Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly Nov. - Dec. 2011 Vol. IX : No. 6 Contents - Articles - 1-3 (Subject wise alphabetically indexed) - Addition of Books - 4 - Reports - 5-11 Prepared by : Neeru Saini Librarian
Transcript

Internal Circulation Only

ICT LIBRARY UPDATE

Bi-monthly Nov. - Dec. 2011 Vol. IX : No. 6

Contents

- Articles - 1-3

(Subject wise alphabetically indexed)

- Addition of Books - 4

- Reports - 5-11

Prepared by : Neeru Saini

Librarian

Articles

Aviation

1 A century of maritime patrol aircraft : (Vayu. VI/2011)

2 Infrastructure : airports : (Master builder : Sept. 2011)

Architecture

1 Spanish Architecture: Unfinished modern tradition : (A+D : Dec. 2011)

2 Architecture as Art : (A+D : Dec. 2011)

Bridge

1 Repeat performance : Reconstruction of Mizen head footbridge : (Bridge Design & Engineering : Issue no. 64

3rd

quarter 2011).

2 Creative application : analysis software in use on a range of bridges : (Bridge Design & Engineering : Issue

no. 64 3rd

quarter 2011).

3 Sustainable Flooring : Epoxy terrazzo flooring : Green Building Initiative : (Master builder : Sept. 2011).

Building

1 Sustainable flooring Epoxy terrazzo flooring: a green building initiative : (Master builder : Sept. 2011)

Business Development

1 Know what your customers want before they do …. (Harvard Business Review : Dec. 2011)

2 Who really makes the big decisions in your company : (Harvard Business Review : Dec. 2011)

3 Getting buildings to dance to their tune : (Energy Next : Nov. 2011).

4 Engineering look at building information modeling as a science …: (The Master Builder – Oct. 2011)

Concrete

1 Effect of fly ash on durability and performance of concrete: (The Indian Concrete Journal: Nov. 2011 Vol. 85

No. 1I)

Energy

1 Green power solution : Operators keen to tap alternative energy potential : (Indian Infrastructure : Nov. 2011)

General

1 Almond may help treat cancer : (Down to Earth : Dec. 16-31, 2011).

2 The sweet, salty way to capture carbon emissions : (Down to Earth : Nov.1-15, 2011)

3 Yoha, stretching better than medicine for back pain : (Down to Earth : Nov. 16-30, 2011)

Human Resource

1 Your use of pronouns reveals your personality : (Harvard Business Review : Dec. 2011)

2 What Gen Next Wants : (Human Capital : Nov. 2011)

Roads

1 Aggressive bidding : NHAI foresees high premium flow : (Indian Infrastructure : Nov. 2011)

2 Sustainable bridges for every bridges engineer : (NBM & CW Sept. 2011). 3 Gaining traction : NHAI annual pre-qualification of bidders to speed up award process : (Indian Infrastructure

: Sept. 2011) 4 Fast Track design and construction of bridges in India : (NBM&CW October 2011).

5 Bridge Barriers & parapets in relation to the crash : (NBM&CW October 2011)

Railways

1 Fact file : Bangalore Metro Rail : Segmental construction by suspended and underslung launching system :

(Master Builder : Sept. 2011)

Steel

1 Bekaert : A World leader in steel Fibre reinforced industrial flooring – a chat with Ganesh Chaudhari :

(Master Builder : Sept. 2011).

2 Incremental launching of steel Girders in British Columbia : (Structural Engineering International : Nov.

2011)

Water

1 Recycling food processing wastewater to potable water standards : (Water Today : Dec. 2011).

2 Green Energy from waste unlocks profit potential : (Water Today : Dec. 2011).

3 Centralized & decentralized wastewater treatment in Hong Kong : (Water Today : Nov. 2011).

4 Watered down : Hydro capacity addition to fall short of eleventh plan target : ( Indian Infrastructure : Nov.

2011).

