IBM SCPM MCV Page. September 7, 2014. Navigating the MCV Page. 1. Calendar View Selectors. 2. Refresh Button. Tip: Selecting the Start Date and End Date on the MCV page only sets the date range for the current MCV page. You can set the default date - PowerPoint PPT Presentation
45
© 2004 E2open. All Rights Reserved. IBM SCPM MCV Page January 3, 2022
Transcript
Page 1: IBM SCPM MCV Page

© 2004 E2open. All Rights Reserved.

IBM SCPM MCV Page

April 21, 2023

Page 2: IBM SCPM MCV Page

2SCPM April 21, 2023

Navigating the MCV Page

1. Calendar View Selectors

2. Refresh Button

Tip: Selecting the Start Date and End Date on the MCV page only sets the date range for the current MCV page. You can set the default date range for all MCV pages at the User Preferences page.

Page 3: IBM SCPM MCV Page

3SCPM April 21, 2023

Navigating the MCV Page

1. Data Measures

3. PIT (Point-in-time)

4. Exception Alert

2. Time Buckets5. Data Measure View Tab

Export Icon

Page 4: IBM SCPM MCV Page

4SCPM April 21, 2023

Displaying Additional Data on the MCV Page

1. Click the Configure Collab View icon (A) to access the Table Configurator dialog box.

2. Select the additional data you want to view (B) and the sort order (C).

3. If you want, save your settings as default (D) and click the Update button (E).

A. Table Configurator

B. Data to View

C. Sort Order

E. UpdateD. Save as Default

Page 5: IBM SCPM MCV Page

5SCPM April 21, 2023

Displaying Additional Data on the MCV Page

1. The system displays the data in columns to the left of the Data Measures column (E).

2. If necessary click and drag to the right the Column Display icon (F) to view all the data.

E. Display Area for additional columns

F. Column Display

Page 6: IBM SCPM MCV Page

6SCPM April 21, 2023

Viewing Data Measures on the MCV Page

The system displays the Data Measures column (G) to the left of the dates column.1. Click and Data Measures icon to view all the options.2. From the Display Data Measures list, click the Data Measure name that you do NOT

want to view3. Click the < arrow button to move the Data Measure to the Available Data Measure column4. Click the Update button

G. Data Measures

1

2

3

4

Page 7: IBM SCPM MCV Page

7SCPM April 21, 2023

Collab Details Menu

• The Collab Details icon (i) provides access to collaboration-related data.

A. Message – attach a message to the collab

B. Collab Attribute – view the Material Master collab attribute values

C. Collab Description – view the collab dimensions

D. Site Attribute – view the Material Master

E. Autofill – Enter PIT data and view exceptions before submitting

F. Alternate Parts – view the alternate parts available for the collaboration

i

A

B

C

D

E

F

Page 8: IBM SCPM MCV Page

8SCPM April 21, 2023

Viewing Collab Message

i

2

1. Click the Collab Details icon to display the Collab Details dialog box.

2. Click Message to access the Message data.

3. Click the Subject line to read and reply to an existing message

or

3. Click the Envelope icon to create a new message

3

3

Page 9: IBM SCPM MCV Page

9SCPM April 21, 2023

Viewing Collab Attribute Data

1. Click the Collab Details icon to display the Collab Details dialog box.

2. Click Collab Attribute to access the Material Master data.

1

2

Page 10: IBM SCPM MCV Page

10SCPM April 21, 2023

Viewing Site Attribute Data

1. Click the Collab Details icon to display the Collab Details dialog box.

2. Click Site Attribute to access the Site Attribute data.

1

2

Page 11: IBM SCPM MCV Page

11SCPM April 21, 2023

Viewing Alternate Parts

1. Click the Collab Details icon to display the Collab Details dialog box.

2. Click Alternate Parts to access the Alternate Parts data.

1

2

Page 12: IBM SCPM MCV Page

12SCPM April 21, 2023

Viewing PIT Attributes

A. To view all PIT Attributes for a data measure, click the data measure name.

B. To view the PIT Attributes for a specific PIT, click the value in the PIT.

A B

Page 13: IBM SCPM MCV Page

13SCPM April 21, 2023

Viewing PIT Attributes

At the PIT Info page, you can select the PIT Attributes you want to view:

1. From the User Fields box, click the PIT Attributes you want to view.

2. Click the Refresh button to refresh the view.

1

2

Page 14: IBM SCPM MCV Page

14SCPM April 21, 2023

Viewing the Summary Tab

A. The Summary tab displays the rolled-up values for multiple collaborations you are viewing on the MCV page.

A

Page 15: IBM SCPM MCV Page

© 2004 E2open. All Rights Reserved.

