+ All Categories
Home > Documents > IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND...

IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND...

Date post: 25-Jul-2020
Category:
Upload: others
View: 13 times
Download: 0 times
Share this document with a friend
25
IJ-REDD+ Project Indonesia-Japan Project for Development of REDD+ Implementation Mechanism (IJ-REDD+) RoD signed on February 4, 2013 Duration: (June 2013 – June 2016) Pilot Provinces: West Kalimantan, Central Kalimantan Technical cooperation Capacity building
Transcript
Page 1: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

IJ-REDD+ Project Indonesia-Japan Project for Development of REDD+ Implementation Mechanism (IJ-REDD+)

RoD signed on February 4, 2013 Duration: (June 2013 – June 2016) Pilot Provinces:

West Kalimantan, Central Kalimantan Technical cooperation Capacity building

Page 2: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

West Kalimantan

Project Purpose: REDD+ implementation mechanism is developed in

West and Central Kalimantan.

Output 1: Sub-national framework

on REDD+ is developed

Output 2:

National park

REDD+ model

is developed

at GPNP.

Output 3: REDD+

model for

HP/HL/APL is

developed at

pilot site(s)

Output 4: Capacity of carbon

monitoring is enhanced at

the provincial level

Central Kalimantan

Output 5: Project findings are referred to in the

process of developing REDD+ implementation

mechanisms at the national level.

Overall Goal: REDD+ implementation mechanism developed by the project is

integrated into national REDD+ mechanism.

IJ-REDD+ Implementation Image

2

Page 3: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

Target Districts and Pilot Site in West Kalimantan

Pilot Site:

Gunung Palung NP

Kab Pontianak

Kab Kubu Raya

Kab Kayong Utara

Kab Ketapang

Page 4: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

PROJECT SET-UP AND ORGANIZATION

STRUCTURE

JCC/PSC

PROJECT DIRECTOR

PJLKKHL

WEST

KALIMANTAN

CENTRAL

KALIMANTAN

o KOMDA

REDD+

o BKSDA

o UNPAR

TECHNICAL

COMMITTEE

o DISHUT PROV

o Bappeda

o BLHD

o UPT(BKSDA

dll…)

o UNTAN dll…

o DISHUTKAB:

1. Ketapang

2. KKU

3. Pontianak

4. Kubu Raya

Chief Advisor

Nat’l Coordinator

Japan & Nat’l

Experts

Project

Staffs:(Prog.Officer,

Assistants,GIS

Spec)

PROJECT OFFICE:

MoFOR

REGIONAL

COORDINATO

R

PROJECT OFFICE

PONTIANAK (Dishut) Japanese Expert

Project Staffs:

Prog.Officer,

Assistant

• Japanese Expert,

• Field Coordinator,

• Project Staffs

(Prog.Officer;

Assistants)

PROJECT OFFICE

Ketapang (TNGP)

Gunung

Palung

National Park

Office

Page 5: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

Output 1 (Provincial Level-West Kalimantan)

Sub-national framework on REDD+ is developed in West Kalimantan

PDM (Project Design Matrix) of RoD

Indicators :

1-1. Provincial RL/REL is established.

1-2. Carbon monitoring method is developed. MRV

1-3. Potential REDD+ sites for future investment are identified.

Activities :

1-1) Organize a team that consists of provincial/district governments and

university

1-2) Provide training on remote sensing analysis and sample spot monitoring

1-3) Overview drivers of deforestation and forest degradation

1-4) Collect data on historical/future land use and carbon stock at the district level

1-5) Calculate provincial RL/REL

1-6) Develop a monitoring plan and implement it.

1-7) Identify potential REDD+ sites and compile information for future REDD+

projects.

1-8) Identify areas of strategic cooperation other than RL/REL and carbon

monitoring

1-9) Provide policy and technical assistance for the execution of strategic

cooperation.

