ICT LIBRARY UPDATE
Bi-monthly Nov. - Dec. 2011 Vol. IX : No. 6
Contents
- Articles - 1-3
(Subject wise alphabetically indexed)
- Addition of Books - 4
- Reports - 5-11
Prepared by : Neeru Saini
Librarian
Articles
Aviation
1 A century of maritime patrol aircraft : (Vayu. VI/2011)
2 Infrastructure : airports : (Master builder : Sept. 2011)
Architecture
1 Spanish Architecture: Unfinished modern tradition : (A+D : Dec. 2011)
2 Architecture as Art : (A+D : Dec. 2011)
Bridge
1 Repeat performance : Reconstruction of Mizen head footbridge : (Bridge Design & Engineering : Issue no. 64
3rd
quarter 2011).
2 Creative application : analysis software in use on a range of bridges : (Bridge Design & Engineering : Issue
no. 64 3rd
quarter 2011).
3 Sustainable Flooring : Epoxy terrazzo flooring : Green Building Initiative : (Master builder : Sept. 2011).
Building
1 Sustainable flooring Epoxy terrazzo flooring: a green building initiative : (Master builder : Sept. 2011)
Business Development
1 Know what your customers want before they do …. (Harvard Business Review : Dec. 2011)
2 Who really makes the big decisions in your company : (Harvard Business Review : Dec. 2011)
3 Getting buildings to dance to their tune : (Energy Next : Nov. 2011).
4 Engineering look at building information modeling as a science …: (The Master Builder – Oct. 2011)
Concrete
1 Effect of fly ash on durability and performance of concrete: (The Indian Concrete Journal: Nov. 2011 Vol. 85
No. 1I)
Energy
1 Green power solution : Operators keen to tap alternative energy potential : (Indian Infrastructure : Nov. 2011)
General
1 Almond may help treat cancer : (Down to Earth : Dec. 16-31, 2011).
2 The sweet, salty way to capture carbon emissions : (Down to Earth : Nov.1-15, 2011)
3 Yoha, stretching better than medicine for back pain : (Down to Earth : Nov. 16-30, 2011)
Human Resource
1 Your use of pronouns reveals your personality : (Harvard Business Review : Dec. 2011)
2 What Gen Next Wants : (Human Capital : Nov. 2011)
Roads
1 Aggressive bidding : NHAI foresees high premium flow : (Indian Infrastructure : Nov. 2011)
2 Sustainable bridges for every bridges engineer : (NBM & CW Sept. 2011). 3 Gaining traction : NHAI annual pre-qualification of bidders to speed up award process : (Indian Infrastructure
: Sept. 2011) 4 Fast Track design and construction of bridges in India : (NBM&CW October 2011).
5 Bridge Barriers & parapets in relation to the crash : (NBM&CW October 2011)
Railways
1 Fact file : Bangalore Metro Rail : Segmental construction by suspended and underslung launching system :
(Master Builder : Sept. 2011)
Steel
1 Bekaert : A World leader in steel Fibre reinforced industrial flooring – a chat with Ganesh Chaudhari :
(Master Builder : Sept. 2011).
2 Incremental launching of steel Girders in British Columbia : (Structural Engineering International : Nov.
2011)
Water
1 Recycling food processing wastewater to potable water standards : (Water Today : Dec. 2011).
2 Green Energy from waste unlocks profit potential : (Water Today : Dec. 2011).
3 Centralized & decentralized wastewater treatment in Hong Kong : (Water Today : Nov. 2011).
4 Watered down : Hydro capacity addition to fall short of eleventh plan target : ( Indian Infrastructure : Nov.
2011).
