    NEBOSH International General Certificatein Occupational Health and Safety

    UNIT IGC3: HEALTH AND SAFETY PRACTICALAPPLICATION

    Student Name:

    Student Number:

    Date of Submission:

  • 8/18/2019 igc 3

    2/17

     

    IGC3 – The Health and Safety Practical Application

    Candidate and course provider declarations:

    For completion by the candidate:

    I declare that the work submitted for this practical application assessment ie. the completed observation sheetsand the report to management, is my own work. I recognise that contravention of this statement constitutesmalpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.

    Name

    Signature _______________________________

    Date

    For completion by a course provider representative (e.g. internal practical assessor):

    I declare that the work marked is identical to that received from the candidate. I recognise that contravention ofthis statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSHMalpractice policy.

    Name (Print) _______________________________

    Signature _______________________________

    Date _______________________________

    For completion by the course provider’s internal practical assessor: 

    I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise thatcontravention of this statement constitutes malpractice and may result in my being subject to the penalties set outin the NEBOSH Malpractice policy.

    Name (Print) _______________________________

    Signature _______________________________

    Date _______________________________

    NB: This declaration must be completed in full submitted and retained with thecandidate’s script. If this declaration is not submitted the candidate’s result may bedeclared void.

  • 8/18/2019 igc 3

    3/17

     

    INTERNATIONAL GENERALCERTIFICATE Assessor’s marking sheet (2011 specification)

    IGC3 – THE HEALTH ANDSAFETY PRACTICAL APPLICATION

    Date of practical application: Name of assessor:

    Course providernumber

    Course providername 

    Student number Student name 

    Criteria

    Maximummarks

    available

    Assessor’s

    marks awarded

    NEBOSHmoderated

    marks(if different)

    1 Completion of observation sheets

    1.1 Range and outline of hazards and consequences 15

    1.2Identification of suitable control measures andtimescales

    15

    2 Report - Introduction and Executive Summary

    2.1Introduction providing an overview of the chosenarea 5

    2.2 Executive summary 5

    3 Report - Main findings of the inspection

    3.1 Quality of interpretation of findings 15

    3.2Identification of possible breaches of internationalstandards

    5

    3.3 Persuasiveness / conciseness / technical content 10

    4 Report - Conclusions and Recommendations

    4.1Clear and concise conclusions which are clearlyrelated to report findings and are effective inconvincing management to take action

    15

    4.2Recommendations which present realistic actions toimprove health and safety in the chosen area

    15

    TOTAL MARKS100

  • 8/18/2019 igc 3

    4/17

     

    Outcome: PASS (60% or more) REFER (less than 60%)

    Date assessed ____ / ____ / ____  

     Assessor’s signature ______________________  

    Date received by course provider ____ / ____ / ____

    Date received by NEBOSH

    (if applicable) _____ / _____ / _____  

    Assessor’s additional comments on the practical application: 

    ASSESSED BY (name in block letters)  ________________________________________________

    The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.

    NEBOSH USE ONLY

    NEBOSH Moderator’s comments: 

  • 8/18/2019 igc 3

    5/17

     

    INTERNATIONAL GENERALCERTIFICATE Candidate’s observation(2011 specification) sheet

    IGC3 – THE HEALTH ANDSAFETY PRACTICAL APPLICATIONSheet number of

    Student name ______________ Student number:

    Place inspected Shoba Terrain, Devanahalli, Bangalore Date of inspection :30/March/2014

    Observations Control measures Timescale

    Hazards and consequences Immediate and longer term actions

    1. Excavation(Physical

    Hazard):Workers are seen in a ditchworking on drainage facility in the

    construction area about eight feet in

    depth and observed that no shoring or

    other means of protection which may

    lead to cave- ins and lead death to

    employees and/ or serious injury but

    not limited to limbs fracture, head

    injuries and no signage of authorized

    personnel only which may lead to slip

    and fall and injuries from cuts, bruises

    or bone fractures for workers.

