IET 120 CONSTRUCTION PROJECT Name: Shane Holbrook
Transcript
Page 1: IET 120 CONSTRUCTION PROJECT Name: Shane Holbrook.

IET 120CONSTRUCTION PROJECTName:Shane Holbrook

Page 2: IET 120 CONSTRUCTION PROJECT Name: Shane Holbrook.

Dwelling Number of Floors 1

Page 3: IET 120 CONSTRUCTION PROJECT Name: Shane Holbrook.

Square Footage Square footage of each floor: 4500

sq feet

Square footage total: 4500

Page 4: IET 120 CONSTRUCTION PROJECT Name: Shane Holbrook.

Building Materials Recycled Natural Cotton for insulation. Geothermal Heating and

Cooling system. Recycled content drywall. Ecofriendly paint. Water Filtration system, utilizing water usage from rainfall.

Water filtration. Catches rain water and filters it for consumption, therefore utilizing water already availible. Geothermal heating and cooling, using earth for climate control. Plants on roof, availble for food, oxygen.

I wanted to go completely green, even using a tornadic type vacuum system for the geothermal. Although the budget didn’t allow for it. The purpose of using the filtration system is to reduce our reliance. To be almost self sustainable. To utilize the earths heat, also cuts back on our impact on which we are using energy.

Page 5: IET 120 CONSTRUCTION PROJECT Name: Shane Holbrook.

Building Materials A continuation of building materials Fireclay Tile Recycled Content Drywall Front Wood Door Interior insulated Door Garage Door Vinyl Windows 2X6 Studs Geothermal heating and cooling Recycled Natural Cotton Sink – Porcelain Countertops – Bamboo Range – Viking 60” gas Range double oven Refrigerator – Victory Ultra spec series

Oriented Strandboard (OSB) Interior/Exterior ecofriendly

paint Metal roofing Fiber cement board siding

5’X3’ (1/2”)

Page 6: IET 120 CONSTRUCTION PROJECT Name: Shane Holbrook.

Floor Plan Layout I chose to make everyone their own

private quarters. The reason being is because everyone really needs their privacy. Communal bedrooms are fine, although this layout, although small, makes one feel more as if they are in their own community, as opposed to a camp or soldier barrack.

Page 7: IET 120 CONSTRUCTION PROJECT Name: Shane Holbrook.

TimelineGantt Chart Version 1.7.3 0

Student GreenIET 120 Today's Date: Wednesday

(vertical red line)Project Lead: [42]

Start Date: Wednesday[42] First Day of Week (Mon=2): 2

WBS TasksTaskLead Start End D

urat

ion

(Day

s)

% C

ompl

ete

Wor

king

Day

s

Day

s C

ompl

ete

Day

s R

emai

ning

1 Task Category 1 [Name] 5/7/14 6/5/14 30 0% 22 0 301.1 buy materials 5/7/14 5/11/14 5 0% 3 0 51.2 contract w orkers 5/12/14 5/16/14 5 0% 5 0 5

1.2.1

Designate building

contract 5/17/14 5/21/14 5 0% 3 0 5

1.2.2

Delegate tasks and

rev iew 5/22/14 5/26/14 5 0% 3 0 5

1.3

Ex cav ate For

Geothermal Heating 5/27/14 5/31/14 5 0% 4 0 5

1.4

Lay begin placing

pipes for geothermal

heating w ater filtration 6/1/14 6/5/14 5 0% 4 0 52 Task Category 2 [Name] 6/5/14 7/4/14 30 25% 22 7 232.1 Lay foundation 6/5/14 6/9/14 5 25% 3 1 4

2.2

Begin lay ing stick

lay out (Frame) and

w ater pipes and

electricity 6/10/14 6/24/14 15 25% 11 3 122.3 Flooring 6/25/14 6/29/14 5 25% 3 1 42.4 Dry w all 6/30/14 7/4/14 5 25% 5 1 43 Task Category 3 [Name] 6/20/14 6/30/14 11 50% 7 5 63.1 Begin Lay ing Roof 6/20/14 6/25/14 6 50% 4 3 33.2 Begin Painting 6/20/14 6/25/14 6 50% 4 3 3

3.3

Construct Water

Filtration on roof 6/25/14 6/30/14 6 50% 4 3 33.4 Begin placing plants 6/25/14 6/30/14 6 50% 4 3 34 Task Category 4 [Name] 1/2/12 1/21/12 20 0% 15 0 204.1 1/2/12 1/6/12 5 0% 5 0 54.2 1/7/12 1/11/12 5 0% 3 0 54.3 Sub Task lev el 2 1/12/12 1/16/12 5 0% 3 0 54.4 Sub Task lev el 2 1/17/12 1/21/12 5 0% 4 0 5

TEMPLATE ROWS: Copy and insert the entire section, or just the specific sub tasks, depending on w hich level you w ant to use (formulas are different for different WBS levels)1 Task Category 1 1/5/09 1/5/09 1 0% 1 0 11.1 Sub Task lev el 2 1/5/09 1/5/09 1 0% 1 0 11.1.1 Lev el 3 Task 1/5/09 1/5/09 1 0% 1 0 11.1.1.1 Lev el 4 task 1/5/09 1/5/09 1 0% 1 0 1

08 -

Sep

- 14

23 -

Jun

- 14

22 -

Sep

- 14

15 -

Sep

- 14

01 -

Sep

- 14

04 -

Aug

- 14

11 -

Aug

- 14

18 -

Aug

- 14

25 -

Aug

- 14

5/7/2014Shane Holbrook

HELP

16 -

Jun

- 14

28 -

Jul -

14

30 -

Jun

- 14

07 -

Jul -

14

14 -

Jul -

14

21 -

Jul -

14

08 -

Dec

- 14

10 -

Nov

- 14

17 -

Nov

- 14

24 -

Nov

- 14

01 -

Dec

- 14

22 -

Dec

- 14

15 -

Dec

- 14

© 2006-2012 Vertex42 LLC

5/7/2014

02 -

Jun

- 14

09 -

Jun

- 14

05 -

May

- 14

12 -

May

- 14

19 -

May

- 14

26 -

May

- 14

03 -

Nov

- 14

06 -

Oct

- 14

13 -

Oct

- 14

20 -

Oct

- 14

27 -

Oct

- 14

29 -

Sep

- 14

HELP

- Modify the GREEN cells and the Tasks, and Task Lead columns. Some of the green cells contain formulas, but those formulas are just examples of ways to add automation and task dependency. You can enter values manually into the green cells, or use formu las.- The Start Date that you choose determines the first week in the gantt chart.- Change the first day of the week via cell K8

To unlock this spreadsheet, purchase Gantt Chart Template Pro: http://www.vertex42.com/ExcelTemplates/excel-gantt-chart.html

Page 8: IET 120 CONSTRUCTION PROJECT Name: Shane Holbrook.

Conclusion It was fun designing the building. I

learned a lot about management of space, and of buildings in general.

I did learn some new things about buildings that I previously didn’t know. I learned about their structure, the processes involved and so fourth.