5 Water proofing : solution for basement waterproofing : (Master builder : Oct. 2011).

6 Code requirements for excess pressure in domestic water system : (Indian Plumbing Today : Sept. 2011)

ADDITIONAL OF BOOKS

1 14691 : IS/ISO 10001 : 2007 : Quality Management customer satisfaction guidelines. 2 14692 : IS:2026 (Part-3) : 2009 : Power transpiration 3rd Revision

3 14693 : IS : 3457 : 2009 : Radii for rounding for general engineering purposes 2nd revision. 4 14694 : IS : 1148 : 2009 : Steel river bars for structural purpose 4th revision. 5 14695 : IS : 2911 (P-1/Sec.3) : 2010 : Design and construction of pile foundations. 6 14696 : IRC : SP 95 : 2011 : Model contract document for maintenance of highways. 7 14697 : IRC : SP 69 : 2011 : guidelines and specifications for explanation joints 1st revision. 8 14698 : IRC : 98 2011 : Guidelines on Accommodation of utility services on roads in urban 2nd revision. 9 14699 : IRC : 58 2011 : Guidelines for the design of plain jointed rigid pavements 3rd revision 10 14700 : Souvenir 72nd Annual session of IRC Lucknow 3-6 Nov. 2011

11 14701 : Agenda and memoranda for the 195th council meeting vol. 1 from appendices 1to 5, 12 14702 : Agenda and memoranda for the 195th council meeting Vol. 2 from appendices 13 14703 : Power welfare scheme ADB Ta 4054 INO Inception Report. 2003

14 14704 : Power welfare scheme Laporan Akhir 2004

15 14705 : Power welfare final report 2004. 16 14758 : Statistical abstract Rajasthan 2006

17 14759 : Statistical abstract Rajasthan 2010

18 14760 : Economic Review 2010 -2011

Reports

Sl. No. Projects Name Acc. No.

Title of the Repo Soft Copy

Year

1 NH-8 (Gomti) : Independent engineering services for

development and operation of beawar …….

14671 Quarterly Inspection/Progress Report No.08:

Oct.2011

14672 O&M Inspection Report No. 24 : Oct. 201147

14589 O & M Inspection Report No. 13 : Sept. 2011

2 NH-10 : Haryana : Independent engineering services

for 4/6 laning of Delhi….

14779 MPR Nov. 2011

14573 MPR : July 2011

14574 MPR : Oct. 2011

3 NH-6 (Orissa) : Consultancy services for preparation

of DPR for rehabilitation and up gradation of ……

14785 Progress Report : Nov. 2011

4 NH-77 : four laning of Hajipur – Muzaffarpur section

of …

14674 MPR : Oct. 2011

14685 Monthly Inspection Report No. 1 : Sept. 2011

14684 QPR. No. 4 : Oct. 2011

14789 Inspection Report : Nov. 2011

14790 MPR No. 12 : Oct. 2011

14763 Monthly Inspection Report No. 2 : Oct. 2011

14567 Inspection Report : April 2011

14568 Inspection Report : May 2011

14582 MPR No. 11 : Sept. 2011

14610 Inspection Report : Oct. 2011

5

NH-21 : (Punjab) : Independent consultancy services

for 4 laning of Kurali Kiratpur section of NH-21 on

BOT Basis…….

14670 MPR No.49 : Oct. 2011

14689 QPR No. 16 : Sept. 2011

14583 MPR No. 48 : Sept. 2011

14612 Project status Report : Oct. 2011

6 NH-15 (PA) : Independent engineer for 4 laning of

Pathankot –Amritsar section …..

14761 MPR No. 15 : Nov. 2011

14601 QPR No. 4 : July to Sept .2011

14602 Monthly Inspection Report No. 5 : Oct. 2011

14603 Monthly Progress Report No. 14 : Oct. 2011

14788 Monthly Inspection Report No. 6 : Nov. 2011

7

NH-4 (Harihar to Haveri) : KARNATAKA Western

Transport Corridor Tumkur - Haveri Sec. Of NH - 04,

Pack. IV & V, ADB Loan.