    2. Physical and Chemical Hazard: A

    painter is seen working on the 7thfloor

    level at 40 feet height painting outside

    of the building in the construction area

    of Phase-I using boatswain’s chair  and

    brush, subject to risk of falling from

    height potentially as he had neither

    safety belt and nor safety harness tied

    to its body to protect from fall could

    cause loss of his life or serious injury

    such as fractureof upper/lower limbs

    and/or head injury, Back pain,

    Chemical hazard and ergonomic

    hazard.

    3.Fall from Height Hazard: Workers

    using scaffold at 45feet high for

    construction had not been mounted

    well on the even surface and had no

    guard rail, outerriggers broken and not

    replaced, not enough braces and toe

    boards have large gaps on the workplatform which all could lead to falling

    Short Term Measure:

    Provision of signage “Authorizedpersonnel “only.

    Long term Measure:

    Construct hydraulic shore on the ditchsides to prevent cave-ins and slip and triphazard for workers.

    Short Term Measure: Stop the workactivity of painting.Long term measures:. Use cherry picker and electric spraypaint where painter can prevent fromfalling and exposure to the paintchemicals would be less with face piecerespirator..Training and Instruction: Sufficient training and instruction shouldbe given to painters on the risks involvedby videos of painters working in

    boatswain’s chair  and importance ofpersonnel protective equipment , safetyharness and prolonged exposure ofchemical hazards.

    Short Term Measure:Stop the work activity using scaffold forconstruction work at height

    Long Term Measure:

    Purchase of new scaffold equipments

    and properly utilising all the safetypractices for Scaffold erection

    1 day

    1 Month.

    Immediately

    1 month.

    1 Month.

    Immediately

    1 month.

  • 8/18/2019 igc 3

    6/17

     

    objects and workers falling from height

    and majorly collapse of scaffold due to

    poor design and structure.

    4. Collision Hazard (Physical): 

    Forklift trucks at the warehouse in the

    construction site are observed thatrounding a blind corner into a loading

    area without stopping can lead to

    collision with workers, collision with

    stationary objects and collision with

    other vehicles which can cause from

    death to serious personal injury by

    falling objects and also lead to

    property damage by topple and/or

    collision.

    5.Hot Work (Fire Hazard): Welding

    rods work at construction site are

    happening near the LPG gas storage

    area which could lead to massive fire

    or explosion wherein other flammable

    objects such as timber woods could

    lead to massive casualties,

    environmental pollution and property

    damage.

    6. Electrical Hazard: Excavation

    area at Phase-III of constructionsitehad high voltage (10000v)powersupply of electricity for the wholeconstruction area had no barriers ordanger signage and workers exposedmay lead to electrocution ,electricburns and secondary effects such asthrown off to the excavated area leadto serious injury from head injury todeath.

    7. Physical Hazard: Excavation areaat the construction site of 8ft depth

    has not been protected by barrierswhich may lead to falling people byslip, topple of excavator and falling ofobject can lead from death to seriousinjury but not limited to bonefractures, or limbs disabilities andhead injuries.

    8.Physical Hazard: Drilling machineused at the construction site forconcrete coring produces high level ofnoise and vibration which can lead

    the users from temporary ringing topermanent ringing of ears(Tinnitus),

    Short Term Measure:. Provision of side mirrors on all blind

    corners where driver can foresee thevisibility of vehicles and workersmovements.Long Term Measures:.Provision of banks men at the blindcorners.

    .Adequate training to all forklift drivers onthe safety practices of driving forklifts onthe blind corners and spots or speedbumps at the blind corners.

    Short Term Measure:Stop the welding work immediately

    Long Term Measure:

    Separate closed ventilated area to weldthe rods and other welding works for theconstruction site.

    Short Term Measure: Danger voltage

    signage needs to be placed.

    Long term measure:

    Barricade the area from the excavationby isolating lock out –tag out system.

    Short Term Measure:Stop the excavation work in progress.

