Project• Existing elevated freeway over Lancaster Avenue
• Project– Reconstruction– Capacity and safety improvements
3
Initial Plan• Initial plan – west leg
– Widened elevated structure
• Community reaction
– Opposition
– Lawsuit
– Leadership interest to find better solution
4
CSS Approach – Stakeholder Objectives• Objectives/concerns
– Replace aging structure
– Increase interchange capacity
– Increase safety
• Merges, weaves
• Design speed
• Sight distances
– Improve aesthetics
• Freeway
• Barrier
– Historic preservation
– Permit T&P building revitalization
– Redevelopment
5
ApproachInitial alternatives
• Existing alignment
– Elevated
– At-grade
– Depressed
• New alignments
Visualization of preferred alternative (SDH&PT, FHWA, 1991)
Before and after photos of the US Post Office façade on Lancaster Boulevard. Source, left: http://www.durangotexas.com/eyesontexas/fortworth/downtown.htm; Source, right: Texas Transportation Institute
New lofts development (next to refurbished old T&P Railroad Complex). Source: Texas Transportation