14796 MPR No. 37 : Nov. 2011 Pack. No. 4

14797 MPR No. 37 : Nov. 2011 Pack. No. 5

14642 MPR No. 36 : Pack. 4 Oct. 2011

14643 MPR No. 36 : Pack. 5 Oct. 2011

8 NH-8 (SD) : Six Laning of Surat-Dahisar Section of

NH-8 from Km. 263.000 to Km. 502.000(Length-

239Km) in the States of Gujarat & Maharastra to be

executed as BOT (Toll) on DBFO pattern under NHDP

Phase-V (Concessionaire: M/S IRB SURAT

DAHISAR TOLLWAY PVT LTD)

14687 Site inspections report : Nov. 2011

14594 MPR : Oct. 2011

14595 Site Inspection Report : Sept. 2011

14596 Site Inspection Report : Oct. 2011

14598 Site Inspection Report : Sept. 2011

14782 QPR : Nov. 2011

9 NH-22 (Punjab) : Independent consultancy services for

4/6 laning of zirakpur parwanoo section of NH-22

including Pinjore Kalka-Bypass on BOT basis ……

14681 MPR No. 43 : Oct. 2011

14581 QPR No. 14 : Sept. 2011

14613 Site visit for specific problems report Oct. 2011

10 Bihar (SH) : Consultancy services for preparation of

detailed project report for rehabilitation, up gradation

and strengthening of roads in Bihar Under ADB

Assisted ph. II Project (Package-2), (South Bihar)

14669 FDPR : Vol. VI (A) : Highway drawings (SH-

81) : June2010

14634 MPR : Sept. 2011

14576 MPR : Sept. 2011

14690 QPR Package I : Sept. 2011

14680 MPR Ph. II Contract Package No. 2,3,& 4 : Oct.

2011

11 NH-60(A) (WB) : Consultancy services for preparation

of detailed project report for rehabilitation and

upgrading to 2 lane /2 lane with paved shoulders

14786 MPR : Nov. 2011

14618 MPR : Oct. 2011

configuration and strengthening of Bankura - Purulia

Section (km 0 to 84) of NH-60A in the state of West

Bengal (Package No. SP/B/6)

12 NH-13 : Four laning of Bijapur Hungund section of

NH-13 from km. 102.00…….

14793 MPR : Nov. 2011

14593 MPR : Oct.2011

14599 Safety audit report No. 2 : Construction Stage

Pack 26 : Oct. 2011

13 NH-9 : (HV) Independent consultancy services for

design engineering construction, development finance

operation and maintenance of 4/6 laning of Hyderabad-

Vijayawada section from km. 40.00 to km. 221.500 of

NH-9 in the state of …..

14768 MPR : Nov. 2011

14780 Quarterly Report 6 : Nov. 2011

14569 MPR : Sept. 2011

14570 Monthly Report : Oct. 2011

14781 Monthly Report : Nov. 2011

14 NH-47 (Chen.): Independent consultancy services for

6 laning from Chengapallia to start of Coimbatore …..

14673 Various other report : Oct. 2011

14682 Monthly Report : Oct. 2011

14784 MPR : Nov. 2011

14563 MPR : Sept. 2011

14564 Monthly Report : Sept. 2011

14565 Various other reports : Sept. 2011

14566 MPR : Oct. 2011

14637 Quarterly Report : August 2011

15 NH-2 (UP) : Consultancy Package GTRIP/SC/2 for the

Construction Supervision for Balance Works of Four

Laning & Strengthening of the Existing Two Lane

Stretch from Km 250.500 to Km 307.500 NH-2 Uttar

Pradesh on Cons. Pack-1A.

14686 Engineering Report No. 111 : Oct. 2011

14614 Engineering Report No. 110. Sept. 2011

14615 QPR : Sept. 2011

14616 MPR : No. 115 : Sept. 2011

14617 MPR : No. 116 : Oct.2011

16

Metro Rail : Delhi Metro rail corporation (Jaipur

Metro) : Contractor : DSC Limited contract –

JP/EW/C1…….

