+ All Categories
Home > Documents > IE 4390 CAPSTONE DESIGN SPRING 2015 INSULATED CONCRETE FORM PRE-ENGINEERED CONSTRUCTION DAVID HOLT,...

IE 4390 CAPSTONE DESIGN SPRING 2015 INSULATED CONCRETE FORM PRE-ENGINEERED CONSTRUCTION DAVID HOLT,...

Date post: 23-Dec-2015
Category:
Upload: joel-maxwell
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
11
IE 4390 CAPSTONE DESIGN SPRING 2015 INSULATED CONCRETE FORM PRE-ENGINEERED CONSTRUCTION DAVID HOLT, MICHAEL MULLEN, MATTHEW SNEAD DR. MICHELLE LONDA
Transcript
Page 1: IE 4390 CAPSTONE DESIGN SPRING 2015 INSULATED CONCRETE FORM PRE-ENGINEERED CONSTRUCTION DAVID HOLT, MICHAEL MULLEN, MATTHEW SNEAD DR. MICHELLE LONDA.

IE 4390 CAPSTONE DESIGNSPRING 2015

INSULATED CONCRETE FORM

PRE-ENGINEERED CONSTRUCTION

DAVID HOLT, MICHAEL MULLEN, MATTHEW SNEAD

DR. MICHELLE LONDA

Page 2: IE 4390 CAPSTONE DESIGN SPRING 2015 INSULATED CONCRETE FORM PRE-ENGINEERED CONSTRUCTION DAVID HOLT, MICHAEL MULLEN, MATTHEW SNEAD DR. MICHELLE LONDA.

MOTIVATION Sustainable Building Systems will lead the

transformation of the building and construction industry

– Reduce the cost of ICF manufacturing.• 10% more than standard construction

– Practicing sustainable building techniques.– Developing innovative materials and

processes.

Insulating Concrete Forms (ICFs)– Stacked Hollow EPS Foam Blocks or Panels– Reinforced with Rebar– Filled with Concrete

Broad Impact– ICF structures will last centuries while wood

only lasts decades– Manufacturing pre-engineered wall systems will

create a skilled work force

Benefits– Reduction in energy use (32% to 44%)*– Less construction waste– No mold– Safe and Strong– More people saving $ and making $

Page 3: IE 4390 CAPSTONE DESIGN SPRING 2015 INSULATED CONCRETE FORM PRE-ENGINEERED CONSTRUCTION DAVID HOLT, MICHAEL MULLEN, MATTHEW SNEAD DR. MICHELLE LONDA.

PRODUCT DESIGN Polystyrene Connectors

– 6 x 5 ½ Connectors– Provides Horizontal Stability– Allows a medium to attach interior

drywall and exterior siding Expanded Polystyrene Panel

– 2 x 48” x 16” x 2.5” – Concrete obtains 28 day cure in 7

days– Effective R value of 50

Stream line manufacturing– 50% reduction in home

construction time– Zero waste– Used in any floor design

Page 4: IE 4390 CAPSTONE DESIGN SPRING 2015 INSULATED CONCRETE FORM PRE-ENGINEERED CONSTRUCTION DAVID HOLT, MICHAEL MULLEN, MATTHEW SNEAD DR. MICHELLE LONDA.

EPS PANEL / FORMS POLYPROPYLENE CONNECTORS MACHINE REQUIREMENTS/CYCLE TIMES REBAR CACLULATIONS

RAW MATERIAL ALLOCATION

Page 5: IE 4390 CAPSTONE DESIGN SPRING 2015 INSULATED CONCRETE FORM PRE-ENGINEERED CONSTRUCTION DAVID HOLT, MICHAEL MULLEN, MATTHEW SNEAD DR. MICHELLE LONDA.

EPS PRE EXPANDER POLYPROPYLENE INJECTION MOLDER EPS INJECTION MOLDING MACHINE REBAR BINDER & CUTTER REBAR THREADING MACHINE TABLE SAW AIR COMPRESSOR FORKLIFT

MACHINE/TOOLING

Page 6: IE 4390 CAPSTONE DESIGN SPRING 2015 INSULATED CONCRETE FORM PRE-ENGINEERED CONSTRUCTION DAVID HOLT, MICHAEL MULLEN, MATTHEW SNEAD DR. MICHELLE LONDA.

32

4

5 67

8

9

1014

13

12

11

23

15

16

17

18

19

20

21

22

24

25

26

1

Process Maps Relationship Diagram Space Requirements Layout Planning Facility Layout

FACILITY DESIGN OPTIMIZATION

Page 7: IE 4390 CAPSTONE DESIGN SPRING 2015 INSULATED CONCRETE FORM PRE-ENGINEERED CONSTRUCTION DAVID HOLT, MICHAEL MULLEN, MATTHEW SNEAD DR. MICHELLE LONDA.

FACILITY DESIGN

Page 8: IE 4390 CAPSTONE DESIGN SPRING 2015 INSULATED CONCRETE FORM PRE-ENGINEERED CONSTRUCTION DAVID HOLT, MICHAEL MULLEN, MATTHEW SNEAD DR. MICHELLE LONDA.

FACILITY DESIGN Designed Facility using SIMIO

Page 9: IE 4390 CAPSTONE DESIGN SPRING 2015 INSULATED CONCRETE FORM PRE-ENGINEERED CONSTRUCTION DAVID HOLT, MICHAEL MULLEN, MATTHEW SNEAD DR. MICHELLE LONDA.

QUALITY CONTROL PLAN Three week’s of cold start-up production

– Morning– Afternoon– Evening

Tensile Strength –– 1200 psi LSL

Flexural Strength – – Minimum rotational flex is 90°twist without

a fracture Continual Testing

– New production run– Material Batch Change– 1000 lbs. of raw material of same batch

1611451291139781654933171

1280

1260

1240

1220

Sample

Sample Mea

n

__X=1251.49

UCL=1285.01

LCL=1217.97

1611451291139781654933171

160

120

80

40

0

Sample

Sample Ran

ge

_R=69.3

UCL=139.0

LCL=0

Xbar-R Chart of Tensile Strength (psi)

Tests performed with unequal sample sizes

Page 10: IE 4390 CAPSTONE DESIGN SPRING 2015 INSULATED CONCRETE FORM PRE-ENGINEERED CONSTRUCTION DAVID HOLT, MICHAEL MULLEN, MATTHEW SNEAD DR. MICHELLE LONDA.

PHASE ONE– SINGLE FACTORY – SERVICE A 200 MILE RADIUS– SUPPLY CHAIN MODEL

PHASE TWO– CENTRAL FACTORY – SERVICE A 200 MILE RADIUS – DISTRIBUTION CENTERS – SERVICE AN ADDITIONAL 200 MILES

SUPPLY CHAIN

Page 11: IE 4390 CAPSTONE DESIGN SPRING 2015 INSULATED CONCRETE FORM PRE-ENGINEERED CONSTRUCTION DAVID HOLT, MICHAEL MULLEN, MATTHEW SNEAD DR. MICHELLE LONDA.

ACKNOWLEDGEMENTS

Indirect Sponsor - David Schreiber

Advisor - Dr. Michelle Londa

This project has no official sponsorship by any industry or company

Michael MullenMatthew SneadDavid Holt


Recommended