    Long term measure: Barrier theexcavation area and provide adequatetraining on safety practices of excavationprocedures.

    Short term Measure:. Use ofappropriate PPE such as gloves toprotect moderately from vibration andear muff to protect from noise.

    1 week.

    1month(Hiringcompetentperson)

    1 month.

    1 day.

    1 month.

    1 day.

    1 Month.

    Immediately

    3 weeks

    1 week.

  • 8/18/2019 igc 3

    7/17

     

    and also vibration can cause fromvibration White finger to nervedamage and also observed that theuser not wearing any personnelprotective equipment.

    9. Chemical Hazard: Workers atconcrete mixer without loading hopperbeen exposed to inhalation of cementdust which can lead to respiratoryissues and/or asphyxiation.

    10. Ergonomic Hazard: Manualhandling of carrying cement andbricks construction materials by oneof the workers using wheel barrow

    weigh approximately 150kgwhich canlead to back pain, rupture ofintervertebral discs, overloadedmuscle can tear.

    11. Physical Hazard: Concrete mixerworkers have been exposed to hotweather condition of approximatelyover 43c could lead to dehydration,heat stress /strokes.

    12.Slip (Physical )Hazard: Spillageof oil from one of the forklifts on theworker’s pathway can cause slip andfall and may lead from serious injurylike bone fracture to lower injury suchcuts and bruises.

    13. Psychological Hazard: Observed

    that one of the workers at theconstruction site were shouting andyelling at the other co-worker to dosomething which can lead to stressand demotivation in front of otherworkers.( Behavioral issue)

    14.Physical Hazard: Poor lighting atthe warehouse where workers needsto get construction materials to thesite might lead to slip, trip and fall

    cause serious injury like head cuts,bone fracture, Limbs disorders etc.

    Long term measure: Purchase of latestversion of drilling machine available inthe market which is of making less noiseand vibration.

    .Maintenance or servicing the existing

    drilling machine.

    Frequent breaks and job rotation can bedone by instructions.

    Providing respiratory PPE (Filteringface- piece respirator) enable the workernot to inhale cement dust.

    Short Term Measure: Instruct to carryonly safe working load limit which is40Kgs.

    Long term Measure: Organisingtraining for all manual handling workersabout manual handling techniques andmaximum weight that one can carry andconsequences if they exceed the weightlimit.

    Short term Measure: Frequent breaksand job rotation methods by instructionsby properly preparing working schedulefor staffs.

    Long Term Measure: Construct heat

    insulated ventilated area where workerscan get some rest with drinking waterfacility.

    Short Term Measure: Clean the oil spillby placing wet floor sign.

    Long term measure could besystematic inspection, maintenance andservice for all forklifts.

    Short term measure: Consultation with

    both employees about the situation andreason for yelling at the work place.

    Long term measure :Reiterating zerotolerance policy and imparting educationon the workplace attitude.Training on behavioural issue andworkplace culture.

    Short Term Measure: Adequate lightingneed to be provided where workers havemore access to materials on daily basis

    Long term measure Providing lux levellighting at all areas of warehouse.

    1 month

    3 weeks

    1 week.

    4 weeks.

    2 days

    4 weeks.

    1 Week

    1 month.

    4hrs.

    1 month.

    1 day

    1 month

    2 days.

    3 weeks

  • 8/18/2019 igc 3

    8/17

     

    15. Chemical Hazard: Poorventilation at the cement storage areawhere workers need access to get

    cement to the construction site andprolonged exposure can lead torespiratory problems, headache,irritation to eyes.

    16. Physical Hazard: Emergency fireexit door has been obstructed withwooden boxes which can lead to tripand fall hazard may cause death of

    many casualties due to major fire andlead to serious injury from head tofracture of bones

    17. Trip Hazard: Trailing of cables atthe back office work area wheremarketing employees were doing thebooking of apartments can lead to tripand fall to both employees and guestscould lead to bone fracture, head

    injury.