14675 Design of piers P68,P172-174,P175 & 184 Doc.

No. ICT/JP/EW/CI/307: R-0 : Nov.2011

14676 Design of piers P-122/P123,P125 to P127 Doc.

ICT/JP/EW/CI/387: R-0 : Nov.2011

14677 Design of pile foundation pile cap and pier P137

Doc. No. ICT/JP/EW/CI/311: R-0 : Nov.2011

14678 Design of pile cap P-120 : Doc. No.

ICT/JP/EW/CI/313: R-0 : Nov.2011

14679 Design of pile foundation & pile caps for P138,

P140 & design of piers of P138 & P139 Doc.

No. ICT/JP/EW/CI/314: R-0 : Nov.2011

14729 Design of pile foundations for P157 Doc. No.

ICT/JP/EW/CI/095 : R-0 : Nov. 2011

14730 Design of pile P-148 & 149 Doc. No.

ICT/JP/EW/CI/310: R-0 : Nov. 2011

14731 Design of pile foundation & Pile caps for P138

–P140 & Design of piers of P138 & 139 Doc.

No. ICT/JP/EW/CI/314: R-0 : Nov. 2011

14732 Design of pile foundations & Pile cap for

CP142 Doc. No. ICT/JP/EW/CI/315 : R-0 Nov.

2011

14733 Design of pires P57, P120 , P128, P140 & P143

, Doc. 316 , Nov. 2011

14734 Design of pile foundations P129 to

P131,P135,P144 to 147& P155 to 158 Doc. 317

: Nov. 2011

14735 Design of pile foundations P132 to P134 Doc.

No. ICT/JP/EW/CI/318: R-0 Nov. 2011

14736 Design of pire P64,P160,P161,P176,P138 &

P185 : Doc. 319 : Nov. 2011

14737 Design of pire foundation P118,P119,P188,P189

: Doc. 320. Nov. 2011

14738 Design of pire foundations P153, P154 & P159

Doc. 321: Nov. 2011

14650 Design if pier P150 : Doc. No.

ICT/JP/EW/CI/301 : Oct. 2011

14651 Design of piers P-148 & 149 Doc. No.

ICT/JP/EW/CI/301 : Oct. 2011

14652 Design of pier P144/297 : Oct. 2011

14653 Design of piers P143/296 : Ro

ICT/JP/EW/CI/297 : Oct. 2011

14654 Design of piers P-40, P54, P56

ICT/JP/EW/CI/302 : Oct. 2011

14655 Design of piers P49/312 : Nov. 2011

14656 Design of piers pile foundation P165 &

P184/102 Rev. R1: Oct. 2011

14657 Design of Piers pile foundation

P39,P50,P162,P163, P165 & 169

14658 Design of piers pile foundation P65, P164, P167

& P168/306 Nov. 2011

14659 Design of piers pile P38, P46, P47, P48 &

P166/305 : Nov. 2011

14660 Pile foundation P164/115 : R-1 : Nov. 2011

14661 Pile foundation P174/112 : Nov. 2011

14662 Pile foundation P185/103 : Nov. 2011

14663 Piers & Pile caps of 190-P195/303 : Nov. 2011

17 NH-59 : Independent engineer sevices for 4 laning of

Godhra to Gujarat/Madhya Pradesh border….

14762 QPR No. 4 : Oct. 2011

14777 MPR No.11 : Sept. 2011

14766 QPR No. 2. : April 2011

14640 MPR No. 10 : august 2011

14644 Inspection Report No. 6 : June. 2011

14645 Inspection Report No. 9 : Sept. 2011

14646 Inspection Report No. 10 : Oct. 2011

14767 MPR No. 12 : Oct. 2011

18 NH-43 : Consultancy services for preparation of

detailed project report for rehabilitation and upgrading

14787 MPR : Dec. 2011

14608 MPR : Oct. 2011

of 2 lane with rehabilitation and upgrading to 2 lane

19

NH-58/72 : Independent engineering services for 4

laning of Haridwar Deheradun section from km.