5 Water proofing : solution for basement waterproofing : (Master builder : Oct. 2011).
6 Code requirements for excess pressure in domestic water system : (Indian Plumbing Today : Sept. 2011)
ADDITIONAL OF BOOKS
1 14691 : IS/ISO 10001 : 2007 : Quality Management customer satisfaction guidelines. 2 14692 : IS:2026 (Part-3) : 2009 : Power transpiration 3rd Revision
3 14693 : IS : 3457 : 2009 : Radii for rounding for general engineering purposes 2nd revision. 4 14694 : IS : 1148 : 2009 : Steel river bars for structural purpose 4th revision. 5 14695 : IS : 2911 (P-1/Sec.3) : 2010 : Design and construction of pile foundations. 6 14696 : IRC : SP 95 : 2011 : Model contract document for maintenance of highways. 7 14697 : IRC : SP 69 : 2011 : guidelines and specifications for explanation joints 1st revision. 8 14698 : IRC : 98 2011 : Guidelines on Accommodation of utility services on roads in urban 2nd revision. 9 14699 : IRC : 58 2011 : Guidelines for the design of plain jointed rigid pavements 3rd revision 10 14700 : Souvenir 72nd Annual session of IRC Lucknow 3-6 Nov. 2011
11 14701 : Agenda and memoranda for the 195th council meeting vol. 1 from appendices 1to 5, 12 14702 : Agenda and memoranda for the 195th council meeting Vol. 2 from appendices 13 14703 : Power welfare scheme ADB Ta 4054 INO Inception Report. 2003
14 14704 : Power welfare scheme Laporan Akhir 2004
15 14705 : Power welfare final report 2004. 16 14758 : Statistical abstract Rajasthan 2006
17 14759 : Statistical abstract Rajasthan 2010
18 14760 : Economic Review 2010 -2011
Reports
Sl. No. Projects Name Acc. No.
Title of the Repo Soft Copy
Year
1 NH-8 (Gomti) : Independent engineering services for
development and operation of beawar …….
14671 Quarterly Inspection/Progress Report No.08:
Oct.2011
14672 O&M Inspection Report No. 24 : Oct. 201147
14589 O & M Inspection Report No. 13 : Sept. 2011
2 NH-10 : Haryana : Independent engineering services
for 4/6 laning of Delhi….
14779 MPR Nov. 2011
14573 MPR : July 2011
14574 MPR : Oct. 2011
3 NH-6 (Orissa) : Consultancy services for preparation
of DPR for rehabilitation and up gradation of ……
14785 Progress Report : Nov. 2011
4 NH-77 : four laning of Hajipur – Muzaffarpur section
of …
14674 MPR : Oct. 2011
14685 Monthly Inspection Report No. 1 : Sept. 2011
14684 QPR. No. 4 : Oct. 2011
14789 Inspection Report : Nov. 2011
14790 MPR No. 12 : Oct. 2011
14763 Monthly Inspection Report No. 2 : Oct. 2011
14567 Inspection Report : April 2011
14568 Inspection Report : May 2011
14582 MPR No. 11 : Sept. 2011
14610 Inspection Report : Oct. 2011
5
NH-21 : (Punjab) : Independent consultancy services
for 4 laning of Kurali Kiratpur section of NH-21 on
BOT Basis…….
14670 MPR No.49 : Oct. 2011
14689 QPR No. 16 : Sept. 2011
14583 MPR No. 48 : Sept. 2011
14612 Project status Report : Oct. 2011
6 NH-15 (PA) : Independent engineer for 4 laning of
Pathankot –Amritsar section …..
14761 MPR No. 15 : Nov. 2011
14601 QPR No. 4 : July to Sept .2011
14602 Monthly Inspection Report No. 5 : Oct. 2011
14603 Monthly Progress Report No. 14 : Oct. 2011
14788 Monthly Inspection Report No. 6 : Nov. 2011
7
NH-4 (Harihar to Haveri) : KARNATAKA Western
Transport Corridor Tumkur - Haveri Sec. Of NH - 04,
Pack. IV & V, ADB Loan.
