A TELEDYNE ENQINEERlNQ SERVICES ATTACHMENT 1 TO TES LETTER 5511-495 The r'evision pages transmitted by this letter reflect changes in IDVP completion status through Wednesday, August 17, 1983. Additional ITRs have been issued and EOI actions taken on August 17-18th which are sumarized by this attachment. 1. ITRs Issued: ITR-59, Corrective Action - Stress in Large Bore Piping. ITR-60, Corrective Action - Large and Small Bore Piping. ITR-63, Corrective Action - HVAC Ducts, Raceways, Instrument Tubing, and Supports. 2. EOI File Actions: 983: Closed with issuance of ITR-63, Revision 0. 1143: Opened to identify that excessive loads exist on an HVAC support anchor bolt;. 3009: Opened to identify a potential concern regarding the containment interior structure horizontal design response spectra. 3. Based on the actions identified above, Table 7.4-1 has been updated as indicated by the next two attached pages. 4.. The remaining pages of this attachment have been provided by the DCP to update the information included in Section 7.3 of the IDVP Final Report. 8308260i28 8308i9 PDR ADOCK 05000575i R PDR '
Transcript
Page 1: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENQINEERlNQ SERVICES

ATTACHMENT 1 TO TES LETTER 5511-495

The r'evision pages transmitted by this letter reflect changes inIDVP completion status through Wednesday, August 17, 1983. AdditionalITRs have been issued and EOI actions taken on August 17-18th which aresumarized by this attachment.

1. ITRs Issued:

ITR-59, Corrective Action - Stress in Large Bore Piping.ITR-60, Corrective Action - Large and Small Bore Piping.ITR-63, Corrective Action - HVAC Ducts, Raceways, InstrumentTubing, and Supports.

2. EOI File Actions:

983: Closed with issuance of ITR-63, Revision 0.

1143: Opened to identify that excessive loads exist on an HVAC

support anchor bolt;.

3009: Opened to identify a potential concern regarding thecontainment interior structure horizontal design response spectra.

3. Based on the actions identified above, Table 7.4-1 has been updatedas indicated by the next two attached pages.

4.. The remaining pages of this attachment have been provided by the DCP

to update the information included in Section 7.3 of the IDVP FinalReport.

8308260i28 8308i9PDR ADOCK 05000575iR PDR '

Page 2: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

C

W ~

Page 3: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

TABLE 7.4-1

A TELEDYNEENQLNEERlNQ SERVlCES

STATUS OF INCOMPLETE VERIFICATIONS DEFINED BY ITRs-8 ANO -35AS OF AUGUST 19, 1983

IOVP PGandE

Re ort SubsectionsUnresolved ITR

EOIs No.*Verification Com lete2Field Desicen Mod

4.4.2.2

4.4.3

4 ' '

2.1.2

2.1.3

2.1.1

1097

1092

1014. 3009

55

57-1

Yes No NA

NA Yes No

54 NA No No

4.4.5

4.4.6

4.4.8

2.1.1.4.3

2.1.5

2.1.4

1014

10261028

51 Yes

58-1 Yes

56 Yes

No

Yes

No

No

No

4.5.2.3b " 2.2.3

4.5.3.2a 2.2.2

4.5.3.2b 2.2.2

4.5.2.3a 2.2.1 938109811381141

1098

10981141

10981142

59-1 Yes

60-1 Yes

61 Yes

60-1 Yes

Part

Part

Part

Part

No

No

No

4.6.2.2

4.6.3

4.6.4

4.6.5

2.3.1

2.3.1

2.3.1'.3.1

67-1 NA '-

67-1 NA

67-1 Yes

67-1 Yes

Yes

Par tPart

Part

NA

NA

*When the ITR number is followed by another number, the ITR has beenissued but a further revision is expected.

1 of 2

Page 4: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

<~a '

r

Page 5: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

TABLE 7.4-1 (Cont)

)> TELEDYNEENQINEERINQ SERVICES

PGandEIDVP

Re ort Subsections UnresolvedEOIs

Verification Com lete7No.* 'ield ~Desi n Mod

'4.6.6.3

4.6.6.5

2.3.3

2.5 1134'143

67-1 Yes . Yes . NA

631 No 'Part Nos

4.6.7

4.6.8.1b

2.3.2

2.4

~ 4,.9.1.4

4.9.2

4.9.3,

2.3.2.3.3

4.6.8.2b 2.6

4.6.9 NA

NA

67-1 Yes

63-1 Yes

63-1 Yes

67-1 Yes

67-1 NA

68 Yes

65 No

Yes

Yes

Yes

Yes NA

Yes NA

No 'ANo No

*When the ITR number is followed by another number, the ITR has been. issued but .a 'further revision is expected.

2of2

Page 6: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

~ '

Page 7: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

DIABLO CANYON PROJECT

PHASE I STATUS

August 12, 1983 Update

6290'78

SUMMARY

'n the following we are provided a listing of the status'f our Phase I work.We have presented below'the scope of the DCP CAP as defined in the Phase I .

Final Report. 'his is an update of the Ju'ly 26; 1983 transmittal,DCVP-TES-1271.

This summary is divided into 3 sections, providing a status of the work. forPhase I.

Section 1.. Civil/Structural Work

Section 2. Piping and Pipe Supports Design Review

Section 3.'quipment Seismic Design Review

For each 'section:some 'of the information is presented in tables.. The status.of all information is in terms of the percent of the work that is complete.

'here no percentage are shown, no DCP activity has occurred. Complete back-upinformation is available in the Phase I Final Report.

~ August 12, 19830040D/0116P

Page 8: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

'I

I'

Page 9: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

SECTION 1. CIVIL/STRUCTURE WORK'290 i8

The status of the Cfvfl/Structural work is summarized below. Details on the

status of this work ar'e presented fn Table 1.1 which includes important

information contained fn the footnotes to this table. For details on this

work, please see applfcable sections of the Phase I Final Report.

August 12,, 1983AAAOn/61160 "

Page 10: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 11: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

0Table 1 1

OIABLO CANYON PROJECT

Areaec on escr p on

Oesi n ReviewNe o - a c. or

Criteria ology AnalysesReviewed Reviewed Reviewed

PHASE I CORRECTIVE ACTION PROGRAN STATUS

CIVIL STRUCTURAL

Oesi n Revision or Reanal sisil)r er a ar e

and NethodologyEstablished

Nodificationss-

OCNs Const.Bu'ssuedCompl. Ce

OCNs

Compl.

2..1 .1 Containmentand internals(>)

OCN NethodologyEstablished

Cele�.

Cal c. Cele.Pre . Check. A r.

2.1.1.3.2.1 Horizontalmodel ofcontainmentfor OE and ODE

2.1.1.3.2.2 Horizontalmodel ofcontainmentinternalstructurefor Hosgri

2.1.1.3.2.3 Horizontalmodel forcontainmentfor Hosgri

100

100

100

Ae ust 12, 1983ooaoo/0086p

-3-

Page 12: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

1

Page 13: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

AreaSection .Oescription

Desi n Rev)evNethod- Calc;— or

Criteria ology AnalysesReviewed Reviewed Reviewed

DCN NethodologyEstablished

Cele.

Cele�.

Ca 1 c.Pre . Check. A r.

~ -- Table 1.1

OIABLO CAHYOH PROJECT

PHASE I CORRECTIVE ACTION PROGRAN Sl'ATUSCIVIL STRUCTURAL

Oesi n Revision or Regnal sis (1)Criteria C arifiedand NethodologyEstablished

NodificationsAs-

DCHs Const. Built OCHs.Issued Conjpl. Conpl. Conpl.

2.1.1.3.2.4

2.1.1.3.2.5

2.1.1.4

2.1.1.4.1

- Verticalsodel forcontaieaentexterior .

for Hosgri

Verticalmodel ofcontaiesentinternalstructuresand

annulus'or

Hosgri

Designreview ofstructures

Contairuaent

100

, 100

2.1.1.i.l.l Seissicanalysis'- review<3>

2.l.l.i.1.2 Review of- design

100 100 100

100 100 100

2.1.1.1.2

2. l . l .I.2.1

2.1.l.e.2.2

Internalstructure

Revive ofsei saicanalysis

RevieM ofdesign(<l .

100 100 50

100 90 . 15

August 12, 198300100/0086 P

Page 14: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 15: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

Sect1onArea

Oescr1pt1onOes1 n Rev1eM

Ne o - Ca c. orCr1ter1a ology AnalysesRev1etal Revlered 'evlmed

OCN NethodologyEstablished

C ale. ~ Ca 1 c. Cal c.Pre . Check. A r.

Tab e 1.1

OIABLO CANYON PROJECT

PHASE .I CORRECTIVE ACTION PROGRAN .STATUSCIVIL STRUCTURAL

<1)Oes1 n Rev1s1on or Regnal s1S

Cr1ter1a C ar1f1eand NethodologyEstabl1shed

Nod1f1cat1onsAs-

OCNs Const. Bu1lt OCNs

Issued Compl. Coelpl: Cotapl.

2.1.1.4.3

2.1.1.4.3.1

2.1.1.4.3.2

2.1.1.5

2.1.1.5.2

Annulus

Anal ys1ssuelaary

Rev1m of Oes1gn

Nod1f1catlon ofAnnulus(8)

Polar crane

Nod1f1cat1ons ofPolar Crane(5)

100 100 100

100 100 - 90

100 100 100

100 99

100 100 80

0

0

Rev1er ofdtxee serv1cecrane se1s.

.analys1s(6)

Nod1f1ca1onsof dlxeeservice crane

i100 100 100 100 0

100 0

0

0

0

0

2.1.1.6

2.1.2

P1pe .

rupturerestraints(>)

Aux111arybulld1ng

95 95 45 85 30 0

2.1.2.2

2.1.2.3

Cr1ter1a(9)

Nethodol ogy

Hosgr1 eval.2.1.2.3.2.'1

2.1.2.3.3 Analyt1cal

methods

August 12, 198300400/0086P

2.1.2.3.2.2 NodelsOE/DOE anal.ssodels

100

100

'. GO

-5-

100

100 100 100

100 100 100

100 100 100

Page 16: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

0

Page 17: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

Table 1.1

Sec on

rArea

Oescr p on

DIABLO CANYON PROJECT

PHASE I CORRECTIVE ACTION PROGRAN STATUSCIVIL STRUCTURAL

Desi n Review" Desi n Rev1sion or Regnal sisll)., Ne o - Ca c. or Cr ter a C ar e

Criteria ology . Analyses and NethodologyRevi cued Reyieued Reviewed . Establ1shed

OCN Nethodology Gale. Cele. Calc.Establ1shed Pre . Check.- A r.

Nod1f icationsAs;

OCMs Const. Bu1lt OCNs

Issued Compl. Compl. Compl.

2.1.2.3.4 Oescript1onoF analyt1caloutput

100 100 100'00

2.1.2.3.5

2.1.2.3.5.1

2.1.2.4

2.1;2.4.1

2.1.2.4.2

2.1.2.4.3

2.1.2.4.4

2.1.2.4.5

2.1.2.5

2.1.3

2.1.3.3

, 2-1.3-3.2

2.1.3.3.3I

Local vert.slab Flex.(12)

Nodel methodand analysisoutput<1>)

Structuredesign revier

Introduction

SlabSt13)

Ma»s<30)

Load dis-s ipat1on tofoundation(31)

Concrete'col@ms

Analys1s andqual1f1cat1onof structure

Fuel handl1ngbu1l din9(14)

Nethodology

Nodeldescr1ption

Nodalmater1alpropert1es

100

100 100

100 100

100 100

100

100

100

100

100

100 100 75

100 100 75

100 100 - 50

95 95 0

100 100 0

100 . 100 100

95 95 25

100 100 0

100 100 0

)4 August 12, 1983

t 00400/0086P

Page 18: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

'

:~

.J

Page 19: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

Area Oes1 n Review

. Table 1.1

DIABLO CANYON PROJECT

PHASE I CORRECTIVE ACTION PROGRAII STATUSCIVIL STRUCTURAL

Desi n Revls1on or Regnal sosll) Node flcatlonsec on

2.1.3.3.4

2.1.3.4

2.1.3.4.1

2.1.3.4.1.1

2.1.3.4.1.2

escr p on

Oescrlptlonof analyses

Design rev1ew

Cr1ter1aeval.

Visual1nspect. ands1apl 1 fledanalysis

Detailedsalsa'Icanalysis

Ne o - Ca c. or Cr er a ar eCr1ter1a ology Analyses'nd NethodologyRev1eMed Rev1eved Rev1eMed Established

DCN methodologyEstablished

100

Ca 1 c. Gal c. Ca 1 c.Pre . Check. A r.

100 100 50

100 100 50

100 100

100 100 50

sOCNs Const. Du)it DCNs

Issued Coepl. Coepl. Coupl.

2.1.3.4.2

2.1.3.5

2.1.3.6

Nod1f1ca-t1ons(15)

Analyses andeod1f1cat tonsof aedtf1edStructure

fuel handlingbulldlng crane

100 100

100 100 '

95 95 50

95 95 TO

100 100 40 0

2.1.4

Platforms(16)

Turbinebul1d1ng'f l>)

100 100 30 20 20 20 0 0 0

2.1.4.2

2.1.4.3

2.1.4.3.1

2.1.4.3.2

Criteria

Nethodology

Structures

Nodels

100

100

100

100

August 12, 'i98300400/0086P

-7-

Page 20: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

'0

Page 21: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

AreaSec on Oescrlp on

2.1.4.3.2.1 Kor1zontal

-'2.1.4.3.2.2 Vert1cal

2.1.4.3.2.3 Pedestal,-aodel

2.1.4.3.3 Analysesdescrlpt1on

2.1.4.3.3.1 Revlm ofanalyses

2.1.4.4 - Design revI ev

Table 1.1

DIABLO CANYON PROJECT

.PHASE I CORRECTIVE ACTION PROGRAN STATUS

CIVIL STRUCTURAL

Cele. Cal c. Cele.Pre : Check. A r.

100

100

100

100

'00

Desi n Review Desi n Revision or Reanal sosll)

Ne ho - Ca c. or Cr erma C ar e

Cr1ter1a ology Analyses and Nethodology

OCN NethodologyEst blush'ed

Nod1flcat1ons

OCHs' Const. Bu1lt DCHs

Issued Coepl. Conpl. Compl.

2.1.4.4.1

2.1.4.4.2

2.1.4.5

2.1.5

2.1.5.1

2.1.5.2

2-).5.2.1

Eval. tocriteria

Nod1f1catlons

Analys1s andqual1f1cat1 on

. of structure(TB)

Intakestructure

Scope

Crater)a

Load1ngcoeb1nat1ons

100

100

100 95 25

100 100 -. 100 100 70

100 80 20

0 0 (Note)*

2.1;5.3 . Nethodology 100

2.1.5.3.1

2.1.5.3.2

Descr1pt1on

Selsalc eath.. model

100

100

'he Cele's have been approved for theirtechnical val1d1ty, hoover f1naldocueentat1on and sign-off have < )tbeen coepleted.

August 12, 19$ 300400/0086 R

-8-

Page 22: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

I1

Page 23: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

AreaSec on Oescr pt on

Oesl n ReviewNe o - Ca c.-or

Cr 1 teria ology . AnalysesReviewed Reviewed 'Reviewed

Table 1.1

DIABLO CANYON PR03ECT

PHASE I CORRECTIVE ACTION PROGRAN STATUSCIVIL STRUCTURAL

(1)Oes1 n Revision or Regnal sls

Cr ter a C ar . eand NethodologyEstablished

Nodl f1catlonsAs«

OCNs Const. Built DCNsIssued Corapl. Coupl. Coapl.

2.1.5.3.3 Nave force .aodel

OCN NethodologyEstablished

100

Calc.

Cele�.

Cal c.Pre . Check. A

2.1.5.3.l 'eismic~ uodel

properties

100

2.1.5.6

-2.1.5.7

2'1.5.7.1

2.1.5.7.2

2.1.5.1.3

2.1.5.8

2;1.5 .8.2

2.1.5.8.3

2.1.5.8.5

2.1.5,8.6

2.1.5.8.7

Analysis ofstructuresub)ected tosave force(>>)

Oeslgn reviewand qual 1 fl-catlon forstructure

Reviewprocedure

Revlmresults

Responsespectra

Intakestructurecrane<20)

Safetyanalysis

Criteria

Sel saicsodas

Oescrlptlonof analysts

Results

100

100

-9-

100 100 100

100 100 100

100 100 100

100 100 100

100 100

100 100

100 100

100 ~ . 100 100 0

August 12, lg8300400/0086P

Page 24: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

I

Page 25: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

Area- Sect1on Descr1ption

Table 1.1

DIABLO CANYON PROJECT

PHASE I CORRECTIVE ACTION PROGRAN STATUSCIVIL STRUCTURAL

Ca 1 c. Cal c. Cele.Pre . Check. A r.

Desi n Review Des) n Revision or Reanal sit(1)Nethod- Ca c. or Crlter1a C ar1 led

Criter1a ology, Analyses'nd Nethodology. Revlemd Rev1eued Reviewed = Established

OCN NethodologyEstablished

Nodl f1cat fonsAs-

OCNs,'onst. Built . DCNs

Issued Compl. Compl. Compl.

2.1.6

2.1.6.2

2.1.6.3

2.1.6.3.1

Outdoorstoragetanks(>>)

Crlterla

Nethodology

Oescr1ptlon

100

100

2.1.6.3.2 Selsmtc math.model

100

2.1.6.3.3

2.1.6.3.4

2.1.6.4

2.1.6.4.1

2-1.6.4.2

2.4

2.4.2

2.4.2.1

Se1sm1c modelproperties

Analyticalmethods

Design revtmand qual 1 f1ca-t1on of tanks(>>)

Rev1ar ofanalysts

Revtev ofresults

Electr1calconduit andracewaysupports(>>>

Crlterla

Responseaccelerat1onof supportsystems

100

100

100

100 . 100 100

100 100 100

August 12, 19830040D/0086 P

-10-

Page 26: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

:0

Page 27: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

Table l.l

Sect1on

2.4.2 '

2.4.2.3

2.4.3

AreaOescr1pt1on

Loadingcoebination

Acceptancecriteria(23)

Seismic'resistanceanalysis

Desi n ReviewKethod- Ca c. or

Criteria ology AnalysesReviewed Reviewed Reviewed

Cr1ter1a C ar1 iedand KethodologyEstabl1shedOCK Kethodology

Establ1 hed

100

t- Ca 1 c. Cele. 'al c.Pre . Check. A r.

100

OIAOLO CANYON PROJECT

PHASE I CORRECTIVE ACTION. PROGRAK STATUSCIVIL STRUCTURAL

'es1

n Rev1sion nr Regnal s1s(1) Kodifications

AsOCNs Const. 8u1lt DCNsIssued Coepl. Coepl. Ceapl.

2.4.3.1

2.4.3.l.l

2.4.3.1.2

2.4.3.1.3

2.4.4

2.4.5

2.4.5.1

2.4.5.2

2.5

2.5.2

2.5.2.l

'ethodol ogy

Oescriptionof supports

Transver'seso i saleanalysis

Longitudinalsei saicanal ys1s

Ver1f icat1onof supportlocations(><)

Oesign review

Evaluat1on tocriteria<25)

Oescript ionof modif ica-tlons<25)

HVAC ducts andsupports(26)

Criter1a

Responseaccelerationof ductworksystem

100

100

100

100

100 '00. 90

~ 95~ 95 0 0

~Additions l OCNs.vereissued as a"result ofcrlter1a :hanges.

August l2, 198300400/0086P.

Page 28: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A

Page 29: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

AreaSection Description

Desi n RevtevHethod- Ca c. or

Criteria ology AnalysesRevt~d Reviewed Reviewed

.Table 1.1

DIABLO CANYON PROJECT

PHASE I CORRECTIVE ACTION. PROGRAH STATUSCIVIL STRUCTURAL

Desi n Revision or Regnal stsr 1)

Cr1ter1a C ar1f ted. and HethodologyEstablished

Hod1ftcattonsAs-

DCHs Const. Built DCHs

Issued Compt. Compl. Compl.OCH Hethodology

EstablishedCalc. Cele. Cele.Pre . Check. A r.

2.5.2.2

2.5.2.3

2.5.3

2.5.3.1

2.5.3.2

2.5.3.3

~ 2.5.4

2.5.4.1

2.5.4.2

'oadingcombinations(2>)

Acceptancecr1teria

Hethodology

Descriptionof ducts andsupports

Genericqualification

Spec1f tcqual 1 f1catton

Design revter

Evaluat1on tocriteria(2B)

Oescrtpt1onof modtf1ca-ttons<20)

'00100

100

100

100

100 100 75

100 95'

0

Notes:

2.

Th1s includes hark required to make calculattons conststent with as bu1lt as a result of other changes or to correct er rors.

Scope of revter 1s established.- The design crtter1a for the dome service crane 1s 1n the f1nal s1gn-off process. Platform dibe1ng rev1sed to address add1t1onal non-se1sm1c related loadings.

3. Soll behav1or for.DE/DOE cond1t1ons 1s st111 be1ng reviewed.

4. Calculations for interface bebreen 1nternals and base mat are being finalized.

5. Calculations for guide struts and rail capacity btth comparison to se1sm1c demand are being completed.

August 12, 190300400/0086P

-12-

Page 30: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

P

A,

Jl

"\

Page 31: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

.Hotes: 6. An analysis to evaluate structural 1ntegrity is, 1n progress.

7. Calculations evaluating the effect of pipe hanger loads on restra1nts are 1n progress.

8. final p1p1ng and other, loads are be1ng reevaluated.

9 ~ Scope of review for OE/DOE condit1ons 1s being evaluated as scope for other cond1t1ons 1s establ1shed. Design allowables and proci-lures for'on-seism1cloads are be1ng evaluated.

. lo.

12. Control room slab and other addit1onal.data po1nts are in the rev1ew or approval process.

Horizontal diaphragm calculat1ons are be1ng rev1ewed.'he vertical slab calculations are approved. The OE/ODE evaluation 1s 1n progress.

14. Scope is establ1shed.

15. Un1t 1 is lOOX complete 1n construction, and Unit 2 construct1on 1s about.5(g complete. As-built of Unit 1 1s 95K complete.

16. Scope 1s be1ng evaluated.

ll. Scope is established. Open items consist of ~l) review of requirements-associated w1th high energy 11ne break, and (2) signoff of cr1ter1a forturbine building crane. Evaluation of structural steel beams is in progress.

18. Scope 1s establ1shed.

lg. As-bu1lts for vent nut modificat1ons have been rece1ved and are be1ng reviewed. As-bu1lts for f1llets have not been rece1ved.

20. Scope of revfew 1s establ1shed.

21. Scope of review 1s established.

22. Scope of review 1s establ1shed.

23. Tests are 1n progress to confirm design'alues used for conduit clamps and back-to-back Superstrut welding.

24 ~ "ocation summary for each support 1s complete for Un1t l. Add1tions due to new 1nstallat1ons are be1ng received on an ongo1ng ba:1s:

25. Revised response spectra are being rece1ved and rev1ew 1s 1n progress. Addlt1onal modif1cat1ons may result.

26. Scope of review is establ1shed.

21. Rev1ew of requirements assoc1ated with high energy 11ne break phenomenon is in progress.

28. Add1t1onal support des1gn associated with HVAC system changes 1s 1n progress. Rev1sed response spectra are be1ng rece1ved and review 1s inprogress. Add1tional modifications may result.

29. No construction 1s requ1red.

30. OE/DOE so11 structure 1nteraction loads are be1ng evaluated.

3l. Supplemental report 1s required to account for the OE/OOE soll structure 1nteract1on.

August '12, 198300400/6086 P

-13-

Page 32: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

e'"

4 '

Page 33: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

SECTION 2. PIPING AND PIPE SUPPORTS, DESIGN REVIEW

2.1 ~Lg 21

. General - The Final Report Scope, Criteria and Methodology sections are

complete and no changes are anticipated. Analyses and qualification of

installations assigned to Westinghouse Corporation have been completed,

All current criteria and design input data have been transmitted to

Westinghouse. They have reviewed recent changes to certain input data

and anticipate no further modifications to be required. This estimate

includes iterations due to construction interface and as-built review.

Table 2.1 tabulates the status of .this information.

All large bore piping has been reviewed and qualified. However, certain

calculations exist with inputs identified as preliminary or results which

require review and acceptance. The notes to the table describe items

which require closure of documentation and an assessment of each item's

significance. These items should not'be totaled as an indication of

analyses with open items as many analyses contain more than a single item..

A small number of iterations of pipe analyses may also result from

problems encountered during support design review and redesign associated

with recently issued analyses and construction difficulties encountered

during support or pipe modification.

2

Thirty-eight minor pipe modifications'have been issued to date and

construction has completed thirty-five.

August 12, 19830040D/0116P

-1 4-

Page 34: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 35: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

Table 2.1

DIABLO CANYON PROJECT'I

PHASE I CORRECTIVE ACTION PROGRAN STATUS

AreaSection Description

Desi n ReviewNethod- Cal c. or

Criter1a ology AnalysesRev1ew Review Review

r

LARGE BORE PIPING

Des1 n Revision or'Regnal slsCriter1a Clartf1ed andNethodolo Est blished

Nethod-OCN DCN ology Cal c. Cal c'. Cele.Pre . A r. Estab. Pre . Check. A r.

NodificationsAs-

DCNs Const. Built DCNs

Issued

Comply�

.— Comply Comply

Notes

2.2.l Large BoreP1p1ng

o Pipe Stresses 100 100

o Valve l00 100equal 1 fication

100 100 l00 100 .100 100 100 100 92 85 0, 5, 6

l00 '100 100 100 100 100 100 N/A — N/A . N/A ~ N/A

o Nozzle and 100 100Flued HeadLoads

100 100 100 100 100 100 100 0 0 0, 4

o Local Stress 100 100 100 l00 100 100 100 l00 100 N/A N/A N/A N/A

Nozzle Loads - Sixty-six analyses conta1n nozzle loads which requ1re documentation of acceptance to current loads. Some add1tional analysismay result from this item.

Spectra - All analyses conta1n the proper current spectra with the exception of two. Spectra for these problems have been rev1sed end theanalys1s are be1ng rerun.

3. Local Stress Evaluation - Approximately th1rty eight local stress evaluat1ons are anticipated to close th1s 1tem. Host evaluations are1«rations to ex1sting calculation caused by load changes and a few w1ll be caused by new support des1gn. Few 1f any des1gn changes will,result from th1s act1vity. These des1gn changes would be 1ssued as a part of large bore pipe stress modificat1ons.

Flued Head Loads - Approx1mately 36 analyses conta1n containment penetration flued heads wh1ch rema1n to be qualif1ed for revised analysisloads. No further modifications are expected.

5. E1ght analyses are impacted by p1p1ng reroutes wh1ch are caused by SIP or construct1on 1nterferences Few p1pe support modificat'ons areexpected.

A «nal walkdown 1s be1ng performed to inspect pipe clearances and verify general p1ping conf1guration. Few mod1fications are an icipated.

Dne analysis contains a valve. for wh1ch a support react1on remains to be qual1fied. No mod1f1cat1on 1s expected.

August l2, 198300400/0086P

-15-

Page 36: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

~"4

Page 37: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

All small bore piping associated with both the Generic and Sample

Programs has been reviewed and qualified with a few exceptions (Table

2.2) ; In addition, certain calculations exist with inputs identified as

preliminary or results which require review and acceptance by others.

The notes to the table describe a listing of items which require closure

of documentation or completion of a calculation activity. The

significance of each item is addressed.

Some computer analyses may require revision due to possible future

changes in input data such as spectra or header movements.

A small number of iterations of pipe analyses may also result from

,problems encountered dur ing support design review and redesign associated

with recently issued analyses and construction difficulties encountered

during support or pipe modification.

2

Ten pipe modifications have been issued and construction is complete.

2

r

August 12, 19830040D/01 16P

-1 6-

Page 38: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 39: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

AreaSection Descript)on

Des1 n ReviewCele. orAnalysesReview

Hethod-Cr1 ter1a ologyReview Revle'w

Table 2.2

DIABLO CANYON PROJECT

PHASE I CORRECTIVE ACTION PROGRAH STATUS

SHALL BORE PIPING

Oes1 n Revision or Regnal s1sCr1ter1a. Clar1f led andethodolo 'stabl 1 shed

Nethod-OCN OCH ology Cele. Calc.Pre A r stab Pre Chec

Calc.A r

HodlflcatlonsAs-

DCHs Const. Built OCHs

Issued Compl. Compl. Compl.

'otes

2.2.2 Small BorePlplng

ner$ c Revue~

o Computer „100Set sm1 ca 1 1 yAnalyzedP)p1ng

o Valve 100Qua11ficatlon

o SAN/TAN . 100o Code 100

Boundarieso Hot Plp1ng 100

Macle. Revlev

100

100

100100

100

100

100

100)00

100

100 100" 100 100 100 100 N/A N/A N/A N/A

100 100 100 100 100 100 H/A N/A N/A N/A

100 100 100 100 100 100 100 W 0 0 0100 100 100 100 100 100 H/AI H/A H/A H/A

100 '00 100 100 100 100 H/A H/A N/A NIA

1,2

100

o As-Built . 100Accuracy

o Rev1sedSpectra

o Concentrated 100Nasses

o Insulat1on . 100Melght

o Overspans . 100o Anchor and 100

Equipment Loadso Equipment and 100

Bulld1ngSAN/TAN

100 100

100

100

100100

100

100

100

100100

100

100 100 100 100 100 100 100

100 100 - 100 100 100

100 H/A

100 H/A

N/A N/A H/A

N/A N/A N/A

100 100 100 . 100 100100 100 100 100 100

100100

N/A100

N/A N/A N/A0 0 0

100 100 100 100 100 100 H/A H/A N/A N/A

.100 100 100 100 100 100 N/A N/A H/A N/A

100 100 . 100 100 100 100 - H/A N/A N/A N/A

August 12, 1983OOIOD/0086P

Page 40: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

tC '!.'

1

I~ 4f

Page 41: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

AreaSection Description

Oesi n ReviewNethod- Cele. or

Criteria ology AnalysesReview Review Revim

Table 2.2

DIABLO CANYON PROJECT

PHASE I CORRECTIVE ACTION PROGRAN STATUS

SHALL BORE PIPING

Oesi n Revision or Regnal sisCriteria Clarified andNethodolo Established .

Nethod-OCN OCN ology Calc. Calc. Calc.Pre . A r. Estab. Pre . Check. A r.

KodificationsAs-

OCNs Const Built OCNs

Issued Compl. Comply Compl-

Notes

o ThermalAnalyses

o Valve Bypasso Vents and

Brains

100

100100

100

100100

100

100100

100 100 100

100 100 100100 100 100

100

100100

100 100100 100

H/A N/A N/A N/A,

N/A H/A N/A N/A

100 100 H/A N/A H/A N/A

Nozzle loads - Twenty-six nozzle loads require close out of documentation to shoe acceptance of those loads contained in the analy es.

2 Spectra - One analysis contains a response spectrum arhich has been revised.

August 12. 198300400/0086P

-1B-

Page 42: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 43: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

2.3 Lar e Bore Su orts

All large bore piping supports have been reviewed and qualified.

However, iterations of piping analyses due to input data revision are

causing support requalification and redesign (Table 2.3). Presently 1430

supports out of a total of 4300 require requalification due to piping

analysis revision. The bulk of these supports are associated with

decreased loads and movements and require only documentation changes. In

addition the activities and items described in the notes must be

completed to ensure no further calculation or design revision. For each

'tem an assessment of significance is established.

1035 supports are in the construction process. 2600 are installed and

are accepted through gC inspection and as-built preparation.

August 12, 198300400/0116P

-19-

Page 44: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 45: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

AreaSection Description

Desi n ReviewCalc. orAnalysesRevlew-

Nethod-Crlterla ologyReview Review

'able2.3

DIABLO CANYON PROJECT

PHASE I CORRECTIVE ACTIOH PROGRAN STATUS

LARGE BORE SUPPORTS

Desi n Revision or Reanal slsCriteria Clarlfled andNethodolo Established'ethod-

OCN OCN ology Ca 1 c. Cal c.Pre . A r.. E tab. Pre . Check.

Cele.A r.

Nodl f1catlonsAs-

DCKs Const. Built DCNsIssued Compl. Compl. Compl.

Notes

2.2.3 Large BoreSupports

o Stress

o Frequency

o Base Plates.

o Nodl f1catlons

Due to Piping'.Reanalysis

100 100 100

100 100 - 100

100 100 100

100 100 100 100 100 100 98 76

100 100 100 100 100 100 98 76

98 76

62 , 16

62 16

62 16

100 100 100 . 100 10D 100 98 76 62 16 1,2,3,4,5,6,7, "

81,2,3,4,5,6,7,81.2,3,4,5,6,7,81 .2,3,4,5,6,7,e

1: As-Bullts - Reconciliation of as-bullts.to date has resulted ln a redesign rate of 25$ . Approximately 1500 as-built reconclllatl ins areoutstanding which ls pro)ected to cause 40 lteratlons to design. There are 350 as-bullts required for fuel load.

2.

3.

5.

6.

7.

8.

Construction D1Fflcultles - presently, approximately 1W of the modified pipe supports require a design iteration to allow constr actioncocpletlon. Based on 1035 supports requiring construction completion, 104 support design changes are anticipated.

Civil Verification - Presently. approximately 1X of the support designs issued with increased loads require redesign or additional structuralsteel design to obtain civil approval of the loading on the structure. Approximately 20 additional aodlflcatlons are antlclpatec to resultfrore,this acti v1 ty.

Small Bore Support Loads - Approximately 30 supports require confirmation of the attached small bore support load. No modifications areanticipated.

Equipment Restraint - Confirmation of the acceptance of support attachments to the two RHR pumps ls outstanding. No modification isanticipated.

Spectra Change Impact on S. I.p. - Changes to spectra have caused many Design Class II supports, which were modified for System Ir:eractlonwith Design Class I installations, to be reviewed. This work ls essentially complete but 12 more modifications are anticipated.

STRUDL - One version oF the STRUDL program used for support qualification has been found to.contain a few errors. The errors har r been.corrected and program reverification completed. Reviews performed to date lndlcate that support qualification conclusions are ui ffected..Nore reviews and recalculation are required to close this issue, but no design changes are anticipated.

Engineering Judgement - 270 supports require review for piping analysis qualified by englneerlng )udgement.

August 12. 198300400/0086 P

-20-

Page 46: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 47: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

2.4 Small Bore Pi e Su orts

All small bore supports associated with both the Generic and Sample

programs have been reviewed and qualified (Table 2.4). However,

iterations of piping analyses due to input revisions and changes to

spectra and temperatures and operating modes are causing support review

and redesign. Pres'ently, approximately 49 supports out of 2500 require

, requalification due to these changes. Very few modifications are

expected to result from this effort. In addition, support

qualification/design iterations will occur as described in the notes to

the table. The significance of each item is addressed.

One hundred fifty supports are in the construction process. 1500 are

.,installed.

