    Reliance Industries LimitedHazira Manufacturing Division

  • 7/30/2019 Hz WriteUp

    2/20

  • 7/30/2019 Hz WriteUp

    3/20

    220 KV Switch yard

    Tankages

    CPP&U

    MEG 1

    PVC

    VCM

    PE 1

    Guest

    House

    PP

    CPP

    ETP

    Cracker

    CK

    RTF

    Tank Farm

    Aromatics

    PE-2

    PTA-2

    MPP2(POY/PSF)

    MEG-2

    MEG-3

    Cracker

    CKR

    TF

    N

    Reliance Industries Limited , HaziraOverall Plot Plan

    PTA-1

  • 7/30/2019 Hz WriteUp

    4/20

    4

    Hazira progression

    Plants Licensor Startup Capacity ( KTA )Technology Installed

    CPP & U May 1991 60 MW

    MEG 1 Shell Sep. 1991 100

    PVC Geon Dec. 1991 160

    VCM Geon Apr. 1992 160PE 1 Du Pont Jul. 1992 160

    POY Du Pont Dec. 1995 120

    PP UCC Sep. 1996 360

    PSF Du Pont Sep. 1996 160

    PTA 1 ICI Jan. 1997 350

  • 7/30/2019 Hz WriteUp

    5/20

    5

    Plants Licensor Startup Capacity ( KTA )Technology Installed

    CPP 2 1996-1998 190 MW

    Cracker S & W Mar. 1997 750

    Aromatics HRI/Mobil Mar. 1997 350

    MEG 2 Shell Mar. 1997 120PE 2 Nova May 1997 200

    PET Sinco Oct. 1997 80

    PFF Du Pont Oct. 1997 30

    MEG 3 Shell Oct. 1997 120

    PTA 2 ICI Nov. 1997 350

    Hazira progression

  • 7/30/2019 Hz WriteUp

    6/20

    6

    CPP-Utility is providing utility services to all plants in complex.

    These utilities are generated and supplied from :

    A. Captive Power Plant :-

    1. Steam generation and distribution

    2. Power receipt, generation, sale and distribution

    B. Utilities

    1. Raw water treatment and distribution

    2. Cooling water treatment and circulation.

    3. DM water production and distribution.

    4. Compressed air and instrument air generation anddistribution.

    Hazira - CPP and Utility

  • 7/30/2019 Hz WriteUp

    7/20

    7

    Major Equipment Supplier in CPP/Utility :

    Gas Turbines by M/s. Thomassen International BV of Holland and

    BHEL of India.Heat Recovery Steam Generators (HRSGs) and one Aux. Boiler by

    M/s. Stork BV of Holland.

    DM Water Plant by M/s. Thermax Ltd.

    Cooling Tower by M/s. Paharpur Cooling Towers.

    Air Compressors are supplied by M/s. Elliot U. K.Air drying units by M/s. Lloyds Steel Industries Ltd.

    Raw water treatment and Effluent treatment plants by M/s. Hindustan

    Oliver Ltd.

    Cogeneration Plant At Hazira :-

    The Cogeneration Plant was commissioned in September, 1991.

    Cogeneration is the combined production of Heat and Electric Power. Each

    cogeneration plant has Gas Turbines and 125 TPH Heat Recovery Steam

    Generator. The fuel for the Congeneration plant is natural gas and HSD.

    Hazira - CPP and Utility

  • 7/30/2019 Hz WriteUp

    8/20

    8

    PRIMARY FUNCTIONS :

    Receipt of material from plant// Bagging in 25 Kg. Bag andJumbo Bag on automatic bagging machine// Storage in theWarehouse // Documentation // Dispatch as per marketingadvise & Payment of Excise Duty

    FEATURES :Solid movement about 550 truck per day - POY, PSF, PP, PE,PVC, etc. // Liquid movement -- about 475 truck per day -MEG, Bz, Xy, EDC, etc // Provision for moving out polymersand polyesters in bulk / containers // Provision for hoppercar loading // Adequate tankages and warehousing capacities