211.000 to km 218 .200 of NH-58 and and km.165.000

to km. 196.825 of …….

14668 Site visit report : Dec. 2011

14585 MPR : Sept. 2011

14586 MPR : August 2011

14620 MPR : Oct. 2011

20

NH-9 (PS): western transport corridor NH-4

Chitradurga to Harihar(km 207 to km 284 ) in

Karnataka State

14757 QPR No. 4 : Oct. 2011

14772 QPR : April 2011

14773 MPR No. 6 : April 2011

14774 MPR No. 7 : May 2011

14775 MPR No. 8 : June 2011

14776 MPR No. 9 : July 2011

14635 MPR No. 11 : Sept. 2011

14639 MPR No. 10 August 2011

14778 MPR No. 12 : Oct. 2011

21

J & K (2151) : Multi sector project for infrastructure

rehabilitation in Jammu and Kashmir ADB Loan 2151

IND

14794 MPR : Nov. 2011

14638 MPR : Oct. 2011

22

NAM (AP) : Design, construction, finance operation

and maintenance of four laning of Narketpally Addanki

Medarametrla Road from ……

14791 MPR No. 8 : Oct. 2011

14647 MPR : August 2011

14648 QPR No. 3 : Sept. 2011

14649 MPR No.7 : Sept. 2011

23

NH-6 (BS) : Consultancy services for preparation of

DPR for rehabilitation and upgradation of Baharagora

to Sambalpur section of NH-6 Orissa …..

14667 Progress Report : Oct. 2011

24 NH-25 (EW-3B) : North – Soth & East- West

Corridors …..

14683 MPR : Oct. 2011

25 Water project : Valuation of Assests and estimation of

equity base for STEM water Authority

14706 Valuation of assets and estimation of equity

base for stem water authority : Final Report

Vol. I : Jan. 2006

14707 Valuation of assets and estimation of equity

base for stem water authority : Final Report

Vol. II : Jan. 2006

26

Tanzania Natta : Consultancy Services for

environmental and social impact assessment Detailed

engineering design and preparation of tender

documents for upgrading of Natta-Mugumu-Loliondo

road to bitumen standard ……

14708 Final Engineering Design Report Confidential

Cost estimate : Dec. 2011

14709 Final Engineering Design Report Confidential

Vol. I : Main Report : Dec. 2011

14710 Final Engineering Design Report Confidential

Vol. II. Topographical survey report : Dec.

2011

14711 Final Engineering Design Report Confidential

Vol. III (A) Soil and material investigation data

(Appendix 4.1 to 4.6) : Dec. 2011

14712 Final Engineering Design Report Confidential

Vol. III (B) Geotechnical Report : Dec. 2011

14713 Final Engineering Design Report Confidential

Vol. IV Traffic Report : Dec. 2011

14719 Final Engineering Design Report Confidential

Vol. V(A-1) : Plan and profile and

miscellaneous drawing : Dec. 2011

14720 Final Engineering Design Report Confidential

Vol. V(A-2) : Drawings plan and structural

drawings Dec. 2011

14721 Final Engineering Design Report Confidential

Vol. V(B) : Setting out data : Dec. 2011

14722 Final Engineering Design Report Confidential

Vol. VI (A) Detail cross section Km. 0+.000 to

km 30+000 : Dec. 2011

14723 Final Engineering Design Report Confidential

Vol. (B) Detail cross section Km.30+000 to km

60+000. Dec. 2011

14724 Final Engineering Design Report Confidential

Vol.(C) Details cross section km.60+000 to km

90+000 : Dec. 2011

14725 Final Engineering Design Report Confidential

Vol. VI (D) Details cross section km.90+000 to

km 120+000

14726 Final Engineering Design Report Confidential

Vol. VI (E) Detail cross section km. 120+000 to

km 150.000 : Dec. 2011

14727 Final Engineering Design Report Confidential

Vol. VI(F) : Design cross section km. 150+000.

to km 171+915 : Sec. 2011

14714 Final Engineering Design Report Confidential

Vol. VII : Drainage data analysis and plan : Dec.

