+ All Categories
Home > Documents > IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group...

IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group...

Date post: 31-May-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
26
IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009
Transcript
Page 1: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL ROUTE 60/83

Community Advisory GroupMeeting No. 2July 28, 2009

Page 2: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

Outline Agenda

• Introduction to Participants• Recap of Community Advisory Group Meeting No. 1

– July 13, 2009 • Drainage• Traffic Safety• Traffic Operations• Refine Problem Statement from Meeting No. 1• Identify Specific Issues for Segment No. 1• Next Meeting – August 11, 2009

Page 3: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

Who Are We?

Introductions

Page 4: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

Community Advisory Group Meeting No. 1

• The July 13, 2009 meeting was attended by 11 people representing:– Residents– Business Owner– Area Church– Fire Protection District– Police Department– Park District– School District– County and Village Municipal Agencies

Page 5: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

Community Advisory Group Meeting No. 1

Summary of Community Context Audit • Pedestrian Safety

• Lack of Roadway Lighting

• Lack of Alternate Transportation Modes

• Traffic Operational Issues

• Residential and Emergency Vehicle Access Issues

Page 6: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

Community Advisory Group Meeting No. 1

Summary of Community Context Audit • Potential Property Acquisition Issues

• Environmental Issues

• Railroad Crossing Delays

• Preservation of Existing Neighborhood and Cultural Features

Page 7: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL Route 60/83

Segment No. 1

Schank Road/IL Route 176 Triangle to Midlothian Road

Page 8: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

Schank Rd/IL 176 Triangle to Midlothian Rd

• Identified Outlets• See photo handouts• Other Outlets

• 1 Major Crossing• Seavey Drainage Ditch

IL 60/83 Drainage Study

Page 9: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83 Drainage Study

Seavey Drainage Ditch

Headwall Discharging to S.D.D.

Page 10: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83 Drainage Study

24” Culvert

Golf CourseWetland

Seavey Drainage Ditch

Outlet #6 24” x 24” Box Culvert

Page 11: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83 Drainage Study• Other Drainage Concerns?

Page 12: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

Overall Corridor Crash Summary

• 3-year analysis period from 2004 to 2006• Study area from IL 176 to IL 60 (Town Line Road)• 12 study zones, segments/intersections (5 North)

• IL 176 intersection• Segment between IL 60/83 & Hawley Street• Hawley Street intersection• Segment between Hawley Street & Midlothian Road• Midlothian Road intersection

• No five percent crash locations

IL 60/83 Traffic Safety

Page 13: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83 Traffic SafetyOverall Corridor Crash Statistics

• 639 total crashes• No fatality crashes• 139 (22%) crashes occurred with injuries • 12 incapacitating type• 27% of crashes weather related (rain, ice, snow)• 23% of crashes occurred during nighttime hours

Page 14: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83 Traffic SafetyRear End, 403, 64%

Turning, 118, 18%

Angle, 44, 7%

Sideswipe-Same Direction, 24, 4%

Fixed Object, 21, 3%

Bike, 6, 1%

Sideswipe-Opposite Direction, 9, 1%

Other, 11, 2%

Pedestrian, 2, 0%

Head On, 1, 0%

IL 60/83 TOTAL CRASHES BY TYPE2004 - 2006

LEGENDCrash Type, Number of Crashes, Percentage

Page 15: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83 Traffic Safety• Total Crashes by Location (North)

Page 16: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83 Traffic Safety• Conclusions

– Predominantly rear end, turning & angle collisions– Most crashes during daytime hours – More crashes observed at locations where the

roadway does not have adequate capacity– Primary countermeasures include:

• Increasing roadway and intersection capacities• Providing larger turning radii• Improving sight distance• Increasing storage lengths• Providing left and right turn lanes where warranted

Page 17: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83 Existing/Projected Traffic

+1.9%+1.9%

+0.04

%+0

.04%

+0.3%

+0.3%

+1.4%

+1.4%

+1.3

%+1

.3%

+0.2%+0.2%

+0.5%+0.5%+1.4%+1.4%

+0.5%+0.5%

+0.7%+0.7%+0.9%+0.9%

Annual Growth RatesAnnual Growth Rates

NORTH PORTION

Page 18: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83 Existing Truck Traffic

7%7%

10%

10%

6%6%

9%9%

10%10%9%9%

Average Daily Truck PercentagesAverage Daily Truck Percentages

NORTH PORTION

Page 19: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83 Traffic Primary Route

IL 8

3IL

83IL 60

IL 60

IL 60/83

IL 60/83

IL 176IL 176IL 176IL 176

AMAM Peak HourSC

HANK

AVE

SCHA

NK A

VE

Page 20: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83 Traffic Primary Route

IL 8

3IL

83

IL 60/83

IL 60/83

IL 176IL 176IL 176IL 176

PMPM Peak HourSC

HANK

AVE

SCHA

NK A

VE

IL 60IL 60

Page 21: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83/176 Traffic Operations

IL 8

3IL

83IL 60

IL 60

IL 60/83

IL 60/83

IL 176IL 176IL 176IL 176

SCHA

NK A

VE

SCHA

NK A

VE

AMAM Peak HourExisting Configuration

With Projected 2030 Traffic

BB

Signalized Intersection

DD

DD

BB

FFInt:Int: EE

DD

BB

FF

EE

Int:Int: EE

Page 22: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83/176 Traffic Operations

IL 8

3IL

83IL 60

IL 60

IL 60/83

IL 60/83

IL 176IL 176IL 176IL 176

SCHA

NK A

VE

SCHA

NK A

VE

PMPM Peak HourExisting Configuration

With Projected 2030 Traffic

FF

Signalized Intersection

BB

FF

EE

FFInt:Int: EE

CC

CC

DD

EE

Int:Int: DD

Page 23: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83 & Hawley St Traffic Operations

IL 6

0/83

IL 6

0/83

Hawley StHawley St

AMAM Peak HourExisting Configuration

With Projected 2030 Traffic

IL 6

0/83

IL 6

0/83

Hawley StHawley St

IL 6

0/83

IL 6

0/83

Hawley StHawley St

PMPM Peak HourExisting Configuration

With Projected 2030 Traffic

IL 6

0/83

IL 6

0/83

Hawley StHawley StFF

CC

CC

EE

Int:Int: FF

CC

FF

FF

FF

Int:Int: FF

Page 24: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

IL 60/83 & Midlothian Rd Traffic Operations

IL 6

0/83

IL 6

0/83

Midlothian RdMidlothian Rd

AMAM Peak HourExisting Configuration

With Projected 2030 Traffic

IL 6

0/83

IL 6

0/83

PMPM Peak HourExisting Configuration

With Projected 2030 Traffic

FF

DD

CC

FF

Int:Int: FF

EE

EE

FF

FF

Int:Int: EE

Midlothian RdMidlothian Rd

Page 25: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

Traffic Simulation• Existing Configuration with 2030

Projected Volumes• North Portion of Study Area• IL 60/83/176 Triangle• IL 60/83 and Hawley Street• IL 60/83 and Midlothian Road• Future traffic exceeds roadway capacity

Page 26: IL ROUTE 60/83 - Illinois Department of Transportation · IL ROUTE 60/83 Community Advisory Group Meeting No. 2 July 28, 2009. Outline Agenda ... IL 60/83 Drainage Study. IL 60/83

Next Meeting Topics

• Summary of Meeting No. 2 Findings• Focus on Segment No. 2 – South of

Midlothian Road to the Intersection of IL Route 60 (Town Line Road) and IL Route 83

• Identification of Sensitive Features


Recommended