8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
1/61
TK-411 Perancangan Pabrik
LAPORAN PT CNB
Hydration of the C4 and C5 Mono – Olefins to Alcohols
DENGAN KAPASITAS 42000 TON/TAHUN
Kelompok 13 :
Rizky Nanda S. (14-2012-027)
Ferischa Ambari R. (14-2012-045)
Nabilah Ulfah Z. (14-2012-059)
Pembimbing
Dicky Dermawan, ST., MT.
Fakultas Teknologi Industri
Jurusan Teknik Kimia
Institut Teknologi Nasional
Bandung
2016
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
2/61
LEMBAR PENGESAHAN
Bandung, 03 Januari 2015
Telah diperiksa dan disetujui oleh:
Catatan:
Pembimbing
Dicky Dermawan, ST., M.T
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
3/61
i
ABSTRAK
PT. CNB merupakan salah satu perusahaan yang bergerak di bidang petrokimia hulu.
Produk utama yang dihasilkan oleh PT CNB yaitu tert – butanol, sec – butanol, dan 2 – metil
– 2 butanol dengan kapasitas produksi masing-masing 42.000 ton/tahun. Butanol (tert-butanol,
sec-butanol , dan 2-methyl 2-butanol ) merupakan pelarut yang banyak digunakan diberbagai
industri. Butanol dapat dibuat dengan proses Direct hydration dengan menggunakan bahan
baku alkena (1-butene, isobutene, dan 2-methyl 1-butene) dan katalis ion exchange resins.
Bahan baku alkena diantaranya yaitu 2 – butena, isobutena dan 2 – metil – 1 butena diperoleh
dari PT Chandra Asri. Produk butanol yang dijual masing – masing memiliki kemurnian 98%
berat. Target pemasaran produk dari PT CNB yaitu diantaranya PT Colorpak Indonesia, PT
Pabrik Cat & Tinta Pacific dan PT Kawaguchi Kimia Indonesia yang membutuhkan produk
PT CNB sebagai bahan baku produksinya. Pabrik ini direncanakan akan didirikan di Cilegon,
Banten.
Kata Kunci : 1-butene, isobutene, 2-methyl-1-butene, Dyrect Hydration
ABSTRACT
PT. CNB is a company which moves in upper – petrochemical. The main product of
PT. CNB are tert – butanol, sec – butanol, and 2 – metil – 2 butanol with each capacity 42.000
ton/year. Butanol (tert-butanol, sec-butanol , and 2-methyl 2-butanol ) is a solvents that often
used in industry. tert-butanol, sec-butanol ,and 2-methyl 2-butanol made by direct hydration
process using alkenes (1-butene, isobutene, and 2-methyl 1-butene) as raw material, water and
ion excange resins as katalist. 1 – butena, isobutena and 2 – metil – 1 butena as raw material
are supplied from PT. Chandra Asri. Each product has 98% wt purity. The marketing target of
product of PT. CNB are PT Colorpak Indonesia, PT Pabrik Cat & Tinta Pacific dan PT
Kawaguchi Kimia Indonesia that needs tert-butanol, sec-butanol , and 2-methyl 2-butanol as
their raw materials. PT CNB will be construct in cilegon, Banten
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
4/61
ii
KATA PENGANTAR
Segala puji dan syukur penulis panjatkan kehadirat Allah SWT, karena atas berkat rahmat-Nya
lah penulis dapat menyelesaikan laporan perancangan pabrik yang berjudul:“Hydration of the C4
and C5 Mono – olefins to Alcohols”
Perancangan pabrik ini merupakan salah satu persyaratan untuk dapat menempuh Tugas Akhir
pada tahap sarjana di Jurusan Teknik Kimia, Fakultas Teknologi Industri, Institut Teknologi Nasional.
Selama perancangan pabrik, penulis telah banyak mendapatkan bantuan serta bimbingan dari
berbagai pihak. Untuk itu, dengan rasa hormat penulis mengucapkan terima kasih kepada:
1. Ibu Dyah Setyo Pertiwi PhD, selaku Ketua Jurusan Teknik Kimia, Fakultas Teknologi Industri,
Institut Teknologi Nasional.
2.
Bapak Dicky Dermawan S.T., M.T, selaku dosen pembimbing utama yang telah membimbing
kami dengan sangat baik dalam perancangan pabrik ini hingga dapat diselesaikan.
3. Kedua orang tua tercinta dan seluruh keluarga yang telah membantu secara moril maupun materil
serta doa yang tidak ada putusnya demi kemajuan dan kesuksesan penulis.
4. Seluruh staf dosen Jurusan Teknik Kimia, Fakultas Teknologi Industri, Institut Teknologi
Nasional.
5. Teman-teman seperjuangan perancangan pabrik kelas A, B dan C yang telah bersama-sama
berjuang dalam menyelesaikan proses pembuatan perancangan pabrik selama 4 bulan.
6. Teman-teman angkatan 2012 Teknik Kimia ITENAS atas segala perhatian dan bantuannya.
7. Rekan-rekan di Jurusan Teknik Kimia, terimakasih atas dorongan, persahabatan dan
kebersamaannya.
8. Semua pihak yang telah mendukung dan membantu dalam penulisan laporan ini yang tidak dapat
disebutkan satu persatu.
Penulis menyadari bahwa Laporan Perancangan Pabrik ini masih perlu disempurnakan, oleh
karena itu penulis mengharapkan kritik dan saran yang bersifat membangun dari semua pihak. Semoga
Laporan Perancangan Pabrik ni dapat bermanfaat khususnya bagi penulis dan umumnya bagi semua pihak yang membacanya.
Bandung, Januari 2016
Penulis
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
5/61
iii
DAFTAR ISI
LEMBAR PENGESAHAN ................................................................................................................... i
ABSTRAK .............................................................................................................................................. i
ABSTRACT ............................................................................................................................................ i
DAFTAR ISI......................................................................................................................................... iii
DAFTAR TABEL ................................................................................................................................ vi
DAFTAR GAMBAR .......................................................................................................................... viii
BAB I ...................................................................................................................................................... 1
PENDAHULUAN ................................................................................................................................. 1
1.1 Latar Belakang .......................................................................................................................... 1
1.2 Spesifikasi Produk .................................................................................................................... 2
1.3 Spesifikasi Bahan Baku ............................................................................................................ 3
1.4 Teknologi Proses ....................................................................................................................... 3
1.5 Lokasi Proyek ............................................................................................................................ 3
1.6 Deskripsi Proses dan Process F low Diagram .......................................................................... 4
BAB II .................................................................................................................................................... 6
NERACA MASSA DAN ENERGI ...................................................................................................... 6
2.1 Informasi Kunci ........................................................................................................................ 6
2.2 Neraca Massa dan Energi......................................................................................................... 7
2.2.1 Sec – Butanol ..................................................................................................................... 7
2.2.2 Tert – Butanol ................................................................................................................... 8
2.2.3 2-Methyl-2-Butanol ........................................................................................................... 9
BAB III ................................................................................................................................................. 10
SPESIFIKASI ALAT UTAMA ......................................................................................................... 10
3.1 Horizontal Tank TK-301 ........................................................................................................ 10
3.2 Olefin Pump P-301 .................................................................................................................. 11
3.3 Mixing Tank TK-302 .............................................................................................................. 12
3.4 Feed Pump P-302 .................................................................................................................... 13
3.5 Heat Exchanger E-301 ............................................................................................................ 14
3.6 Packed Bed Reactor R-301 ..................................................................................................... 15
3.7 Anion Exchange A-301 ........................................................................................................... 16
3.8 Heat Exchanger E-302 ............................................................................................................ 17
3.9 Flash Vessel V-301 .................................................................................................................. 18
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
6/61
iv
3.10 Heat Exchanger E-303 ............................................................................................................ 19
3.11 Flash Vessel V-302 .................................................................................................................. 20
3.12 Heat Exchanger E-304 ............................................................................................................ 21
3.13 Flash Vessel V-303 .................................................................................................................. 22
3.14 Distillation Coloumn T-301 .................................................................................................... 23
3.15 Reflux Pump P-301 ................................................................................................................. 24
3.16 Accumulator V-304 ................................................................................................................. 25
3.17 Reboiler E-305 ......................................................................................................................... 26
3.18 Condensor E-306 ..................................................................................................................... 27
3.19 Mixing Tank TK-303 .............................................................................................................. 28
3.20 Heat Exchanger E-307 ............................................................................................................ 29
BAB IV ................................................................................................................................................. 30
UTILITAS DAN LAYOUT PABRIK ............................................................................................... 30
4.1 Sistem Pengelolaan dan Distribusi Air .................................................................................. 30
4.2 Sistem Pengelolaan dan Distribusi Steam ............................................................................. 32
4.3 Instrumentasi dan Pengendalian Proses ............................................................................... 34
4.4 Sistem Pengolahan Limbah .................................................................................................... 35
4.5 Sistem Utilitas Lain ................................................................................................................. 35
4.6 Layout Pabrik dan Tata Letak Peralatan Utama ................................................................ 36
BAB V .................................................................................................................................................. 38
MANAJEMEN DAN KESELAMATAN KERJA ............................................................................ 38
5.1 Manajemen .............................................................................................................................. 38
5.1.1 Bentuk Perusahaan ......................................................................................................... 38
5.1.2 Bentuk Organisasi ........................................................................................................... 38
5.1.3 Sistem Kerja .................................................................................................................... 40
5.1.4 Kebutuhan Tenaga Kerja ............................................................................................... 405.1.5 Peraturan Perusahaan .................................................................................................... 41
5.2 Kesehatan dan Keselamatan Kerja ....................................................................................... 43
5.2.1 Pencegahan Terhadap Kebakaran dan Peledakan ...................................................... 43
BAB VI ................................................................................................................................................. 45
ANALISIS EKONOMI ...................................................................................................................... 45
6.1 Asumsi Umum ......................................................................................................................... 45
6.2 Perkiraan Biaya Peralatan ..................................................................................................... 45
6.3 Perkiraan Biaya Investasi ...................................................................................................... 46
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
7/61
v
6.4 Perkiraan Biaya Produksi Tahunan ..................................................................................... 47
6.4.1 Biaya Produksi Variabel ................................................................................................ 47
6.4.2 Biaya Produksi Tetap ..................................................................................................... 47
6.5 Analisis Kelaikan Ekonomi .................................................................................................... 48
6.6 Analisis Sensitivitas ................................................................................................................. 50
6.7 Simpulan dan Rekomendasi ................................................................................................... 50
6.7.1 Kesimpulan ...................................................................................................................... 50
6.7.2 Rekomendasi ................................................................................................................... 51
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
8/61
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
9/61
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
10/61
viii
DAFTAR GAMBAR
Gambar 1.1. Konsumsi Cat dan Tinta di Indonesia..................................................................1
Gambar 1.2. Data Impor Metil Etil Keton...............................................................................2
Gambar 1.3. Lokasi Pendirian Pabrik PT CNB........................................................................4
Gambar 1.4. Flow diagram proses pembuatan alkohol...................................................................4
Gambar 2.1 Process Flow Diagram Production Sec Butanol...................................................7
Gambar 2.2 Process Flow Diagram Production Tert Butanol..................................................8
Gambar 2.3 Process Flow Diagram Production 2 – methyl - 2 Butanol..................................9
Gambar 4.1 Sistem pengolahan air sungai PT CNB................................................................30
Gambar 4.2. Sistem Distribusi Air Pendingin PT CNB...........................................................31
Gambar 4.3 Sistem Pengolahan Air Umpan Boiler..................................................................32Gambar 4.4 Instrumensasi dan Proses Kontrol PT CNB...................... .................................34
Gambar 4.5 Denah Kawasan Pabrik........................................................................................36
Gambar 4.6 Denah tata letak peralatan PT CNB.....................................................................37
Gambar 5.1 Struktur Organisasi PT CNB.............................................................................................39
Gambar 6.1 Kurva Net Cash Flow..........................................................................................49
Gambar 6.2 Kurva Analisis Sensitivitas.................................................................................50
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
11/61
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
12/61
2
Gambar 1.2. Data Impor Metil Etil Keton
Impor Metil etil keton meningkat setiap tahunnya. Sec – butanol yang merupakan
bahan baku Metil Etil Keton hingga saat ini masih diimpor dari luar negeri karena
belum ada produsen sec – butanol di Indonesia. Berdasarkan pertimbangan tersebut PT
CNB juga memproduksi sec – butanol untuk memenuhi kebutuhan bahan baku industri
MEK dan juga industri lainnya. PT CNB akan memproduksi sec – butanol dengan
kapasitas 6,1 ton/tahun. Selain t – butanol dan sec – butanol, PT CNB juga
memproduksi 2 – methyl – 2 butanol yang digunakan sebagai pelarut dalam industriProcessing acids. Di indonesia produsen 2 – methyl – 2 butanol belum ada, sehingga
untuk memenuhi kebutuhan 2 – methyl – 2 butanol dalam industri dalam negeri maka
PT CNB akan memproduksi 2 – methyl – 2 butanol dengan kapasitas 5,3 ton/tahun.
