I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE
Transcript
Page 1: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference

April 9, 2015 Columbia, MO

Jugesh Kapur, PE, SE

Page 2: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

I-5, Skagit River Bridge Collapse• Bridge collapses on May 23,

2013• Struck by over height truck• I-5 the only N-S interstate in WA

state w/ ADT = 71,000• $14 billion of US-Canada

commerce passes thru I-5 annually

Courtesy: WSDOT

Page 4: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

I-5, Skagit River Bridge Collapse

Courtesy: WSDOT

Page 5: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

First Steps

1. Within 24 hrs – Assembled team to evaluate replacement options

2. Within 24 hrs – Selected contractor (force acct.) to remove debris

3. Within 48 hrs – Options for temp. bridge alternatives evaluated – 30 day emergency contract executed

4. Within 72 hrs – Governor and Secretary of Transportation announce plans to install temp. span w/in 30 days and reopen I-5

Courtesy: WSDOT

Page 6: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Next Steps

• Coordination w/ NTSB investigation

• Inspection of remaining trusses & piers

• Repairs to remaining trusses• ACROW temp bridge ordered

and pier supports modified

Courtesy: WSDOT

Page 7: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Temp. Span Details• Acrow panels – arrived w/in 5

days• Two temp. bridges placed side by

side using launching technique• Speed reduced to 40 mph• Opened to traffic in 27 days

Courtesy: WSDOT

Page 8: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Perm. Span Contract Details

1. Accelerated RFP Process

2. A+B+C = Best Value Approach

A= # hours of total closure x $660K/day B= Days past Sept 4th x $50K C= Price proposal

3. Two week proposal period – from RFP to award

4. Best value award $6.9M – Max J. Kuney & PB team

5. Anticipated opening of Sept 5th w/ 12 hr. total closure Courtesy: WSDOT

Page 9: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Perm. Span Options

1. Precast, prestressed deck bulb tee girders (59” deep)

2. Lightweight concrete deck bulb tee girders (65” deep)

3. Steel girders (6’ deep) w/ 3.5” precast stay-in-place panels w/ 5” CIP concrete topping

4. Steel plate girders (5’-6” deep) with CIP slab

5. WSDOT obtained all environ. permits, ROW , detour permits, etc.

Courtesy: WSDOT

Page 10: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Preferred Alternate

Modified deck bulb tees (lightweight concrete) chosen for:

1. Shorter fabrication time2. Greater schedule control3. Conventional construction4. Concrete wt. = 133pcf

Challenges :

1. Concrete superstructure weight less than 915 tons

2. Weight for shipping and erection

Courtesy: WSDOT

Page 11: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Girder Connection Details

1. Headed bars used between girders (first use in WA, based on NCHRP 12-69 research); staggered between girders

2. Full moment connection

Courtesy: WSDOT

Page 12: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Camber Challenges

1. Predicted camber – 5.5”

2. Vertical profile - 1.5”

3. Pre-cambered the girder forms - 4.375”

4. Used 1.5” modified concrete overlay

Courtesy: WSDOT

Page 13: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Perm. Span Details

Replacement Scheme – Lateral Slide

Courtesy: WSDOT

Page 14: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Lateral Slide Details1. Push & reset system2. 2 – 150 M-ton jacks one on each side for lateral move; 4 –

150 M-tons for vert. movement 3. Total lateral move – 75 ft4. Skid beam w/ clad stainless steel sheets; support beams w/

Teflon surface

Courtesy: WSDOT

Page 15: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Temp. Bents – Special Feature

Special truss span = 77 ft.

Courtesy: WSDOT

Page 16: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Skid Track Details

Courtesy: WSDOT

Page 17: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

1 7

Modified Concrete Overlay

• 1 ½” modified concrete overlay• 42 hours cure time• Deck temperature between 450-750F

Courtesy: WSDOT

Page 18: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Placement Details

Courtesy: WSDOT

Page 19: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Lowering Span To Final Position

Courtesy: WSDOT

Page 20: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Bridge Move Summary

1. 19 hours full road closure2. Temp. span out in 25 minutes3. Permanent span into place in 45 minutes4. Superstructure lowering in 30 minutes

Courtesy: WSDOT

Page 21: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

2 1

NTSB’s Findings (failure mechanism)

1. Truck hits the sway brace2. Vertical member L4-U4 is deformed3. Upper chord U3-U5 pulled downward4. Bucking failure in upper chord at node U4

Page 22: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

NTSB’s Findings

1. Load 2” taller than permitted.2. Pilot car distracted by cellphone (although hands-free);

claimed that clearance pole never struck the bridge.3. Insufficient distance between pilot car and truck (less than

1/2 of what it should be).4. States should have better warnings for low-clearance

bridges.5. Provide lane specific guidance for bridge clearance.

Page 23: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Vertical Clearance Upgrade

Courtesy: WSDOT

Page 24: I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.