+ All Categories
Home > Documents > III. Project Package 1 Sample Contentsopen_jicareport.jica.go.jp/pdf/12121281_06.pdf · Smart...

III. Project Package 1 Sample Contentsopen_jicareport.jica.go.jp/pdf/12121281_06.pdf · Smart...

Date post: 28-Jun-2018
Category:
Upload: lammien
View: 217 times
Download: 0 times
Share this document with a friend
17
III. Project Package 1 Sample Contents ITS Center can provide a route information based upon the processed real- time congestion data. Drivers can decide the fastest way destination. Information Provision North and South Line 11
Transcript

III. Project Package 1 Sample Contents

ITS Center can provide a route information based upon the processed real-time congestion data. Drivers can decide the fastest way to get their

destination.

②Information Provision North and South Line

11

III. Project Package 1 Sample Contents

③④Transit and Event Information Provision at Venues

12

III. Project Package 1 Sample Contents

⑤⑥Transit and Traffic Information Provision at Airport⑦ Ferry and Transit Information Provision at Sea port⑧ Transit information Provision at Terminal⑨ Bus Location Information Provision,⑩Sightseeing Place Information Provision⑪BRT and Transit Information Provision

13

III. Project Package 1 Sample Contents

Digital Broadcasting Base Information Provision

14

III. Project Package 1 Sample Contents

Web Base Information ProvisionSmart Phone, Tablet Base Information Provision

15

III. Project Package 1 Detailed Data Flow

Autopista Fluminense

CCTV

VMSMobileVMS

OCR

MOEGPS-Maintenance

Vehicle

CCTV

VMSMobileVMSOCR

Speed Gun

Traffic Count

CCTV

VMSMobileVMS

Speed Gun

MOEGPS-Maintenance

Vehicle

CCTV

VMSMobileVMS

Lane Signal

Speed Gun

Air Pollution Observation Equipment

GPS-Maintenance Vehicle

CCTV

VMSMobileVMS

OCR

Work Zone Information

Speed Gun

Accident Information

Work Zone Information

Accident Information

Work Zone Information

Accident Information

Work Zone Information

Accident Information

Work Zone Information

SECONSERVA

Accident Information

ETC Traffic DataSTP (ETC Operator)

BUS (INTER)

BRT/BUS

CCTV

Bus Stop Information

Concessionaire

Concessionaire

Concessionaire

CCTV

Conessionaire

Taxi

Cargo

Rain Gauge

Water Level Gauge

SOx, NOx, PM Gauge

Thermometer

Rain Gauge

Anemovane

Hygrometer

Thermometer

Aerotonometer

Solarimeter

Air Pollution Meter

Rain Gauge

Anemovane

Hygrometer

Thermometer

Aerotonometer

Solarimeter

ITS Center

(Information Source)

(Gathered Information)

LegendCCTV

CCTV

Ferry

Taxi

CCTV

UtilissimoTransport

LTDA

BRT/BUS

Bus/BRT lines Information

FETRANSPORT

CCR-Ponte

DER

Lamsa

CET-Rio

Central CoopAssociation of

Taxi Companies

Socicam

Rio Onibus

INEA-SEA

SMAC Monitorar Rio

SIMERJ

Civil Defense ALERTA Rio

Private Bus Companies

DETRO

CODERTE

SMTR

CCR Barcas

Taxi Companies

METRO

Bus/BRT lines Information

Bus/BRT lines Information

Bus/BRT Stop Information Bus/BRT Stop

Information

Bus/BRT Stop Information

Time Table Information

Time Table Information

SuperViaTime Table Information

Data Gathering Server

Data Processing

Data Gathering

InformationProvision

INFOVIA NETWORK

INFOVIA NETWORK

Airport Flight

Information CCTV

MOE

Seaport

INFOVIA NETWORK

Bus/BRT GPS Data

Bus/BRT GPS Data

Photo data

Concessionaire Performance Information

CCTV Image

Bus Departure Information

CCTV Image

Performance Information

Rain

Water Level

SOx, NOx, PM

Temperature

Rain

Wind

Humidity

Temperature

Atmosphere

Sun data

SO2, NOx, PM10, O3, NO2

Rain

Wind

Humidity

Temperature

Atmosphere

Sun data

Delay, Accident Information

CCTV Motion Picture

CCTV Motion Picture

GPS Data and Operational Information

GPS Data

Delay, Accident Information

CCTV Motion Picture

CCTV Image

Meteorological Information

CCTV Motion Picture

Condition of Information Provision

Meteorological Information

Condition of Distribution

Condition of Information Provision

Point Speed Data

Point Speed Data

Meteorological Information

Condition of Distribution

CCTV Motion Picture

Condition of Information Provision

Condition of Information Provision

Point Speed Data

Point Traffic Volume

CCTV Motion Picture

Condition of Information Provision

Condition of Information Provision

Lane Signal Provision Control

Point Speed Data

Air Pollution Observation Information

CCTV Motion Picture

Condition of Information Provision

Condition of Information Provision

Condition of Distribution

Point Speed Data

Work Zone Point, Section, Period of Road Work

CCTV Motion Picture

Condition of Information Provision

Condition of Information Provision

Point Speed Data

Accident Point, Section, Level

Work Zone Point, Section, Period of Road Work

Accident Point, Section, Level

Work Zone Point, Section, Period of Road Work

Accident Point, Section, Level

Work Zone Point, Section, Period of Road Work

Accident Point, Section, Level

Work Zone Point, Section, Period of Road Work

Accident Point, Section, Level

Traffic Volume Data

GPS Data

GPS Data

Bus/BRT GPS Data

Point Speed Data

16

Data Gathering

III. Project Package 1 Detailed Data Flow

Data Gathering Server

Probe Data Storage Server

Point Data Server

Transit Data Server

Report Generating Server (Concessionaires Monitoring)

