    Hydro Power Potential in PakistanAn Overview

    Muhammad Adil Javed

    Matrikelnummer: 2709215

  • 8/3/2019 Hydro Power Potential in Pakistan

    2/12

    Hydro Power in Pakistan

    Comparison, Production and Potential

    6464

    1422

    55300

    0

    10000

    20000

    30000

    40000

    50000

    60000

    Currently Producing Projects in Pipeline Potential

    MW

    11,68% of

    potential

  • 8/3/2019 Hydro Power Potential in Pakistan

    3/12

    Hydro Power Stations

    Currently in Operation

  • 8/3/2019 Hydro Power Potential in Pakistan

    4/12

    Hydro Power Stations

    Under Construction

  • 8/3/2019 Hydro Power Potential in Pakistan

    5/12

    Total HydroPower Potential

    : 55300 MW

  • 8/3/2019 Hydro Power Potential in Pakistan

    6/12

    Total Hydro Power Potential in Pakistan

    Sr. Category Capacity (MW)

    1 HYDEL STATIONS INOPERATION 6464

    2 UNDER CONSTRUCTION 1422

    3 READY FORIMPLEMENTATION (PUBLIC SECTOR) 9858

    4 FEASIBILITY STUDY COMPLETED (PULIC SECTOR) 173

    5 FEASIBILITY STUDIES INHAND (PUBLIC SECTOR) 11351

    6 READY FORIMPLEMENTATION (THROUGH PPPP) 1155

    7 FEASIBILITY STUDIES INHAND (THROUGH PPPP) 1909

    8 PROJECTS ADVERTISED BY PPIB FOR PRIVATE SECTOR 1620

    9 IDENTIFIED POTENTIAL FOR FEASIBILITY STUDY 21247

    TOTAL 55300

  • 8/3/2019 Hydro Power Potential in Pakistan

    7/12

    Analysis ofHydro Power Potential:

    By Provinces

    42%

    35%

    11%12% KPK

    GB

    AJK

    PUNJAB

  • 8/3/2019 Hydro Power Potential in Pakistan

    8/12

    Imporant On Going Projects

    Diamer Basha Dam

    8,1 MAF Storage, 4500 MW

    New Bong Escape Project

    Run offRiver, 84 MW

    Munda Dam, Multipurpose Project

    1,3 MAF Storage, 740 MW

    Jinnah HPP

    Jinnah Barrage, 86 MW

  • 8/3/2019 Hydro Power Potential in Pakistan

    9/12

    Diameer Basha Dam Project

    8,1 MAF AnnualSurface WaterStorage

    Installed capacity of

    4500 MW Reduce Siltation in

    TarbelaDam

    Pay back in 8 years

    A

    nnual Earning of1,98 Billion

    It ll be completed in7-8 years

  • 8/3/2019 Hydro Power Potential in Pakistan

    10/12

    New Bong Escape Project

    First Hydro

    Independent

    Power Producers

    (IPP)

    Run ofRiver, 84

    MW

    Success of Public-

    Private ownership

  • 8/3/2019 Hydro Power Potential in Pakistan

    11/12

    Problems

    Lack of Public and PoliticalWill

    Dispute over water

    Deficiency ofTechnical

    Capability

    Absence ofTechnology

    High Cost & Poor

    Government

    Recommendations

    Create Awareness &Educate people

    Encourage use ofRun of

    River HPP

    Involve Foreign

    Consultants for Technical

    Training

    Work with ONLY those

    who Transfer Technology

    Encourage Private-PublicOwnership

    Educate investors about

    high cost to benefit ratios

  • 8/3/2019 Hydro Power Potential in Pakistan

    12/12


Recommended