1. Work Undertaken that Best Illustrates Capability to Handle the Tasks assigned
Transcript
Page 1: Illustrative work

1. Work Undertaken that Best Illustrates Capability to Handle the Tasks assigned

Page 2: Illustrative work

Name of assignment or project: Shahpur kandi dam project, Punjab , IndiaLocation: Pathankot, Punjab, IndiaClient: Soma Enterprise LimitedMain project features: Shahpurkandi Dam Project has been declared as ‘National Project’ by Ministry of Water Resources, Govt. of India during February 2008. It comprises of 55.5 high concrete Dam, 7.70 Km long Hydel Channel, 2 nos. Head Regulators 2 no. Power Houses of total 206 MW capacity. The project is on River Ravi.

Position held: Sr. Structural EngineerMajor Activities performed: Structural design of Dam overflow and non over flow blocks. Finally vetted by IIT Mumbai. Construction of dam is in progress. Also involved in tender stage design of power house complex. Few snap shots of FE models of project:

Page 3: Illustrative work

Name of assignment or project: Shongtong Karchham Hydro Electric Project( 450 MW)Location: Kinnaur, Himachal Pradesh, IndiaClient: Patel Engineering Limited, MumbaiMain project features: Shongtong Karchham Hydro Electric Project, a run-of-river scheme, on the river Satluj in Distt. Kinnaur of HP, envisages construction of 102.50 m long diversion barrage, near village Powari, to divert 406 cumecs discharge to four sedimentation chambers, each 300 m long. Water from sedimentation chambers is further carried through water conductor system comprising 8020 m long 10.00 m diameter circular HRT, terminating in 39.50 m diameter surge shaft and three 5.10 m diameter steel lined (each 211.00 m long) pressure shafts, to feed three vertical axis Francis Turbines, housed in an underground powerhouse, located on the left bank of the river Satluj near village Ralli, to generate 450 MW of power. Project is under construction.

Position held: Sr. Structural EngineerMajor Activities performed: Involved in structural design of almost all the civil structures of project. Few snap shots of FE models of project:

 

Page 4: Illustrative work

Name of assignment or project: Top Down Construction in NH-54 at Jatinga,AssamLocation: Stretch on National Highway NH-54 near Jatinga AssamClient: Hindustan Construction Company, MumbaiMain project features: National Highway no. 54 is to cross a small hillock near Jatinga in Assam. The level of the road is to be about 40m below the highest level of thehillock, which slopes down gently on the two sides along the road alignment. Another road,perpendicular to NH-54, passes over the top of this hillock. The NH-54 road stretch which isto cross this hillock is about 300m long.

Position held: Structural EngineerMajor Activities performed: Structural design of RCC Top Down Structure. Snap shot of FE mode:

Name of assignment or project: Dagachhu Hydro Power ProjectYear: March 2010 to May 2013Location: Dagana District, BhutanClient: Hindustan Construction Company, MumbaiMain project features: Installed Capacity - 114 MW; Diversion structure - 36 m high, Concrete Gravity Dam; Headrace Tunnel - 4.4m Dia and Underground Powerhouse. Project commissioned in 2015.

Position held: Structural EngineerMajor Activities performed: Structural design of RCC Retaining walls, bridges, aqueducts, Water intake RCC structure, Desilting Structure, Water channels, River training walls and control room buildings. Few snap shots of FE models of project:

 

Page 5: Illustrative work

Name of assignment or project: Kutehr Hydro Electric ProjectYear: 2010 to 2012Location: Himachal Pradesh, IndiaClient: JSWELMain project features: Installed Capacity - 3 x 80 MW; Diversion structure - 24 m high Barrage; Headrace Tunnel - 15 Km long, 6.2 m dia, Concrete lined circular and Underground Powerhouse.

Position held: Structural EngineerMajor Activities performed: Involved in preparation and evaluation of construction tender .Structural analysis and design of Barrage, substation building, Tunnel portal structures and tunnel lining, retaining walls etc. .Name of assignment or project: Pare Hydro Electric ProjectYear: April 2010 – June 2010Location: Arunachal Pradesh, IndiaClient: NEEPCOMain project features: Installed Capacity - 2 x 55 MW; Diversion structure - 78 m high Concrete Dam; Headrace Tunnel - 7.5 m dia, 2.81 km long Horse shoe shaped and Surface Powerhouse.

Position held: Structural EngineerMajor Activities performed: Involved in review of stability of Water intake structure as proposed in DPR, Structure analysis, design & detailing of Service bay structure of Power house complex. Name of assignment or project: Srinagar Hydro Electric ProjectYear: July 2008 – Feb 2010Location: Uttranchal, IndiaClient: GVKMain project features: Installed Capacity - 330 MW; Diversion structure - 95m high Concrete Gravity Dam; Headrace Tunnel - 2 nos., 1.01 km & 1.14 km long, 9 m dia, Circular and Surface Powerhouse.