Page 6: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

Activity Flow of Output 1

Forming a team (technical committee) consist of JICA team, Provincial

Government , University, UPT of MoFr

Workshops on REDD+ and Climate Change in West Kalimantan

Analysis of District Level REL

in Tier 2 level

and Base Map

Output 2

Project level REL and

PDD in Gunung

Palung NP

(Nested approach)

Improvement of

provincial BAU

of RAD-GRK

Identify

potential

REDD+ sites

Output 3: REDD+

model for HP/HL/APL

is developed at pilot

site(s)

Formulation of Provincial REDD+ Strategy

RAD-GRK implementation support

(collaboration with JICA peat fire prevention project)

① Setting up

② REL analysis and potential REDD+ sites

Ketapang, Kayong Utara

Pontianak, Kubu Raya

Develop MRV plan

Training for MRV (GIS, Satellite image Analysis) - Training in Japan, Local training

Input: GIS software, satellite image

③ Capacity building of MRV

④ Policy formulation and implementation support

REDD

Mechanism

UNFCC

BILATER

AL(JCM)

Voluntar

y (VCS)

Nested

Appro

ach

Page 7: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

1st Year Outcome of Output 1: Provincial Level West

kalimantan

Provincial Level REDD+ Policy Support

Kick-off Workshop Joint Workshop with JICA FCP Project in

October, 2013

About 130 participants from central and local

governments, universities, NGOs, partners

To socialize IJ-REDD+ and raise awareness

of initiatives regarding forest and climate

change Technical Committee

Prov’l Technical Committee held in June, 2014

Progress report & discussion on project activities

Coordination among stakeholders

Coordination and Policy Support

Participated REDD+ Strategy(SRAP)

Socialization Workshop

Support printing and translation of SRAP

Kalbar

Page 8: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

Output 1 Provincial Level West Kalimantan

MRV Capacity Building

Monitoring (Remote Sensing, Field Survey, GIS) Training

Contribution to REDD+ MRV, RAD-GRK

Monitoring

Basic Training at

Pontianak (Feb, 2014)

Satellite Image Analysis

Forest Resource

Monitoring

Field Practice at

Pontianak (May, 2014)

Collect field data for land

use classification

Forest Inventory Survey

Training in Japan

(June, 2014) High-level remote sensing

technology

Concept in REDD+

Field Visit

Action Plan by

each participant of

the training

NEXT STEP Follow-up Training at

Pontianak Support provincial

mechanism of

REDD+ and

RAD-GRK MRV

Forming MRV Working

Group under Provincial

Gov.

Page 9: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

Base map

making

(Land utilization,

Moratorium

map,

deforestation

map, etc.)

Identify potential

REDD+ sites

REL analysis and potential REDD+ sites

Output 3

REDD+ Models in HL/HP/

APL

Analysis of District

REL/RL

Cons

ul-

tant

Team

Development of REDD+ Mechanism in West Kalimantan

from Sub-National to Model Sites

2000

2006

2009

2011

2013

Next

Step

Output 2

REDD+ Model in Gunung

Palung National Park

Landsca

pe

Approac

h

Peat Land Survey

(Peat distribution and

emission factor)

Analysis on process

Page 10: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

10

TENTATIVE : PERUBAHAN TUTUPAN LAHAN DARI

2000 SAMPAI 2013

REL analysis and potential REDD+ sites (Base map

making)

Page 11: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

IJ-REDD+ SUPPORT POKJA REDD+ IN

DEVELOPING REDD+ IMPLEMENTATION

FRAMEWORK IN WEST KALIMANTAN SUCH AS;

Develop a monitoring plan which is involved related

organizations

Stakeholder Analysis

• To understand current situation of stakeholder around

REDD+/RAD-GRK in West Kalimantan

• To analyze possibility, problem and relationship of/with

each stakeholder on REDD+/RAD-GRK activities.

• This study is conducted by Forestry Faculty,

Tanjungpura University

SRAP Socialization

• Mensosialisasikan rencana aksi perubahan

pengurangan emisi provinsi Kalimantan Barat,

khususnya pada sektor berbasis lahan.

The above activities will also carry out in

Ketapang.

Page 12: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

Time Frame of REL Analysis

Review existing analysis ( ex. RAD-GRK BAU)

Collecting existing data

vegetation data, land utilization data, moratorium map, etc.

Collecting satellite image data

Formulation of base map

Capacity building (training) for GIS, satellite image analysis, etc.

