Hydro Power Potential in PakistanAn Overview
Muhammad Adil Javed
Matrikelnummer: 2709215
8/3/2019 Hydro Power Potential in Pakistan
2/12
Hydro Power in Pakistan
Comparison, Production and Potential
6464
1422
55300
0
10000
20000
30000
40000
50000
60000
Currently Producing Projects in Pipeline Potential
MW
11,68% of
potential
8/3/2019 Hydro Power Potential in Pakistan
3/12
Hydro Power Stations
Currently in Operation
8/3/2019 Hydro Power Potential in Pakistan
4/12
Hydro Power Stations
Under Construction
8/3/2019 Hydro Power Potential in Pakistan
5/12
Total HydroPower Potential
: 55300 MW
8/3/2019 Hydro Power Potential in Pakistan
6/12
Total Hydro Power Potential in Pakistan
Sr. Category Capacity (MW)
1 HYDEL STATIONS INOPERATION 6464
2 UNDER CONSTRUCTION 1422
3 READY FORIMPLEMENTATION (PUBLIC SECTOR) 9858
4 FEASIBILITY STUDY COMPLETED (PULIC SECTOR) 173
5 FEASIBILITY STUDIES INHAND (PUBLIC SECTOR) 11351
6 READY FORIMPLEMENTATION (THROUGH PPPP) 1155
7 FEASIBILITY STUDIES INHAND (THROUGH PPPP) 1909
8 PROJECTS ADVERTISED BY PPIB FOR PRIVATE SECTOR 1620
9 IDENTIFIED POTENTIAL FOR FEASIBILITY STUDY 21247
TOTAL 55300
8/3/2019 Hydro Power Potential in Pakistan
7/12
Analysis ofHydro Power Potential:
By Provinces
42%
35%
11%12% KPK
GB
AJK
PUNJAB
8/3/2019 Hydro Power Potential in Pakistan
8/12
Imporant On Going Projects
Diamer Basha Dam
8,1 MAF Storage, 4500 MW
New Bong Escape Project
Run offRiver, 84 MW
Munda Dam, Multipurpose Project
1,3 MAF Storage, 740 MW
Jinnah HPP
Jinnah Barrage, 86 MW
8/3/2019 Hydro Power Potential in Pakistan
9/12
Diameer Basha Dam Project
8,1 MAF AnnualSurface WaterStorage
Installed capacity of
4500 MW Reduce Siltation in
TarbelaDam
Pay back in 8 years
A
nnual Earning of1,98 Billion
It ll be completed in7-8 years
8/3/2019 Hydro Power Potential in Pakistan
10/12
New Bong Escape Project
First Hydro
Independent
Power Producers
(IPP)
Run ofRiver, 84
MW
Success of Public-
Private ownership
8/3/2019 Hydro Power Potential in Pakistan
11/12
Problems
Lack of Public and PoliticalWill
Dispute over water
Deficiency ofTechnical
Capability
Absence ofTechnology
High Cost & Poor
Government
Recommendations
Create Awareness &Educate people
Encourage use ofRun of
River HPP
Involve Foreign
Consultants for Technical
Training
Work with ONLY those
who Transfer Technology
Encourage Private-PublicOwnership
Educate investors about
high cost to benefit ratios
8/3/2019 Hydro Power Potential in Pakistan