IBM SCPM Forecast Cycle

April 21, 2023

ITS & MD Training

Page 16: IBM SCPM MCV Page

16SCPM April 21, 2023

Forecast Cycle

Page 17: IBM SCPM MCV Page

17SCPM April 21, 2023

Forecast Cycle Business Process

COMMITMENT

FORECAST

IBM Hub Supplier

Page 18: IBM SCPM MCV Page

18SCPM April 21, 2023

Forecast Cycle Data Flow

FORECASTCOMMITMENT

IBM

Supplier

Supplier

Supplier

BackendSystems

E2openSCPM

BackendSystems

SCPM GUI

Page 19: IBM SCPM MCV Page

19SCPM April 21, 2023

Forecast Cycle Overview

• Updating– You can load Forecast Cycle data to SCPM via three

methods: 1. S2S (server-to-server) upload from your backend system2. Manual update via spreadsheet upload3. Manual update via E2open UI

Page 20: IBM SCPM MCV Page

20SCPM April 21, 2023

Data Measures

• The system represents dynamic data in Data Measures

• There are three types of data measures:

1. Standard – data input to E2open, manually or via S2S from other systems– Forecast and corresponding Commit, for example

2. Calculated – data computed by E2open – Forecast-Commit Delta, for example

3. Exceptions – problems flagged by E2open – Based on pre-defined business logic– Supply Shortage, for example

Page 21: IBM SCPM MCV Page

21SCPM April 21, 2023

Forecast Cycle Data Measures

*

*

* Supplier cannot view

S2S

Calculated

S2S or Manually Entered by Supplier

Rollover

Manually Entered by OCM

120 250 300

110 230 280

105 230 290

100 120 250

100 120 250

200

100

400

-15 -20 -10

-15 -35 -45

105 230

105 230 290 Copied

Page 22: IBM SCPM MCV Page

22SCPM April 21, 2023

Forecast Cycle Data Measures

* Supplier cannot view

Calculated

Exception Flag

Exception Flags

**

*

*

*

*

S2S from IBM

Calculated

-15 -20

-15 -45

Page 23: IBM SCPM MCV Page

23SCPM April 21, 2023

Current to Previous Rollover

• When SCPM receives from a Site, a Forecast with a new version number, it:

1. Rolls over the data contained in the Forecast, Commit and Proposal data measures to their respective Previous data measures.

2. Uploads the new Forecast data to the Forecast data measure.

120 250 300

120 200 300

100

100 120 250

100 120 200

1

2

90 180 230

180 230 300

Rolled Over

Page 24: IBM SCPM MCV Page

24SCPM April 21, 2023

Viewing Forecast Cycle Data History

Page 25: IBM SCPM MCV Page

25SCPM April 21, 2023

Viewing Forecast Cycle Data History

1. Follow the path: Supply Collaboration Collaborations Forecast History to access the Collaboration Search page.

2. Enter your search criteria.

3. Click the Search button to access the Collaborator Selector page.

1

2

3

Page 26: IBM SCPM MCV Page

26SCPM April 21, 2023

Viewing Forecast Cycle Data History

1

1. Click the Collab Details icon for the collaboration for which you want to view the Forecast Cycle history data.

2. From the menu, click Forecast History to access the History Selector page.

2

User Role

Fields

Operation

Change Dates

Data Measure

Page 27: IBM SCPM MCV Page

27SCPM April 21, 2023

Updating IBM Data

Page 28: IBM SCPM MCV Page

28SCPM April 21, 2023

Updating Forecast Data

1. Enter the data into the Forecast PITs.

2. Click the Update button.

1

Update Button

Page 29: IBM SCPM MCV Page

29SCPM April 21, 2023

Updating Proposal Data

• To update the Proposal data measure, from the MCV page:

1. Click the checkboxes for the Collabs you want.

2. Click the Copy Proposal button to copy the Commitment data to the Proposal PITs.

500 400 300 500 500

500 400 300 500 500

2

1

500 400 300 500 500

Copy Proposal

2

Tip: You must be usingthe Procurement or OCM role to update Proposal data

Page 30: IBM SCPM MCV Page

30SCPM April 21, 2023

Updating Commodity Risk Data

There are two ways to update the Commodity Risk data measure:

A. Enter the data directly into the Commodity Risk PITs and click the Update button.

or

1. Click the checkboxes for the Collabs you want.

2. Click the Proposal to CRA (i) or Commit to CRA (ii) button to copy the PIT data to the CRA PITs.

1

i ii

A

Update Button

iii

Tip: You must be usingthe OCM or OCM Risk role to update CRA data

Page 31: IBM SCPM MCV Page

31SCPM April 21, 2023

Viewing Commit By SubGeo

Page 32: IBM SCPM MCV Page

32SCPM April 21, 2023

Viewing Commit by SubGeo

1. From the Collaborations sub-tree, click Commit by SubGeo to access the Collaboration Search page.

2. At the Collaboration Search page, enter your search criteria.

3. Click the Search button to execute your search and access the Collaboration Selector page

1

2

3

Page 33: IBM SCPM MCV Page

33SCPM April 21, 2023

Viewing Commit by SubGeo

At the Collaboration Selector page:

1. Select the checkbox for the Collabs you want

2. Click the View button to access the MCV page.

1

2

Page 34: IBM SCPM MCV Page

34SCPM April 21, 2023

Viewing Commit by SubGeo

1. At the MCV page, click the Collab Details icon for a collaboration to access the Collab Details menu.

2. From Collab Details menu, click EPDV (Extended PIT Detail View) to access the PIT Info page.

500 400 300 500 500

500 400 300 500 500

1

500 400 300 500 500

Proposal to CRA Commitment to CRA

2

500 400 300 500 500

Page 35: IBM SCPM MCV Page

35SCPM April 21, 2023

Viewing Commit by SubGeo

1. At the PIT Info page, select the SubGeo for which you want to view the Commit data.

500 400 300 500 500

500 400 300 500 500

500 400 300 500 500

1

500 400 300 500 500

Page 36: IBM SCPM MCV Page

36SCPM April 21, 2023

Assigning an Unassigned Forecast

Page 37: IBM SCPM MCV Page

37SCPM April 21, 2023

Assigning an Unassigned Forecast

• IBM may send a forecast to SCPM without an assigned supplier

• To execute a assign an unassigned forecast, you must be using either the Procurement role or OCM role

• To assign an unassigned forecast:

1. Follow the Menu Path: Supply Collaborations Collaborations Assign Forecast.

2. Filter for the collaboration which contains the unassigned forecast you want to assign to a supplier.

3. Workflow not complete…

Page 38: IBM SCPM MCV Page

38SCPM April 21, 2023

Assigning an Unassigned Forecast

1. From the Collaborations sub-tree, click Assign Forecast to access the Multi Collab Filter page.

2. At the Filter Parameters page, enter your filter criteria.

3. Click the Next button to execute your filter and access the Collaboration Selector page

1

2

Page 39: IBM SCPM MCV Page

39SCPM April 21, 2023

B2B Triggers

Page 40: IBM SCPM MCV Page

40SCPM April 21, 2023

B2B Triggers

• The B2B Triggers in the SCPM UI allow you to send data contained in SCPM to suppliers’ backend systems via B2B

• To execute a B2B Trigger, you must be using the B2B_I role

• There are two B2B Triggers:

1. Send B2B Forecast to Suppliers

2. Send B2B Order Book to Suppliers

• Once the B2B trigger has been executed, the Collab Attribute 4A4 will be set to ‘Y’, indicating that it has been sent. If you later decide you need to modify the data and resend it, using a regular Org Access role you will need to edit the Collab Attribute 4A4 value to ‘N’ before resending the data.

Page 41: IBM SCPM MCV Page

41SCPM April 21, 2023

B2B Triggers

• IBM can trigger SCPM to send Forecast and Order Book PITs to Suppliers via S2S:

1. From the Upload/Download tree click B2B Forecast to Suppliers or B2B OB to Suppliers to access the Filter Parameters page.

2. Enter your filter parameters and click the Next button.

1

2

Page 42: IBM SCPM MCV Page

42SCPM April 21, 2023

B2B Triggers

1. At the Timeline Pattern page, click the Timeline Pattern you want.

2. Click the Next button to prompt the system to execute the download and access the Download Status page.

3. At the Download Status page, note the Key for your download.

Note: You can monitor the success of your transaction via the Network Console.

1

2

3

Page 43: IBM SCPM MCV Page

43SCPM April 21, 2023

B2B Reports

1. From the Issues tree, click Problem Filter to view the Problem Summary page.

2. Click the Problem Name to review the list.

3. Select the desired Collabs.

4. Click the Multi Collab button to view the details.

12

3

4

Page 44: IBM SCPM MCV Page

44SCPM April 21, 2023

Updating Supplier Data

Page 45: IBM SCPM MCV Page

45SCPM April 21, 2023

Updating Commitments

• From the MCV page, there are three methods for Suppliers to update Commitments:

A. Enter the data directly into the Commitment PITs and click the Update button to submit it

B. Click the checkboxes (i) for the Collabs and click the Confirm Forecast button to copy the Forecast data to the Commitment PITs.

C. Click the checkboxes (i) for the Collabs and click the Confirm Proposal button to copy the Proposal data to the Commitment PITs.

A500 400 300 500 500

500 400 300 500 500

C

C

i

Update Button

B

B

500 400 300 500 500

A


Recommended