• Identify key trades where Apprenticeship Placements are possible
• Embed the apprentice placement requirement within sub-contractor procurement
‘The sub-contractor will provide ‘one’ full apprenticeship placement from the ATA for the duration of their works. The Contractor is deemed to have allowed to have included for the delivery of the apprentice placement
within their tendered / contract sum
Supply Chain Engagement
Employment and Skills Plan
Trade NumberStart Date
Placement Duration
Electrical 1 Nov-12 12 MonthsNov-12 12 MonthsMay-13 6 Months
Dry-liner 1 Nov-12 10 Months
Construction Operative 1 Nov-12 6 Months
Business Admin 1 Nov-12 12 Months
Painter & decorator 2 Feb-13 8 Months
Carpenter 1 Feb-13 7 Months
Plumber 2
`
``````
HackneyGreenwich
Waltham ForestBarking & Dagenham
RedbridgeHarrow
EalingSutton
SouthwarkKensington & Chelsea
IslingtonTower Hamlets
LewishamCroydon
HounslowWandsworth
LambethNewham
Fragmented Supply chain
OPLCJohn Laing
Berkeley HomesSanctuary Housing
CCURVTESCOS
Mouchel Countryside Properties
Catalyst HousingAffinity Sutton
Metropolitan HousingSt George
Taylor WimpeyWates ConstructionSir Robert McAlpine
Berkeley HomesVolker Highways
Allenbuild
McLarensArdmoreFarrans
Hill PartnershipMorgan Sindall
Skanska
AC FlooringAF Connell Ltd
All Metal RoofingArdmore GroupAsh Contracting
BDLBlue Mechanical
Box and CharnockBreyer GroupBugler Limited
Chaps LtdChine Brickwork
DWS
Malden GroupMcGee
MPG LtdPanteraPentacle
RAKRosedale
Rydon GroupS. Lucas
S&R LondonSE Carpentry
Eddercliff CarpentryBrenbar
Commercial InsulationDB ScaffoldingGR Carpentry
H&V ServiceplanHaydon M&EHouston Cox
Imtech G&H LimitedIrvine-Whitlock
JC Carpentry LtdJ ReddingtonJJ Sweeney
KafftenStraton & Hasler
Bugler LimitedDurkan
Lovells PartnershipMansells
Telford HomesBarnes Construction
Town & CountryTaylor WimpeyHammersons
London & QuadrantStanhope
KOP Properties
Regal HomesNine ElmsSt. James
Hyde HousingSouthern Housing
Derwent
OsbourneBAM Nuttall
Barratt HomesBreyer GroupWillmott Dixon
SkinnersConneely
D&L ElectricalEW Gee Limited
FMSMcGinnNeilcott
NPSNRT Carpentry
StanmoreSwift Brickwork
WDHHaslemere Carpentry
Laser ElectricalGrangewood Brickwork
Hanover ElectricalMacs Plasterboard
Muranda LTDPage & GleesonPrice Building Ltd
Robinsons PlumbingSelect Interiors
CJ O’SheaKaybridge Construction
SkanskaDimension Data
Completed Apprenticeship
Sustainable Employment
Case Study – REDS10 Host Employer
Matt Ramsey•Barking & Dagenham Resident•Apprentice Carpenter•Building Crafts College
Present Future
MAY 2011
JAN 2012
MAR 2012
AUG 2012
DEC 2012
JUN 2013
Under-represented & Disadvantaged Groups
Community WomenWOMEN INTO CONSTRUCTION NEWHAM Women FC TOWER HAMLETS WFC
Disability
Outreach Partners
Colleges
•Provide transparency in relation to the activity being undertaken on the project.
•Ensure there is an early intervention in the procurement process to ensure that Labour forecasting and skills demand analysis is undertaken to provide specific useful information through which to manage your recruitment and training provision.
•Where possible ensure we are both meet short term vacancies and long term needs where there is a lack of trained individuals within a particular skill gap provide you with that intelligence.
•Work in a spirit of collaboration where rather than us providing you with a regular update a member of your team can work with us on either a part time or full time basis
•Provide a regular update on progress against targets
•Provide regular case studies as positive role models on individuals from the host boroughs that go into training and employment to ensure we meet our objectives around Equality, Diversity and Inclusion.
Overview of transformation works• Removal of a number of temporary structures including the
Athletes Training Centre at Eton Manor, Basketball Arena, Water Polo, warm-up track and Games-time security areas and spectator stands.
• Demolition• Logistics• Traffic Marshalling
• Building connections to the new footways and cycle paths and reconfiguration of 30 Games’ bridges and underpasses to improve public access.
• Laying footpaths• Bridge dismantling and construction• Create cycle paths
• Doubling the amount of parkland to 102 hectares including the planting of a further 4,000 trees, ten hectares of meadow, new lawns and two large allotment sites
• Planting trees• Planting hedges• Laying turf
Inspired by 2012: The legacy from the London 2012 Olympic and Paralympic GamesA joint UK Government and Mayor of London report