IDX Investor Day 2012 Jakarta, 02 Mei 2012
Transcript
Page 1: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

IDX Investor Day 2012Jakarta, 02 Mei 2012

Page 2: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

DISCLAIMER

The views expressed here contain information derived from publicly available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the

information. Any forward looking information in this presentation has been prepared on the basis of a number of assumptions which may prove to be incorrect. This presentation should not be relied upon as a recommendation or

forecast by PT. Indo Tambangraya Megah Tbk. Nothing in this release should be construed as either an offer to buy or sell or a solicitation of an offer to buy or sell shares in any jurisdiction

2

Page 3: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

1. Pendahuluan

2. Tinjauan Operasional

3. Tinjauan Pemasaran

4. Tinjauan Keuangan

Agenda

3

Page 4: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

1

Pendahuluan

4

Page 5: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

5

Struktur dan Riwayat Perusahaan

ITMG

65.00%

Indominco Trubaindo Bharinto Jorong

PT Indominco Mandiri

(CCOW Gen.I)

PT Trubaindo Coal Mining

(CCOW Gen II)

PT Kitadin-Embalut

(KP)

PT Bharinto Ekatama

(CCOW Gen III)

PT Jorong Barutama Greston

(CCOW Gen II)

50.00%

PT Indo Tambangraya Megah Tbk.

Banpu Minerals (Singapore) Pte Ltd

99.99% 99.99% 99.99%99.99% 99.67%

174 Mt

695 MtResources

Reserves102 Mt

327 MtResources

Reserves13 Mt

150 MtResources

Reserves112 Mt

298 MtResources

Reserves6 Mt

144 MtResources

Reserves

Banpu Minerals Co.Ltd

Reserves 417* Mt

Resources 1,627* Mt

BMS

99.99%

BMC

Banpu PCLBanpu

Publik35.00%

Kitadin

PT Kitadin-Td.Mayang

(KP)

10 Mt13 Mt

Resources

Reserves

BCI50.00%

100.00%Banpu Coal

Investment Co.Ltd

Catatan: Data Resources dan Reserves per 31 Desember 2011

Kalimantan Timur Kalimantan Timur Kalimantan SelatanKalimantan TimurKalimantan Timur / Tengah

INDONESIAN STOCK EXCHANGEIPO 18th Dec 2007

6,500-7,300 kcal/kg6,000-6,300 kcal/kg 5,800 kcal/kg6,400-6,800 kcal/kg 6,700 kcal/kg 5,300 kcal/kg

Page 6: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Agenda

2

Tinjauan Operasional

6

Page 7: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

7

.

IndomincoProduksi batubara 2011: 14.8 juta ton. Target produksi untuk 2012: 15.0 juta ton

PembangkitListrikBerbahanbakarbatubara

TrubaindoProduksi batubara2011: 7.1 juta ton.

Target produksi untuk2012: 7.1 juta ton

JorongProduksi batubara2011: 1.4 juta ton.

Target produksi untuk2012: 1.0 juta ton

BharintoTarget produksi untuk

2012: 0.7 juta tonKitadin-EmbalutProduksi batubara2011: 1.3 juta ton. Target produksi untuk2012: 0.7 juta ton

Kitadin-Td.MayangProduksi batubara2011: 0.4 juta ton dantarget produksi untuk2012: 2.7 juta ton. Saatini juga bekerjasebagai kontraktortambang di area Indominco

