ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
1. Context
ICSS SITE (PHASE 1 & 2)
View 1
View 2
View 3
i270
29.1
October 23 2008 | PAGE 2
ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
1. Context
View 4 View 5 View 3 View 6
View 7 View 8 View 9 View 10
i270
29.1
October 23 2008 | PAGE 3
ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
2. Site Plan
i270
29.1
October 23 2008 | PAGE 4
ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
3. Site Survey
i270
29.1
October 23 2008 | PAGE 5
ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
4.Concept Section
Concept Section
i270
29.1
October 23 2008 | PAGE 6
ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
5. Concept Plan
Concept Plan
i270
29.1
October 23 2008 | PAGE 7
ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
6. Main Floor Plan
Gross Floor Area = 740 sqm
i270
29.1
October 23 2008 | PAGE 8
ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
7. Second Floor Plan
Gross Floor Area = 495 sqm
i270
29.1
October 23 2008 | PAGE 9
ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
8. Building Elevations
South Elevation
West Elevation
i270
29.1
October 23 2008 | PAGE 10
ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
8. Building Elevations
North Elevation
East Elevation
i270
29.1
October 23 2008 | PAGE 11
ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
9. Views
South West View
South East View
i270
29.1
October 23 2008 | PAGE 12
ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
10. Building Sections
SECTION A-A
SECTION B-B
i270
29.1
October 23 2008 | PAGE 13
ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
10. Building Sections
SECTION C-C
i270
29.1
October 23 2008 | PAGE 14
ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
11. Program AreasICSS ROOMS AND AREAS – CFI PROPOSAL
CHERNOFF THOMPSON ARCHITECTS 27/06/08 Project #28013.0 \\Home\doc\Project_28013\ROOMS AND AREAS\Table - ICSS Rooms and Areas - CFI Proposal 27June08.doc
Floor 1CCHm2
ICSSm2 Including m2
Research Lab 1 (large) 99 Bio-Security Room 3m2
Research Lab 2 (small) 48 Bio-Security Room 3m2
Research Lab 3 (small) 48 Bio-Security Room 3m2
Swim Tunnel Room 24
Incubation Room 24
Larval Culture Room 55
Grow-out/Broodstock/Surgery Area 201 Mechanical on Second Floor
Aeration Tower 9
Live Feed (Feed Prep) Room 12
Feed Storage Room 12
Floor 2
Dry Lab 112
Office 1 12
Office 2 12
Resource Room (i.e., Library) 36
Project Room (i.e., Meeting Room) 36
CCH Diagnostic Lab 20.7
CCH Data & Sample Repository 12
CCH Lab 13
CCH Corridor 15.2
Total Net Area * 740
Total Gross Area 60.9 1,110
* CFI proposal used a 1.5 gross up multiplier for a total area of 1,100 m2 (to include common areas such as hallways, stairs, washrooms, entrance, mechanical, electrical, janitors, etc.)
ICSS ROOMS AND AREAS – as per SCHEMATIC DESIGN LAYOUTS
CHERNOFF THOMPSON ARCHITECTS 27/10/08 Project #28013.0
• A 1.44 gross up multiplier for a total area of 1,235.0 m2 (to include common areas such as hallways, stairs, entrances).
• Exterior terrace stair is not included in the area calculations.
Floor 1CCHm2
ICSSm2 Including m2
Research Lab 1 (large) 82.0
Research Lab 2 (small) 53.0
Research Lab 3 (small) 50.0 Bio-Security Room 5m2
Swim Tunnel Room 24.0
Larval Culture Room 76.0
Fish Culture Area 190.0
Live Feed (Feed Prep) Room 12.0
Feed Storage Room 12.0
Storage Room 18.5
Mechanical/ Water Entry Room 28.0
Electrical 13.0
Floor 2
Dry Lab 112.0
Office 1 12.0
Office 2 12.0
Resource Room (i.e., Library) 33.0
Project Room (i.e., Meeting Room) 33.0
CCH Diagnostic Lab 21.0
CCH Data & Sample Repository 12.0
CCH Lab 13.0
Storage 14.0
Communication Room 7.4
Jan 6.0
Mech 6.0
Aeration Tower 2.0
Men’s Washroom 7.0
Women’s Washroom 7.0
Shower 4.5
Total Net Area * 46.0m2 814.4m2 860.4m2
Total Gross Area 1235.0m2
i270
29.1
October 23 2008 | PAGE 15
ICSS - SCHEMATIC DESIGN
JENSEN CHERNOFF THOMPSON ARCHITECTS
12. Project Schedule
ID Task Name Duration Start Finish1 Schematic Design 31 days? Mon 08/09/08 Mon 20/10/08
2 Consultants Meeting 1 (9:00 am to 12 pm) Nanaimo 1 day? Tue 09/09/08 Tue 09/09/08
3 Consultants Meeting 2 (9:00 am to 12:00 pm) Vancouver 1 day? Wed 24/09/08 Wed 24/09/08
4 Consultants Meeting 3 (9:00 am to 12 pm) Nanaimo 1 day? Tue 14/10/08 Tue 14/10/08
5 Schematic Design By Consultants (12:00 pm) 1 day? Fri 17/10/08 Fri 17/10/08
6 Design Development 25 days? Tue 21/10/08 Mon 24/11/08
7 Consultants Meeting 1 (9:00 am to 12 pm) Vancouver 1 day? Tue 28/10/08 Tue 28/10/08
8 Consultants Meeting 2 (9:00 am to 12 pm) Nanaimo 1 day Mon 10/11/08 Mon 10/11/08
9 Consultants Meeting 3 (9:00 am to 12 pm) Vancouver 1 day Tue 25/11/08 Tue 25/11/08
10 Consultants DD Report 1 day? Thu 20/11/08 Thu 20/11/08
11 Contract Documents 45 days? Tue 25/11/08 Mon 26/01/09
12 Consultants Meeting 1 (9:00 am to 12 pm) Nanaimo 1 day Tue 09/12/08 Tue 09/12/08
13 Prelimary Consultants Construction Documents 1 day? Fri 02/01/09 Fri 02/01/09
14 Consultants Meeting 2 (9:00 am to 12 pm) Vancouver 1 day? Tue 06/01/09 Tue 06/01/09
15 Construction Drawings Consultants 1 day? Fri 16/01/09 Fri 16/01/09
16 Tender 20 days? Tue 27/01/09 Mon 23/02/09
17 Construction 195 days? Tue 24/02/09 Mon 23/11/09
18 Commissioning 15 days? Tue 24/11/09 Mon 14/12/09
09/09
24/09
14/10
17/10
28/10
10/11
25/11
20/11
09/12
02/01
16/01
24/11
31/08 07/09 14/09 21/09 28/09 05/10 12/10 19/10 26/10 02/11 09/11 16/11 23/11 30/11 07/12 14/12 21/12 28/12 04/01 11/01 18/01 25/01 01/02 08/02 15/02 22/02 01/03 08/03 15/03 22/03 29/03 05/04 12/04 19/04 26/04 03/05 10/05 17/05 24/05 31/05 07/06 14/06 21/06 28/06 05/07 12/07 19/07 26/07 02/08 09/08 16/08 23/08 30/08 06/09 13/09 20/09 27/09 04/10 11/10 18/10 25/10 01/11 08/11 15/11 22/11 29/11 06/12 13/12 20/12September October November December January February March April May June July August September October November December
Task Split Progress Milestone Summary Project Summary External Tasks External Milestone Deadline
International CentreSturgeons Studies
Page 1
Project: 28013.0Date: Fri 10/10/08