NH-129-1(30); C.N. 32275 I-129, SOUTH SIOUX CITY PROJECT INFORMATION SHEET As of October 2019 LOCATION The proposed project would resurface approximately 3.23 miles of Interstate 129 (I-129) in South Sioux City in Dakota County. The project would start approximately 0.55 miles west of the grade separation of I-129 under southbound U.S. Highway 75 (US-75)/U.S. Highway 77 (US-77) at mile marker US-20 (MM) 428.37 and extend east to the bridge over the Missouri River at MM 3.05. Construction may begin and/or end approximately 500 feet ahead of or beyond the actual project limits to accommodate transitioning the pavement. PURPOSE AND NEED The purpose of the proposed project is to preserve the I-129 transportation asset, improve the reliability of the transportation system, and perpetuate the mobility of the traveling public. The need for the project is based on the condition of the existing pavement and bridge structures. SCOPE OF WORK Proposed improvements on this project would include milling and resurfacing with asphalt the existing I-129 roadway and shoulders and the US-75/US-77 & Dakota Ave Interchange ramps and shoulders. Bridge structures S129 00008, S129 00107, S129 00123 and S129 00150 on I-129 would undergo repairs. Bridge structures over I-129 at US-75/US-77, S129 00038 & S129 0039 and at C Ave, S129 00201 would also undergo repairs. Additional work would include guardrail improvements and replacing sign trusses over the roadways. TRAFFIC VOLUMES Year 2020 2030 Vehicles Per Day (ADT) 27,140 29,640 % Heavy Trucks 13% 13% I-129 MM 0.00 - MM 3.08 CONSTRUCTION SCHEDULE Construction could begin as early as spring 2020 and be completed in approximately 2 years. ESTIMATED COST The estimated cost of the proposed project is approximately $11.6 million. Funding for the project would derive from state and federal funding sources. ACCOMMODATION OF TRAFFIC The proposed resurfacing and bridge repair work on I-129 and US-75/US-77 would be constructed under traffic with lane closures controlled with approved temporary traffic control; however, local traffic utilizing the ramp accesses along I-129 within the project area would require detours. Designated detours for these ramp accesses would be provided; one would utilize US-75/US-77, N-35, and N-110/G Avenue, the other would utilize US-77, W 28th Street, and Dakota Avenue. The bridge repairs and ramp closures at this location would be separated into three groups, and work on each bridge group would not occur at the same time as another bridge group. These detours could be in place for up to two years. The proposed project would also require detouring C Avenue for repair work on the bridge over I-129. A designated detour would be provided utilizing E 39th Street, Dakota Avenue/IBP Avenue, and E 48th Street. See the maps on the inside of the handout for more details. Additionally, the project would require short duration night-time detours of I-129 and US-75/US-77 traffic during removal and installation of overhead signs and structures. The detours would be required for eastbound and westbound I-129 and northbound and southbound US-75/US-77. Only one direction of traffic would be detoured per night. Eastbound I-129 and northbound US-75/US-77 would have a designated detour utilizing I-129, N-110, N-35, and US-75/US-77. Southbound US-77 traffic would have a designated detour utilizing W 29th St, Old Hwy 20 and I-129. Westbound I-129 traffic from Iowa would have a designated detour utilizing I-29 and US-77. Westbound I-129 traffic originating in Nebraska would have a designated detour utilizing Dakota Avenue, W 29th St and US-77. RIGHT-OF-WAY The proposed project would not require the acquisition of additional property rights. Access to adjacent properties would be maintained during construction but may be limited at times based on traffic phasing requirements. POTENTIAL IMPACTS No wetland impacts are anticipated. Crystal Cove Park and the Dakota City Trail are located near or within the project area. No impacts to these facilities are anticipated. PROJECT CONTACTS Send Comments to: NDOT Public Involvement Sarah Soula 1500 Highway 2 P.O. Box 94759 Lincoln, NE 68509-4759 402-479-4871 [email protected] For more information: NDOT District 3 Engineer Kevin Domogalla 408 S 13th Street Norfolk, NE 68701-3714 402-370-3470 [email protected] Visit http://dot.nebraska.gov/projects/future-projects and click on the “I-129, South Sioux City” link
Transcript
Page 1: I-129, SOUTH SIOUX CITY › media › 13968 › cn-32275-fact-sheet-2019.pdfI-129 under southbound U.S. Highway 75 (US-75)/U.S. Highway 77 (US-77) at mile marker US-20 (MM) 428.37

