Date post: | 16-Aug-2015 |
Category: |
Documents |
Upload: | ahmad-samy-msc |
View: | 8 times |
Download: | 1 times |
Cost Overrun Causes Cost Overrun Causes Related to the Design Related to the Design Phase in the Egyptian Phase in the Egyptian Construction IndustryConstruction Industry
Assessment of the Egyptian ExperienceAssessment of the Egyptian Experience
Cost Overrun Causes Cost Overrun Causes Related to the Design Related to the Design Phase in the Egyptian Phase in the Egyptian Construction IndustryConstruction Industry
Assessment of the Egyptian ExperienceAssessment of the Egyptian Experience
By : Ahmad SamyBy : Ahmad SamyAugust 2013August 2013
By : Ahmad SamyBy : Ahmad SamyAugust 2013August 2013
Problem StatementProblem Statement
Discussing causes of cost overrun is a step in enhancing the Discussing causes of cost overrun is a step in enhancing the professional practice through trying to avoiding the occurrence or the professional practice through trying to avoiding the occurrence or the
impact of these causes .impact of these causes .
Problem StatementProblem Statement
Discussing causes of cost overrun is a step in enhancing the Discussing causes of cost overrun is a step in enhancing the professional practice through trying to avoiding the occurrence or the professional practice through trying to avoiding the occurrence or the
impact of these causes .impact of these causes .
IntroductionIntroductionIntroductionIntroduction
Research ObjectivesResearch ObjectivesResearch ObjectivesResearch Objectives
IntroductionIntroductionIntroductionIntroduction
Research MethodologyResearch MethodologyResearch MethodologyResearch Methodology
IntroductionIntroductionIntroductionIntroduction
Literature Literature ReviewReview
Experts Experts InterviewsInterviews
QuestionnaireQuestionnaire SurveySurvey
Statistical Statistical AnalysisAnalysis
Objective: Thorough understanding of building economics related to pre-construction stages in books and journals.
Output: A list of cost overrun causes related to design phase from references and international researches
Objective: To suggest additional causes and adapt the selected causes to the Egyptian construction industry .
Output: A list of cost overrun causes related to design phase in the Egyptian construction industry
Objective: to assess the frequency and impact of the selected causes
Output: Data from 101 valid participation forwarded to statistical Analysis.
Objective: to arrange cost overrun causes according to their importance based on the questionnaire information
Output: Data from 101 valid participation forwarded to statistical Analysis.
Scope of the ResearchScope of the ResearchScope of the ResearchScope of the Research
IntroductionIntroductionIntroductionIntroduction
This research focuses on Identifying the Identifying the Importance Importance of causes of cost overruns that are stemming, related or takes place during the design and other pre-construction phases in the Egyptian construction industry.
The Literature review discussed the following The Literature review discussed the following
titles:titles:
The Literature review discussed the following The Literature review discussed the following
titles:titles:
Literature ReviewLiterature ReviewLiterature ReviewLiterature Review
International studies incorporated in the researchInternational studies incorporated in the researchInternational studies incorporated in the researchInternational studies incorporated in the research
Literature ReviewLiterature ReviewLiterature ReviewLiterature Review
Author(s)Author(s) YearYear CountryCountryResearch PerformedResearch Performed
MethodMethod ParticipantsParticipants Projects TypeProjects Type
Koushki et al. 2005 Kuwait Interview Owners and Developers Residential Houses
Azhar et al. 2008 Pakistan Questionnaire Construction Firms Heavy Engineering, Infrastructure, Commercial and Industrial Construction
Jackson 2002 UK Questionnaire Quantity Surveyors Various
Kaming et al. 1997 Indonesia Questionnaire / Interview Project Managers High Rise Buildings
Le-Hoai et al. 2008 Vietnam Questionnaire Owners, Consultants and Contractors Large Construction Projects
Apolot et al. 2009 Uganda Questionnaire Architects, Quantity Surveyors and Engineers Various
Baloyi & Bekker 2011 South Africa Questionnaire Owners, Consultants and Contractors Stadiums
Ameh et al. 2010 Nigeria Questionnaire Owners, Consultants and Contractors Telecommunication construction projects
Bubshait & Al-Juwairah 2002 Saudi Arabia Questionnaire Owners, Consultants and Contractors Various
Chang 2002 USA Cases Study - Interviews Owner's Project Managers Four Roadway Construction Projects
Durdyev et al. 2012 Turkey Questionnaire Project management consultants, Contractors and Sub-contractors Residential Projects
Ali & Kamaruzzaman 2010 Malaysia Questionnaire Project Managers, Quantity Surveyors and Engineers Various
Literature ReviewLiterature ReviewLiterature ReviewLiterature ReviewCauses collected through the literature Causes collected through the literature review and the international studies:review and the international studies:Causes collected through the literature Causes collected through the literature review and the international studies:review and the international studies:
Literature ReviewLiterature ReviewLiterature ReviewLiterature ReviewCauses collected through the literature Causes collected through the literature review and the international studies:review and the international studies:Causes collected through the literature Causes collected through the literature review and the international studies:review and the international studies:
Literature ReviewLiterature ReviewLiterature ReviewLiterature ReviewCauses collected through the literature Causes collected through the literature review and the international studies:review and the international studies:Causes collected through the literature Causes collected through the literature review and the international studies:review and the international studies:
Literature ReviewLiterature ReviewLiterature ReviewLiterature ReviewCauses collected through the literature Causes collected through the literature review and the international studies:review and the international studies:Causes collected through the literature Causes collected through the literature review and the international studies:review and the international studies:
Experts InterviewsExperts InterviewsExperts InterviewsExperts InterviewsThe interview depended on a 77 semi structuredsemi structured, the collected causes from literature review were assessed to three main questions
The interview depended on a 77 semi structuredsemi structured, the collected causes from literature review were assessed to three main questions
Experts InterviewsExperts InterviewsExperts InterviewsExperts InterviewsInterview Results:Interview Results:
Frequency index, impact index, importance index and relative importance of cost Frequency index, impact index, importance index and relative importance of cost overrun cause according to the questionnaire overall resultsoverrun cause according to the questionnaire overall resultsFrequency index, impact index, importance index and relative importance of cost Frequency index, impact index, importance index and relative importance of cost overrun cause according to the questionnaire overall resultsoverrun cause according to the questionnaire overall results
Data AnalysisData AnalysisData AnalysisData Analysis
Pareto Analysis to determine the most important causes from the overall results.Pareto Analysis to determine the most important causes from the overall results.Pareto Analysis to determine the most important causes from the overall results.Pareto Analysis to determine the most important causes from the overall results.
Data AnalysisData AnalysisData AnalysisData Analysis
Pareto Analysis to determine the most important causes from the overall results.Pareto Analysis to determine the most important causes from the overall results.Pareto Analysis to determine the most important causes from the overall results.Pareto Analysis to determine the most important causes from the overall results.
Data AnalysisData AnalysisData AnalysisData Analysis
Overall and different parties’ relative importance of causesOverall and different parties’ relative importance of causesOverall and different parties’ relative importance of causesOverall and different parties’ relative importance of causes
Data AnalysisData AnalysisData AnalysisData Analysis
Correlation between the Involved PartiesCorrelation between the Involved PartiesCorrelation between the Involved PartiesCorrelation between the Involved Parties
Data AnalysisData AnalysisData AnalysisData Analysis
1.1. Occurrence of design variations, changes or additional work by owner or designerOccurrence of design variations, changes or additional work by owner or designer1.1. Occurrence of design variations, changes or additional work by owner or designerOccurrence of design variations, changes or additional work by owner or designer
Recommendations Recommendations Recommendations Recommendations
2. Unrealistic estimation of construction period2. Unrealistic estimation of construction period2. Unrealistic estimation of construction period2. Unrealistic estimation of construction period
Recommendations Recommendations Recommendations Recommendations
3. Lack of information and definitions of scope due to incomplete recognizing or badly 3. Lack of information and definitions of scope due to incomplete recognizing or badly developed client's needs and lack of involvement of the appropriate stake holdersdeveloped client's needs and lack of involvement of the appropriate stake holders
3. Lack of information and definitions of scope due to incomplete recognizing or badly 3. Lack of information and definitions of scope due to incomplete recognizing or badly developed client's needs and lack of involvement of the appropriate stake holdersdeveloped client's needs and lack of involvement of the appropriate stake holders
Recommendations Recommendations Recommendations Recommendations
4. Inadequate design, design errors and mistakes, lack of details or contradiction in 4. Inadequate design, design errors and mistakes, lack of details or contradiction in design and conflict between design documents (drawings and specifications)design and conflict between design documents (drawings and specifications)
4. Inadequate design, design errors and mistakes, lack of details or contradiction in 4. Inadequate design, design errors and mistakes, lack of details or contradiction in design and conflict between design documents (drawings and specifications)design and conflict between design documents (drawings and specifications)
