Prepared for: Prepared by:Marquette County Road Commission AECOM
Ishpeming, MI Marquette, MI
60240279December 9, 2011
Hydraulic Report
County Road 595 Bridge over Second River
Prepared ByAECOMBrian A. Hintsala, P.E.906.226.4966
7/27/2019 Hydraulic Report CR 595 Second River
2/44
AECOM i
Contents
1.0 Introduct ion ..........................................................................................................................1
2.0 Method of Analysis ............................................................................................................. 1
3.0 Variables and Coefficients .................................................................................................1
4.0 Starting Point ....................................................................................................................... 1
5.0 Discussion ........................................................................................................................... 1
6.0 Conclusion ........................................................................................................................... 2
List of AppendicesAppendix A HEC-RAS Computations
Appendix B Profile Sheets
Appendix C Topographic Map HEC-RAS River Sections
Appendix D Bridge Plans
Appendix E Cross Sections
Appendix F Damage Waivers
Appendix G Flow Rates
Appendix H Site Photographs
Appendix I USGS Topographical Map and River Gradient Calculations
7/27/2019 Hydraulic Report CR 595 Second River
3/44
AECOM 1
1.0 Introduction
This hydraulic report is being prepared for the Marquette County Road Commission concerning theproposed County Road 595 crossing of the Second River. The site is located in Section 25 of T48N,R29W, Quad Map Name - Diorite (Lat. 46.52666610/Long. -87.86756371) in Champion Township,Marquette County. Multiple road alignments were investigated. The chosen alignment crosses theriver at the site of an existing crossing composed of multiple culverts. The existing culverts are bothstructurally and geometrically inadequate for the projected road traffic and require replacement.
2.0 Method of Analysis
The hydraulic analysis was performed using the HEC-RAS River Analysis System computerprogram, Version 3.1.3 developed by the U.S. Army Corps of Engineers Hydraulic EngineeringCenter. The steady flow data for the flood events were obtained from the Michigan Department of
Environmental Quality (MDEQ).
3.0 Variables and Coefficients
The river sections near the bridge use an expansion coefficient of 0.30 and contraction coefficient of0.50 which are suitable for a typical bridge per Table 3.3 of the HEC-RAS Hydraulic ReferenceManual. The Mannings n-values for friction loss were selected using Table 3.1 of the HEC-RASHydraulic Reference Manual. The main channel is fairly uniform with some weeds so a value of 0.035was chosen. The overbanks are covered with medium brush so a value of 0.070 was chosen.Representative photographs of the site are included in Appendix H.
4.0 Starting Point
The starting point of the analysis was a surveyed river section about 227 feet downstream of theproposed road. This location was chosen because it was far enough downstream to be outside of theinfluence of the proposed bridge. The starting water surface elevation was calculated by HEC-RASusing the slope-conveyance method. An average channel slope of 0.0012 was estimated from aUSGS quadrangle map and used for the normal depth boundary condition. The calculations areincluded in Appendix I.
5.0 Discussion
The main channel of the Second River is variable in width and not well defined. At the 100-year floodevent a large portion of the flow is carried by the overbank floodplain. The river gradient is relativelyflat and the flow regime is sub-critical for all flood events.
The existing crossing is composed of two 36" circular culverts and one 42" x 66" elliptical culvert.Because of the relatively low hydraulic capacity of the existing culverts, the road is overtopped duringflood events. The proposed bridge will be placed directly over the location of the existing culverts.
The proposed bridge has a span of 58 feet. The relatively large span is required to replace theculverts because the overtopping of the existing road during flood events. In addition, the proposed
7/27/2019 Hydraulic Report CR 595 Second River
4/44
AECOM 2
bridge is highly skewed (to align it to the river channel) which reduces its effective width. Theproposed bridge is composed of a prestressed concrete box beam deck supported by concretefoundation walls on steel piles. The restored stream banks are protected with heavy riprap. The
proposed bridge has a large enough hydraulic opening to reduce the water elevations upstream of thebridge without overtopping the proposed road.
The river cross sections are placed in HEC-RAS at the distances measured along the center line ofthe channel. In some cases the surveyed sections on each side of the bridge were adjusted up ordownstream as required to model the bridge using the standard bridge/culvert input section of HEC-RAS. This is required because the actual location of the bridge was not known when the survey wasperformed. The final positions of the sections are shown in the plan view in Appendix C.
The existing road approaches cut off a portion of the overbank flow during the higher flow events.Ineffective flow areas were included in the overbank portions of the cross sections upstream anddownstream of the bridge as suggested in chapter 5 of the HEC-RAS Hydraulic Reference Manual.
The proposed bridge has a larger hydraulic opening than the existing culverts. This reduces the watervelocity at the crossing as well as the water elevation upstream.