Produk PT CNB yaitu t – butanol akan dipasarkan pada PT Colorpark Indonesia
dan PT Pacific Paint dan industri cat lainnya. Sec – butanol akan dipasarkan pada PT
Kawaguchi Kimia Indonesia dan industri MEK lainnya dan 2 – methyl – 2 butanol akan
dipasarkan pada PT Indonesia Processing Acids Ltd.
1.2 Spesifikasi Produk
Produk yang dihasilkan PT CNB yaitu tert – butanol, sec - butanol, dan 2 – methyl
– 2 - butanol. Adapun spesifikasi produk yang dihasilkan oleh PT CNB disajikan pada
tabel 1.2.
0
3000
6000
9000
12000
15000
18000
21000
2001 2002 2003 2004 2005
Impor Metil Etil Keton
Impor Metil Etil Keton
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
13/61
3
Tabel 1.1 Spesifikasi Produk PT CNB
Produk Massa (kg/h) % massa
Sec – Butanol 6117.26 0.9937
Tert - Butanol 4420.33 0.9938
2 – methyl – 2 - butanol 5347.83 0.9966
1.3 Spesifikasi Bahan Baku
Bahan baku yang digunakan proses produksi PT CNB ini yaitu 1 – butene,
isobutene, serta 2 – methyl – 1 – butene sebagai bahan baku utama, H2O sebagai reaktan,
serta aseton sebagai pelarut. Spesifikasi bahan baku yang ditetapkan untuk memenuhi
spesifikasi pemrosesan disajikan pada tabel 1.3.
Tabel 1.2 Spesifikasi Bahan Baku
Kandungan Syngas Massa (kg/h) % massa
2 – butene 5000 98
Isobutene 5000 97
2 – methyl – 1 butene 5000 98
H2O 1801.51 100
Aseton 7500 100
1.4 Teknologi Proses
Teknologi proses yang digunakan untuk mengubah olefin menjadi butanol ialah
proses Dyrect Hydration. Pada proses dyrect hydration ini, olefin langsung direaksikan
dengan air dengan bantuan katalis ion exchange resin untuk menghasilkan beberapa
jenis butanol. Reaksi yang berlangsung merupakan reaksi eksotermis. Proses ini dipilih
dikarenakan beberapa pertimbangan, diantaranya yaitu lebih ramah lingkungan serta
mengurangi bahaya korosi karena tidak adanya penggunaan zat yang bersifat asam
sehingga dapat mengurangi biaya investasi kapital.
1.5 Lokasi Proyek
Lokasi pembangunan proyek yaitu di Jalan Amerika, Citangkil, Kota Cilegon -
Banten, 42443. Peta situasi lokasi proyek dapat dilihat pada Gambar 1.2.
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
14/61
4
Gambar 1.2. Lokasi Pendirian Pabrik PT CNB
1.6 Deskripsi Proses dan Process F low Diagram
Mixing Tank Packed Bed
Reactor Anion Exchange Flash Drum
Distillation
5000 kg/h Isobutene
5000 kg/h 1-butene
5000 kg/h 2-methyl-1-
butene
1802 kg/h Water
7500 kg/h Acetone
Acetone Waste
7000 kg/h
tert-butanol 4420.33 kg/h
sec-butanol 6117.26 kg/h
2-methyl-2-butanol 5347.83 kg/h
Gambar 1.3. Flow diagram proses pembuatan alkohol
Proses Flow Diagram pembuatan alkohol dengan menggunakan metode hidrasi
ditampilkan pada gambar 3. Secara garis besar perancangan pabrik dimaksudkan untuk
memproduksi 3 jenis alkohol yang berbeda (isobutene, 1-butene, dan 2-methyl -1-
butene) dari 3 jenis olefin yang berbeda yaitu tert-butanol, sec-butanol, dan 2-methyl -
2-butanol. Produk alkohol yang diperoleh diharapkan memiliki kemurnian yang tinggi
yaitu berkisar 98% berat. Reaksi yang terjadi pada proses pembuatan alkohol ini yaitu:
CnH2n + H2O → CnH2n+OH
Umpan berupa olefin akan masuk ke dalam sistem dan dicampurkan dengan air
yang berfungsi sebagai reaktan dan aseton yang berfungsi sebagai pelarut olefin dalam
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
15/61
5
air. Olefin, air dan aseton masuk ke dalam mixing tank untuk dilakukan proses
pencampuran. Olefin yang masuk ke dalam mixing tank terlebih dahulu dinaikkan
tekanannya hingga mencapai 10 bar. Bahan selanjutnya akan masuk ke dalam reaktor
setelah terlebih dahulu dinaikkan temperaturnya hingga 70oC.
Reaktor yang digunakan pada proses pembuatan alkohol ini ialah Fix Bed
Reactor. Di dalam reaktor terdapat katalis padat berupa ion exchange resin yang akan
membantu mempercepat proses reaksi antara olefin dan air. Alkohol yang dihasilkan
dari reaksi diharapkan memiliki fraksi konversi sebesar 0,88.
Alkohol yang keluar dari reaktor kemudian akan memasuki anion exchange
untuk dilakukan proses pemisahan asam asetat dan asam format yang akan menjadi
produk samping. Setelah melewati anion exchange, alkohol yang bebas asam asetat dan
asam format akan masuk ke dalam flash drum untuk dilakukan proses penguapan
sekejap untuk menguapkan pelarut aseton yang masih terkandung di dalam alkohol.
Aseton yang memiliki titik didih lebih rendah dari alkohol akan terlebih dahulu
diuapkan dan akan menjadi produk atas. Aseton yang masih dapat digunakan kembali
di recycle dan dimasukkan ke kembali ke dalam mixing tank untuk kembali digunakan
sebagai pelarut olefin. Produk bawah dari proses flash ini berupa alkohol yang masih
mengandung sedikit aseton yang selanjutnya akan dilakukan pemurnian kembali pada
unit berikutnya.
Proses pemurnian dilakukan dengan menggunakan proses distilasi. Alkohol
yang memiliki titik didih lebih rendah dari aseton akan keluar sebagai produk bawah,
sedangkan aseton akan keluar menjadi produk atas yang selanjutnya akan kembali di
recycle dan dimasukkan kembali ke dalam mixing tank untuk kembali dicampurkan
dengan bahan baku.
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
16/61
6
BAB II
NERACA MASSA DAN ENERGI
2.1 Informasi Kunci
Perhitungan neraca massa dan energi pada perancangan pabrik ini menggunakanModel persamaan Persamaan NRTL. Persamaan ini dapat mempresentasikan
kesetimbangan uap-cair dan cair-cair baik untuk sistem biner maupun sistem
multikomponen secara baik hanya dengan parameter biner.
Dalam proses pembentukan produk terdapat reaksi dan kinetika reaksinya yang
ditunjukan dalam persamaan berikut:
= [8] atau = []
= 1.5 ∙ 10−−6
2 = 1.0 ∙ 10
−−6
3 = 4.5 ∙ 10
−−6
Satuan laju reaksi r adalah kmol/m3(reaktor)s. Energi aktivasi memiliki satuan
kal/mol, satuan dari k adalah m3(gas)/m3(reaktor).s. dan satuan dari konsentrasinya
adalah kmol/m3gas.
Olefin yang dibutuhkan sebanyak 42000 ton/tahun. Produk yang diperoleh
harus memiliki kemurnian 98%. Pada proses ini digunakan katalis ion exchange resin
dengan volume katalis 0.0031 m3, dan bulk density sebesar 122 kg/m3.