Analyzing satellite image data

Tier 2 level REL/RL analysis in 4 districts

Ground truth and evaluation of accuracy

Detailed analysis of deforestation and degradation

Formulation of deforestation hot spot map and identification of

potential REDD+ sites

Capacity building (training) for GIS, satellite image analysis, etc.

Output 3: Production Forest, Protection Forest, APL Pilot site(s)

1st Year

2nd Year

& later

Page 13: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

Luaran 2 (TN Gunung Palung) Dikembangkannya model REDD+ Taman Nasional di TNGP

Indikator:

2-1.Teridentifikasi Faktor penyebab deforestasi dan degradasi hutan

2-2. Dikembangkannya Kebijakan dan langkah-langkah untuk menyelesaikan faktor-

faktor penyebab

2-3. Dicocokkannya Jumlah emisi CO2 dengan RL/REL

2-4. Dinilainya dampak aktivitas proyek

2-5. Dibuatnya rancangan manual operasional model REDD+ taman nasional Aktivitas:

2-1) Melakukan pelatihan fasilitasi dan keahlian lainnya.

2-2) Studi penyebab deforestasi/degradasi dan keanekaragaman kondisi setempat.

2-3) Mengidentifikasi desa target dan membagi informasi mengenai IJ-REDD di desa-desa.

2-4) Rancangan rencana aktivitas REDD+

2-5) Mengembangkan metode RL/REL dan monitoring karbon.

2-6) Melakukan survey dasar keanekaragaman hayati dan penghidupan masyarakat

2-7) Memfasilitasi para pihak untuk membuat kesepakatan mengenai pengaturan pengelolaan

sumberdaya alam

2-8) Melakukan pengamanan/aktivitas saling menguntungkan dalam perbaikan penghidupan,

konservasi keanekaragamn hayati dan manfaat jasa lingkungan

2-9) Mengumpulkan dan menganalisis data perubahan tata guna lahan dan persediaan karbon,

konservasi keanekaragaman hayati dan penghidupan mansyarakat

2-10) Membuat draft manual operasional model REDD+ dengan menganalisa kondisi setempat,

perangkat kebijakan , aktivitas proyek beserta dampaknya.

PDM (Project Design Matrix) of RoD

Page 14: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

TARGET IN GUNUNG PALUNG NP

Collaborative Management (MDK): 2 +4 = 6 villages

REDD+ Survey: covering whole NP & outside boundary

Page 15: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

1. Socio-economics survey for identifying baseline and

appropriate target & activity

2. Partnership Building and Issue Analysis through

Community Facilitation

3. Focus Group Discussion/Survey on NTFP use and

potential measures for management

4. Preparation and Implementation of Community-based

Management Plan

MAIN ACTIVITIES IN TARGET

VILLAGE

Page 16: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

1. Community Facilitation (August 2014-March 2015) for 5

masharakat in Sampurna & 2 Baddan PMD staff

2. Workshop on Collaborative Management & REDD+ concept

3. Joint Meeting in village level for sharing issues and progress

of management activities

4. Training on Joint Monitoring with community for forest and

biodiversity management

CAPACITY BUILDING FOR

COLLABORATIVE MANAGEMENT

Page 17: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

KOORDINASI DENGAN

PEMERINTAH DAERAH

Pelatihan

Fasilitasi

Membangun

kemitraan dan

analisa isu bersama

masyarakat

Rencana Aksi

Bersama

Masyarakat

Survey (sosial

ekonomi, HHBK,

potensi)

Implementasi

Pemerintah

Daerah

Koordinasi

Sinergi Program

Koordina

si

Data

Page 18: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

Output 4 (Provincial Level-Central Kalimantan)

Capacity of carbon monitoring is enhanced at the provincial level in

Central Kalimantan

Indicators :

Carbon monitoring methods that are applied by REDD+ projects in

Central Kalimantan is compiled by MRV institution.

Activities :

4-1) Assist to organize MRV institution.

4-2) Provide training for MRV institution, local governments and communities to

enhance knowledge and skills on carbon monitoring.

4-3) Assess carbon monitoring methods that are applied/being developed by

REDD+ projects including JICA-JST in terms of accuracy, costs and accessibility.