Table 1 on the following page summarizes the key model results for two configurations:
1. The existing 3 culvert crossing.2. The proposed 58 span bridge.
6.0 Conclusion
Analysis results indicate that the proposed bridge decreases water surface elevations and channelvelocities for all of the flow events compared to the existing bridge.
7/27/2019 Hydraulic Report CR 595 Second River
5/44
Hydraulic Comparison of Bridge Options
County Road 595 overSecond River3/18/2011
Table 1HEC-RAS Analysis Results
(cfs)
100 Year 10 Year 100 Year 100 Year 100 Year 100 Year
(600 cfs) (220 cfs) (600 cfs) (600 cfs) (600 cfs) (600 cfs)
Existing Culverts 5.50 6.28 168 1557.58 1557.67 1558.00
Proposed Bridge 5.48 3.12 600 1557.21 -0.37 1557.37 -0.30 1557.83 -0.17
Change
River Station 11
Water Surface
Elevation at Upstream
Face of Bridge
River Station 9
(feet) (feet)
Energy Gradient
Elevation at 450'
Upstream of Bridge
Velocity in
Channel at Bridge
Energy Gradient
Elev at Upstream
Face of Bridge
Model Configuration Change Change
River Station 9River Station 8.5
(ft/sec) (feet)
Flow
thru
Bridge
Opening
7/27/2019 Hydraulic Report CR 595 Second River
6/44
AECOM
Appendix A
HEC-RAS Computations
7/27/2019 Hydraulic Report CR 595 Second River
7/44
AECOM
Computations
The HEC-RAS data files are included in a separate electronic folder named:
HEC-RAS_CR 595 over Second River.zip
In order to provide a brief summary of the analysis results, a Profile Output Table for both theexisting and proposed conditions are included on the following pages.
7/27/2019 Hydraulic Report CR 595 Second River
8/44
HEC-RAS Plan: Ex Culverts River: Second Riv Reach: Main
Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude #Chl Cu
(cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft)
Main 11 Q10 220.00 1552.51 1556.95 1557.02 0.000699 2.36 141.79 76.55 0.23
Main 11 Q50 460.00 1552.51 1557.54 1557.71 0.001538 3.85 188.26 81.45 0.34
Main 11 Q100 600.00 1552.51 1557.75 1558.00 0.002073 4.63 206.16 83.80 0.40
Main 10 Q10 220.00 1551.48 1556.92 1556.93 0.000134 1.32 378.95 218.71 0.11
Main 10 Q50 460.00 1551.48 1557.47 1557.51 0.000330 2.23 517.98 290.77 0.17
Main 10 Q100 600.00 1551.48 1557.67 1557.73 0.000445 2.66 578.05 302.47 0.20
Main 9 Q10 220.00 1551.70 1556.89 1553.43 1556.91 0.000144 1.42 326.87 227.86 0.11
Main 9 Q50 460.00 1551.70 1557.41 1554.41 1557.47 0.000346 2.36 457.68 271.25 0.18
Main 9 Q100 600.00 1551.70 1557.58 1554.87 1557.67 0.000482 2.85 506.71 283.51 0.21
Main 8.5 Culvert #2 Q10 220.00
Main 8.5 Culvert #1 Q10 220.00
Main 8.5 Culvert #3 Q10 220.00
Main 8.5 Culvert #2 Q50 460.00
Main 8.5 Culvert #1 Q50 460.00
Main 8.5 Culvert #3 Q50 460.00
Main 8.5 Culvert #2 Q100 600.00
Main 8.5 Culvert #1 Q100 600.00
Main 8.5 Culvert #3 Q100 600.00
Main 8 Q10 220.00 1551.79 1555.21 1555.38 0.003728 4.16 115.85 124.33 0.48
Main 8 Q50 460.00 1551.79 1556.00 1556.15 0.003475 4.65 238.12 188.08 0.48
Main 8 Q100 600.00 1551.79 1556.34 1556.48 0.003103 4.63 325.24 304.53 0.46
Main 7 Q10 220.00 1551.56 1554.96 1554.08 1555.04 0.001200 2.93 178.73 176.59 0.30Main 7 Q50 460.00 1551.56 1555.74 1554.79 1555.83 0.001201 3.42 363.12 292.22 0.31
Main 7 Q100 600.00 1551.56 1556.09 1555.05 1556.18 0.001200 3.62 475.53 347.00 0.31
7/27/2019 Hydraulic Report CR 595 Second River
9/44
