydrated before transported to the landfill where it would be buried.

5. The Moderator summarized the points: the Project was a good, tangible

thing the government was trying to do for the people. The attendees

unanimously supported the Project while the constructors needed to address

the environmental concerns of the nearby residents and prevent pollution

accidents.

Third, during the meeting, the constructors promised to put in place proactive

measures of environmental governance, reduce emissions, conserve

resources and energy and contribute to the local economic and social

developments.

205

Page 214: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Figure 3.2 Meeting Photos

3.3 Public Participation SurveyTwo rounds of surveys have been conducted through questionnaires.

3.3.1 First Round of SurveyIn the first round of the survey, 50 questionnaires (40 for individuals and 10 for

business entities) were handed out by evaluators and constructors in August

18-19, 2011, to people who were likely to be affected, mainly residents of the

villages and entities near the Project. While questionnaires were distributed,

respondents were briefed about nature, scale and investment of the Project

and the main pollutants resulted from the Project construction and operation,

and asked to offer comments and suggestions on prevention and control

measures. Respondents were told to complete the questionnaires in their sole

discretion.

In the survey, 50 questionnaires were distributed and 50 valid questionnaires

were collected (40 for individual and 10 for entities). The recovery rate was

100%. Survey statistics are shown in Table 3.1 and Table 3.2.

206

Page 215: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 3.1 Overview of the Respondents in the First Survey

Item Respondents

Proportion of Total Respondents (%)

Sex Male 40 80Female 10 20

Age30 years old 15 30

30-50 years old 32 6450 years old 3 6

Education

Junior high school and below 8 16

High school or technical school 5 10

University and above 32 64Other 5 10

207

Page 216: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Table 3.2 Results and Analysis of the First Survey

Questions Answers Respondents

Ratio (%)

Are you aware of the ProjectYes 28 56

A little 22 44No 0 0

Regarding the land acquisition for the Project, I would like to

Get reasonable economic compensation 30 60

Get some land in return 20 40Stop the acquisition 0 0

The impact of the Project on the environment is

Serious 0 0Considerable 0 0

Average 23 46Insignificant 27 54Uncertain 0 0

The construction of the Project will

Help utilize local resources 11 22Help protect the local

environment 12 24

Improve the quality of life for local people 27 54

Reduce the quality of life 0 0Cause serious pollution of

the local environment 0 0

During the construction, which of the following problem (s) will affect your

life?

Noise 20 40Dust 15 30

Land temporarily occupied by the Project 0 0

Traffic congestion caused by construction vehicles 0 0

Construction safety issues 5 10Increased employment

opportunities 10 20

Other 0 0

When the Project is completed, which of the following issue (s) will affect

your life?

Noise 5 10Exhaust 25 50

Solid waste 20 40Wastewater 0 0

Environmental health 5 10

Will the Project promote regional economic development?

Yes 50 100No 0 0

I don’t know 0 0

What is your attitude toward the Project?

Very much in favor 39 79Supportive 11 21

Against 0 0

3.3.2 Second Round of SurveyIn the second round of the survey, 50 questionnaires (40 for individuals and

10 for business entities) were handed out by evaluators and constructors in

August 18-19, 2011, after the meeting was concluded, to the attendees,

people and entities who were likely to be affected. While questionnaires were

distributed, respondents were briefed about nature, scale and investment of

the Project, the main pollutants resulted from the Project construction and

208

Page 217: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

operation, control approaches and treatment, means of discharge and

predicted impact on the environment and asked to offer comments and

suggestions on prevention and control measures. Respondents were told to

complete the questionnaires in their sole discretion.

In the survey, 50 questionnaires were distributed and 50 valid questionnaires

were collected (40 for individual and 10 for entities). The recovery rate was

100%. Survey statistics are shown in Table 3.3 and Table 3.4.

Table 3.3 Overview of the Respondents in the Second Survey

Item Respondents

Proportion of Total Respondents (%)

Sex Male 40 80Female 10 20

Age30 years old 15 30

30-50 years old 32 6450 years old 3 6

Education

Junior high school and below 8 16

High school or technical school 5 10

University and above 32 64Other 5 10

Table 3.4 Results and Analysis of the Second Survey

Questions Answers Respondents

Ratio (%)

Are you aware of the ProjectYes 28 56

A little 22 44No 0 0

The impact of the Project on the environment is

Serious 0 0Considerable 0 0

Average 23 46Insignificant 27 54Uncertain 0 0

The construction of the Project will

Help utilize local resources 11 22

Help protect the local environment 12 24

Improve the quality of life for local people 27 54

Reduce the quality of life 0 0Cause serious pollution to the local environment 0 0

Are the noise and dust control measures feasible during the Project construction?

Yes 50 100No 0 0

Not sure 0 0Are the sludge and odor control

measures feasible after completion and during the operation?

Yes 50 100No 0 0

Not sure 0 0Will the Project promote regional Yes 50 100

209

Page 218: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

economic development? No 0 0I don’t know 0 0

What is your attitude toward the Project?Very much in favor 39 79

Supportive 11 21Against 0 0

210

Page 219: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Sample Form of the First Public Participation SurveyPublic Participation Questionnaire (for individuals)

Project

Hunan Integrated Economic

Development Demonstration

Town Project (Yueshan Town

Subproject, Xiangxiang City)

Utilizing WB Loans

Construction SiteYueshan Town,

Xiangxiang City

Project profile:

The Project involves two major parts, the WWTP and supporting facilities and the farmers

market in Yueshan Town, Xiangxiang City. The Project also includes urban software

constructions. The proposed site for Yueshan WWTP is in Yingxiong Ridge Group,

Xinqiaohe Village, Yueshan Town, Xiangxiang. It covers an area of 1,0193 ㎡ with designed

capacity of 6,000 m³/ d which is to be completed in two phases. This construction delivers

3,000m³/ d, including the WWTP and its supporting networks serving the central areas of

Yueshan Town within 2.03 k㎡ in the short term and 3.22 k㎡ in the long term. The Yueshan

Farmers Market is located in Pukou Group, Xinqiao Village and covers an area of 12 mu

with a total construction area of 6,000 ㎡, including market stalls 3,000 ㎡, shops 2,100 ㎡,

management space 200 ㎡ and power stations, pump rooms, refuse collection points, public

rest rooms and other facilities 500 ㎡, in addition to 15 parking spaces. The soft environment

mainly includes seminars, exchange of experience, study tours and technical training for

farmers.