14796 MPR No. 37 : Nov. 2011 Pack. No. 4
14797 MPR No. 37 : Nov. 2011 Pack. No. 5
14642 MPR No. 36 : Pack. 4 Oct. 2011
14643 MPR No. 36 : Pack. 5 Oct. 2011
8 NH-8 (SD) : Six Laning of Surat-Dahisar Section of
NH-8 from Km. 263.000 to Km. 502.000(Length-
239Km) in the States of Gujarat & Maharastra to be
executed as BOT (Toll) on DBFO pattern under NHDP
Phase-V (Concessionaire: M/S IRB SURAT
DAHISAR TOLLWAY PVT LTD)
14687 Site inspections report : Nov. 2011
14594 MPR : Oct. 2011
14595 Site Inspection Report : Sept. 2011
14596 Site Inspection Report : Oct. 2011
14598 Site Inspection Report : Sept. 2011
14782 QPR : Nov. 2011
9 NH-22 (Punjab) : Independent consultancy services for
4/6 laning of zirakpur parwanoo section of NH-22
including Pinjore Kalka-Bypass on BOT basis ……
14681 MPR No. 43 : Oct. 2011
14581 QPR No. 14 : Sept. 2011
14613 Site visit for specific problems report Oct. 2011
10 Bihar (SH) : Consultancy services for preparation of
detailed project report for rehabilitation, up gradation
and strengthening of roads in Bihar Under ADB
Assisted ph. II Project (Package-2), (South Bihar)
14669 FDPR : Vol. VI (A) : Highway drawings (SH-
81) : June2010
14634 MPR : Sept. 2011
14576 MPR : Sept. 2011
14690 QPR Package I : Sept. 2011
14680 MPR Ph. II Contract Package No. 2,3,& 4 : Oct.
2011
11 NH-60(A) (WB) : Consultancy services for preparation
of detailed project report for rehabilitation and
upgrading to 2 lane /2 lane with paved shoulders
14786 MPR : Nov. 2011
14618 MPR : Oct. 2011
configuration and strengthening of Bankura - Purulia
Section (km 0 to 84) of NH-60A in the state of West
Bengal (Package No. SP/B/6)
12 NH-13 : Four laning of Bijapur Hungund section of
NH-13 from km. 102.00…….
14793 MPR : Nov. 2011
14593 MPR : Oct.2011
14599 Safety audit report No. 2 : Construction Stage
Pack 26 : Oct. 2011
13 NH-9 : (HV) Independent consultancy services for
design engineering construction, development finance
operation and maintenance of 4/6 laning of Hyderabad-
Vijayawada section from km. 40.00 to km. 221.500 of
NH-9 in the state of …..
14768 MPR : Nov. 2011
14780 Quarterly Report 6 : Nov. 2011
14569 MPR : Sept. 2011
14570 Monthly Report : Oct. 2011
14781 Monthly Report : Nov. 2011
14 NH-47 (Chen.): Independent consultancy services for
6 laning from Chengapallia to start of Coimbatore …..
14673 Various other report : Oct. 2011
14682 Monthly Report : Oct. 2011
14784 MPR : Nov. 2011
14563 MPR : Sept. 2011
14564 Monthly Report : Sept. 2011
14565 Various other reports : Sept. 2011
14566 MPR : Oct. 2011
14637 Quarterly Report : August 2011
15 NH-2 (UP) : Consultancy Package GTRIP/SC/2 for the
Construction Supervision for Balance Works of Four
Laning & Strengthening of the Existing Two Lane
Stretch from Km 250.500 to Km 307.500 NH-2 Uttar
Pradesh on Cons. Pack-1A.
14686 Engineering Report No. 111 : Oct. 2011
14614 Engineering Report No. 110. Sept. 2011
14615 QPR : Sept. 2011
14616 MPR : No. 115 : Sept. 2011
14617 MPR : No. 116 : Oct.2011
16
Metro Rail : Delhi Metro rail corporation (Jaipur
Metro) : Contractor : DSC Limited contract –
JP/EW/C1…….