HEC-RAS Plan: New Bridge River: Second Riv Reach: Main
Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude #Chl Culv
(cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft)
Main 11 Q10 220.00 1552.51 1555.89 1556.12 0.002818 3.95 69.25 51.60 0.44
Main 11 Q50 460.00 1552.51 1557.01 1557.30 0.002829 4.80 146.70 76.94 0.46
Main 11 Q100 600.00 1552.51 1557.53 1557.83 0.002631 5.03 187.85 81.39 0.45
Main 10 Q10 220.00 1551.48 1555.71 1555.77 0.000606 2.31 174.95 125.16 0.22
Main 10 Q50 460.00 1551.48 1556.85 1556.93 0.000629 2.84 365.63 214.30 0.23
Main 10 Q100 600.00 1551.48 1557.40 1557.48 0.000602 2.99 498.24 280.88 0.23
Main 9 Q10 220.00 1551.70 1555.64 1553.44 1555.71 0.000541 2.25 139.87 89.61 0.21
Main 9 Q50 460.00 1551.70 1556.71 1554.42 1556.83 0.000768 3.20 220.88 203.14 0.26
Main 9 Q100 600.00 1551.70 1557.21 1554.88 1557.37 0.000857 3.62 260.18 257.73 0.28
Main 8.5 BR U Q10 220.00 1551.90 1555.51 1553.92 1555.65 0.001602 2.96 74.39 31.20 0.34
Main 8.5 BR U Q50 460.00 1551.90 1556.43 1554.91 1556.73 0.002706 4.36 105.57 36.60 0.45
Main 8.5 BR U Q100 600.00 1551.90 1556.86 1555.36 1557.24 0.002935 4.94 121.37 37.00 0.39
Main 8.5 BR D Q10 220.00 1551.90 1555.39 1553.92 1555.54 0.001846 3.12 70.61 30.48 0.36
Main 8.5 BR D Q50 460.00 1551.90 1556.17 1554.91 1556.53 0.003476 4.78 96.26 35.07 0.51
Main 8.5 BR D Q100 600.00 1551.90 1556.54 1555.36 1557.01 0.004132 5.48 109.54 37.00 0.45
Main 8 Q10 220.00 1551.79 1555.21 1555.40 0.004011 4.32 90.79 124.03 0.50
Main 8 Q50 460.00 1551.79 1556.01 1556.28 0.004744 5.44 144.35 188.93 0.57
Main 8 Q100 600.00 1551.79 1556.39 1556.70 0.004963 5.90 169.98 208.03 0.59
Main 7 Q10 220.00 1551.56 1554.96 1554.08 1555.04 0.001200 2.93 178.71 176.58 0.30Main 7 Q50 460.00 1551.56 1555.78 1554.79 1555.86 0.001201 3.44 340.15 215.51 0.31
Main 7 Q100 600.00 1551.56 1556.17 1555.06 1556.26 0.001201 3.67 434.39 259.16 0.31
7/27/2019 Hydraulic Report CR 595 Second River
10/44
AECOM
Appendix B
Profile Sheets
7/27/2019 Hydraulic Report CR 595 Second River
11/44
0 100 200 300 400 500 600 7001550
1551
1552
1553
1554
1555
1556
1557
1558
1559
1560
1561
1562
Wolf Lake Road over Second River Plan: Existing culverts 3/18/2011
Main Channel Distance (ft)
Elevation
(ft)
Legend
EG Q100
WS Q100
EG Q50
WS Q50
Crit Q100
EG Q10
WS Q10
Crit Q50
Crit Q10
Ground
Second Riv Main
7/27/2019 Hydraulic Report CR 595 Second River
12/44
0 100 200 300 400 500 600 7001550
1552
1554
1556
1558
1560
1562
Wolf Lake Road over Second River Plan: New Bridge 3/18/2011
Main Channel Distance (ft)
Elevation
(ft)
Legend
EG Q100
WS Q100
EG Q50
WS Q50
Crit Q100
EG Q10
WS Q10
Crit Q50
Crit Q10
Ground
Second Riv Main
7/27/2019 Hydraulic Report CR 595 Second River
13/44
AECOM
Appendix C
Topographic MapHEC-RAS River Sections
7/27/2019 Hydraulic Report CR 595 Second River
14/44
7/27/2019 Hydraulic Report CR 595 Second River
15/44
AECOM
Appendix D
Bridge Plans
7/27/2019 Hydraulic Report CR 595 Second River
16/44
7/27/2019 Hydraulic Report CR 595 Second River
17/44
7/27/2019 Hydraulic Report CR 595 Second River
18/44
7/27/2019 Hydraulic Report CR 595 Second River
19/44
AECOM
Appendix E
Cross Sections
7/27/2019 Hydraulic Report CR 595 Second River
20/44
AECOM
Cross Section
Cross sections are included for the existing condition and the proposed bridge condition.
