+ All Categories
Home > Data & Analytics > ICI Final Project (Group)

ICI Final Project (Group)

Date post: 17-Jan-2017
Category:
Upload: bolin-loong
View: 72 times
Download: 1 times
Share this document with a friend
11
INTRODUCTION In this project, we are given a task to look for a suitable site of 30m x 40m to initiate a project proposal. For our group, we are required to propose a project proposal at our 30m x 30m site which located at Jalan Ramin 6, Bandar Ambang Botanic, 41200 Klang, Selangor. Students have to study different types of building developments. Some research and site visit should be carrying out to make this project complete.
Transcript
Page 1: ICI Final Project (Group)

INTRODUCTION

In this project, we are given a task to look for a suitable site of 30m x 40m to

initiate a project proposal. For our group, we are required to propose a project proposal at

our 30m x 30m site which located at Jalan Ramin 6, Bandar Ambang Botanic, 41200

Klang, Selangor.

Students have to study different types of building developments. Some research

and site visit should be carrying out to make this project complete.

Page 2: ICI Final Project (Group)
Page 3: ICI Final Project (Group)

KEY PLAN

SITE PLAN

Page 4: ICI Final Project (Group)

LOCATION PLAN

Page 5: ICI Final Project (Group)

Introduction to the site

The site that we had chosen is an empty area that was abandon which located at

Bandar Ambang Botanic.

This site was surrounded by some buildings and parking lots. The conditions of

this site are quite bad as it was abandon by others. Rubbish is all over this empty field.

Tall grass that grow inside this small field causes the increases number of insects.

But this site location is a good location for any development. The building

surrounded it can helps in the development.

Page 6: ICI Final Project (Group)

SITE CONTEXT

GM KLANG

CLUB HOUSE

SHOPLOTS

OUR SITE

SHOPLOTS

SHOPLOTS

Page 7: ICI Final Project (Group)

HISTORY

At the early year of 2002, Gamuda Lands Bhd started to develop Bandar Botanic.

Before that it was only forest and empty fields.

This development is mainly for residential area as first. In year 2005, Gamuda

Lands also build some commercial areas and business areas in Bandar Botanic to give

work opportunities for the citizen.

The site we chosen which is at Jalan Ramin, Bandar Botanic was developed in the

year 2006. The project took 1 years and 3months to finish all the buildings in Taman

Ramin. The completed date was on July of 2007.

Page 8: ICI Final Project (Group)

SITE ANALYSIS

SUNLIGHT

From the site, the sun is always visible until the day become dark, around 7pm

because there is nothing blocks the sun. Although it is surrounded by some buildings, but

the buildings are not tall enough to block the sunlight. So, the temperature during the day

time is quite high, is around 30-33 degree Celsius.

Page 9: ICI Final Project (Group)

WIND DIRECTION

The wind flows from all the directions around the site, except from the east of the

site because the building is slightly taller. Those buildings blocked the wind flow from

entering the site. But the site is also very dusty because the flyover is just beside it. The

wind blow stronger from that direction and causes the dust to enter the site.

SOUNDS

Few sounds can be heard from the site. The winds sound is obvious as the wind

blow strongly towards the site. The car sounds can be heard also in the site. Cars that pass

by through the flyover and the road near the site can be clearly heard. Those sounds are

very irritating and most people will dislike it.

Page 10: ICI Final Project (Group)

Recommended