Produksi 2011: 25 juta ton dan Target 2012: 27 juta ton

Operasional di tahun 2012

Page 8: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Indominco Mandiri

8

3.1

EAST BLOCK

Santan River Port stock yard

Bontang City

Asphalt haul road 2.5Km

35Km

Sea conveyor

Mine stockyard

Inland conveyor 4km

0 106 82 km4

WEST BLOCK

Operations

Stockpile

Ports

Hauling

Crusher

ROM stockpile

SKEMA INDOMINCO-BONTANG

Post Panamax

95,000DWT

ANALISA PRODUKSI INDOMINCO

3.1 3.4 4.2 4.1

1Q 2Q 3Q 4Q

20112012

SR 13.511.8

12.0 12.1

Blok Barat

1.8 1.5 1.8 2.1 2.0

1Q 2Q 3Q 4Q

Blok Timur

1.3 1.6 1.6 2.1 2.1

1Q 2Q 3Q 4Q

SR 15.8 12.513.1 13.3

10.1 10.910.9 10.9

Volume

Produksi 2011: 14.8 juta ton dan Target 2012: 15.0 juta ton

Volume

MAJOR QUARTERLY UPDATESProduksi 2011 yang sesuai target disebabkan oleh kondisicuaca dan curah hujan yang baik pada 2H11 dan adanyapenambahan alat berat dari PAMA.Persiapan studi kelayakan untuk washing plant di Blok Timurmasih berjalan.Penyelesaian tahap pre-studi kelayakan pada In-Pit Crushing Conveyer (IPCC) sistem.Studi untuk perluasan kapasitas pelabuhan batubara Bontangdan mine-stock yard yang dilakukan oleh konsultan dari luar

Page 9: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Trubaindo and Bharinto

9

Mahakam River

Operation

Stockpile

Hauling

Barge Port

Crusher

South Block 1(Dayak Besar)

North Block

40kmMine to port

KedangpahuRiver

ROM stockpile

BunyutPort

0 10 2515 205 km

Product coal conveyor, stacking,

stockpile

SKEMA TRUBAINDO-BHARINTO

EAST KALIMANTAN

Bharinto 60km south west of

TrubaindoNorth Block

South Block 2(Biangan)

PT. BHARINTO

PT. TRUBAINDO

ANALISA PRODUKSI TRUBAINDO

1.5 1.6 1.7 1.8 2.1

1Q 2Q 3Q 4Q

SR : 10.0 11.9 14.1

12.4Produksi 2011: 7.1 juta ton dan Target 2012: 7.1 juta ton

20112012Volume :

ANALISA PRODUKSI BHARINTO

1Q 2Q 3Q 4Q

Target 2012: 0.7 juta ton

Volume : 0.0 0.0 0.0 0.00.0

20112012

MAJOR QUARTERLY UPDATESTrubaindo:

Produksi 2011 sedikit dibawah target karena kapasitas coal stockyard Trubaindo yang sudah penuh sebagai dampakdari runtuhnya jembatan Kutai Kartanegara.

Bharinto: Aktifitas pre-stripping sudah dilakukan sejak Januari 2012.Fasilitas jalan untuk pengangkutan batubara diestimasikanselesai pada 1Q12.Operasi penambangan ditargetkan akan mulai di 2Q12.

Page 10: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Kitadin Embalut and Td.Mayang

10

Balikpapan

MahakamRiver Samarinda to Muara Berau

Bontang city

EMBALUT

Embalut Port

to Muara Jawa

ROM stockpile

Operations

Stockpile

Ports

Hauling

Crusher

0 106 82 km4

5km Mine to port

TD. MAYANG

EAST KALIMANTAN

IMM EB

SKEMA KITADIN

IMM WB

Bontang Port

ANALISA PRODUKSI EMBALUT

0.3 0.3 0.3 0.4

1Q 2Q 3Q 4Q

SR : 8.9 8.7 11.2 11.5Produksi 2011 : 1.3 juta ton dan Target 2012: 0.7 juta ton

Volume :

ANALISA PRODUKSI TD. MAYANG

1Q 2Q 3Q 4Q

Volume :0.0 0.0 0.0

0.2

Produksi 2011: 0.4 juta ton; Target 2012: 2.7 juta ton

20112012

201120120.40.5

15.1SR :

MAJOR QUARTERLY UPDATESKitadin Embalut:

Produksi 2011 lebih tinggi dari target dikarenakan olehkinerja kontraktor yang cukup baik.Penurunan target produksi batubara di tahun 2012 disebabkan oleh sulitnya kondisi lokasi tambang dankompensasi lahan di area tambang Kitadin Embalut.