August 12, 19830040D/0116P

-21-

Page 48: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

g ~

Page 49: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

Section

2.2.2

AreaDescription

Small BoreSupports

n lc Revl

Desi n Review¹ethod- Gale. or

Criteria ology . AnalysesReview . Review Review

Table.2.4

DIABLO CANYON PROJECT

PHASE I CORRECTIVE ACTION PROGRA¹ STATUS

SHALL BORE PIPE SUPPORTS

Desi n Revision o'r Regnal slsCriteria Clarified andHethodolo Established

¹ethod-DC¹ DC¹ . ol'ogy Gale. Cele.Pre A r Estab Pre Check

Calc.A r

¹odl flcatlonsDesign . As- DesignChanges Const. Built ChangesIssued Compl. Complv Accepted

Notes

'100 100o Standard 100'upporti

Piping Review

exhale

eve e

o SAN/TAN 100 . 100 100o Code Boundaries 100 '1oo .100o Lugs 100 100 100o Large Bore . 10D 100 loD

100 100100 100100 100100 100

100'00

100100

100 100 '00100 1001oD 1oD100 100100 100

100 10010D 100100 N/A100 100

'00

100 100 100 90 79 . 24

90 79 24 1290 79 '4 1 2

N/A N/A H/A90 79 24 1 2.3

o As-Built 100Accuracy

o Revised Spectra 100o Concentrated 100

Nasseso Insulation 100

Heighto Overspans 100o Equipment and 100

BuildingSAN/TA¹

o Thermal Loads 100o Vents and, 100

Drainso Anchor and 100

Equipment Loads

100100

100

-100100

100100

100

100100

100100

100

100100

100

100 100 100 . 100 100 100 100 100 K/A N/A N/A . N/A

100 100100 100

100100

100 100100 100

100 . H/A100 100

N/A N/A90 79

H/A24 1 2.4

100 100 100 100 100 100 N/A H/A H/A H/A

100 100100 100

100100

100 10010D 100-

100 N/A10D H/A

N/A N/AN/A '/A H/A

H/A 1.2 5

100 100 100 100 100 100 H/A N/A N/A H/A100 100 . 100 100 100 100 100 90 79 24 1.2,4

100 100 100 100 100 100 H/A N/A H/A H/A

Notes:

2.

3

.4.

As-Bullts - Reconclllatlon of as-builts to date has resulted in a redesign rate of 2X. Approximately 800 as-built reconciliation areoutstanding which ls pro)ected to cause 16 iterations to design.

Construction Olfflcultles - Presently, approximately 2-1/ of the modified pipe supports require a design iteration to allow co~:tructioncompletion. Based on 150 supports outstanding ln construction, 4 support design changes are anticipated.

Approximately 30 pipe supports require review for revised Large Bore analysis.

For these issues expanded investigation was required.-22-

August 12, 19830040D/0086P

Page 50: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 51: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

SECTION 3. EQUIPMENT SEISMIC DESIGN

The status of the equipment seismic design work is presented in the

following. This includes Mechanical Equipment, Electrical Equipment andI

Instruments, and Heating, Ventilating, and Air Conditioning (HVAC) Equipment.

3.1 Mechanical E ui ment

The scope, criteria, and methodology phases of the program are 10(C

complete. For 100% of the mechanical equipment, calculations which

determine if the equipment is seismically qualified for a given set of

controlled seismic input have been competed (See Table 3-1).

3,2 Instrumentation and Controls

. The ISC work c'onsists of selected analysis, design, and construction\

activities. The status for all I and C equipment is presented in

Table 3-1.

For the analysis work completion means, the equipment qualification

levels have been compared to the appropriate required response spectra

and have been found acceptable. Some final documentation may be

outstanding.

Design work is complete when the DCN has been issued by engineering for

modifications to bring equipment- up to the qualified configuration.

,August 12, 19830040D/0116P

23»

Page 52: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 53: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

Construction work is complete when all equipment modifications have be n

completed by General Construction. Some final .documentation may be

outstanding.

For Instrument tubing supports the analyses are complete as of

March 29, 1983 (Rev. 6 of DCM C-17), and the design and constructionI

resulting from these analyses are complete.

3.3 Electrical E ui

ment'ctivities

relating to Phase I are complete. Responses have been

provided to all RFIs and EOIs.

i

Section 2.3.2 of the Phase I Final Report provides the detailed

information for the Class IE electrical equipment.

3.4 ~NAC q I t(

The review of seismic qualification of Class I HVAC equipment has been-

completed as of August 16, 1983. This is based upon the application of

seismic spectra issued for project use. Table 3.1 tabulates the percent

completeness of major steps of the related work.

August 12, 19830040D/0116P

-24-

Page 54: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 55: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

The seismic qualification of HVAC equipment is an ongoing process in

which the ana1yses wi11 be updated as new input are generated in

accordance with PEI-13 and DCM CH-52.

August 12, 19830040D/0116P

-25-

Page 56: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

~ p~ J

Page 57: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

SectionArea

Description

Table 3.1

DIABLO CAHVOH PROJECT

PHASE I CORRECTIVE ACTION PROGRAN STATUS. EQUIPNEHT SEISNIC DESIGN .

Desi n Reviev . 'esi n Revision or Regnal sisNethod- Calc. or Criteria Clarified and

Criteria ology Analyses . Nethodolo Establ i shedReviewed - Revimed Reviewed Nethod-

OCN OCN ology Calc. Gale. Calc.Pre . A r. Estab. Pre . Check. A r..

Nodi ficat ionsAs-

OCHs Const. Built OCNs

Issued Coepl. Compl. Compl.(X)

Notes

2.3.1

; 2.3.1.2

2.3.1.3

'echanical (See attachment:Equipeent(1)

Criteria(2)

Nethodology(3)

Table 2.3.1-1)

100 100

.100

2.3.2 Instrunenta-tiono Hot shut- 100

doun panelo Instruments 100

(panel s-PIA 4 PIB)

o Local 100instrumeentpanels

o Limit 100switches

o Pressure 100and pres-sure changetransmitters

o Solenoid 100valves

o PAN Panels = 100and instru-ments

o Containment 100Hz oonitors

o Containaent 100radiationhigh rangedetectors

o Control '00room airsupplychlorinedetector

o Plant vent 100~ radiation

aonitor

'100

100

100

100

100

100

100

100

100

100

100 100

100

100

100

100

100 100

100

100 100

100 0 0 0 'ote .

100 100 100 100 lh..

100 50 * 0 „0 Not

August 12, 1983OOIOD/0086P

-26-

Page 58: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

I

,I

Page 59: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

AreaSection Descrlptlon

Table 3.1

DIABLO CANYON PROJECT

PHASE I CORRECTIVE ACTION PROGRAM STATUSEljUIPNENT SEISIIIC DESIGN

Crlterla Clarl fled andNethodolo Establ I shed

flethod-CN OCN ology Cal c. Calc. Ca 1c.re A r. Estab. Pre . Check. A r.

Desi n Review Desi n Revls ion or Regnal slsNethod- Calc.. or

Crlterla ology AnalysesReviewed . Reviewed Reviewed

0- P

Nodl flcatlonsAs-

DCNs Const. Built DCNsIssued. Compl. Compl. Compl.('A) '

ates

o Control 100room

press'adl

ation .

monitor(<)o Control 100

room press ~

Chlorinemonitor(4)

o Control 100rome airsupply rad.monitor

o Pressurizer 100SRV Pos.Indicator

o Sub-cooled 100.marginmonitor

o Process 100solenoidvalves

100

10D

100

100

100

100

75

75

1DD

100

100

100

. 100

100

2.3. 2

2.3.3

Electr Ical 100Equipment(1)

HVAC Equip- 100ment

100

100

100(8) 100 95(9) 15 5 0 0

100 100 100 100 100 10D 10D 100 60 60 See 'e 1.

Notes: l. Scope of .this clerk ls defined and cccplete. The methodology phases of the program are 100K complete.

Coojplete defined as the issue of a controlled document which defines appropriate crlterla &lch includes load comblnatlons, selsaIc input.damping values and alliable stresses.

3. Complete ls defined as the issue of a formal document belch describes an appropriate methodology to be employed.

Devices Iclll be relocated due to high RRS at Elev. 190' Devices have been tested to test machine llmlts.5. Design modlflcatlon ls the result of neo annulus spectra.

6. Design aodlflcatlon ls the result of equipment upgrade not design verlflcatlon.

August 12, 1983%400/0086P

-27-

Page 60: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

'

Page 61: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

0390(HNotes: l. Spectra for the turb1ne bu1ld1ng at elevat1on 190 ft are not available at this time. Equipment has been tested to shake table li=.its.

Equipment located 1n the turbine building at elevation )04 ft and above 1s qualified based on prel1minary spectra available.

8. Ouct-mon1tor HVAC. equipment analyzed 1s 9'omplete.9. issuance of design changes is about 75K complete, and construction 1s approximately SX complete.

August l2, 198300400/0086 P

-28-

Page 62: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 63: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

TABLE 2. 3. 1. 1-1NECHANICAL EQUIPNEMT SEISNIC

QUALIFICATION RESULTS

'/12/83

E ui ment

Feedwater System

RequiredQual 1f1catloll

Location: " "Level'uilding/

Elevation M-S E-W . V

Qualifi-cationMethod

-QualifyingSpectraHE DDE DE

DampingValueUsed

PhysicalNodifi-cationsRequired7Yes/No

NotesReference

AFW Pump and Motor Aux/100 0.30 0.35 0.24 A

.0.60 0.70 0.480.85 0;96 0.56

DE

DDE

HE

R

R

R

No

AFW Pump (Turbine-driven) Aux/100 0.28 0.46 0.310.56 0.92 0 '20.96 0.79 0.58

DE

DDE

HE

R

R

R

No

AFW Pump Turbine

CVC System

Aux/100 0.28 0.46 0 '10.56 0.92 0 '20.96 0.79 0.58

DEDDE

HE

R

R

R

Boric Acid Tank

Safety Injection System

SI Pump Lube Oil Filter

Aux/115 0.69 0.83 0 '31.38 1.65 0.262.69 2.60 0.96

Aux/85 1.0 1.0 0.651.0 1.0 0.65*1.0 1.0 0.65

A

DEDDE

HE

DEDDE

HE

2X2X4X

R

R

R

No A

KEY: A —Qualified to latest spectra 6 nozzle loadB —Currently high nozzle load. 'nticipate will be resolved by further analysis.C — Design change in progress.D —Currently high nozzle loads. Anticipated that support modifications will be required.

Page 64: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 65: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

TABLE 2. 3. 1. 1-1 (Cont'd) 8/ 2/83

E ui ment

Component Cooling System

RequiredQual ification

LevelLocation:Bu i ld ing/Elevation N-S E-M

Qualif i-cationMethod

QualifyingSpectra

'HE DDE DE

DampingValueUsed

PhysicalNodifi-cationsRequired7Yes/No

NotesReferenc

CCM Pump

CCM Pump Rotor

Aux/73

Aux/73

0.2 0.2 0 130.4 0.4 0.270.63 0.63 0.5

0.2 0.2 -0.130.4 0.4 0.270.63 0.63 0.5

DEDDE

HE

DEDDE

HE

R

R

R

R

R

R.

No

C

Containment Fan Cooler Box Cont/140 0.8 0.8 0.541 '5 1.25 0.841.7 1.7 1.97

DEDDF

HE

R

R

No

Gaseous Radwaste System

Waste Gas Compressor

Waste Gas MoistureSeparator

Aux/60 '.2 0.2 0. 13

Aux/60 0 ' 0.2 0.13

DE'oWaste Gas Decay Tank Aux/60 0.2 0.2 0. 13 DE No

-30-

Page 66: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

0

h

Page 67: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

5

TABLEQ . 1. 1-1 (Cont ') 8/0 8

E ui ment

\

Location:Building/Elevation

RequiredQualification

" " Level

HN-S

Qualifi-cationMethod

.QualifyingSpectraHE DDE DE

DampingValueUsed .

Phy.s icalMod ifi-cationsRequired7Yes/No

NotesReference

Diesel Generator System

Diesel Generator

Diesel Transfer Pump andMotor

Diesel Generator Lube OilFilter

Diesel Transfer Filter

Diesel Transfer Strainer

Turb/85

MSS/77

Turb/85

MSS/77

MSS/77

0. 410.811.10

0.20.40.54

1 ~ 252.501.90

0,20.40.54

0.20.40.54

0 '1.0.811.10"

0.20.40.54

1 ~ 252.501.90

0.20 '0.54

0.20 '

0.54

0.270.540.92

0.130.270.50

0.831.671.50

0. 130 '70.50

0. 130. 270.50

DEDOE

HE

DEDOE

HE

DEOOE

HE

DEDDE

HE

DE

ODE

HE

2X2'X

4X

1XlX4X

R

R

R

R

R

R

,No

No

No

No

D

Priming Tank Turb/85 0.20 0.20 0.130.40 0,40 0.270.54 . 0.54 0.50

DE

DDE

HE

R

R

R

Starting Air Receiver

Ventilation System

Containment H2 PurgeSupply Filters

Turb/85

Aux/100

0.200.400 '5

0.340.680.86

0.200 '00.85

0 ..300.600.91

0.130.270.50

0.130.270 '0

DEODE

~ HE

DE'DE

HE

2%

2X4X

R

R

R

No

Containment H2 PurgeExhaust Filters

Containment H2 Supply andExhaust Blowers and Motors

Aux/115

Aux/115

0.37 0.5'.737 1 ~ 0

0.96 1.4

1.92 1.63.81 . 3.22.94 3.01

0.130 '70 '00.741.471.. 50

DE

DDEHE

DE

DDEHE

R

R

R

No

No

B"

nneon In8 8 Lh-31-

Page 68: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

*

L

)

'h

0

Page 69: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

TABLE 2.3.1.1-1. (Cont'd) 8/12/83

/

E ui ment

CCW Heat Exchanger

Location:Building/ElevationTurb/85

/

HN-S

0.480.960.98

EM V

0 ~ 20 . 0. 1340.40 0;270.61 0.50

RequiredQualification

" Level Qual ifi- Qualifyingcation 'SpectraNethod HE DDE DE

OEDDE

HE

DampingValueUsed

2X2X4X

PhysicalNodifi-cationsRequired7Yes/No

Yes

NotesReferenc

CCW Surge Tank Aux/163 0.901.792.26

0.581.162.27

0.170.331.2

.DEDDE

HE

R

R

R

No

CCW Pump Lube Oi l Cooler Aux/73 0.2 0.20.4 0.40.63 0.63

0;130.270.50

DEDDE

HE

R

R

R

No

Nakeup Water System

Nakeup Water TransferPump and Notor

Aux/100 0.31 0 '00 '1 0.600.85 0.75

0. 130.270.60

DEDDE

HE

R

R

R

No

Saltwater System

ASW Pump and Notor

Fire Protection System

Intake/-2 0.39 0.350.78 0.701.030 1.013

0.260.520.55

DE

DDE

HE/

R

R

4'I

No 3 A

Fire Pump Aux/115 0 '9 0.35 0.260,78 0.70 0.521.03 1.013 0 '5

OE

ODE

HE

R

R

R

No

Fire Pump Notor Aux/115 0.39 0.350.78 0.701 '30 1.013

0 '60.520.55

DEDDE

HE

Portable Fire 'Pump (diesel) NSS/85 0.2 0.20.4 0.40.54 0.54

0. 130.270.50

OE

DDEHE

R

R

R

No

-32-

Page 70: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

t

Page 71: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

IDVP FINAL REPORTLIST OF TABLES

A TEI EDYNEENGINEERING SERVICES

. TABLE

5-3-932

TITLE

Modification in Response to Specific Error

EOI File: 932

FOLLOWSPAGE NO.

5.4.2-1

5-3-938

5-3-949

Modification inEOI File: 938

Modification in

Response to Specific Error

Response to Specific Error 5.4.2-1

5-3-963EOI File: 949

Modification in Response to Specific Error

EOI File: 963

5'.4.2-1

5-3-1069 Modification in Response to Specific Error

EOI File: 1069

5-3-1107 Modification in Response to Specific Error

EOI File.: 1107

5-3-8009 Modification =in Response to Specific ErrorEOI File: 8009

5-3-8010 Modification in Response to Specific Error

EOI File: 8010

5-3-8012 Modification in Response to Specific Error

EOI File: 8012

5.4.'2-1

5.4.2-1

5.4.2-1

5.4.2-1'.4.2-1

5-3-8017

5-3-8057

Modification in

EOI File: 8017

Modification in

Response to Specific Error

Response to Specific Error

'.4.2-1

5-4-983 Modification in

EOI File: 8057

5-3-8062 Modification inEOI File: 8062

Response to Specific Error

Response to Generic Concern

5.4.2-1

5.4.2-1

5.4.2-1'-4-1014EOI; File: 983

Modification inEOI File: 1014

Response to Generic Concern 5.4;2-1

IDVPFINAL

X1 REV 1830816

Page 72: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

4

1 ~

ll

Page 73: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TEI EDYNEENQINEERINQ SERVIt ES

TABLE

5-4-1026

5-4-1092

5-4-1098

5-4-8009

5-4-8057

7.3-1

7.3-2

7.3-3

7.3-4

7.3-5

7.3-6

7.4-1 ,

IDVP FINAL REPORTLIST OF TABLES

TITLE

Modification in Response to Generic Concern

EOI File: 1026

Modification in Response to Generic Concern

EOI File: 1092

Modification in Response to Generic Concern'OIFile: 1098

Modification in Response to Generic Concern

EOI File: 8009

Modification in Response to Generic Concern

EOI File: 8057

Phase I Corrective Action Program Status:Civil StructuralPhase I Corrective Action Progr am Status:,Large Bore PipingPhase I Corrective Action Program Status:Small Bore PipingPhase I Corrective Action Program Status:Large Bore Supports

Phase I Corrective Action Program Status:Small Bore Pipe SupportsPhase I Corrective Action Program Status:Equipment Seismic Design

Status, of Incomplete VerificationsDefined by ITRs-8, -34, and -35

FOLLOWS

PAGE NO.

5.4.2-1

5.4.2-1

5.4;2-1

5.4.2-1

5.4.2-1

7.3.3-1

7.3.3-1

7.3.3-1

7.3.3-1

7.3.3-1

7.3.3-1

7.4-4

IDVPFINAL

X11 REV 1830816

Page 74: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

4

Page 75: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

-s<-TELEDYNEENQlNEERlNQ SERVlCES

where necessary to assess the effects of various DCP assumptions and

calculations. For the auxili lary building, the IDVP performed separ-

ate analyses, such as sensitivity studies for the dynamic models, toP

assess the significance of modeling parameters.

Two EOIs were written as a result of the IDVP verification:P

EOI 1124 was issued for the finite element modeling of the con-

'trol room floor slab. The location of the supporting walls in

the model did not match the actual locations. This model was

used to generate Hosgri floor response spectra. The DCP has

corrected -.this error. The IDVP then verified that slab quali-fication analyses for vertical loading were acceptable. This

EOI was classified as a Class B Error, and the error resolved

.by verification of the DCP reanalysis.

EOI 1132 was issued because the Auxiliary Building DCP member

evaluations had been reported as being complete. This file was

combined with EOI'097. The DCP is still in the .process ofevaluating the slabs for in-plane loads, and this effort issubject to further verification.

The verification program intended to be conducted by the IDVP is not

yet completed.. Based upon the efforts performed to June 25,. 1983, theIDVP considers the following aspects of the DCP work to be acceptableand to satisfy the licensing criteria:

o gualification analyses reflect the as-built structure.

~ Accidental eccentricities for the concrete portions were

applied properly.

o The synthetic time-histories used for analyses give an

acceptable representation of the smooth design spectra.

IDVPFINAL

4.4.2-7 REV 1830816

Page 76: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 77: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

4.4.3 Fuel. Handling Building

A TELEDYNEENGINEERING SERVICES

The Fuel Handling Building (FHB) is a Design Class I steel-framedstructure which. is supported at elevation 140 feet of the auxiliarybuilding. The building dimensions are 58 feet (E-W direction) by

366 feet (N-S direction) by 48 feet high. It supports a fuel handling

bridge crane 'nd houses other equipment. -Moment-resisting steelframes 'in the East-West direction and cross-braced columns .in the

North-South direction comprise the structural system. The roof is a

trussed and cross-braced diaphragm covered with metal decking and

built-up roofing. A portion of the end frames in the East-West direc-tion are supported 'on a concrete wall common with the fan rooms.

~ In accordance with the FSAR and'osgri report, Design Class I struc-tures must be'ualified for all .seismic events; thus, member evalua-tion for the structural steel members was performed- for the DE, DDE,

and Hosgri events and the required loading combinations.

4.4.3.1 Verification of Corrective Action

The IDVP. verification of the DCP Corrective Action Program for the FHB

is defined in 'ITRs-8 and -35. The IDVP verification consisted ofexamining on a sampling basis the analyses for both seismic,and non-

seismic loads. The seismic loads are the DE, DDE, and Hosgri events,while the non-siesmic loads are dead, live, wind, temperature, etc.

. The IDVP will perform a field inspection of the FHB when modifications're complete. Connections, additional, members and/or removed members,

'etc., will be examined and checked for conformance with the design and

qualification analyses. ITR-57 reports on the IDVP" verification ofthe FHB.

The DCP conducted its evaluation of the criteria implementation and

qualification analyses through the Internal Technical Program (ITP).

IDVPFINAL

4.4.3-1 REV 1830805

Page 78: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

I

Page 79: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNE'NQINEERlNQ SERVlCES

=- ~ Time history analyses (Hosgri) of the dynamic models which

produced response spectra and provided accelerations foruse in the equivalent static model.'he input time historyfrom elevation 140 feet of the auxiliary bui 1 ding was also

reviewed.

o Evaluation of the nodal accelerations used to determine

equivalent static loads.

o'omputation of loads 'for the equivalent static analysisand a sample of'he computer runs for a static analysis1 oad .case.'

Comparison of selected member loads with member allowablesloads for the postulated Hosgri event.

l

The selected sample covers approximately SO% of the structure dynamic

anal'yses, excluding the crane-, and the same percentage for the static*ana'lysis and member evaluation. The IDVP did not review the prelim-inary'tatic model, which was used by the DCP as a .basis for determin-ing analysis and modification requirements.

No EOIs were -issued for the FHB with regard to the DCP CorrectiveAction Program.

The ver'ification program intended. to be conducted by the IDVP is com-

plete. except that the as-built condition wi 11 be. field verified'gainst the design drawings used as the basis for the analyses. Based

upon the efforts performed to August 19, 1983,, the IDVP considers thefollowing aspects of. the DCP work to be acceptable and to satisfy thelicensing. criteria:

IDVP.

FINAL'..4.3-.3 REV 1

830816

Page 80: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 81: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENGlNEERING SERVICES

~ 'mission of an allowance for accidental eccentricity in

the FHB because the torsional effects are accounted for in

the auxiliary building response at elevation 140 feet.

~ The ranges of crane locations and assessment of the'ir

effects upon results.

o'he dynamic models used in the FHB evaluation.

e Response spectra generation.

~ Equivalent static loads determined from the dynamic accel-

eration profiles.I

e gualification of members and connections.

The IDVP intends to formulate final conclusions as to the qualifica-tion of the FHB and conformance to licensing criteria'hen the DCP

modifications and field walkdown have been completed and the IDVP has

verified the as-built against the design conditions. This verifi-cation will be reported in Revision 1 to ITR-57. EOI 1092 will'ot be

closed until this field verification is complete.

(To Be Supplemented)

IDVPFINAL

4.4.3-4 REV 1830816

Page 82: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 83: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

~< TEI EDYNEENQINEERINQ SERVICES

The review of the PGandE model resulted in two areas of concern..Thefirst had 'to do with the frame consolidation used to obtain the equiv-alent radial beam flexural rigidity properties. The IDVP concludedthat the frame consolidation does not adequately represent the struc-ture at elevations 101 and 106 feet.

The second concern was that the PGandE model does not consider the. possible effects of tangential beam flexibility on local response

spectra. The IDVP studies included simple one and two degrees-of-freedom lumped mass models which confirmed that the tangential beam

flexibility is an important factor in the resp'onse spectra generation.

The results and conclusions of the verification review of the contain-ment annulus has been reported in ITR-50. The conclusions relative tothe specfic concerns of the NRC letter are:

There are no significant differences in the computed

masses and member joints (with the exception of the BNL

error in the slab to crane wall connection mentioned) be-

tween the 1981/1982 URS/Blume analyses and BNL (Model B)

analysis.

'I

~ The joint characteristics in the Blume analysis realistic-.ally represent the as-built configuration.

o The spectra smoothing technique applied by PGandE is con-

sistent with the DCNPP licensing criteria.

~ The issue of discrepancies between design piping analysesand the as-built configurations is a generic concern thathas been identified by the IDVP and is discussed in 4.5.2.

e The significance of the errors in the modeling of bends in"annulus structure piping is considered negligible.

IDVPFINAL

4.4.5-3 REV 1830805

Page 84: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 85: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

><-TEI EDYNEENQlNEERINQ SERVlCES

4.4.6 Intake Structure

The intake structure is a massive Design Class II .concrete structure

that. houses the Design Class I Auxiliary Saltwater (ASW) Pumps. The

vent shaft and snorkel pipes, as well as nearby supporting equipment,

are part of the ASW system. The dynamic analysis of the Intake Struc-

ture produces response spectra. used as input to these systems..'n

accordance with the FSAR, a Design Class II 'structure is required

to retain its .integrity during 'a seismic event so that the function of

Class I equipment will not be impaired. Hence, the DCP has evaluated

the structural integrity of the intake structure for the postulated

Hosgri event, but floor response spectra used for evaluation ofN

safety-related equipment have been computed for DE, DDE and Hosgri

conditions.

4.4.6.1. .Verifi'cation of Corrective Action

The IDVP verification of the DCP Corrective Action Program for the in-take structure is defined in ITRs-8 and -35. The IDVP review con-

.sisted of examining the qua'lification of the structure for seismic and

non-seismic loads. The seismic loads are the DE, DDE, and Hosgri

events, while the non-seismic loads are soil bearing pressures, hydro-

dynamic, wave force, dead and live load, and missile loads. ITR-58

reports the IDVP verification of corrective action for the intake

structure.

The DCP reviewed the as-built drawings to ensure an accurate input tothe analysis and made modifications as necessary, as detailed in the

PGandE Phase I Final Report. For the intake structure, the DCP re-viewed and accepted the 'dynamic analysis, member evaluation, genera-

tion of response spectra, and structural stability calculations per-formed by URS/John Blume Associates. In'ddition, the Blume Internal

IDVPFINAL

4.4.6-1 REV 1830816

Page 86: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 87: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

->i-TELEDYNEENQINEERlNQ SERV!CES

o The flow straighteners possessed adequate strength using

the ductility criteria specified. Walls and slabs were

qualified without the use of ductility considerations.

o Vent shaft system was shown to be adequate.

As noted by the above statements and by consideration of the DCP qual-

ification analyses, the IDVP considers the intake structure to be

qualified and to meet licensing requirements. The sliding, over-

turning and soil bearing pres'sure calculations are under continuing

review as discussed in 4.9.2, and will be reported in ITR-68 and in

Revision 1 to ITR-58.

(To Be Supplemented)

IDVPFINAL

4.4.6-4 'REV 1

830816

Page 88: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 89: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

-r<-TELEDYNEENQINEERINQ SERVICES .

reviews, specific areas of interest were chosen for re-views. These sp'ecific areas included items such as valvemodeling and qualification, application of stress intensi'-fication factor, spectra'nputs, etc. Alternate calcula-tions were performed by the IDVP as necessary to review

DCP calculations.

As a result, of the above-described activity, four. EOIs

were issued. EOI 1126 addresses the SIF discrepancy forintermediate butt welds and the omission of a SIF of 1.9

'at valve/elbow interfaces. This item has been incorpor-ated into the DCP final review checklist for review ofpotential impacts on all DCP analyses, and the file has

been closed.

EOI 1133 addresses the discrepancy noted for one DCP valvemodel where only two-thirds of the required eccentric mass

was considered in the DCP analysis. This item has been

determined, to be a Class C Error and has been resolvedthrough revision of the DCP analysis.

EOI 1135 addresses the discrepancies in . valve body . and

operator weights for valves LCV-113 and -115. This itemhas been determined to be a Class C Error and resolvedthrough revision of DCP analysis.

EOI 1137 addresses a discrepancy in valve weight for FCV-

365. This EOI together with EOIs. 1133 and 1135 combined

to form a gener'ic concern with valve modeling. The itemhas been, incorporated into the DCP Final Review checklistfor review of potential impacts on all DCP analyses. The

concern of EOI 1137 was determined to be a Class C Error.

IDVPFINAL

The verification program intended to be conducted by theIDVP is not yet'omplete. Based 'pon the efforts

4.5.2.3-4 REV 1

830816

Page 90: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 91: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

-A-TELEDYNEENQINEERlNQ SERVlCES

performed to August 15, 1983, the IDVP considers the

following aspects of the DCP work to be -acceptable and to

satisfy the licensing criteria.

The DCP reanalysis of all original work 'nd the

development of the DCP final review checklist is an

'ppropriate program for qualification of all DCP

analyses.

qualification analyses'n general reflect the as-

built conditions.

4 Overall modeling methods were found acceptable,

except for application of stress intensificationfactors (SIF) and valve modeling as noted above.

Loadings used in the DCP analyses were found

acceptable. Loading data were found properly con-

trolled and applied by the DCP.

Internal documentation was found to be in sufficient~ detail to allow the verificatioh of transfer of data.

Computer files and descriptions were indexed.

Stress analyses were found accept'able for all review-

ed analyses except Analyses 2-111, Revision '0; and

4A-100, Revision 0, which contained unique discrep-

. ancies and were reanalyzed by the DCP.

Numerical accuracy of the calculations sampled was

adequate.

In summary, the IDVP concluded that DCP is followingestablished procedures and licensing criteria, and ismeeting the latest loading criteria and operating. modes.

The concerns on stress intensification factors and valve. modeling were determined to be generic concerns. These

IDVPFINAL

4.5.2.3-5 REV 1

830816

Page 92: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

J

Page 93: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

-«-TELEDYNEENQlNEERlNQ SERVlCES

generic concerns are resolved by the inclusion of specific

checks in the DCP final review checklist. Certain valve

models and SIFs will be reviewed by the IDVP after they

have passed the DCP final review. None of the specif ic

concerns that led to these two generic concerns caused an

exceedence of the licensing criteria. The DCP Corrective

Action Program for . Design Class 1 large bore piping

adequately covers all essential steps required to obtain

proper qualification of the piping.

The IDVP intends to formulate a final conclusion as to the

qualification of large bore piping and its conformance to

licensing criteria when the IDVP verification iscompleted.

(To Be Supplemented)

b. Larg'e Bore Piping Supports

The IDVP verification of the DCP Corrective Action Program

for large bore pipe supports is defined in ITRs -8 and-35. The IDVP review consisted of an examination of quali-fication of each pipe support for all seismic and non-

'seismic loads. Seismic loads are the DE, DDE, and Hosgri

.events, while non-seismic loads are deadload, thermal

accident, friction, fast valve closure, and relief valve

opening thrust. This activity will be reported in ITR-60.

IDVPFINAL

4.5.2.3-6 REV 1

830816

Page 94: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 95: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

P> TELEDYNEENGlNEERINQ SERVlCES,

criteria and, accuracy. of calculations., The process by

which the IDVP selected support samples included .the

fo 1 lowing:

~ In general, the selected supports, were associated

with piping that was part of the IDVP large bore pip-ing sample.

Several supports were selected as a result of IOVP

field verification activities for piping samples.

o The OCP General Pipe Support Status (GPSS) log was

reviewed to determine revision'tatus, respectivepiping analyses, etc. This status log listed approx-

imately 6000 to 7000 supports.

~ Supports were selected to represent various support

types, pipe sizes, plant locations, and organizations(consultants) performing desigh analyses.

The IOVP selected a total of 22 support analyses for.re-view. The support types. were as follows:

,o 3 snubbers

~ 6 spring hangers

o' anchors

I 7 rigid supports

The IDVP performed design reviews for the selected 'CPanalyses to verify .the following aspects of the designanalysis:

'4.5.2.3-8 REV 1

830818

Page 96: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 97: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENQINEERINQ SERVICES

.performed a finite element analys i s which appl ied the

piping spectra to this support and demonstrated thatcriteria were satisfied., The IDVP has verified thisanalysis and EOI 1122 was resolved as a Deviation. The

IDVP does not consider it a generic concern.

EOI .1129 notes that errors were made in calculating 'the

weld stress for a 1/4-inch weld between pipe lug and

supporting steel on Pipe Support 56S/3A. These errorsoffset each other and no overstress occurred. This item

'as. been classified as an error Class C. This EOIdoes'ot

represent a generic concern.

EOI 1131 notes that the design analyses for Pipe Supports58S/16V and 63/26V do not evaluate the shear lugs and

attachment 'welds, as required in the DCP Corrective ActionProgram. The DCP has revised these analyses to includethe shear lugs and attachment welds. The IDVP review ofthe revised DCP calculations shows these, stresses to be

small. This EOI has been classified as a deviation.

The verification program intended to be conducted by theIDVP is not yet complete. Based . upon the effortsperformed to June 25, 1983, the IDVP considers thefollowing aspects of the DCP work to be acceptable and tosatisfy the licensing criteria.

'e Support drawings are satisfactory.

e Loads and load combinations used in the pipe supportanalyses are correct.

o Pipe support frequencies are satisfactory (except as

noted in EOI 1122).

IDVPFINAL

4.5.2.3-10 ~ .REV 1

830816

Page 98: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

I

Page 99: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

ATELEDYNE'NG|NEERINQ SERVtCES

A design review checklist was developed for the IDVP,re-

. view to ensure that all necessary items were examined and

documented. Checklist 'observations were. further expanded

with comments where clarification or more detailed con-

sideration was appropriate. In addition to the checklist,the IDVP design review included asessments of the com-

pleteness, applicability, and consistency of - the DCP,

review and reanalysis methodology.

'he

IDVP performed an analysis package'nd .pipe 'support

review to evaluate the completeness of all pertinentdesign input data, output results and associated documen-

tation.

Alternate calculations were performed by the IDVP, where

necessary, to assess the effects of various DCP . assump-P

tions and to confirm calculations.

- The IDVP selected a sample of 8 DCP smal 1 bore pipesupport analyses to ensure conformance to DCP criteria and

accuracy of calculations; The selection process included

the following:

~ The DCP list of small bore supports that com-

prised the full DCP review sample (approximately210 supports) was reviewed by the IDVP.

~ Supports were selected to represent varioussupport types, pipe sizes, plant locations, and

organizations (consultants) performing design

, analyses.

IDVPFINAL

4.5.3.2-7 REV 1830818

Page 100: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

\

Page 101: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

>i-TELEDYNEENQINEERINQ SERVICES

~ In general, the selected supports were associat-

ed with piping that was part of the IDVP small

bore piping sample.

~ Several supports were selected as a result of

IDVP field verification activities for piping

samples.~ ~

One EOI report was issued.. EOI 1039 was classified as a

Class C error because of an error in the DCP support

deflection evaluation. The DCP revised their analysis to

show support met criteria.

The verification program intended to be conducted by the

IDVP is not yet complete. Based upon the efforts perform-

ed to August 19, 1983, the IDVP considers the followingaspects of the DCP work to be acceptable:

~ The .small bore pipe supports analyzed by the DCP

adequately represent the worst cases for the

issues/design considerations determined by theirgeneric and sampling reviews.

~ Support drawings are satisfactory.

~ Pipe support drawings and information used inthe analyses reflect the as-built conditions.

~ Loads and load combinations used in the pipesupport analyses are correct.

~ Standard component supports such, as springhangers, snubbers, and pipe clamps are satis-factory.