The construction of the Project will have certain impact on the environment and the

residents, as there will be emissions, noise and disturbance with the ecology. The waste gas

and noise are resulted from construction vehicles and machinery, and their impact will be

minimized by installing mufflers and noise reduction and exhaust purification devices. Strict

environmental management will put in place during construction to control the noise and

dust, and effective measures will be implemented to prevent safety and environmental

issues.

After completion of the Project, vehicle exhaust, domestic wastewater, wastewater from the

market, equipment noise, trading noise, domestic waste, wastewater sludge and market

waste. Wastewater will be discharged through the pipelines to the wastewater plant where it

will be treated, solid waste will be collected and transported to the urban waste transfer

station, sludge will be dewatered and transported out of the town in closed containers, and

noise will be minimized with mufflers and other installations. Pollutants generated by the

Project can be discharged in compliance with the standards and will not have significant

impact on the environment. We would like to know your attitude towards this project as well

as your comments. Please make the following choices and leave your comments and

211

Page 220: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

suggestions based on your knowledge and opinions.

Name Zhou

Wenfe

i

Sex Male Ethnic

Identity

Han Educa

tion

Junior

high

school

Age 42

Family

Size

3 Number of Staff 2 Occup

ation

Agricu

lture

Conta

ct

13787

32102

9

Address Yingxiong Group (No.), Xinqiao Village (Street), Yueshan Town (Township),

Xiangxiang County

Main

source of

income

Growing

plants

Growing

livestock

or fish

Industrial

companies or

mining

Migrant

worker

Other

1. Are you aware of the Project? Yes A little No

2. Regarding the land acquisition for

the Project, I would like to:

Get reasonable

economic

compensation

Get

land in

return

Stop the

acquisition

3. The impact of the Project on the environment is:

serious; considerable; average; insignificant uncertain

4. The Project will:

help utilize local resources; help protect the local environment; improve the quality of

life for local people; reduce the quality of life; cause serious pollution the local

environment

5. During the construction, which of the following problem (s) will affect your life?

Noise; Dust; Land temporarily occupied by the Project; Traffic congestion caused

by construction vehicles; Construction safety issues; Increased employment

opportunities; Other.

6. When the Project is completed, which of the following issue (s) will affect your life?

Noise; Exhaust; Solid waste; Wastewater; Environmental health.

7. Will the Project promote regional economic development?

Yes; No; I don’t know.

8. What is your attitude toward the Project? (if against, please state why)

Very much in favor; Supportive; Against

Other suggestions and requests

Operator Li Shuyuan Date of Survey August 28, 2011

212

Page 221: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Public Participation Questionnaire (for entities)

Project

Hunan Integrated Economic

Development Demonstration Town

Project (Yueshan Town Subproject,

Xiangxiang City) Utilizing WB Loans

Construction SiteYueshan Town,

Xiangxiang City

Project profile:

A total investment of 5637.4 yuan is put into building the Project. The construction includes:

①WWTP in Yueshan Town, Xiangxiang and supporting facilities. The Yueshan WWTP is

located in Xinqiaohe Village, Yueshan, Xiangxiang, and covers an area of 10193 ㎡ (or

15.29 mu), with a capacity of 10,000 m³/ d constructed in two phases. This construction will

deliver 5,000 m³/ d supported by 13,520 m of urban wastewater pipelines. This wastewater

treatment plan only receives domestic wastewater water, industrial wastewater whose

quality is comparable with domestic wastewater water or pretreated industrial wastewater in

compliance with national standards and suitable to be treated together with domestic

wastewater water. Wastewater will be treated and discharged into the Xinqiaohe River.

According to the plan, wastewater from central areas of the Yueshan Town will be collected.

② Research in small town industrial development and economic development plan for

Yueshan Town will be made. ③ Programs will be made to enhance project management

and monitoring capacity. Project managers will be organized for training and study tours to

improve levels of urban management and construction project management. The

construction period starts in July 2012 and ends in June 2014. Currently, construction

preparations are in progress.

The construction of the Project will have certain impact on the environment and the

residents, as there will be emissions, noise and disturbance with the ecology. The waste

gas and noise are resulted from construction vehicles and machinery, and their impact will

be minimized by installing mufflers and noise reduction and exhaust purification devices.

Strict environmental management will put in place during construction to control the noise

and dust, and effective measures will be implemented to prevent safety and environmental

issues.

After completion of the Project, vehicle exhaust, domestic wastewater, wastewater from the

market, equipment noise, trading noise, domestic waste, wastewater sludge and market

waste. Wastewater will be discharged through the pipelines to the wastewater plant where it

will be treated, solid waste will be collected and transported to the urban waste transfer

station, sludge will be dewatered and transported out of the town in closed containers, and

noise will be minimized with mufflers and other installations. Pollutants generated by the

Project can be discharged in compliance with the standards and will not have significant

impact on the environment. We would like to know your attitude towards this project as well

as your comments. Please make the following choices and leave your comments and

suggestions based on your knowledge and opinions.

213

Page 222: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Entity Yueshan Rural Credit Cooperative, Xiangxiang

(Common Seal)

Nature

of Entity

Enterprise Staff 25 Contact

Address Xinqiao Village, Yueshan Town

(township), Xiangxiang County

Telephone 0731-56540248

1. Are you aware of the Project? Yes A little No

2. Regarding the land acquisition for

the Project, I would like to:

Get

reasonable

economic

compensation

Get land in

return

Stop the

acquisition

3. The impact of the Project on the environment is:

serious; considerable; average; insignificant uncertain

4. The Project will:

help utilize local resources; help protect the local environment; improve the quality

of life for local people; reduce the quality of life; cause serious pollution the local

environment

5. During the construction, which of the following problem (s) will affect your life?

Noise; Dust; Land temporarily occupied by the Project; Traffic congestion caused

by construction vehicles; Construction safety issues; Increased employment

opportunities; Other.