FRONT

NH-129-1(30); C.N. 32275I-129, SOUTH SIOUX CITY

PROJECT INFORMATION SHEETAs of October 2019

LOCATIONThe proposed project would resurface approximately 3.23 miles of Interstate 129 (I-129) in South Sioux City in Dakota County. The project would start approximately 0.55 miles west of the grade separation of I-129 under southbound U.S. Highway 75 (US-75)/U.S. Highway 77 (US-77) at mile marker US-20 (MM) 428.37 and extend east to the bridge over the Missouri River at MM 3.05. Construction may begin and/or end approximately 500 feet ahead of or beyond the actual project limits to accommodate transitioning the pavement.

PURPOSE AND NEEDThe purpose of the proposed project is to preserve the I-129 transportation asset, improve the reliability of the transportation system, and perpetuate the mobility of the traveling public. The need for the project is based on the condition of the existing pavement and bridge structures.

SCOPE OF WORKProposed improvements on this project would include milling and resurfacing with asphalt the existing I-129 roadway and shoulders and the US-75/US-77 & Dakota Ave Interchange ramps and shoulders. Bridge structures S129 00008, S129 00107, S129 00123 and S129 00150 on I-129 would undergo repairs. Bridge structures over I-129 at US-75/US-77, S129 00038 & S129 0039 and at C Ave, S129 00201 would also undergo repairs. Additional work would include guardrail improvements and replacing sign trusses over the roadways.

Light Light Italic

Regular Italic

BoldBold Italic

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ROBOTO CONDENSED | Accent copy

Secondary Brand Typefaces

Thin

Light

Regular

Bold

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ROBOTO SLAB | Accent copy

Regular Italic

BoldBold Italic

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ARIAL | Internal use

TRAFFIC VOLUMES

Year 2020 2030

Vehicles Per Day (ADT)

27,140 29,640

% Heavy Trucks 13% 13%

I-129 MM 0.00 - MM 3.08

CONSTRUCTION SCHEDULEConstruction could begin as early as spring 2020 and be completed in approximately 2 years.

ESTIMATED COSTThe estimated cost of the proposed project is approximately $11.6 million. Funding for the project would derive from state and federal funding sources.

ACCOMMODATION OF TRAFFICThe proposed resurfacing and bridge repair work on I-129 and US-75/US-77 would be constructed under traffic with lane closures controlled with approved temporary traffic control; however, local traffic utilizing the ramp accesses along I-129 within the project area would require detours. Designated detours for these ramp accesses would be provided; one would utilize US-75/US-77, N-35, and N-110/G Avenue, the other would utilize US-77, W 28th Street, and Dakota Avenue. The bridge repairs and ramp closures at this location would be separated into three groups, and work on each bridge group would not occur at the same time as another bridge group. These detours could be in place for up to two years. The proposed project would also require detouring C Avenue for repair work on the bridge over I-129. A designated detour would be provided utilizing E 39th Street, Dakota Avenue/IBP Avenue, and E 48th Street. See the maps on the inside of the handout for more details.

Additionally, the project would require short duration night-time detours of I-129 and US-75/US-77 traffic during removal and installation of overhead signs and structures. The detours would be required for eastbound and westbound I-129 and northbound and southbound US-75/US-77. Only one direction of traffic would be detoured per night. Eastbound I-129 and northbound US-75/US-77 would have a designated detour utilizing I-129, N-110, N-35, and US-75/US-77. Southbound US-77 traffic would have a designated detour utilizing W 29th St, Old Hwy 20 and I-129. Westbound I-129 traffic from Iowa would have a designated detour utilizing I-29 and US-77. Westbound I-129 traffic originating in Nebraska would have a designated detour utilizing Dakota Avenue, W 29th St and US-77.