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
17/61
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
18/61
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
19/61
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
20/61
10
BAB III
SPESIFIKASI ALAT UTAMA
3.1 Horizontal Tank TK-301
Tabel 3.1 Spesifikasi Horizontal Tank (TK-301)
Nama Alat Tank Storage
Kode TK-301
Fungsi Menampung bahan baku
Material Carbon Steel SA-515 grade 70
Posisi Horizontal
Shell
Tekanan Operasi (psia)43.1430
Tekanan Disain (psia)53.9287
Temperatur (oF)77
Tebal perhitungan (in)0.1312
Tebal pasaran (in)0.25
Head
Tabal Perhitungan (in) 0.1281
Tebal Pasaran (in)0.25
Jenis Hemispherical
Kolom
Tinggi (m) 6.2145
Diameter (m) 2.0715
Volume (m3) 25.599
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
21/61
11
3.2 Olefin Pump P-301
Tabel 3.2 Spesifikasi Olefin Pump (P-301)
1
Technical Data Sheet , Centrifugal Pump2
3
4 Costumer5 Address Plant Location
6 GENERAL
7 Quotation No. Inspection Requirement
8 Contract No. Pump Class
9 Order No. Number of pumps 2 Pcs.
10 DESIGN / OPERATING
11 Arrangement pH-Value
12 Pumped Fluid Name Isobutene Pumped Fluid Analysis Name
13 Working temperature oC Density 574,4 kg/m3
14 Design temperatureoC Viscosity cP
15 Ambient TemeratureoC Suction pressure 297.5 kPa
16 Minimal Volume Flow 8.931 m3/h Discharge pressure 1010 kPa
17 Bleed (extraction) flow m3/h Bleed (extraction) pressure kPa18 Suction Head M Hydro test pressure kPa
19 Differential Head M Efficiency pump 70 %
20 NPSH avail. / required M Pump power duty 2.75 kW
21 Rotation Speed 1/min Pump motor nominal power kW
22 MATERIAL
23 Casing Pol/riser
24 Lining Bear Support
25 Impeller Coupling
26 Casing Impeller Base frame
27 Shaft Mechanical seal
28 Bearing bush Gasket
29 Distribution Head Sluffing box gland
30 CONTRUCTION
31 Type of Suction Gaskets and seal type32 Case slit Radial bearing type
33 Direct of rotat at driven end Axial bearing type
34 Type/number of stage Intermediate bearing type
35 Impeller dia. Actual 60 mm Bearing service life
36 Impeller dia. Min. / Max. mm Bearing monitoring
37 Impeller type Type of Lubricantion
38 Case mounting Lubricating device
39 Mechanical seal manuf./type Thrust balance
40 Packing manuf./type Direction of relief water
41 Venting Dranning
42 Cooling Flusing
43 Cooling fluid Type
44 Operating pressure kPa Operating pressure kPa45 Operating temperature oC Operating temperature oC
46 Mass flow kg/s Mass flow kg/s
47 Note :
48
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
22/61
12
3.3 Mixing Tank TK-302 Tabel 3.3 Spesifikasi Mixing Tank (TK-302)
Nama Alat Mixed Tank
Kode TK-302
Fungsi Mencampurkan Aliran 2, 3, 4, dan Rec
Material Carbon Steel SA-515 grade 70
Posisi Vertikal
Shell
Tekanan Operasi (psia)137.7861
Tekanan Disain (psia)172.2326
Temperatur (oF)194
Tebal Operasi (in)0.1539
Tebal Pasaran (in) 0.25
Head
Tebal Operasi (in)0.1395
Tebal Pasaran (in)0.25
Jenis hemispherical
Kolom
Tinggi (m) 9.04
Diameter (m) 3.014
Volume (m3) 39.4395
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
23/61
13
3.4 Feed Pump P-302
Tabel 3.4 Spesifikasi Feed Pump (P-302)
1
Technical Data Sheet , Centrifugal Pump2
3
4 Costumer5 Address Plant Location
6 GENERAL
7 Quotation No. Inspection Requirement
8 Contract No. Pump Class
9 Order No. Number of pumps 2 Pcs.
10 DESIGN / OPERATING
11 Arrangement pH-Value
12 Pumped Fluid Name Tert-Butanol Pumped Fluid Analysis Name
13 Working temperature oC Density 764,6 kg/m3
14 Design temperatureoC Viscosity 0,1435 cP
15 Ambient TemeratureoC Suction pressure 950 kPa
16 Minimal Volume Flow 105.17 m3/h Discharge pressure 1010 kPa
17 Bleed (extraction) flow m3/h Bleed (extraction) pressure kPa18 Suction Head m Hydro test pressure kPa
19 Differential Head m Efficiency pump 70 %
20 NPSH avail. / required 100.15 / 135.21 m Pump power duty 1.31 kW
21 Rotation Speed 1/min Pump motor nominal power kW
22 MATERIAL
23 Casing Pol/riser
24 Lining Bear Support
25 Impeller Coupling
26 Casing Impeller Base frame
27 Shaft Mechanical seal
28 Bearing bush Gasket
29 Distribution Head Sluffing box gland
30 CONTRUCTION
31 Type of Suction Gaskets and seal type32 Case slit Radial bearing type
33 Direct of rotat at driven end Axial bearing type
34 Type/number of stage Intermediate bearing type
35 Impeller dia. Actual 480 mm Bearing service life
36 Impeller dia. Min. / Max. mm Bearing monitoring
37 Impeller type Type of Lubricantion
38 Case mounting Lubricating device
39 Mechanical seal manuf./type Thrust balance
40 Packing manuf./type Direction of relief water
41 Venting Dranning
42 Cooling Flusing
43 Cooling fluid Type
44 Operating pressure kPa Operating pressure kPa45 Operating temperature oC Operating temperature oC
46 Mass flow kg/s Mass flow kg/s
47 Note :
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
24/61
14
3.5 Heat Exchanger E-301
Gambar 3.5 Spesifikasi Heat Exchanger (E-301)
Tabel 8. Spesifikasi Heat Exchanger ( E-301)
EXCHANGER SPECIFICAION SHEET
1CUSTOMER
PT.CNB JOB NO.
2 REFERENCE NO.
3 ADDRESS INQUIRY NO.
4 PLANT LOCATION PT. EAST JAKARTA INDUSTRIAL PARK DATE 07/11/15
5 SERVICE OF UNIT ALCOHOL FROM OLEFINS ITEM NO. E-101
6 SIZE TYPE 2-4PASS CONNECTED IN PIPE
7 GROSS SURFACE PER UNIT SHELLS PER UNIT SURFACE PER SHELL
8 PERFORMANCE OF ONE UNIT
9 TUBE SHELL
10 FLUID CIRCULATED Cooling Water Olefin
11 TOTAL FLUID ENTERING 173800 KG/HR 71303.5 KG/HR
12 VAPOR - -
13 LIQUID 173800 KG/HR 71303.5 KG/HR
14 STEAM -
15 NON-CONDENSABLES
16 FLUID VAPORIZED OR CONDENSED
17 STEAM CONDENSED
18 GRAVITY-LIQUIDS
19 VISCOSITY - LIQUID 0.6955 cP 0.1537 cP
20 MOLECULAR WEIGHT - VAPORS 18.02 G/MOL 253.3 G/MOL
21 SPECIFIC HEAT - LIQUIDS BTU/LB/oF BTU/LB/oF
22 LATENT HEAT - VAPORS BTU/LB/oF BTU/LB/oF
23 TERMPERATURE IN 30 oC 141.8 oC
24 TEMPERATURE OUT 45 oC 106.8 oC
25 OPERATING PRESSURE 10 bar 10 bar
26 NUMBER OF PASSES PER SHELL 4 2
27 VELOCITY FT/SEC. FT/SEC.
28 PRESSURE DROP PSI PSI
29 FOULING RESISTANCE
30
31 HEAT EXCHANGER - KJ/HR. 11020000 M.T.D. (Corrected) 86.4146 oC
32 TRANSFER RATE - SERVICE EFF. SSURFACE PER UNIT
CONSTRUCTION
34 DESIGN PRESSURE 10 bar 10 bar
35 TEST PRESSURE 10 bar 10 bar
36 DESIGN TEMPERATURE 141.8 oC 106.8 oC
37 TUBES NO. 32 O.D. 0.75IN BWG. 10 LENGTH 16in PITCH -
38 SHELL I.D. 8IN O.D.
39 SHELL COVER SA-316 FLOATING HEAD COVER
40 CHANNEL CHANNEL COVER
41 TUBE SHEET - STATIONARY FLOATING HEAD COVER
42 BAFFLES - CROSS TYPE
43 BAFFLE - LONG TYPE
44 TUBE SUPPORT
45 GASKETS
46 CONNECTION - SHELL - IN PIPE OUT PIPE RATING PSI
47 CONNECTION - CHANNEL -IN OUT RATING PSI
48 CORROSION ALLOWANCE - SHELL SIDE TUBE SIDE
49 CODE REQUIREMENTS TEMA CLASS
50 WEIGHTS - EACH SHEEL BUNDLE FULL OF WATER
51 NOTE: INDICATE AFTER EACH PART WHETHER STRESS RELIEVED (S. R.) AND WHETHER RADIOGRAPHED (X-R)
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
25/61
15
3.6 Packed Bed Reactor R-301
Tabel 3.6 Spesifikasi Packed Bed Reactor R-301
Nama Alat Packed BedReactor
Kode R-301Fungsi
Material Stainless SteelSA-260, 316L
Desain Reaktor
Waktu Tinggal (menit) 5
Volume Reaktor (m3) 1,3995
Volume Katalis (m3) 0,3773
Shell
Tekanan operasi (psia) 145,04
Tekanan desain (psia) 181,29
Temperatur operasi (oC) 70
Temperatur desain (oC) 76,67
Tebal perhitungan (in) 0,68
Tebal pasaran (in) 0,6875
Head
Tebal perhitungan (in) 0,40
Tebal pasaran (in) 0,4375
Kolom
Tinggi (m) 21,79
Diameter (m) 7,26
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
26/61
16
3.7 Anion Exchange A-301
Tabel 3.7 Spesifikasi Anion Exchange (A-301)
Nama Alat Anion Exchange
Kode A-300
Fungsi
Material Stainless Steel SA-260, 316L
Desain Anion Exchange
Shell
Tekanan operasi (psia) 145,04
Tekanan desain (psia) 181,29
Temperatur operasi (o
C) 70Temperatur desain (oC) 76,67
Tebal perhitungan (in) 0,78
Tebal pasaran (in) 0,8125
Head
Tebal perhitungan (in) 0,45
Tebal pasaran (in) 0,5
Volume (m3) 13662,99
KolomTinggi (m) 7,69
Diameter (m) 2,56
Volume (m3) 39,67
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
27/61
17
3.8 Heat Exchanger E-302
Tabel 3.8 Spesifikasi Heat Exchanger (E-302)
Tabel 8. Spesifikasi Heat Exchanger ( E-302)
EXCHANGER SPECIFICAION SHEET
1CUSTOMER
PT.CNB JOB NO.