7/27/2019 Hydraulic Report CR 595 Second River
21/44
AECOM
Existing Channel Condit ion
7/27/2019 Hydraulic Report CR 595 Second River
22/44
7/27/2019 Hydraulic Report CR 595 Second River
23/44
7/27/2019 Hydraulic Report CR 595 Second River
24/44
7/27/2019 Hydraulic Report CR 595 Second River
25/44
7/27/2019 Hydraulic Report CR 595 Second River
26/44
7/27/2019 Hydraulic Report CR 595 Second River
27/44
7/27/2019 Hydraulic Report CR 595 Second River
28/44
AECOM
Proposed Bridge Condition
7/27/2019 Hydraulic Report CR 595 Second River
29/44
7/27/2019 Hydraulic Report CR 595 Second River
30/44
7/27/2019 Hydraulic Report CR 595 Second River
31/44
7/27/2019 Hydraulic Report CR 595 Second River
32/44
7/27/2019 Hydraulic Report CR 595 Second River
33/44
7/27/2019 Hydraulic Report CR 595 Second River
34/44
7/27/2019 Hydraulic Report CR 595 Second River
35/44
AECOM
Appendix F
Damage Waivers
7/27/2019 Hydraulic Report CR 595 Second River
36/44
AECOM
No Damage Waivers Required
7/27/2019 Hydraulic Report CR 595 Second River
37/44
AECOM
Appendix G
Flow Rates
7/27/2019 Hydraulic Report CR 595 Second River
38/44
Michigan.gov Home | DEQ_Home | Online Services | Permits | Programs | Site Map | Contact_DEQState Web Sites | Privacy Policy | Link Policy | Accessibility Policy | Security Policy
Copyright 2011 State of Michigan
J oint Permit Application DEQ Home | CIWPIS | Online Services | Permits | Programs | Site Map | Contact DEQ
Flood Discharge Request Record 20110446-5 12/6/2011
| Home | Water Management | Lowflows | Discharge Requests | Watersheds Map |
Discharge InformationWatercourse: SECOND RIVER
Location: Wolf Lake Road Drainage Area: 6.52 mi2
Basin Name: 46 - Escanaba Contributing Area: 6.52 mi2
County: Marquette Tn/Rng/Sec: 48N29W/25
Township: Champion Latitude: 46.52673257
Quad Name: Champion Longitude: -87.86750978
Quad ID: D11SW
Requested By : Sheila Meier (DEQ-LWM-Ishpeming)
Received Date: 11/23/2011
Request Type: Trans. - County Issued Date: 12/5/2011
File Number: 20110446-5 Reference Number: 20100380
Discharge Frequencies: Volume Frequencies:
10%: 220 cfs2%: 460 cfs
1%: 600 cfs 1%: 750 acre-ft
0.5%: 800 cfs 0.5%: 900 acre-ft
0.2%: 1100 cfs
Access to the Flood Flow Database is provided as a service to allow you to check the status of your flood flow requests or to view discharges from previousrequests for preliminary design purposes. The discharges values are only valid for the original requestor and for one year after the original request date. Toobtain discharge information from the Hydrologic Studies Program, a flood flow discharge request formmay be submitted electronically to the DEQ. A writtenor email response to your request will be returned to you and must accompany your permit application.
Page 1 of 1DEQ - Flood Frequency Discharges
12/6/2011http://www.deq.state.mi.us/flow/hflow.asp?FileNumber=20110446-5
7/27/2019 Hydraulic Report CR 595 Second River
39/44
AECOM
Appendix H
Photos
7/27/2019 Hydraulic Report CR 595 Second River
40/44
County Road 595 over Second River
Existing Crossing Looking North
Downstream End of Culverts
7/27/2019 Hydraulic Report CR 595 Second River
41/44
County Road 595 over Second River
Looking Downstream from Existing Crossing
Upstream End of Culverts
7/27/2019 Hydraulic Report CR 595 Second River
42/44
County Road 595 over Second River
Looking Upstream from Existing Crossing
7/27/2019 Hydraulic Report CR 595 Second River
43/44
AECOM
Appendix I
USGS Topographical Map andRiver Gradient Calculations
Map includes portions ofQuadrangle maps:
Champion Diorite
Republic Greenwood
7/27/2019 Hydraulic Report CR 595 Second River
44/44
087 54' 0.00" W 087 52' 0.00" W 087 50' 0.00" W
1540
1560
CR 595/Second Riv 20' Intv 3.116 mi20' diff =20'/16,452'=0.0012 or 0.12%
1540
1560
CR 595/Second Riv 20' Intv 3.116 mi20' diff =20'/16,452'=0.0012 or 0.12%
1540
1560
CR 595/Second Riv 20' Intv 3.116 mi20' diff =20'/16,452'=0.0012 or 0.12%
1540
1560
CR 595/Second Riv 20' Intv 3.116 mi20' diff =20'/16,452'=0.0012 or 0.12%