+ All Categories
Home > Documents > Hydraulic crane split hopper dredger VLAANDEREN · PDF fileVuyk Engineering Rotterdam B.V....

Hydraulic crane split hopper dredger VLAANDEREN · PDF fileVuyk Engineering Rotterdam B.V....

Date post: 13-Mar-2018
Category:
Upload: phammien
View: 213 times
Download: 0 times
Share this document with a friend
2
Vuyk Engineering Rotterdam B.V. Naval architects, Marine engineers, Consultants P.O. Box 1, De Linie 7 2900 AA Capelle aan den IJssel Phone +31 (0)10 450 25 00 Fax +31 (0)10 458 72 45 Email [email protected] Website www.vuykrotterdam.com Values are for presentation only Principal dimensions 76,02 m 72,50 m 14,50 m 5,00 m 4,57 m Description of system Length overall Length b.p.p. Breadth moulded Depth moulded Draft at dredging mark Hopper capacity Hopper load Suction pipe diameter Dredging depth, maximum VER project 07.021 Hydraulic crane split hopper dredger VLAANDEREN XXI Introduction The split hopper dredger ’Vlaanderen XXI’ is frequently engaged in gravel dredging with delivery of the gravel to various North Sea ports between Le Havre, France and Flushing, The Netherlands. For unloading in the various ports, the Operational Manager used its own mobile hydraulic crane, traveling by road between these ports. This became highly unpractical, therefore the Belgian owner DEME decided to equip the vessel with its own hydraulic crane. Capacity To install the Sennebogen hydraulic crane with grab, Vuyk Engineering Rotterdam was ordered to redesign the deck area for the conversion. Due to the split hopper discharge system, the crane support had to be placed on one side of the hopper and as close as possible to the centre line of the vessel. A construction was created in the centre of the hopper area to support the crane foundation on SB side. The existing overflow duct had to be relocated to the centre of the hopper. To avoid contact between the crane and overflow duct during splitting, the overflow was also placed on the SB side. The large hole in the construction, serving as crane foundation warranted a FEM calculation to ensure the necessary strength in all directions. 1 635 m2 289 t 650 mm 33,00 m
Transcript
Page 1: Hydraulic crane split hopper dredger VLAANDEREN · PDF fileVuyk Engineering Rotterdam B.V. Naval architects, Marine engineers, Consultants P.O. Box 1, De Linie 7 2900 AA Capelle aan

Vuyk Engineering Rotterdam B.V.Naval architects, Marine engineers, Consultants

P.O. Box 1, De Linie 7

2900 AA Capelle aan den IJssel

Phone +31 (0)10 450 25 00

Fax +31 (0)10 458 72 45

Email [email protected]

Website www.vuykrotterdam.com Values are for presentation only

Principal dimensions 76,02 m

72,50 m

14,50 m

5,00 m

4,57 m

Description of system

Length overall

Length b.p.p.

Breadth moulded

Depth moulded

Draft at dredging mark

Hopper capacity

Hopper load

Suction pipe diameter

Dredging depth, maximum

VER project 07.021

Hydraulic crane split hopper

dredger VLAANDEREN

XXI

Introduction The split hopper dredger 'Vlaanderen XXI' is frequently engaged in gravel dredging

with delivery of the gravel to various North Sea ports between Le Havre, France

and Flushing, The Netherlands. For unloading in the various ports, the Operational

Manager used its own mobile hydraulic crane, traveling by road between these

ports. This became highly unpractical, therefore the Belgian owner DEME decided

to equip the vessel with its own hydraulic crane.

Capacity

To install the Sennebogen hydraulic crane with grab, Vuyk Engineering Rotterdam

was ordered to redesign the deck area for the conversion.

Due to the split hopper discharge system, the crane support had to be placed on

one side of the hopper and as close as possible to the centre line of the vessel.

A construction was created in the centre of the hopper area to support the crane

foundation on SB side. The existing overflow duct had to be relocated to the centre

of the hopper. To avoid contact between the crane and overflow duct during

splitting, the overflow was also placed on the SB side.

The large hole in the construction, serving as crane foundation warranted a FEM

calculation to ensure the necessary strength in all directions.

1 635 m³

2 289 t

650 mm

33,00 m

Page 2: Hydraulic crane split hopper dredger VLAANDEREN · PDF fileVuyk Engineering Rotterdam B.V. Naval architects, Marine engineers, Consultants P.O. Box 1, De Linie 7 2900 AA Capelle aan

Vuyk Engineering Rotterdam B.V.Naval architects, Marine engineers, Consultants

P.O. Box 1, De Linie 7

2900 AA Capelle aan den IJssel

Phone +31 (0)10450 25 00

Fax +31 (0)10458 72 45

Email [email protected]

Website www.vuykrotterdam.com Values are for presentation only

The loading piping was redesigned, because of the relocation of the overflow duct

and the limitation of the original system for sand and silt only.

Loading openings were positioned at the fore and aft side of the hopper area .

Overboard discharges with grids were created to wash a substantial amount of

sand overboard before the gravel enters the hopper.

Finally an inclining test was conducted and a new stability booklet, approved by the

Flagstate Authorities, could be handed over to the Operational Manager.

Early September 2007, the vessel's trails were successfully executed and the

vessel is now fully operational again.

VER project 07.021

Hydraulic crane split hopper

dredger VLAANDEREN

XXI

VER Scope of works On behalf of DEME Building Materials, the following engineering was performed by

Vuyk Engineering Rotterdam for this conversion:

� Inclination test and stability calculations

� Finite Element Method calculations for foundations hydraulic crane

� Re-arrangement of delivery pipes above deck

� Check of vessels's longitudinal strength

� Re-integration of vessel's hopper overflow system