Position held: Sr. Engineer- StructuresMajor Activities performed: Involved in Structure analysis, design & detailing of Power channel, Cross drainage works, Bridges, Forebay Tank, Forebay Intake, bypass channel structures.

Type of structure analysed and design : 2 to 20m high cantilever retaining walls with/without counterforts, cross drainage box culverts, column-beam-slab frame structure, isolated/raft foundations for power channel,CD works, Forebay tank, forebay intake and bypass channel structurtes, RCC/PSC girder super structure(For 2 lane bridges), Raft/Pile for substructure of bridges(4 nos).

Name of assignment or project: Kameng Hydro Electric ProjectYear: 2009 Location: Arunachal PradeshClient: NEEPCO

Position held: Sr. Engineer- StructuresMajor Activities performed: Involved in Structure analysis and design of piles to resist lateral load for slope stabilisation of power house slopes

 

Page 6: Illustrative work

Name of assignment or project: Nyabarongo Hydro Electric Project Year: 2009 - 2010Location: Republic of RwandaClient: Angelique International Ltd.Main project features: Installed Capacity - 28 MW; Diversion structure – 41 m high Concrete Gravity Dam; Headrace Tunnel - 4 m dia, 1.2 km long D shaped and Surface Powerhouse.Position held: Project CoordinatorMajor Activities performed: Responsible for DPR review and detailed design of power house, Tail race channel, Water intake structures. Project coordination.

Name of assignment or project: Ting Ting and Tashiding Hydro Electric ProjectsYear: 2008Location: Sikkim, IndiaClient: Dans Energy Pvt. Ltd.Main project features: Ting Ting and Tashiding Hydro electric projects envisage the construction of 96 MW Hydro Electric Project each. Position held: Sr. Engineer (Structures)Major Activities performed: Involved in Preliminary structural design of power house, tail race channels, HRT intake structure and preparation of DPR.

Name of assignment or project: Rohtang Road TunnelYear: 2007-2008Location: Himachal Pradesh, IndiaClient: BROMain project features: The Rohtang Tunnel project envisages the construction of a 8.8 km long highway tunnel in high Himalayan ranges near Manali (HP) to by pass the Rohtang pass on Manali – Leh Road. The south portal of the tunnel is located at an altitude of 3055m (amsl) about 25 km north of Manali and the north portal is located across Rohtang pass on the left bank of the river Chandra at an altitude of 3080m (amsl) at 78.7 km away from Manali. The tunnel work comprise all civil, mechanical and electrical works in 8.8 km long bore two lane bi-directional highway tunnel with the finished width of 10m at the tunnel walk ways levelPosition held: Engineer- StructuresMajor Activities performed: Was involved in Structure analysis, design & detailing of portal structures comprising of office cum ventilation building and avalanche protection structure.

 

Page 7: Illustrative work

Name of assignment or project: DLF SEZ IT park at Silokhera, Gurgaon, India; 16 storey DLF Commercial Complex, Gachibowli, Hyderabad, 25 stories DLF complexes “Magnolias” and “Summit” at Gurgaon, IndiaYear: 2006-2007Client: DLFPosition held: Senior Design EngineerMajor Activities performed: Structure analysis, design & detailing of Multi-storey Buildings.

Name of assignment or project: Residential buildings, Commercial buildings, Government / NGO Projects, Island Resorts, Mosques in MaldivesYear: 2004 - 2006Location: Maldives

Position held: Civil / Structural engineer

Activities performed: Involved in:

Structure analysis, design & detailing. Preparation of BOQs & Tender documents Site inspections. Scrutinizing bills of contractors and preparing

interim statements. Preparation of Project time schedules. Attending progress meetings and providing

consultancy to client & contractor.Name of assignment or project: Nathpa Jhakri Hydro Electric Project Year: 2002 - 2004Location: Himachal Pradesh, IndiaPosition held: Design engineerActivities performed: Job responsibilities included: FEM analysis of Concrete casing around turbine

using ‘Ansys’ Software. Structure analysis & design. Site inspections. Technical coordinator for 3D model of Nathpa

Jhakri Hydro Electric project.

 

Page 8: Illustrative work

Name of assignment or project: Multistorey Punjab Urban Development Authority office complex , Amritsar, Multistorey complex of Gandhi Vineeta Ashram, Jalandhar, Sports complex at Panchkula and Gurgaon, Design of water distribution network of a township in Ropar (Punjab) and Sec-51A,ChandigarhYear: 2002 - 2004Location: Punjab and Haryana, India

Position held: Design engineer

Activities performed: Involved in Structure analysis & design and Site inspections.

Name of assignment or project: Baspa Hydro electric projectYear: 1999 - 2000Location: Himachal Pradesh, IndiaMain project features: Installed Capacity - 300 MW; Diversion structure –Concrete Gravity Dam; Headrace Tunnel - 4m dia, 7.95 km long, modified Horse shoe shaped and Underground Powerhouse.Position held: Field EngineerActivities performed: Responsible for preparation of bar bending schedules, coordination with contractors and execution of work at different sites of underground power house complex.

 