Recommendations Recommendations Recommendations Recommendations
5. Lack of communication and coordination between design participants of different 5. Lack of communication and coordination between design participants of different backgroundbackground
5. Lack of communication and coordination between design participants of different 5. Lack of communication and coordination between design participants of different backgroundbackground
Recommendations Recommendations Recommendations Recommendations
6. Lack of value management and Build ability consideration6. Lack of value management and Build ability consideration6. Lack of value management and Build ability consideration6. Lack of value management and Build ability consideration
Recommendations Recommendations Recommendations Recommendations
7. Lack of Designers understanding of cost and value and the subsequent cost 7. Lack of Designers understanding of cost and value and the subsequent cost implications of what included in the designimplications of what included in the design
7. Lack of Designers understanding of cost and value and the subsequent cost 7. Lack of Designers understanding of cost and value and the subsequent cost implications of what included in the designimplications of what included in the design
Recommendations Recommendations Recommendations Recommendations
8. Inadequate consideration of risks 8. Inadequate consideration of risks 8. Inadequate consideration of risks 8. Inadequate consideration of risks
Recommendations Recommendations Recommendations Recommendations
9. Occurrence of mistakes in quantities taking off9. Occurrence of mistakes in quantities taking off
It is important to take off the quantities of the design with a great precision in order It is important to take off the quantities of the design with a great precision in order to provide the real sum for the design management during design and later to cut off to provide the real sum for the design management during design and later to cut off the costly variations at construction phase. the costly variations at construction phase.
3d enhanced CAD programs offer a great help for the design team to provide a 3d enhanced CAD programs offer a great help for the design team to provide a realistic quantities taking off as well as experienced specialists incorporated during realistic quantities taking off as well as experienced specialists incorporated during the design phase.the design phase.
9. Occurrence of mistakes in quantities taking off9. Occurrence of mistakes in quantities taking off
It is important to take off the quantities of the design with a great precision in order It is important to take off the quantities of the design with a great precision in order to provide the real sum for the design management during design and later to cut off to provide the real sum for the design management during design and later to cut off the costly variations at construction phase. the costly variations at construction phase.
3d enhanced CAD programs offer a great help for the design team to provide a 3d enhanced CAD programs offer a great help for the design team to provide a realistic quantities taking off as well as experienced specialists incorporated during realistic quantities taking off as well as experienced specialists incorporated during the design phase.the design phase.
Recommendations Recommendations Recommendations Recommendations
10. Unavailability of construction cost data to develop a realistic cost estimate10. Unavailability of construction cost data to develop a realistic cost estimate
More attention should be paid to provide this information about rates of More attention should be paid to provide this information about rates of construction services and materials in different parts of Egypt. construction services and materials in different parts of Egypt.
Providing such information would increase the investments in many regions and give Providing such information would increase the investments in many regions and give clearer perceptions of construction costs in other, this helps investment from future clearer perceptions of construction costs in other, this helps investment from future setbacks due to unrealistic estimates through encouraging contractors to submit setbacks due to unrealistic estimates through encouraging contractors to submit realistic bids.realistic bids.
10. Unavailability of construction cost data to develop a realistic cost estimate10. Unavailability of construction cost data to develop a realistic cost estimate
More attention should be paid to provide this information about rates of More attention should be paid to provide this information about rates of construction services and materials in different parts of Egypt. construction services and materials in different parts of Egypt.
Providing such information would increase the investments in many regions and give Providing such information would increase the investments in many regions and give clearer perceptions of construction costs in other, this helps investment from future clearer perceptions of construction costs in other, this helps investment from future setbacks due to unrealistic estimates through encouraging contractors to submit setbacks due to unrealistic estimates through encouraging contractors to submit realistic bids.realistic bids.
Recommendations Recommendations Recommendations Recommendations