IDVPFINAL

4.5.3. 2-8 REV 1

830818

Page 102: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 103: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENGINEERING SERVICES

~ All eight analyses meet criteria.

The IDVP intends to formulate a final conclusion as to the

qualification of small bore pipe supports and their con-

formance to licensing criteria when the IDVP verificationhas been completed.

(To Be Supplemented)

IDVPFINAL

4.5.3.2-9 REV 1

830818

Page 104: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

r4 ~

I

I"

Page 105: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENQINEERINQ SERVtCES

4.6.2.2 Verification of DCP Activities

The IDVP verification of DCP work on tanks is defined by ITRs -8 and

-35. The IDVP verification of the DCP work includes all aspects

described in Section 4.6.1 and the following aspects were emphasized:

~ Verification of the PGandE review methodology to assure

'hat the correct spectra were checked by PGandE against

qualification analyses.

e Completeness of qualification

The'result's of the verification have been reported in ITR-67.

The DCP Internal Technical Program for equipment consisted of a review.

of the seismic qualification, implemented by checking the latestseismic qualification data against those used for the qualification ofequipment. This check used the latest response spectra for the DE,

DDE, and Hosgri event. Whenever changes to the response spectra

. required requalification of the equipment, the equipment was requali-fied by analysis or testing. Equipment identified for review was thatassociated with the engineered safety systems - designed by PGandE

(Reference PGandE Phase I Final Report).

The CCW surge tank was s'elected as the IDVP verification sample of the

DCP implementation. The CCW surge tank is a Design Class I tank and

is located atop the auxiliary building at elevation 163 feet. This

tank is classified and built to ASME Section VIII (Rules for, Constr uc-

tion of Pressure Vessels). This is one of five mechanical tanksreviewed by the DCP. Of the five, three were verified for Hosgri'loadings as part of the initial sample. Of the two remaining tanks,only the CCW surge tank was required to be evaluated for both DE and

DDE loadings.

IDVPFINAL

4.6.2..2-1 REV 1830816

Page 106: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

'R

~ "~

Page 107: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

r< TELEDYNEENGINEERING SERVICES

The IDYP .performed a design review for the OCP reanalysis. A check-list was developed which covered all required criteria items, 'ndcritical analytical procedures, and ensured completeness of the IOVP

review. In addition to the check. list, the IOVP review includedassessments of the completeness, applicability, consistency, and

adequacy of the OCP review and reanalysis methodology. Where discrep-ancies were noted, or. methodology was deemed not totally appropriate,alternate calculations were carried out by the IDVP to verify the con-clusions of the'CP reanalysis.

The IOVP issued EOI 1136 which noted that the OCP analysis for the CCW

surge tank calculated bolt shear stress allowables that did not con-form'o established DCP criteria and the ASME code. However, the boltstresses remain below . the correct allowable values. The OCP analysisalso did not consider internal pressure induced, stress in the tank forthe evaluation of tank stresses at the nozzle. Tank stresses wouldexceed the specified allowable stress if pressure was considered usingthe same values and procedures as the OCP analysis. "However, it was

determined that the OCP reanalysis was very conservative and theactual pressure stresses were negligible. Thus, actual total stresseswere below criteria and EOI 1136 was determined 'to be a Class C Error.

The technical aspect's of the verification program conducted by theIOVP has been completed and reported in ITR-67. 'ased upon theseefforts, the IDVP considers the followihg aspects of the OCP work tobe, acceptable and to. satisfy the licensing criteria:

e The seismic spectra utilized by the OCP for tanks reflects~ the current spectra.

o The mathematical modeling used in the reanalysis was con-sidered to be acceptable.

IOVP'INAL

4.6.2.2-2 REV 1

830818

Page 108: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

0

(I'q

Page 109: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

-w-TELEDYNEENGINEER(NQ SERVtCES

o All established OCP criteria are considered to have been

adequately met.

The items identified in EOI 1136 are considered to be random

analytical discrepancies.

The IOVP intends to formulate a final conclusion as to the .qualifica-tion of all mechanical equipment and its conformance to licensingcriteria when all IOVP verification work in this area is 'complete.Effects of future revisions to seismic spectra and piping nozzle loadson equipment remain to be evaluated as part of the IOVP completionsamp.le.

(To Be Supplemented)

IOVP''FINAL

4.6.2.2-3 REV 1

830818

Page 110: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

J

Page 111: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENG!NEERINQ SERVtCES

The one observation, EOI File 950, was the result of a discrepancy instiffener plate thickness determined from the field verification.Although the IDVP did not consider physical modifications of FCV-95 tobe necessary to satisfy criteria, the DCP modified all valvesspecified in'CO-G-M-876 by replacing a 3/8" thick plate with a plateof the 1/2" design thickness. The IDVP verified these'modifications.

No additional sampling or verification of valves was required.

4.6.3.2 Verification of DCP Activities

The IDVP. performed verification of DCP activities for Valves in ac-cordance with ITRs-8 and -35. The IDVP examined the DCP work for'llaspects discussed in Section 4.6.1. The results of this verificationhave been reported in ITR-67.

The DCP Internal Technical 'Program ( ITP) for Valves is closely tied tothe DCP efforts for piping. Certain valves were selected by the DCP

'for'eanalysis to determine valve natural frequencies and allowableaccelerations. These valves had been originally qualified by seismicservice-related contractors'o PGandE. Only "'otor-operated valveswith eccentric masses were reanalyzed. The allowable acceleration,results were then used by piping to determine if modifications to thevalve or pipe supporting structure were required.

Electro-Hydraulic Valve LCV-110 was selected as the IDVP verificationsample. The valve is a Design Class I level control valve located on

the pipeway .structure outside the containment building'. LCV-110 isone 'of the 6 different types of valves analyzed as part of the DCP's

ITP.

LCV-110 is one of four similar valves: LCV-110, 111, 113 and 115.This type of valve was 'selected for the IDVP review sample because asimilar valve had caused an overstress condition in the pipe line in

IDVPFINAL

4.6.3-3 REV 2830816

Page 112: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

t

Ll

Page 113: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

. -r<-TELEDYNEENQINEERINQ SERVICES

one of the IDVP initial sample piping analyses (Reference EOI 1069);

In addition, the actuator motor on these valves had been replaced.

The IDVP performed a design review of DCP reanalysis. A checklist was

developed which covered all criteria items, critical analytical pro-cedures, and completeness of the 'CP reanalysis. In addition. to'hechecklist, the IDVP design review included reviewer assessments on thecompleteness, applicability, consistency and adequacy of the DCP re-analysis methods. Where discrepancies were noted, or methods deemed ~

not totally appropriate, alternate calculations were carr ied out bythe IDVP to verify the conclusions of the DCP-reanalysis.

\

Actual piping accelerations as well as any additional valve support=bracing were not included in this portion of the review because theresults of this DCP reanalysis are to be used as 'criteria for the pip-ing system qua]ification.

No.EOIs have been issued in this review area to date.

The verification program intended to be conducted by the IDVP is notyet'omplete. Based upon the efforts performed to August 15, 1983,the IDVP considers the following aspects of the DCP work to be accept- .

able and to satisfy the licensing criteria.

- o , The methods and results of the reanalysis comply with theestablished DCP criteria.

~ Mathematical modeling of the valve adequately representsthe structure of the valve.

6 Critical areas were examined.

IDVPFINAL

4.6.3-4 REV 1

830818

Page 114: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

~ ~

Page 115: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

-><-TELEDYNEENQINEERINQ SERVICES

The, IDVP considers the following aspects of the DCP work to be unre-solved concerns at this time.

~ Resolution of the appropriate allowable stress criteriaapplicable to valve bolting.

The IDVP intends to formulate a final conclusion as to the qualifica-tion of and its conformance to licensing criteria when the IDVP veri-fication is complete.

.(To Be Supplemented)

IDVPFINAL

4.6.3-5 REV 1830818

Page 116: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 117: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

4.6.4.3 Verification of OCP Activities

A TELEDYNEENGINEERINQ SERVICES

The IOVP verification of OCP activities for Pumps is defined by ITRs

-8 and -35. The IDVP review examines the OCP work for all aspects

described in Section 4.6.1 above. The results of this verificationhave been reported in ITR-67.

I

The OCP Internal Technical Program for Equipment consisted of a reviewof the seismic, qualification. This review consisted of checking thelatest seismic qualification data against those used for the qualifi-cation of equipment. This checking was performed using the latestresponse spectra for the OE, OOE, and Hosgri 'event. Whenever changes

'I

to the response spectra required requalification of the equipment,. theequipment was requalified by analysis or testing. Equipment identi-fied for review consisted of those associated with the engineeringsafety systems designed by PGandE (Reference OCP'hase I FinalReport).

Two identical fire pumps located in the Unit I Auxiliary Building atelevation 115 feet were selected as the IOVP verification sample. The

. fire pumps are Design Class I equipment.

This pump is one of eight pumps reviewed by the OCP. Of these eight,one was qualified by shake table testing (see Section 4.9.1) and isthus excluded from the 'sampling of reviewed/reanalyzed pumps. Five of *

the .remaining seven pumps were included in the IDVP initial sample and.

additonal verification work. Thus, with ,the IDVP review of the fire. pump, six of the seven pumps qualified by analysis and in the IDVP

scope have been verified.

The IOVP verification included assessments of the completeness,applicability, consistency, and adequacy of the OCP review andreanalysis methodology. Where discrepancies were noted,'rmethodology deemed not totally appropriate, alternate calculations

j

IDVPFINAL,

4.6.4.3-1 REV 1

830818

Page 118: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 119: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

~> TELEDYNEENQINEERINQ SERVICES

were carried out by the IOVP to verify the conclusions of the DCP re-* analysis.

k

EOI 1140 was issued in connection with the fire pump and identifiedtwo concerns regarding the discharge nozzle flanged joint. The first

. concern, rela'tive to bolt stresses was resolved as a closed item after,further evaluation. The second concern, which. involved a non-

conformance of the installed flange configuration with PGandE pipingspecifications, resulted in an Error Class C.

The verification program intended to be conducted by the IOVP is notyet complete. Based upon the efforts performed to August 15, 1983,the IOVP considers the following aspects of the OCP work to be

acceptable:

~ Operabi.lity, as defined by rotating el'ement clearances and

.interfereces, was adequately demonstrated.

e. 'The seismic spectra utilized by the OCP for pumps reflectsthe current spectra.

o The mathematical modeling used in ".the reanalysis was

'judged to 'be acceptable for the fire pump.

~ With the exception of the item identified in the next.

paragraph all established OCP criteria are judged to havebeen adequately met.

'he IOVP considers 'the following aspects of the OCP work to be unre-solved concerns 'at this time.

o 'Flanges on pumps require reevaluation relating to the ap-propr'iate allowable stress values. to be used for the castiron, fire pump.

IDVPFINAL

4.6.4.3-2 REV 1

830818E

Page 120: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

'I

Page 121: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENQINEERINQ SERVlCES

The IDVP intends to formulate a final conclusion as to the qualifica-'tion of pumps and their conformance to licensing criteri,a when theIDVP verification'has been completed.

(To be supplemented)

IDVPFINAL

4.6.4.3-3 REV 0830818

Page 122: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

K ~

I

lh 'i

Page 123: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

)< TELEDYNEENQINEERINQ SERVICES

4.6.5.2 Verification of DCP Activities

.The IDVP verification of DCP, activities for heat exchangers is defined

,by ITRs -8 and -35. The IDVP verification of the DCP work includes'll aspects described in Section 4.6.1. The. results of the verifica-tion have been reported in ITR-67.

The DCP Internal Technical Program for equipment consisted of a review

of the seismic 'qualification. This review comprised checking the-latest seismic qualification data against those used for the qualifi-cation of equipment. This checking was performed using the

latest'esponse

spectra for the DE, DDE, and Hosgri event. '.Whenever changes

to the response spectra required requalification .of. the, equipment, the

equipment was requalified by analysis or testing. Equipment identi-fied for review comprised that associated with the engineered safetysystems designed by .PGandE (Reference PGandE Phase I Final Report).

,The DCP performed a reanalysis of the CCW pump lube oil cooler withrevis'ed seismic imputs.

: The CCW pump lube oil cooler was selected as the IDVP verificationsample of the DCP's ITP activities for heat exchangers. 'One lube oilcooler is. mounted with each of the thr'ee CCW pumps located .in the aux-

iliary building at elevation 73 feet.'he CCW pump lube oil coolersare Design Cl'ass I. Equipment. ..This cooler, or heat exchanger, is one

of two heat exchangers reviewed by the DCP. The'ther was the CCW:

heat.exchange'r', which was in the IDVP initial sample.

The IDVP performed a design review of the reanalysis. A checklist was

developed which covered all criteria items, and. critical analyticalprocedures, and ensured completeness of the DCP review.. In additionto the checklist, the IDVP work included assessments of the complete-ness, applicability, consistency of the reanalysis methodology. Where

discrepancies were noted, or methodology was deemed not totally .appro-I

IDVPFINAL

4."6;5.2-1 REV 1830816

Page 124: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

f

Page 125: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

-r<-TELEDYNEENGINEERING SERVICES

priate, alternate calculations were carried out by the IDVP to verifythe conclusions of the OCP reanalysis.

'One EOI file; 1130, was established. The OCP reanalysis of the CCW

pump lube oil cooler showed that-allowable criteria were exceeded and

that physical modifications were required. This reanalysis was theanalysis of record when the OCP had indicated that all ITP work inthis area was complete and no physical modifications were necessary(OCP Phase I Final Report, Revision 3, dated 4/22/83). There is no-

concern with the engineering of this item. The IOVP determined thatthe status of qualification was internally tracked within the OCP and

required "actions would have been implemented, even though this was notapparent from the DCP Phase I Final Report. EOI 1130 was resolved as

a Deviation.

The technical effort of the verification program intended to be con-ducted by the IDVP is complete except for IOVP/OCP agreement on theallowable stress criteria to be used for cast iron. Based upon theefforts performed to August 19, 1983, the IOVP considers the followingaspects of the OCP work to be acceptable:

Seismic spectra utilized in the reanalysis were the cur-rent spectra..

o . The methods and results of the reanalysis reviewed complywith the established OCP criteria.

o Mathematical modeling of the tank adequately represented~ the cooler structure.

I

~ Because all OCP reviewed heat exchangers are included inthe IOVP, all such heat exchangers have been verified as

complying with criteria.

IOVPF IHAL",

4.6.5.2-2 REV 1

830818

Page 126: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

1 ~

g ~

J

~ g

wl

4 P

A

Page 127: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

>> TELEDYNEENQINEERlNQ SERVlCES

~ these other areas are sufficiently large, and they have

not identified any similar concerns (see other equipment

sections).

~ If there are further instances of incorrect bolt size, the

IOVP does not bqlieve there wi 11 be an impact on licensingcriteria, for two reasons. First, the OCP has inspected

all bolt sizes in - HVAC equipment; any errors will be

within measurement tolerances. Second, all discrepanciesidentified by the IOVP were small and did not affectcr.i.ter ia.

To further strengthen these conclusions, the IOVP performed furtherfield verification for bolt sizes as part of the verification ofcorrective action. The results of this field verification confirm theconclusions above..

IOVP''

FINAL4.6.6.2-2 REV 1

830818

Page 128: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 129: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

r< TELEDYNEENQINEERINQ SERVICES

4.6.6.3 .Verification of DCP Activities - HVAC Equipment

The IDVP performed verification of DCP activities for HVAC equipment

in accordance with ITRs -8 and -35. The IDVP verification of the DCP

work included all aspects described in Section 4.6.1 above. The

samples selected for IDVP review are representative of Design Class I

rotating machinery. The results of this verification have been

presented in ITR-67.

The DCP Internal'echnical Program (ITP) for equipment consisted of a

review of the newest seismic qua'lification data against data used forthe qualification of equipment. This check was performed using the

latest response spectra for the DE, DDE and Hosgri event. Whenever

changes to the response spectra required requalification of the equip-

ment; this was done by analysis or testing. . Equipment identified forreview was that associated with the engineered safety systems designed

by PGandE (see PGandE Phase 1 Final Report).

The DCP assembled documentation packages for seismic qualification of

all safety-related HVAC equipment. This equipment is identified and

the method of seismic qualification is documented. The qualificationis reviewed for effect of any seismic spectra changes. A reanalysis

or test was performed if the spectra affected the qualification of the

component. Redesign and modifications'ere implemented, if required,

to maintain qualification.

The sample selected by the IDVP for verification of the DCP'.s ITP forI

HVAC equipment consisted of supply fan S-1 and compressor CP-35.

Supply fan S-1 and a'n identical fan, S-2, are located in the auxiliarybuilding at elevation 85 feet. Compressor CP-35 and an identicalunit, CP-36, are located in the auxiliary building at elevation 154

feet, 6 inches. Both the fan and compressor are Design 'Class I equip-ment.

IDVPFINAL

4.6.6.3-1 'REV 1

830816

Page 130: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

0

c

Page 131: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

->< TELEDYNEENQlNEERlNQ SERVlCES

or incorrect value produced stresses within allowables. EOI 1125 was

classified as a Class C Error. The resolution is discussed under

"Hosgr i Spectra," section 4.3.2.2.

EOI 1127 was'ssued for two concerns over the modeling technique and

methods used in the reanalysis of fan S-1. One concern was resolved

as not significant .based on the IOVP initial sample work; The IOVP

determined, that the second concern was not valid and the'CP modeling

method was correct. EOI 1127 was classified as a Closed'tem;

The technical aspects of the verification program conducted by the"IOVP has been completed and reported in ITR-67. Based upon these

efforts, the IOVP considers the following aspects of the OCP work tobe acceptable and to satisfy the licensing criteria.

The mathematical modeling of the structures was found tobe adequate.

o Application and satisfaction of established OCP criteriawere, found to be adequate.

o A concern did exist over the proper control and applica-tion of seismic spectra, an issue which is related to work

done in the initial sample. The concern was resolved as

discussed in section 4.3.2.2.

The IOVP intends .to formulate a final conclusion as to the qualifica-tion of. and its conformance to licensing criteria when the IOVP verif-ication is complete. The IOVP effort will include a completion sample

to evaluate any changes in design input.

(To Be Supplemented)

IOVPFINAL

4.6.6.3-3 'REV 1830818

Page 132: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 133: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

'4.6.7.3 Verification of DCP Activities

<<-TELEDYNEENGINEERING SERVICES

The IDVP performed verification of DCP activities for electricalequipment in accordance with ITRs -8 and -35. The IDVP review exam-

ined the DCP work for all aspects discussed in Section 4.6.1. Thiscategory of electrical equipment and instrumentation includes all such

equipment qualified by analysis. This verification effort has'eenreported in ITR-67. Equipment items qualified by shake table testingare discussed in Section 4.9.1.

The .DCP reviewed the previous seismic qualifications of equipment todetermine their vaTidity with respect to current spectra for the DE,

DDE, -and Hosgri event. If the analysis was invalid, the equipment was

reanalyzed to ensure qualification to the current response spectra and

then redesigned or modified as required. Equipment identified forreview is equipment associated with the engineered safety systemsdesigned by PGandE (see PGandE Phase I Final Report).

The station battery racks were selected as the IDVP verificationsample of. the DCP's review of electrical equipment qualified by anal-ysis. The racks support the station batteries, which are Design ClassI equipment. This equipment is located in the auxiliary building atelevation 115 feet.

The station battery racks are one of five major items of electricaland instrumentation equipment qualified by analysis that. are withinthe IDVP scope. Major equipment in this case excludes small panels,transmitters; switches, circuit breakers and other small items of thistype.

Of the five major equipment items, two were included in the IDVP ini-tial sample work: the main annunciator cabinet and the hot shutdownremote panel. Two others were included in the additional verificationsample: the local instrument panels and the instrument AC panel.-

IDVPFINAL

4.6.7-3 REV 1

830816

Page 134: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 135: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

-r~-TELEDYNEENGINEERING SERVICES

Thus, with the inclusion of the station battery racks, all analyzed

major electrical equipment and instrumentation items have been

included in the IDVP verification effort.

The IDVP performed a design review of *the reanalysis performed 'by the

DCP on the station battery racks, using a checklist'o cover analysis

criteria items, critical analytical, procedures, and'ompleteness ofthe DCP review. In addition to the checklist, the IDVP design review

included assessments'n the completeness, applicability; consistencyand adequacy of the DCP review and reanalysis methodology. Where

discrepancies were noted, alternate calculations were carried out by

the IDYP to verify the conclusions of the DCP reanalysis.

'esults of the IDVP reviews of the DCP reanalysis of the station. battery racks are:

~ Seismic spectra used 'in the reanalysis were . the currentspectra.

'o, . No specific analysis criteria were formally establishedfor this equipment. However, the American In'stitute ofSteel. Construction Code was used by the. DCP as criteriafor the structural analysis.

e An incorrect bolt size, was used in the analysis.(See EOI 1128).

EOI '1128 notes that in the DCP reanalysis of the station battery racks3/8 inch bolts were used instead of the 1/2 inch bolts called for and

the shea~ force was incorrectly calculated. A further IDVP evaluationindicated that the structural integrity'f the racks was not impaired.EOI 1128 was,resolved as an Error Class C.

IDVPFINAL

4.6.7-4 REY 1830818

Page 136: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 137: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENGINEERING SERVICES

The verification program intended to be conducted by the IDVP is com-

plete. The IDVP considers the fo'llowing aspects of the DCP work to be

acceptable and to satisfy the licensing criteria.

o The seismic response spectra used by the DCP for elec-

trical equipment and instrumentation qualified by analysis

reflects the current spectra.

~ Although no specific criteria have, been established by the

DCP for analyses in this area, use of the AISC Code isadequate.

~ The mathematical modeling used for the reanalysis was con-

sidered to be acceptable and the results of the re'analysis

comply with DCP criteria.

-The IDVP intends to formulate a final conclusion as to the qualifi-cation of all electrical equipment and instrumentation and its can-

formance to licensing criteria when all IDVP verification work in thisarea is complete. Effects of any changes in the seismic design inputswill be evaluated as part of the IDVP Completion Sample.

(To Be Supplemented)

IDVPFINAL

4.6.7-5 REV 1830818

Page 138: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 139: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

-s<-TELEDYNEENQINEERINQ SERVICES

The procedure utilized by the IDVP to perform the designreviews involved a combination of design review checklistsand alternate calculations. The latter were performed inthose cases where checklist review results were not suffi-

'ient to verify that supports met licensing commitments.

The IOVP verification of the DCP plan implementation was

based on a l00 percent sample of the OCP program for 'in-strument tubing and supports. The OCP program implementa-

. tion is contained in six qualification analysis packages

. which make up the IOVP scope for design review. One ofthe six packages contains the generic tubing span qualifi-cations. The remaining five contain tubing support quali-fications based on a DCP walkdown to identify contro'llingor specific worst-case configurations within the contain-

'mentannulus.

EOI 1123 was issued due to the use of incorrect member

properties for a particular support type. The member

properties were different from both the OCP documented as-built information and the IOVP field verified data, whichwere equivalent. The DCP concurred with this assessmentof the discrepancy, and the file was classified as a

,Class C Error..

The verification program intended to be conducted by theIOVP is not yet complete. Based upon the efforts per-

- fo'rmed to June 25, 1983, the IDVP considers the followingaspects of the OCP work to be acceptable

e. =-Four OCP qualification analyses have been verified tobe 'in conformance with procedures.

IOVPFINAL

4.6.8.2-3 . REV 1

830818

Page 140: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

I

f A

Page 141: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

-r<-TELEDYNEENGINEERINQ SERVICES

~ The OCP provided sufficient and accurate "as-built"survey documentation supporting OCP qualification an-alyses for 12 support types.

'The IDVP intends to formulate a final conclusion as to thequalification of instrument tubing and supports and theirconformance to licensing criteria when the IOVP verifica-tion has been completed.

(To Be Supplemented)

IDVPFINAL

4.6.8.2-4 REV 1

830818

Page 142: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

W -P

P

Page 143: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

~<-TELEDYNEENGINEERINQ SERVICES

4.6.9 Filters

The IDVP verification of DCP activities for filters is defined by

ITRs-8 and -35. The IDVP verification of the DCP work included allaspects described in 4.6.1. The results of the verification have been

reported in ITR-67.

The DCP Internal Technical Program for filters involved a review of

the seismic qualification. This review consisted of checking the

newest seismic qualification data against data used for the qualifi-cation of equipment., This check was performed using the latest r es-

ponse,,spectra for .the DE, DDE, and Hosgri event. Whenever changes to

the response spectra required requalification of the equipment, the

equipment was requalified by analysis or testing. Equipment identi-fied for review comprised that associated with the engineered safety

systems designed by PGandE (Reference PGandE Phase I Final Report).

this - includes the safety injection pump lube oil filter, diesel oiltransfer filter, and the strainer.

The safety injection pump lube oil filter was selected as the IDVP

verification sample. One lube oil filter's mounted with each of the

two safety injection pumps located in, the auxiliary building at eleva-

. tion 85 feet. The safety injection pump lube oil coolers are Design

Class I equipment.

For the safety injection lube oil filter, the IDVP performed a design

review of the the DCP reanalysis. A design review checklist was

developed which covered all criteria items, critical analytical proce-

dures, and completeness of the DCP review. In addition to the check-

list, the IDVP design'eview included reviewer assessments 'on the com-

pleteness, applicability, consistency, and reanalysis methodology.

Where discrepancies were = noted, or methodology deemed not totally

I,DVPFINAL

4.6.9-1'EV 1830816

Page 144: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 145: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

~< TELEDYNEENGINEERING SERVICES

4.6.9 Filters

~ The IDVP verification of DCP activities for. filters is defined by

ITRs-8 and -35. The IDVP verification of the DCP work included allaspects described in 4.6.1. The results 'of the verification have been

reported in ITR-67.

The DCP Internal Technical Program for filters involved a review of

the seismic qualification. ..This review consisted of checking the

newest seismic qualification data against data used for the qualifi-cation of. equipment;, This check was performed using the latest res- .

ponse..spectr a for the DE, DDE, and Hosgri event. Whenever changes to

„ the response spectra required requalification of the equipment, the

equipment was requalified by analysis or testing. Equipment identi-fied for review comprised that associated with the engineered. safety

systems designed by PGandE (Reference PGandE Phase I Final 'Report).

this includes the safety injection. pump lube oil filter, diesel oiltransfer filter, and the strainer.

1

.The safety. injection pump lube oil filter was selected as the IDVP

verification sample. One lube oil filter'is mounte'd with each of the

two safety injection pumps located in, the auxiliary building at eleva-

.tion. 85 feet. The safety injection pump lube oil coolers are Design

Class I equipment.r

For the safety injection lube oil filter, the IDVP performed a design

review of the the DCP reanalysis. A design review checklist was

developed 'which covered all criteria items, critical analytical proce-

dures, and completeness of the DCP review. , In addition to the check-

list, the IDVP design review included reviewer'ssessments 'on the com-.

pleteness, applicability, consistency, and reanalysis methodology.

Where discrepancies were noted, or methodology'eemed not totally

I.DVPFINAL

4.6.9-1'EV 1830816

Page 146: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

I

Page 147: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENGINEERING SERVICES

'I

appropriate, alternate calculations were carried out by the IOVP toverify the conclusions of the OCP reanalysis.

No EOI files were established for this category of equipment.

The technical„ aspects of the .verification program conducted by the

IOVP"has been completed and reported in ITR-67. Based upon these

efforts, the IOVP considers the following asp'ects of the OCP work tobe acceptable and .to satisfy the licensing criteria:

The seismic spectra utilized by the OCP for 'the filterreflect the current spectra (see 7.0).

Nathematical modeling adequately represented the filterand support structure.

e The methods and results of the reanalysis comply withestablished OCP criteria.

The IOVP intends to formulate a final conclusion as to the qualifi-cation of all mechanical equipment and its conformance to licensingcriteria. when all IOVP verification work in this area is complete.

Effects of future, revisions to the seismic inputs on equipment will be

evaluated as part of the IOVP Completion Sample."

(To Be Supplemented)

IOVPFINAL

4.6.9-2 REV 1830818

Page 148: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 149: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

>s TELEDYNEENGINEERING SERVICES

In addition, utilizing the DCP jet impingement review results for a

'sample . of high-energy lines, the IDVP verified the jet-targetinteractions of each sampled postulated line break, and reviewed thesafety effects on safety-related equipment.

High energy lines were selected by the IDVP to represent approximately

10 percent of the estimated total number of postulated HELBs insidecontainment. The sample consisted of large and small lines includingreactor coolant piping as well as secondary system piping. Since theIDVP verification was conducted prior to the completion by the'CP oftheir reanalysis effort, the IDVP samp'le was drawn from the completed

work available. This represented approximately 50 percent of the highenergy lines inside containment. The IDVP field verified thejet-target interactions of each sampled postulated line break and

'eviewed the DCP .safety evaluation of the effects of these'et-targetinteractions.

- As a result of the. IDVP verification, four items of possible concern

were . identified and are reported in EOI 8065. The DCP. failed topr'operly identify these four safety-related targets which were

impinged upon by the sampled postulated pipe break events. However,

in comparison to the total of 273 DCP-identified jet-targetinteractions determined adequate by the IDVP, it was concluded thatthese four discrepancies were isolated instances and were notindicative of any generic deficiency in the jet impingement fieldreview. In addition, the results of further evaluation of thesejet-target interactions indicated - that accident mitigationcapabilities, would not be impaired due to these localized jetimpingement effects. On this basis, EOI File 8065 was closed.

REV 1

830816

The DCP reanalysis program a's established by the procedure and

criteria as well as the sampled documentation of this jet impingementreanalysis provided sufficient information for the IDVP to concludethat the specific concerns in EOI File 7002 were adequately addressedand documented. EOI File 7002 was closed.

-IDVP 4.8.5-2FINAL

Page 150: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

C

Page 151: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

r<-TELEDYNEENGlNEERlNQ SERVlcES

. where the number used is that for the EOI File identified as a Find-

ing. A history of each EOI File is contained in the LISTLOG printout

in Appendix D. The ITRs which include a detailed presentation of the

subject are identified in Table 5-1 and additional information is

available from the cross-indexes in Appendix E. Table 5-1 also refer-ences the final report section, or sections, which summarize the tech-

nical aspects of the file.

Although each EOI File identified as a Finding has been classified by

the IDVP as an ER/A, ER/AB, or ER/B, there are three different bases

for that cl'assification, specifically:

13 files (932, 938, 949, 963, 983, 1069, 8001, 8009, 8010,

8012, 8017, 8057, 8062) were classified on the basis of a

, technical error identified during verification of the

initial sample.

1 file (7002) was classified on the basis of the IDVP

evaluation of the gA Audits and Reviews.

e ~ 7 files (1003, 1014, 1022, 1026, 1092, 1097, 1098) were

classified as a r'esult of the establishment of the DCP

Corrective Action Program.

With respect to the last basis, none of these seven EOI Files had been

fully resolved by the IDVP at the time the Corrective Action Program

(CAP) was established. When the CAP was established, each of these

files was redefined .to track the generic DCP action and was resolvedby verification of DCP activities in accordance with ITR-8 and -35.EOI File 7002 also led to generic DCP action which was verified inaccordance with ITR-34..

'I

With respect'o the 13 EOI Files which resulted in a Finding on thebasis of a technical error, 6 developed from RLCA Phase I work and 7

from SWEC Phase II work. Of the 6 RLCA originated files, one (983)

IDVP,FINAL

5;2-2 REV 2830805

Page 152: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 153: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

-«-TELEDYNEENQlNEERlNQ SERVlCES

was redefined to cover generic CAP efforts. The remaining 5 fileswere concerns specific to the item being evaluated by RCLA, but allwere influential in defining expanded IDVP activities in ITRs-1 or -8.

All 7 SWEC originated files were specific concerns, and all 7 con-

tributed to the identification of four generic concerns which were

verified in accordance with ITR-34.

.Several of the Table 5-1 pages indicate that other EOI Files were com-

bined with the file identified's the Finding. The existence of such

combined files should not be interpreted as increasing or decreasing

the number of Findings. In no case were two or more Findings combin-

ed. In all cases, each of the files being 'combined was tracking a

common concern. By combining the files, the overall concern'as more

readily tracked and each was more certain of proper resolution. When

the combination was with an EOI File originated by RCLA, the combined

concern was being addressed as part of the CAP and was subject to IDVP

verification in accordance with ITRs-8 and -35. There were only two

cases (EOI 8001s and 8012) where SWEC originated files were combined;

one also included two RFR originated files. The former affected the

evaluation of environmental conditions outside of containment and were

resolved by DCP activities verified in accordance with ITR-34. EOI

8012 considered separation and single failure criteria of Clas's lE

CRVP power supplies. .

IDVPFINAL

5.2-3 REV 2830805

Page 154: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

It

t ~

Page 155: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

<< TELEDYNEENQINEERINQ SERVICES

TABLE 5-1-1003

'IGNIFICANT FINDING: EOI FILE: 1003

'PHYSICAL MODIFICATION(S)7: No ERROR CLASS: A/B

TITLE: HVAC Duct Support Reanalyses

1., THE FOLLOMING EOI FILE NUMBERS MERE COMBINED MITH THIS FILE: 1077

2. STRUCTURE(S), SYSTEM(S) OR COMPONENT(S) INVOLVED: HVAC duct supports

3. SURGERY OF CONCERN:

Certain HVAC duct supports may not have been evaluated fol Hosgriloadings prior to 811008.

4. SUMMARY OF RESOLUTION:

DCP committed to review the seismic analysis and design of all~ Design Class 1 HVAC duct supports per Rev. 0 to Section 2.5.1 of 'the

DCP Phase I Final Report and to reanalyze and, if necessary,redesign such supports.

'The IDVP has verified the DCP Corrective Action per ITRs-8 and -35,with the exception of the concern addressed by EOI 1134 (having'odo with the application of the Rayleigh-Ritz method) which will beseparately addressed.

5- RESULTED IN ADDITIONAL VERIFICATION/SAMPLE OR VERIFICATION .OF DCPEFFORTS PER ITR(S): 8

6- FOR FURTHER INFORMATION SEE:

APPENDIX D AND SUBSECTION(S): 4.6.6INTERIM TECHNICAL REPORT(S): 15 and 63

IDVP~ 'INAL REV 2

830816

Page 156: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 157: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENQINEERINQ SERVICES

TABLE 5-1-1022

SIGNIFICANT FINDING: EOI FILE: 1022

PHYSICAL MODIFICATION(S)7: No ERROR CLASS: A/B

. TITLE: Intake Structure Reevaluation

1. THE FOLLOMING EOI FILE NUMBERS MERE COMBINED MITH THIS FILE: 967 and

988

2. STRUCTURE(S), SYSTEM(S) OR COMPONENT(S) INVOLVED: Intake structure\

3. SNNARY'OF CONCERN:

As a result of IDVP concerns listed in the above files and their own

internal technical program review, the DCP committed to a

reevaluation of the Intake Structure in their corrective action

program.

Modifications made with respect to wave-force effects must be

considered in the seismic reevaluation. I

4. SUMMARY OF RESOLUTION

Verification of DCP Corrective Action is complete.