Weather Monitoring Server

Traffic Volume Processing Server

Bus Arrival Information Server

Incident Information Processing Server

GIS Sever

Web Server

Digital Broadcasting Data Converting Server

Bus GPS data

Velocity Information Gathering Server

Real Time Traffic Volume Bus Location Information

Aggregated in Per 1minPer 5minPer 60minPer 12hoursPer 24hours

Motion Picture Analysis Server

Fixed Route Travel Time Calculation Server

Real Time Travel Time Information

Daily and Monthly Report

Weather Monitoring Server

Weather Information with geocoded data, chart and graphic

Incident Information

Incident Information with geocoded data, chart, graphic and CCTV image

Following information is displayed on Digital Road Map•Equipment Location and Current Information

•Real Time Congestion Information Map

•Real Time Weather Information

•Fixed Important Routes Travel Time

Monitoring Display Control System

Taxi GPS dataBus GPS data BRT GPS data

Point Speed data (from OCRs or Speedmeters)Traffic Volume data (from OCRs or Speedmeters)

Meteorological data

Air Pollution data

Field Equipment Condition such as VMS, Arrow Signal at Tunnels

Route/Lines

Frequency/ Time TableFare

Contract Infomation

Incident Monitoring Server

Accident (Type, Location, Duration)

Work Zone(Type, Location, Duration)Disaster (Type, Location, Level, Duration)

CCTV Data Server

Weather Information

Meteorological Warning Message

Fixed-type CCTV image

With X,Y,Z geocoding data velocity and acceleration

PTZ CCTV image

Fixed-type CCTV image

PTZ CCTV image

Meteorological Warning Message Weather Information

Traffic Volume data

Taxi GPS dataBus GPS data BRT GPS data

Point Speed data

Real Time Traffic Volume

Aggregated in Per 1minPer 5minPer 60minPer 12hoursPer 24hours

Stakeholders

Route/Lane

PTZ CCTV imageFixed-type CCTV image

Route/LinesFrequency/ Time TableFareContract Infomation

Route/LinesFrequency/ Time TableFareContract Infomation

Meteorological dataAir Pollution data

Bus Arrival /Departure Information

Users

Users

Processing SystemDistribution SystemMonitoring System

Data Storage SystemData Gathering SystemLegend

Point Speed Data

Point Speed Data

Real Time Traffic Congestion Monitoring,Traffic Speed Provision

Caluculation of -Average Speed -Density

17

Data Processing

III. Project Package 1 Detailed Data Flow

USERS

(Information Provision Device)

(Provided Information)

Legend

Socicam

Rio Onibus

INEA-SEA

SMAC Monitorar Rio

SIMERJ

Civil Defense ALERTA Rio

Private Bus Companies

DETRO

CODERTE

SMTR

CCR Barcas

Taxi Companies

METRO

SuperVia

Data Gathering Server

ITS Center

Autopista Fluminense

Route InformationTravel Time

Work Zone InformationAccident Informat ion

VMS

SECONSERVA

STP (ETC Operator)

UtilissimoTransport

LTDA

Processed InformationInformation Provision Display

FETRANSPORT

Central CoopAssociation of

Taxi Companies

Seaport

Digital TVOBUSmart Phone

Bro

adc

asti

ng

USERS

Smart PhoneComputer

USERS

Information Provision Display(BRT, SuperVia, METRO)

Route InformationTravel Time

Work Zone InformationAccident Information

Mobile VMS

Route InformationTravel Time

Work Zone InformationAccident Informat ion

VMS

Route InformationTravel Time

Work Zone InformationAccident Information

Mobile VMS

CCR-Ponte

Route InformationTravel Time

Work Zone InformationAccident Information

VMS

Route InformationTravel Time

Work Zone InformationAccident Information

Mobile VMS

DER

Route InformationTravel Time

Work Zone InformationAccident Information

VMS

Route InformationTravel Time

Work Zone InformationAccident Informat ion

Mobile VMS

Lamsa

Route InformationTravel Time

Work Zone InformationAccident Information

VMS

Route InformationTravel Time

Work Zone InformationAccident Informat ion

Mobile VMS

CET-Rio

Processed Information

Processed Information

Processed Information

Processed Information Information Provision Display

Airport

Data Processing

Data Gathering

InformationProvision

• Seamless Traffic Condition Information

• Route Information based upon the Processed real-time Congestion

• Transport Information• Transit Information• Bus Location

Information• Weather Information• Air Pollution

Information

Processed Information

Inte

rnet

Information Provision Display

Information Provision Display

Information Provision Display

USERS

USERS

Broadcaster

Processed Information Processed Information

INFOVIA NETWORK

18

Information Provision

III. Project Package 2 Sample Contents

Bus Information Provision System

19

III. Project Package 2 Detailed Data Flow

20

III. Project Package 3 Sample Contents

Expansion of Adaptive Signal Control

Installing and Control more Variable Message Signboard System

21

IV. Implementation Schedule

22

Preparation stageFinance PreparationSelection of Consultant

Procurement stageDetail designTender (Package1)