    18. Ergonomic Hazard: Sales&Marketing department employeeshave a poor working posture lookingat the computer due to non-adjustable chairs and computermonitors can lead to musculoskeletaldisorder, eye strain, fatigue and backpain.

    19.Biological Hazard: Beenobserved that there is a pond locatednear right side of the constructionarea where all drainage water of thevillage are stagnated can causebiological effect of inhaling and/orabsorption of harmful bacteria andviruses may lead to contagiousdiseases or Dermatitis,Legionellosis.

    Short Term Measure: Instruct theworker not to enter cement storage area.

    Long term measure : changing thecement storage area to adequateventilated area by installing DilutionVentilation system.

    Short Term Measure: Remove theobstruction from the emergency fire exitdoor.

    Long term measure: Reiterateemployees about the importance of fireevacuation emergency procedures inplace by training and to maintain goodhousekeeping.

    Short Term Measure: Immediatelyremove all cables from the walkingareas and floor and mount it throughceiling.

    Long term measure :Showing training

    videos for workers at risk and hiddenhazards present in accident of trailingcables,

    Short Term Measure: frequent breaksand job rotation by having tailor madegood working schedule.

    Long term measure :Purchasingadjustable chairs and monitors whereworkers can adjust to adequate level

    Short Term Measure: Water treatmentwith chlorine (eg.chlorination) to kill thebacteria.

    Long term measure: Constructing abarricade on the whole constructionareas where workers can be exposedless than normal.

    1 day

    1 month

    1 day

    4 Weeks.

    3 days.

    4 weeks.

    1 week.

    1 month

    2 days.

    1 month

  • 8/18/2019 igc 3

    9/17

     

    20. Mechanical Hazard:Electric disccutter machine (110V) for stonecutting had no guards and could leadto potentially high risk forentanglement as he is wearing looseclothing, and cutting and/or abrasion

    as he is not using any PPE.

    21. Cafeteria for construction workersand management has been found intidy and hygienic condition withhealthy menu which demonstrates thecommitment of the management.

    22. Locker facility allocated for eachand every construction sectionemployees separately according totheir needs and nearest to the placeof work for easy access.

    23. First aid provision at eachconstruction sections and first aidtraining for all employees given duringorientation mandatorily.

    24. Drinking water facility at each floorlevel for employees with hot and coldoptions according to the workerneeds.

    25. Toilets have been maintainedclean and tidy with all provision to theworkers such as hand wash liquidsoaps, toilet rolls (big and small), airfreshener and air-conditioned.

    Short Term Measure: Instruct worker touse PPE Gloves and not to wear looseclothing to prevent entanglement.

    Long Term Measure:Provide training,instruction and demonstrating videos to

    the workers on procedures of operatingelectric stone cutters and its importance.

     Appreciate the management andcafeteria staff for designing healthymenu and housekeeping of entirecafeteria.

    Demonstrates the managementcommitment towards health and safetyof their employees.

    It demonstrates the importance of firstaid provision and how it can be utilizedwell when unplanned event occurs atwork site.

    Promotes good working atmosphere foremployees and ability to work withmorale.

    Good commitment from themanagement towards the hygienicfacility of toilets with provisions.

    2 days

    4 weeks.

    Continue

    Continue

    Continue

    Continue

    Continue.

  • 8/18/2019 igc 3

    10/17

     

  • 8/18/2019 igc 3

    11/17

     

    INTERNATIONAL GENERALCERTIFICATE(2011 specification) Candidate report template

    UNIT IGC3 – THE HEALTH ANDSAFETY PRACTICAL APPLICATION

    Student number

    Location:Shoba Terrain Devanahalli, Bangalore Date of review:28/September/2014

    Introduction including overview of area inspected and activities taking place:

    I am Paul prepared this report follows the health and safety inspection of one of the biggestconstruction projects of Shoba Developers a leading real estate company in India and abroad has theupcoming project as Shoba Terrain at Devanahalli Bangalore which comprises of three phases,warehouse and administrative building which had both indoor and outdoor activities and its spreadover 20 acres located at Devanahalli, Bangalore north which is close to our Bangalore Internationalairport. The inspection took place on 28 march 2014 between 1000 and 1300hrs.

