32
IES Faculty March 2014 Part L2A 2013 Update and Priority Schools Building Programme (PSBP)
Transcript
Page 1: IES Faculty - Part L 2013 & Priority School Building Programme

IES Faculty March 2014Part L2A 2013 Update and Priority

Schools Building Programme (PSBP)

Page 2: IES Faculty - Part L 2013 & Priority School Building Programme

Overview

• 1400 Introduction

• 1415 Part 1 – Part L 2013 Changes

– School Test Case

• 1515 Q&A

• 1530 Part 2 – PSBP Overview

– Schools Test Case

• 1630 Q&A

Page 3: IES Faculty - Part L 2013 & Priority School Building Programme

Part L Timeline

20022006

-28%

2010

-25%

2013

-9%

2016

-20-30%

2019

-30-40%

Source: UKGBC Building Zero Carbon report February 2014

Page 4: IES Faculty - Part L 2013 & Priority School Building Programme

Part L 2013 Headlines

• Aggregate 9% improvement

• 4 classes of notional building

• Notional building air permeability is sub divided by

size; Window U value reduced from 1.8 to 1.6

• Criterion 2 – buildings with high heat gains can have

a less demanding are weighted U value

• Improvements depend on type of building including

lighting efficacy, terminal SFP’s etc

Page 5: IES Faculty - Part L 2013 & Priority School Building Programme

2013

Changes

Page 6: IES Faculty - Part L 2013 & Priority School Building Programme

Part L The Future

UKGBC Non Domestic Zero Carbon Task Group

Page 7: IES Faculty - Part L 2013 & Priority School Building Programme

The Performance Gap

Page 8: IES Faculty - Part L 2013 & Priority School Building Programme

Real vs Compliance

Page 9: IES Faculty - Part L 2013 & Priority School Building Programme

Real vs Compliance

Page 10: IES Faculty - Part L 2013 & Priority School Building Programme

Enhanced Modelling

� Radiators and chilled ceilings may now be

autosized

� Using specified room temperatures and loads

(either manually entered or generated by a

System Loads analysis)

� Users can elect to autosize the number of

units of a chosen type and the required water

flow.

Page 11: IES Faculty - Part L 2013 & Priority School Building Programme

Part L2A 2013

Navigators detail all the steps that

should be considered in a Compliance

Assessment.

•Once data is entered users check the

associated entry recording who

completed the action and when.

•Users can record their own notes via

the Navigator either for future reference

or for others working on the same

Project.

Page 12: IES Faculty - Part L 2013 & Priority School Building Programme

Part L2A 2013

Page 13: IES Faculty - Part L 2013 & Priority School Building Programme

Part L2A 2013

Page 14: IES Faculty - Part L 2013 & Priority School Building Programme
Page 15: IES Faculty - Part L 2013 & Priority School Building Programme

Constant illuminance added (see Room Data:

NCM lighting)

Page 16: IES Faculty - Part L 2013 & Priority School Building Programme

Part L2A 2013 Q&A

[email protected]

Page 17: IES Faculty - Part L 2013 & Priority School Building Programme

Part L2A 2013

School Test Case

Page 18: IES Faculty - Part L 2013 & Priority School Building Programme

School – Naturally Ventilated

Part L2A 2013 Test Case

Building Attribute Differences 2010 Notional Building 2013 Notional Building

Glazing U-Value 1.8 W/m2.K 1.6 W/m2.K

Air Permeability 5 3

Lighting Efficacy 55 lm/W 60 lm/W

Lighting - Occupancy Sensing Controls None Yes

Demand Control Ventilation None None*

*DCV is only applicable in Mechanically Ventilated Buildings

Page 19: IES Faculty - Part L 2013 & Priority School Building Programme

School

Part L2A 2013 Test Case

Result 2010 Notional

Building

2013 Notional

Building

Reduction

TER (kg.CO2/m2) 19.0 19.67 -4%

Heating Energy

(kg.CO2/m2)

1.98 1.74 12%

Cooling Energy

(kg.CO2/m2)

1.23 1.3 -6%

Auxiliary Energy

(kg.CO2/m2)

8.35 8.40 -1%

Lighting Energy

(kg.CO2/m2)

5.97 6.82 -14%

DHW Energy

(kg.CO2/m2)

1.46 1.41 3%

Page 20: IES Faculty - Part L 2013 & Priority School Building Programme

School

Part L2A 2013 Test Case

0

2

4

6

8

10

12

14

16

18

20

Heating DHW Cooling Auxiliary

Energy

Lighting Total

2010 Notional

2013 Notional

Page 21: IES Faculty - Part L 2013 & Priority School Building Programme

PSBP

Priority Schools Building Programme

(PSBP)

Daylighting Criteria – DA & UDI

Adaptive Comfort

Page 22: IES Faculty - Part L 2013 & Priority School Building Programme

PSBP

• Announced mid 2013

• The Priority School Building Programme

(PSBP) is the government’s largest School

building programme.

• The PSBP covers 261 schools which will be

wholly or substantially rebuilt.

• The PSBP covers Secondary, Primary and SEN

Schools in England

Page 23: IES Faculty - Part L 2013 & Priority School Building Programme

PSBP

• Daylight Factors OUT – CBDM IN

• Climate Based Daylighting Modelling

• Daylight Factors: simulated using overcast sky

models

• CBDM uses actual weather data –realistic outputs

Page 24: IES Faculty - Part L 2013 & Priority School Building Programme

PSBP

• Primary Measure of CBDM is UDI

• UDI Target: 100 – 200Lux for 80% of the

occupied time

Page 25: IES Faculty - Part L 2013 & Priority School Building Programme

PSBP

• Secondary Measure of CBDM is DA

• DA Target: spaces receive target Illuminance

for 50% of the occupied hours

Page 26: IES Faculty - Part L 2013 & Priority School Building Programme

PSBP

Page 27: IES Faculty - Part L 2013 & Priority School Building Programme

PSBP

Page 28: IES Faculty - Part L 2013 & Priority School Building Programme

PSBP Q&A

[email protected]

Demo

Page 29: IES Faculty - Part L 2013 & Priority School Building Programme

PSBP Images

[email protected]

Page 30: IES Faculty - Part L 2013 & Priority School Building Programme

PSBP Images

[email protected]

Page 31: IES Faculty - Part L 2013 & Priority School Building Programme

PSBP Q&A

Page 32: IES Faculty - Part L 2013 & Priority School Building Programme

PSBP Q&A

[email protected]


Recommended