6. When the Project is completed, which of the following issue (s) will affect your life?

Noise; Exhaust; Solid waste; Wastewater; Environmental health.

7. Will the Project promote regional economic development?

Yes; No; I don’t know.

8. What is your attitude toward the Project? (if against, please state why)

Very much in favor; Supportive; Against

Other suggestions and requests

Operator Date of Survey September 1, 2011

214

Page 223: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Sample Form of the Second Public Participation SurveyPublic Participation Questionnaire (for individuals)

Project

Hunan Integrated Economic

Development Demonstration

Town Project (Yueshan

Town Subproject,

Xiangxiang City) Utilizing

WB Loans

Construction SiteYueshan Town,

Xiangxiang City

Project Profile:

In order to further promote Yueshan’s healthy and sustainable development of economy and

society, improve the quality of living environment in the town and address the insufficient

funds for infrastructure construction, in line with World Bank loans’ purpose "to improve the

environment and promote sustainable development" and the realities of Yueshan Town, and

based on the on-site surveys conducted by experts from provincial, municipal and local

development and reform commissions, decisions have been made to step up the construction

of integrated economic development demonstration town project to allow continued, fast

economic and social developments of Yueshan Town. The Project aims to improve urban

infrastructure, public services and investment environment, enhance fast economic growth,

protect people’s well-being, and build a solid foundation for the coordinated, sustained and

steady development of Yueshan’s economy and society. With thorough and careful

investigations of the town, the Yueshan People’s Government has chosen Xinqiaohe Village,

Yueshan Town, Xiangxiang City, as the Project site, which covers an area of 1,0193 ㎡ (or

15.29 mu), with a total investment of 56.374 million yuan, including a WWTP and supporting

pipe networks that serve the urban area of Yueshan Town.

The construction of the Project will have certain impact on the environment and the residents,

as there will be emissions, noise and disturbance with the ecology. The waste gas and noise

are resulted from construction vehicles and machinery, and their impact will be minimized by

installing mufflers and noise reduction and exhaust purification devices. Strict environmental

management will put in place during construction to control the noise and dust, and effective

measures will be implemented to prevent safety and environmental issues.

After completion of the Project, vehicle exhaust, domestic wastewater, wastewater from the

market, equipment noise, trading noise, domestic waste, wastewater sludge and market

waste. Wastewater will be discharged through the pipelines to the wastewater plant where it

will be treated, solid waste will be collected and transported to the urban waste transfer

station, sludge will be dewatered and transported out of the town in closed containers, and

noise will be minimized with mufflers and other installations. Pollutants generated by the

Project can be discharged in compliance with the standards and will not have significant

impact on the environment. We would like to know your attitude towards this project as well as

your comments. Please make the following choices and leave your comments and

215

Page 224: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

suggestions based on your knowledge and opinions.

NameLiu

Jingyang

Se

xMale

Ethnic

IdentityHan Education

Technical

schoolAge 32

Family

Size5

Number of

Staff4

Occupatio

n

Governm

ent

official

Mobile

13873

24665

8

Addres

s

Tanmenkou Group (No.), Xinqiao Village (Street), Yueshan Town (township),

Xiangxiang County

Main

source

of

income

Growing

plants

Growing

livestock

or fish

Industrial

companies or

mining

Migrant

worker

Other

1. Are you aware of the Project? Yes A little No

2. The harm of the Project causes to the environment is:

serious; considerable; average; insignificant uncertain

3. The Project will:

help utilize local resources; help protect the local environment; improve the quality of

life for local people; reduce the quality of life; cause serious pollution the local

environment

4. Are the noise and dust control measures feasible during the Project construction?

Yes; No; I don’t know.

5. Are the sludge and odor control measures feasible after completion and during the

operation?

Yes; No; I don’t know.

6. Will the Project promote regional economic development?

Yes; No; I don’t know.

7. What is your attitude toward the Project? (if against, please state why)

Very much in favor; Supportive; Against

Other suggestions and requests

When the Project is completed, operating cost and model shall be identified to ensure that the

Project functions to improve urban environment and people’s quality of life and promote the

town’s economic development.

Operator Liu Shuai Date of Survey October 20, 2011

216

Page 225: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Public Participation Questionnaire (for entities)

Project

Hunan Integrated Economic Development

Demonstration Town Project (Yueshan

Town Subproject, Xiangxiang City) Utilizing

WB Loans

Construction Site

Yueshan

Town,

Xiangxiang

City

Project profile:

To further promote the healthy sustainable development of social economy of Yueshan

Town, to improve township residential environment quality and to change the insufficient

status of funds for basic facilities, Yueshan Town decides, according to the purpose of World

Bank (“WB”) Loans “to improve the environment and to keep sustainable development”, to

use the WB loans to quicken the construction of Hunan Integrated Economic Development

Demonstration Town Project and to practically promote the fast development of social

economy of Yueshan Town, on the base of reality and upon the site survey carried out by

the development and reform departments of the province, the city and the town and by

experts. The construction of the Project aims at raising the level of urban basic facilities of

Yuehsan Town, strengthening public service function, improving investment environment,

boosting swift economic growth of Yueshan Town and ensuring people living and working in

peace and contentment, so as to lay a sound foundation for the all-around, harmonious,

sustainable and steady development of social economic environment of Yueshan Town.

With thorough and careful investigations of the town, the Yueshan People’s Government

has chosen Xinqiaohe Village, Yueshan Town, Xiangxiang City, as the Project site, which

covers an area of 12.8 mu), including a WWTP and supporting pipe networks serving the

urban area of Yueshan Town.

The construction of the Project will have certain impact on the environment and the

residents, as there will be emissions, noise and disturbance with the ecology. The waste

gas and noise are resulted from construction vehicles and machinery, and their impact will

be minimized by installing mufflers and noise reduction and exhaust purification devices.