    Phase-I and II each comprises of 12 floors and have 460 apartments where the indoor activities suchas painting ,drilling , plumbing, and electrical connection are happening and it is almost in thehandover stage.

    Phase-III is at the initial stage of construction where the main outdoor activities such as excavation,building concrete, concrete mixing and welding works are happening which comprises of 230apartments&12floor levels and expected to complete by March-2014.

    Warehouse where indoor activities such as safe stacking and storing of construction materials suchas cement ( separate storage area) in the warehouse and welding rods, bricks, woods .

    Workers in administrative building are carrying out registration activities of apartments & otheradministrative indoor activities such as printing, copying and emails.

    Management and administrators of about 20 employees and 400 construction workers were presentwhile this inspection was conducted.

    The aim and reason for this inspection report to highlight the areas of concern about existing healthand safety hazard and to reduce the accidental statistics of previous year, also to measure thestandard of health and safety management system maintained and to check whether it meets thelegal standards.

  • 8/18/2019 igc 3

    12/17

     

    INTERNATIONAL GENERALCERTIFICATE(2011 specification) Candidate report template

    UNIT IGC3 – THE HEALTH ANDSAFETY PRACTICAL APPLICATION

    Student number

    Location: Shoba Terrain, Devanahalli, BangaloreDate of review28 /September /2014

    Executive Summary

    In 2013, there have been 12 accidents recorded on this construction site, out of which 7 minor fromcuts and bruises and 5major injury of bone fracture, head injury due to worker fell from height .Thisinspection observed some major areas of health and safety concern on both outdoor and indooractivities carrying out by workers which can put them under risk but not limited to death, serious injuryand property damage.

    Major findings and its recommendations:  Workers are at high risk of cave-in at the ditch where drainage pipeline work is happening and

    construction of hydraulic shoring could prevent from death to serious injury.

      Painter is working at height of 40feet( 7th floor) on boatswain’s chair with neither safety beltand nor harness which might lead to fall from height cause serious injury to death and cherrypicker with electric foam painter has been recommended.

      Scaffold not erected on the flat surface, no guard rails braces are not well fitted and somemissing, toe boards have huge gaps can lead to scaffold collapse , people and object fall fromheight and purchasing new scaffold is highly recommended.

      Forklifts are not stopping at the blind corners and can lead to collision with other vehicle &workers and topple forklift if the load is heavy may cause from death to serious injury andproperty damage , using banks men and side mirror at the blind spots are highlyrecommended.

      Rods have been welded close to the LPG storage area which can lead to explosion and fireand cause from several personnel death to serious injury and property damage, a separatecovered welding place is highly recommended to prevent from this risk.

      High power electric supply near excavation area needs to be covered by lock out-tag outisolation system.

    Inspection also observed good welfare facilities to workers from clean toilets with liquid hand soap,drinking water at each floor levels, first aid provisions and lockers, however requesting your earliestattention on the hazards which outlined above to reduce the risk to acceptable level whichsubsequently enable to decrease the accident records for this year.

  • 8/18/2019 igc 3

    13/17

     

    INTERNATIONAL GENERAL

    CERTIFICATE(2011 specification) Candidate report template

    UNIT IGC3 – THE HEALTH ANDSAFETY PRACTICAL APPLICATION

    Student number

    Location: Shoba Terrain, Devanahalli, Bangalore Date of review 28/September/2014

    Main findings and recommendations of the inspection:

    1.Cave- In/Trenching :

    Workers are in a ditch of about 8 feet in depth doing drainage pipeline work and found that there is noprotection from cave- in and slip and fall into the ditch as well as there is no protection and signagestating authorised personnel only or prohibited area which breaches the ILO legislation of ConventionC167-Safety and Health in construction convention, 1988(No.167).