2 REFERENCE NO.
3 ADDRESS INQUIRY NO.
4 PLANT LOCATION PT. EAST JAKARTA INDUSTRIAL PARK DATE 07/11/15
5 SERVICE OF UNIT ALCOHOL FROM OLEFINS ITEM NO. E-101
6 SIZE TYPE 2-4PASS CONNECTED IN PIPE
7 GROSS SURFACE PER UNIT SHELLS PER UNIT SURFACE PER SHELL
8 PERFORMANCE OF ONE UNIT
9 TUBE SHELL
10 FLUID CIRCULATED Cooling Water Olefin
11 TOTAL FLUID ENTERING 42160 KG/HR 60249 KG/HR
12 VAPOR - -
13 LIQUID 42160 KG/HR 60249 KG/HR
14 STEAM -
15 NON-CONDENSABLES
16 FLUID VAPORIZED OR CONDENSED
17 STEAM CONDENSED
18 GRAVITY-LIQUIDS
19 VISCOSITY - LIQUID 0.6955 cP 0.196 cP
20 MOLECULAR WEIGHT - VAPORS 18.02 G/MOL 253.3 G/MOL
21 SPECIFIC HEAT - LIQUIDS BTU/LB/oF BTU/LB/oF
22 LATENT HEAT - VAPORS BTU/LB/oF BTU/LB/oF
23 TERMPERATURE IN30 o
C87.81 o
C24 TEMPERATURE OUT 45 oC 70 oC
25 OPERATING PRESSURE 10 bar 10 bar
26 NUMBER OF PASSES PER SHELL 4 2
27 VELOCITY FT/SEC. FT/SEC.
28 PRESSURE DROP PSI PSI
29 FOULING RESISTANCE
30
31 HEAT EXCHANGER - KJ/HR. 2673000 M.T.D. (Corrected) 41.3891 oC
32 TRANSFER RATE - SERVICE EFF. SSURFACE PER UNIT
CONSTRUCTION
34 DESIGN PRESSURE 10 bar 10 bar
35 TEST PRESSURE 10 bar 10 bar
36 DESIGN TEMPERATURE 87.81 oC 70 oC
37 TUBES NO. 32 O.D. 0.75IN BWG. 10 LENGTH 16in PITCH -
38 SHELL I.D. 8IN O.D.
39 SHELL COVER SA-316 FLOATING HEAD COVER
40 CHANNEL CHANNEL COVER
41 TUBE SHEET - STATIONARY FLOATING HEAD COVER
42 BAFFLES - CROSS TYPE
43 BAFFLE - LONG TYPE
44 TUBE SUPPORT
45 GASKETS
46 CONNECTION - SHELL - IN PIPE OUT PIPE RATING PSI
47 CONNECTION - CHANNEL -IN OUT RATING PSI
48 CORROSION ALLOWANCE - SHELL SIDE TUBE SIDE49 CODE REQUIREMENTS TEMA CLASS
50 WEIGHTS - EACH SHEEL BUNDLE FULL OF WATER
51 NOTE: INDICATE AFTER EACH PART WHETHER STRESS RELIEVED (S. R.) AND WHETHER RADIOGRAPHED (X-R)
52 REMARKS:
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
28/61
18
3.9 Flash Vessel V-301
Tabel 3.9 Spesifikasi Flash Vessel (V-301)
Nama Alat Flash Vessel
Kode V-301
Fungsi
Material Stainless SteelSA-260, 316L
Desain Flash Drum
Shell
Tekanan operasi (psia) 143,59
Tekanan desain (psia) 179,49
Temperatur operasi (o
C) 150Temperatur desain (oC) 155,5
Tebal perhitungan (in) 1,95
Tebal pasaran (in) 2
Head
Tebal perhitungan (in) 1,03
Tebal pasaran (in) 1,0625
Volume (m3) 210.944
KolomTinggi (m) 21,79
Diameter (m) 7,26
Volume (m3) 902,74
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
29/61
19
3.10 Heat Exchanger E-303
Tabel 3.10 Spesifikasi Heat Exchanger (E-303)
Tabel 8. Spesifikasi Heat Exchanger ( E-303)
EXCHANGER SPECIFICAION SHEET
1CUSTOMER
PT.CNB JOB NO.
2 REFERENCE NO.
3 ADDRESS INQUIRY NO.
4 PLANT LOCATION PT. EAST JAKARTA INDUSTRIAL PARK DATE 07/11/15
5 SERVICE OF UNIT ALCOHOL FROM OLEFINS ITEM NO. E-101
6 SIZE TYPE 2-4PASS CONNECTED IN PIPE
7 GROSS SURFACE PER UNIT SHELLS PER UNIT SURFACE PER SHELL
8 PERFORMANCE OF ONE UNIT
9 TUBE SHELL
10 FLUID CIRCULATEDCooling Water Olefin
11 TOTAL FLUID ENTERING 60310 KG/HR 806824 KG/HR
12 VAPOR - -
13 LIQUID 60310 KG/HR 806824 KG/HR
14 STEAM -
15 NON-CONDENSABLES
16 FLUID VAPORIZED OR CONDENSED
17 STEAM CONDENSED
18 GRAVITY-LIQUIDS
19 VISCOSITY - LIQUID 0.1903 cP 0.0139 cP
20 MOLECULAR WEIGHT - VAPORS 18.02 G/MOL 253.3 G/MOL
21 SPECIFIC HEAT - LIQUIDS BTU/LB/oF BTU/LB/oF
22 LATENT HEAT - VAPORS BTU/LB/oF BTU/LB/oF
23 TERMPERATURE IN 90.1o
C 153o
C24 TEMPERATURE OUT 146 oC 149 oC
25 OPERATING PRESSURE 10 bar 10 bar
26 NUMBER OF PASSES PER SHELL 4 2
27 VELOCITY FT/SEC. FT/SEC.
28 PRESSURE DROP PSI PSI
29 FOULING RESISTANCE
30
31 HEAT EXCHANGER - KJ/HR. 19960000 M.T.D. (Corrected) 24.3670 oC
32 TRANSFER RATE - SERVICE EFF. SSURFACE PER UNIT
CONSTRUCTION
34 DESIGN PRESSURE 10 bar 10 bar
35 TEST PRESSURE 10 bar 10 bar
36 DESIGN TEMPERATURE 153 oC 149 oC
37 TUBES NO. 32 O.D. 0.75IN BWG. 10 LENGTH 16in PITCH -
38 SHELL I.D. 8IN O.D.
39 SHELL COVER SA-316 FLOATING HEAD COVER
40 CHANNEL CHANNEL COVER
41 TUBE SHEET - STATIONARY FLOATING HEAD COVER
42 BAFFLES - CROSS TYPE
43 BAFFLE - LONG TYPE
44 TUBE SUPPORT
45 GASKETS
46 CONNECTION - SHELL - IN PIPE OUT PIPE RATING PSI
47 CONNECTION - CHANNEL -IN OUT RATING PSI
48 CORROSION ALLOWANCE - SHELL SIDE TUBE SIDE49 CODE REQUIREMENTS TEMA CLASS
50 WEIGHTS - EACH SHEEL BUNDLE FULL OF WATER
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
30/61
20
3.11 Flash Vessel V-302
Tabel 3.11 Spesifikasi Flash Vessel (V-302)
Nama Alat Flash Vessel
Kode V-302
Fungsi
Material Stainless SteelSA-260, 316L
Desain Flash Drum
Shell
Tekanan operasi (psia) 144,06
Tekanan desain (psia) 180,08
Temperatur operasi (o
C) 141,9Temperatur desain (oC) 147,2
Tebal perhitungan (in) 1,36
Tebal pasaran (in) 1,375
Head
Tebal perhitungan (in) 0,74
Tebal pasaran (in) 1,375
Volume (m3) 95.587,87
KolomTinggi (m) 14,71
Diameter (m) 4,90
Volume (m3) 277,51
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
31/61
21
3.12 Heat Exchanger E-304
Tabel 3.12 Spesifikasi Heat Exchanger (E-304)
Tabel 8. Spesifikasi Heat Exchanger ( E-304)
EXCHANGER SPECIFICAION SHEET
1CUSTOMER
PT.CNB JOB NO.