5. RESULTED IN ADDITIONAL VERIFICATION/SAMPLE OR VERIFICATION OF DCP

EFFORTS PER ITR(S): 8

6. FOR. FURTHER INFORMATION SEE:

APPENDIX D AND SUBSECTION(S): 4.3 and 4.4.6INTERIM TECHNICAL REPORT(S): 10, 32, and 58

IDVP,FINAL

REV 2830816

Page 158: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

'EV

I

Page 159: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

PE. TELEDYNEENGINEERINQ SERVICES

TABLE 5-1-1069

SIGNIFICANT FINDING: EOI FILE: 1069

PHYSICAL MODIFICATION(S)7: Yes ERROR CLASS: A

TITLE: Auxiliary Feedwater System Valves LCV-113 and LCV-115

1. THE FOLLOWING 'EOI FILE NUMBERS WERE COMBINED WITH THIS FILE: None

2- STRUCTURE(S), SYSTEM(S) OR COMPONENT(S) INVOLVED: Valves LCV-113 and

LCV-115

1

3. SUMMARY OF CONCERN:

PGandE Piping Design Analysis 2-14 (prior to 811130) indicated'hatsupports are not required on the valves. The RLCA verificationanalysis showed supports are needed. This fact was confirmed with a

later PGandE analysis. Also, PGandE to obtain approval, from the

valve supplier of the addition of supports on the valve operator.

4. SUMMARY OF RESOLUTION:

Ver ification of modif ication and of valve qual ific'ation with the

added supports is complete.

„C

F

r

5.- 'ESULTED IN ADDITIONAL VERIFICATION/SAMPLE OR VERIFICATION OF DCP

'FFORTSPER ITR(S):8'.

FOR FURTHER INFORMATION SEE:

'APPENDIX D AND SUBSECTION(S): 4.5.2INTERIM TECHNICAL REPORT(S): 12 and 59

IOVPFINAL

REV 1830816

Page 160: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

r~

I I

g1

I

EE

%c

7

I

J

C

gf

4

Page 161: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENGINEERINQ SERVI| ES

TABLE 5-1-1092

SIGNIFICANT FINDING: EOI FILE: 1092

PHYSICAL MODIFICATION(S)7: Yes ERROR CLASS: A

TITLE: Fuel Handling Building Reevaluation/

'I I

1.. THE FOLLOWING EOI .FILE NUMBERS WERE COMBINED WITH THIS FILE: 990

991,. 1027, 1079, and 1091

2. STRUCTURE(S), 'SYSTEM(S) OR COMPONENT(S) INVOLVED: Fuel Handling

Building

3. SUMMARY OF CONCERN:

As a result. of IDVP concerns listed in the above files and their own

internal technical review, the DCP committed to a reevaluation of.the Fuel Handling Building in this corrective action program.

- 4. SCARY OF RESOLUTION:

Verificat'ion of DCP Corrective Action is complete except for fieldverification .against the, design drawings used as the basis for theanalyses'.

5. RESULTED IN ADDITIONAL VERIFICATION/SAMPLE OR VERIFICATION OF DCP .

EFFORTS PER ITR(S): 8,

6. 'OR FURTHER INFORMATION SEE:

APPENDIX D AND SUBSECTION(S): 4.4.3INTERIM TECHNICAL REPORT(S): 6 and 57

I

P

,I

' IDVPFINAL

REV 2~ 830816

Page 162: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

C

Page 163: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

-><-TELEDYNE.ENGlNEERlNG SERVlCES

TABLE 5-2-1124

SIGNIFICANT FINDING: EOI FILE: 1124

PHYSICAL MODIFICATION(S)7: NO ERROR CLASS: B

TITLE: Auxiliary Building Spectra Generation

1. THE FOLLOWING EOI FILE NUMBERS WERE COMBINED WITH THIS FILE: None

2.. STRUCTURE(S), SYSTEM(S) OR COMPONENT(S)'NVOLVED:

Control Room Floor Slab

3. SCARY OF CONCERN:

The design analysis finite element model of the control room slab

used to generate Hosgri response spectra did not agr ee with the

field v'erified location of the supporting walls.

The DCP has revised the finite element model to agree with the fieldverified dimensions. At certain frequencies the response spectra

have increased by more than 15 percent,

'I \

4. SUQ98Y OF RESOLUTION:

Resolved through IDVP verification of the revised DCP analysis..

5. RESULTED IN 'ADDITIONAL VERIFICATION/SAMPLE OR VERIFICATION OF DCP

EFFORTS PER ITR(S): 8

6..FOR FURTHER INFORMATION SEE:

APPENDIX D AND SUBSECTION(S): 4.4.2INTERIM TECHNICAL REPORT(S): 55

IDVPFINAL

P

REV 1830816

Page 164: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 165: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

)<-TELEDYNEENGlNEERlNQ SERVICES

TABLE 5-3-1069

MODIFICATION IN RESPONSE TO SPECIFIC ERROR: EOI FILE: 1069

ERROR CLASS: A

1. STRUCTURE(S), SYSTEM(S), OR COMPONENT(S) INVOLVED:

Auxiliary Feedwater System, Analysis 2-14

2. DESCRIPTION OF PHYSICAL MODIFICATION:

Addition of supports on valves LCV 113 and LCV 115.

3. PHYSICAL MODIFICATION VERIFIED BY IDVP: Yes

4. FURTHER DESCRIPTION IS AVAILABLE IN TABLE 5-1-1069 AND IN PGandE

PHASE I FINAL'EPORT:

SECTION(S): 1.7.2; Appendix 1C

TABLE(S): 2.2.1-4

IDVP,FINAL

REV 1

830816

Page 166: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

~ l

Page 167: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

C

A TELEDYNEENGINEERINQ SERVICES

6.4.3 Significance as Indicated by EOI File Classification~

'he-EOI File classification'system described in 3.6.2 included a clas-

sification method. . As described in Section 5, the most significanterrors, which were termed Findings, were identified by classificationas Class A, Class A or Class B, or Class B Errors with no intent todistinguish significance among such classes. All IDVP Findings are

.summarized in Tables 5-1 and 5-2. As is indicated by the table ~ in-cluded in 5.5.4, 8 percent of the initial sample and additional veri-fication/sample EOI Files were classified as Findings. Another 16

percen't of these Files were combined with Findings as discussed inSection 5.

The second most significant grouping was that termed Observations,which included all EOI Files classified as Class C Errors or as Devia-tions. This. category would have also included Class 0 Errors had any

'een identified. EOI Files classified as Observations are summarized

by 5.5, and included 38 percent of the initial sample and additionalverification/sample files.

The remaining EOI Files resulting from the initial sample and addi-tional verification/sample efforts were classed as being neither Find-ings or Errors. These were 37 percent of the total.

Several of the EOI Files .resulted in the performance of modifications.The performance of modifications is a measure of significance, in that

'he

absence of modifications would indicate a negligible .impact .of theIDVP on the. actual DCNPP-1 configuration and. imply that any errorsidentified by the IDVP were only "paper" concerns. The matter of mod-

ificat'ions is treated briefly in 6.5, which references back to 5.4'nd,speci,fically, to Tables 5-3 and 5-4.

IDVPFINAL

6.4.3-1 REV 1830805

Page 168: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

II

M" ~

~ '

C

N

'

J

II

4

Page 169: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

7.4 IOVP STATUS AS OF JUNE 25, 1983

-)s-TELEDYNEENQINEERINQ SERVICES

This report was based upon the IOVP status as of June 25, 1983 and the

last revision considers additional work through August 19, 1983. The

overall status may be summarized by the statement that the IDVP has

completed all Phase I and Phase II efforts in accordance with the

NRC-approved plans with the following exceptions:

~ RLCA soils efforts defined by ITR-1 and subsequently ex-

panded by Staff comment

~ Certain RLCA efforts defined by ITRs-8 and -35

„ The RLCA efforts are to be completed by supplementing various subsec-

tions of this report and by the issuance of various ITRs.

Table 7.4-1 summarizes the status of the IOVP effort as of August 19,

1983. The first column identifies all portions of this IOVP FinalReport which must be supplemented at a later date to report completionof the IDVP effort defined by ITRs-8 and -35. The second column

provides a cross-reference to the PGandE Final Report sections which

report on the same subject, and is also useful in examining the OCP

status which is indexed in Table 7.3-1 through 7.3-6 by 'these numbers.

The third column of Table 7.4-1 identifies those EOI Files which per-tain to each of the incomplete subsections and which were unresolvedas of August 19, 1983.

IOVP'INAL7.4-1 REV 1

830818

Page 170: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

~<

h-7

\ j y

L l

4

V

~ '

Page 171: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENQlNEERlNG SERV!GES

The fourth column of Table 7.4-1 identifies the ITR which will be

.issued to report the details of the IOVP work summarized in the listedIOVP Final Report subsection, as well as the future efforts requiredt'o complete the IOVP. These include ITRs-51, -54 -56, -59, -60, -61,-63, -65, and -68.. All other ITRs have been issued, except thatITRs-52 and -53 have been replaced by ITR-68, ITR-62 wi 11 be combined

with ITR-60, and ITRs-64 and -66 will be combined with ITR-63.

The last three columns of Table 7.4-1 summarize the status of IOVP

verification. In all cases, the IOVP verification program is thatcontained in'ither ITR-8 or -35. The column headings are

~ . "Field" - indicates the status of field verification, not'ncluding field verification of modifications.

e "Design" - indicates the status of verification of OCP de-

sign efforts.

e "Mod" - indicates the status of, IOVP field verification of'hysical modifications.

One of four terms (Yes, Part, No or NA) is entered in Table 7.4-1 to,I

summarize the IDVP status.

, o In the first of these last three columns: "Yes" means

that the IOVP has completed this field verification; "No"

means that IOVP field verification is planned, but not yet'completed; and, "NA" means that field verification is notapp 1 i cable.

a In the second of these last three columns: "Yes"means'hat

the IDVP has completed their design verificationeffort except, where applicable, the field verification ofmodifications; "Part" means that the IOVP has completed a

IOVPFINAL

7.4-2 REV 1

830818

Page 172: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 173: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

><-TELEDYNEENQINEERINQ SERVICES

TABLE 7.4-1

STATUS OF INCOMPLETE VERIFICATIONS OEFINEO BY ITRS-8, -34, AND '-35

IOVP PGandE

-Re ort Subsections UnresolvedEOI s

I,TRNo.

Verification Com letelField ~Desi n, Nod

4.4.2.2

4.4.3

4.4.4

4.4.5

4.4.6

4.4.'8

2.1.2

2.1.3

2.1.1

2.1.1.4.3

2.1.5

2.1.4

1097

1092

1014

1014

10261028

55

57-1 NA

54 NA

51 Yes

58-1 Yes

56 Yes

Yes No

No No

No No

Yes NA

No No

Yes No NA

4.5.2.3a 2.2.1

4.5.2.3b 2.2.3

4.5.3.2a 2.2.2

4.5.3.2b 2;2.2

938109811381141

1098

10981141

10981142

59 Yes

60 Yes

61 Yes

60 Yes

Part

Part

Part

Part

No

No

No

4.6.2.2

4.6.3

4.6.4

4,6.5

4.6.6.3

4.6.6.5

2.3.1

2.3.1

2.3.1

2;3.1

2.3.3

2.5 1134

67-1 NA

67-1 NA

67-1 Yes

67-1 Yes

67-1 Yes

63 No

Yes

Part

Part

Part

Yes

Part

NA

IOVPFINAL lof 2

REV 1

830816

Page 174: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 175: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

TABLE 7.4-1'Cont)

P0 TELEDYNEENGlNEERlNQ SERVICES

, IOVP PGandE

Re ort Subsections Unresolved ITREOIs No.

Verification Com lete?Field ~Desi n Mod

4.6.7

4.6.8.1b

2.3.2

2.4 983 63 Yes

67-1 Yes Yes

Yes No

4.6.8.2b 2.6 63 Yes Yes

4.6.9

4.9.1.4

4.9.2

= 4.9.3

2.3.2.3.3

NA

NA

NA"

NA

'865

Yes

No

67-1 Yes

67-1 NA

Yes

Yes

No

No

NA

IOVPFINAL 2of2

REV 1

830816

Page 176: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 177: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

R

A TELEDYNEENGINEERING SERVICES

SECTION

8.0'EFERENCES

8.1 IDVP DOCUMENTATION

8.1.1 Teledyne Engineering Services

The following'TRs and Program Plans have been published by TeledyneEngineering Services, 130 Second Avenue, Waltham, Massachusetts.''

~ . Diablo Canyon Nuclear Power Plant Design Verific'ation ProgramManagement Plan Phase I, March 29; 1982.

~ Diablo Canyon Nuclear Power Plant Design Verification ProgramManagement Plan Phase II, June 18, 1982.

~ Diablo'anyon Nuclear Power Plant - Independent DesignVerification Program Adjunct Program for . Evaluation ofConstruction guality Assurance, November 1982.

ITR-2: Comnents on the R. F. Reedy, Inc., guality AssuranceAudit Report on Safety-Related Activities Performed by PacificGas and Electric Prior to June 1978.'

Revision 0, June 23, 1982

ITR-11: Pacific Gas and Electric - Westinghouse SeismicInterface Review.

Revision -0, November 2, 1982

ITR-50: Containment Annulus Structure . Vertical SeismicEvaluation.

Revision 0, July 22, 1983

IDVPFINAL.

8.1.1-1, REV 1,'830815

Page 178: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

i'I

'

't

Hl

Page 179: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENGINEERlNG SERVlCES

~ ITR-16: Soils - Outdoor Water Storage Tanks.

Revision 0, December 8, 1982

~ -ITR-17: Piping - Additional Samples.

Revision 0,- December 14, 1982

I ITR-30: Small Bore Piping Report.

Revision 0, January 12, 1983

ITR-31: HVAC Components.

Revision 0, January 14, 1983Revision 1, -August 4, 1983

~ ITR-32: Pumps.

Revision 0, February 17, 1983Revision 1, April 1, 1983

~ ITR-33: Electrical Equipment Analysis.Revision 0, February 18, 1983Revision 1, April 28, 1983

~ ITR-35 Independent Design Verification Program VerificationPlan for Diablo Canyon Project Activities.Revision 0, April 1, 1983

a ITR-37: Valves.Revision 0, February 23, 1983

~ ITR-39: Soils - Intake Structure Bearing Capacity and LateralEarth Pressure.

Revision 0, February 25, 1983

~ ITR-40: Soils Repor t - Intake Sliding Resistance.Revision 0, March 9, 1983

I ITR-43: Heat Exchangers.

Revision 0, April 14, 1983

~ ITR-44: Shake Table Test Mounting Class 1E ElectricalEquipment.

, Revision 0, April 15, 1983

IDVPFINAL

8.1.2-2 REV 1830815

Page 180: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

'I4I

Page 181: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

N

><-TELEDYNEENQINEERINQ SERVICES

. ~

ITR-57 Review of DCP Activities Fuel HandlingBuilding.'evision

0,'ugust 1, 1983

ITR-58: Verification of DCP Activities Intake Structure.

Revision 0, August 8, 1983

ITR-67 Large and Small Bore Pipe Supports.

Revision 0, August 12, 1983

Preliminary Report 'n the Design Interface Review .of theSeismic Reverification Program,'ovember 12,': 1981,

Design Verification Program; Seismic Service-RelatedContracts Prior to June 1978.

Revision 0, December 3, 1981Revisi'on 1; February'27, 1982

~ Design Verification. Program. for Power Ascension - 'DiabloCanyon Nuclear Power Plant - Unit 1.

Revision 0,- January 9, 1982

4IDVPFINAL

8.1.2-3 REV 1'30815

Page 182: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 183: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

<s TELEDYNEENQINEERINQ SERVICES

8.1.4 Stone .E Webster Engineering Corporation

The following ITRs and Program Plans have been published by Stone .5Webster Engineering Corporation, 245 Summer Street, Boston,Massachusetts.

ITR-14: Verification'f the Pressure, Temperature, Humidity,and Submergence Environments Used for Safety-.Related EquipmentSpecifications Outside Containment for Auxiliary FeedwaterSystem and Control Room Ventilation and Pressurization System.

Revision 0,'ecember 6, 1982Revision 1, May 9, 1983Revision 2, July 25, 1983

ITR-18: 'erification of the Fire Protection ProYided forAuxiliary Feedwater System, Control Room .Ventilation andPressurization System Safety-Related Portion of the 4160 V

Electric System.

Revision 0, December 13, 1982 .

Revision 1, May 24, 1983

~ ITR-19: 'Verification of the Post-LOCA Portion of theRadi ati on Environments Used for Safety-Related EquipmentSpecification Outside Containment for Auxiliary FeedwaterSystem and Control Room Ventilation and Pressurization System.

Revision 0, December 16, 1982

~ ITR.-20: = Verification of the Mechanical/Nuclear Design of the'ontrol Room .Ventilation and Pressurization System.

Revision 0, December 16, 1982Revision 1, April 20, 1983Revision 2, July 25, 1983

e .ITR-21: Verification of the Effects of High Energy LineCracks and Moderate Energy Line Breaks for Auxiliary FeedwaterSystem and Control Room Ventilation and Pressurization System.

Revision 0, December 15, 1982Revision 1, May 3, 1983

~ ITR-22: Verification of the Mechanical/Nuclear Portion of theAuxiliary Feedwater System.

Revision 0, December 17, 1982Revision 1, April 20, 1983Revision 2, July 25, 1983

'DVP

FINAL8.1.4-1 REV 1

830815

Page 184: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 185: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

'E

P> TELEDYNEENQINEERINQ SERVI|.-ES

~ ITR-23:, Verification of High Energy Line Break and InternallyGenerated Missile'eview Outside Containment for AuxiliaryFeedwater System and Control Room Ventilation and

Pressurization System.

Revision 0, December 20, 1982Revision 1,'May 27, 1983

o ITR-24: Veri'fication of the 4160 V Safety-Related ElectricalDistribution System.

Revis'ion 0, December 21, 1982Revision 1, May 4, 1983

~ ITR-25: Verification of the Auxiliary Feedwater SystemElectrical Design.

Revision 0, December 21, 1982Revision 1, April 29, 1983

~ ITR-26: Verification of the Control Room Ventilation and'Pressurization System Electrical Design.

Revision 0, December 21, 1982Revision 1, May 2, 1983

ITR-27: Verification of the Instrument and Control-Design ofthe Auxiliary Feedwater System.

Revision 0, December 23, 1982Revision 1, May 13, 1983Revision 2, July 25, 1983

ITR-28: Verification of the Instrument and Control Design'fthe Control Room Ventilation and Pressurization System.

Revision 0, December 23, 1982Revision 1, May 13, 1983Revision 2, July 25,. 1983

o ITR-29: Design Chain — Initial Sample.

Revision 0,. January 17, 1983

ITR-34: Verification of DCP Efforts by Stone 5 WebsterEngineering Corporati on.

Revision 0, February 4, 1983Revision 1, March 24, 1983

~ ITR-36: Final Report on Construction guality Assurance, Evaluation .of G. F. Atkinson.

- Revision 0, February 25, 1983Revision 1, June 20, 1983

IDVPFINAL

8.1.4'-2 REV 1830815

Page 186: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

4

Page 187: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENGINEERING SERVICES

e ITR-38:, Final Report on Construction equality AssuranceEvaluation of Wismer 5 Becker.

Revision 0, March 1, 1983Revision 1, March 16, 1983Revision 2, June 20, 1983

~ ITR-45: Additional Verification of Redundancy of Equipmentand Power Supplies in Shared Safety-Related Systems.

Revision 0, May 17, 1983

e ITR-46: Additional Verification of Selection of System DesignPressure and Temperature and Differential Pressure AcrossPower-Operated Valves.

Revision 0, June 27, 1983

~ ITR-47: Additional Verification of EnvironmentalConsequences of Postulated Pipe Ruptures Outside ofContainment.

Revision 0, June 27, 1983

~ ITR-48: Additional Verification of Jet Impingement Effects ofPostulated Pipe Ruptures Inside Containment.

Revision 0, July'7, 1983

~ ITR-49: Additional Verification of Circuit Separation andSingle Failure Review of Safety-Related Electrical Equipment.

Revision 0, June 23, 1983

IDVPFINAL

8.1.4-3 REV 1830815

Page 188: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

H

1

I

Page 189: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

I<-TELEDYNEENQINEERINQ SERVICES

8.2 OPEN MEETINGS

8.2.1 NRC Meetings (Transcribed)

The following meetings were transcribed. The date of the meeting and theattendees are listed.

October 9, 1981, Nuclear Regulatory Coranission and. Pacific Gas and

Electric Company.

February 3, 1982, Nuclear Regulatory Comnission, Pacific Gas and

Electric Compahy, Teledyne Engineering Services, Robert L. CloudAssociates, and Stone 8 Webster Engineering Corporation.

March 25, 1982, Nuclear Regulatory Commission, Pacific Gas and ElectricCompany, Teledyne Engineering Services, Robert L. Cloud Associates,Stone 8 Webster Engineering Corporation, and Roger F. Reedy, Inc.

April 1, 1982, Nuclear Regulatory Comnission, Pacific Gas and ElectricCompany, Teledyne Engineering Services, Robert L. Cloud Associates,

'ogerF. Reedy, Inc., and Stone 8 Webster Engineering Corporation..

June 10, 1982, Nuclear Regulatory Commission, Diablo Canyon Project,, Teledyne'ngineering Services, Robert L. Cloud Associates, and Roger F.Reedy, Inc.

July 27,. 1982, Nuclear Regulatory Cormission, Diablo Canyon Project,Teledyne Engineering Services, Robert L. Cloud Associates, andBrookhaven National Laboratories.

August 6, 1982, Nuclear Regulatory Comission, Pacific Gas and ElectricCompany, Teledyne Engineering Services, Robert L. 'loud Associates,Roger F. Reedy, Inc., Stone 8 Webster Engineering Corporation, andDesignated Other Parties.

September 1, 1982, Nuclear Regulatory Coomission, Pacific Gas andElectric Company, Teledyne Engineering Services, Robert L. CloudAssociates, Roger F. Reedy, Inc,, Stone 8 Webster EngineeringCorporation, Designated Other Parties, and Brookhaven NationalLaboratories.

October 19, 1982, Nuclear Regulatory Comnission, Diablo Canyon Project,Teledyne Engineering Services, Robert L. Cloud Associates, and Stone 8

Webster, Engineering Corporation.

October 20, 1982. Nuclear Regulatory Commission.

IDVPFINAL

8.2.1-1 REV 1

830815

Page 190: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 191: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

-><-TELEDYNEENQINEERINQ SERVICES

Nov'ember 10, 1982, Nuclear Regulatory Conmission and Designated OtherParties:,

\

December 8, 1982, Nuclear Regulatory Coranission.

December 21, 1982, Nuclear Regulatory Commission,'. Diablo Canyon Project,. Teledyne Engineering Services, Brookhaven National Laboratories, and'estinghouse.

January 13, 1983, Nuclear Regulatory Coranission, Diablo Canyon Project,Teledyne Engineering Services, Robert L. Cloud Associates, Roger F.Reedy, Inc., and Designated Other Parties.

January 28, 1983,* Nuclear Regulatory Commission, Diablo Canyon Project,Teledyne Engineer i'ng Services, Stone 8 Webster Engineering Corporation,

, and Westinghouse.

February 15, 1983, Nuclear Regulatory Comnission, Diablo Canyon Project,Teledyne Engineering Services, Robert L. Cloud Associates, DesignatedOther Parties, .and Brookhaven'ational Laboratories.

Nay 4, 1983, Nuclear Regulatory Commission, Pacific Gas and ElectricCompany, Teledyne Engineer.ing Services, and Designated Other Parties.

May 20, 1983, Nuclear Regulatory Commission, Teledyne EngineeringServices', Stone 8 Webster Engineering Corporation, Designated Other.Parties, and Westinghouse.

May 21, 1983, Nuclear Regulatory Commission, Teledyne EngineeringServ'ices, Stone 5 Webster Engineering Corporation, Designated . OtherParties, and Westinghouse.

June 17, '983, Nuclear Regulatory Commission, Robert L. CloudAssociates, Diablo Canyon Project, Brookhaven National. Laboratories andDesignated Other Parties.

July 6, 1983, Nuclear .Regulatory Coranission, Diablo Canyon Project,Teledyne Engineering Services, Brookhaven National Laboratories.

July 14, 1983,'uclear Regulatory Coranission, Pacific Gas and ElectricCompany, and Designated Other Parties.

August 10, 1983, Nuclear Regulatory Comission, Diablo Canyon Project,Teledyne Engineering Services, Robert L. Cloud Associates, andDesignated Other Parties.

I

IDVPFINAL

,8.2.1-2 REV 1830815

Page 192: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 193: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

P> TELEDYNEENQINEERINQ SERVICES

8.2.2 Other "Open" Meetings.

November 12, 1982, Nuclear Regulatory Comnission, Diablo Canyon Project,Teledyne Engineering Services, Robert L. Cloud Associates, and

* Brookhaven National Laboratories.

December 9, 1982, Nuclear Regulatory Comoission, Pacific Gas andElectric Company, Teledyne Engineering Services, and Robert L. CloudAssociates.

December 14-15, 1982, Nuclear Regulatory Coranission, Diablo Canyon'roject,Teledyne Engineering Services, and Robert L. Cloud Associates.

December 20; 1982, Nuc.lear Regulatory Comnission, Diablo Canyon Project,Tele'dyne Engineering Services, and Roger F. Reedy, Inc.

February 4, 1983, Nuclear Regulatory Comission, Diablo Canyon Project,.Teledyne Engi'neering Services, Robert. L. Cloud Associates, Roger F.Reedy, Inc'., Stone,E Webster Engineering Corporation, and BrookhavenNational Laboratories.

February 14, 1983, Nuclear Regulatory Comoission and Brookhaven National'Laboratories.

April 21, 1983., Nuclear Regulatory Coomission, Diablo Canyon Project,Teledyne - Engineering Services, Robert L. Cloud Associates, Roger F.Reedy, Inc., and Stone 8 Webster Engineering Corporation.

April 25-26, 1983, Nuclear Regulatory Coranission, Diablo Canyon Project,-Teledyne Engineering Services, Stone 5 Webster Engineering Corporation,and Designated Other Parties.

. April 26-27, 1983, Nuclear Regulatory Conmission, Diablo Canyon Project,Teledyne Engineering Services, and Robert L. Cloud Associates. '

April 27-28, 1983, Nuclear Regulatory Comnission, Diablo Canyon Project,Teledyne Engineering Services, and Robert L. Cloud Associates.

May 12, 1983,'uclear- Regulatory Comnission, Diablo Canyon Project,Teledyne Engineering . Services, Robert L. Cloud Associates, Roger F.Reedy, Inc.,'tone 8 Webster Engineering Corporation, and. DesignatedOther Parties (as Observers).

June 17, 1983, Nuclear Regulatory Comission, Pacific Gas and ElectricCompany, Teledyne Engineering Services, Robert L. Cloud Associates, andBrookhaven National Laboratories.

IDVPFINAL

8.2.2-1' REV 1830815

Page 194: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 195: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

<> TELEDYNEENQINEERINQ SERVICES

July 21, 1983, Nuclear Regulatory Comnission, Diablo Canyon Project,Teledyne Engineering Services, and Robert L. Cloud Associates.

July 27, 1983, Diablo Canyon Project, Teledyne Engineering Services, andRobert L. Cloud Associates.

IDVPFINAL

8.2.2-2REV 1830815

Page 196: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 197: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

REVs 0 LATEST REVo AC'ZION PGZEREV 1

830817 0.3-5

'

s

FILE NOs

938CONNEHTo

938COHNFHTt

938CIIENTo

DATE BASIS REV DATE BY STATUS ORG TES NODS SUB JECT

820120, FID 7 821123 TES ER/A PG'kE RDF YES VALVE 8805B ORIENT ~ LINE 1988t AUX~ BUILDIKGs

VALVE 8805B MILL BE ROTATED TO VERTICAL POSITIOH REQUIRED BY PGZE DRAMIKG DC663219"458-2(ERROR CLASS A) o

MESTIHGNISE LETTER POTE-4735 (821026) PERNITS VALVES 8726At 8724A AHD 8728A TO BE INSTALLED 'lH KORI70KTAL

DIRECTIOH (CLOSED ITEN) o ALSO IH ITR 12s

820120 FIB 8 830721 '(ES OIR RLCA Ri!F YES VALVEE8805B ORIEHT LIHE 1988 AUX BUILDIHG

VALVE 8805B MILL BE ROTATED TO VERTICAL POSITIOH REQUIRED BY PGZE DRANIHG DC663219-458-2(ERROR CLASS A)

MESTIHGHOUSE LETTER PGRE-4735 (821026) PERNZTS VALVES 8726At 8724A AHD 8728A TO BE IHSTALLED IH HORIZONTAL

(IPECTION (CLOSED ITEN), ALSO IH ITR 12, RLCA TO FIELD VERIFY CONPLEIED MOD INDICATED BY DCP 830720 CONP SHT.

0 9'

SPACE RESERVED FOR LATER REVISIOHo

938 . 0 10 0CO)IEHTo SPACE RESERVED FOR LATER REVISIONo

I s

938 . 0"

11 0COHNEHTo SPACE RESERVED FOR LATER REVISIOHo

938 0 12 0CNMENTo SPACE RESERVED FOR LATER REVISIONs

938 0 13 0CONNEHTo SPACE RESERVED FOR LATER REVISIOHo

E

938 0 14 0COlNEHTo SPACE RESERVED FOR LATER REVISIONo

'

'939 '20120 FID 0 '20120 RLCA OIR RLCA RDF SUPTo 73 72R DIRECTIOHs LZHE 1988t AUXo BUILDING~

CONNEHTo ISO 446544 REVoil SHOMS SUPPORT 73/72R TO BE ACTIVE IH K"S DIRECTZOH OHLYf FIELD IHSPECTIOH SHOMS SUPPORT.TO BE ACTIVEIH BOTH'-S 1 E"M,DIRECTIOHSo

939 820120 FID 1 820519 RLCA PER/C TES RDF SUPTo 73"72R DIRECTIONs LINE 1988t AUXo BUILDINGoCONENTo RLCA 102 AHALYSIS SHOMED ALL STRESSES LESS THAH ALLOMABLE. PGZE AHALYSIS 8-25 SHOMS SUPPORT ACTIVE IN H"S DIRECTION NLY

939 820120 FID . 2 820621 TES ER/C PGZE RDF SUPTs 73 72R DIRECTINo LINE 1988t AUX~ BUILDIHGs"CO}IEHTl ITR"it 3o2o4 t POTE LETTER DCVPWCA"74 DATED APRIL 23t 1982 ( RLCA FILE P105-4-939-006) oPGZE PZPIHG ANALYSIS 8-25 .

(RLCA FILE P105-4-432)sRLCA PIPING ANALYSIS RLCA 102o SUPPORT ACTIVE IH THE H-S 1 E-M DIRECTIOH'LL PIPE STRESSES LESSTHAN ALLOMABLESo

939 820f20 FZD 3 820708'ES CR HONE RDF HO SUPTo 73-72R DZRECTZONo LINE 1988t AUXo BUILDINGCONNENTo SUPTo 73/72R N CVC ISO 446544 Ril AND DESIGH AKALYSIS 8-25 IS SKOMH AS X-DIR SUPPORTo FIELD IHSPECTIOH

INDICATED SUPTo IH X-I DIRECTIOHo RLCA 102 ANALYSIS SKOMS STRESSES LESS TKAH ALLOMABLEo PGZE LETTER DCVP-RLCA-74 (820423AGREES MITH FIELD IHSPECTZOKo ERROR CLASS Co HO PHYs HODSo PER POTE RESOLUTIOH SKEET 820701 s

940 820120 FID 0 820120 RLCA OZR RLCA RDF LIHE 103 DINEHSIOHo TURBIHE BUILDIHGoCONHEKTo ISO I49316 REVs3 SHOMS AS BUILT LENGTH OF LIHE 103 SOUTH OF SUPPORTS 18/2R 1 18/12SL AS 15 FTt6 IHCKES ~ RLCA FIELD

INSPECTION SHOMED DINEHSIOH AS 6 FTo

940 820120 FID 1 820510 RLCA PER/C TES RDF . LINE 103 DZHEHSIOHo TURBINE BUILDIHGoCONNEHT's THE DESIGN ANALYSES 4"2 1 4-3 DO HOT SAOM CORRECT DZMEHSIOH'PIPE STRESSES IH RLCA f02 ANALYSIS DO HOT EXCEED ALLOMABLE

940 '20120 F ID 2 820619 TES ER/C PGiE RDF LIHE 103 DINEHSIOH. TURBIHE BUILDINGCONIEHTl ITR-ft 3s2oh t PGZE LTR DCVP-I.CA-80 (5/2/82) (RLCA FILE P105-4"940-003) oPIPIHG'SO 449316t REVo03 ( RLCA FILE ". Qgf-f-45@PGfg QPgPG ANAL(SIS 4-2 (R(,CA FILE Pf05-4-432).! 4-3(RLCA FILE P105-4-432).RLCA PIPING ANALYSIS RLCA 104U ER H 5 7J (RL A FILE P105-4-521"045) ALL STRESSES LESS THAN ALLOMABLE DIN DIFF ,EXCEED 79-14 TOLERANCE.

Page 198: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

I

C

I

Page 199: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

ftEV 1

'30817.'.3-9V

REV» 0 LATEST REV» ACTION POTE

FILE NO. DATE BASIS REV» . DAlE BY 'TATUS ORO TES NODS SUBJECT

950 820128 FID 6 820701 TES PRR/CI TES JCT YES VALVE FCV 95 PLATE THICKHESS» AUX» BUILDIHO»'ONNEHT~ ITR It 3»5»1»3t PktYSICAL NODIFICATIOH CONPLETEt TES SITE VISIT SUNNARYt 820625»

950CONNEHT»

950CONNEHTE

950CONNEHT»

950CONNENT»

950. CONNEHTo

950Cl)NNFHl »

820128*

FID 7 820701 TES CR HOHE JCT YES . VALVE FCV 95 PLATE THICKHESS» AUX» BUILDIHG»FIELD INSPECTION SHOMS UNDERSIZE PLATE IHSTALLED ON FCV-'95» DCO-G+876 REQUIRES'1/2 INCH PLATE» 3/8IHCH PLATE IHSTALLED» PHYSICAL NOD ~ PER PGRE CONPLETIOH SHEET 820713 CORRECTED DISCREPENCY» ER/Ct ALL SlRESSESBELOM ALLOMABLE METH OR MITHOUT NOD»

820128. FID 8 830422 TES OIR RLCA JCT YES UALVE FCV 95 PLATE THICKHESS» AUX» BUILDIHG»NODIFICATIOH OF 1/2'TIFFENER PLATE TO VALUE FCV-37 PER DCO-G+876 HOT INPLENENTED» FIELD OBSERVED TO HAVE

3/8'LATES»OICERHED DESIGH AHALYSES FOR THESE VALUES NAY.HOT REFLECT AS-BUIlT COHDITIOH» RLCA TO REUEEM AND PROUIDERECONNENDATIOH FOR FUTURE DISPOSITIOH»

820128 FID 9 830429 RLCA PPRR/OIP TES JCT YES UALUE FCU 95 PLATE THICKHESS» AUX» BUILDING»DURIHG FIELD VERIFICATIOH BY IDVP FOR OTHER EQUIPNENTt OBSERVATION THAT FCV-37 STIFFHER PLATES MERE3/8'OT 1/2'ER DCO-G-N-876» DESIGH AHALYSES FOR TkkESE VALUES NAY HOT REFLECT AS-BUILT» PGSE TO

REEXANIHE AS"BUILT AHD RESPOND»

820128 FID 10 830504 TES PRR/OIP PGEE JCT YES VALVE FCV 95 PLAlE THICKHESS ~ AUX~ BUILDIHG»"'URIHGFIELD VERIFICATIOH BY IDVP FOR OTHER EQUIPNEHTt OBSERUATIOH THAT FCV-37 STIFFHER. PLATES MERE

3/O'OT 1/2'ER DCO<-N-876» DESIGkt ANALYSES FOR THESE VALVES NAY HOT REFLECT AS-BUELT» POTE TOREEXANIHE AS-BUILT AHD RESPOHD»

820128 FID 11 830608 TES OIR RLCA JCT YES VALUE FCU 95 PLATE THICKHESS» 'AUX~ BUILDIHG»DESIGH ANALYSIS FOR THESE VALVES NAY HOT REFLECT AS-BUILT COHDITIOHS» TES REQUESTS RLCA TO VERIFY THAT 1/2'LATESHAVE BEEN IHSTALLED ON THE SEVEN VALVES,INCLUDED IH DCO-G-N-876»

820128' ID 12 830712 RLCA PPRR/Cl TES JCT YES VALVE FCV. 95 PLATE THICKNESS» AUX» BU1LDING.Rft:EH? RLCA FIELD VERIFICATIOH SHOMS ALL VALUES SPECIFIED IN DCO-G-N-876 AS HAVING 1/2'HICK STIFFHER PLATES IHSTALLEDTO kkOkk FCFLFCT THE DESIGkl CONDITIONS PER THE Dk:O.