Strict environmental management will put in place during construction to control the noise

and dust, and effective measures will be implemented to prevent safety and environmental

issues.

After completion of the Project, vehicle exhaust, domestic wastewater, wastewater from the

market, equipment noise, trading noise, domestic waste, wastewater sludge and market

waste. Wastewater will be discharged through the pipelines to the wastewater plant where it

will be treated, solid waste will be collected and transported to the urban waste transfer

station, sludge will be dewatered and transported out of the town in closed containers, and

noise will be minimized with mufflers and other installations. Pollutants generated by the

Project can be discharged in compliance with the standards and will not have significant

impact on the environment. We would like to know your attitude towards this project as well

as your comments. Please make the following choices and leave your comments and

217

Page 226: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

suggestions based on your knowledge and opinions.

Entity Yueshan Town Central Township

(Common Seal)

Nature

of Entity

Staf

f

50 Contact

Address Xinqiao Village, Yueshan Town Mobile 137862266

7

1. Are you aware of the Project?

Yes A little No

2. The impact of the Project on the environment is:

serious; considerable; average; insignificant uncertain

3. The Project will:

help utilize local resources; help protect the local environment; improve the quality

of life for local people; reduce the quality of life; cause serious pollution the local

environment

4. During the construction, are the measures to control noise and dust feasible?

Yes; No; I don’t know.

5. When the Project is completed, are the measures to control sludge and odor during

operations feasible?

Yes; No; I don’t know.

6. Will the Project promote regional economic development?

Yes; No; I don’t know.

7. What is your attitude toward the Project? (if against, please state why)

Very much in favor; Supportive; Against

Other suggestions and requests

Operator Yan Han Date of Survey October 20,

2011

218

Page 227: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Sign-in Sheet for Public Participation Meeting

Meeting on Hunan Integrated Economic Development Demonstration Town Project (Yueshan Town Subproject,

Xiangxiang City) Utilizing WB Loans Sign-in SheetNo

.Name Sex

Ethnic

IdentityEducation Company (occupation) or Address Contact Signature

1 Li Bosheng Male Han University Mayor, Yuanshan People's Government

2 Gao Aichao Male Han Technical

School

Linnian Station, Yueshan 1387323370

3

Li Bosheng

3 Chen Jianjun Male Han High School Xinqiao Village, Yueshan 1397329976

6

Gao Aichao

4 Wang Shulin Male Han High School Xinqiao Village, Yueshan 1387322125

3

Chen Jianjun

5 Wu Zhongyi Male Han High School Xinqiao Village, Yueshan 1561628218

1

Wang Shulin

6 Chen Zhi Male Han High School Xinqiao Village, Yueshan 1323732512

9

Wu Zhongyi

7 Liu Jingyang Male Han Junior College Yueshan Urban Planning Office 1387324665

8

Chen Zhi

8 Male Han Junior College Yueshan Urban Planning Office 1378623191

8

Liu Jingyang

9 Male Han High School Xinqiao Village, Yueshan 1397322407

8

219

Page 228: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

10 Zhong Mengqi Female Han High School Xinqiao Village, Yueshan 1357405182

8

11 Peng Xiaohua Male Han Bachelor’s

Degree

Town Hall, Yuanshan 1378626138

7

Zhong Mengqi

12 Yang Jian Male Han High School Environmental Protection Station, Yueshan 1378932339

0

Peng Xiaohua

13 Zhou Zhaohui Male Han High School Qingqiao Village, Yueshan 1320132717

8

Yang Jian

14 Liao Zhijun Male Han High School Yueshan Town 1587329837

5

Zhou Zhaohui

15 Peng Chuanyang Male Han High School Yueshan Town 1305515378

8

Liao Zhijun

16 Male Han Junior College 1378932665

8

Peng Chuanyang

17 Chen Yi Male Han Junior College Farmer, Yueshan Town

18 Liu Wenhua Male Han Master’s Degree World Bank Provincial PMO 1387313918

9

Chen Yi

19 Tang Guirong Female Han Master’s Degree Changsha Environmental Protection Career Technical

College

1397580044

9

Liu Wenhua

20 Wu Zhongwei Male Han Master’s Degree Changsha Environmental Protection Career Technical

College

1800381399

5

Tang Guirong

21

22

220

Page 229: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

23

24

25

26

27

221

Page 230: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Appendix 4 Planning and Detail Budget of Project Environmental MonitoringSchedule 4 Planning and Detail Budget of Environmental Monitoring of the WWPT of Yueshan Town Project

Monitoring Period

Environmental Factor

Distribution of Monitoring Stations (Quantity)

Monitoring Item Monitoring Frequency

Unit Price(RMB/Period)

Annual Cost(RMB/Year)

Period Cost (RMB)

Total(RMB) Monitored by

Construction Period(3 Years)

Ambient Air

4 Monitoring Stations: Xinqiao Village, Hongyang Village, Central Hospital and Xianfeng Middle School

TSP4 Periods/Year, 2 Days/Period, and 1 Time/Day

480 1920 5760

13080

Xiangxaing City Environmental Monitoring Station

Water Quality

I Monitoring Station: Wastewater Collection Poor on the Construction Spot

pH, Suspensions, Petroleum

4 Periods/Year, 1 Day/Period, and 1 Time/Day

130 520 1560

Noise

4 Monitoring Stations: Xinqiao Village, Hongyang Village, Central Hospital and Xianfeng Middle School

LeqdB (A)

4 Periods/Year, 1 Day/Period, and 2 Times/Day (Once each during Daytime and Night)

480 1920 5760

Subtotal (RMB) 4360 6800Operation Period(3 years)

Ambient Air 6 Monitoring Stations: Xinqiao Village, Hongyang Village, and 4 Boundaries of the WWTP