2 REFERENCE NO.
3 ADDRESS INQUIRY NO.
4 PLANT LOCATION PT. EAST JAKARTA INDUSTRIAL PARK DATE 07/11/15
5 SERVICE OF UNIT ALCOHOL FROM OLEFINS ITEM NO. E-101
6 SIZE TYPE 1-2PASS CONNECTED IN PIPE
7 GROSS SURFACE PER UNIT SHELLS PER UNIT SURFACE PER SHELL
8 PERFORMANCE OF ONE UNIT
9 TUBE SHELL
10 FLUID CIRCULATED Cooling Water Olefin
11 TOTAL FLUID ENTERING 115500 KG/HR 487789 KG/HR
12 VAPOR - -
13 LIQUID 115500 KG/HR 487789 KG/HR
14 STEAM -
15 NON-CONDENSABLES
16 FLUID VAPORIZED OR CONDENSED
17 STEAM CONDENSED
18 GRAVITY-LIQUIDS
19 VISCOSITY - LIQUID 0.1903 cP 0.0139 cP
20 MOLECULAR WEIGHT - VAPORS 18.02 G/MOL 253.3 G/MOL
21 SPECIFIC HEAT - LIQUIDS BTU/LB/oF BTU/LB/oF
22 LATENT HEAT - VAPORS BTU/LB/oF BTU/LB/oF
23 TERMPERATURE IN 30 oC 146 oC
24 TEMPERATURE OUT 45 oC 142.6 oC
25 OPERATING PRESSURE 10 bar 10 bar
26 NUMBER OF PASSES PER SHELL 2 1
27 VELOCITY FT/SEC. FT/SEC.
28 PRESSURE DROP PSI PSI
29 FOULING RESISTANCE
30
31 HEAT EXCHANGER - KJ/HR. 7324000 M.T.D. (Corrected) 106.69 oC
32 TRANSFER RATE - SERVICE EFF. SSURFACE PER UNIT
CONSTRUCTION
34 DESIGN PRESSURE 10 bar 10 bar
35 TEST PRESSURE 10 bar 10 bar
36 DESIGN TEMPERATURE 146 oC 142.6 oC
37 TUBES NO. 36 O.D. 0.75IN BWG. 10 LENGTH 16in PITCH -
38 SHELL I.D. 8IN O.D.
39 SHELL COVER SA-316 FLOATING HEAD COVER
40 CHANNEL CHANNEL COVER
41 TUBE SHEET - STATIONARY FLOATING HEAD COVER
42 BAFFLES - CROSS TYPE
43 BAFFLE - LONG TYPE
44 TUBE SUPPORT
45 GASKETS
46 CONNECTION - SHELL - IN PIPE OUT PIPE RATING PSI
47 CONNECTION - CHANNEL -IN OUT RATING PSI
48 CORROSION ALLOWANCE - SHELL SIDE TUBE SIDE
49 CODE REQUIREMENTS TEMA CLASS
50 WEIGHTS - EACH SHEEL BUNDLE FULL OF WATER
51 NOTE: INDICATE AFTER EACH PART WHETHER STRESS RELIEVED (S. R.) AND WHETHER RADIOGRAPHED (X-R)
52 REMARKS:
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
32/61
22
3.13 Flash Vessel V-303
Tabel 3.13 Spesifikasi Flash Vessel (V-303)
Nama Alat Flash Vessel
Kode V-303
Fungsi
Material Stainless SteelSA-260, 316L
Desain Flash Drum
Shell
Tekanan operasi (psia) 142,59
Tekanan desain (psia) 178,24
Temperatur operasi (o
C) 145Temperatur desain (oC) 150,5
Tebal perhitungan (in) 1,29
Tebal pasaran (in) 1,3125
Head
Tebal perhitungan (in) 0,70
Tebal pasaran (in) 0,75
Volume (m3) 82.150,16
KolomTinggi (m) 13,98
Diameter (m) 4,66
Volume (m3) 238,5
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
33/61
23
3.14 Distillation Coloumn T-301
Tabel 3.14 Spesifikasi Distillation Coloumn (T-301)
COLUMN T-301
Function : Memisahkan Tert-Butanol dari Water
1 Item No.
2 Shell Material Stainles Steel SS-304
3 O.D. Shell (in) 78.74
4 Shell Thickness (in) 0.25
5 Shell Height (ft) 50
6 Type Head (Top and Bottom) HemiSperical
7 Head Thickness (in)
Top 0.25
Bottom 0.25
8 Design Temp (˚C) 300
9 Design Pressure (psi)
Shell 177.6716
Top Head 177.6716
Bottom Head 180
10 I.D. Vessel Manhole
11 No. / Type Trays 64 / Sieve Tray
TRAY DATA
12 Tray Materials Stainles Steel SA-240 Grade 316L
13 Tray corrosion Allow. (in) 0.125
14 D* CH* R AREA TOP (Tower area Sq, Inches)-
15 D* CH* R AREA BOT (Tower area Sq, Inches) -
16 Outlet Weir Periphery -
17 Outlet Weir Height (in) 12.9032
18 Outlet Weir Adjustment -
19 Inlet Weir Height (in) -
20 Tray Manway ** -
21 Tray Spacing (mm) 609.6
22 D* CH* R Clearance (mm) 38.10
23 Sump and Orawoff Requirement -
24 Cap and Riser Materials -
25 Cap and Riser Assy. Type -
26 Size of Caps -
27 Cap Spacing -
28 Cap Skirt Clearance -
29 Cap Slot Spec -
30 TOP of slot above Tray -
31 Type of slot in cap -
32 I.D and Height of Risers -
33 Size of Tray support Bar -
34 Tray Support Materials Stainles Steel SA-240 Grade 316L
Remarks :
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
34/61
24
3.15 Reflux Pump P-301
Tabel 3.15 Spesifikasi Reflux Pump (P-303)
1
Technical Data Sheet , Centrifugal Pump2
3
4 Costumer5 Address Plant Location
6 GENERAL
7 Quotation No. Inspection Requirement
8 Contract No. Pump Class
9 Order No. Number of pumps 2 Pcs.
10 DESIGN / OPERATING
11 Arrangement pH-Value
12 Pumped Fluid Name Tert-Butanol Pumped Fluid Analysis Name
13 Working temperature oC Density 959,6 kg/m3
14 Design temperatureoC Viscosity 0,2851 cP
15 Ambient TemeratureoC Suction pressure 960 kPa
16 Minimal Volume Flow 48.98 m3/h Discharge pressure 1010 kPa
17 Bleed (extraction) flow m3/h Bleed (extraction) pressure kPa18 Suction Head m Hydro test pressure kPa
19 Differential Head m Efficiency pump 70 %
20 NPSH avail. / required 1.629 / 2.199 m Pump power duty 0.38 kW
21 Rotation Speed 1/min Pump motor nominal power kW
22 MATERIAL
23 Casing Pol/riser
24 Lining Bear Support
25 Impeller Coupling
26 Casing Impeller Base frame
27 Shaft Mechanical seal
28 Bearing bush Gasket
29 Distribution Head Sluffing box gland
30 CONTRUCTION
31 Type of Suction Gaskets and seal type32 Case slit Radial bearing type
33 Direct of rotat at driven end Axial bearing type
34 Type/number of stage Intermediate bearing type
35 Impeller dia. Actual 360 mm Bearing service life
36 Impeller dia. Min. / Max. mm Bearing monitoring
37 Impeller type Type of Lubricantion
38 Case mounting Lubricating device
39 Mechanical seal manuf./type Thrust balance
40 Packing manuf./type Direction of relief water
41 Venting Dranning
42 Cooling Flusing
43 Cooling fluid Type
44 Operating pressure kPa Operating pressure kPa45 Operating temperature oC Operating temperature oC
46 Mass flow kg/s Mass flow kg/s
47 Note :
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
35/61
25
3.16 Accumulator V-304
Tabel 3.16 Spesifikasi Accumulator (V-304
Nama Alat Accumulator
Kode Acculumator
Fungsi Menampung keluaraan dari condensor
Material Stainless Steel SS-340
Posisi Horizontal
Shell
Tekanan Operasi (psia)142.1372
Tekanan Disain (psia)177.6716
Temperatur (oF)284
Tebal Operasi (in)0.2037
Tebal Pasaran (in) 0.25
Head
Tebal Operasi (in)0.164
Tebal Pasaran (in)0.25
Jenis hemispherical
Kolom
Panjang (m) 5.07
Diameter (m) 1.69
Volume (m3) 11.523
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
36/61
26
3.17 Reboiler E-305
Tabel 3.17 Spesifikasi Reboiler (E-305)
Tabel 8. Spesifikasi Heat Exchanger Reboiler ( E-305)
EXCHANGER SPECIFICAION SHEET
1CUSTOMER
PT.CNB JOB NO.
2 REFERENCE NO.
3 ADDRESS INQUIRY NO.
4 PLANT LOCATION PT. EAST JAKARTA INDUSTRIAL PARK DATE 07/11/15
5 SERVICE OF UNIT ALCOHOL FROM OLEFINS ITEM NO. E-101
6 SIZE TYPE 2-4PASS CONNECTED IN PIPE
7 GROSS SURFACE PER UNIT SHELLS PER UNIT SURFACE PER SHELL
8 PERFORMANCE OF ONE UNIT
9 TUBE SHELL
10 FLUID CIRCULATED Olefin Steam
11 TOTAL FLUID ENTERING 54440 KG/HR 18900 KG/HR
12 VAPOR - -
13 LIQUID 54440 KG/HR 18900 KG/HR
14 STEAM -
15 NON-CONDENSABLES
16 FLUID VAPORIZED OR CONDENSED
17 STEAM CONDENSED
18 GRAVITY-LIQUIDS
19 VISCOSITY - LIQUID 0.071 cP 0.0096 cP
20 MOLECULAR WEIGHT - VAPORS 253.3 G/MOL 18.02 G/MOL
21 SPECIFIC HEAT - LIQUIDS BTU/LB/oF BTU/LB/oF
22 LATENT HEAT - VAPORS BTU/LB/oF BTU/LB/oF
23 TERMPERATURE IN 179.7 oC 270 oC
24 TEMPERATURE OUT 179.7 oC 200 oC
25 OPERATING PRESSURE 10 bar 10 bar
26 NUMBER OF PASSES PER SHELL 2 4
27 VELOCITY FT/SEC. FT/SEC.
28 PRESSURE DROP PSI PSI
29 FOULING RESISTANCE
30
31 HEAT EXCHANGER - KJ/HR. 21220000 M.T.D. (Corrected) oC
32 TRANSFER RATE - SERVICE EFF. SSURFACE PER UNIT
CONSTRUCTION
34 DESIGN PRESSURE 10 bar 10 bar
35 TEST PRESSURE 10 bar 10 bar
36 DESIGN TEMPERATURE 270 oC 200 oC
37 TUBES NO. 32 O.D. 0.75IN BWG. 10 LENGTH 16in PITCH -
38 SHELL I.D. 8IN O.D.
39 SHELL COVER SA-316 FLOATING HEAD COVER
40 CHANNEL CHANNEL COVER
41 TUBE SHEET - STATIONARY FLOATING HEAD COVER
42 BAFFLES - CROSS TYPE
43 BAFFLE - LONG TYPE
44 TUBE SUPPORT
45 GASKETS
46 CONNECTION - SHELL - IN PIPE OUT PIPE RATING PSI
47 CONNECTION - CHANNEL -IN OUT RATING PSI
48 CORROSION ALLOWANCE - SHELL SIDE TUBE SIDE
49 CODE REQUIREMENTS TEMA CLASS
50 WEIGHTS - EACH SHEEL BUNDLE FULL OF WATER
51 NOTE: INDICATE AFTER EACH PART WHETHER STRESS RELIEVED (S. R.) AND WHETHER RADIOGRAPHED (X-R)
52 REMARKS:
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
37/61
27
3.18 Condensor E-306
Tabel 3.18 Spesifikasi Condensor (E-306)
Tabel 8. Spesifikasi Heat Exchanger ( E-306)
EXCHANGER SPECIFICAION SHEET
1CUSTOMER
PT.CNB JOB NO.