2011

14715 Final Engineering Design Report Confidential

Vol. VIII : Structure design calculations

(Bridges and box culverts) Dec. 2011

14716 Final Engineering Design Report Confidential

Vol. IX : Bill of quantities (Appendix 16.1, 16.2

and 16.3 ) : Dec. 2011

14717 Final Engineering Design Report Confidential

Vol. X (A) : Valuation Report : Dec. 2011

14718 Final Engineering Design Report Confidential

Vol. X (B) : Resettlement Action plan Dec.

2011

14728 Final Engineering Design Report Confidential

Vol. 10 (B) Resettlement action plan (Annexure

1.4) Dec. 2011

27

NH-1 (Jalandhar Amritsar) : 6 laning of Jalandhar –

Amritsar section of NH-1 from km. 387.100 to km

407.100 in the state of Punjab under NHDP Phase II

on EPC Mode

14739 FDPR Vol. I : Main Report Nov. 2011 CD

14740 FDPR Vol. II: Traffic surveys and analysis

report : Nov. 2011

14741 FDPR Vol. III : Design Report : Nov. 2011

14742 FDPR Vol. IV : Soil and material investigation

report : Nov. 2011

14743 FDPR Vol. V(A) : Environmental screening and

environmental assessment report : Nov. 2011

14744 FDPR Vol. V(B) : Social Impact screening

Report : Nov. 2011

14745 FDPR Vol. VI. Technical specification : Nov.

2011

14746 FDPR Vol. VII : Tate analysis : Nov. 2011

14747 FDPR Vol. III(A) : Bridges design calculation

(Part – 1 of 7) : Nov. 2011

14748 FDPR Vol. III(A) : Bridges design calculation

(Part – 2 of 7) : Nov. 2011

14749 FDPR Vol. III(A) : Bridges design calculation

(Part – 3 of 7) : Nov. 2011

14750 FDPR Vol. III(A) : Bridges design calculation

(Part – 4 of 7) : Nov. 2011

14751 FDPR Vol. III(A) : Bridges design calculation

(Part – 5 of 7) : Nov. 2011

14752 FDPR Vol. III(A) : Bridges design calculation

(Part – 6 of 7) : Nov. 2011

14753 FDPR Vol. III(A) : Bridges design calculation

(Part – 7 of 7) : Nov. 2011

14754 FDPR Vol. VIII : Cost estimates : Nov. 2011

14755 FDPR Vol. IX : Bill of Quantities : Nov. 2011

14756 FDPR Vol. XI : XI : Works contract agreement :

Nov. 2011

28

NH-47 (Kollam) Consultancy services for preparation

of DPR for construction of 2 lane Lollam Bypass on

NH-47 in the state of Kerala

14765 FDPR Vol. I : Main Report : Sept. 2011

14552 FDPR Vol. I Main Report : Nov. 2011

14553 FDPR Vol. II : Bridge Design Calculations

(Part -1 of 3) : Nov. 2011

14554 FDPR Vol. II : Bridge Design Calculations (Part

-2 of 3) : Nov. 2011

14555 FDPR Vol. II : Bridge Design Calculations (Part

-3 of 3) : Nov. 2011

14556 FDPR Vol. III : Technical specification : Nov.

2011

14557 FDPR Vol. IV : Rate Analysis : Nov. 2011

14558 FDPR Vol. V : Bill of Quantities : Nov. 2011

14559 FDPR Vol. VI : Cost Estimate : Nov. 2011

14560 FDPR Vol. II (A) : Geotechnical Investigation

Report : Nov. 2011

14561 FDPR Vol. VIII (A) : Civil Work contract Part

– A : Prequalification : Nov. 2011

14562 FDPR Vol. VIII (B) : Civil work contract Part –

B : Prequalification : Nov. 2011

29 Bihar (SH) : Civil works contracts for Bihar State

Highway Project Phase – II : Package No. 2,3 & 4

14769 Inception Report : No.v2011

30

NH-65 (Rajasthan) : Consultancy services for