    Recommendation:

    Hydraulic Shoring of trench would prevent workers to fall from height by slip or soil to cave in andwould cost approximately $200 and it is easier to fix by one person and can be used for newupcoming projects as well.

    2. Painter working at height:. 

    Painter was working at the 7thfloor level of about 40feet high painting outside the building Phase-I using

    boatswain’s chair and brush, may fall from height as he had no safety belt and harness and may

    exposed to inhalation of chemical substances in paint which may lead to suffocation and manual

    handling at height using hands lead to muscle pain and stress and its breaching the legislation of

    ILOC155 Occupational Health and safety convention 1981 and Work at height regulation-2005(WAHR).

    Recommendation:

    Use cherry picker which is available with us for the painter to access at 5th floor level for painting and

    purchase of one electric paint sprayer with face piece respirator would prevent the chemical exposureand fall from height and also avoid much manual handling. Sprayer and respirator would cost around$120.

  • 8/18/2019 igc 3

    14/17

     

    3.Scaffold collapse, Falling of people and objects: 

    Scaffold being used by the workers at construction site level of 45 feet high is not mounted on the evensurface , out riggers were broken and not being replaced, toe board have huge gaps and some braces

    been missing and others are not fitted properly which may lead to collapse of scaffold, falling of peopleand object from height can lead to fatal , serious injury from head injury to muscle stress and painbreaching the international legislation of Convention C167-Safety and Health in constructionconvention ,1988(No.167) and Health and safety at work 1974(HASWA).

    Recommendation:

    Purchase of new scaffold which would save many people lives and prevents falling of objects andcollapsing of scaffold which would cost around $350.

    4. Collision with workers, vehicles and Property damage:

    Forklift trucks at the warehouse in the construction area are observed that rounding a blind corner into

    a loading area without stopping can lead to collision with workers, collision with stationary objectsand/or vehicles which can cause from death to serious personal injury by falling objects on victims

    and also lead to property damage by topple of forklift which breachesILO C155 Occupational Health

    and safety convention 1981 and Health and safety at work 1974(HASWA).

    Recommendation:

    Provision of side mirror on the blind corners where driver can foresee the movement of people and

    vehicles which ultimately prevent collision and it would cost $40 and also provision of banksmen for the

    blind spots and corners.

    5. Fire hazard at the welding area:

    Welders are welding the rods which is closer to the LPG gas storage area and sparks while welding

    can contact with the LPG gas lead to massive fire/explosion cause property damage and mass

    casualties in the workplace which breaches the international legislation of Convention C167-Safety

    and Health in construction convention, 1988(No.167) and Fire protection and prevention Act 1997.

    Recommendation:

    Provide a separate covered welding area for the whole construction site where all welding works can

    take place may cost $550 which eventually prevents mass casualties and property damage.

    6. Electrical Issue:

    Main electric power supply for the entire construction site located near the excavation area is

    unprotected and no signage of danger being placed can lead to electrocution, burns, death and

    secondary effect like fall from height due to throw off can cause serious injury of bone fractures and

    head injury which breaches theILO legislation of C155 Occupational Health and safety convention 1981

    and Electricity at work regulations 1989(EAWR).

    Recommendation:

    Barricade the high danger electricity power supply area by isolating( lock out –tag out system) andwould cost $200 can prevent electrocution, burns, even death and secondary deaths such as fall from

    height by being victim throw off due to electrocution and fall into excavated area cause head injury orserious personal injury.

  • 8/18/2019 igc 3

    15/17

     

    INTERNATIONAL GENERALCERTIFICATE(2011 specification) Candidate report template

    UNIT IGC3 – THE HEALTH ANDSAFETY PRACTICAL APPLICATIONs

    Student number:

    Location :Shoba Terrain, Devanahalli, Bangalore. Date of review: 28/September/2014

    Conclusion:

    Firstly, I would like to take this opportunity to thank Shoba management &each and every worker atsite for their outstanding cooperation while conducting inspection without which I could have not donethis observation about health and safety practices at construction site. 