Density of H2S, NH3 and Odor

4 Periods/Year, 1 Day/Period, and 4 Times/Day

15840 63360 190080 256740

222

Page 231: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Water Quality

1 Monitoring Station: General Outlet of the WWTP, the 800m lower reaches of the outlet, and the 2000m lower reaches of the outlet

pH, DO, COD, BOD5, NH3-N, TP, TN, SP, Oil and grease, Petroleum, Chroma and Fecal Coliform

3 Periods/Year and Once Each during Dry, Wet and Normal Water Seasons, 3 Days/Period and 1 Time/Day

4620 18480 55440

Noise

6 Monitoring Stations: Xinqiao Village, Hongyang Village, and 4 Boundaries of the WWTP

LeqdB (A)

4 Periods/Year, 1 Day/Period, and 2 Times/Day (Once each during Daytime and Night)

720 2880 8640

Sludge

1 Monitoring Station: Sludge Discharged from Sludge Pool

Heavy Metals (As, Hg, Pb, Cr, Cd, Cu)

2 Pperiods/Year, 1 Day/Period, and 1 Time/Day

430 860 2580

Subtotal (RMB) 85520 256740total (RMB) 269820

223

Page 232: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Appendix 5 Project Associated Works (Environmental Monitoring Plan of Quanhu Garbage Disposal

Plant, Xiangxaing City)Chart 5 Environmental Monitoring Plan of Quanhu Garbage Disposal Plant, Xiangxaing City

Monitoring Period

Environmental Factor

Distribution of Monitoring Stations (Quantity)

Monitoring Item

Monitoring Frequency Monitored by

Unit Price(RMB/Period)

Annual Cost(RMB/Year)

Period Cost (RMB)

Total(RMB)

Operation Period (3 years)

Ambient Air

3 Monitoring Stations: 1 Spot at the upper Drift of the Annual Leading Wind and 2 at the down Wind of the Annual Leading Wind

Particles, Odor Strength, Ammonia, H2S and CH4

4 Periods/Year, 1 Day/Period, and 4 Times/Day

Qualified Monitoring Organizations

12560 50240 150720

239460 (Paid by the owner of the garbage disposal plant and not included in the project expenses)

Noise Noise with the Site Boundary (2 Spots) LeqdB (A)

4 Periods/Year, 1 Day/Period, and 2 Times/Day (Once Each during Daytime and Night)

240 960 2880

Ground WaterAt the Wells dug by the Villagers with Undefined Spots

NH3-N, pH, COD and Unionized Ammonia

3 Periods/Year and Once Each during Dry, Wet and Normal Water Seasons, 1 Day/Period and 1 Time/Day

5880 17640 52920

Sludge Sampling within the Site

pH, Organic Matters, Water content, Total Zn, Total Cu, Total Pb, Total Cd, Total Hg, Total As and

3 Periods/Year, 1 Day/Period, and 3 Times/Day

2400 7200 21600

224

Page 233: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Total Cr

LeachateOutlet of the Leachate Disposal Facility (One)

Chroma, COD, BOD5, SS, NH3-N, Fecal Coliform, TN and Hexavalent Chromium

3 Periods/Year and Once Each during Dry, Wet and Normal Water Seasons, 1 Day/Period and 1 Time/Day

1260 3780 11340

Subtotal 22340 79820 239460Total (RMB) 239460

225

Page 234: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Appendix 6 Summary of Project Environmental Management PlanSchedule 6 Summary of Environmental Management Plan of Yueshan Town WWTP Project

Possible Impact Mitigation Measures Execution

PeriodExecuted by Monitored by Monitoring

FactorsMonitoring Frequency

Monitoring Station

Environmental Management Budge (RMB)

/

a. According to the real construction of the project pipe network, it’s designed that the washing of trucks and machines are not carried out in the construction site but in special washing places.b. Regarding to expropriation and relocation, related detail plans shall be provided as soon as the confirmation of the design proposal. And immediate negotiation with the local residents so as to reach harmonious relocation and compensation negotiation;c. Consideration shall be mainly settled on the protection of such sensitive targets as surrounding residents against the construction, and countermeasures about practical pollution prevention and control shall be provided so as to reduce the interference to sensitivity targets; andd. Earthworks shall be balanced and optimized so as to achieve the balance of excavation and filling. It shall be considered first if Earth and stones abandoned can be circulated on the site or in the WWTP; if not, residue shall be cleaned and removed according to required procedures and delivered to specified disposal location.

Design Period

The Constructor

Xiangxaing City Environmental Protection Bureau

/ / / /

Waste Gas Pipe network Construction

a. it shall be conducted to strengthen management, to construct in a civilized way and to lightly lift and unload construction materials.b. Tarp shall be covered with on the trucks delivering such materials easy to causing dust as lime, sand and stone, cement, etc.;c. The construction site shall be

Construction Period

The Constructor

Xiangxaing City Environmental Protection Bureau

TSP 4 Periods/Year, 2 Days/Period, and I Time/Day

4 Monitoring Stations: Xinqiao Village, Hongyang Village, Central Hospital and Xianfeng

113080 (13080 if including Monitoring Expense)

226

Page 235: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

surrounded with colored steel sheets for closed construction; andd. Temporary earthwork yard shall be watered and covered with nets so as to avoid dust emission.

Middle School

Plant Construction

a. During construction period, transportation management shall be strengthened, with tarp covered on trucks and no overload;B. Roads shall be watered frequently so as to reduce the chances of dust emission and the pollution of dust;c. it’s forbidden to discard construction garbage randomly, especially off the red construction lines;d. The construction site shall be surrounded with colored steel sheets for closed construction;e. Temporary earthwork yard shall be watered and covered with nets so as to avoid dust emission;f. it shall be conducted to strengthen management, to construct in a civilized way and to lightly lift and unload construction materials;g. No overload happens during loading and no drop from truck carrying earth during transportation. Before any traffic leaves the site, dirt and dust on the wheels shall be cleaned off first so as to avoid any scattering on the way; andh. Labor protection of the staff shall be well carried out and an anti-dust mask shall be worn.