2 REFERENCE NO.
3 ADDRESS INQUIRY NO.
4 PLANT LOCATION PT. EAST JAKARTA INDUSTRIAL PARK DATE 07/11/15
5 SERVICE OF UNIT ALCOHOL FROM OLEFINS ITEM NO. E-101
6 SIZE TYPE 4-8PASS CONNECTED IN PIPE
7 GROSS SURFACE PER UNIT SHELLS PER UNIT SURFACE PER SHELL
8 PERFORMANCE OF ONE UNIT
9 TUBE SHELL
10 FLUID CIRCULATED Olefin Steam11 TOTAL FLUID ENTERING 36850 KG/HR 9482.05 KG/HR
12 VAPOR - -
13 LIQUID 36850 KG/HR 9482.05 KG/HR
14 STEAM -
15 NON-CONDENSABLES
16 FLUID VAPORIZED OR CONDENSED
17 STEAM CONDENSED
18 GRAVITY-LIQUIDS
19 VISCOSITY - LIQUID 0.1022 cP 0.0139 cP
20 MOLECULAR WEIGHT - VAPORS 18.02 G/MOL 253.3 G/MOL
21 SPECIFIC HEAT - LIQUIDS BTU/LB/oF BTU/LB/oF
22 LATENT HEAT - VAPORS BTU/LB/oF BTU/LB/oF
23 TERMPERATURE IN 146 oC 155 oC24 TEMPERATURE OUT 147.5 oC 149 oC
25 OPERATING PRESSURE 10 bar 10 bar
26 NUMBER OF PASSES PER SHELL 8 4
27 VELOCITY FT/SEC. FT/SEC.
28 PRESSURE DROP PSI PSI
29 FOULING RESISTANCE
30
31 HEAT EXCHANGER - KJ/HR. 6716000 M.T.D. (Corrected) 4.911 oC
32 TRANSFER RATE - SERVICE EFF. SSURFACE PER UNIT
CONSTRUCTION
34 DESIGN PRESSURE 10 bar 10 bar
35 TEST PRESSURE 10 bar10
bar36 DESIGN TEMPERATURE 155 oC 149 oC
37 TUBES NO. 26 O.D. 0.75IN BWG. 10 LENGTH 16in PITCH -
38 SHELL I.D. 8IN O.D.
39 SHELL COVER SA-316 FLOATING HEAD COVER
40 CHANNEL CHANNEL COVER
41 TUBE SHEET - STATIONARY FLOATING HEAD COVER
42 BAFFLES - CROSS TYPE
43 BAFFLE - LONG TYPE
44 TUBE SUPPORT
45 GASKETS
46 CONNECTION - SHELL - IN PIPE OUT PIPE RATING PSI
47 CONNECTION - CHANNEL -IN OUT RATING PSI
48 CORROSION ALLOWANCE - SHELL SIDE TUBE SIDE
49 CODE REQUIREMENTS TEMA CLASS
50 WEIGHTS - EACH SHEEL BUNDLE FULL OF WATER
51 NOTE: INDICATE AFTER EACH PART WHETHER STRESS RELIEVED (S. R.) AND WHETHER RADIOGRAPHED (X-R)
52 REMARKS:
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
38/61
28
3.19 Mixing Tank TK-303
Tabel 3.19 Spesifikasi Mixing Tank (TK-303)
Nama Alat Mixed Tank
Kode TK-303
Fungsi Mencampurkan Aliran 15, 16, dan 18
Material Carbon Steel SA-515 grade 70
Posisi Vertikal
Shell
Tekanan Operasi (psia)142.1
Tekanan Disain (psia)177.625
Temperatur (oF)287.4
Tebal Operasi (in)0.143
Tebal Pasaran (in) 0.25
Head
Tebal Operasi (in)0.134
Tebal Pasaran (in)0.25
Jenis hemispherical
Kolom
Tinggi (m) 5.472
Diameter (m) 1.842
Volume (m3) 432.18375
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
39/61
29
3.20 Heat Exchanger E-307
Tabel 3.20 Spesifikasi Condensor (E-307)
Tabel 8. Spesifikasi Heat Exchanger Condenser ( E-307)
EXCHANGER SPECIFICAION SHEET
1CUSTOMER
PT.CNB JOB NO.
2 REFERENCE NO.
3 ADDRESS INQUIRY NO.
4 PLANT LOCATION PT. EAST JAKARTA INDUSTRIAL PARK DATE 07/11/15
5 SERVICE OF UNIT ALCOHOL FROM OLEFINS ITEM NO. E-101
6 SIZE TYPE 2-4PASS CONNECTED IN PIPE
7 GROSS SURFACE PER UNIT SHELLS PER UNIT SURFACE PER SHELL
8 PERFORMANCE OF ONE UNIT
9 TUBE SHELL
10 FLUID CIRCULATED Cooling Water Olefin
11 TOTAL FLUID ENTERING 60310 KG/HR 1237145 KG/HR
12 VAPOR - -13 LIQUID 60310 KG/HR 1237145 KG/HR
14 STEAM -
15 NON-CONDENSABLES
16 FLUID VAPORIZED OR CONDENSED
17 STEAM CONDENSED
18 GRAVITY-LIQUIDS
19 VISCOSITY - LIQUID 0.1903 cP 0.0139 cP
20 MOLECULAR WEIGHT - VAPORS 18.02 G/MOL 253.3 G/MOL
21 SPECIFIC HEAT - LIQUIDS BTU/LB/oF BTU/LB/oF
22 LATENT HEAT - VAPORS BTU/LB/oF BTU/LB/oF
23 TERMPERATURE IN 30 oC 140.3 oC
24 TEMPERATURE OUT 45 oC 139.6 oC
25 OPERATING PRESSURE 10 bar 10 bar26 NUMBER OF PASSES PER SHELL 2 4
27 VELOCITY FT/SEC. FT/SEC.
28 PRESSURE DROP PSI PSI
29 FOULING RESISTANCE
30
31 HEAT EXCHANGER - KJ/HR. 19960000 M.T.D. (Corrected) 102.28 oC
32 TRANSFER RATE - SERVICE EFF. SSURFACE PER UNIT
CONSTRUCTION
34 DESIGN PRESSURE 10 bar 10 bar
35 TEST PRESSURE 10 bar 10 bar
36 DESIGN TEMPERATURE 140.3 oC 139.6 oC
37 TUBES NO. 32 O.D. 0.75IN BWG. 10 LENGTH 16in PITCH -38 SHELL I.D. 8IN O.D.
39 SHELL COVER SA-316 FLOATING HEAD COVER
40 CHANNEL CHANNEL COVER
41 TUBE SHEET - STATIONARY FLOATING HEAD COVER
42 BAFFLES - CROSS TYPE
43 BAFFLE - LONG TYPE
44 TUBE SUPPORT
45 GASKETS
46 CONNECTION - SHELL - IN PIPE OUT PIPE RATING PSI
47 CONNECTION - CHANNEL -IN OUT RATING PSI
48 CORROSION ALLOWANCE - SHELL SIDE TUBE SIDE
49 CODE REQUIREMENTS TEMA CLASS
50 WEIGHTS - EACH SHEEL BUNDLE FULL OF WATER51 NOTE: INDICATE AFTER EACH PART WHETHER STRESS RELIEVED (S. R.) AND WHETHER RADIOGRAPHED (X-R)
52 REMARKS:
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
40/61
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
41/61
31
kation dapat digunakan asam kuat dan resin penukar anion dapat digunakan basa
kuat.
Cooling water yang telah ditreatment akan didistribusikan ke dalam jaringan alat
penukar panas, untuk mendinginkan air proses. Cooling water yang telah mengalami
kenaikan temperatur, didinginkan kembali ke dalam cooling tower , dimana terjadi
perpindahan panas secara kontak langsung antara udara dan cooling water . Makeup
water ditambahkan sebagai pengganti jumlah air yang hilang di dalam cooling water
akibat adanya penguapan, windage drift , dan blowdown. Dalam hal ini diambil asumsi
makeup water sebesar 10% loss. Sistem distribusi air yang digunakan pada PT CNB
disajikan pada gambar 4.2.
E-305
E-301
E-300
COOLING TOWER
548351,3 kg/h
30 C
54835,13 kg/h
25 C54835,13 kg/h
493516,17 kg/h
174600 kg/h
30 C
174600 kg/h
45 C
42164 kg/h
30 C
42164 kg/h
45 C
331587,3 kg/h
30 C
331587,3 kg/h
45 C
548351,3 kg/h
45 C
Gambar 4.2. Sistem Distribusi Air Pendingin PT CNB
Berdasarkan perhitungan kebutuhan air pendingin total yaitu 548351,3 kg/h
untuk dua buah cooler dan satu kondensor pada unit distilasi dengan asumsi laju
make up sebesar 10% laju air pendingin total.
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
42/61
32
4.2 Sistem Pengelolaan dan Distribusi Steam
Sebelum memasuki boiler air umpan yang berasal dari reservoir perlu dilakukan
pengolahan air umpan terlebih dahulu agar memenuhi spesifikasi standar yang telah
ditentukan. Diagram proses pengolahan air umpan boiler disajikan pada gambar 4.3.
E-8 Steam System
Filter
Raw Material
Ion Exchange Regeneration
Ion
Exchange
Ion Exchange
RegenerationLiqors
ChemicalTreatment
Vent
Low Pressure
steam
Fuel
Dearator
Boiler
Blowdown
Boiler
Fuel
Gas
Condensate
Return
Condensate
Loss
Gambar 4.3. Pengolahan Air Umpan BoilerKebutuhan listrik pada PT CNB digunakan untuk proses dan unit penyuplai air,
penerangan, perlengkapan elektronik bak di pabrik, dan di kantor. Daftar kebutuhan listrik pada
PT CNB disajikan pada tabel 2.
Tabel 4.1. Daftar Kebutuhan Listrik PT CNB
AlatDaya
kW kWh
P-301 2,413 8686,8
P-302 1,916 6897,6P-303 2,92 10512
Total 7,249 26096,4
Kebutuhan listrik untuk kantor 7,249 kW dengan asumsi untuk menghidupkan peralatan
elektronik yang digunakan dalam kantor, sedangkan kebutuhan listrik untuk penerangan
disajikan pada tabel 4.2.
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
43/61
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
44/61
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
45/61
35
4.4 Sistem Pengolahan Limbah
Limbah yang dihasilkan oleh PT CNB berasal dari vessel unit V-302 dan limbah
proses akibat zat-zat yang terbuang, bocor, atau tumpah. Limbah yang keluar dari vessel
unit V-302 ialah limbah aseton. Aseton merupakan salah satu pelarut organik yang
termasuk ke dalam golongan limbah B3. Namun, limbah ini memiliki nilai bakar
sehingga dapat dimanfaatkan kembali sebagai bahan bakar untuk boiler. Adapin HHV
dari aseton ialah 89,511 Btu/gal.
4.5 Sistem Utilitas Lain
Sistem utilitas lain yang digunakan di PT CNB ialah unit pemadam kebakaran.
Unit ini disediakan untuk kebakaran yang terjadi pada bahan berpijar seperti kayu,
arang, kertas, dan bahan berserat. Air ini dapat disemprotkan dalam bentuk kabut.
Sebagai sumber air, biasanya digunakan air tanah yang dialirkan melalui pipa-pipa yang
dipasang pada instalasi-instalasi tertentu di sekitar areal pabrik. Air dipompakan dengan
menggunakan pompa yang bekerja dengan instalasi listrik tersendiri, sehingga tidak
terganggu apabila listrik pada pabrik dimatikan ketika kebakaran terjadi.