4-4) Provide technical assistance for MRV institution according to its requirement.

Output, Indicators and Activities in PDM

Page 19: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

Proposed project structure (Central Kalimantan)

Japanese

Experts

National

Experts

National

Coordinator

Project

Director

PHKA

MoFor

Local

Resource

Person

BLH

KOMDA

REDD

UNPAR

BAPPEDA Hokkaido

University

JICA-JST

Project

JCM(Bilateral Credit Mechanism) F/S

Sumitomo, Marubeni, Mitsubishi UFJ

Other

Ministries and

Agencies

Sekretariat

Bersama

Page 20: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

Proposed Activities of IJ-REDD+

To improving existing BAU or REL analysis

(particularly peatland emission) based on the

outcomes of JICA-JST project by Hokkaido

University, F/S by Japanese companies, etc.

To proposing improved MRV method

particularly for peatland.

REL and MRV Improvement

Short-term Expert

Provide technical assistance for MRV institution

according to its requirement.

Assist to organize MRV Institution

Flexible Support

Page 21: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

Collaborative Management of Conservation Forest with

Communities (M1.6.1.6)

JICA experience in Gunung Halimun NP,

West Bali NP, etc

Forest and Peatland Fire Prevention (M1.6.2.1)

JICA experience in JICA-JST Hokkaido

Univ Project, JICA Peat Fire Prevention

Project in West Kalimantan and Riau

To provide training to core technical personnel in provincial level

for forest monitoring, remote sensing and GIS (Training in Japan)

To provide training to personnel of provincial, district and

municipal government, as well as for community leaders for

forest monitoring, basic remote sensing and GIS training

(Training in Central Kalimantan)

Capacity Building for MRV

Training in Japan, Local Training

Assist STRADA REDD+ through JICA Experience

Workshop, Field Visit

Page 22: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

Output 5 (National Level) Project findings are referred to in the process of developing REDD+

implementation mechanisms at the national level.

Indicators :

Findings of the project are presented and recognized in the Ministry of

Forestry (MoFor) and other national agencies concerning REDD+.

Activities :

5-1) Examine policies and strategies of MoFor and other agencies concerned

with REDD+.

5-2) Share project findings with MoFor and other agencies concerned with

REDD+.

5-3) Provide policy and technical assistance for MoFor and other agencies

concerned with REDD+.

5-4) Coordinate Japanese assistance in the REDD+/forest sector.

5-5) Communicate with partners for effective implementation of IJ-REDD+.

Output, Indicators and Activities in PDM

Page 23: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

Output 5: National Level REDD+ Mechanism

Support for policy development and implementation of

Directorate of Environment Service

Support for policy development and implementation by

Climate Change Working Group of MoFor on REDD+

policies and mechanism

Collaboration with DG Planology regarding provincial REL

and MRV support

Coordination with other ministries and agencies regarding

climate change and REDD+

Coordination with other partners (FCPF, FIP, GIZ, KfW, etc.)

Coordinating other JICA projects with KLN

Page 24: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

① Membangun model di

TNGP

Membangun Mekanisme tentang REDD+

dari Kegiatan REDD+ di tingkat sub

nasional

Pelatihan

Fasilitasi

③ Peningkatan kapasitas terkait

REDD+ untuk mengembangkan

mekanisme

2000

2006

2009

2011

2013 Identifikasi

Lokasi

Potensial

Analisis Citra

Satelite

Survey Socio-

economic

Merefleksikan di tingkat

nasional

②REDD+ model di lokasi lain

Program

kunjungan ke

Jepang

Pelatihan

Monitoring

Workshop Kegiatan REDD+ yang

berkaitan

④ Mereplekasikan mekanisme

REDD+ di tingkat nasional

Aktivitas REDD+ yang

terkait di tempat lain

Proyek REDD+ di TNGP

Page 25: IJ-REDD+ ProjectKab Pontianak Kab Kubu Raya Kab Kayong Utara Kab Ketapang . PROJECT SET-UP AND ORGANIZATION STRUCTURE JCC/PSC PROJECT DIRECTOR PJLKKHL WEST KALIMANTAN CENTRAL ... Prog.Officer,

Terima Kasih THANK YOU


Recommended