I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction...

Date post: 30-Jan-2016
Category:
Upload: alexander-newman
View: 213 times
Download: 2 times
Share this document with a friend
Popular Tags:
21
I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November 16, 2015
Transcript
Page 1: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

I Wear My “Safety” Glasses at Night:Maximizing Planning Tools to Reduce Utility Construction

Costs and Headaches

95Th Annual Conference

Raleigh, NC

November 16, 2015

Page 2: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

OverviewProject BackgroundProject

ManagementSafety is Job #1!!Minimize “headaches”

through effective: Stakeholder Engagement Risk Management

Planning

ToolsConstructionResults

Page 3: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

Project BackgroundTechnical Aspects – Purpose, Need, Constraints

Page 4: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

Project Background (continued)Identification of Stakeholders - Interests

Town of Chapel Hill Traffic (Willow and Conner)NCDOT (S. Estes)Town of Chapel Hill PoliceLocal businesses and residents

University Mall Banks Medical/Dental facilities Drug stores/retail Restaurants Offices Apartments

Page 5: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

OWASA’s goals Safety is JOB #1!!

Continuous stakeholder

engagement

Effective

Communications

Maximize construction

efficiency

Meet construction timing

constraints within budget

Page 6: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

Keep everyone SAFE!!!!Workers

“Standard” safety practicesWorking in busy roadsWorking in intersections

DriversSafety in work zonesTake advantage of seasonal traffic

volumes

PedestriansAdequate provisions for sidewalks

When is the best time to work safely and efficiently?

Page 7: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

Three phases of Stakeholder EngagementPlanning Phase

Collect Input, ask questions!What are your concerns?How will the project affect you?

Construction PhaseContinuous status reporting.Availability of information. Immediate and accurate responses

to questions Internal and external stakeholders.

Post ConstructionHow did we do?

Page 8: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

PlanningIdentify stakeholder

requirementsNCDOT encroachmentTown engineering

requirements

Identify potential construction issuesTree protectionStream buffersBus routesPedestrian accessEasementsEnvironmental concerns

Page 9: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

Planning (continued)

Review previous construction projectsWater mainRoadwayStormwater

Review potential trenchless rehabilitation technologiesCIPPPipe bursting

Page 10: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

Planning (continued)Night Construction

Minimize construction and shutdowns for businesses

Minimize trafficIncrease safe working conditionsMaximize available time for

constructionNoise ordinance considerationsImpact to residencesLimited OWASA operational

supportTown requirements

Page 11: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

Design ToolsTopographic Survey

Subsurface Utility Engineering (SUE)Quality Level BQuality Level A

Page 12: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

Design ConsiderationsOWASA Operations

preferencesMaintain public

accessibility

Minimize need for temporary services

Maintain trafficReduce conflicts with other

utilities

Page 13: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

Design ConsiderationsMinimize water service shutdownsIsolation valves

Page 14: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

Construction ToolsPrequalification of contractors

Eight (8) contractors approved

Full time construction observation

Bid resultsSix (6) bids receivedLow bid: $1.568 MillionAverage all bids: $2.182 MillionAverage of 3 low bids: $1.708 Million

Page 15: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

ConstructionConstruction start and progressNightly pavement repairsIssues

Page 16: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

Construction

Page 17: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

Construction CompletionSchedule

Bid – January 17, 2014Award – March 5, 2014Notice to Proceed – May 19, 2014Substantial Completion – October 29, 2014 Final Completion – December 1, 2014

Project CostsPlanning, design, construction services –

$387,167Original Const. Contract Amount –

$1,568,925Const. Change Orders –

($252,319)Final Const. Contract Amount – $1,316,605

Page 18: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

ResultsSafety

NO SAFETY INCIDENTS!

Stakeholder EngagementWe knew stakeholders’ needsDaily progress reports

Page 19: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

Results (continued)Stakeholder feedback

During construction Only 4 phone calls (complaints) from citizens! We were able to share accurate daily status and schedule

Post construction surveys We typically receive between 4 and 6 responses We received 19 responses Our average rating was 4 out of 5 (our goal is above 4)

Local Government Partners“I drive this route every day to get to work and it was hard for me to tell there was a construction project in progress” – Lance Norris, Town of Chapel Hill Public Works Director

Project Planning, Design and Stakeholder engagement were key to our success.

Page 20: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

AcknowledgementsMoffat Pipe, Incorporated

Town of Chapel Hill

NCDOT, District 1

Page 21: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.

Contact Information:

Jeremy Fireline, PE

[email protected]

919.537.4249

Ben Latino, PE

[email protected]

919.233.8091

QUESTIONS?