    Few major findings needs immediate attention towards the safety of workers from the managementsuch as “ Cave-in, Fall from height( People and objects), Electricity & Fire hazard, collision withvehicle and pedestrians at warehouse by forklifts which can be controlled in near future byincorporating suitable recommendations .Other safety concerns such as manual handling, vibration,noise, stress, biological effect, chemical exposure, heat stress, poor lighting and ventilation can alsobe controlled with suitable preventive control measures which also recommended on the observation

    sheet.

    The workforces were seemed to be very happy when I inquired about their well-being within thefacility and they echoed there is no company can compete the welfare facilities such as locker, firstaid provisions, drinking water, healthy menu at cafeteria and cleaner toilet facilities and also told whatelse one would expect? Which brings enthusiastic myself when I hear them which clearlydemonstrates the brigade management commitment towards health and safety of their workers.

    Lastly, I would request to please take necessary actions on the suitable recommendation outlined forexisting major hazards and I look forward for your support to further enhance our business reputationby protecting our workers &property and meeting the obligation of national and internationallegislations and for our next ISO certification due in 2 months for renewal without any hindrance.

  • 8/18/2019 igc 3

    16/17

     

    INTERNATIONAL GENERALCERTIFICATE(2011 specification) Candidate report template

    UNIT IGC3 – THE HEALTH ANDSAFETY PRACTICALAPPLICATION

    Student number

    Location :Shoba Terrain, Devanahalli, Bangalore Date of review28 /September /2014

    Recommendations:

    Recommendation Likely resource implications Priority Target date

    .Hydraulic shoring of

    trench would preventworkers from falling by slipand fall and also cave-in ofsoil towards the workers.

    Would cost $200 to install

    Hydraulic shoring and withoutshoring an accident which may leadto death of workers and insurancecompensation can be more than$1000of each worker and otherindirect costs may be applicable.

    High 28-April-2014( 1 Month)

    .Painting at 7th floor using

    cherry picker and electricpaint sprayer with facepiece respirator.

    Cost of electric paint sprayer andface piece respirator would be $120and cherry picker which is alreadyavailable in the work place can beused to work at height .By notimplementing this cause painter fallfrom height and lead to death

    and/or serious injury andcompensation of $1000 or moreand other direct and indirect cost ofapproximately $2000.

    High 28-April-2014( 1 Month)

    .Purchase of new scaffoldand erect and training toall scaffold employees forproper erection proceduresand its consequences ofbeing collapsed

    Scaffold would cost $350 andfailure to purchase and use currentscaffold may collapse and causeproperty damage, falling of peopleand objects which may costapproximately $5000 including bothindirect and direct costs.

    High 28-April-2014( 1 Month))

  • 8/18/2019 igc 3

    17/17

     

    Recommendations Likely Resource implications Priority

    Target date

    .Provision of side mirror atthe blind corner for the

    driver to foresee themovements.

    .Provision of banks men atblind corners to guide thedriver at warehouse.

    Would cost $40 and collision withother vehicle would cost property

    damage from $500 to $800depends on consequence.

    Salary $800 monthly for hiringcompetent banks men.

    High

    Medium

    1 Week

    28-April-2014( 1 Month)

    .Separate barricadewelding area to preventfrom fire/explosion as it ishappening close to LPG

    gas storage area.

    Would cost approximately $550 forseparate barricaded welding area atconstruction site leaving which maylead to many casualties and

    property damage from $ 5000 to$8000 as direct( Property damage)and other indirect costs such ascourt fines etc.

    High28-April-2014

    ( 1 Month)

    .Barricade the high voltagemain power supply area byisolating the power using(Lock out- Tag out)system.

    Would cost approximately $200 tobarricade the area and it wouldprevent worker from death toserious injury.

    High 28-April-2014( 1 Month)


Recommended