950"

820} "8 FE[t }3 "8307}5 TES F'RR/Cl fES JCT YES VALVE FCU 9S PLATE THICKNESS. AUX BUILDINGCPNNENT, 'RECEnT RLCA FIELD VERIFICATION SHOMS ALL UALVES SPFCIFIEE'H DCO-G.-N-876 AS HAVING 1/2'HICK STEFFMER PLATES IHSTA'LLEP

TO HOM REFLECT lHE DESIGH CONDITIONS PER THE DCO,

'50 82012S FID }4 8307}5 TES CR NONE JCT YES VALUE FCV 95 PLATE THICKHESS. AUX, BUILDING,CONMEkkll NODIFECATION OF }/2'TIFFENER 'PLATE 10 VALUE FCV"37 PER DCO-8+876 HOT INPLENEHTED FIELD OBSERVED TO KAUE 3/8'LAlES

COHCERkt THAT D A, FOR VALVES NAY NOT REFLECT AS-BUILT CONDITION RECENT RLCA FIELD VERIFICATION SNOMS ALL VALVES SPEC-EFEFD EH DCO-G-N-876 AS tkAVENG }/O'HICK STEFFHER PLATES INSTALLED TO NOU REFLECT THE DESIGN COktDI?EOH MAS ER/C. CE

951 820129 FID 0 '20129 RLCA OIR RLCA RDF SUPT» 1-27 LOCATIOH»LIHE 593t AUX» BUILDIHG»CONNEHTl AUXILIARYFEEDMATER ISO 445878 REV.14 LOCATIOH OF SUPPORT'1/27R DISAGREES MITH FIELD INSPECTIOH LOCATION. ISO SkkOMS

DINEHSION AS 9'NCHES FRON ELBOM» RLCA FIELD IHSPECTIOH SHOMED 35 IHCHES FRON ELBOM»

95} 820129 FID 1 820309 RLCA PPRR/DEV TES RDF SUPT» 1 27 LOCATION»'LINE 593t AUX~ BUILDIHG»CONNENT» POTE PIPING ANALYSIS 2"17 LOCATNH DISAGREES METH FIELD INSPECTION LOCATEOH1'GEE ANALYSIS SHOMS DINEHSIOH AS 33»25

INCHES FRON ELBOM» PGEE TO REVISE ISO»

951 820129 FID 2 820417 TES PRR/DEV PGEE RDF SUPT» 1 27, LOCATION»LIHE 593t AUX» BUILDIHG»CONNEH? l POTE PIPIHG ISO 445878r REV 14 i PGEE PIPEHG AHAl.YSIS 2-17 DATED 5/7/82 EHFORHA?IOH IHCORREC? OH ISO FIELD AGREESMITH DESIGH ANALYSIS MITHIH 79-14 TOLERAHCES, »

951~

820129 FID 3 820524 TES CR HOHE RDF HO SUPT» 1 27 LOCATION»LIHE S93t AUX» BUILDIHG~CONNEHT} SUPPORT 1/27R IS SkkOMH OH AUX» FEEDMATER ISO 445878 REV»14 TO BE LOCATED 9 IHCHES FRON THE ELBOM»RLCA FIELD IHSPEC?IOHSHOMED THIS SUPPORT TO BE LOCATED 35 INCHES FROM THE ELBOM» DESIGN AHALYSIS 2-0 (820507) SHOMS'SUPPORT 1/27R TO BELOCATED 33 '1/4'RON ELBOM CMITHIH 79-14 TOLERANCE) DEVIATIOH» HO PHY» NODS» PER PGEE CONPLETIOH SHEET" 820521»

Page 200: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

e

Page 201: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

REV, 0 LATEST REVo ACTION PGIEREV 1

('30'(l 7 I>. 3-19

FILE HOo

982CONNEHTo

DATE BASIS REVo DATE BY STATUS ORG lES NODS SUBJECT

820206 DND .4 820721 RLCA PPIN/Cl TES RDC TURB BLDG BLUNE TRAHSNITTALS

ITR-it '3oio4 THIS EOI TO BE CONBIHED MITH EOI 1026 AS AH ERROR A OR Bt

982 820206 'ND 5 820723 TES PRR/CI TES RDC 'URB BLDG'LUNE TRAHSNITTALS

CONNEHTo DELETE FRON ITR-it 3oio4 THIS EOI IS CONBIHED MITH EOI 1026-AS AH ERROR A OR.Bo

982CONNEHToo

983CONNEHTo

P

~ 820206 DND 6 820723 TES CR. HONE RDC HO TURB BLDG BLUNE TRANSNITTALS

SECTION 3o3o3 OF ImVo 12t 1981 PRELINIHARY SEISNIC REVERIFICAlIOH REPORT STATES THAT DETAILED TRAHSNITTALS MERE

HOT REVIBKD BY RLCA BUT SIHCE THE TURBIIK BUILDIHG IS BEIHG EVALUATED AS PART OF THE PGCE ITPt THIS EOI ISCONBIHED, IHlO 1026 (ER/AB) o

820206 SID 0 820206. RLCA PER/A TES RCM RACEMAY SUPPORT SPECTRA

HIHE OF TMEHTY RACEMAY SUPPORT SEISNIC CALCULATIOHS DOHE MITHIHAPPLICABLE SPECTRAo

983CONNEHToo

820206 SID 1 820421 lES ER/A PGIE RCM RACEMAY SUPPORT SPECTRA

ITR it 3o7o4 HIRE OF TMEHTY SUPPORT ~ CALCULATION DONE MITH IHAPPLICABLE SPECTRAo

983 820206 SID 2 820910 lES ER/A * PG EE RCM YES RACEMAY SUPPORT REAHALYSISCONNENTI 'HIHE OF TMEHTY RACEMAY SUPPORT SEISNIC CALCULATIOHS DOHE MITH INAPPLICABLE SPECTRAo

REV 2 ISSUED TO CONBIHED EOI FILES 910 AND '930 IHTO THIS OHE FILE AS A CLASS 'A', ERRORo

983 820206 SID" 3 8308'12 TES OIR RLCA RCM YES RACEMAY SUPPORT REANALYSIS

CONIIENTl RI,CR TO REVIEM THE DCP CGNPLETION PACKAGES AND SURNIT A POTEHTIAL RESOLUTIGN OR ERROR REPORT TO THE PROGRAN NANAGER

983CONNEHTo'' 0SPACE RESERVED FOR LAlER REVISION

983 0 . 5 '0CONNENT ~ SPACE RESERVED FOR LATER REVISIOHo

'83 0 6 0CONNENTo SPACE RESERVED FOR LATER REVISIOHo

984 820206 DND 0 820206 RLCA OIR RLCA RDC TURB BLDG IHTERFACE PROCEDURESCONNEHTI THE POTE DESIGN REVIEM IS PRESEHTED IH THE REPORT 'NOSGRI DESIGH VERIFICATIOH - TIWBIHE BUILDING'tFEBRUARYt1980 (LOG 7) o

SIHCE THE DESIGN REVIEM DID HOT VERIFY THE INTERFACE PROCEDURES BETIKEH URS/BLUNEt PORE AHD THE FIELD (FIG. 4-10-2t URS/BLUNE REPORT OH DESIGN REVIEMt LOG 7) t THESE MILL BE INVESTIGATED o

984 820206 DND 1'20618 RLCA PPRR/OIP TES RDC TURB BLDG IHTERFACE PROCEDURESCONNEHToo BESIDES REVo0 CONCERHt THE BLUNE INTERNAL REVIEM IDEHTIFIED PROBLENS MlTH TNE ANALYTICALNODELo

984 820206 DND 2'20701 TES PRR/OIP POTE RDC TImB BLDG IHTERFACE PROCEMNESCONNEHTl ITR"it 3 1 4'AHD PGIE ITEN 24 NAY INDICATE HEED FOR REANALYSIS PREVIOUS PGIE DESIGN REVIEM DID NOT VERIFY POTE/BLUNE

FIELD IHTERFACEt THIS STILL REQUIRES VERIFICATIOH IF NO REAHALYSIS IS DONEo TES REVIEIKD RLCA NOVo 12 1981o PRELINIHARY

984 820206 DND 3 820720 TES OIR RLCA RDC TURB BLDG INTERFACE PROCEDURESCONNEHTl ITR 3 1 4 BASED ON POTE INTERNAL TECHNICAL PROGRAN PRESEHTED OH JULY 14 TO ibt 1982 PGIE NAY REANALYZE TURBINE

BUILDIHGo TES AHD RLCA MILL RECOHSIDER AHD RESOLVE THIS FILEo1

984 820206 DND 4 820721 RLCA PPRR/CI TES RDC TURB BLDG IHTERFACE PROCEDURESCONNEHT ~ ITR it 3oi ~ 4 RLCA RECONNENDS CONBINIXG THIS fILE MITH EOI 1026 ~

Page 202: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

0

Page 203: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

REV 1

83PB] 7 D. 3-26LATEST REVsREVS 0 ACTIOH PGCE

FILE'O 'ATE BASIS REV DATE BY STATUS ORG TES NODS SUBJECT

1002 820206 SID'

820623 TES PRR/CI - TES CHK HO SUPPLY FANS S67r 68t i 69 IHPUTCIQKHTT RLCA HAS REVIEMED CALCULATIONS ATTACHED TO POTE ACTIOH IKET OF 820310 AND ALSO VERIFIED THAT HO

HODIFICATIONS HAVE BEEH HADE AS A RESULT OF THIS FILES

6002 820206 S!0 5 820622 TES CR HsllE CHH HO SOPPLY PSHS S670 68 I 60 IIIPOTCIIEHTP RLCA PRELININARY REPNT OF 811112 NOTED CALC'S FOR FAHS USED UNCOHSERVATIVE SEISNIC IHPUTS ERIN Bs

POTE'PROVIDED NEM CALCS MITH PROPER IHPUTSO'DVP VERIFIED NO NODIFICATION MADE AS RESULT OF THIS FILE»

1002 820206 SID " 6'30308 TES OIR RLCA M NO SUPPLY FANS S678 68 i 69 IHPUTCOIIEHTI BASED OH PGK RESPONSE AND RLCA VERIFICATIOH THAT HO NODS REQUIREDS RLCA SIILD CONSIDER ISSUIHG POTEHTIAL PROGRAN

RESOLUTIOH REPORT MHERE ER/B IS DOMHGRADED TO ER/C AHD FILE CLOSE9 OUT REFER TO PAR 5. 1 2 OF 8301 IDVP SN FOR

PROCEIIES

1002 820206 SID . 7 830310 RLCA PER/C TES CHK HO SUPPLY FAHS S67r 68 1 69 INPUTCIQKHT~ CALCS USED IHCORRECT AHD UNCOHSERVATIVE SEISNIC IHPUTSS ALSOt FORCED DRAFT SHUTTER DANPER OUALIFICATIOH SHOMED 'INCORRECT

SEISNIC DEFINITION BECAUSE GRAVITY MAS HOT ADDED TO VERTICAL ACCELERATIONP STRESS CALCS USING CO)RECT SEISNIC INPUTSAND DEFIHITIONS DIDH'T EXCEED ALLOMABLESP DOMHGRADED FROH ER/Bs

1002 820206 SID 8 830322 TES ER/C PGIE CHK NO 'UPPLY FANS S670 68 1 69 IHPUTCONIKHTI CALCS-FOR SUPPLY FANS FOIID TO lSED IHCORRECT AHD UHCOHSERVATIHE SEISNIC INPUTS ALSOS GRAVITY HOT ADDED FOR SEISNIC-

CONSIDERATIOHS OF FORCED DRAFT SmlTTER DANPER IIALs CALC STRESSES USIHG CURRENT SEISNIC IHPUTS AHD DEFINITIONS DIDH'TEXCEED ALLOMABLESS ER/B ESTABLISHED BY REVs 1 TO THIS FILE IS MIHGRADEDs

1002 820206 SID, 9 830322 TES CR HONE CHK HO SUPPLY FANS S67r 68 1 69 INPUTCOIKHTl CALCS FOR SUPPLY FANS. FIND TO USED INCORRECT AHD IICOHSERVATIHE SEISMIC INPUTS ALSOS GRAVITY HOT ADDED FOR SEISHIC

COHSIDERATIOHS OF FORCED DRAFT SIITTER DANPER QUALS CALC STRESSES USIHG CNREHT SEISNIC IHPUTS AHD DEFIHITIONS DIDN'EXCEED ALLOMABLES ER/B ESTABLISHED BY REV 1 TO THIS FILF. IS DOMHGRADED TO AH ER/C

1003 820206 OD 0 820206 RLCA OIR RLCA RCM 4KV SM RN HVAC DUCT SUPTICIQKHTI HOSGRI DUCT SUPPORT QUALIFICATIONS HAVE NOT BEEN LOCATED AS OF 811028 TO,BE ADDRESSED BY PGIE 1 REVIEMED

BY RLCAO

1003 820206 OD 1 820607 RLCA PPRR/OIP TES RCM 4KV SM RN HVAC DUCT SUPTCONCKHTP PORE MILL SUPPI.Y THE ANALYSIS OF RECORD DATED PRIOR TO 811028

1003 820206 OD 2 820621 TES PRR/OIP PGK RCM 4 KV SM RN HVAC DUCT SUPT .

CIQKHTT PGK TO SUPPLY THE ANALYSIS OF RECORD DATED PRIOR TO 811028

1003 820206 OD 3 820823 TES OIR RLCA RCM 4 KV SM Rll HVAC DUCT SUPTCIQKHTO RLCA TO REVIEM AHD DISPOSITION ACCORDIHGLY THE POTE RESOLUTIOH 1

CONPLETIOH SHEETS t820615'003

820206 09 . 4 820825 RLCA PER/C TES RCM 4 KV SM RN HVAC DUCT SUPTCIIEHTI DUCT SUPPORT CALCSO DATED PRIOR TO 811028 DO HOT QUALIFY SUPPORT FOR

AREA A (TURBINE BUILDING)SDUCT SUPPORT MAS HOT EVALUATED FORHOSGRI 0

1003, 820206 09, 5'21005 TES ER/AB PGIE RCM YES HVAC DUCT SUPPORT REEVALUATIOHCOCIEHTI REVS 4 MAS A PER/Cs BASED OH 820917 SUBNITTAL OF DCP PHASE 1 FINAL REPORT IH MHICH DCP HAS'TATED THAT INAC'SUPPORTS

ARE BEIHG REAXALYZEDr IDVP PROGRAN REVIEM CONHITTEE OH 820929 DECIDED TO CHANGE THIS'TO AH ERROR/A OR Bs IDVP ALSODECIDED TO CONBIHE FILE 1077 MITH THIS FILEs

f053 fl;5206 'IID 5 835721 TEE: OfR RLCAS RCM HVAC DUCT SUPPORT REEVALUATIONCOHCIEHTl TTASFD OCC I[61'P VERIPICATEOH EFFORT OF CAF'O DATE lITUP HAS ONLY ONE UNRESOLVED ISSUE EOI 1134t ICHICH Mll,l. BEHE<CYl.VFFS 9F'f'ARATELY. fll.f'A TO REVIEW ACID fifSOLVE FILE 10037 MITH EXCEPT10H OF EOI 1134 ISSUEt 1F POSSIBLE,

'

1053 8.0ZG*5 OD 7 830722 RLCA PF'RR/el TES RCM HVAC 5UCT SUPPORT REEVALUATIONCCOCIHEHTl IDVP IIAS VERIFTED THAT MITH THE EXCEPTION OF SPECIFIC ITEN DETAILED IH EOI 11342 MHICH MILL BE RESOLVED SEPARATELYCAP FOR HVAC Duer ACID SUF'PORTS IS AN ACCEPTABLE AHD PROPERLY IHPLEHEHTED PROGRAH FOR RESOLUTIOH OF EOI 1003

1003,25756 Of( 8 830801 TES PER/CI TES RCM HVAC DUCT SUPPORT REEVALUATIOClCOWFHTl TIK IDVP HAS VERTFIED THAT EXCEPT FOR TSSUE ICC EOI l}348 THE CAP FOR HVAC DUCT AHV SUPPORT$ 1S AN ACCEPTABLE AHD .~ PROPFRLY IHF'LEHFHTED PFOGRAH FOR RESOLUTIOH OF EOI 1003 EOI 1134 MILL RE RESOLVED SEPARATELY

Page 204: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 205: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

FILE NO<

1003fOIIMFIITI

1004CONNEHTt

1004CONNEHTt

REV 1'RE'V. 0 'ATEST REV< ACTIOH PGIE 830817 D.3-27

DATE BASIS REV< DATE BY STATUS ORG TES NODS SUBJEC7

I70."IIA Itti .9 810801 IF!I CI tIOIIE RCM tIO .HVRC fiUCf SUf'PORT REEVALUATION

DUU SIIf'f'(IRf CALCS &ATTICS f'RIOR 10 IIII''8 till!I' IIIIALII'7&I!PORT FOfl ARFA 0 Oi'URBIIIE BUII.DIIIG, 'EUCT SUI'PORI'Of

FVALUATEI> PIIR IIOSGRI, INCLUDES EOI 1077. II<VV VEhll ILD 1.XCff'I FOR ISSUE IH 1134~ CAI'OR IIVAC E>UCT AMD SUPPORTS IS AH

ACCEPTABLE A!ID.I'ROPERLY IMFLMHTED PROGRAM I'OR RESOLUIIOtl OF EOI 1003, EOI 1134 RESOLVED SEf'ARATELY f'REV ER/AB Cl

820206 OD 0 820206 RLCA OIR RLCA RM PG2EWSTINGHOUSE SEI StllC INTERFACE.

RLCA PREL< REPORT 811112<ELECTRICAL EQUIPNEHT AHD IHSTRUMEHTATIOH<CONCERH ADDRESSED IHSUFFICIENT TRANSMITTAL OF

SEISMIC INFORMATION FRON PGIE TO MESTINGHOUSE<ONLY OIIE TRAHSNI7TAL FOUND TO DATEtHEMNARK TINE HISTORIES

FOR CONTAINNEHT IHTERIOR<

820206 OD 1 820322 RLCA PPRR/OIP TES RM P62EVEST IN&HOUSE SEISNIC INTERFACE

RLCA RECOMMENDS THAT PG2E ASSEMBLE 2 CONTROL SPECTRA AND CHECK QUALIFICATIONS AGAIHST THIS SPECTRA<

2004 820206 OD 2 820417 7ES PRR/OIP PGIE RM PG2EWSTIHGHOUSE SEISNIC IHTERFACE <

CONEKTI PG2E TO ASSEMBLE 2 CONTROL SPECTRA AND NECK QUALIFICATIOHS AGAINST THIS SPECTRA<

1004 &20206 OD 3 820524 TES OIR RLCA RM PG2E-MESTIHGHOUSE SE ISNIC IHTERFACE,. COINEHTt PG2E RESOLUTIOH SHT< 820521 MITH IHDEX OF HOSGRI SPECTRA RECEIVED BY MESTIHGHOUSE FROM PGIE< PGIE TRAHSNI'fTED

70 TES DOCUNEtfTATIOH THAT CONFIRMED THIS IHDEX< MESTIHGHOUSE AUDIT OH 820507 BY IDVP.

1004 820206 OD 4 820609, RLCA PPRR/Ci TES RM P&2E-MESTIHGHOIISE SEISMIC IHTERFACE.,CONNEHT< BASED ON P&2E TRANSMITTAL DCVP-TES"72 AHD THE IDVP MESTIHGHOUSE AUDIT OH 820507t TES IHFORMED RLCA TNT SEISMIC

INTERFACE BETMEEH P02E AHD MESTINGISUSE IS VERIFIED.

k

, 1004 820206 OD 5 820622 TES PRR/CI TES RM PG2P7ESTIHGIIOUSE SEISNIC INTERFACECONNQTt BASED OH PG2E TRAHSNITTAL DCVP"TES"72 AHD THE IDVP MESTIHGHOUSE AUDIT OH 820507

TES COHCLUDED TNT THE SEISNIC IHTERFACE BFTMEEH PGIE AHD MESTINGHOUSE IS VERIFIED<

'004

820206 OD 6 820622 TES CR HOHE RM HO PGIE-UESTIHGHOUSE SEISNIC INTERFACE<CONIIEHTI ELECTRICAL EQUIPNEHT AND INSTRUMENTATION< CONCERN ADDRESSED IHSUFFICIENT TRANSNITTAL OF SEISMIC IHFORMATIOH FROM P&2E,

TO M< BASED ON PGIE TRANSMITTAL DCVP-TES"72 AND THE IDVP MESTIHGHOUSE AUDIT OH 820507r TES CONCLUDED THAT THE SEISNICINTERFACE BETMEEH PG2E AND MESTINGHOUSE IS VERIFIED.

1005 820206 OD 0 820206 RiCa OIR RLCA RRB MYLE LABS TRANSNITTAL OF 'SPECTRACONNENTI DIKUMEHTATIONREQUIRED REGARDING FORMAL TRANSMITTAL OF SPECTRA FROM PG2E TO MYLE LABS,

k

1005 820206 OD 1 820309 RLCA PPRR/CI TES RRB MYLE LABS TRAHSNITTAL OF SPECTRACONMEHTt HO DOCUNEHTATISI FOUND TO DATE REMDING FORNAL TRANSNITTAL OF SPECTRA BUT COHCERH COVERED BY EOI'S 1013 2 1049

k

1005 820206 OD 2 820417 TES CR KORE RRB HO MYLE LABS TRANSMITTAL OF SPECTRACONNENTI ALTHOUGH HO DOCUMENTATION OF FORMAL TRAHSNITTAL OF SPECTRA FRON PGIE TO MYLE HAS BEEH FOUND TO DA7Et THIS COHCERH IS

COVERED BY EOI'S 1013 5 1049<

1006 820206 OD''

0 820206 RLCA OIR RLCA CHK ELECTQUIP QUAL BY AHALYSISCONNEHTt FOR EQUIPMENT REQUIEM.IFIED BY ANALYSIS) AS IHDICATED BY HOTE 5 IH TABLE 10-1 OF HOSGRI~ HO IHFORNATION HAS BEEH

FOUHD TO'ATE AS TO MHO ND PERFORNED THESE AHALYSES< THIS IS BEING COVERED GENERICALLY BY RLCA IH THE CINEHTPRO&RAN<

1006 820206 OD 1 820309 RLCA PPRR/CI TES CHK .ELEC EQUIP QUAL BY ANALYSISCOINEHTt THE PNSE I PROGRAN INCLUDES TMO ELECTRICAL CABINETS QUALIFIE9 BY ANALYSIS<

k

~ 1006CONNEHTI

1007CONNEHTt

k

820206 . OD 2 820421 TES CR HONE CHK HO ~ ELEC EQUIP QUAL BY ANALYSISFOR EQUIPtIEHT REQUALIFIED BY ANALYSIS'S IHDICATED BY NOTE 5 IH, TABLE 10-1 OF HOSGRI) HO IHFORNATON HAS BEEHFOUND TO DATE AS TO Nm ND PERFORNED 7%SE ANALYSES< THE PHASE I PROGRAM INCLUDES TMO ELECTRICAI. CABIHETSQUALIFIED BY ANALYSIS<

820206 SID 0 820206 RLCA OIR RLCA CHK ELEC EQUIP TRANSNITTAL OF INFOSHOULD FURTHER IHVESTIGATIOH FAIL TO SICOVER RECORDS THAT UNSATISFACTORILY DOCUMENT THE TRAHSFER OF SEISNICANALYSES MILL BE EXAMINED TO SEE IF APPLICABLE SEISNIC IINFORNATIOH MAS APPLIED<

REOUALIFICATIOH IHFQRNTION BETMEEH PG2E AND TIKIR CONSULTNfSr THE ACTUAL TEST SPECTRA AND 7HE REQUALIFICATION

Page 206: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 207: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

REV 1

830817REV» 0 .LATEST REV» ACTIOH PG&E

FILE HO» DATE BASIS REV. DATE BY STATUS ORG TES INDS SUBJECT

1020 820218 SIR 2 820»17 TES PRR/SEII PRIE JCT ACE SALTNTER PREP PRELIS SPECT,IRTAEE STRSCI,

CNNEHT» PRELIIIIHARY SPECTRA IDENTICAL TO HOSGRI SPECTRA C(N'IRMEDr TES TRIP REPORT HO 14490

1020 820218 SID 3 820629 TES CR ~ HOME JCT NO 'UX SALTQATER PIN(P PRELIM SPECT»IHTAKE STRUCT»

CMSIT! UMCNTI(OLLED PRELIIIIHARY SPECTRA USED TO QINLIFY PUMPt PG&E FILE 11603t 771227» IDENTICAL'TO HOSBRI SPECTRAtPB&E

CNPLETIOM REPORT 820601o =DEVIATION»

1021CNNEHT(

1021COINEHT»

820218 OD 0 820218 RLCA OIR RLCA RDF CCNIX ANALYSIS AS RIGID ANCH(a» TURBINE BLDG»

PG&E PIPIN (9IALYSIS 403 SNNS C(NPOHEHT COOLING NTER HEAT EXCHANGER AS RIBIDI HOSGRI (TABLE 7-5) LISTS NATURAL FREQ»

OF 9 Hzo (H(NIZNTALAN VERTICAL) FOR THIS HX» THE INDELIHG OF A HOINIGID PIECE OF EQUIPHEHT AS A RIGID ANCHOR'HAY HOT

BE CONSERVATIVEi

820218 OD 1 . 820430 RLCA PPRR/OIP TES RDF CCNX ANALYSIS AS RIBID ANCHOR» TURBINE BLDG»

PER PB&E SEMI-NNTHLY OPEN ITEM $22- PB&E MILL EXAIIIHE THE RIGID %DELI}i OF THE CMIX IH THE PIPIIS ANALYSIS»

1021 820218 OD 2 820510 TES PRR/OIP PB&E RDF CCNX ANALYSIS AS RIGID AMCNR» TURBINE BLDG»

CNNEHTI ITR-1t 302»4 PG&E PIPIIN ANALYSIS 4-3 DATED 1/30/800 NSBRI REPORT TABLE 7"50 THE NATURAL FREQUENCY OF THE C(3 HEAT

EXCHANGER IS LESS THAM THE IIIHllRIIIREQUIREMENT FOR PIPING NDEL TERMINATIN» PG&E SHOULD EXAIIIME THIS PROBLEII»

1021 820218 OD 3 820910 TES OIR RLCA RDF CMIX ANLYSIS AS RIGID AMCHN» TURBINE BLDG»

C(NHEMTI BASED N PG&E PRESEHTATI(NS (AUGUST 681982 AHD AUGUST 2dr 1982) OF THEIR INTERNAL TECHNICAL PROGRAM OF PIPIHOr TES AMD

RLCA MILL RECNSIDER COMBININ THIS FILE HITH FILES 9618105881059 & 1098 IHTO NE ERROR CLASS A OR B FILE» .

'I

1021 820218 OD 4 820913 RLCA PPRR/CI TES RDF CCMIIX ANALYSIS AS RIGID ACHOR TURBINE BLDG

CNNENTI BASED N.PG'&E PRESEHTATIO»5 (AUG 6 OD AUG 26t 1982) OF THEIR INTERNAL TECINICAL PROGRAM OF PIPIHGtTHIS FILE COININED MITH FILES 9618 10588 10598 AN 1098 IHTO NE ERROR CLASS A OR B FILE» SEE

FILE 1098 FOR. ERROR REPORT»

1021 820218 OD .5 820921 TES PRR/CI TES RDF CNHX ASLYSIS AS RIGID AHCINR» TINBIHE BLDG»

COINEMTI"PG&E PIPIN NALYSIS 4-3(800130)t HOSGRI REPORT TABLE 7-50 THE NATURAL FREQUENCY OF THE CCM HEAT EXCHAINER IS LESS'HAH

THE HIHINN REQUIREMENT OF PIPING INDEL TERHINATIOH THIS FILE HAS BEEH CNBIMED IHTO FILE 1098 AHD

HAS BEEN DESIGNATED AS ERROR A/Bo

1021 820218 OD 6 820921 TES CR MOHE RDF NO CCNN ANALYSIS AS RIGID ANCHORS TURBINE BLIRG»

COINEHTI PG&E PIPING ANAL $4-3(REV 16r3/4/80)REPRESEHTS THE COlPOXEHT COOLING MATER HEAT EXCH» AS A.RIGID AMNOR» THE HQSGRI RPT»

(TABLE 7-5)LISTS NATURAL FREQ OF 9 HERTZ(HORIZ & VERT)FOR THIS HEAT EXCH THE HODELIHG OF A H(NRIBID PIECE OF EQUIP AS

A RIGID AHCH(N HAY NOT BE COHSERVATIVE» THIS FILE CNB»IHTO FILE 1098 & DESIGNATED'S ERROR A/Bo

'022 820218 SID 0 820218 RLCA OIR RLCA RDC INTAKE STRUCTURE REENLUATIN»

, C(NHEMTI SPECTRA AT 201'SED 8'-9'»SPECTRA APPLICABLE AT A LEVEL TEH FEET» BELOM UPPER PINP SUPPORT MERE USEDI HOT CONSERVATIVE»

1022 820218 SID 1 820430 RLCA PPRR/OIP TES RDC IHTAKE STRUCTURE REENLUATIN» ~ P

COINEHTt PG&E TO ENLNTE SPECTRA USED»

1022 820218 SID 2 820510 TES'IN/OIP PG&E RX IHTN(E STRUCTURE REEVALUATION»COIQKHT) ITR-1 3»505»4 AHD 30904 PG&E ASSEMBLE SPECTRA»SPECTRA AT 201'SED 8»-98»SPECTRA APPLICABLE AT A LEVEL TEH

FEET»'ELOM

UPPER PINP SUPPORT IIERE USED) HOT CNSERVATIVE» PG&E TO EVALUATE SPECTRA USED»

1022 820218 SID 3 820903 TES OIR RLCA RDC INTAKE STRUCTURE REEVALUATINCOINENTI CNBIHE MITH FILES 967 & 988 RELATIVE TO EVALUATINOF INTAKE STRUCTINE SEISMIC SPECTRA» PG&E TO REANALYZE INTAKE

STRUCTURE»

1022 820218 SID 4 820907 RLCA PER/AB TES RX IHTAKE STRUCTURE REENLUATIN»COIQIENTI REANALYSIS OF INTAKE STRUCTURE PERFORMED BY PG&Er 820806 & 8209010 COINIHE THIS ITEN HITH EOI 967 & 9880

J

1022 8.0?18 BID 5 820910 TES ER/AIT PG&E RDC IHTAKE STRUCTURE REEVALUATIONCOHNENTl SPECTRA AT 2 I'SED 8'-9'PECTRA APPLICABLE AT A LEVEL TEH FEET RELOM UPPER PUIIP SUPPORT MERE USEDI HOT CONSERVATIVE

INTAKE STRUCTURE IH REANALYSIS IH PG&E INTERNAL TECHIIICRL PROGRAM COMBINE EOI 967 & 988 IH TO 1022

Page 208: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 209: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

REUO 0 LATEST REV ~ ACTION POlEREV 1

830817 o.3-34

FILF. HOP

1022C{NHENTI

DATE BASIS REVO DATE BY STATUS

820218 . STD 6 830723 TES OIR

UPPER AUX SRLT MATER PUHP SUPPORT LOCATED10''UNPMYPT. SPECTRA NAY NOT 'O'E A~PL!CABLE.

ORO TES NODS SUBJECT

RLCA ROC INTAKE STRUCTURE REEVALUATIONS

ABOVE ELEVATION -"., 1'. SPECTRA FOR -". 1'SED AS INPUT FOR UPPER

RLCA TO RET'IEM KP <-,t%UATION OF INI4f SIR(ICTWI 'K!NG PERFORNED.

1022COHHEHTo

820218 SID 7 830723 RLCA PPRR/CI TES RDC IHTAKE STRUCTURE REEUALUATION

IDVP HAS VERIFIED THAT MITH EXCEPTION OF SOILS MORKP MNICN MILL BE RESOLUED SEPARATELY) CAP FOR INTAKE STRUCTURE

IS AN ACCEPTARLE AND PROPERLY IHPLEHEHTED PROGRAN FOR RESOLUTION OF THIS EOl0:

1022CONHEtlTP

1022COHNEHTo

1023CONNENTI

820218 SID 8 '30726 TES PRR/CI TES RDC INTAKE STRUCTURE REEVALUATIOtl,

FILE REDEFIHED TO TRACK DCP RE-EVALUATION BEING PERFORNED AS PART OF CAP IDUP VERIFIED THAT UITH EXCEPTION OF

SOILS IIORK MHICH MILL 'RE RESOLVE9 SEPARATELYt CAP FOR INTAKE STRUCTURE IS AN ACCEPTABLE AND PROPERLY INPLEHEHTED

PROORAH FOR RESOLUTION OF THIS EOI,

820218 SID 9 830726 TES CR NONE RDC NO INTAKE STRUCTURE REEVALUATIONSUPPER AUX SALT MATER PUNP SUPPORT LOCATED IO'BOVE ELEVATIOII -201'0 SPECTRA FOR -20 1'SED AS INPUT FOR UPPER PJNP SUP

PORTo IDUP HAS VERIFIE9 THAT MITH EXCEPTION OF SOILS MORKT MNICH MILL RE RESOLVED SEPARATELY) CAP FOR IHTAKE STRUCTURE

IS All ACCEPTARLE AND PROPERLY INPLENENTE9 PROGRAN FOR RESOLUTION OF THIS EOI INCLUDES EOI'S 967 t 988. MAS AH ER/AB Cl

820219 OD 0 820219 RLCA OIR RLCA RDF 3'ALVE NCUNO LINES 577 t 5788 AUX. DLD&o

P&lE DMB 447119 REV 12 AND PIPII3 SCHEN 102003t SHEET 48 REV 9 REFERS TO ITEN 15 OH 102039 THIS ISO 102039 SHT

41t REV09 SNNS 3 IHO VELAN VALVE TO BE DESCRIBED ON mo 663317 52 ~ EN.Y 4 L 6 INo VELAH VALVES ARE DESCRIBEB NEREO

1023 820219 OD 1 820322 RLCA PPRR/DEV TES RDF 3'ALVE mUNP LIKES'77 1 5788 AUXo BLDG.