Wastewater

Pipe network Construction

a. According to the real construction of the project pipe network, it’s designed that the washing of trucks and machines are not carried out in the construction site but in special washing

pH, Suspensions, Petroleum

4 Periods/Year, 1 day/Period, and 1 Time/Day

I Monitoring Station: Wastewater Collection Poor on the

227

Page 236: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

places;b. The construction shall be carried out in other times rather than wet season, if possible; andc. Oil leaked shall be recycled with buckets, poured into waste oil tanks after being collected with special buckets and hand over waste oil reclamation depot; and waste oil dropped on the earth shall be cleaned with cotton.

Construction Spot

Plant Construction

a. Plant construction organization shall build a depositing reservoir during the construction period so that rain drops and accumulated water can be reused for washing and watering after depositing to the required degree; andb. As for temporary domestic facilities built during the construction period, kitchen wastewater shall be reused for watering the Plant site after removing oil and depositing, and temporary rest rooms shall be installed with dry latrines, the wastes in which shall be cleaned away regularly.

Solid Wastes

Pipe network and Site Construction

a. Domestic waste shall be packed with bags, separately collected and be collective cleaned away by the environmental protection department for further disposal;b. The construction site of the WWTP shall be provided with dry latrines which shall be cleaned regularly. Shit shall be reused as agricultural fertilizer after collective gathering;c. Construction garbage shall be separately packed, and if recyclable, those garbage shall be recycled by an appointed personnel and those but if

/ / /

228

Page 237: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

not, those garbage shall be reused to fill the construction site of the WWTP; andd. According to Administration regulations for City Construction Garbage, the Construction organization shall be responsible for the disposal of construction garbage. Before disposal, the organization shall file application to the environmental sanitation department and deliver the garbage via the required transportation line within the required duration. Earthwork residue shall be minimized, reused and harmlessly treated as possible. According to the engineering construction status of the city, those residues shall be first used to fill other construction sites of the city after discussion with the city construction department and the city environmental sanitation department. It’s better to be disposed on the site as possible; and if not, it shall be delivered to a required place outside of the city and properly stacked.

229

Page 238: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Continue Schedule 6 Summary of Environmental Management Plan of Yueshan Town WWTP Project

Possible Impact Mitigation Measures Execution

PeriodExecuted by Monitored by Monitor

FactorsMonitoring Frequency

Monitoring Station

Environmental Management Budge (RMB)

Noise

Pipe network Construction

a. During construction, the operation time of construction equipment shall be properly arranged so as to avoid that lots of equipment with high noise may operated at the same time or at night. Night transportation shall be reduced as possible and operation during 2:00-6:00 is forbidden. Construction works required to be carried out at night shall be approved by the related local department first and noise barriers shall be built between the noise source and the sensitive points;b. As for construction on the roads where the school is located, the construction organization shall negotiate with the school first to arrange construction works with high noise carried out during winter and summer vacations, weekends or after-school durations in the construction period as possible and the construction works shall be quickened to shorten construction period and to reduce the interference. Rush construction are carried out during weekends so as to reduce the disturbance to the teaching of the school; andc. As for the construction on the roads where the hospital is located, the construction organization shall negotiate with the hospital and set up moveable noise barriers.

Construction Period

The Constructor

Xiangxaing City Environmental Protection Bureau

LeqdB (A) 4 Periods/Year, 1 Day/Period, and 2 Times /Day (Once Each during Daytime and Night)

4 Monitoring Stations: Xinqiao Village, Hongyang Village, Central Hospital and Xianfeng Middle School

Plant A, The operation time of construction

230

Page 239: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Construction

equipment shall be properly arranged, and those equipment with high noise shall not be operated at night;B. Construction works at different periods shall be carried out according to Noise Limits for Construction Sites (GB12523-90) and such measures as setting barriers and using equipment with lower noise shall be taken to strictly control noise during the construction period;c. Equipment with lower noise shall be chosen as possible, such as using hydraulic machines instead of diesel machines and installing mufflers to the mixers;d. The noise of fixed equipment and such machines used for digging and moving earth as bulldozers can be reduced via installing mufflers to the vent pipe and separating vibration parts from the engine; ande. The power-generating machinery are regularly maintained and repaired.

Ecological Environment

(1) Yards for discarding earth and residue shall be well selected but it’s better to use up. The engineering is separated into different sections so as to reduce the impact on the sight;(2) Earth digging shall avoid to be carried out in wet season and before the coming of the wet season, the sides formed through digging and filling and by the discarded earth shall be well treated;(3) Drain ditches shall be dug at the surrounding of the yard for discarding earth to avoid water loss and earth erosion. Temporary yards shall be well covered after the completion of the construction; and(4) Environmental protection and monitoring organizations shall be established and special personnel responsible for environmental protection

/ / /

231

Page 240: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

are appointed to strengthen construction management and promotion of environmental protection, to remind people to protect the environment, and to forbid construction personnel from lumbering in a destructive manner; the construction contract shall require the contractor to carry out construction strictly according to construction and expropriation scope and to stack residue at specified places.

Waste Gas (1) In view of the stronger odor and the leading wind in summer, main facilities to cause odor such as sludge pool and sludge dewatering chamber are arranged at the down wind or crosswind of the leading wind in summer, via optimizing plant layout, so as to guarantee the sanitation distance to the sensitive points;(2) When the Project is completed and put into operation, production management shall be strengthened, pollution shall be prevented from the sources, every production process emitting odor shall be well controlled and a complete job responsibility system and a monitoring system shall be set up;(3) Safety management shall be conducted. When the Project is completed and put into operation, the personnel shall be trained on accidence disposal and all monitoring equipment shall be regularly maintained so as to make sure successful operation and the monitor and control of odor. When coming into the Pump chamber, the personnel shall pay attention to the aeration so as to avoid excessive accumulation of H2S and NH3 which are harmful to the personnel;(4) Land use shall be well planned. According to the requirements of sanitation protection distance, the planning department shall re-plan the land within the scope and specified that the building of such sensitive points as residential areas, schools, hospitals is forbidden; and(5) Greening shall be reinforced. Since the causing of

Operation Period

The Operator

Xiangxaing City Environmental Protection Bureau

Density of H2S, NH3

and Odor

4 Periods/Year, 1 Day/Period, and 1 Time/Day

6 Monitoring Stations: Xinqiao Village, Hongyang Village, and 4 Boundaries of the WWTP

406740 (256740 if including Monitoring Expense)

232

Page 241: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

odor is unavoidable to the WWTP, greening engineering is very important to the improvement of environmental quality and the Plant greening design shall be completed with the construction detail design at the same time. Plant greening is to completely cover all bare earth so flowers and trees shall be widely planted. Arbors and bushes such as pine trees are planted on both sides of the roads within the pant, and high and huge trees such as polar and locus trees are planted around the Plant boundaries to form a multiple-lay shelterbelt so as to reduce the impact degree of foul gad.