    / loading-unloading facilities // Drumming facility for DEGand TEG

    Support Services : Logistics

  • 7/30/2019 Hz WriteUp

    9/20

    9

    Support Services : HSE

    HSE Managementbased on ResponsibleCare

    Focus on safety duringEngineering,Construction, Startup &Operation

    Ongoing training andvalidation for all theemployees includingcontractors

    100% compliance withall pollution controlnorms

    Periodic health checkupfor all employees

    Regular audits, both

    internal & external Community awareness

    & emergency response /disaster managementplan

    Safety of Person Overrides All Production Targets

    Commitment

    Accountableility

    Performancemeasure-

    ment

    InformationSharing

    IncidentInvestigation

    CAERIntegration

    Siting

    Codes andStandards

    EmergencyManagement

    Multiple SafeGuard

    SafetyRevies

    Maint. andInspection

    FACILITY

    MANAGEMENTLEADERSHIP

    TECHNOLOGY

    PERSONNEL

    Design Documentation

    Management ofChange

    Process HazardAnalysis

    ProcessHazard information

    HealthSurveillance

    MedicalMutual Aid

    EmergencyTreatment

    CPR Training/Hazcom

    HEALTH

    ENVIRONMENT PROTECTION

    Env. Protection

    Measures

    Env.MonitoringStatutory

    Compliance

    Reduction/ Recycle ofWaste/ Safe Disposal

    JobSkills

    Consumer Premises Audit

    TankerDriver'sTraining

    Tanker Inspection

    TransportEmergency

    Team

    PRODUCT STEWARDSHIP

    EmployeeProficiency

    InitialTraining

    Safe WorkPractice

    Fitness forDuty

    Contractors

    Based on Responsible Care

    TOP

    Managemen

    Support

    HSE Reporting

    Level

    Quantity / Quality

    of Resources

    Line Responsibility for

    HSE Management

    On going HSE

    Awareness & Training

    Continuous Improvement

  • 7/30/2019 Hz WriteUp

    10/20

    10

    Support Services : CTS

    BenchmarkingProduct development

    Quality assurance

    Pinch Technology

    Process Safety management

    Cost reduction

    Process evaluation

    Process Engineering

    Test runs & debottlenecking

    Energy Conservation

    Functions & Activities

  • 7/30/2019 Hz WriteUp

    11/20

    11

    Support Services : CES Functions & Activities

    1.0 MECHANICAL

    1.1 Planning

    1.2 Inspection & Corrosion

    1.3 Condition Monitoring

    1.4 Contract Lineup

    1.5 Drawing & FCOs

    1.6 Documentation / Technical Library

    1.7 Machining & Overhauling

    2.0 ELECTRICAL

    2.1 Motor Over Hauling

    2.2 Relay Testing & Calibration

    2.3 Transformer Oil Filtration & Oil Checking

  • 7/30/2019 Hz WriteUp

    12/20

    12

    Support Services : CES Functions & Activities

    3.0 INSTRUMENTATION3.1 Testing & Calibration of Instruments / Control Valves3.2 Maintenance of Analyzer

    3.3 Maintenance of DCS3.4 Maintenance of PLCs3.5 Import Substitution

    4.0 POWER ELECTRONICS4.1 Telecommunication4.2 Plant Address System4.3 Fire Protection System4.4 Maintenance of UPS4.5 Power Electronics

    5.0 CIVIL5.1 Maintenance of Buildings & Roads5.2 Mini Projects Execution5.3 Town Ship Maintenance

    S S i b

  • 7/30/2019 Hz WriteUp

    13/20

    13

    Support Services : About Maintenance

    Maintenance Systems

    Through IT

    Maintenance Work Order System

    PreventiveMaintenance Schedules

    Equipment Data Sheets

    Shutdown Planning

    and Monitoring

    Reliability Studies

    Maintenance Cost

    Failure Analysis

    Equipment Tag Meter

    Equipment Service Schedules

    Equipment History

    Material Management Inventory Control

    TPMBenchmarked against World

    Standards by A T KearneySpecial attention to

    -Technician productivity

    -ERV tracking and control

    -Reliability and uptime

    Contracting strategies

    Least cost maintenance

    Material management improvements

    -Stocking policy/JIT

    -Procurement cycle time reduction-Vendor development/rating

    World Class Maintenance

    S t S i S

  • 7/30/2019 Hz WriteUp

    14/20

    14

    Support Services : MIS Set Up & Activities

    The MIS/IT department at hazira is centralised function for whole site looking

    after the followings

    Installation and maintenance of infrastructure required for IT

    Development, implementation and support of application system for

    areas of manufacturing and commercial (Now apart from SAP)