14675 Design of piers P68,P172-174,P175 & 184 Doc.
No. ICT/JP/EW/CI/307: R-0 : Nov.2011
14676 Design of piers P-122/P123,P125 to P127 Doc.
ICT/JP/EW/CI/387: R-0 : Nov.2011
14677 Design of pile foundation pile cap and pier P137
Doc. No. ICT/JP/EW/CI/311: R-0 : Nov.2011
14678 Design of pile cap P-120 : Doc. No.
ICT/JP/EW/CI/313: R-0 : Nov.2011
14679 Design of pile foundation & pile caps for P138,
P140 & design of piers of P138 & P139 Doc.
No. ICT/JP/EW/CI/314: R-0 : Nov.2011
14729 Design of pile foundations for P157 Doc. No.
ICT/JP/EW/CI/095 : R-0 : Nov. 2011
14730 Design of pile P-148 & 149 Doc. No.
ICT/JP/EW/CI/310: R-0 : Nov. 2011
14731 Design of pile foundation & Pile caps for P138
–P140 & Design of piers of P138 & 139 Doc.
No. ICT/JP/EW/CI/314: R-0 : Nov. 2011
14732 Design of pile foundations & Pile cap for
CP142 Doc. No. ICT/JP/EW/CI/315 : R-0 Nov.
2011
14733 Design of pires P57, P120 , P128, P140 & P143
, Doc. 316 , Nov. 2011
14734 Design of pile foundations P129 to
P131,P135,P144 to 147& P155 to 158 Doc. 317
: Nov. 2011
14735 Design of pile foundations P132 to P134 Doc.
No. ICT/JP/EW/CI/318: R-0 Nov. 2011
14736 Design of pire P64,P160,P161,P176,P138 &
P185 : Doc. 319 : Nov. 2011
14737 Design of pire foundation P118,P119,P188,P189
: Doc. 320. Nov. 2011
14738 Design of pire foundations P153, P154 & P159
Doc. 321: Nov. 2011
14650 Design if pier P150 : Doc. No.
ICT/JP/EW/CI/301 : Oct. 2011
14651 Design of piers P-148 & 149 Doc. No.
ICT/JP/EW/CI/301 : Oct. 2011
14652 Design of pier P144/297 : Oct. 2011
14653 Design of piers P143/296 : Ro
ICT/JP/EW/CI/297 : Oct. 2011
14654 Design of piers P-40, P54, P56
ICT/JP/EW/CI/302 : Oct. 2011
14655 Design of piers P49/312 : Nov. 2011
14656 Design of piers pile foundation P165 &
P184/102 Rev. R1: Oct. 2011
14657 Design of Piers pile foundation
P39,P50,P162,P163, P165 & 169
14658 Design of piers pile foundation P65, P164, P167
& P168/306 Nov. 2011
14659 Design of piers pile P38, P46, P47, P48 &
P166/305 : Nov. 2011
14660 Pile foundation P164/115 : R-1 : Nov. 2011
14661 Pile foundation P174/112 : Nov. 2011
14662 Pile foundation P185/103 : Nov. 2011
14663 Piers & Pile caps of 190-P195/303 : Nov. 2011
17 NH-59 : Independent engineer sevices for 4 laning of
Godhra to Gujarat/Madhya Pradesh border….
14762 QPR No. 4 : Oct. 2011
14777 MPR No.11 : Sept. 2011
14766 QPR No. 2. : April 2011
14640 MPR No. 10 : august 2011
14644 Inspection Report No. 6 : June. 2011
14645 Inspection Report No. 9 : Sept. 2011
14646 Inspection Report No. 10 : Oct. 2011
14767 MPR No. 12 : Oct. 2011
18 NH-43 : Consultancy services for preparation of
detailed project report for rehabilitation and upgrading
14787 MPR : Dec. 2011
14608 MPR : Oct. 2011
of 2 lane with rehabilitation and upgrading to 2 lane
19
NH-58/72 : Independent engineering services for 4
laning of Haridwar Deheradun section from km.