Noise

(1) Low-noise type of equipment shall be selected for such shops with higher noise as the wastewater pump room, the sludge pump room, the blast fan chamber and the sludge dewatering chamber and de-noising measures including damping cushions or flexible joints shall be adopted during the installation;(2) Sound insulation shall be taken to walls, doors and windows between the operation room and equipment room so as to reduce the noise impact to the personnel;(3) The design adopts the principle of sonic distance to reduce the impact of noise. In the general layout, the noise source has the farthest distance to the buildings so as to provide a good work environment for the staff of the WWTP; and(4) To match the engineering construction, high arbors and bushes are planted together to form a mixed shelter belt, greening area within the Plant is widened so as to reach the effect of using vegetation to absorb noise.

Operation Period

The Operator

Xiangxaing City Environmental Protection Bureau

LeqdB (A)

4 Periods/Year, 1 Day/Period, and 2 Times/Day (Once Each during Daytime and Night)

6 Monitoring Stations: Xinqiao Village, Hongyang Village, and 4 Boundaries of the WWTP

233

Page 242: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Appended to Schedule 6 Summary of Environmental Management Plan of Yueshan Town WWTP Project

Possible Impact Mitigation Measures Execution

PeriodExecuted by Monitored by Monitor

FactorsMonitoring Frequency

Monitoring Station

Environmental Management Budge

Wastewater (1) Before flowing into the WWTP, industrial wastewater shall be re-treated to meet the standard of Grade III required in Discharge Standard for Municipal Wastewater (CJ18-86) and Integrated Wastewater Discharge Standard (GB8978-1996). And at the mean time, it must be sure that the treatment of the first class pollutants harmful to human health shall be strictly controlled within the shop and discharged into the WWTP after reaching the standard;(2) Wastewater discharged from medical organizations shall reach the related limits of pollutants required on GB18466-2005 Discharge Standard of Water Pollutants for Medical Organizations;(3) The project construction and operation management shall be strengthened so as to guarantee that wastewater treatment facilities and the efficiency reach the standards and requirement designed, that the Project run stably and normally in the long-term and that the tail water is discharged after treatment and reaching the related standards;(4) All environmental management regulations and systems are established and job functional training plans are full executed for the staff on all posts.(5) Equipment maintenance and repairing are well done to reduce and eliminate any malfunction in time so as to avoid wastewater discharged beyond standards and to prevent from restful discharge accidents;(6) Outlet is managed in a standardized manner. Auto measurer of wastewater amount and auto proportional sampling machine are set at the end outlet and there shall be online monitoring

Operation Period

The Operator

Xiangxaing City Environmental Protection Bureau

pH, DO, COD, BOD5, NH3-N, TP, TN, SP, Oil and Grease, Petroleum, Chroma and Fecal Coliform

4 Periods/Year and 1 Period/Quarter, 3 Days/Period and I Time/Day

1 Monitoring Station: General Outlet of the WWTP

234

Page 243: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

equipment for measuring such main water quality indexes as pH, water temperature and COD;(7) Spare equipment is prepared so as to prevent the cause of adverse consequences in the case of emergent preparedness of accidences,; and(8) Domestic wastewater and wastewater from sludge washing flow into wastewater treatment facilities via wastewater pipeline and are discharged after being treated to required standard with engineering wastewater.

Sludge (1) Solid wastes in the WWTP, especially sludge, cannot be randomly discarded but properly collected, stocked and regularly delivered to garbage filling yard for sanitation filling;(2) It’s forbidden to discharge sludge of the Project to non-special solid waste yards such as surface water and the banks, valleys, low-lying areas, water-eroded caves and farmland;(3) The temporary stock of sludge in the WWTP must be well protected via foundation anti-seepage measures so as to prevent from such loss and secondary pollution as rain leaching and washing and the enrichment and large emission of odor;(4) The WWTP shall properly take the responsibility of sludge treatment, carry out overall management of the production, transportation, stock, treatment and disposal of sludge, compile and conduct regulations, working process and requirements on environmental protection against sludge, establish a special monitoring department or appoint special (or pluralistic) monitoring personnel, guarantee proper disposal of sludge and strictly forbid the pouring, stacking, discarding and scattering of sludge randomly;(5) Sludge treatment shall be carry out in a minimization, stabilization and harmless manner, and sludge treatment facilities shall be planned, constructed and put into operation at the same time with wastewater disposal facilities;

Operation Period

The Operator

Xiangxaing City Environmental Protection Bureau

Heavy Metals (As, Hg, Pb, Cr, Cd, Cu)

2 Periods/Year, 1 Day/Period, and 1 Time/Day

1 Monitoring Station: Sludge Discharged from Sludge Pool

235

Page 244: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(6) A sludge management accounting system and a transportation duplicate-form system shall be established. The WWTP shall set up a sludge management system to record in detail the production quantity, the transportation quantity, the disposal quantity, the destination and so on, and regularly report to Xiangxiang City Environmental Protection Bureau. A sludge transportation duplicate-form system shall be established and the transportation duplicate-forms shall be filled in according to the reality when the WWTP transports sludge;(7) Sludge transportation is standardized. The organizations participating in sludge transportation shall be a qualified carrier with related road goods transportation operation licenses and it’s forbidden that any individual or any organization without related operation licenses participates sludge transportation. Meanwhile, enclosed, water-proof, anti-seepage and sift-proof measures shall be taken to trucks used for transporting sludge;(8) The top of the sludge stock within the WWTP shall be covered and the ground shall be fully ossified. Barriers, discharge ditches and collection wells shall be set beside the stock so as to convey water draining from the sludge stocked back to the water treatment system for treatment;(9) Enclosed tank cars shall be adopted for transporting sludge externally;(10) The minimization of sludge shall be taken via choosing advanced sludge dewatering equipment to reduce the percentage of moisture to below 50%, which can reduce the production quantity of sludge;(11) The sludge shall be guarantee 100% disposal; and(12) Domestic waste shall be packed with bags, separately collected and be collective cleaned away by the environmental protection departments.