CONNENTt RLCA RECOSEHDED P&1E CHECK DOC!D(ENTATIml ON ALL VALVESO FOLL(MNB POTE ACTIClt RLCA MILL SELECTIVELY VERIFY VALVE

DOCUNEHTATIOH0

If

l023 . 8202IO Oll 2 8200IT TES PRR/OIP P8IE ROP 3'RLIIE MCIRI LINES 577 I 578i 083 OLMCONNENTt P&1E TO CHECK THE DOCUNEHTATION ON ALL VALVESO FOLLOMING PORE ACTIm!t RLCA MILL SELECTIVELY VERIFY

VALVE DOCIWENTATION0

1023'MEHTt

1023CONNBITt

820219 OD 3 820707 TES OIR 'LCA RDF 3'ALVE DOCUNO LINES 577 1 57&5 AUXO IN,D&o

ITR-it 302oht RLCA TO REVIEM IHFORNATION SEHT BY PGK IN RESPONSE TO RLCA S 820414 REQUEST ~

'I

820219 OD ~ 4 820713 RLCA PPRR/Cl TES RDF 3'ALVE DOCUH» LINES 577 i 5788 AUXO BLDGO

,DELETE FRON ITR 1t 30204t RLCA NS REVIEMED THE INFORNATIOH REQUIRED TO NODEL THE AFM VALVEO

1023 &20219 OD 5 &2070 TES PN/CI TES RDF 3'ALVE DOCUN LINES 577' 578 AUX BLDG

CONNEHTt DC 66317 52 1 ~ DC6633i7 4 30 102003t SHEET It REV090 PB'I VALUE INVENTORY HOO 102039 ~ POTE PIPING ISO4471198REV0120 RLCA HAS RKEIVED THE INFORNATION REQUIRED TO NODEL THE AFM VALVEo

1023CONNEHTt

820219 OD 6 820717 TES CR 'et RDF HO 3 VALVE D(CNo LINES 577 L 578t AUXO BLDG ~

RLCA MAS HOT ABLE TO OBTAIH INFORNATION FOR A 3 IHO VELAH UALVEO THIS VALVE IS REFERED TO AS ITEN 15 OH

THE AUXo FM.ISO 447119 REV0120 THE REQUIRED VALVE DRAMIHG 663317"4"3 MAS LATER SEHT BY PGEE TO RLCA»

1024CONNEHTO

820220 FID 0 820220 RLCA OIR RLCA RDF PIPE SUPTO HONENOLINE 1917tAUX BUILDIHGOP&tE NAKEMTER ISO 4493178 REV03 HISLABELS SUPPORT 85S-40V AS 85S-40R»

1024 820220 FID 1 820520 RLCA PPRR/CI TES RDF PIPE SUPTO HONENOLIHE 1917t AUX BUILDIH&oCONNEHTt SEVERAL LINES ARE SUPPORTED BY THIS RESTRAINTt 5 RIGID AHD Ot(E BY A SPRING HANGERO

THIS ITEN MILL BE COVERED BY A REVIEM OF THE 79-14 PROSRANP

1024CONSENT/

1024COINENTt

820220 FID 2 820607 TES PRR/CI TES RDF PIPE SUPTO NONEH OLIHE 1917tAN RUILDIH&0PGiE PIPING ISO 449317t REV03 POLE DRAMIHG 049272t SHEETS 44544At45 THROUGH 4590SUPPORT DM IS LABELED 85S"40V(SPRING'HANGER) YET SUPPORT IS ACTUALLY A RIGID Y FOR LIHE 1917-4 SEVERAL LINES ARE SUPPORTED BY THIS RESTRAIHTI 5RIGIDLY'AHD (LE BY SPRING HANGEROTHIS ITEN MILL BE COVERED BY A REVIEM OF THE 79-14 PROGRANO

820220 FID '3 820607 TES CR NONE RDF HO PIPE SUPTo NONENOLINE 1917t AUX BUILDIHGPISO 449317 R3 SNNS SUPPORT 85S/40R (RIGID) 0 THE DESIGN ANALYSIS FOR, THIS SUPPORT IS LABELED 80S/40V (SPRIHG) 0

CmIFIRNS SUPPORT FUNCTIOHO CLOSED ITEHO

SEVERAL LIHES ARE SUPPORTFD BY THIS RESTRAII(Tt 5 RIGIDLY AHD ONE BY SPRIH&o DRAMIHG 049272 SNTO 44 44A 45A TNRU 45D0 0 1 t

Page 210: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 211: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

REV 2830817 os 3-49REUs 0 'ATEST REUs ACTIOH PG!E

FILE HOo, - DATE BASIS REVo DATE ='Y STATUS ORG TES NODS SUBJECT

1068 820315 QAR 1'20524 TES CR HQHE HAR HO URS/BL(SE QA FIHDIHGSCOHHENTs HO QA PROGRAHt IH CONFORHAHCE MITH 10CFR50 APPEHDIX Bt MAS IHPLEHEHTEDt RESULTING IH LACK OF FORHAL DESIGN CONTRGLs

TO BE REPLACED BY EOI 3005s CLOSED ITEHs

1069COHHENT(

1069COHHEHTs

820315 FID 0 820315 RLCA OIR RLCR RDF VALVE LCV 113/115 UNSUPT AFM LINES 577/578 AUX BPG2E AFM ISO 447119r REVs12 SHOMS VALVES LCU 113 X 115 UHSUPPNTEDi RLCA FIELD INSPECTION C(X(FIRHED THISs PGiE ANALYSIS2-14t COHPUTER DATE 1/16/82 IHDICATES SUPPORTS HAVE BEEH ADDED TO UALVESs RLCA TO COHPLETE VERIFICATIOH BASEDOH ORIGINAL FIELD IHFORHATIOHt MITH SUBSEQUEHT CONSIDERATION OF REVISIOHSs

820315 FID 1 820426 RLCA PPRR/CI TES RDF VALVE LCV 113/115 INSUPTs AFM LIHES 577/578 RUXs BsPGiE COHFIRHED ADDITION OF HEM SUPPORTS TO VALVES AND PRQUIDED 1981 ANALYSIS, Eot 1071 REPORTS OVERSTRESS IH THIS PIPINGAHALYSISs

1069 820315 FID 2 820511 TES 'OIR RLCA RDF 'ALVE LCU 113/115 UNSUPTs AFM LINES 577/578 AUXs Bs"COHHEHT~ TES RECOHHEHDS THAT FILE 1069t REVo0t BE RESOLVED EXCLUSIVELY BASED OH THE REVIEM OF THE PGlE 1981 AHALYSISt

PG1E REASOHS FOR THE'CHANGES RND THE RDDITIOH OF THE HEM SUPPORTS TO VALVES LCV113 AHD.LCV115 RATHER THANCLOSED OUT RND TRAHSFERRED TO FILE 1071 FOR EVENTUAL RESOLUTIOHs

1069 820315 FID 3 820517 RLCA PER/A TES RDF VAI.VE LCV 113/115 UHSUPTs AFM LINES 577/578 AUXs BsCOHHEHTs LACK OF SUPPORTS:OH VALVE OPERATOR CAUSES OVERSTRESS IH RLCA PIPING ANALYSIS 109s PGtE IH PROCESS OF ADDING RlPPCRTSs

ADDITIONAL SUPPORTS TO BE FIELD VERIFIED BY RLCA RLCA 109 MAS'RERUN MITH SUPPORTS OH VALVE OPERATOR (K15YCVF) T() 8HOM. STRESSES BELOM ALLOMABLEs POE PIPING ANALYSIS 2-4 DATED 1-16-82 INDICATE SUPPORTS OH VALVE OPERATORs

1069 '820315 FID 4 820607 TES FR/A PGiE RDF VALUE LCU 113/115 INSUPTs AFM LINES 577/578 AUXs BsCOHHENT) PGKE PIPIHG. ISO 447119r R.12r PIPIHG ANALYSES 2-14 (7/26/77 4 1/16/82) s RLCA PIPING ANALYSIS RLCA 109 SEQs OS K15VFM3i K15YCVF (3/19/82 t 5/9/82) s PGiE LTRs DCVPWLCA-67 (4/23/82) s PGiE DISs 049264r SHEETS 157-,169o VERIFs ANALYSIS,FAILS

STRESS EQUATIONS DUE TO UHSUPo VALVE OPERATORS.s THE ADDIo OF SUPTs OH UALVE OPERATOR RESULTS IN ACCEPTABLE STRESSESs

1069 820315 7ID'5 820630 'TES ~ ER/A POTE RDF YES UALVE LCV 113/115 UNSUPT AFM LINES 577/578 AUX B~ COHHENTs POTE TO ADD SUPPORTS AHD TO ASK VALUE SUPPLIER FOR VALVE QUALIFICATIOH FOR SUPPORTS OH VALVE OPERATORs

~ 1069 . 820315 FID 6 830625 TES OIR . RLCA RDF YES VALVE LCV 113/115 UNSUPTo AFM LIHES 577/578 AUXs BsCQHHENT'CP COHPLETIOH SHEET DATED 830620 IHDICATED THAT SUPPORTS HAVE BEEH ADDED TO LCV-113 AND LCV-115 VALVE OPERATORS

QUALIFICATIONs

RND VALVES HAVE BEEH QUALIFIED MITH THE SUPPORTS RLCA TO VERIFY SUPPORT ADDITIOH AHD REVIEM DCP VALVE

1069 820315 FID 7 830712 "RLCR PPRR/CI TES RDF YES VALVE LCV 113/115'UNSUPT, AFM LINES 577/57(s AUX, B,COHHENTl DCP COHP 'SHEET DATED 830620 INDICATES THAT SUPPORTS HAVE BEEN ADDED TO LCV"113 RND LCV"115 UALVE OPERRTORS ANDVALVES KRVE BFEH QUALIFIED MITH SUPPORTS RLCR HAS FIELD VERIFIED ADDITION OF THESE SUPPORTS

s

1069 .

COHHENTt

1069COHHENTs

820315 FIB 8 '830715 TES PRR/CI 'fS RDF YES VALVE LCV 113/115 UNSUPT AFM LINES 577/578 AUXs BoDCP COHP SHEET DATED 830620 INDICATES THAT SUPPORTS HAVE BEEH ADDED TO LCV-113 AND LCV-115 VALVE OPERRTORS RNDVALUES HAVE BEEN QUALIFIED MITH SUPPORTS RLCA HRS FIELD VERIFIED ADDITIOH OF'HESE SUPPORTS

820315 FID .9 830715 TES CR NONE RDF YES 'ALUE LCU 113/115 UNSUPTs AFM LINES 577/578 RUX, B,PGXE RFM ISO 447119r R,2 SHOMS VALVES LCU-113 i 115 UNSUPPORTED DCP COHPLETIOH SHEET DATED 830620 INDICATED THAT .SUPPORTS HAUE BEEN ADDED TO LCV-113 AND LCV"115 VALVE OPERATORS AND VAL'VES HAVE BEEN QUALIFIED MITH SUPPORTS'+ALEHRS FIELD VERIFIED,ADDITION OF THESE SUPPORTS PREUIOUSLY AH ERROR CLASS R, CI.OSEDITEN,'PORTS' RLCA

C

1070.'OHHEHTs

01070

COHHEHTo

820315 DHD 0 820315 RLCA OIR RLCA RDC AUX, BLDG, HORIZONTAL SOlL SPRING CALC,RLCA DIFFERS FROH THE NS/BLUHE SOIL SPRING BY 501 ~

ITR-1t 3s 1 oh AUXILIARYBUILDIHG RLCA TO COHPLETE HCNEILL MORKs, THE HORIZONTAL SOIL SPRING INDEPEHBENTLY CALCULATED YB

DELETE FROH ITR-1 t 3sis4 RLCA RECOI(ENDS THAT THIS FILE BE COHBI}(E

820315 DHD 1 820721 RLCA PPRR/CI TES RDC AUXo BLDGs

EOI 1097s,, COHBI)(ED MITH

Page 212: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 213: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

REUo 0 LATEST REVo ACTIOH PGZEREV 2 .

830817 D.3-6].FILE HOo

1098COMMENT<

1098COMMENT,

1098COMMENTo

1098COKMEHTo

1098COMMENTl

1098COMMEHTo

DATE . BASIS REVo DATE BY STATUS ORG TES , NODS SUBJECT .

820714 ICD 5 820922 TES ER/AB POTE RDF PIPING REEVALUATINoBASED OH POTE PRESEHTATXONS OF THEIR TECHNICAL PROGRAM THIS FILE IS COMBINED QXTH FILES 9&it .1021 1058 10591060 AHD 1104 AS AH ERROR CLASS A OR Bo THE INCLUSIOH OF FILES 1060 ND 1104 INTO THIS FILE MAS ACHIEVED BY PRNfREVIEW'COMMITTEE ACTION o ALL CONCERHS OF THE ABOVE MEHTIONED FILES MILI. BE REVIEWED UNDER THIS FILEo

820714 ICD 6 830120 TES ER/AB PGLE RDF PIPING REEVALUATINo'ASEDOH PGLE PRESEHTo OF THEIR TECIOIICAL PROGRAMt THIS FILE IS COMBINED M/FILES 9&it 102it 1058ti059t1060 t 1104.AS AN

ER A/B THE IHCLUSION OF FILES 1060 AHD 1104 IHTO THIS FILE MAS ACHIEVED BY PRO(NAM REVIEW (mTTEE ACTIN ALL C(NCERNS

OF THE ABOVE MEHTIONED FILES MILL BE REVIEWED HEREo REV. 6 MAS ISSUED TO REFLECT XNCLUSI(N OF FILE 6001 o

820714 ICD 7 830225 TES ER/AB POTE RDF YES PIPZHG REEVALUATINoBASED ON POTE PRESEHT OF THEIR TECH PROGRAMt THIS FILE IS COMBINED Q/FILES 9&iti021 1058 1059 106041104 AS AN ER/A/B

'THE INCL OF FILES 1060 1 1104 IH70 THIS FILE MAS ACHIEVED BY PROB REVIEW COMMITTEE ACTINo ALL CNCERHS OF THE ABOVE ~,

FILES MILL BE REVIEMED HERE REV 6 MAS ISSUED TO'REFLECT INCL OF 6001 REV 7 ISSUED TO REFLECT IHCL OF 1115 1 6002

820714 ICD 8 830627 TES ER/AB PGXE RDF YES PIPING REEUALUATIOH

BASED OH PGLE PRESEHTo OF 7HEIR TECH'» PROGRAMt THIS FILE IS COMBINED'M/FILES 961t1021t1058t1059t1060 1 0

"THE INCL OF FILES 1060.1 1104 IHTO THIS FILE MAS ACHIEVED BY PROG REVIEW COM ACTZOHo ALL CONCERHS OF THE ABOVE

WILL BE REVIEMED HEREo REV 6 ISSUED TO REFLECT IHCL OF 6001o REV 7 ISSUED TO REFLECT IHCL OF 1115 1 &002 R

820714. ICD ' 830706 TES ER/AB PGXE RDF 'ES PIPING REEVALUATIONBASED ON POTE PRESENT OF THEIR TECH. PROGRAM THIS FILE ZS COMBINED M/FILES 961 1021 1058 1059t1060 1 1104 AS AN'ER/ABTHF. IHCL OF FILES 10&0 Z, 1104 INTO TH!S FILE MAS ACHIEVED BY PROG REVIEW COM ACTIOH, ALL CONCERNS OF THE ABOVE FILESMILL BE'FUZEMEII HERE'. REV 6 - ZHCL OF 6001. REU 7 ISSUED TO REFLECT IHCL OF 1115 1 6002, REU, 8 - 1126, REU,9 - 1137

0 10 0SPACE RESERVED FOR LATER REUISIONSo.

.'098 0 ii 0COMIIEHTt SPACE RESERUED FOR LATER REVISIONSo

1099 820804 FID 0 820804 RLCA OIR RLCA PPR COMPONENT COOLING MATER HEAT EXCHo TURBIHE BLDGoCO}fMEHTl DRAWING SHOWS 3/4'7IFFEHER PLATES N HORTH SIDE OF FIXED END SUPPORT) FIELD VERIFICATIN DOES NOT SHOU THESE PLATES

ON HX 4 1"2o

1099 820804 FID 1 820816 RI.CA PPRR/OIP - TES PPR Cm(PNEHT COOLING MATER HEAT EXCHo TUINIIK BLDGo,:COMMENT( PGK TO ESTABLISH GEOMo CONIDERED BY DESo AHALo T DETERHXHE REASOHS FOR DIFFEREI(CES BETWEEN SUPPORTSo

I

1099 820804 FID 2 820820 TES PRR/OZP PGZE PPR NO COMPONENT COOLING MATER HEAT EXCH" TNBXNE BZDGoCOMMENT» BASIS o TES REVIEW OF GEONo DIFFo M/ RLCAt REVIEW OF RLCA BASIS FOR FINDIHG (PGiE FILES) 1-REVIEW OF 1099-1 t.'TES

MEMO 820819. POTE TO ESTABLISH THE. SUPPORT CONFIGURATION REPRESEHTED BY THE DESIGN ANALYSIS AHD DETERNINE THE REASNSFOR THE.DIFFERENCES BETMEEH'THE TMO SUPPORTSo

1099 820804 FID 3 821104 .TES OIR RLCA PPR COPOHENT COOLING MATER HEAT EXCH TNBIHE BLDGCOMMEHTo RLCA AND TES.TO ASCERTAIH UALIDITYOF POTE COMPLETION SHEET AHD VERIFY THAT THE ADDED PLATES OF CCMIN 4 1-2 HAVE BEEN

DESIGNED FOR HOSGRIo DESIGN CALCSo FOR ALTERNATE 'SHEAR RESTRAIHT'NE BEEN FOUN XH PGKES RESPONSE TO TES RFZ 0108(DCVP " TES 418 DATED 821006)o

1099 - 820804 FID 4 830216 RLCA PPRR/DEV TES PPR COMP(NEHT COOLIHG MATER HEAT EXCH o TURBINE BLDGoCO)fMEHTol PGZE DRAWING 463683 REVo 6 SHSS 3/4 S71FFNER PLATES OH lmRTH SIDE OF FIXED SUPPORTo RLCA FIELD VERXFICATIN SHOMS

. NORTH SIDE OF FIXED EHD SUPPORT OF KX 1"2 DOESN'T IHCLUDE THESE. HX 1-1 DOES DESIGH ANALYSIS'HOT AFFECTED) Sll(PLIFIED. MODEL DOESH'7 IHCLUDE THESE PLATESo DRAWING HAS BEEH REVISEDo

1099 820804 FID . 5 830225 TES PRR/DEV TES PPR CNIPOHEHT COOLING MATER HEAT EXCHo TURBINE BLDGoCOMMEHTl PGCE DRAWING 463683 REV 6 SHOWS 3/4'TZFFHER PLATES OH HORTH SIDE OF FIXED SUPPORT RLCA FIELD VERIFICATINI SNNSNORTH SIDE OF FIXED EHD SUPPORT OF HX 1-2 DOESH'T IHCLUDE THESEo HX 1-1 DOESo DESIGH AHALYSIS HOT AFFECTEDt SIMPLIFIEDMODEL DOESM'7 INCLUDE THESE PLATESo DRAWING HAS BEEN REVISEDo

1099 '20804 FID 6 830225 TES CR H(NE PPR HO COIIPOHENT COOLXHG MATER HEAT EXCHo 7(WBINE BLDGoCOMMEHTo PGXE DRAQZHG 463683 REVo 6 SHOWS 3/4'TIFFHER PLATES OH NORTH SIDE OF FIXED SUPPORTo RLCA FIELD VERIFICATION SINUSHORTH SIDE OF FIXED EHD SUPPORT OF N 1"2 DOESH'7 INCLUDE THESE. HX 1-1 DOES DESIGN ANtLYSXS NOT AFFECTEDt SllfPLIFIEDMODEL MESH'7 XHCLUDE THESE PLATESo DRAWING HAS BEEH REVISEDo DEVIATIOHo

1100 820816 OD 0 -'20816 RLCA OIR RLCA RDC HLA SOIL REVIEW OUTDOOR MATER STNAGE TNKSCOMMENTl HLA FIELD LOG OF'ORIHG 4 il (820208) IHDICATES TMO FIREWATER TANKS I 7HERE SHOULD OHLY BE OHE FIREWATER TA@l

Page 214: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 215: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

nrV 2t<".t(tt<] / I? ..l /0REV» 0 LATEST REV. ACTIOtt POSE

FILE HO, DATE BASIS REV, DATE BY STATUS ORG TES NODS SUBJECT

1120 830322 FID 1 830322 RLCA PER/B TES CHK COHDEHSORS CR-35'Pl(ASE I DCP CORRECTIVE ACTIOH)~ -. ~ CONNEHTo'ESIGN ANALYSIS HV-4»1 SHOMS 3/4'XT» HOUSIHG NONTIHG BOLTS USED IH EARLIER EDS CALC» IDVP FIELD C}KCK SNNS BOLTS TO

BE 1/2'o IDVP FACTORED BOLT STRESS IH D»A» BY DIFFEREHCE IN BOLT SIZE (3/4'S» 1/2')o RESS.TNT BOLT STRESS EX(mALLOMABLE DCP HAS REVISED D R AS A RESULT OF {DVP FIELD VERIFICATIOH TO S)WM BOLT STRESS TO BE BELOM ALLOMRBLE

1120 830322 F ID 2 830405 TES ER/B . PG1E CHK CONDO(SORS CR-35 (PHASE I DCP (WCTIVE ACTION)COtlNEHTl DESIGN ANALYSIS SHOMS 3/4'XTERIOR HOUSIHG NOUNTIHG BOLTS USED IN EARLIER EDS CALC MERE ACCEPTED IN

PH I DCP CAP» IDVP FOUHD 1/2'OLTS AND FACTORED BOLT STRESS BY DIFFERENCE IH BOLT SIZE» STRESS

EXCEEDS ALLOMABLE» DCP HAS REVISED 9»R» RND RBLE TO'HOM STRESSES BEIN RLLONBLE»

1120 830322 F ID, 3 830420 TES OIR RLCA 0(K CNSGRS CR-35 (PHASE I DCP C(NECTIVE ACTIN)CONNENTl RDVERSE EFFECT OF LOUR BOLT SIZE ON STRESS CONPEHSATED FOR BY It{CREASED NUNBER OF BOLTS AND OVERALL BOLT SPRCIN»

TES RECONNEHDS RLCA TO REVIEM THIS FILE At(9 COHSIDER DOMHGRADING IT FRON AH ER/B TO AH ER/Co

~ . 1120. 830322 FID 4 . 830429 RLCA PER/C TES CHK CONBENSORS CR-3S (PHASE I DCP CORRECTIVE ACTIN).CONNEHT ~ 'ORIGIHAL EDS CRLC SHOMED FOUR 3/4 SNHTING BOLTS» FIELD SHOMS 1/2 o NNEVERt ADVERSE EFFECT OF SNRLLER

BOLT SIZE CONPEHSATE BY ACTUAL FIELD CONFIGURATIN( (6 NOUNTIHGS AS OPPOSED TO 4 IH DESIGN ANALYSIS)'OMNGRADEDFRON ER/B TO ER/C SIHCE CRITERIA OR LINITS HAVEH'T BEEH EXCEEDED»

1120 830322 FID 5 830504 TES ER/C PGlE CHK CONDEHSORS CR-35 (PHASE I -XP CORRECTIVE ACTIN)CONNEHT» ORIGIHAL EDS CALC SHOMED FOUR 3/4'OUHTIHG BOLTS» FIEL9 SN)MS 1/2'o )OtEVERt ADVERSE EFFECT OF SNRLLER

BOLT SIZE CONPEHSATE BY ACTUAL FIELD CONFIGURATION (6 teSTINGS AS OPPOSED TO 4 IH DESIGH ANALYSIS)DOMNGRADED FRON ER/9 TO ER/C SIHCE CRITERIA OR LINITS HAVEN'T BEEH EXCEEDED»

1120 830322 F ID ~ 6 830507 TES CR HONE CHK HO CONDEHSORS CR"35 (PHASE I DCP CORRECTIVE

ACTION�)

.CONNEHT» ORIGIHRL EDS CALC SHOMED FOUR 3/4'OUHTIHG BOLTS» FIELD SNNS 1/2'. HOMEVER't ADVERSE EFFECT OF SNALLERBOLT SIZE CONPEHSATE BY ACTUAL FIELD COHFIGURATIOH (6 NOU(TIHGS AS OPPOSED TO 4 IN DESIGN ANALYSIS)DOMNGRADED FRON ER/B TO ER/C SIHCE CRITERIA OR LINITS HAVEH'T BEEN EXCEEDED»

1121 830506 FIB' 0 830506 RLCA OIR RLCA CHK. BOLT SIZEt FILTER UNIT - 39CONNEHT$ DESIGH AHALYSIS HV 5»lit Ro 0 SHOMS AHCHOR BOLT SIZE OF 5/8 BETMEEH Cm)CRETE SLAB'A)m MIDE FLANGE

BASE BEAN» FIELD SHOMS 1/2'IRNETER» RLCA TO DETERNIHE SIGNIFICANCE» MILL BE EXRNINED M/1096,AND1120 FOR POSSIBLE GENERIC COHCERH RE»'VAC CGNPONENT HOLD DOMN BOLT SIZE»

1121 . 830506 FID 1 830608 'LCA PER/C TEG CHK BOLT SIZEt FILTER UNIT - 39»CONNEHT» DCP REVISED ANALYSIS S)tOMS BOL'TS TO NEET ALLOMABLES AND DESIGH CR'ITERIA» RESULT OF THIS EOlt 1096 AHD 1020t POSSIBLE

GENERIC CONCERHt EVEH THOUGH HO OVERSTRESS» RLCA MILL REVIEM DCP BOLT SIZE PROGRRN ND SPECIFIC SRNPLE OF CL» IHOLD-DGMN BOLTS.

1121, 830506 FID 2 T80610 TES ER/C PGCE CHK BOLT SIZEt FILTER UNIT - 39CONNEHTl DCP REVISED AHAQSIS SNOMS BOLTS TO NEET ALLOMABLES AHD DESIGH CRITERIA» RESULT OF THIS EOlt 1096 NB 1020t POSSIBLE

GEHERIC CONCERHt EVEH THOUGH HO OVERSTRESS» RI.CA MILL REVIEM DCP BOLT SIZE PROGRAN At(9 IF DEENEB HECESSARYt A SPECIFICSANPLE OF. CL» I HOLD-DOMH BOLTS»

1121 830506 FI9 3 830610 TES CR HOHE CHK HO BOLT SIZEt FILTER UNIT " 39»CONNEHT» DISCREPANCY BETMEEH HOLD"DOMN BOLT SIZE IH D»A» AHD IH FIELD» DCP REVISE9 AHALYSIS Sto)S B{N.TS TO NEET ALLOMRBLES RNB

DESIGH CRITERIA» RESULT OF THIS EOIt 1096 AND 1020t POSSIBLE GENERIC CONCERHt EVEN THG(hH NO OVE(5TRESS» RLCA MILLREVIEM DCP BOLT SIZE PROGRAM AHD IF DEENED HECESSARYt A SPECIFIC SANPLE OF CL» I HOLD DGMN BOLTS»

1122 830512 OD 0 830512 RLCA OIR RLCA JFN 'ARGE BORE PIPE SUPPORT 10/70SLCONNEHT» DESIGH ANALYSIS CALC HO» S"1281 R»3 DOESH'T ADDRESS SUPPORT FREQUEHCIES IH UNRESTRAINED DIRECTIONS AS REQUIRED BY

LICENSIHG CRITERIA» SINPLIFIED IDVP CALCS SHOMS FREQUEHCIES LESS .THAH 20 HZ» DCP INDICATES'AHALYSIS HAS BEEHREVISED (REV 4) AND IT'DDRESSES AHD SHOMS ALL FREQ» IH UNRESTRAIHED DIRECTION GREATER THAN 20'HZ» IDVP MILL VERIFY.CALC

1122 830512 OD 1 830623 RLCA PER/C TES JFN LARGE BORE PIPE SUPPORT 10/70SLCONNENTl 9 R. FOR SUPPORT 10/70SL (CALC S-1281 R 3) DGESH'T ADDRESS SUPPORT FREQUENCY'lH UNRESTRAIHED DIRECTIOH AS REQUIRED

GEHERIC CONCERN»

BY DCP PROCEDURES» REALISTIC CALCS SHOM FREQ,TO BE ABOVE 20 HZ ALLOMABLE» IDVP DOESN'T CONSIDER THIS EOI TQ'BF, A

83P5)2 '87? 7 8307."6 RLCA PER/C TES JFN LARGE BORE PIPE SUPPORT 10/70SLCONNFHTl D.A. FOR SUYPGRT'(CALC S-.1281 R. 3) DOEStl'T ADDRESS FREQ OR STRESS IH UNRESTRAINED DIRECTIONS PER DCP

PROCEDURES'CPCRITERI(? REQUIRES EITHER FREQ EXCEED 20 HZ OR STRESS DUE TO LOADING.NEET ALLOMABLES DCP PERFORNED FEN TO SNGMh(l. SIFESSFS BELOM nl.LGttABLE, IDVP FEELS EOI ttot A GENERIC CONCFRN.

l1 2 830. 12 09 3 830?"9 TES rf'lt/DE'v PG(E JFtt LARGE BORE plpE SUPPORTCONNF?(T' ~ A. f'R SUPPORT (CALC S"1281 R 3) DOFStt'T ADDRESS FREQ OR STRESS IH UNRESTRAINED Digf{;TIP/l,'cf Cft[TERIA REQUIRES F(THER FREQ EXCEE(l ?0 Hz OR STRESS DUE TO LOADING NEET ALL'OMABL

" N S PER DCP PRQCEDUttE'S,4LL STRESSES BEI OM ALL6MABLE I(VP FEf-:Ls EOI ttar A GENERIC CONCERN

ALLOMABLES PCP PERFORNED FEN TO SKOM .l i~2. '3051 . OD 4 83080 TES CR HONE JFN NG LARGE BOt?E PIPE SUPPOP»T 10/70$ LCONNENTl 9 A FGR SUPPORT (CALC S-1281» R 3) DGEStt'T ADDRESS FREQ OR STRESS IN UNRESTRAINED DIRECTIOtt$ PER DCP PDCP CRITERIA RE(?UIRES EITHER FRED FXCEEI 20 HZ OR STRESS DUE 70 LOADING NEET RLLONABLES,. (?gPALL STRESSFS BELOM AL'GMABLE IDVP FEE'S EOI ttOT.A GENERIC CONCERtl DFVIRTIOH

Page 216: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 217: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

." REVo 0 LATEST REUo

FILE HOo DATE BASIS REVo DATE BY

'122 0 5 0 =

COtmEHT'o SPACE PROVIDED FOR LATER REVISIONSo

ACTIN POLK

STATUS ORG TES NODS SUBJECT

REV 2

830817 D.3-71;

1123 ~ ~ 830513 OD 0 830513 RLCA OIR RLCA RCM INSTRUMENTATION TUBING SUPPORT ~

CONNEHTI DESI6N ANALYSIS ITS-5r'R. 0 ASSUMES SUPPORT MEMBER TO BE A 1202 SECTION D A ITS-5r R 1 PROVIDES AS-BUILT DATA

~~ THAT SNQMS A B 1202 SECTIONo SIMPLIFIED DoAo FOR SUPPORT USER INDICATES STRESS ABOVE ALLO%LE IF CORRECT SECTION

'PROPERTY (J) IS USEDo REPRESENTS SOLE INSTANCE MHERK LICEHSIHO CRITERIA MAY HAUE BKEH KXCEKDKDo

1123 830513. OD 1 830623 RLCA PER/C 'ES RCM IHSTRUNEHTATIOH TUBIHG SUPPORT

~ COMMENT', D,A ITS-5r R 0 ASSUMES SUPPORT MEMBER TO BE A 1202 SECTION REVISIOH 1 PROVIDES AS-BUILT DATA THAT SNNS SUPPLYMEMBER TO RE A B 1202 SECTIOHo MORE REALISTIC CALCS SHOM ALL STRESSES TO BE UNDER ALLOMABLESo IDVP DOESH'T CONSIDER

THIS EOI TO BE A GEHERIC CONCERHo

1123 „, 830513 OD 2 830627 TES ER/C PGfE RCM INSTRUNEHTATIOH TUBIHG.SUPPORI

CQNNENTo DESIGH AHALYSIS ITS 5r Ro 0 ASSUMES SUPPORT MEMBER IO BE A 1202 SECTIOHo R ~ 1 OF CALC PROVIDES AS BUILT DATA THATSHOMS SUPPORT MENBER TO BE B-1202 SECTIOH MORE REALISTIC CALCS SHOM ALL STRESSES TO BE UHDER ALLOMABLES THISEQI HOIES A SOLE IHSTANCEr IDVP DOESH'T COHSIDER THIS A GENERIC COHCERH,

1123 830513 09 3 8 0713 TES CR NONE RCM NO IHSlRUNENTAIION TUBIHG SUPPORT

CONNEHTo DESIGN ANALYSIS ITS 5r. RE 0 ASSUMES SUPPORT MENDER TO BE A 1202 SECTIONS Ro 1 OF CALC PROVIDES AS BUILT DATA IHAT

SHOMS SUPPORT MEMBER TO BE B-1202-SECTION NORE REALISTIC CALCS SHOM ALL STRESSES TO BE UHDER ALLOMABLES. THIS

EOI NOTES A SOLE IHSIANCF IttUP DOFSN'I CONSIDER THIS A GEHERIC COHEStttt 'FRROR CLASS C.