Kitadin Tandung Mayang: Memproduksi batubara pada area konsesinya sendiri sejak3Q11 dan target produksi 2012 sebesar 2.7 juta ton.Saat ini masih bekerja sebagai kontraktor tambang di lokasitambang Indominco.

Page 11: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Jorong

11

Coal terminal

Jorong

Pelaihari

Pacific Ocean

Haul road

Operations

Stockpile

Hauling

Barge Port

0 10 2515 205 km

20km

SKEMA JORONG ANALISA PRODUKSI JORONG

0.3 0.2

1Q 2Q 3Q 4Q

SR :

Produksi 2011: 1.4 juta ton dan Target 2012: 1.0 juta ton

8.6

Volume :0.4

8.6

0.4

8.6

201120120.3

8.6

MAJOR QUARTERLY UPDATES

Produksi 2011 sesuai dengan target dikarenakan olehkinerja kontraktor yang cukup baik.

Mentargetkan produksi batubara sebesar kurang lebih 1.0 juta ton per tahun dikarenakan keterbatasan reserves

Page 12: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Agenda

3

Tinjauan Pemasaran

12

Page 13: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Rata-rata harga jual batubara

13

30

50

70

90

110

130

150

170

190

Jan-

07

Mar

-07

May

-07

Jul-0

7

Sep

-07

Nov

-07

Jan-

08

Mar

-08

May

-08

Jul-0

8

Sep

-08

Nov

-08

Jan-

09

Mar

-09

May

-09

Jul-0

9

Sep

-09

Nov

-09

Jan-

10

Mar

-10

May

-10

Jul-1

0

Sep

-10

Nov

-10

Jan-

11

Mar

-11

May

-11

Jul-1

1

Sep

-11

Nov

-11

Jan-

12

USD / Ton

TriwulanIndeks NEX

NEX per 26 Apr 2012:$101.90/ton

Triwulan hargajual rata-rata

Indeks NEX bulananRata-rata harga jual bulanan

Harga jual 4Q11: $103.1/tHarga jual FY11: $97.1/t

Page 14: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Indikasi penjualan batubara tahun 2012

14

Kontrak penjualan batubara dan harga

51%

31%

6%13%

Status Kontrak Status Harga

KontrakSudah ditetapkan

Mengacu indeks

TARGET PENJUALAN 2012: 27 juta ton

Belum dikontrak Harga belumditentukan

Belumterjual

87%

13%

Page 15: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Penjualan batubara berdasarkan geografis 

15

JAPAN (16%)

INDIA (9%)

INDONESIA (9%)

PHILIPPINES (5%)

HONG KONG (4%)

TAIWAN (8%)

S.KOREA (5%)

THAILAND (7%)

Ekspektasi 2012

2012

*Includes small, non-regular purchasers

Penjualan batubara2011: 24.7 juta ton

OTHERS* (0%)

2012

CHINA (23%)