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
46/61
36
4.6 Layout Pabrik dan Tata Letak Peralatan Utama
Kantor Administrasi
15m x 25m
Area Produksi
40 m x 70 m
Mesjid
10m x 10m
Kantin dan
Poliklinik
10m x 10m
G e d u n g S e r b a g u n a
1 0 m x 2 0 m
Sarana
Olahraga
7m x 7m
B e n g k e l
1 0 m x
1 0 m
Area Perluasan
80m x 20 m
Ruang
Kontrol
9mx9m
Area Utilitas
20m x 25m
Unit Pengolahan
Air
15m x 10m
Laboratorium
7m x 10m
Gudang
Peralatan
7m x 7m
TAMAN
a
a
a
a
Pos
Keamanan
3m x 3m
Pos
Keamanan
3m x 3m
d d d d d d d d d d d d d
v
Storage Tank
Gambar 4.5 Denah Kawasan Pabrik
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
47/61
37
Storage
Bahan Baku
3,902 m
TK-301
4,65 m
A-301 7 , 4 6 m
V-301
7,25 m
V-303
4,92 m
V-302
4,65 m
E-302
6,05 m
E-303
6,05 m
E-304T-301
3,23 m
TK-302
4,65 m
6,05 m
4,88 m
R-301
15 m
E-301
ROAD
Acces Way
P-301
P-303
P-302
0.96 m
Gambar 4.6 Denah tata letak peralatan PT CNB
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
48/61
38
BAB V
MANAJEMEN DAN KESELAMATAN KERJA
5.1 Manajemen
5.1.1 Bentuk PerusahaanBentuk badan usaha dalam perancangan pabrik pembuatan butanol
adalah perseroan terbatas (PT). Pertimbangan pemilihan bentuk perusahaan
berupa persero terbatas (PT), adalah sebagai berikut :
Kehidupan PT lebih terjamin karena tidak di pengaruhi oleh berhentinya
salah seorang pemegang saham, direktur, atau karyawan.
Terbatasnya tanggung jawab para pemegang saham karena segala sesuatu
yang menyangkut kelancaran perusahaan dipegang oleh pimpinan
perusahaan dan setiap pemegang saham hanya mungkin menderita kerugian
sebesar jumlah yang ditanamkan pada PT yang bersangkutan.
Kedudukan atau wewenang antara pemimpin perusahaan dan pemegang
saham (pemilik) terpisah satu sama lain.
Kemungkinan terhimpunnya modal yang sangan besar dan melimpah, yaitu
dengan membagi modal atas sejumlah saham-sahamnya.
Adanya efisiensi dalam perusahaan. Tiap bagian dalam PT dipegang oleh
orang yang ahli dibidangnnya.
5.1.2 Bentuk Organisasi
Masalah organisasi merupakan hal penting dalam perusahaan, hal ini
menyangkut efektivitas dalam meningkatkan kemampuan perusahaan dalam
memproduksi dan mendistribusikan produk yang dihasilkan. Dari sekian banyak
bentuk-bentuk organisasi pabrik ini menggunakan bentuk organisasi garis dan
staf. Pemilihan ini didasarkan pada beberapa pertimbangan yaitu :
Bentuk organisasi ini dapat digunakan oleh setiap organisasi yang besar,
apapun tujuannya seberapapun luas tugasnya dan betapapun kompleksnya
susunan organisasi pada perusahaan tersebut.
Pengambilan keputusan yang sehat dan mudah diambil.
Penempatan “the right man in the right place’’ lebih mudah dilakukan
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
49/61
STRUKTUR ORGANISASI
PT CNB
Gambar 5.1 Struktur Organisasi PT CNB
Direktur
GRUP
DirekturDewan
Komisaris
Manajer
Produksi
Manajer
Teknik Manajer Umum &
Keuangan
Manajer Pembelian
& pemasaran
Kepala
Seksi
Mesin
Kepala Seksi
Listrik &
Instrumentasi
Kepala
Seksi
Keuangan
Kepala
Seksi
Personalia
Kepala
Seksi
Keamanan
Kepala Seksi
Pembelian &
Penjualan
Kepala
Seksi
Proses
Kepala Seksi
laboratorium
R&D
Kepala
Seksi
Utilitas
Karyawan
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
50/61
40
5.1.3 Sistem Kerja
Pabrik ini direncanakan akan beroprasi selama 350 hari kerja pertahun
dengan masa shut down dan maintenance selama 15 hari kerja. Dalam satu hari
kerja pabrik akan beroprasi Selma 24 jam. Mengingat waktu operasi yang terus
menerus maka pabrik ini memerlukan pekerja regular dan pekerja shift.
5.1.4 Kebutuhan Tenaga KerjaDalam melaksanakan kegiatan pabrik, dibutuhkan susunan karyawan seperti pada
struktur organisasi. Jumlah karyawan yang dibutuhkan adalah sebagai berikut:
Tabel 5.1 Jumlah Karyawan dan Tingkatan Pendidikan
No Jabatan Jumlah (orang) Pendidikan
1 Dewan Komisaris 2 Ekonomi/ Tenik (S2)
2 Direktur 1 Ekonomi/ Tenik (S2)
3 Sekretaris 1 Sekretaris (D3)
4 Manager Produksi 1 Teknik Kimia (S2)
5 Manager Teknik 1 Teknik Industri (S2)
6 Manager Umum dan Keuangan 1 Ekonomi/ Manajemen (S2)
7 Manager Pembelian dan Pemasaran 1 Ekonomi/ Manajemen (S1)
8 Kepala Seksi Proses 1 Teknik Kimia (S1)
9 Kepala seksi Laboratorium dan R& D 1 Teknik Mesin (S1)
10 Kepala Seksi Utilitas 1 Teknik Kimia (S1)11 Kepala Seksi Mesin 1 Teknik Mesin (S1)
12 Kepala Seksi Listrik dan Instrumentasi 1 Teknik Elektro (S1)
13 Kepala Seksi Keuangan 1 Ekonomi (S1)
14 Kepala Seksi Personalia 1 Ekonomi/ Manajemen (S1)
15 Kepala Seksi Keamanan 1 Pensiunan Abri
16 Kepala Seksi Pembelian dan Penjualan 1 Manajemen Pemasaran (S1)
17 Karyawan Produksi 35 SMK/ Politeknik
18 Karyawan Teknik 10 SMK/ Politeknik
19 Karyawan Umum dan Keuangan 10 SMU/ D1/ Politeknik
20 Karyawan Pembelian dan Pemasaran 10 SMU/ D1/ Politeknik
21 Dokter 2 Kedoteran (S1)
22 Perawat 2 Akademi Perawat (D3)
23 Petugas Keamanan 9 SMU/ Pensiunan Abri
24 Supir 3 SMU/ STM
25 Petugas Kebersihan 12 SMU
Total 110 orang
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
51/61
41
5.1.5 Peraturan Perusahaan
1. Jam Kerja Karyawan
Pembagian jadwal kerja pabrik maleic anhydride, sebagai berikut :
a. Karyawan Regular atau non-Shift
Senin – Jumat : 09.00 – 17.00 WIB
Istirahat : 12.00 – 13.00 WIB
b. Karyawan Shift
Shift pagi : 07.00 – 15.00 WIB
Shift siang : 09.00 – 17.00 WIB
Shift sore : 17.00 – 07.00 WIB
2. Kehadiran
a.
Setiap pekerja diwajibkan absen ketika masuk dan pulang kerja.
b. Ketidakhadiran harus dilaporkan, secara tertulis kepada atasannya
langsung pada hari yang sama dengan memberikan alasannya.
c.
Ketidakhadiran karena alesan sakit lebih dari satu hari harus dilengkapi
dengan surat dokter.
d.
Pekerja tidak boleh masuk diluar jam kerjanya, kecuali mendapat surat
tugas.
e. Pelanggaran kedisiplinan oleh pekerja dapat dikenkan sanksi
administrasi
f.
Apabila pekerja tidak masuk selama lima hari kerja berturut-turut tanpa
keterangan secara tertulis dan bukti yang sah dan telah dipanggil oleh
perusahaan, maka ia dianggap mengundurkan diri.
g.
Pekerja yang meninggalkan pekerjaan dalam jam kerja wajib memintaijin dari atasannya langsung.
3. Tata Tertib
Setiap pekerja diwajibkan :
a. Melakukan semua tugas yang diterima dan menggunkan
wewenangnnya sesuai dengan peraturan perusahaan.
b.
Mematuhi ketentuan jam kerja penuh
c. Mengerjakan sendiri semua tugas dan tanggung jawab yang
dibebankan kepadanya
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
52/61
42
d.
Menjaga dan memelihara dengan baik semua barang milik perusahaan
yang dipercayakankepadanya.
e.
Setiap saat bersikap sopan dan mampu bekerjasama dengan atasan
danpekerja lain.
f. Setiap hari memeriksa dan mengatur semua perlengkapan kerja di
tempatnya masing-masing.
g.
Menggunakan kartu tanda pengenal pada baju bagian atas yang mudah
terlihat pada jam kerja.
h. Menjaga kebersihan lingkungan kerja.
i.
Memakai alat-alat keselamatan kerja yang sesuai dengan standar
safety.
j.
Mencegah timbuhlnya bahaya yang dapat merugikan orang dan
investasi perusahaan.
k. Melaporkan segera pada pihak yang berwenang bila terjadi kecelakaan
atau gangguan keamanan di lingkungan kerja.
4. Fasilitas Kerja
Guna memenuhi kesejahteraan karyawan terdapat beberapa fasilitas
yang diberikan oleh perusahaan, antara lain :
a.
Tunjangan
Selain gaji poko, karyawan juga menerima tunjangan-tunjangan lain
meliputi :
Tunjangan duka cita, dibatasi untuk anggota keluarga
THR ( Tunjangan Hari Raya)
Bonus
b. Tunjangan Kesehatan
Tunjangan kesehatan meliputi :
Tunjangan perawatan kesehatan
Biaya rumah sakit
Biaya persalinan (dibatasi sampai 2 kali kehamilan) untuk karyawan
wanita dan istri dari karyawan
c. Pemberian Cuti
Izin cuti yang diberikanpada karyawn meliputi :
-
Cuti tahunan
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
53/61
43
Cuti diberikan 12 hari dalam satu tahunnya
- Cuti panjang
Cuti tambahan ini diberikan selama 5 hari bagi karyawan yang
sudah bekerja selama 5 tahun
- Cuti kehamilan
Cuti ini diberikan selama 3 bulan sebelum dan sesudah
melahirkan.
- Cuti keguguran
Cuti keguguran diberikan selama 45 hari.
- Cuti sakit
Kantin
Transportasi
Jamsostek
Seragam kerja
Fasilitas olahraga
5.2 Kesehatan dan Keselamatan Kerja
5.2.1 Pencegahan Terhadap Kebakaran dan PeledakanProses produksi sec – butanol, tert – butanol, dan 2 – methyl – 2- butanol
menggunakan reactor yang beroperasi pada suhu 80°C. Bahaya yang
kemungkinan timbul adalah kebakaran atau peledakan yang berasal dari
reactor . Selain itu, unit penghasil uap (boiler ) juga dapat menciptakan hal yang
serupa apabila pengendalian tidak berjalan optimal. Lebih lanjut, produk dari
pabrik ini berupa sec – butanol, tert – butanol, dan 2 – methyl – 2- butanol yang
mengharuskan sistem tidak boleh mengalami kebocoran karena apabila itu
terjadi syngas yang keluar dari sistem terkena percikan api dapat menyebabkan
kebakaran.