1124 830514 QD ~ 0 830514 RLCA OIR RLCA RDC AUXILIARYBUILDING SPECTRA 6ENERATIN

~ COMMENT. D,A. F,E. MODEL C.R. SLAB USED TQ GENERATE HOSGRI RESPONSE SPECTRA DOESH'T AGREE MITH FIELD LOCATIN OF

SUPPORTING MALLSo SPAN LEISTHS OF SLAB NAY SHIFT FREQUENCY AND APPROACH FUNDAMENTAL VERTICAL FREQUENCY.AHD

PROVIDE INCREASE9 AMPLIFICATIOHo CLASSIFICATION OF EOI MILL DEPEND N SUBSEQUEHT VERIFICATINo

1124'30514 09 1 830627 RLCA PER/B TES RDC AUXILIARYBUILDIHG SPECTRA GEHERATIOH

COMMENT'. 9ESIGN AHALYSIS FEM OF CR SLAB USED IO GEHERATE HOSGRI SPECTRA DOESH'T AGREE MITH FIELD VERIFIED LOCATION QF

SUPPPPTING MALLSo DCP REVISED FEN TO AGREE MITH FIELD~ AT CERTAIN FREQUEHCIESt SPECTRA INCREASED BY 15X, DCP

IHDICATES ttO STRUCTURAL NODS RESULTED FROM THIS ERRORo

1124 830514 OD 2 830628 TES ER/R PG LE RDC AUXILIARYBUILDING SPECTRA GENERATIONCONNEHTo DESIGN AHALYSIS FEM OF CR 'SLAB USED,TO GENERATE HOSGRI SPECTRA DOESH'T AGREE MITH FIELD VERIFIED LQCATIQH QF

SUPPORTIHG MALLS. DCP REVISED FEM TO AGREE MITH FIELD AT CERTAIH FREQUEHCIES SPECTRA IHCREASED BY 15X,„„. I QICATES NO. STRUCIURAL NODS RESULTED FRON THIS ERROR

830514 09' 830721 IES 'IR RLCA RDC AUXILIARY BUILDIHG SPECTRA GENERATION

COMMENTl DESIGN ANALYSIS FEM OF CR SLAB FOR HOSGRI SPECTRA DOESN'T AGREE M/FIELD LOCATIOH OF SUPPORTING MALLS. DCP HAS

RE'UISED TO AGREE M/FIELD SPECTRA INCREASES NORE IHAtt 15% AT.SOME FREQ IDVP DESIGH UERIFIED DCP SPECTRA DCP

Ittt}ICAIES HO SIRUCTURAL NODS RESULT RASED Ott LETTER DCVP-TES-1252r RLCA TO REVIEM AND ISSUE A RESOLUTION

1124 830514 OD 4 830721 RLCA PPRR/CI IES RDC AUXILIARY BUILDING SPECIRA GEHERATIOH

'OMNENllDESIGN ANALYSIS FEN OF CR SLAR FOR HOSGRI SPECTRA DOESN'T AGREE M/FIELD LOCATIOH OF SUPPORTIHG MALLS DCP HAS

REVISED TQ AGREE M/FIELD. SPECIRA INCREASES MORE THAN 15X AT SOME FREQ IDUP DESIGN VERIFIED DCP SPECTRA"

DCP

INDICATES HO STRUCTURAL MORS RESULT,,

} 124 83P514 OD 5 830725 TES PRR/CI IES RDC AUXILIARYBUILDIHG SPECTRA GEHERATIOH ..

CONMENTl DESIGN ANALYSIS FEN OF CR SLAR FQR HOSGRI SPECTRA DOESH'T AGREE It/FIELD LOCATION OF SUPPORTING MAt.t.S, DCP NAS

REVISED TO AGREE M/FIELD. SPECTRA INCREASES NORE THAN 15X AT SOME FREQ IDUP DESIGH VERIFIED DCP SPECTRA, DCP

INDICATES NO STRUCTURAL NODS RESULTo

1124 830514 09 6 830725 TES CR HONE RDC NO AUXILIARYBUILDIHG SPECTRA GENERATION

COMMENT: nESIGH ANALYSIS FEN OF CR SLAB FOR HOSGRI SPECTRA DOESN'T AGREE M/FIELD LOCATIOH OF SUPPORTING MALLS. DCP HAS

REVISED IO AGREE M/FIELD. SPECTRA INCREASES NORE THAH 15X AT SOME FREQ IDUP DESIGH VERIFIED'DCP SPECTRA DCP

INDICATES HO STRUClURAL NODS RESULT. PREVIOUSLY AH ERROR CLASS B CLOSED ITEM.

1125 830520 SID 0 830520 RLCA OIR RLCA CHK HVAC CQttPRESSOR CP"35r 36CQMNEHTl CONTROL AND APPLICATION OF NSGRI SPECTRA MAS IDENTIFIED IH IHITIALSAMPLE AS A GEttERIC CmoCERH DCP CAP FORMULATED

TO INCLUDE REVIEM FOR CORRECT HOS6RI SPECTRA IHPUTSo DESIGN ANALYSIS IHIU 3ol it REUo 1 USES INCORRECT AHDUHCmtSERVATIVE SPECTRAo HO OVERSTRESSo

1125 830520 SI D 1 830526 RLCA PER/C TES CHK HUAC COMPRESSOR CP"35r 36COMNEHTo CALC D"HV"3o1"1 REVo 1 USES IHCORRECT AHD INtCOHSERUATIVE SPECTRAo CONTROL AH9 APPLICATIQH OF HOSGRI SPECTRA ID DURING

IHITIALSAMPLE MQRK AS GENERIC COHCERHo DCP CAP FORNULATED TQ IHCLUDE REVIEM FOR CORRECT HOSGRI SPECTRA INPUTSo. THIS ITEM DOES HOT CAUSE OUERSTRESSo

Page 218: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

,~

Page 219: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

Fll.E NO<

1127'ONMEHTI

FILE HO

1128'OMMEHte

F,ILE NO>

1128COMMENTI

REV 2830817 0.3-72a

REVo 0 LATEST REVe ACTIOH PGRE

DATE BASIS REVI DATE BY STATUS ORG TES NODS SUBJECT

830525 'MD 3 830616 TES CR NONE CHK HO HVAC SUPPLY FANS S-it 2DCP FREQUENCY CALC USED ONLY BEARIHG BLOCK SUPPORT BEAN AHD HOT OTHER FLEX OF FAH SUPPORTING STRUCTUREa FH 'MAYACTUALLY BE LOMER DCP FREQ CALC ACCEPTABLE " SINILIAR TO IHITIALSAMPLE MORK (FAH S"31) DCP BEARING BLOCK SUPPORTBEAN FREQ CALC CORRECTs ORIGIHAL RLCA COHCERH HOT VALID'LOSED ITENi

REV, 0 „, LAlEST REVo ACTION PG1E

DATE BASIS. REV. DATE BY STATUS ORG TES NODS SUBJECT .

830531 FID 0 830531 RLCA OIR RLCA CHK STATIOH BATTERY RACKS9 A FOR RACKS ASSUMES 1/2'IAMETER A-307 STRUCTURAL BOLTS RLCA FIELD VERIFIED BOLTS TO BE 3/8'F BOLTS THREADEDAT SHEAR LOCATIONS SHEAR STRESS EXCEEDS ALLOMABLES BY 63Xr IF NOT THREADEDt STRESS IS

ACCEPTABLE'EV»

0 LATEST REVo ACTIOH PGEE

DATE BASIS REV, 'ATE BY STATUS ORG TES NODS SUBJECT

830531 FID 1 830620 RLCA OIR RLCA CHK STATIOH BATTERY RACKSDoAs FOR STATIOH BATTERY RACKS ASSUMES A-307 1/2'lRUCTURAL BOLTS'LCA FIELD VERIFIED BOLTS TO BE 3/8'oDoAa ALSO DDESN'T CONSIDER RESOLVED SHEAR FORCE FOR 3/8'OLT ANALYSIS'lRESSES EXCEED ALLOMABLE IFCORRECT BOI.T SIZE AND SHEAR FORCE IS USED.

REV. 0 LATEST REV o 'CT IOH P GEE

FILE HOo . DATE BASIS REVa DATE BY STATUS ORG TES NODS SUBJECT

1128 . 830531 FID 2 830627 RLCA PPRR/OIP TES CHK STATIOH BATTERY RACKS

MENTS DoAo FOR STATION BATTERY RACKS ASSUMES A-307 1/2'TRUCTURAL BOLTS'LCA FIELD VERIFIED'OLTS TO BE 3/8'.~ "9)A, ALSO DOESH'T CONSIDER RESOLVED SHEAR FORCE FOR 3/8'OLT ANALYSIS'TRESSES EXCEED ALLONBLE IF

CORRECT BDLT SIZE AND SHEAR FORCE IS USED

REV. 0 - LATEST REVo ACTION PGiE

FILE HO. DATE BASIS'EV, DATE BY STATUS ORG TES NODS SUBJECT

1128 830531 FID 3 , 830628 TES PRR/OIP PGEE CHK STATIOH BATTERY RACKS

CONMEHT ~ DoA» FOR STATION BATTERY RACKS ASSUMES A 307 1/2 STRUCTURAL BOLTS'LCA FIELD VERIFIED BOLTS lO BE 3/8 ~

D.A. ALSO DOESH'T COHSIDER RESOLVED SHEAR FORCE FOR 3/8'OLT ANALYSIS'TRESSES EXCEED ALLOMABLE IFCORRECT BOLT SIZE AND SHEAR'FORCE IS

USED'iV8-NOS3i F16 . 4 ,830809 TES OIR RLCA CHK STATION BATTERY RACKS

COMMENll TES RFQUESTS THAT RLCA REVIEM THIS FILE ALONG MITH THE DCF"S RESPONSE .TO RLCA RFI 4972 AND PROVIDE A RECOMMENDATION FOR

ITS FUtURE DISPOSITION

jj28 830531 FID 5 830809 RLCA PER/C TES CHK STATIOH BATTERY RACKS

COMMENTt BENIGN ANA'SIS FOR STATIOH BATTERY.RACKS (EQPN CALC 9-E-3 4-1) R 0) LISTS DIFFEREHT STRUCTURAL FRAME BOLTS AHD ANCHOR

BOLTS THAN THOSE IH THE FIEL9. ALSO 'AD DISTRIBUTIONS BTMH MEMBERS ARE UNCONSERVATIVE AND lHE RESOLVED SHEAR FORCE-

FPR FRAMf'OLTS MAS NOT COHSIDEREDi RLCA HAS PERFORMED ALTERNATE CALCS THAT SHOU ALL STRESSES NEET ALLOMABLES,

-tres- - --0 --- -6- —--0COMMEHTl SPACED RESERVED'FOR LATER REVISION

1128 0 . 7 0COMMEN t SPACED RESERVED FOR LATER'REVISIOH

8

REVi 0 'AlEST REVo ACTIOH PGKE

FILE NO DATE BASIS REV . DATE BY STATUS ORG TES NODS SUBJECT

1129 830603 OD .. 0 830603 RLCA OIR RLCA JFN LARGE BORE PIPE SUPPORT 56S/3ACOMMENT1 D A INCORRECTLY ANALYZED 1/O'ELD BETMEEH.PIPE LUG AHD SUPPORTIHG STEEL MELD STRESS EXCEEDS ALLONBLE MHEH DIVIDED

BY MELD CROSS SECTIOH 'UPPOR't MODIFIED BY DCP COHFIGURATION QUALIFIED BY CALC NO LOHGER EXISTS IN PLANT. HOGEHERIC CONCERH.

Page 220: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 221: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

FILE NOe

1129COMMENTS

FILE HQ

1129CONNEHTT

FILE NO.

1129CONNEHTT

REV 2830817 D 3-72b

'I

&TV, 0 ,"

LATEST REV ACT ION POTE

DATE BASIS REV. DATE BY STATUS ORG lES NODS SUBJECT

830603 OD 1 830620 RLCA PER/C TES JFM LARGE BORE PIPE SUPPORT 56S/3A

MELD SlRESS 'CALC USED CONSERVATIVE ASSUNPTIOH FOR NONEHT OF INERTIAo STRESS MEETS ALLOMABLES IF ACCURATE MENEH7 OF

,IHERTIA IS USED AND RESULTANT STRESS IS DIVIDED BY MELD CROSS SECTIOH SUPPORT MODIFIED BY DCP SUPPORT QUALIFIED BY '.

CALC A"103r R5 HO LONGER EXISTS IH PLANT HOT A GENERIC, CONCERNS

REVo 0 LATEST REV. ACTIOH PGXE

9ATE BASIS, REV DATE BY STATUS ORG lES NODS, SUBJECT

830603 OD'

830627 TES ER/C PGXE JFH CARGE BORE PIPE SUPPORT 56S/3A

DoA MADE CONPEHSATING ERRORS ANALYZIHG 1/4 MELD BETWEEN PIPE LUG AND SUPPORTIHG STEEL MELD STRESSES DO NOT EXCEED

ALLO'MABLES. NO GHERIC COHCERH ERROR C.

REV. 0 . - . LATEST REV+ ACTIOH POLE

DATE BASIS REVi DATE BY STATUS ORG TES NODS 'UBJECT

830603 09 3 830628 TES CR HOHE JFN LARGE BORE PIPE SUPPORT 56S/3A9@AD MADE CONPEHSATIHG ERRORS ANALYZIHG 1/4 MELD BETWEEN PIPE LUG AND SUPPORTING STEELt MELD STRESSES DO NOT EXCEED

ALLOMABLES. HO GHERIC CONCERNS ERROR Co

REVi 0 LATEST REVo AClIOH PG1E

jILE HO DATE BASIS REV, DATE 'Y STATUS ORG TES NODS SUBJECT

1130 830603 09 0 830603 RLCA OIR - RLCA PPR . CONPOHENT COOLING MATER LUBE OIL FILTERCONMENTT D,A,'ONCLUDES COOLER NOT QUALIFIED AND NODS ARE REQUIRED, PGtE PH, I FIHAL REPORT STATES IT IS AND NODS HOT HEEDED,

ITR 48 R 0 REQUIRES IDVP TO VERIFY DCP CAP HAS BEEH FULLY INPLENEHTED THE SIGHIFICAHCE OF COHCERN IS THA REQUIRED, CORRECTIVE ACTIOH MAS HOT IMPLEMENTED( RLCA TO EXPAHD REVIEW IH THIS

AREAR'REV.

0 LATEST REVo ACTION PGRE

FILE HOo 'ATE BASIS REV. DATE BY STATUS ORG TES NODS SUBJECT

1130 830603 OD , 1'30618 RLCA PPRR/DEV TES PPR CONPOHEHT COOLING MATER LUBE OIL FILTERCONNEHTl DCP SCHEDULE AHD FIHAL REPORT SNOMED MORK OH THIS ITEH TO'BE'COMPLETE AHD QUALIFIED AFTER 830614

TECHNICAL MEETING DCP SHOWED THE ITEM IHCLUDED OH IHTERNAL IHTERFACE LISTS OF ITEMS FOR ACTIOH, IT IS CLEAR THATREQUIRED ACTION'MOULD HAVE BEEH INPLENEHTEDo DCP COMMITTED TO REVISE THIS SECTIOH OF PHo I FIHAL REPORTS

REVi 0 LATEST REVo ACTIOH POTE

, FILE HOi DATE BASIS REV. DATE BY STATUS ORG TES MODS SUBJECT

1130 830603 OD 2 830627 TES PRR/DEV PGCE PPR COMPOHENT COOLIHG MATER L'UBE OIL FILTERCONNEHTl, PGLE PHi I FIHAL REPORT IHDICATES THIS ITEM QUALIFIED AHD NO MODS,. DESIGH AHALYSIS COHCLUDES THAT IT IS HOT QUALIFIED

DUE TO HIGH NOZZLE LOADS DCP IHTERHAL MEMOS INDICATE ITEN ALREADY BEING TRACKED. PH, I FINAL REPORT IS INCORRECTt'GXE HAS CONMITED TO CORRECT ITo ~

REV"a 0 LATEST REVI ACTIOH PGRE

1130 8i0603 Oii .1 '30650 TES CR NOHE PPR HO COMPONEHT COOLIHG MATER LUBE OIL FILTERCOMMENTS D.h COIICLUDES COOLER NQT QUALIFIED AND NODS ARE REQUIRED. PGXE PH I FINAL REPORT STATES IT IS AHD NODS HOT HEEDED

AFTER 830614 TECHNICAL MEETING DCP SHOWED TNE ITEN IHCLUDED ON IHTERHAL IHTERFACE. LISTS OF ITEMS FOR AC'TIDH Il IS =

CII:~R THAT REOUIRFD ~CTION WOULD HAVF. BEEN IMPLEMENTED, DCP COMMITTED TO REVISE THIS SECTION OF PH, I FINAL REPORT, DF~

FILE HO, DATE BASIS REV. DATE BY STATUS ORG. TES NODS SUBJECT

'131 830606 QD 0 830606 RLCA OIR RLCA JFN LARGE BORE PIPE SUPPORTS 58S/16V AHD 63/26VCONMEHT1 9tA ~ DO HOT EVALUATE SHEAR LUGS AHD ATTACHNEHT MELDS ~ EVALUATIOH REQUIRED FOR CAP ~ IDVP MILL REVIEW REVISED DCP

CALCS AND EVALUATE THE LUGS AHD MELDS BASED ON ORIGINALLOADS'EV

0 LATEST REVo ACTION PGRE

FILE HOi DATE BASIS REVi 'ATE BY STATUS ORG TES NODS SUBJECT

'131

830606 OD 1 830620 RLCA PPRR/DEV TES JFM LARGE BORE PIPE SUPPORTS 58S/16V AHD 63/26VCOMMENTS DESIGH ANALYSES DOH'T EVALUATE SHEAR LUGS AHD ATTACKMEHT MELDS [CALCS H-1040 R,2 AHD H-359 R.4); THIS IS REQUIRED

BY DCP PROCEDURES'EPARTURE FROM PROCEDURE~ HOT ERRORS STRESSES ARE LOM BY IHSPECTIOHo,

Page 222: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 223: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

REV. 0 LATEST REVs ACTIOH POTE

~ REV 2'830817 0.3.-72c

F ILE HO GATE BASIS REV. 'ATf BY STATUS ORG TES NODS SUBJECTI

1131 830606 09 2 830624 TES PRR/DEV POLE JFN LARGE BORE PIPE SUPPORTS 58S/16V AHD 63/26U-COHMEHTl 9 A. FOR THESE SUPPORTS AHD ASSOCIATED PIPIHG DON'T EVALUATE SHEAR LUGS AND ATTACHMENT MELDS, THIS EVALUATIOH

REQUIRED BY DCP PROCEDURES'EPARTURE FROM PROCEDUREr HOT AH ERRORs STRESSES IH lHESE SHEAR LUGS AND

ATTACNMEHl MELDS„ARE LOM BY IHSPECTIONsREVs 0 ,

'LATEST REUs ACTIOH PGfE

FILE HO. DATE BASIS REU DATE'Y STATUS ORG TES NODS SUBJECT

1131 830606 OD , 3 830624 TES CR HOHE JFH LARGE BORE PIPE SUPPORTS 58S/16V AHD 63/26VCOMMENTS 9.A FOR THESE SUPPORTS AND ASSOCIATED PIPIHG DOH'T ENLUATE SHEAR LUGS AHD ATTACHNEHT MELDS THIS EVALUATION

REQUIRED BY DCP PROCEDURES. DEPARTURE FROM PROCEDUREr HOT AH ERROR STRESSES IH THESE SHEAR LUGS AND

AlTACHMEHl MELDS ARE LOM BY IHSPECTIOH, DEVIATIOH,REVs 0 LATEST REU ACTIOH PGIE

FILE NO DATE BASIS "REU'ATE BY STATUS 'RG TES NODS SUBJECT

1132 830606 09 ' 830606 RLCA OIR RLCA RDC AUXILIARYBUILDINGCOMKENTs DCP REPORTED COMPLETION OF AUX BUILDING MEMBER EVALUATIONSs DOES HOT INCLUDE ENLUATIOH OF SLABS FOR IH-PLAHE ~

LOADIHG 'REQUIRED CORRECTIVE ACTIOH MAS NOT FULLY IMPLENEHTEDr YET REPORTED AS COMPLETE RLCA MILL COHTIHUE REVIEWIH CIVIl/STRUCTURAl. AREA.

FILE HO, 9ATE BASIS REV, DATE BY STATUS ORG TES NODS SUBJECT

1132 '30606 OD .1 830618 RLCA PPRR/CI TES RDC AUXILIARYBUILDIHGCOMKFNTl THIS EOI CONTAINS AN INCORRECT STATEMEHT, IT SHOULD READ '„.THIS MODEL MAS REQUIRED TO MORE ACCURATELY

DISlRIBUlE THE LOADS FROM THE ORIGIHAL STICK MODEL . 'LCA RECOMMENDS COKBIHING THIS EOI MllH EOI 1097 AS.AN ERROR CLASS A OP. Bs

REV. 0 LATEST REVs ACTIOH PGRE

FILE HQs DATE BASIS 'REVs DATE BY STATUS ORG TES .NODS 'UBJECT

1132 830606 . 09 2 830625 TES PRR/CI TES RDC AUXILIARYBUILDIHGCONMENTl THIS EOI CONTAINS AN IHCORRECT STATENEHT IT SHOULD READ '..THIS MODEL MAS REQUIRED TO KORE ACCURATELY

DISTRIBUTE THE LOADS FRON THE ORIGIHAL STICK MODEL . 'LCA RECOMNEHDS CONBIHING THIS EOI MITH EOI 1097 AS

AN ERROR CLASS A OR BsREVs '0 '

LATEST REVs ACTIOH PGLE

FILE HOs DATE BASIS REUs DATE BY STATUS ORG TES NODS SUBJECT

1132 830606 09 3 830627 TES CR NONE RDC AUXILIARYBUILDIHGCOMMEHTl DCP REPORTED COMPLETIOH;OF AUX BUILDIHG NEKBER EVALUATIONS DOES NOT INCLUDE ENLUATIOH OF SLABS FOR IH-PLANE LOADIHG

THIS EOI COHTAIHS AH INCORRECT STATEMEHT, IT SHOULD READ '„,THIS MODEL MAS REQUIRED TO MORE ACCURATELY DISTRIBUTETHE LOADS FROM THE ORIGIHAL STICK MODEL'..'LCA RECONKEHDS CONBIHIHG THIS EOI WITH 1097 AS AH ER/AB CLOSED ITEN

REVs '0 LATESl REUs ACTIOH PG!E

FILE NO'AlF. BASIS REV. 9ATF. BY STATUS ORG TES NODS SUBJECT

1133 '30613 . 07r 0 830613 RLCA OIR" RLCA RDF LARGE BORE PIPIHG - ANALYSIS 8-117 REU. 2'OMKEHElVALVE 9003A IH D.A. 8.-117r REV 2 MAS NODELLED WITH 2/3 WEIGHT AT OVERALL NLUE C. OF G. SECT 4 5 6 2 OF, DCP

PROCEDURE P-11 REV. 3 REQUIRES TOTAL UALUE MEIGHT TO BE MODELLED THERE RLCA TO EXAMIHE REV 3 TO CONFIRH STRESSINPACl AND COHlINUE REVIEW OF VALVE NODfLLIHG,

REVs 0 LATEST REU, ACTIOH PGaE

1133 '30613 09 .' 830629 RLCA PER/C TES RDF 'ARGE BORE PIPIHG ANALYSIS,8 117 REVs 2

COKMFNTl NLVE 9003A IH 9 A. 8-117r R 2 MAS HODELI.ED WITH 2/3 WEIGHT AT C OF G DCP PROCEDURE REQUIRES TOTAL MEIGHT BE.MODFLLED THERE, RLCA HAS VERIFIED THAT REVISED DCP ANALYSIS CORRECTLY MODELS VALVE AND ACCELERATIOHS MEETALI.G!lAPLESs EOI 1133 HAS BEEN COMBINf9 INTO THIS FILE

11'XY 880613 Of> 2 83070h 'FS ER/C PGEE RDF LARGE BORE PIPIHG '-AHALYSIS Ir- .......

COMKEHTs DsAs 8 117t Rs 'MODELLED 2/3 OF'LVE WEIGHT OF Cs OF Gs DCP PROCEDURES REQUIRES TOTAL VALUE WEIGHT s EOI 1106HAS BEEN COMBINED WITH THIS FILEs DCP HAS RFVISED AHALYSISs RLCA HAS UERIFIED REUISED ANALYSIS CORRECTLY MODELSVALVE 9003A AND SHOWS ACCELERATIONS TO NEET ALLOMABLESs

113 830613 ,OD 3 830706 TES CR HONE RDF NO LARGE BORE PIPING - ANALYSIS 8-117 REV, 2CONMENTs 9.A. 8-11> R "2 MODELLED 2/3 OF NLVE WEIGHT OF C OF G 9CP PROCEDURES REQUIRES TOTAL 'VALVE MEIGHT EOI 1106

HAS BEEN COMBINED WITH THIS FILEs DCP HAS REUISED AHALYSIS. RLCA HAS VERIFIED REVISED ANALYSIS CORREClLY NODELSN! VF 90C3A AND SHOWS ACCFLERATIONS TO Nffl'L(.OMABLfS ERROR CLASS C

Page 224: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 225: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

0FILE HO»

1134 .,

CONNEHTt

REV» 0 LATEST REV» ACTIOH PGLED. 3-72d

DATE BASIS REV DATE BY STATUS ORG TES NODS SUBJECT

830615 OD 0 830615 RLCA OIR RLCA RCM HVAC DUCT AHD DUCT SUPPORTS

RLCA HAS REVIEMED 3 D A THAT USED STRUDL-II IN 2 OF THE 3F LOADING RESULTED IH HODAL FREQUEHCY HOT

CORRESPONDING TO FIRST NODE» OHE DIRECTIONAL LOADIHG USED WITH RAYLEIGH-RITZ XETHOD HAY HOT ACCURATELY

ESTABLISH FIRST %DE FREQUENCY. l'OSSIBLE GENERIC CONCERN .

REV» 0 LATEST REV» ACTIOH PGRE

FILE NO, DATE 'ASIS REV, DATE BY STATUS ORG TES NODS SUBJECT

1135 830616 OD 0 830616 RLCA OIR RLCA RDF LARGE BORE PIP IHG AHALYSIS 2-120

CO}}KENTl VALVES LCV-113 AHD 115 IN D A 2"120 REV 0 MERE NODELLED WITH VALVE BODY WEIGHT OF 69 LBS AHD OPERATOR WEIGHT OF

ll9 LBS» RLCA REVIEW SHOMED MEIGHTS TO BE APPROXINATELY 125 LBS AND 130 LBS RESPECTIVELY»

83jbib OD I 83P629 RLCA PER jC TES RDF LARGE BORE PIPING ANALYSIS 2-120

CONMEHT: D,A 2-120'.P NODELLED VALVE BODY MEIG}}T OF 69 LBS AND OPERATOR MEIGHT OF 119IED REVISED DCP AHNALYSISNCORRECT'LYRLCA REVIEW SHQ'WED MfIGHTS TQ Bf 125 AHD 130 LBS) Rf$PECTIVELY» RLCA HAS VERIFIED REVISED DCP AHA

OOSELS OALUES AOC'DOS ACCELERATIONS EEET ALL»I»A»LES. EOI LI»6 COIIOIOEO Iil'IO THIS FILE

1135 830616 OD .2 830706 TES ER/C PGt E RDF LARGE BORE PIP IHG ANALYSIS 2-120

CONNEN< l D.A 2-120» R»0 NODELLED VALVE BODY WEIGHT OF 69 LBS AHD OPERATOR MEIGHT OF 119 LBS FOR VALVES LCV-113 AHD 115»

RLCA REVIEW SHOWED WEIGHTS TO BE 125 AHD 130 LBSF RESPECTIVELY RLCA HAS VERIFIED REVISED DCP AHALYSIS CORRECTLY

NOBELS VALVES AND SHOMS ACCELERATIONS NEET ALLOMABLES, EOI 1106 COMBINED IHTO THIS FILE1

1135 830616 OD 3 830706 TES CR HONE RDF HO LARGE BORE PIPING AHALYSIS 2-120

CONKE}}Tl D»A 2-120. R»0 NODELLED VALVE BODY MEIGHT QF 69 LBS AHD OPERATOR WEIGHT OF 119 LBS FOR VALVES LCV-113 AHD 115.

RLCA REVIEW SHOWED WEIGHTS TO BE 125 AND 130 LBSF RESPECTIVELY RLCA HAS VERIFIED REVISED DCP AHALYSIS CORRECTLY

NODELS VALVES AHD SHOWS ACCELERATIOHS NEET ALLOMABLES» EOI 1106 COMBIHED IHTO THIS FILE» ERROR CLASS C»

1136'30616 DND 0 830616 RLCA OIR RLCA PPR CONPOHEHT COOLING MATER SURGE TANK

CQNNEHTC ALLOWABLE CALCULATED IN ANALYSIS IS LARGER THAH ALLOMABl.E DEFINED BY CODE» TANK INTERNAL PRESSURE EXCLUDED FROH

EVALUATIOH OF TANK SHELL STRESS AT HOZZLES. BOLT STRESSES WITHIN CORRECT ALLOWABLE» TANK SHELL STRESS EXCEED

ALLOMABLE IN FORNAL SEHSE» IDVP FAULTED CONDITIOH EVALUATION SHOMED STRESSES MITHIH ALLOMABLES»

1136 '}306kb 'ND 1 830630 RLCA PER/C TES PPR CONPOXEHT COOLIHG MATER SURGE TANK

CONHEHTt ALLOMABLE CALCULATED IH ANALYSIS LARGER THAN CODE ALLOWABLE BUT STRESSES MITHIH CRITERIA MHEN CORRECTLY CALCULATED

SHEAR STRESS IS USED TANK IHTERHAL PRESSURE EXCL'UDED FROH EVALUATION OF SHELL STRESS AT HOZZLES TANK ACTUALL'Y

VEHTED TO ATH»OSPHERE AND INTER}}ALPRESSURE IS HEGLIGIBLE»

1136 . 830616, DND 2 830707 TES - ER/C PGXE PPR CONPONENT COOLIHG MATER SURGE TAHK

CONMEHT» INCORRECT BOLT ALLOMABLE-STRESS'USED IH ANALYSIS» CALCULATED STRESSES DOH'T EXCEED CORRECT CRITERIOH» ORIGIHAL

EOI ERRED M/RESPECT TO INCLUSIOH OF DESIGN PRESSURE CALC OF SHELL STRESSES HEXT TO NOZZLEF ONLY 3 PSI OPERATING

PRESSURE IS REQUIRED (NEGLIGIBLE)»

1136 830616 - DND 3 830707 TES CR HONE PPR HO COMPOHEHT COOLIHG MATER SURGE TANK

CPNNEHTt IHCORRECT BOLT'ALLOMABLESTRESS USED IH ANALYST, CALCULATED STRESSES'OH'T EXCEED CORRECT CRITERIOH, ORIGIHAL

EOI ERRED M/RESPECT TO IHCLUSIOH OF DESIGN PRESSURE CALC OF SHELL STRESSES NEXT TO HOZZLEF OHLY 3 PSI OPERATING

.. PRESSURE IS REQUIRED (NEGLIGIBLE) ERROR CLASS C

1137 830621 DND 0 830621 RLCA OIR RLCA RDF LARGE. BORE PIPIHG - ANALYSIS 4-1PllCONNEHTI 'VALVE FCV 365 IN REV ~ 1'F THE ANALYSIS MAS MODELLED MITH A WEIGHT OF 405 LB$ » RLCA REVIEM $}}Q'WED MfIGHT

TO BE APPROX» 502 LBS» COMBINES WITH 1133 AHD 1135 AS A GENERIC COHCERH WITH VALVE NDELLIHG IH CAP,

1137 830621 DND i 830629 RLCA PER/C TES RDF LARGE BORE PIPIHG - ANALYSIS 4-101CONNEHT: VALVE FCV-365 NODELLED WITH WEIGHT OF 405 LBS, RLCA REVIEM SHOWED MEIGHT OF 502 LBS, GEHERIC COXCERH MITH

VALUE NODELLIHG IH CAP DCP REVISED ANALYSIS TO INCLUDE CORRECT WEIGHT LICE}}SING CRITERIA NEET DCP

CONNITTED TO FINAL PIPIHG REVIEW TO ASSURE CORRECT VALVE HODELLING» GEHERIC CONCERN CONBINED MZTH EOI 1098 AS FR/A}t

1137 83P621 DND 2'30706 TES ER/C POTE RDF LARGE BORE PIPIHG - AHALYSI$ 4"10 1

CONNEHT', VALVE FCV-365 NODELLED MITH WEIGHT OF 405 LBS RLCA REVIEW SHOMED MEIGHT OF 502 LBS GENERIC CONCERN MITH

VALVE NODELLING IN CAP DCP REVISED AHALYSIS TO INC}.UDE CORRECT WEIGHTS LICENSIHG CRITERIA NEET» DCP

CONHZTTED TO FIHAL PIPIHG REVIEW TO.ASSURE CORRECT VALVE NODELLIHG GEHERIC CONCERN COt}BIHED MITH EOI 1098 AS ER/AB,

11'$7 83P621 DND 3 830706 TES CR NONE RDF t}0 LARGE BORE PIPIHG " At}ALYSIS 4-101

CONNFN(: VALVE FCV-365 NODELLED MITH WEIGHT OF 405 LBS ~ RLCA REVlfM SHOWED WEIGHT OF 502 LBS'EHERIC CONCERH WITH

VALVE NQDELLIHG IN CAP» DCP REVISED ANALYSIS TO INCLUDE CORRECT MEIGHTF LICENSIHG CRITERIA NEET» DCP

CONNITTED TQ FINAL PIPING REVIEM TO ASSURE CORRECT VALVE NODELLIHG GEHERIC CONCERN CONBIHED M/EOI 1098 AS ER/AB. ER/C

Page 226: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 227: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

LATEST REV. ACTIOH PGIE RLV 1

830817 3.3-73. FILE HO, DAIF BASIS REV. DATE BY STATUS ORG TES NODS SURJECf

1138 830725 OD 0 830725 'LCA OIR RLCA RDF 'ARGE BORE PIPIHG 9-108> REV. 0

CONNEHTt DiA APPLIED SIF OF 1 0 AT PIPE/REGENERATIVE HX INTERFACE RLCA DETERNINED 'SIF OF lo9 REQUIRED( PIPE STRESSES EXCEED

ALLOMARLE IF CORRECT SIF USED'tA ~ RERUH MITH USING ACTUAL SPECTRAL STRESSFS NEET ALLOMABLESo DCP CONNITTED TO

REVIEM AlL LoRe DESIGH CLASS ! ANALYSES FOR SIFTS

1l39 830726 OD 0 830726 RLCA OIR RLCA RC(t STAii BORE SUPPORT 2159/2CONNEHT' A FREQUENCY CALO IH RESTRAIHED DIRECTION PERFORNED RY CONPARING CONPUTED SUPPORT DEFLECTIOH TO CONSERVATIVE,

,STANDARD f<FFLECTIOH CALC ERRONEOUSLY CONPAREDi RESUlTS IH FREQ LESS THAN 20 HZ REVISED AHALYSIS HAS REEH

REPORTED TO SHOM CRITERIA HAS REEH NET,

. 1139 i)3O7'26 "Or . I a3Of)O3 RiCA PN/T TES RCM SNAii BORE SUIPORT 2159/2CONNEHTl D A. FREQUENCY CALC IN RESTRAINED DIRECTIOH RASED ON CONPUTIHG SUPPORT DEFLECTIOH AND CONPARIHG TO CONSERVATIVE

STAHDARD. DEFlECTION ERROHEOUSLY CONPARED RESULTING IH FREON LESS THAH 20 HZ DCP REVISED ANALYSIS AND RLCAVERIFIED THAI FREQ EXCEEDS 20 HZ AS-RUILT SUPPORT NEET LICEHSING CRITERIA.

i139 . 830726 OD 2 830809 TES ER/C PGaE RCM SHALL RORE SUPPORT 2159/2CONNEHfl D A. FREQUEHCY CALC IH RESTRAIHED DIRECTION RASED OH CONPUTING SUPPORT DEFLECTIOH AND CONPARING TO CONSERVATIVE,

STANDARf! DEFLECTIOH ERRONEOUSLY CONPARED RESULTIHG IH FREQ LESS THAN 20 HZ, DCP REVISED ANALYSIS AHD RLCAVERIFIEf! THAT,.FREQ EXCEEDS 20 HZ AS-BUILT SUPPORT NEET LICEHSIHG CRITERIA,

(139 . 830726 OD 3 830809 TES CR HOttE RCM HO SMALL BORE SUPPORT 2159/2fONNENTl D.A. FREQUEHCY CALC IH RESTRAINED DIRECTIOH BASED ON CONPUTING SUPPORT DEFLECTIOH AHD CONPARIHG TO CONSERVATIVE

STAHDARfi. DEFLECTION ERRONEOUSLY CONPARED RESULTIHG IH FREQ, LESS THAN 20 HZ, DCP REVISED ANALYSIS AND RLCAVFRIFIED THAT FRFQ, EXCEFDS 20 HZ AS-BUIIT SUPPORT NEET LICEHSIHG CRITERIA ERROR CLASS C,

1140 830729 Ol> 0 830729 RLCA OIR . RLCA,ICT FIRE PUNP - CAP AHALYSIS SQE"7 Ii REV. 0CONNEHT: DCP ANALYSIS DOESH'T EXANINE I!ISCHARGE HOZZl.E FLANGED JOINT, IDVP REVIEM SHOMS CONRINATION OF SEISNIC PIPIHG NOZZLE

LOADS AHf! DESIGH PRESSURE CAUSE FlAHGE ROLf STRESS TO EXCEED ALLOMARLE CRITERIA (ASNE SECT III CL III M/HOSGi(lCRITERIA) .