RIGHT-OF-WAYThe proposed project would not require the acquisition of additional property rights. Access to adjacentproperties would be maintained during construction but may be limited at times based on traffic phasingrequirements.

POTENTIAL IMPACTSNo wetland impacts are anticipated. Crystal Cove Park and the Dakota City Trail are located near or within the project area. No impacts to these facilities are anticipated.

PROJECT CONTACTS

Send Comments to:NDOT Public InvolvementSarah Soula1500 Highway 2P.O. Box 94759Lincoln, NE [email protected]

For more information:NDOT District 3 EngineerKevin Domogalla408 S 13th StreetNorfolk, NE [email protected]

Light Light Italic

Regular Italic

BoldBold Italic

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ROBOTO CONDENSED | Accent copy

Secondary Brand Typefaces

Thin

Light

Regular

Bold

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ROBOTO SLAB | Accent copy

Regular Italic

BoldBold Italic

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ARIAL | Internal use

Visit http://dot.nebraska.gov/projects/future-projects and click on the “I-129, South Sioux City” link

Page 2: I-129, SOUTH SIOUX CITY › media › 13968 › cn-32275-fact-sheet-2019.pdfI-129 under southbound U.S. Highway 75 (US-75)/U.S. Highway 77 (US-77) at mile marker US-20 (MM) 428.37

Bridge Structure S129 00038UTILIZE ORANGE DETOUR

129

Southbound US-77 to eastbound I-129 on ramp & westbound I-129 to

southbound US-77 on ramp

Bridge Structure S129 00123LUTILIZE PURPLE DETOUR

Bridge Structure S129 00039UTILIZE ORANGE DETOUR

Bridge Structure S129 00008RUTILIZE ORANGE DETOUR

DETOUR ROUTES

I-129, SOUTH SIOUX CITY

PROJECT MAP

MM 428.37HWY US-20BEGIN PROJECT

S129 00008LS129 00008R

S129 00038S129 00039

S129 00107L S129 00107R S129 00123L

S129 00123R

S129 00150LS129 00150R

S129 00201

LEGENDPROJECT LOCATION

BRIDGE LOCATION

129

29

76

MM 3.05INTERSTATE I-129END PROJECT

Bridge Structure S129 00008LUTILIZE ORANGE DETOUR

Bridge Structure S129 00201UTILIZE LIGHT PURPLE DETOUR

Bridge Structure S129 00150RUTILIZE PURPLE DETOUR

Bridge Structure S129 00123RUTILIZE PURPLE DETOUR

129

129

129 129

129

129

129

C AV

E.

IBP/

DAKO

TA A

VE.

DAKO

TA A

VE.

IBP

AVE.

129129

G A

VE.

W 29TH ST.

DAKO

TA A

VE.

IBP

AVE.

C AV

E.

E 39TH ST.

E 48TH ST.

Specifics on the bridges and detours can be found on the back page of this handout. Bridges in black font would not need to be detoured. To the right are details on which bridges require detours.

Southbound US-77 to westbound I-129 on ramp

Eastbound I-129 to southbound US-77 on ramp

Northbound US-77 to westbound I-129 on ramp & eastbound I-129 to

northbound US-77 on ramp

Eastbound I-129 exit ramp to IBP Ave

Southbound Dakota Ave to westbound I-129 on ramp

Southbound Dakota/IBP Ave. to eastbound I-129 on ramp

C Ave. bridge over I-129

N

N

N

N

N

N

NN

N N

Images below show the ramp closures associated with bridge repairs.

Bridge Structure S129 00150RUTILIZE PURPLE DETOUR

Bridge Structure S129 00201UTILIZE LIGHT PURPLE DETOUR