211.000 to km 218 .200 of NH-58 and and km.165.000
to km. 196.825 of …….
14668 Site visit report : Dec. 2011
14585 MPR : Sept. 2011
14586 MPR : August 2011
14620 MPR : Oct. 2011
20
NH-9 (PS): western transport corridor NH-4
Chitradurga to Harihar(km 207 to km 284 ) in
Karnataka State
14757 QPR No. 4 : Oct. 2011
14772 QPR : April 2011
14773 MPR No. 6 : April 2011
14774 MPR No. 7 : May 2011
14775 MPR No. 8 : June 2011
14776 MPR No. 9 : July 2011
14635 MPR No. 11 : Sept. 2011
14639 MPR No. 10 August 2011
14778 MPR No. 12 : Oct. 2011
21
J & K (2151) : Multi sector project for infrastructure
rehabilitation in Jammu and Kashmir ADB Loan 2151
IND
14794 MPR : Nov. 2011
14638 MPR : Oct. 2011
22
NAM (AP) : Design, construction, finance operation
and maintenance of four laning of Narketpally Addanki
Medarametrla Road from ……
14791 MPR No. 8 : Oct. 2011
14647 MPR : August 2011
14648 QPR No. 3 : Sept. 2011
14649 MPR No.7 : Sept. 2011
23
NH-6 (BS) : Consultancy services for preparation of
DPR for rehabilitation and upgradation of Baharagora
to Sambalpur section of NH-6 Orissa …..
14667 Progress Report : Oct. 2011
24 NH-25 (EW-3B) : North – Soth & East- West
Corridors …..
14683 MPR : Oct. 2011
25 Water project : Valuation of Assests and estimation of
equity base for STEM water Authority
14706 Valuation of assets and estimation of equity
base for stem water authority : Final Report
Vol. I : Jan. 2006
14707 Valuation of assets and estimation of equity
base for stem water authority : Final Report
Vol. II : Jan. 2006
26
Tanzania Natta : Consultancy Services for
environmental and social impact assessment Detailed
engineering design and preparation of tender
documents for upgrading of Natta-Mugumu-Loliondo
road to bitumen standard ……
14708 Final Engineering Design Report Confidential
Cost estimate : Dec. 2011
14709 Final Engineering Design Report Confidential
Vol. I : Main Report : Dec. 2011
14710 Final Engineering Design Report Confidential
Vol. II. Topographical survey report : Dec.
2011
14711 Final Engineering Design Report Confidential
Vol. III (A) Soil and material investigation data
(Appendix 4.1 to 4.6) : Dec. 2011
14712 Final Engineering Design Report Confidential
Vol. III (B) Geotechnical Report : Dec. 2011
14713 Final Engineering Design Report Confidential
Vol. IV Traffic Report : Dec. 2011
14719 Final Engineering Design Report Confidential
Vol. V(A-1) : Plan and profile and
miscellaneous drawing : Dec. 2011
14720 Final Engineering Design Report Confidential
Vol. V(A-2) : Drawings plan and structural
drawings Dec. 2011
14721 Final Engineering Design Report Confidential
Vol. V(B) : Setting out data : Dec. 2011
14722 Final Engineering Design Report Confidential
Vol. VI (A) Detail cross section Km. 0+.000 to
km 30+000 : Dec. 2011
14723 Final Engineering Design Report Confidential
Vol. (B) Detail cross section Km.30+000 to km
60+000. Dec. 2011
14724 Final Engineering Design Report Confidential
Vol.(C) Details cross section km.60+000 to km
90+000 : Dec. 2011
14725 Final Engineering Design Report Confidential
Vol. VI (D) Details cross section km.90+000 to
km 120+000
14726 Final Engineering Design Report Confidential
Vol. VI (E) Detail cross section km. 120+000 to
km 150.000 : Dec. 2011
14727 Final Engineering Design Report Confidential
Vol. VI(F) : Design cross section km. 150+000.
to km 171+915 : Sec. 2011
14714 Final Engineering Design Report Confidential
Vol. VII : Drainage data analysis and plan : Dec.