    Providing central help desk support to overcome user' problems in

    relation to computerised system

    All the computer system and plant process control systems are connected to a

    system of network comprising of following

    Fibre optic cable UTP Cable

    Switches Hubs

    PCs PrintersModems Servers

  • 7/30/2019 Hz WriteUp

    15/20

    S t S i Fi Fi hti & C t l S t

  • 7/30/2019 Hz WriteUp

    16/20

    16

    All the plants are designed and erected / constructed with due regards

    to the appropriate fire protection measures, [under relevant / adapted

    standards & codes of practices] broadly in terms of (i) safety

    distances between equipment as well as between the plants, (ii) fire /

    safety risk analysis including hazard operability study (hazop) and

    hazard analysis (hazan) (iii) isolation of process equipment includingof emergency shut-down systems & (iv) passive fire protection viz.

    fire doors, fire barriers, fire resistant coatings & sealant etc.

    Support Services : Fire Fighting & Control System

    S t S i Fi Fi hti & C t l S t

  • 7/30/2019 Hz WriteUp

    17/20

    17

    PROVISIONS :-

    Two full-fledged fire stations manned by qualified and experienced fireservice personnel including officers (i.e. total complement of 65 personnel).

    Availability of six major / mobile fire fighting appliances viz. Foam

    Tenders (04), DCP Tender (01) & Emergency cum Rescue Tender (01).

    Fixed fire fighting installations viz. Deluge valves, water spray system,

    pressurized fire water / hydrant system, riser system, water / foam monitors,

    foam system, modular DCP, CO2 system, Halon system, heat shield water

    spray units etc.

    Fire alarm panels [installed in plant control rooms as well as in control

    rooms of fire stations] interfaced with automatic detectors viz. smoke

    detectors, heat detectors, UV / IR detectors, & LEL detectors.

    Portable fire extinguishers, trailer / trolley mounted extinguishers as wellas monitors (water / foam).

    Support Services : Fire Fighting & Control System

    Support Services : Fire Fighting & Control S stem

  • 7/30/2019 Hz WriteUp

    18/20

    18

    PROVISIONS :-

    Reservoirs / storages of fire water for carrying out fire fighting operations

    [at a stretch] for 9 hrs.

    Dedicated fire pumps are installed at two separate locations to feed /

    convey this water through the net-work of pressurized fire water mains /

    headers protecting the plants / complex.

    Adequate inventories of other special extinguishing media viz. foam

    concentrates / DCPs.

    Availability of adequate Breathing Apparatus sets, emergency escape sets,

    special PPEs & emergency tool kits.

    Mutual Aid agreements with the neighboring industries viz. KRIBHCO,

    ONGC & NTPC.

    Well defined On-site & Off-site emergency plans. [which also includepredetermined emergency escape routes & occupancy wise evacuation

    plans]

    Support Services : Fire Fighting & Control System

  • 7/30/2019 Hz WriteUp

    19/20

    Support Services : Fire Fighting & Control System

  • 7/30/2019 Hz WriteUp

    20/20

    20

    ACTIVITIES :-

    Tactical Functions Of Fire Service Personnel :-

    (a) Handling of Fire Emergencies

    (b) Handling of Non - Fire Emergencies [i.e. Spillage, Leakages Etc.] :-

    (c) Special Services

    Maintenance of Fire Protection Systems :-

    Communication Systems :-

    Preparedness :-

    Training :-

    Support Services : Fire Fighting & Control System


Recommended