San Salvador !"0#"01!
8/9/2019 Hydroelectric Central
2/21
Page 9
TOCIntroducton !
Objective’s 4
Hydroelectric Central 5 de noviembre 5
Care When Working Whit Electricity 9Conclusion 10
Translate ""
8/9/2019 Hydroelectric Central
3/21
Page 9
Introducton
The building starts in the year 1954 and fnish in 1966 in the presidency
o Coronel Oscar Osorio. The constructor is Harza ngeneering Co!pany.
"a! type gra#ity $is one in %hich its o%n %eight is responsible or
resisting the thrust o the %ater&.The 'lectricity can be dangerous. (ut i you use co!!on sense and
ollo% prescribed saety !easures) you %ill co!e to no har!. The basic
rule is* al%ays shut o+ electrical po%er to the area in %hich you are
%or,ing.
Objetives
8/9/2019 Hydroelectric Central
4/21
Page 9
• "efne %hat a hydroelectric plant is.
• Obser#e the parts that !a,e po%er generators
• -nderstand the use o electricity generators
• a,e proper use o %or, ite!s.
Hydroelectric Central ! de
"ovie#bre$
8/9/2019 Hydroelectric Central
5/21
Page 9
• The na!e o the
hydroelectric 5 de
no#ie!bre correspond the
frst proyect in the /e!pa
0i#er or the 'ecuti#e
Co!!ission the /e!pa
0i#er $C'/ in 2panish&.
• The building starts in the
year 1954 and fnish in
1966 in the presidency o
Coronel Oscar Osorio. The
constructor is Harza
ngeneering Co!pany.
• The tipe o da! is called
3edge o %ater or 3flo de
agua $in 2panish& because
the storage capacity is not
bigger) ho%e#er is capable
o pro#iding po%er durning
e#ery year through
!anage!ent and the
operation ecient the
reser#oir.
• n the years 777877 the
da! %as repo%ered and
!odernized raising the
installed capacity o 1.4
: a 99.4 :. The %or,s
%ere eecuted by the
consortiu! ;
;
8/9/2019 Hydroelectric Central
6/21
Page 9
• "a! type gra#ity $is one in
%hich its o%n %eight is
responsible or resisting
the thrust o the %ater&.•
• The !ai!u! di+erential
bounce is 56 !eters.• ai!u! #olu!e o
17?.?7 da!!ed Cubic@s
illi!eters.
•
• ini!u! #olu!e o 65.17
Cubic@s illi!eters
da!!ed.•
•
• ini!u! operating height*
1?6.77 !eters abo#e sea
le#el.• 'arly :arning* 1?9.57
!eters abo#e sea le#el.•
•
•
• ai!u! Ao% turbine 1
!Bs.
• ai!u! 0eser#oir area *
1B.54 ,!.
• ini!u! 0eser#oir area*
?.?9 ,!.
•
8/9/2019 Hydroelectric Central
7/21
Page 9
•
•
• Princi&al 'yste#s
•
• $epo%ered t&e '(droelectric Central
•
• nta,e $5 radial gates
electro!echanical %inch type
e!ergency shutdo%n&.•
• Turbine $5 units o the
horizontal ais Drancis type
addressable blades and
distributors&.•
• 'citation $5 units based on
8/9/2019 Hydroelectric Central
8/21
Page 9
• 2peed 0egulator $5 E"
electronics integrated into a
hydro electro pneu!atic
go#ernor.•
• Fenerator $5 units o the
synchronous type&G -1) -
and -B* 7 :G -4* 1 :G
-5 o 1.4 :.
•
• Transor!er $5 units today
%ith ollo%ing !ai!u!
capacities* 5 : -1) -
46.6G -B* 57 :G -4* 46.6
:G -5* 46.? :&.
• (u)iliary 'yste#*
• /ubrication 2yste!
• /iting turbine syste!.
• Cooling 2yste!
• 2yste! drains prey. $Eu!ping ro! galleries and
base!ent&• Co!!ercial !easure!ent syste! $2'C&
• /andflls
• '!ergency Elant ?57 I:.
• 47 ; control syste! $engine roo! and substation&• deluge fre protection syste! o po%er transor!ers
• Dire protection syste! generating units and auiliary
eJuip!ent.• 2yste! electrical protection o generating units and
transor!ers.
8/9/2019 Hydroelectric Central
9/21
Page 9
R#$ot#nc%c&n %''.( MW
2000-2002
• 0T- $re!ote trans!ission unit&
• 2C
8/9/2019 Hydroelectric Central
10/21
Page 9
•
• Care -hen -orking -ith
electricity• The 'lectricity can be dangerous. (ut i you use co!!on sense
and ollo% prescribed saety !easures) you %ill co!e to no har!.
The basic rule is* al%ays shut o+ electrical po%er to the area in
%hich you are %or,ing. Then !a,e sure it is o+ by using a #oltage
tester beore touching the %ires. there is no electricity in the
%ires) you cannot be hurt. HereLs a chec,list*
• 0e!o#e the use or turn o+ the brea,er that controls the circuit you are
%or,ing on. Eost a note on the bo to %arn the others not to touch it
because you are %or,ing in a circuit.• (eore touching any %ire) !a,e sure they are dead by chec,ing %ith a
#oltage tester.• =e#er stand on a da!p Aoor %hen %or,ing %ith electricity. the Aoor
around your use or brea,ers bo is e#en occasionally %et) ,eep so!e
boards or a rubber !at there to stand on beore touching the bo.•
=e#er touch any plu!bing pipes or gas pipes %hen %or,ing %ithelectricity. They are oten used as the ground to the electrical syste!.