2011
14715 Final Engineering Design Report Confidential
Vol. VIII : Structure design calculations
(Bridges and box culverts) Dec. 2011
14716 Final Engineering Design Report Confidential
Vol. IX : Bill of quantities (Appendix 16.1, 16.2
and 16.3 ) : Dec. 2011
14717 Final Engineering Design Report Confidential
Vol. X (A) : Valuation Report : Dec. 2011
14718 Final Engineering Design Report Confidential
Vol. X (B) : Resettlement Action plan Dec.
2011
14728 Final Engineering Design Report Confidential
Vol. 10 (B) Resettlement action plan (Annexure
1.4) Dec. 2011
27
NH-1 (Jalandhar Amritsar) : 6 laning of Jalandhar –
Amritsar section of NH-1 from km. 387.100 to km
407.100 in the state of Punjab under NHDP Phase II
on EPC Mode
14739 FDPR Vol. I : Main Report Nov. 2011 CD
14740 FDPR Vol. II: Traffic surveys and analysis
report : Nov. 2011
14741 FDPR Vol. III : Design Report : Nov. 2011
14742 FDPR Vol. IV : Soil and material investigation
report : Nov. 2011
14743 FDPR Vol. V(A) : Environmental screening and
environmental assessment report : Nov. 2011
14744 FDPR Vol. V(B) : Social Impact screening
Report : Nov. 2011
14745 FDPR Vol. VI. Technical specification : Nov.
2011
14746 FDPR Vol. VII : Tate analysis : Nov. 2011
14747 FDPR Vol. III(A) : Bridges design calculation
(Part – 1 of 7) : Nov. 2011
14748 FDPR Vol. III(A) : Bridges design calculation
(Part – 2 of 7) : Nov. 2011
14749 FDPR Vol. III(A) : Bridges design calculation
(Part – 3 of 7) : Nov. 2011
14750 FDPR Vol. III(A) : Bridges design calculation
(Part – 4 of 7) : Nov. 2011
14751 FDPR Vol. III(A) : Bridges design calculation
(Part – 5 of 7) : Nov. 2011
14752 FDPR Vol. III(A) : Bridges design calculation
(Part – 6 of 7) : Nov. 2011
14753 FDPR Vol. III(A) : Bridges design calculation
(Part – 7 of 7) : Nov. 2011
14754 FDPR Vol. VIII : Cost estimates : Nov. 2011
14755 FDPR Vol. IX : Bill of Quantities : Nov. 2011
14756 FDPR Vol. XI : XI : Works contract agreement :
Nov. 2011
28
NH-47 (Kollam) Consultancy services for preparation
of DPR for construction of 2 lane Lollam Bypass on
NH-47 in the state of Kerala
14765 FDPR Vol. I : Main Report : Sept. 2011
14552 FDPR Vol. I Main Report : Nov. 2011
14553 FDPR Vol. II : Bridge Design Calculations
(Part -1 of 3) : Nov. 2011
14554 FDPR Vol. II : Bridge Design Calculations (Part
-2 of 3) : Nov. 2011
14555 FDPR Vol. II : Bridge Design Calculations (Part
-3 of 3) : Nov. 2011
14556 FDPR Vol. III : Technical specification : Nov.
2011
14557 FDPR Vol. IV : Rate Analysis : Nov. 2011
14558 FDPR Vol. V : Bill of Quantities : Nov. 2011
14559 FDPR Vol. VI : Cost Estimate : Nov. 2011
14560 FDPR Vol. II (A) : Geotechnical Investigation
Report : Nov. 2011
14561 FDPR Vol. VIII (A) : Civil Work contract Part
– A : Prequalification : Nov. 2011
14562 FDPR Vol. VIII (B) : Civil work contract Part –
B : Prequalification : Nov. 2011
29 Bihar (SH) : Civil works contracts for Bihar State
Highway Project Phase – II : Package No. 2,3 & 4
14769 Inception Report : No.v2011
30
NH-65 (Rajasthan) : Consultancy services for