preparation on Detailed Project Report for Ladnu (NH-

65 ) – Khaatu-Degana-Metra City- Lambia-Jaitaran-

Raipur-Bheem (NH-8 ) – Parasoil –Gulabpura (NH-79

) in the state of Rajasthan

14770 Inception Report : Dec. 2011

14771 Quality Assurance Plan : Dec. 2011

31

NH-47 (KL-3) : Independent engineering services for

design, construction, development, finance , operation

and maintenance of 6 laning of Vadakanachery

Thrissur section of ……

14783 Monthly Inspection Report : Oct. 2011

32

NH-75 : Pre Tender consultancy services for 4 laning

of Satna-Bela section of NH-75 on bot basis in the state

of MP

14792 Traffic analysis report (Final) ; Dec. 2011

33 Nippo : M/s Nippo corporation C/o Maruti Suzuki

India Ltd.

14795 MPR : August 2011 Vol. II

NH-2 (VA) : Independent engineering services for the

work of 6 laning of Varanasi aurangabad

14590 MPR No. 4 : Sept. 2011

14632 QPR No. 1: July 2011

14633 MPR No. 5 Oct. 2011

14641 QPR No. 2 Oct. 2011

NH-47 (KL-I) : 4/6 landing of national highway from

Thrissur to Edapally Section of NH-47 …..

14609 MPR : Sept. 2011

14611 Review of road safety Now. 2011

NH-54 (AS-1) : 4 laning of Silchar to Balachera

section of NH-54 from ……

14606 QPR : Sept. 2011

14607 MPR : Oct. 2011

14636 Interim account of compensation : Oct. 2011

NH-26 : National Highway Development Project

(North South Corridor ) Jhansi to Lalitpur in the state

of

14579 MPR : Sept. 2011

14580 QPR : Sept. 2011

14664 MRP : Oct. 2011

MP (2154) : Consultancy services for construction

supervision of package No. 2

14608 MPR : Oct. 2011

Ethiopia (HAI) : Consultancy services for the

construction supervision of Afdera Abala Road Project

Hawusewa Abal Irebti

14578 QPR : No. 29 : July to Sept. 2011

Ethiopia (JM) : Consultancy services for the

construction supervision of Jimma Mizan Road

Upgrading Project contract 2 : Bonga-Mizan Junction

14577 MPR : August 2011

Mongolia (CSZU) : Regional Road development

project construction of sainshand zamiin UUD Road

14605 QPR : Sept. 2011

NH-83 : (Patna-Gaya-Dhobi) : Preparation of

feasibility cum preliminary design for 4/6 laning of

patna gaya dhobi ….

14571 Traffic survey and analysis : May 2011

14572 Traffic survey and analysis : July 2011

NH-27 (MP) : Pretender consultancy services for four

lanign of Mangawa U.P. Border section of NH-27 on

BOT Basis in the state of MP

14584 Traffic analysis report (Final ) : Nov. 2011

HP (4860) : Consultancy services for a study to short

list prioritize 20 number black spots and design

14587 Accident investigation and prevention report

Vol. 1 Main Report

14588 Accident investigation and prevention report

Vol. II Road accident data.

NH-50 (BH) : Four laning of Bijapur Hungunda

section of NH-50 from km. 225.800 to km 323..012…..

14591 QPR : Sept. 2011

14592 Inspection Report No. 10 : Sept. 2011

14666 Inspection Report : Oct. 2011

14666I Inspection Report No. Oct. 2011

Tanzania : United republic of Tanzania ministry of

infrastructure Development Tanzania airports authority

14600 The rehabilitation and upgrading of kigoma

airport