2012 2012

2012

2012

20122012

2012

4.1 4.2 4.5

4.1

-

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

2008 2009 2010 2011

2.4

0.6

1.8 1.4

-

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

2008 2009 2010 2011

2012

-

0.9 1.2 0.9

-

0.20

0.40

0.60

0.80

1.00

1.20

1.40

2008 2009 2010 20111.6

3.1

5.1 5.8

-

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

2008 2009 2010 2011

1.4 1.4 1.8 1.8

-

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

2008 2009 2010 2011 1.7

2.6 2.4 2.0

-

0.5

1.0

1.5

2.0

2.5

3.0

2008 2009 2010 2011

1.6 1.8

1.1 1.3

-

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

2008 2009 2010 2011

1.4 1.3 0.5

2.1

-

0.5

1.0

1.5

2.0

2.5

2008 2009 2010 2011

2.1 2.0

1.5 1.7

-

0.5

1.0

1.5

2.0

2.5

2008 2009 2010 2011

0.1 0.2 0.2

- -

0.1

0.1

0.2

0.2

0.3

2008 2009 2010 2011

MALAYSIA (5%) 2012

1.3 0.9 1.1 1.3

-

0.5

1.0

1.5

2.0

2.5

3.0

2008 2009 2010 2011

0.1

2.2

0.9

2.3

-

0.5

1.0

1.5

2.0

2.5

2008 2009 2010 2011

ITALY (7%)

Page 16: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Agenda

4

Tinjauan Keuangan

16

Page 17: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Penjualan Bersih

17

2007 2008 2009 2010 2011

2007 2008 2009 2010 2011

Satuan: Juta tonVOLUME PENJUALAN

Satuan: USD/Ton

RATA-RATA HARGA JUAL BATUBARA

Satuan: Jutaan Dolar AS

PERTUMBUHAN PENJUALAN*

IndomincoTrubaindo

JorongKitadin

* Tidak termasuk pendapatan dari pelabuhan2007 2008 2009 2010 2011

18.1 17.7

+11%YoY

21.022.2

73.9

42.3

+30%YoY

71.574.9

2007 2008 2009 2010 2011

765

1,311

1,5011,658

+45%YoY

24.7

97.1

2,397

Page 18: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

18

Neraca Keuangan

Net Gearing (%)

Net D/E (times)

(30%)

(0.34)(0.36)

(34%)

POSISI KEUANGAN

2007 2008

258222

POSISI HUTANG

2007 2008

92

11

55

2009

429

(0.47)

(44%)

2009

2011

612

0

2011

(0.57)

(57%)

295

2010

0

2010

(0.41)

(41%)

2007 2008 2009 20112010

(Satuan: Jutaan Dolar AS)

(Satuan: Jutaan Dolar AS)

Page 19: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Kinerja Keuangan

19

2007 2008 2009 FY10 fy112007 2008 2009 FY10 FY11 2007 2008 2009 FY10 FY11

LABA BERSIHLABA BERSIHLABA USAHA**LABA USAHA**

Satuan: Jutaan Dolar AS

163

56

2357%

18%

Laba Usaha Margin Laba Usaha Laba Bersih Margin Laba Bersih

LABA KOTOR*LABA KOTOR*

458

Laba Kotor Margin Laba Kotor

FY07 FY08

*) Termasuk royalti

27%

21%

29%

FY09

563492

33%

336

22%

FY10

35%38%

518

32%

416388

25%

12%

204

FY11

206

892

37%

FY07 FY08 FY09 FY10 FY11

764

32%

FY07 FY08 FY09 FY10 FY11

546

23%

**) Laba usaha sebelum depresiasi dan amortisasi

Satuan: Jutaan Dolar AS Satuan: Jutaan Dolar AS

Page 20: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

20

Rencana Belanja Modal (Capex) 2012

Catatan: Jumlah pembelanjaan modal termasuk kantor pusat Jakarta

Indominco Trubaindo Bharinto Kitadin Jorong ITM Konsolidasi*

209

80

108

96

2

In-pit crushing conveyor (IPCC)Pengembangan pelabuhanCrushing plant & Washing plant

Infrastruktur TrubaindoCrushing plant

(Satuan: Jutaan Dolar AS)

Page 21: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Pembayaran Dividen

21

* Pembayaran dividen pada tanggal 15 Mei 2012

2,506

1,168795706

295678

407

1,286

344

1H08 3Q08 4Q08 1H09 2H09 1H10 2H10 1H11 2H11

Dividen payout (%)

Dividen per lembar saham (Rp)

60% 50%

67% 50%

88%

75%

75%

75%

90%

1H08 3Q08 4Q08 1H09 2H09 1H10 2H10 1H11 2H11Rp 1,345 / share( 60% payout )

