ILLUSTRATED PRODUCT CATALOGUEMAJOR PROJECTS
1990-20101990 2010
CLIENT – ELF ANTARLOCATION – Donges, FranceYEAR OF DELIVERY - 1992
f fSCOPE : Supply of 1 catalytic reformer and 1 Hot oil heater
CLIENT - PetrokemyaLOCATION – Al Jubail, Saudi ArabiaYEAR OF DELIVERY - 1993
f f fSCOPE : Design and supply of 10 milliseconds cracking furnaces in 5 modules, prefabricated in Belgium and
shipped to Saudi Arabia. The 5 modules of 2 heaters each were entirely prefabricated, equipped and tested in
Europe with all the auxiliaries equipment, instruments, piping and wiring, including lighting fixtures. To be
shipped, each module was rolled from the yard to the deck of the semi-submersible heavy lift vessel with 4
trailers each with 80 hydraulic heights controlled and steerable double-wheels. Technology M.W. Kellogg.
f f
CLIENT – Mitteldeutsche Erdoel RefLOCATION – Leuna, GermanyYEAR OF DELIVERY - 1994SCOPE : Leuna 2000 Project. Engineering and fabrication of 6 Heaters : 1 Column Feed Heater, 1 Reactor
Charge Heater, 3 Hydrotreaters, 1 Catalytic Reformer, technology Lurgi.
f f
CLIENT – IBN HayyanLOCATION – Al Jubail, Saudi ArabiaYEAR OF DELIVERY - 1994SCOPE : Supply of 1 modularised EDC cracking furnace.
f f
CLIENT – Reliance Industries LimitedLOCATION – Jamnagar, IndiaYEAR OF DELIVERY - 1996SCOPE : Reliance 1 Project. Design and supply of 12 heaters : 4 Hydrodesulfurisation Heaters, 2 Vacuum
Distillation Heaters, 4 Atmospheric Distillation Heaters and 2 Reactor Charge Heaters.
CLIENT – Rafineria GdanskaLOCATION – Gdansk, PolandYEAR OF DELIVERY - 1996SCOPE : Replacement of a Vacuum Distillation Heater in 7 days.
Stage 1 : Removal of the old heater from foundations.
Stage 2 : The new heater built on temporary foundations is being rolled on position by mean of trolleys
pushed on the rails by hydraulic jacks.
Stage 3 : Placement of the new heater on the existing foundations.
CLIENT – HadeedLOCATION – Al Jubail, Saudi ArabiaYEAR OF DELIVERY - 1996SCOPE : Installation of a fully modularised Process Gas Heater to be installed at 40 meters elevation on the
top of reactor structure.
CLIENT – UEI PosvenLOCATION – Puerto Ordaz, VenezuelaYEAR OF DELIVERY - 1997SCOPE : Supply of 2 gas heater, technology HYL.
CLIENT – Fina Antwerp OlefinsLOCATION – Antwerp, BelgiumYEAR OF DELIVERY - 2001SCOPE: FAO Project, supply of 1 Naphta Ethane Cracking Furnace. Recognition of Excellence in Quality and
Safety, ExxonMobil technology.
CLIENT – SincorLOCATION – José, VenezuelaYEAR OF DELIVERY - 2001SCOPE : Design, full modularisation and sea transportation of 8 Heaters : 2 Cracking Heaters, 1 Reactor Charge
Heater, 1 Hydrotreater, 2 Vacuum Distillation Heaters, 2 Atmospheric Distillation Heaters.
CLIENT – Holborn EuropaLOCATION – Holborn, GermanyYEAR OF DELIVERY - 2000SCOPE : Supply of 1 Steam Reformer (Haldor Topsoe Technology) and 1 hydrodesulfurisation heater.
CLIENT – Air LiquideLOCATION – Antwerp, BelgiumYEAR OF DELIVERY -2001SCOPE : Jupiter Project, supply of 1 232 tubes Steam Reformer, Haldor Topsoe technology.
CLIENT – SasolLOCATION – Sasolsburg, South AfricaYEAR OF DELIVERY -2002SCOPE : Supply of 2 steam superheaters.
CLIENT – ExxonMobil ChemicalLOCATION – Jurong Island, SingaporeYEAR OF DELIVERY - 2006SCOPE : LSTK project. Design and fabrication of the 9th furnace of the Singapore Olefins Plant : 1 steam
cracking furnace, Exxon Technology.
CLIENT – Chandra Asri Petrochemical CenterLOCATION – West Java, IndonesiaYEAR OF DELIVERY - 2007SCOPE : Furnace expansion project. Supply and erection of 1 Steam Cracker, KBR technology.
CLIENT – Reliance Industries LimitedLOCATION – Jamnagar, IndiaYEAR OF DELIVERY - 2008SCOPE: Reliance II Project. Design and supply of 28 modularised furnaces : 3 Steam Superheaters, 2 Vacuum
Distillation Heaters, 1 Reboiler, 11 Reactor Charge Heaters, 1 Catalytic Reformer, 4 Atsmospheric Distilation
Heaters, 2 Hot Oil Heaters, 6 Hydrotreaters, 1 Delayed Coker.
CLIENT – Total PetrochemicalsLOCATION – Gonfreville, FranceYEAR OF DELIVERY - 2007SCOPE : Supply of 1 modularised Steam Superheater.
Prefabrication in Thessaloniki, Greece and sea transportation to Gonfreville, France.
CLIENT – Oman AromaticsLOCATION – Sohar, Sultanate of OmanYEAR OF DELIVERY - 2008SCOPE : Design and supply of 15 aromatic heaters : 8 Reboilers, 6 Reactor Charge Heaters and 1 Catalytic
Reformer.
CLIENT – P.I.C.LOCATION – Shuaiba, KuwaitYEAR OF DELIVERY - 2009SCOPE : Aromatic Complex project. Design and supply of 4 Reboilers and 2 Reactor Charge Heaters, UOP
technology.
CLIENT – KinefLOCATION – Kirishi, RussiaYEAR OF DELIVERY - 2007SCOPE : Supply of 1 Visbreaker and 2 Vacuum Distillation Heaters in 2004.
Erection of the Heaters on the Kirishi Site in 2007.
CLIENT – ExxonMobil ChemicalLOCATION – Jurong Island, SingaporeYEAR OF DELIVERY – 2010SCOPE : Supply of 7 cracking furnaces, fulkly modularised in Thailand, and shipped to Singapore, Exxon
technology.
CLIENT – Total PetrochemicalsLOCATION – Immingham, United KingdomYEAR OF DELIVERY - 2007SCOPE : Supply of 1 64 tubes Steam Reformer, Jacobs technology.
CLIENT – Total PetrochemicalsLOCATION – Gonfreville, FranceYEAR OF DELIVERY - 2011SCOPE : UGO 2011 project : supply of 2 Steam Cracking furnaces, Shaw technology.
CLIENT – Hellenic PetroleumLOCATION – Elefsis Refinery, GreeceYEAR OF DELIVERY - 2010SCOPE : Supply of 1 Steam Methane Reformer, Haldor Topsoe technology and 2 hydrocrackers.
CLIENT – NIS GazpromneftLOCATION – Pancevo Refinery, SerbiaYEAR OF DELIVERY - 2012SCOPE : Supply of 1 complete steam reforming unit for Hydrogen production, Haldor Topsoe technology.