Negotiation/Contract (Package1)

Tender (Package2)Negotiation/Contract (Package2)

Tender (Package3)

Negotiation/Contract (Package3)

Implementation StageSurvey/Design (Package1)Manufacturing (Package1)Instal lation (Package1)Survey/Design (Package2)Manufacturing (Package2)Instal lation (Package2)Survey/Design (Package3)Manufacturing (Package3)Instal lation (Package3)

Overall Test

1st QT 3rd QTItem

2013 2014 2015 20161st QT 2nd QT 3rd QT 4th QT 4th QT 1st QT 2nd QT 3rd QT 4th QT2nd QT 3rd QT 4th QT 1st QT 2nd QT

Oly

mpi

c

Appendix -Related Stakeholders-

Project Package 1/4Stakeholders Gathered and Collected Data/ Information

by each stakeholdersRoad Related Agencies/Private Companies

ANTT -Federal concession road traffic /administrative informationDNIT -Federal road traffic /administrative InformationDER-RJ -State road traffic /administrative informationCET-RIO -Municipality road traffic /administrative informationCCR Ponte -Niteroi bridge traffic/administrative informationAutopistaFluminense

-Autopista Fluminense road traffic /administrative information

LAMSA -LAMSA road traffic /administrative informationSECONSERVA -Work zone info with longitude and latitude

Transit/Transport Related Agencies

DETRO -Interstate, inter municipalities bus operating information and GPSbased positioning information (will be prepared by DETRO and eachBus companies)

CODERTE -Bus Terminal Information-Bus Arrival Information

Novo Rio (Socicam)

-Bus Terminal Information-Bus Arrival Information

COR -Weather Information, municipality road traffic /administrativeinformation

23

Appendix -Related Stakeholders-

Project Package 1 – 2/4Stakeholders Gathered and Collected Data/ Information

by each stakeholdersTransit/Transport Related Agencies- cont

SMTR -Bus operative information from Rio OnibusAir Port -Arrival / Departure information from INFRAERO

Transit/Transport Operator

Rio Onibus -Bus/BRT Operational Information-Bus/BRT GPS Data-Bus frequency information

FETRANSPOR -Bus/BRT stop location information-Bus/BRT lines information(Bus network information)-Bus frequency information

Super VIA -Rail Operational Information-Rail Time Table

METRO -METRO Operational Information-METRO Time Table

CCR Barcas -Ferry Operational Information-Ferry Time Table

24

Appendix -Related Stakeholders-

Project Package 1 – 3/4Stakeholders Gathered and Collected Data/ Information

by each stakeholdersTransit/Transport Operator

Private Bus Companies

-Bus Operational Information-Bus GPS Data-Bus frequency information

Socicam -Bus Terminal Operational Information-Bus Arrival Information

Central Coop -Taxi AssociationTaxi CompaniesRadio Taxi, Chile Taxi, Coopamar

-Taxi GPS data(via Auto Cab, Smart Sys)

Air Operator INFRAERO -Flight Information (Departure, Arrival Delay and Accident)-Meteorological information-CCTV monitoring (Airport, Taxi Parking)

Seaport AdministratorFreight Operator Utilissimo

Tranportes LTDA-Freight Operational Information

25

Appendix -Related Stakeholders-

Project Package 1 – 4/4Stakeholders Gathered and Collected Data/ Information

by each stakeholdersPublic Safety Agencies

Civil Defense-SEDEC

-Emergency Information with longitude and latitude

SAMU-CBMERJ

BOMBEIRO-CBMERJSESEGSMSDC

Weather/Air Pollution Monitoring Agency

INEA-SEA, -Rain and water level data of rivers-Air Pollution data with longitude and latitude

SIMERJ-SEDEC -Weather monitoring and rain monitoring data with longitude and latitude

SMAC -Air Pollution data with longitude and latitude

26

Appendix -Related Stakeholders-

Project Package 2

Stakeholders Gathered and Collected Data/ Information by each stakeholders

Transit/Transport Related Agencies

SMTR/DETRO Processed information shall be provided via ITS Center

Transit/Transport Operator

FETRANSPOR Bus operating line data, Bus stop/Terminal geocoding dataPrivate Bus Companies

GPS data

Bus Terminal Operators

Bus departure time table

Mob TV Current bus position information provision inside busInformation Provider

ITS Center Traffic Information, Estimated bus arrival time information, transfer information etc.

27


Recommended