Rp 1,964 / share( 70% payout )

Rp 1,202/ share( 75% payout )

Rp 3,674/ share( 85% payout )

*

Page 22: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

22

Terima kasih

Page 23: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Agenda

Lampiran

23

Page 24: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

24

Resources dan Reserves Batubara (per 31 Des 2011)

Indominco

Kitadin-Td.Mayang

Jorong

Trubaindo

Blok barat

Blok Timur

242

28

453

151

14

144

6

327

102

298

112

12

RESOURCES

RESERVES

Kitadin-Embalut

Total Reserves : 417 juta ton

Total Resources : 1,627 juta ton

146

9

Bharinto

Note: * Pembaruan data reserves dan resources per tanggal 31 Des 2011 berdasarkan estimasi yang dilakukan oleh pihak yg kompeten(dengan mempertimbangkan JORC code) dan teknikal studi dan audit yang dilakukan oleh perusahaan konsultan berskala international

(Satuan: Juta Ton)

Page 25: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Peningkatan Reserves 2011

25

JORONGINDOMINCO KITADIN EMB & TMTRUBAINDO BHARINTO

• Sistem In-Pit Crushing Conveying (IPCC) memungkinkanpenambangan dapat dilakukan secara lebih ekonomis danlebih dalam.

• Fasilitas IPCC akan membuat biaya pengupasan tanahlapisan atas (OB removal) lebih murah dan lebih cepatsehingga biaya OB removal per bcm lebih kompetitif.

• Kegiatan eksplorasi telah meningkatkan reserves di Blok Timur Indominco pada tahun 2011.

• Kegiatan penambahan reserves di Blok Timur Indomincoakan tetap berlanjut dan akan berdasarkan atas kegiataneksplorasi dan kajian pertambangan.

PENINGKATAN RESERVES : INDOMINCO BLOK TIMUR

• Kajian teknik (termasuk IPCC) dan pengeboraneksplorasi telah meningkatkan perkiraan reserves

• Kegiatan penambahan reserves di Bharinto akan tetapberlanjut dan akan berdasarkan atas kegiataneksplorasi dan kajian pertambangan.

PENINGKATAN RESERVES : BHARINTO

(Satuan: Juta Ton)

2010 2011

PENJUALAN

25

-17 6

PENINGKATAN RESERVES

2010 2011

SALES

-15150+39 174

2010 2011

-225 23

2010 2011

-7109 102

2010 2011

45

+67 112

Total Reserves per 31 Desember 2011: 417 juta ton

PENINGKATAN RESERVES

PENJUALAN

PENJUALAN

Page 26: IDX Investor Day 2012 - PT Indo Tambangraya Megah Tbkitmg.co.id/media/kcfinder/docs/itm-file-1374465632-itm... · 2016-02-12 · Any forward looking informa tion in this presentation

Peningkatan Reserves 2011: dengan metode IPCC

26

100 m

50 m

PIT BENCHES

BACKHOEEXCAVATOR

TRUCK

IN-PITCRUSHER

IN-PITCONVEYORS

SPREADER STOCKPILE

100 m

50 m

ILUSTRASI SISTEM IPCC

• Sistem IPCC, metode penambangan yang mengandalkan listrik, cenderungmembutuhkan belanja modal yang lebih tinggi, namun biaya yang dikeluarkan akan lebih rendah apabila dibandingkan dengan menggunakanmesin excavator diesel dan pengangkutan dengan truk.

• IPCC membutuhkan umur tambang yang lama (10 tahun+) dan volume batubara yang cukup banyak.

• IPCC memungkinkan proses OB removal yang lebih ekonomis danpenambangan batubara pada kedalaman 100 – 200m yang mana metodepengangkutan dengan menggunakan truk tidak dapat dilakukan.

SEMI-MOBILE CRUSHER

CONVEYOR

SPREADER