preparation on Detailed Project Report for Ladnu (NH-
65 ) – Khaatu-Degana-Metra City- Lambia-Jaitaran-
Raipur-Bheem (NH-8 ) – Parasoil –Gulabpura (NH-79
) in the state of Rajasthan
14770 Inception Report : Dec. 2011
14771 Quality Assurance Plan : Dec. 2011
31
NH-47 (KL-3) : Independent engineering services for
design, construction, development, finance , operation
and maintenance of 6 laning of Vadakanachery
Thrissur section of ……
14783 Monthly Inspection Report : Oct. 2011
32
NH-75 : Pre Tender consultancy services for 4 laning
of Satna-Bela section of NH-75 on bot basis in the state
of MP
14792 Traffic analysis report (Final) ; Dec. 2011
33 Nippo : M/s Nippo corporation C/o Maruti Suzuki
India Ltd.
14795 MPR : August 2011 Vol. II
NH-2 (VA) : Independent engineering services for the
work of 6 laning of Varanasi aurangabad
14590 MPR No. 4 : Sept. 2011
14632 QPR No. 1: July 2011
14633 MPR No. 5 Oct. 2011
14641 QPR No. 2 Oct. 2011
NH-47 (KL-I) : 4/6 landing of national highway from
Thrissur to Edapally Section of NH-47 …..
14609 MPR : Sept. 2011
14611 Review of road safety Now. 2011
NH-54 (AS-1) : 4 laning of Silchar to Balachera
section of NH-54 from ……
14606 QPR : Sept. 2011
14607 MPR : Oct. 2011
14636 Interim account of compensation : Oct. 2011
NH-26 : National Highway Development Project
(North South Corridor ) Jhansi to Lalitpur in the state
of
14579 MPR : Sept. 2011
14580 QPR : Sept. 2011
14664 MRP : Oct. 2011
MP (2154) : Consultancy services for construction
supervision of package No. 2
14608 MPR : Oct. 2011
Ethiopia (HAI) : Consultancy services for the
construction supervision of Afdera Abala Road Project
Hawusewa Abal Irebti
14578 QPR : No. 29 : July to Sept. 2011
Ethiopia (JM) : Consultancy services for the
construction supervision of Jimma Mizan Road
Upgrading Project contract 2 : Bonga-Mizan Junction
14577 MPR : August 2011
Mongolia (CSZU) : Regional Road development
project construction of sainshand zamiin UUD Road
14605 QPR : Sept. 2011
NH-83 : (Patna-Gaya-Dhobi) : Preparation of
feasibility cum preliminary design for 4/6 laning of
patna gaya dhobi ….
14571 Traffic survey and analysis : May 2011
14572 Traffic survey and analysis : July 2011
NH-27 (MP) : Pretender consultancy services for four
lanign of Mangawa U.P. Border section of NH-27 on
BOT Basis in the state of MP
14584 Traffic analysis report (Final ) : Nov. 2011
HP (4860) : Consultancy services for a study to short
list prioritize 20 number black spots and design
14587 Accident investigation and prevention report
Vol. 1 Main Report
14588 Accident investigation and prevention report
Vol. II Road accident data.
NH-50 (BH) : Four laning of Bijapur Hungunda
section of NH-50 from km. 225.800 to km 323..012…..
14591 QPR : Sept. 2011
14592 Inspection Report No. 10 : Sept. 2011
14666 Inspection Report : Oct. 2011
14666I Inspection Report No. Oct. 2011
Tanzania : United republic of Tanzania ministry of
infrastructure Development Tanzania airports authority
14600 The rehabilitation and upgrading of kigoma
airport