236

Page 245: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

Continue Schedule 6 Summary of Environmental Management Plan of Yueshan Town WWTP Project

Possible Impact

Mitigation MeasuresExecution Period

Executed by

Monitored byMonitor Factors

Monitoring Frequency

Monitoring Station

Environmental Management Budge

Ecological Environment

(1) Plant greening shall take into consideration the combination of arbors, bushes and grass and keep at a certain layered structure. Local species shall be planted as many as possible to reduce the introduction of foreign species, and shall be the first choice when in selection of tree (or grass) species;(2) Management shall be conducted. The Plant shall appoint special people to well carry out greening and management, and set down related regulations to protect greens and the ecological environment;(3) When wastewater pipelines are buried, the ground of the pipeline sections within the town shall be ossified and the ground of the pipeline sections in the field shall be planted with vegetation so as to recover vegetation as much on the bare ground caused by the pipeline construction. Local major grass species shall be chose as greening species. Meanwhile, the important area shall be surrounded with wire nets for in-time management and protection against destruction by cattle, sheep or people; and(4) The management of wastewater pipeline shall be strengthened and regular inspection shall also be carried out

Operation Period

The Operator

Xiangxaing City Environmental Protection Bureau

/ / /

237

Page 246: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

to the wastewater pipeline so as to monitor the leakage of the pipeline for taking in-time treatment and to avoid the possible pollution to ground water by the leakage of the wastewater pipeline.

Risk and Protection

(1) The process design shall spare a certain capacity of reflux treatment and buffering in the treatment system and related treatment equipment shall be installed so as to guarantee that the buffering and reflux equipment of the system will be triggered to retreat unqualified water till reaching the standards before discharge in the case that equipment failure may impact the normal operation of the treatment system;(2) Damageable equipment shall be of multiple sets and be provided with enough spare parts for the purpose of maintenance and update. Electromechanical machines of the treatment system shall be of at least two sets, one for operation and one for spare purpose;(3) Equipment of good quality shall be selected. Every machine, electric appliance, instrument and so on installed on the treatment facilities shall be of good quality and low failure rate, meet design requirement, and be suitable for long-term operation and fit for maintenance and repairing;(4) Within the operation period, operators shall strictly carry out job function according to the related regulations of treatment facilities, and take frequent patrol inspection and in-time maintenance and repairing to the equipment, so as to

Operation Period

The Operator

Xiangxaing City Environmental Protection Bureau

238

Page 247: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

reduce equipment failure rate;(5) The earthing protection of electric equipment shall be conducted according to related regulations, an auto trip circuit is provided, the operation of major equipment is digitally monitored via a computer which can alarm in time and record event location, event properties and time of occurrence so as to facilitate people organization and in-time repairing;(6) Two-way power provision is adopted to guarantee the normal operation of power facilities and lines;(7) it shall be guarantee at the best that grid and sand depositing pool operate well to reduce the concentration of SS and COD in the water to some degree;(8) Pollution causes are found out from the water catchment system. Related companies shall take emergency measures to control the discharge quantity of substances poisonous to microorganism;(9) In the case that external force majeure factors happen to cause the discharge of wastewater before treatment, part or all of water discharge companies shall be required to stop discharging wastewater in to the pipeline so as to secure water security;(10) During the settlement of accidents incurred, warning marks shall be hung beside the waters close to the outlet so as to notify parties concerned to take preventive measures;(11) Before the operation of the WWTP, its operation and

239

Page 248: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

management personnel shall take security and safety education first and safety operation procedures and management systems are established and strictly implemented after the operation. Frequent inspection is required;(12) The design of building shall take into consideration of such sanitation requirements as water discharge, heating and ventilation, and lighting. The places for permanent work shall be provided with air conditional. And the enclosed operation places with bad ventilation shall use mechanical ventilation;(13) Such labor protection appliances as life jackets, lifebuoys, safety belts and safety helmets shall be provide within the Plant. And proper protection facilities shall be provided to the operators working or inspecting in the wells or tunnels so as to avoid poisoning and at least two operators shall be on the spot at the same time;(14) The edges of the paths connected to the pool shall be provided with rails and lightings so as to guarantee the safety of people working beside the pool;(15) The safety protection of all electric appliances shall meet the safety regulations of electric appliances and the earthing protection of high voltage equipment shall be well done;(16) The dangerous parts of machines, such as driving belts, gears and grinding wheels, shall be provided with guarding devices;

240

Page 249: Hunan Integrated Economic Development Demonstration Town ...documents.worldbank.org/curated/en/5779614682177611…  · Web viewThe Hunan Integrated Economic Development Demonstration

(17) Dangerous areas within the Plant shall be alarmed by hanging a warning board at the noticeable position, platforms higher than 1.2m shall be provided with protection rails and those places which may cause the enrichment of poisonous harmful gas shall be provided with venting facilities;(18) During each period, according the actual necessity and convenience of use, production sanitation rooms (such as rest rooms, washing rooms and undressing rooms) shall be provided; besides the strengthening of ventilation and the provision of shelter, rest rooms shall also be built for work in construction sections with bad environment and open field. Concentration bathrooms are constructed in the Plant; and(19) Worker who directly deal with wastewater, sludge and domestic waste shall do regular health examination and take regular injection of related vaccines.

241


Recommended