Touching a hot %ire and the pipe at the sa!e ti!e could cause current
to Ao% through your body.•
8/9/2019 Hydroelectric Central
11/21
Page 9
%anted to con#ey a or! o it and the saying %here it is
peror!ed as is the process that in#ol#es and the tea! to
use or the generation o hydroelectric energy o or!.
• This ite! %e ha#e %anted to con#ey %ith our class!ates
and teacher since not all trust the sa!e career and as %ell
be able to gi#e the! to ,no% %hat %e ,no% about the
subMect o electric po%er generation and the precautions
that should be ta,en %hen %or,ing %ith it.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
8/9/2019 Hydroelectric Central
12/21
Page 9
•
• .ranslation
•
•
•
• /ntroduccin
• Due construida entre 195481966 baMo la direcciNn de la
presidencia del Coronel Oscar Osorio. /os constructores
ueron Harza ngeneering Co!pany. Eresa tipo gra#edad.
• /a electricidad puede ser peligrosa. Eero si se usa el sentido
co!n y se siguen las !edidas de seguridad prescritas) se
llega a ningn daPo. /a regla bQsica es* sie!pre
desconectar la corriente elRctrica de la zona de trabaMo.
•
•
•
•
•
•
•
•
•
8/9/2019 Hydroelectric Central
13/21
Page 9
•
•
•
• Objetivos
• "efnir Jue es una central hidroelRctrica.
• Obser#ar las piezas Jue conor!an las generadoras de energSa
• 'ntender el uso de las generadoras de electricidad
• Hacer un uso adecuado de los ele!entos de trabaMo.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
8/9/2019 Hydroelectric Central
14/21
Page 9
•
•
•
•
• CE".(2 H/3OE2EC./C(! 3E "O/E56E
•
• /a central HidroelRctrica 5
de =o#ie!bre corresponde
al pri!er proyecto
HidroelRctrico del 0io
/e!pa de la Co!isiNn'Mecuti#a HidroelRctrica del
0So /e!pa $C'/&.
• Due construida entre
195481966 baMo la
direcciNn de la presidencia
del Coronel Oscar Osorio.
/os constructores ueron
Harza ngeneering
Co!pany.
• 'l tipo de presa es 3flo de
agua por no tener gran
capacidad de
al!acena!iento) sin
8/9/2019 Hydroelectric Central
15/21
Page 9
e!bargo es capaz de
su!inistrar potencia
durante todo el aPo a
tra#Rs del !aneMo y
operaciNn efciente del
ni#el del e!balse.
• 'n el periodo 777877
la C.H. 5 de =o#ie!bre ue
repotenciada y
!odernizada) ele#ando la
capacidad instalada de
1.4 : a 99.4 :. /os
trabaMos ueron eMecutados
por el consorcio ; ;
8/9/2019 Hydroelectric Central
16/21
Page 9
•
• Cota de alerta te!prana*
1?9.57 !sn!
•
•
• Caudal !Qi!o turbinado *
1 !Bs
•
8/9/2019 Hydroelectric Central
17/21
Page 9
• (ocato!a $5 co!puertas
radiales tipo !alacate con
cierre electro!ecQnico de
e!ergencia&.
• Turbina $5 unidades del
tipo Drancis eMe horizontal
y distribuidores de Qlabes
direccionables&
• 'citaciNn $5 unidades a
base de con#ertidores
8/9/2019 Hydroelectric Central
18/21
• 'iste#as (u)iliares
• 2iste!a de /ubricaciNn
• 2iste!a de le#anta!iento de turbina.
• 2iste!a de 'nria!iento
• 2iste!a de drenaMes de presa. $bo!beo desde galerSas y sNtano&
• 2iste!a de !ediciNn co!ercial $2'C&
• ;ertederos
• Elanta de '!ergencia ?57 I:.
• 2iste!a de control 47 ; $sala de !QJuinas y subestaciNn&
• 2iste!a contra incendio dilu#io de los transor!adores de potencia
• 2iste!a contra incendio de las unidades generadoras y eJuiposauiliares.
• 2iste!a de protecciones elRctricas de unidades generadoras y transor!adores.
• 0T- $unidad de trans!isiNn re!ota&
• 2iste!a 2C
8/9/2019 Hydroelectric Central
19/21
R#$ot#nc%c&n %''.( MW
2000-2002
•
• Proyectos a %uturo,
• 0ehabilitaciNn de la -nidad de ser#icio Eropio ?57 I:
• 'pansiNn de CH 5 de =o#ie!bre a unidades generadoras de 47
: cu. 'le#ando la capacidad instalada en un 7 K $17 :&
• CapacitaciNn continua al personal) conor!e al a#ance
tecnolNgico.
• eMora continua en los procesos y siste!as.
• eMora continua en las di#ersas Qreas de la central) ca!pa!ento)
y relleno sanitario en ar!onSa con el !edio a!biente.
•
• Cuidado al trabajar conelectricidad
8/9/2019 Hydroelectric Central
20/21
• /a electricidad puede ser peligrosa. Eero si se usa el sentido
co!n y se siguen las !edidas de seguridad prescritas) se llega a
ningn daPo. /a regla bQsica es* sie!pre desconectar la corriente
elRctrica de la zona de trabaMo. < continuaciNn) asegurarse de usar
un co!probador de tensiNn antes de tocar los cables. 2i no hay
electricidad en los cables) no te puedes lasti!ar.
8/9/2019 Hydroelectric Central
21/21
!is!a carrera y asS poder darles a conocer lo Jue nosotros
conoce!os del te!a de generaciNn de energSa elRctrica y las
precauciones Jue se debe tener al trabaMar con ella.
•