8307-"9 OD ~ ( 830812 RiCA OIR RLCA JCT 'IRE PUNP - CAP At(ALYSIS SQE-7 1~'EV 0CONNEHT'CP ANALYSIS DOESN'T EXANINE DISCHARGE NOZZLE FLAHGED JOINT IDVP REVIEM SHOMS COt(BIHATIOH OF SEISNIC PIPIHG NOZZLE

LO"DS AND DESIGH PRESSURE CAUSE FLAHGE ROLT STRESS TO EXCEED ALLOMABLE CRITERIA (ASNE SECT III) CL 111 M/HOSGRI CRIT ) "

APf'.LICATION OF APPROP CODE AND CALCS SHOM ALL STRESSES BELOM ALLOMABLE AS-BUILT DOESH'T NEET PGKE PIPIHG SPECIFICAT'ION

1140 830729 OD 2 830812 RLCA PERiC TES JCT . FIRE PUNP - CAP AHALYSIS SQE-7,1 REV, 0CONNENTl DCP ANALYSIS DOESN'T EXANINE DISCHARGE NOZZLE FLANGED JOIHT, IDVP REVIEM SHOMS CONRIHATIOH OF SEISNIC PIPING ((OZZLE

LOADS AND DESIGH PRESSURE CAUSE FLAHGE BOLT STRESS TO EXCEED AlLOMABLE CRITERIA (ASNE SECT III CL Ill M/HOSGR CRIT)'PPLICATIOHOF APPROP CODE AND CALCS SHOM ALL STRESSES BELOM ALLOMABLE AS-BUILT DOESN'T NEET PGIE PIPIHG SPECIFICATIOH

1140 830"29 05 3 830R12 TES ER/C PGSE JCT FIRE PUNP - CAP A'tILYSIS SQE-7 I> REV 0~ 'ONNEHT( DCP AH41.YSIS DOESH'T EXANINE DISCHARGE NOZZLE FLAHGED JOIHT IDVP REVIEM SHOMS CONBINATI(fN OF SEISNlt, PIPING NOZZLE

LOADS AND I!ESIGN PRESSURE CAUSE FLANGE BOLT STRESS TO EXCEED ALLOMABLE CRITERIA (ASNE SECT Ills CL III M/HOSGRI

CRIT'�

)APPI.)CA'flOH OF APPROP CODE AND CALCS SHAM ALL S'TRESSES BELOM ALLOMABLE AS-BUILT DOESH'T NEET POTE Plf'ING SPECIFICATIOH

I (4t 8 0802 OtI 0 83080'' RL<,'A 0th RLCA Rf7 SNAii AHD LARGE BORE PIPIHGCONNENfl f>CP PROCEDURE P"11i R 4 DOES''I INCL(IDE LINES 26 AHD 1040 THRU 1043 HIGH ENERGY LIHES FOR POSTUlATED RREAK lOCATIOH

REVIEM. SINCE P-11 DIDtt'T IDENTIFY LIHES AS H E.i POSTULATED BREAK LOCATIOHS NAY NOT HAVE BEEH-DENTIFIED'142

830809 OD 0 830809 RLCA OIR RLCA RCM SHALL BORE SUPPORT SI "GR LIHE 3900CONNENTl ANCHOR S1-8R OH LINE 3900 HOT CONSIDERED RY D A. FOR EFFECTS. OF VARIOUS LOADIIHG COHDITIOHS OH OTHER DESIGH CLASS I

SUPPORTS SUPPORT LOCATED ON HOH-CL, I PIPIttG, CONSIDERATIOH OF VARIOUS LOADING CONDITIOHS REQUIRED RY DCN N-9, TECHHICACONCERH HAS APPARENTLY REEH ELIHIHATED SIHCE AHCHOR HAS BEEH REPLACED MITH A GRAVITY SUPPORTS

Page 228: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 229: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

REV 1

830817 0 3-77 .

~

~REUs 0 LATEST REVA" ACTIOH POTE

FILE HOs DATE BASIS REVD DATE BY STATUS ORG TES NODS 'SUBJECT

7001 821011 OAR 0 821011 RFR OIR RFR NR 'UXND FH BUILDING INAC SYSTEM

CMEHTA AS FAR AS COULD BE DETERNIHED) THERE IS HO EVIDENCE OF AH IHDEPEHBKHT REVIEM OF AUX NN FH BUILDIHG HVAC PRENMRR c-

LOSS CALC PERFORMED BY GEZD THIS ITEH IS OUTSIDE CURREHT SUKC SAMPLE FOR IDVP PNSE 2s

7001 821011 - QAR 1 830202 TES PRR/CI TES NR AUX AN FH BUILDING HVAC SYSTEM

CONIKHTA BASED UPOH ADDITIONAL.IHFORNATIOH PROVIDED BY PG'I (DCVP-TES-6h7) NI 821215 NN REVIEMED BY SMECS TIK ONCEIN NBRESSED

BY THIS FILE NS BEEH RESOLUEDA FILE TO BE CLOSEDD

7001 821011 'OAR 2 830202 TES CR HNE NAR HO AUX AHD FH BUILDING HVAC SYSTEM

CONMEHTI AS FAR AS COULD BE DETERMINED'D THERE IS HO EUIDEHCE OF AH INDEPENDENT REVIEM OF AUX AN FH BLDG INAC'PRESSURE LOSS CALC

PERFORMED BY GEZ THIS ITEN 18 OUITSIDE CURRENT %EC MPLE FOR llWP PH ll BASED UPN ADD INFO INDED BY PGg IDCUP-

18"bht? OIL 82$ 2l5 I KVINKD BlT 5MECt THE COCKRN AD@?E8SKD BY TIIT8 FILE HA8 DKH 8ATISFACTNILY RESOLVEDD FILE CLOSED»

7002 '21011 QAR 0 821011 RFR OIR RFR NR CGHTAflREHT JET INPINEIKHT

cDHHEHTl N osxcTIDE EDIDEHDE FDIND THAT N EFIEDTO DF JEI IHgllNI(HI Pcm!ENI fggDEHHQ ~DNImm +FI OEDT

NY NO'f BE IN CURRENT IDVP SCOPE ADDITIONL VERIFkCJLAIS $8?Ul

7002 821011 OAR 1 821011 RFR PPRR/OIP TES NR COHTAIINKHT JET IMPINGEMENT

CONKHTD POTE TO PROVIDE SMEC M/OBJECTIVE EVIDEHCE AHD/N RESPONSE RELATIVE TO NALYSES FOR EFFECTS OF JET IIIPIHGENBff

OH COMPOHEHTS INSIDE CNITAIHIKHTPER PARA)3s6 OF FSARD

7002 821011 OAR' 821022 TES PRR/OIP POTE NR COHTAIOEHT JET INPIHGBKHT

COMMENT) POTE TO PROVIDE CALCULATIOHS AHD OTHER SUPPORTING DOCUIKHTATIOH OF JET INPIHGBKHT NALYSIS PERFORMED IHSIDE CONAINKHT'S

STIPULATED IH FSAR SECTS 3s6) PARAGRAPH 3)6) ADDITIONALVERIFICATIOH REOUIREDA J

7002 . 821011 QAR 3 830204 TES OIR TES NR COHTAINKHT JET IMPIHGENEHT

CO}NEHTI JET INPIHGENEHT IHSIDE COHTAIHNEHT IS BEIN AHALYZED BY DCP AHD MILL BE SUBJECT TO IDVP VKRIFICATINAS PART OF

ADDITIOHAL VERIFICATIOH PROGRAM) THIS FILE MILL BE RECLASSIFIED AS A CLASS A/B ERNN SO TNT IT CAN BE ADDRESSED AS

PART OF THE,ADDITIOHALVERIFICATIOH EFFORTs „

7002. 821011 QAR 4 830204 TES ER/AB PGKE NR COHTAII8KHT JET INPIHGElKHT

COMMENT) RFR AUDIT OF PGK SNNED HO DOCUNEHTED EUIDEHCK RED JET INPIHGBKHT IHSIDE CNTAINK¹ FSN SECTS 3)6 PARA 3D6 STATES

THIS MAS DOMED HECESSARY AHALYSIS BEING DOHE BY DCP MILL BE REVISED BY IDVPD FILE EFFORTS DESCRIBEB IH ITR-3hs

.— 7002 821011 OAR 5 830726 TES OIR S9EC MAR" COHTAIHNEHT JET IMPIHGENEHT

COMMENTS SIIEC TO REVIEM DCP CONPLETIOH SHEET SIGNED 830720) At)D PROVIDE A RECONNEHDATIOH FOR FUTURE DISPOSITIOH

7002 82101L OAR 6 830802 TES CR AOkE NAR HO COHTAIkMEHT JET INPIHGEMEHTCOMMENT', ,)ff IMPINGEMEHT INSIDE COHTRIHMENT ANALYZED BY DCP AHD VERIFIED BY IDUP AS PART OF ADDITIOHAL UERIFICATIOH PROGRAM,

ISSUAt)CE OF ITR-48 REPORTS SUCCESSFUL COMPLETIOH OF 'ADDITIONAL SAMPLE'OVERIHG JET IMPIHGEtIEHT EFFORTS OF

POSTULATFD PIPE RUPTURES INSIDE COHTAIHMEHT DEFINED BY ITR"34) SECTIOH 6 PREVIOUSLY AH ER/AB CLOSED ITEN

1

7003 821123 OAR 0 . 821123 RFR OIR RFRCONNEHTI JUSTIFICATIOH THAT EDS COHCURS MITH THE PGIE RESOLUTIREVIEM OF THE COHTAINKHT ISOLATION SYSTEM MAS HOT

Page 230: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 231: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

REVD 0 LATEST REVs ACTIN PG1E REV 283P8] 7 0. 3-118

FILE HOD DATE BASIS REVD DATE BY STATUS ORG TES NODS SUBJECT

80&4 830215 DMD 5 830407 TES PRR/DEV POTE RRB AFM SYS COMPOHEHTS PON 110t 111t 113t 1 115CONMENTI PS'ES, AHD COMP, SHT, DATED 830322, DESIGN DKUNBITS IMPROPERLY REPORTED CLASSIFICATIOH OF POM'S AS'S-R, PGtE TO

, REVISE EHUIRMIEHTAL QUALIFICATIOH FILES AN INSTRUMENT SCHEMATIC 102036 TO REFLECT CLs II STATUSs

8064, 830215 DN & 830407 TES CR HONE RRB HO AFM SYS COMPONENTS .PON 110t 111t 113r 1 115CONMEHTI HO DOCUMENTATION THAT POM'S LISTED ARE ENVIROHMEHTALLYQUALIFIEDR POKE RESD AHD CONPD SNTP DATED 8303220 DESIGN

DONEHTS IMPROPERLY REPORTED CLASSIFICATIOH OF PON'S AS S-Rs POTE TO REVISE EHVIRONNEHTAL QUALIFICATION FILES AHD

INSTRUMENT SCHEMATIC 102036 TO REFLECT CLs II STATUSS DEVIATIOHD

8M5 830608 FID 0 830608 SMEC OIR SMEC LCH JET IMPIHGENEHT REVIEMCONBITi POSTDATED BRM ON FEEDNTER L1HE HOD 555 MAY IMPINGE UPON HORIZONTAL PORTION OF NAIH STEAN LIHE HOs 2270 CONDUIT

l5-582 NISIDEHTIFIED AND NAY BE MITHIN ZINE OF IHFLUEHCE OF RCP OUTLETD LINE 24 MAY IMPINGE UPOH CONDUIT KX-4280RUPTNE OF LETDONI LIRE 24 NAY IMPINGE UPON TMO OF THE VERTICAL SUPPORTS FOR EXCESS LETDOMN LINE 24.

80&5 830608 FID 1 830608 SMEC PPRR/OIP TES LCH JET INPINGBIENT REVIEMCOMMENT'0 SAFETY EVALUATION SHOULD BE PERFNNED BY THE DCP TO DETERMINE MHETHER IDEHTIFIED TARGETS ARE HEEDED TO SAFELY SMUTDOMN

THE PLANT UHDER THE CONDITIONS ASSOCIATED MITH THE POSTULATED PIPE BREAKS OR RUPTURESs

'D65

030600 FIR 2 030666 TER PRR/DIP PSIE LCR 'ET IRPIRSERERT RESTER

CONMBITo. FOUR ITEMS OF CNCERH HAVE BEEH IDENTIFIED RESULTIHG FROM DATA OBTAIHED DURIHG THE IDVP 830524-26 SITE VERIFICATIONDDCP TO PERFORM A SAFETY EVALUATION TO RESOLVE THE ITENSD

80&5, 830608 F ID 3 830621 TES OIR SMEC LCN JET IMPIHGEMEHT RE'VIEM

COMNENTI'MEC TO REVIEM THE DCP CONPLETIOH SHEET SIGHED 830617 AHD PROUIDE A RECOINEHDATION FOR FUTURE DISPOSITIOH.

8065OMMEHTs

8065OMMEHTs

8065-COMMENTI

830608 F ID 4 830715 SMEC PPRR/CI TES LCH JET IMPINGENEHT REUIEM

DGP EVALUATED FOUR JET IMPINGEMENT IHTERACTIOH M/S-R TARGETSs ALL FOUR IHTERACTIONS ARE CONCLUDED TO IMPAIR HO ESSENTIAL

FUNCTIONS REQUIRED TO MITIGATE CONSEQUENCES OF POSTULATED HELB'S AND TO SAFELY SHUTDOMN 'PLANT

CONSIDERED ISOLATED INSTAHCES AND HOT INDICATIVE OF AHY GENERIC DIFFICIENCY IN DCP JET IMPINGEMEHT FIELD REUIEMs

830608 FID 5 830720 TES PRR/CI TES LCN JET IMPINGENEHT REVIEM

DCP EVALUATED FOUR JEl'MPIHGENENT IHTERACTION M/S-R TARGETS. ALL FOUR IHTERACTIONS ARE CONCLUDED TO IMPAIR HO ESSENTIAL

FUNCTIONS REQUIRED TO MITIGATE.CONSEOUEHCES OF POSTULATED HELB'S AND TO SAFELY SNUTDOMN PLAHT FOUR DISCREPANCIES ARE

CONSIDERE9 ISOLATED INSTANCES AHD NOT IHDICATIVE OF ANY GENERIC DIFFICIEHCY IH DCP JET IMPIHGENEHT FIELD REVIEMs

830608 F ID . 6 830720 TES CR HONE LCH HO JET INPIHGEMEHT REVIEMDCP EVALUATED FOUR JET IMPINGEMENT IHTERACTIOH M/S-R TARGETSs ALL FOUR INTERACTIOHS ARE COHCLUBED TO IMPAIR HO ESSEHTIALFUNCTIONS REQU1RED.TO MITIGATE CONSEQUENCES OF POSTULATED NELB'S AND TO SAFELY SMUTDOMH PLAHT. FOUR DISCREPAHCIES ARE

CONSIDERED ISOLATED INSTANCES AND HOT INDICATIVE OF ANY GENERIC DIFFICIEHCY IH DCP JET INPIHGNENT FIELD REUIEM CI

Page 232: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 233: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

r< TELEDYNE. ENGlNEERINQ SERVlCES

E.l ITRs In Numerical Sequence

2'

820623

3 0 '207164 0 820723

5 0 820819

6'

820910

7 0 '209178 0 821005

9 0 821015

10 0 821'029

11 0 '21102

12 0 821105

13 0 821105

14 2 . 830725

REV , ISSUEITR , NO. 'ATE

1 1 821022

ISSUEDBY

RLCA

TES

RLCA

RLCA

RLCA

RLCA

'LCARLCA

RFR

RLCA

TES

RLCA

RLCA

. SWEC

TITLE

. Additional Verification and Additional

Sampling (Phase 1)

Comments on the R.F. Reedy, Inc., gual-

ity Assurance Audit Report on Safety-Related Activities 'erformed by. PGandE .

Prior to June 1978

Tanks

Shake Table Testing

Design Chain

Auxiliary BuildingElectrical Raceway Supports

Independent Design Verification Program

for PGandE Corrective Action'evelopmentof the Service-Related Con-

tractor List for Non-Seismic Design

Work Performed for DCNPP-1 Prior . toJune 1, 1978

Verification of Design Analysis Hosgri

Spectra

PGandE-Westinghouse Seismic InterfaceReview

PipingSoils - Intake StructureVerification of the Pressure, Tempera-

ture, Humidity, and Submergence Envi"ronments used for Safety-Related Equip-ment Specifications Outside Containment

for Auxiliary Feedwater System and CRVP,

System

IDVPFINAL

E. 1-1 REV 1

830805

Page 234: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 235: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

->s-TELEDYNEENGINEERING SERVICES

E.1 ITRs In Numerical Sequence (Continued)

REV ISSUEITR NO. DATE

15 0 821210

16 0 821208

17 0 821214

18 1 830524

19 0 .821216

20 2 830725

21 1 830503

22 2 830725

23 1 830527

ISSUEDBY

RLCA

RLCA

RLCA

SWEC

SWEC

SWEC

SWEC

SWEC

SWEC

TITLE

HVAC Duct and Supports Report

Soils - Outdoor Water Storage Tanks

Piping - Additional Samples

Verification of the Fire ProtectionProvided for, Auxiliary Feedwater System

Control Room Ventilation and Pressuri-zation System Safety-Related Portion ofthe 4160V Electric System

Verification of the Post-LOCA Portionof the Radiation Environments used forSafety-Related Equipment SpecificationOutside Containment for Auxiliary Feed-

water System and, Control Room Venti la-tion and Pressurization System

Verification of the Mechanical/Nuclear

Design of the Control Room Ventilat'.onand Pressurization

System'erificationof the Effects of High

Energy Line Cracks and Moderate Energy

Line Breaks for Auxiliary Feedwater

System and Control Room Ventilation and

Pressurization System

Verification of the Mechanical/Nuclear

Portion of the Auxiliary Feedwater

System

Verification of High Energy Line Break

and Internally Generated Missile Review

Outside Containment for Auxiliary Feed-

water System and,Control Room Ventila-tion and Pressurization System

IDVPFINAL

E.1-2 REV 2830805

Page 236: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 237: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

E.l ITRs In Numerical Sequence (Continued)

)0 TELEDYNE .

ENGINEERINQ SERVICES

REV . ISSUEITR NO. DATE

ISSUEOBY TITLE

24 1 830504

25 1 '30429

26 . 1 830502

27 2 830725

28 2 830725

35 '0 830401

36 . 1 830620

37 0 830223

38 2 830620

39 . 0 830225

29 0 820117

30'

830112

31 - 1 830804

32 1 830401

33 1 830428

34 1 830324 =

SWEC

SWEC

SWEC

SWEC

SWEC

SWEC

RLCA

RLCA

RLCA

RLCA

SWEC

RLCA

I

SWEC

RLCA

SWEC

RLCA

Ver ification of the 4160V Safety-Related Electrical Oistribution System

Verification of the Auxiliary Feedwater

System Electrical Oesign

Verification of the Control Room Venti-lation and Pressurization System Elec-.

trical Oesign

Verification of the Instrument and Con-

trol Oesign of the Auxiliary Feedwater

System

Verification of the Instrument and Con-

trol Oesign of the Control Room Ventil-ation and Pressurization System

Oesign Chain - Initial Samples

Small Bore Piping Report

HVAC Components

Pumps

Electrical Equipment AnalysisIndependent Oesign Verification of OCP

Efforts by SWEC

Independent Oesign Verification Program

Verification Plan for OCP ActivitiesFinal Report on Construction gualityAssurance .Evaluation of G.F. AtkinsonValves

Final Report on Construction equalityAssurance Evaluation of Wismer and,

Becker

Soils - Intake Structure BearingCapacity and Lateral Earth. Pressure

IOVPFINAL

E. 1-3 REV 3830816

Page 238: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 239: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

E.1 ITRs In Numerical Sequence (Continued)

s< TELEDYNEENGINEERINQ SERVICES

REV ISSUEITR NO. DATE

ISSUEDBY TITLE

40 0 830309

41 0 830419

42'

830415

45 0 830517

46 '0 830627

47 " 0 . 830627

48 0 '30727

49 0 830623

50 '0 830722

51

43 . 0 830414

44 0'30415

* RLCA

RFR

RFRh

RLCA

RLCA

SWEC

SWEC

SWEC

SWEC

SWEC

TES

TES

Soils Report - -Intake SlidingResistance.,Corrective Action Program and Design

Office VerificationR.F. Reedy, Inc., Independent DesignVerification Program Phase. II Review

'nd Audit of PGandE and Design Consul-tants for DCNPP-1

Heat Exchangers

Shake Table Test Mounting Class,lEElectrical EquipmentAdditional Verification of Redundancy

of Equipment and „Power ~ Supplies inShared Safety-Related Systems

Additional Verification of Selection ofSystem Design Pressure and Temperatureand Differential Pressure Across Power-

Operated Valves

Additional Verification of Envir'on-

mental Consequences of Postulated PipeRuptures Outside of ContainmentAdditional Verification of Jet Impinge-ment Effects of Postulated Pipe *

Ruptures Inside Containment

Additional Verification of Circuit Sep

aration and Single Failure Review ofSafety-Related Electrical EquipmentContainment Annulus Structure VerticalSeismic EvaluationCorrective Action — Containment Annulus

IDVPFINAL

E.1-4 REV 3830811

Page 240: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 241: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

E.l ITRs In Numerical Sequence (Continued)

>s-TELEDYNEENQINEERINQ SERVICES

REV ISSUEITR NO. DATE

~ ISSUEDBY TITLE

52

53

54

55

56

5.7

Replaced by ITR-68

Replaced by ITR-68

RLCA

RLCA

RLCA

0 830801 RLCA

6

58' 830808, RLCA

59

60

RLCA

RLCA

'162

63

RLCA

Combined with ITR-60

RLCA

,. 64 Combiyed with ITR-63

65"'

RLCA

66 Combined with ITR-63

67 = 0 830812 RLCA

. 68 'LCA

Correcti ve Action Containment Bui 1 dingCorrective Action Auxiliary Building .

Corrective Action Turbine BuildingReview of DCP Activities Fuel Handling

BuildingVerification of DCP Activities IntakeStructureCorrective Action Large Pipe StressCorrective Action Large and Small Bore

Pipe SupportsCorrective Action Small Bore Piping

Corrective Action HVAC Ducts, Raceways,

Instrument Tubing and Supports

Corrective Action Rupture Restraints

Corrective Action Equipment

Verification of HLA Soils Work

IDVPFINAL

E.1-5 REV 2 "

830816

Page 242: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 243: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

ITR

A TELEDYNEENQINEERlNG SERVlCES

E.2A ITR/EOI CROSS REFERENCE

EOI

16 968, 969, 970, 981, 1070, 1094, 1100, 1101, 3000

17 1009, 1098, 1104, 1106, 1107, 1108

18 8019, 8020, 8021, 8035, 8036, 8037, 8038, 8039,

19 NONE

20 8012, 8016

21 8011, 8014, 8028, 8029, 8030, 8031, 8050

22 8009, 8010, 8015, 8027, 8048, 8060., 8062

23 8007, 8008, 8049

24 8013, 8022, 8023, 8024, 8025, 8026, 8045

25,

26

27

8011, 8042, 8043, 8044, 8061, 8063

8011, 8041, 8042, 8044, 8061

8018, 8032, 8047, 8049, 8051, 8052, 8054, 8055, 8057, 8058,8059, 8060, 8064

28 '017, 8046, 8053, 8056, 8057, 8059

29

30

31

32

33

Design Chain - Non Seismic

1024, 1043 thru 1048, 1058, 1059

1018, 1061, 1083, .1096, 1102, 1120, and 1121

1020.; 1022, 1072, 1073, 1113, 1114

949, 1004, 1006, 1007, 1008, 1087, 1117

34 „ Verification of OCP Efforts by SWEC

35 IOVP Verification Plan for OCP Activities by RLCA

36 9008, 9015, 9016, 9021

37 950, 998, 999, 1082, 1116

38 9001 thru 9007, 9009 thru 9014, 9017 thru 9020, 9022 thru9029'9

1112

IDVPFINAL

E.2A-2 REV 1830816

Page 244: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

~,

Page 245: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

ITR

40 NONE '

TELEDYNEENGINEERING SERVICES

E.2A ITR/EOI CROSS REFERENCE

EOI

41 'ONE

42 7001 thru 7006

43 978, 1088, 1099

44

45

46

47'8

1118, 1119

8012, 8016

8009, 8010, 8062

8001'002,

'8065

49 8017, 8057

50

51

52'3

1014

1014

See ITR-.68

See .ITR-68

54 .1014

55

56

1028, 1097, 1124, 1132

1026

57 '092

, '58 1022

59

60

61

1098, 1126, 1133, 1135, 1138, 1141

1098, 1122, 1129, 1131, 1139, 1142

1098, 1141

IOVPFINAL

E,. 2A-3 REV 2830816

Page 246: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

I 5

Page 247: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

ITR

A TELEDYNEENGINEERING SERVICES

E.2A ITR/EOI CROSS REFERENCE

EOI

62 Combined with ITR-60

63 '83, 1003, 1123, 1134

64 , Combined with ITR-63

65 1098

66 Combined with ITR-63

67 1128, 1130, 1136, 1140

68 None

NOTE:

The information on this Table excludes tabular material andappendixes.

IOVPFINAL

E.2A-4 REV 1'830816

Page 248: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

J

Page 249: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNE.ENGlNEERING SERVICES

E.28 EOI/ITR CROSS REFERENCE

EOI

"90920930939329 3'34'

10

12

12

ITR EOI

971972973974 .

"97597697

Noneone

NoneNoneNone10 1

ITR

935936937938939940941942

944945

'9469479489499509595295395495595695795895996096'62963964965966-9968969970

1212

. 12

12

12

212123337

12

12

12

2 13 62 3 62 3 6

97897998098198298398498598698

991992993994995996997998999000

1001002

„, 10031004

" 1005100610071008

~ 10090 0

10111012

10 1 43None

2 10 13 16

7 10 63

6 10

3737

121015 63

0 334 0334 10 33

0 332 10 12 172 7 03 10

IOVPFINAL

E.28-1 REV 2830816

Page 250: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

I

0

Page 251: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

<< TELEDYNEENQINEERINQ SERVICES

E.28 EOI/ITR CROSS REfERENCE

EOI

10141015101610 7

0210211022102310241025

ITR

2 10, 12 50 5 543, 10None

3

122 10 32 58

3010 12

EOI

105705

10591060

0610621063064

10651066

0671068

3012

1010

1212

ITR

026020 8

102903

7 10 562 62 6 0 552 6

069070

1071107207

1074

10

6 3 6'2

32

.0 031033

~103410351036

03038

10391040

041042

04310441045

046104710481049105005

1052105310541055

NoneNoneNoneNone

oneNoneNone

303030

3030

23 10

10one

07. 1078

10791080108108210831084

1085'086

810881089090

10910921093109409509097

1098

None

10 12

37311010

1212

NoneNone

577 10

1255

17 59 60 61

IOVPFINAL

E.28-2 REV 2830816

Page 252: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

0

0

Page 253: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

~< TELEDYNEENQINEERINQ SERVICES

E.2B EOI/ITR CROSS REFERENCE

EOI

11001101

01103'110411051106.

07108

01 10

1 12

141115

ITR

13, 1612, 3, 6

02'2

2 7

None

323260

EOI

30003003002300330043005300630073008600160027001700270070047005

006

ITR

2, 12 13 16

2 102 050 55 550 559 60 61654242 48424242

112111221123

" 112411251126

2128

112911301131

3211331134

353

676063556759

6760

6055596359

401141

659 61

IDVPFINAL

E. 28-3 REV 3830816

Page 254: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

E

Page 255: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

A TELEDYNEENQlNEERINQ SERVlCES

E.3A ITR/REPORT SECTION

ITR

42. 43

44"45

4647

8495051

5355565

je 58596066263665666768

SECTION 4.0.SUBSECTIONS

4.1.3 4.2.1 4.2.2 4.2.34.6.5 ~

4.9.4.8.24.8.34.8.4

~ 4.8..8.6

4.4.54.4.5See ITR-68See ITR-68.4.

4.4.8~ ~ 3

4.4.6

4.5.2~ ~ 3

See ITR-604.6.6See ITR-634.9.3

ee ITR-634.6.2 4.6.4 4.6.5 4.6.6 4.6.7 4.6.9 4.9.14.9.2

IOVP.FINAL

E.3A-2 RE.V 2830816

Page 256: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

0

Page 257: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

><-TELEDYNEENQINEERlNQ SERVlCES

E. 3B REPORT SECTION/ITR

SECTION 4.0SUBSECTIONS ITR

Re ort Sections 0.0 throu h 3.7.3 have no ITRs4.04.

4. .24. .34 ~ ~ 44. .5

.64.24.2.4.2.24.2.34.2.4.4.3

4.'3.4.3.34.3.4,44.4.

.4.4.34 ' '

4.4.64.4.7

.4.84.54. 5;1

~ 4.5.3

4.6.24.6.3

4.6.54.6.6

4.6.84.6.9

NoneNoneNoneNone

22 425 9 '295 29NoneNone2 9 29 36 38 4 422 422 0 4 4236 38NoneNone

NoneNoneNone

'5754

58None

NoneNone

30 61NoneNone3 "6737

43 675 3 63 67

7 6367

IOVPFINAL

f.3B-1 REV 2830816

Page 258: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

If

Page 259: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

-A TELEDYNEENQlNEERlNQ SERVlCES

F.l ACRONYMS AND INITIALISMS

AEC

AFW

AISC

AISI

ALDI

ANCO

ANI

ANS

ANSI

ASME

ASW

AWWA

B lume

BPC

CAP

CCW

CI

CMTR

CQA

CR

CRVP

DCM

DCNPP

DCP

DDE

DE

DEV

Atomic Energy Coranission "

Auxiliary Feedwater (System)

American Institute of Steel ConstructionAmerican Iron and Steel InstituteApplicable Licensing Document Index

Applied Nucleonics IncorporatedAuthorized Nuclear InspectorAmerican Nuclear SocietyAmerican National Standards Institut'eAmerican Society of Mechanical Engineers

Auxiliary Salt Water (Pump)

American Water Works Association'RS/JohnA. Blume and Associates, Engineers

-Bechtel Power CorporationCorrective. Action Program

Component Cooling Water (System)

. Closed Item

Certified Material Test Report

Construction quality Assurance

Completion ReportContro,l Room Ventilation and Pressurization (System) „

Design Criteria Memorandum

Diablo Canyon Nuclear Power PlantDiablo Canyon Project (PGandE and BPC).

Double Design Earthquake

Design Earthquake

Devi ationDFOT

Dt10

DOP .

DOV

EDS

IDVPFINAL

Diesel Fuel Oil TransferDesign Methodology DeficiencyDesignated Other PartiesDesign Office VerificationEDS Nuclear, Inc.

F. 1-1 REV 1

830805

Page 260: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of
Page 261: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

EES

EOI

ER

ER/A

ER/8

ER/C

ER/0

, ER/AB

FCV

F ID

- FOT

FSAR

FT

GEZ

GFA

GTAM

HELB

HELC

HLA

HVAC

18(C'CD

IDVP~ IEEE

IGM

ITP

ITR

LCV

. LOCA

MAFW

MELB

MS

NCR

NDE

',IDVPFINAL

Cygna Energy

Services)Error or. Open

Error Report

Error Class A

Error Class B

Error Class C

Item

Error Class D

Error Class A or Class B

Flow Control Valve

Field. Inspection DeficiencyFuel Oil Transfer (Pump)

Final Safety Analysis Report

Flow TransmitterGarretson-Elmendorf-Zinov

Guy F. Atkinson Co.

Gas Tungsten Arc Welding

High Energy Line Break

High Energy Line Crack

Harding Lawson Associates

Heating, Ventilation, and Air Conditioning (System)

Instrumentation & ControlIndependent Calculation DeficiencyIndependent Design Verification Program

Institute of Electronic Im Electrical Engineers'Internally Generated MissileInternal Technical Program (of the DCP)

Interim Technical Report

Level Control ValveLoss-of-Coolant AccidentMotor Driven Auxiliary Feedwater (Pump)

Moderate Energy Line Break

Main Steam

Nonconformance ReportNon-Destructive Examination

F.1-2 REV 1

830805

sr-TELEDYNEENGINEERINQ SERVlCES

Services, (formerly, Earthquake Engineering

Page 262: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

V

,4

Page 263: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

NEMA

NFPA

NPSH

NPSHa

NQAM

'RCNRR

NSC

NSSS

00

OIP

OIR

OWST

P IP" R

PGandE

PUP

PPRR

PRAP

PRR

P'RC

QA

QAP

QAR

RCS

RFR

RHR

RLCA

RRA

SAT

S IFPR

SMAW

SWEC

SWSQAP

eview

urance Pro-

National Electrical Manufacturing Associ'ationNational Fire Protection AssociationNet Positive Suction Head

Net Positive Suction Head availableNuclear Quality Assurance Manual (Bechtel)Nuclear Regulatory Commission

Nuclear Reactor RegulationNuclear Service Corp.

Nuclear Steam Supply System

Other DeficiencyOpen Item Transferred to PGandE

Open Item Report

Outdoor, Water Storage Tanks

Project Engineering Instructions (DCP),

Potential Error ReportPacific Gas and Electric Company

Program Management Plan

Potential Program Resolution ReportProbabilistic Risk Assessment Programs

Program Resolution ReportPlant Staff Review Comittee (PGandE)

Quality Assurance

Quality Assurance ProgramQuality Assurance Audit 8 Review

Reactor Coolant System

Roger F. Reedy Inc.Residual Heat Removal

Robert L. Cloud AssociatesRadiation Research AssociatesSpectral Acceleration FactorsSupplementary Information for Fire. Protection R

Shield Metal Arc Weld

Stone 5 Webster Engineering CorporationStone 8 Webster Standard Nuclear Quality Assgram

IDVPFINAL

F.1-3 REV 1

830805

Page 264: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

iQ

Page 265: 'IDVP Final Rept,' eighth text submittal. · 2017-02-28 · DIABLO CANYON PROJECT PHASE I STATUS August 12, 1983 Update 6290'78 SUMMARY 'nthe following we are provided a listing of

TAFW

TES

TMI

WE(B

Wyle

A TELEDYNEENQINEERINQ SERVICES

Turbine-Drive Auxiliary Feedwater Pump

Teledyne Engineering ServicesThree Mile IslandWismer & Becker

Wyle Laboratories

IDVPFINAL

F.1-4 REV 0'30805