Dari uraian diatas maka perlu dilakukan upaya pencegahan dan penanganan
terhadap kebakaran dan ledakan sebagai berikut :
1. Untuk mengetahui adanya bahaya kebakaran maka sistem alarm dipasang pada
tempat yang strategis dan penting seperti di laboratorium dan ruang proses.
2. Pada peralatan pabrik yang berupa tangki dibuat mainhole dan handhole yang
cukup untuk pemeriksaan.
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
54/61
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
55/61
45
BAB VI
ANALISIS EKONOMI
6.1 Asumsi Umum
Harga Bahan Baku dan Produk
Harga Harga Per Satuan (US$/ton)
Bahan Baku 102,363,632.83
Produk 167,880,000.00
CE Index
CE Index 1989 = 320 (D.E Garret,1989)
CE Index 2005 = 420 (S.M Walas,2005)
CE Index 2015 = 550,47
Parameter Lain
Jumlah operator : 7 orang/shift 4 kelompok
Hari kerja per tahun : 350 hari
Jam kerja normal : 43 jam/minggu dan libur 14 hari
Gaji pokok per bulan : US $ 0,212
Gaji lembur : 1,5 kali gaji pokok.
Umur pabrik : 10 tahun
Metode Depresiasi : Straight line
Tabel 6.2 Asumsi Persentase Parameter Lain
Komponen Persentase (%)
Off-Site 30%
Start up 7,5%
Working capital 10% Labor Related Cost 60%
Capital Related Cost 26%
Sales Realated Cost 20%
Suku Bunga 11%
6.2 Perkiraan Biaya Peralatan
Jumlah purchase equipment pada pabrik ini yaitu US $ 3,122,701.00 dengan rincian
seperti yang disajikan pada table 6.3
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
56/61
46
Tabel 6.3 Perkiraan Harga Peralatan
No Kode Alat Nama Alat Harga Sekarang
1 TK-301 Storage Tank Alkena $ 114,301.00
2 TK-302 Mixing Tank $ 160,000.00
3 P-301 Pump Alkane $ 9,500.004 P-302 Pump Alkane $ 10,000.00
5 P-303 Reflux Pump $ 5,300.00
6 R-301 Packed Bed Reactor $ 251,000.00
7 A-301 Anion Exchange Bed $ 379,000.00
8 E-301 Cooler $ 294,000.00
9 E-302 Heater $ 294,000.00
10 E-304 Heater $ 221,000.00
11 E-305 Condenser $ 294,000.00
12 E-306 Reboiler $ 294,000.0013 E-307 Cooler Recycle $ 294,000.00
14 V-301 Flash Vessel $ 70,000.00
15 V-302 Flash Vessel $ 30,000.00
16 V-303 Flash Vessel $ 52,000.00
17 V-304 Accumlator Drum $ 65,800.00
18 T-301Alcohol Purification
Tower$ 260,000.00
Total $ 3,122,701.00
6.3 Perkiraan Biaya Investasi
Biaya investasi awal yang dibutuhkan untuk membangun pabrik yang
memproduksi 3 jenis alkohol dengan kapasitas masing-masing 42.000 ton/tahun secara
rinci ditunjukkan pada tabel di bawah ini:
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
57/61
47
Tabel 6.4 Biaya Pembangunan Pabrik
Dari tabel di atas didapat Plant Cost dari pabrik ini yaitu sebesar US $
34,365,324.51
6.4 Perkiraan Biaya Produksi Tahunan
6.4.1 Biaya Produksi Variabel
Biaya variabel di pabrik ini dapat ditunjukkan pada Tabel 6.5
Tabel 6.5 Biaya Produksi Variabel
BPV
Raw Material $ 102,363,632.83
Utilitas $ 91,417.49
Sales Related Cost $ 33,576,000.00
TOTAL $ 136,031,050.3
6.4.2 Biaya Produksi Tetap Tabel 6.6 Biaya Produksi Tetap
BPT
Operating Labor $ 13,564.025
Labor Related Cost $ 8,138.415
Capital Related Cost $ 12,285,603
Total$ 12,307,305 *)
$ 7,582,073 **)
Component factor Cost
Purchased Equipment 1 3,122,701.00$
Piping 0.7 2,185,890.70$
Electrical 0.15 468,405.15$
Instrumentation 0.3 936,810.30$
Utilities 0.5 1,561,350.50$
Foundation 0.095 296,656.60$
Insulation 0.08 249,816.08$
Painting, Fireprootfing, safety 0.1 312,270.10$
Yard Improvement 0.1 312,270.10$
Environmental 0.3 936,810.30$
Buildings 0.7 2,185,890.70$
Land 0.08 249,816.08$
Construction, Engineering 0.6 1,873,620.60$
Contractor fee 0.3 936,810.30$
Contingency 0.5 1,561,350.50$
Multiplier (fluid Processing) 5.5 17,174,855.50$
34,365,324.51$
54,038,340.81$Total Cost Investment
Total Plant Cost
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
58/61
48
*) BPT dengan depresiasi
**) BPT tanpa depresiasi
Total bunga dari pinjaman pertama yaitu sebesar US $ 31,427,089
sehingga bunga per tahunnya menjadi US $ 181,212.
Tabel 6.7 Biaya Bunga ( Interest)
Dari beberapa data diatas, dapat disimpulkan bahwa biaya produksi tahunan untuk
kapasitas produksi 100% yaitu US $ 146,937,045. Analisa biaya produksi dari awal
pabrik dibangun hingga akhir umur pabrik dapat ditunjukkan pada tabel di bawah ini:
Tabel 6.8 Biaya Produksi Per Tahun
6.5 Analisis Kelaikan Ekonomi
Analisis awal kelaikan proyek dapat ditentukan berdasarkan beberapa metode analisis,
diantaranya:
Tahun ke- Cicilan Sisa Pinjaman Bunga
1 3,142,708.93$ 32,947,754.87$ 181,212.65$
2 3,142,708.93$ 31,300,367.13$ 181,212.65$
3 3,142,708.93$ 29,652,979.38$ 181,212.65$
4 3,142,708.93$ 28,005,591.64$ 181,212.65$
5 3,142,708.93$ 26,358,203.90$ 181,212.65$
6 3,142,708.93$ 24,710,816.15$ 181,212.65$
7 3,142,708.93$ 23,063,428.41$ 181,212.65$
8 3,142,708.93$ 21,416,040.66$ 181,212.65$
9 3,142,708.93$ 19,768,652.92$ 181,212.65$
10 3,142,708.93$ 18,121,265.18$ 181,212.65$
TOTAL 33,239,215.78$
3,323,921.58$
3,323,921.58$
3,323,921.58$
3,323,921.58$
3,323,921.58$
3,323,921.58$
3,323,921.58$
3,323,921.58$
3,323,921.58$
3,323,921.58$
Total Pembayaran
Tahun Kapasitas (%) Sales BP
1 50% 83,940,000.00$ 78,921,520.57$
2 55% 92,334,000.00$ 85,723,073.08$
3 65% 109,122,000.00$ 99,326,178.12$
4 80% 134,304,000.00$ 119,730,835.66$
5 100% 167,880,000.00$ 146,937,045.73$
6 100% 167,880,000.00$ 146,937,045.73$
7 100% 167,880,000.00$ 146,937,045.73$
8 100% 167,880,000.00$ 146,937,045.73$9 100% 167,880,000.00$ 146,937,045.73$
10 100% 167,880,000.00$ 146,937,045.73$
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
59/61
49
Tabel 6.9 Analisis Kelaikan Ekonomi PT CNB
Parameter Kelaikan Nilai
Return of Investment (ROI) 18,06%
Payback Period (PP) 4,2 tahun
Break Even Point (BEP) 49,08%.
Internal Rate of Return (IRR) 10,10%
Net Cash flow (NCF) US $ 88.086.505,15
Suatu pabrik dikatakan layak jika nilai Present Value (PV) lebih besar dari nol
di akhir umur proyek. Nilai tersebut dapat ditunjukkan pada gambar di bawah ini:
Gambar 6.1 Kurva Net Cash Flow
-4
-2
0
2
4
6
8
10
12
14
16
18
0 2 4 6 8 10 12
V a l u e ( $ )
x 1 0 0
0 0 0 0 0
Payback Periode (year)
NCF
NPV, i1
NPV, i2
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
60/61
50
6.6 Analisis Sensitivitas
Analisis sensitivitas dari PT CNB disajikan pada gambar 6.2.
Gambar 6.2 Kurva Analisis Sensitivitas
Berdasarkan dari gambar 6.2 dapat dilihat bahwa besarnya pendapatan dari hasil
penjualan dipengaruhi oleh beberapa aspek seperti penjualan, biaya bahan baku, biaya
utilitas, plant cost , dan working capital. Dari gambar diatas, terlihat bahwa sales
(penjualan) merupakan variable yang paling sensitif dibandingkan variabel lainnya. Hal
ini dikarenakan sales sangat dipengaruhi oleh ketertarikan konsumen serta harga tukar
dolar. Sedangkan untuk biaya lain-lain seperti biaya utilitas dan working capital tidak
mempunyai pengaruh besar dengan penjualan/pendapatan.
6.7 Simpulan dan Rekomendasi 6.7.1 Kesimpulan
Dari analisa ekonomi yang telah dilakukan dapat disimpulkan BEP
(sebelum depresiasi) pada kapasitas produksi 34,24% sehingga setengah dari
kapasitas masih mendapatkan keuntungan, Payback Period pada pabrik ini 4
tahun yakni lebih kecil daripada PP minimum, IRR pabrik ini lebih kecil
daripada suku bunganya yaitu 10,1%. Keuntungan bersih untuk pabrik ini yaitu
-25000000
-20000000
-15000000
-10000000
-5000000
0
5000000
10000000
15000000
20000000
25000000
-0,4 -0,3 -0,2 -0,1 0 0,1 0,2 0,3 0,4
% Variasi
sales
Raw Material
Utilitas
Working Capital
Plant Cost
8/17/2019 Hydration of the C4 and C5 Mono – Olefins to Alcohols
61/61
US$12974177/tahun pada kapasitas penuh, maka dapat dinyatakan PT. CNB
layak didirikan.
6.7.2 Rekomendasi
Untuk perhitungan estimasi harga menggunakan Wallas lebih direkomendasikan karena kemungkinan kesalahan pada perhitungan lebih kecil.
Selain itu data – data yang digunakan pada Wallas lebih terkini, sehingga untuk
perhitungan estimasi harga akan lebih baik menggunakan Wallas.