IM and IM-DF connection test status. Status : Test @ FNAL (IM and DF with DF mini backplane) IM worked on DF. Low speed data transfer test was succeeded. Required data transfer speed (DDR200 MHz) was not stable due to the IM power generator problem. - PowerPoint PPT Presentation
Popular Tags:
2
IM and IM-DF connection test status Test Setup @ Waseda DATA from QUEST Readout by I2C JTAG for DF JTAG for IM Status : Test @ FNAL (IM and DF with DF mini backplane) IM worked on DF. Low speed data transfer test was succeeded. Required data transfer speed (DDR200 MHz) was not stable due to the IM power generator problem. Test @ Waseda (IM and DF with DF mini backplane) After replacement of power generator, required speed (DDR 200 MHz) was accomplished with channel delay. Now we are testing the data flow around IM (i.e. QUEST->IM->DF test) with pseudo data. Plan : Test @ waseda Finish IM data flow test in Nov. New IMx10 (power gen replaced and minor change) available at Dec. Final IM data flow test with new IM and new FW in Dec. Test @ CERN ( IM and DF with ATCA)
Transcript
Page 1: IM and IM-DF connection test status

IM and IM-DF connection test status

Test Setup @ Waseda

DATA from QUEST

Readout by I2C

JTAG for DF

JTAG for IM

Status : Test @ FNAL (IM and DF with DF mini backplane)• IM worked on DF. Low speed data transfer test was succeeded.• Required data transfer speed (DDR200 MHz) was not stable due to the IM power generator

problem. Test @ Waseda (IM and DF with DF mini backplane)• After replacement of power generator, required speed (DDR 200 MHz) was accomplished

with channel delay. • Now we are testing the data flow around IM (i.e. QUEST->IM->DF test) with pseudo data.

Plan :Test @ waseda• Finish IM data flow test in Nov.• New IMx10 (power gen replaced and

minor change) available at Dec.• Final IM data flow test with new IM

and new FW in Dec.Test @ CERN ( IM and DF with ATCA)• IM data flow will be tested with DF

on ATCA , with pseudo data(Lab4) and read ROD data (P1) in Jan and Feb.