+ All Categories
Home > Documents > Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size =...

Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size =...

Date post: 09-Jun-2021
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
219
INTEGRATED CHARTER 1.0 INTRODUCTION The Nigerian Airspace Management Agency (NAMA), was established by Act No. 48 of 1999 of the Federal Republic of Nigeria, to develop the Nigerian Airspace to a level consistent with the requirements of the International Civil Aviation Organization’s (ICAO) Standards and Recommended Practices (SARPS). The Agency therefore is saddled with the provision of Air Traffic Management to ensure safe, efficient, expeditious and economic flight operations. 2.0 PURPOSE OF NAMA SERVICE CHARTER NAMA Service Charter is a promise by NAMA to address the challenges of corrupt practices and inefficiency in the system. The Charter is intended to display the promises upon which customers can: o Expect quality service delivery o Demand their rights to good service o Have recourse when service delivery fails; o Actively be involved in the service delivery programme. 3.0 VISION STATEMENT To be one of the leading Air Navigation Service Providers (ANSP) in the world. 4.0 MISSION STATEMENT To provide safe, efficient, effective and economic Air Navigation Services to airspace users, through deployment of new technology and dedicated workforce. Page 1 of 219
Transcript
Page 1: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

INTEGRATED CHARTER1.0 INTRODUCTION

The Nigerian Airspace Management Agency (NAMA), was established by Act No. 48 of 1999 of the Federal Republic of Nigeria, to develop the Nigerian Airspace to a level consistent with the requirements of the International Civil Aviation Organization’s (ICAO) Standards and Recommended Practices (SARPS). The Agency therefore is saddled with the provision of Air Traffic Management to ensure safe, efficient, expeditious and economic flight operations.

2.0 PURPOSE OF NAMA SERVICE CHARTER

NAMA Service Charter is a promise by NAMA to address the challenges of corrupt practices and inefficiency in the system. The Charter is intended to display the promises upon which customers can:

o Expect quality service deliveryo Demand their rights to good serviceo Have recourse when service delivery fails;o Actively be involved in the service delivery programme.

3.0 VISION STATEMENT

To be one of the leading Air Navigation Service Providers (ANSP) in the world.

4.0 MISSION STATEMENT

To provide safe, efficient, effective and economic Air Navigation Services to airspace users, through deployment of new technology and dedicated workforce.

5.0 OBJECTIVES

In order to achieve its mission, the Agency has set the following objectives:

5.1 To continue to provide safe and functional air navigation services that will meet international standards.Page 1 of 172

Page 2: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

5.2 To increase the capacity of Air Traffic Control Management in order to manage the increasing air traffic volume and simultaneously reduce delays without infringing on prescribed safety standards.

5.3 To reduce cost for users.

6.0 SERVICES RENDERED AND STANDARDS

The Agency provides:

Efficient air traffic management in Nigeria.

Aeronautical telecommunication services.

Meteorological information for the purpose of air navigation.

Aeronautical information for the purpose of flight operations.

Alerts and co-ordinates the implementation of Aeronautical Search and Rescue.

Services are provided on a 24 hour basis in all the major airports.

Our services are provided in line with International Civil Aviation Organization’s (ICAO) Standards And Recommended Practices (SARPs)

7.0 STATEMENT OF SERVICES TO BE PROVIDED AS A RIGHT

7.1 Aerodrome Control Services.

7.2 Approach Control Services.

7.3 Terminal Radar Control Services

7.4 Area/ Airways Procedural Control

Page 2 of 172

Page 3: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

7.5 Area Radar Control Services

7.6 Flight Information Services

7.7 Alerting Services – Advisory Service

7.8 Aeronautical Telecommunication Services, Aeronautical Information Services.

8.0 MECHANISM FOR MONITORING PERFORMANCE8.1 The Agency undertakes periodic proficiency checks of personnel to ensure accuracy in aviation development (Once in

two years).8.2 Carries out periodic safety audit checks of equipment (hardware) and air navigation procedures (software).8.3 Report of Air Traffic Service (ATS) incidents are investigated and the results are published and disseminated to

concerned parties (depending on the occurrence).8.4 Publish details of service excellence and/or failures in the in-house journal of the Agency on a quarterly basis.8.5 Publish safety policies and Safety Management Manuals for the Agency (periodic/yearly review if there are changes).9.0 NAMA CUSTOMER CARE POLICY

The Customer Service Policy of the Nigerian Airspace Management Agency is the foundation for all staff interactions with the general public in the light of the standards outlined below:

Customers are to be treated politely, promptly and with helpful attention.

Staff members are familiar with Agency’s policies and services and are able to articulate and explain the rationale behind them.

Deliver timely quality services with courtesy, sensitivity and minimum delay according to set standards.

10.0 DEFINING STANDARDS

Page 3 of 172

Page 4: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Our standards are defined by our customers so that we deliver the best care to them. We will: Regularly ask for their opinions on our services Use these opinions to improve the quality of the services we provide Be conscious of our communication style (i.e; audible voice, maintain eye contact when speaking to someone, tone of

voice) and communicate in a professional manner

11.0 LIST OF NAMA CUSTOMERS INTERNAL CUSTOMERS

Federal Ministry of Aviation

NAMA Board

NAMA Management

Staff of NAMA

EXTERNAL CUSTOMERS

Airline Operators

Aviation equipment manufacturers/Suppliers

Federal Airports Authority of Nigeria (FAAN)

Nigerian Civil Aviation Authority (NCAA)

• Nigerian Meteorological Agency (NIMET)

• Nigerian College of Aviation Technology (NCAT)

• The Flying Public

• The Nigeria Customs Service (NCS)Page 4 of 172

Page 5: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

• The Nigeria Air Force (NAF)

• The Nigerian Navy (NN)

• The Nigeria Immigration Service (NIS)

• The Nigerian Army (NA)

• The State Security Service

• Power Holding Company of Nigeria (PHCN)

• Central Bank of Nigeria (CBN)

• Nigeria Police Force (NPF)

National Emergency Management Agency (NEMA)

Nigerian Maritime Administration and Safety Agency (NIMASA)

Aircraft Handling Companies

• Oil Companies in Nigeria

Federal Ministry of Agriculture

Federal Ministry of Works and Housing

Financial Institutions

Accountant General of the Federation

Auditor General of the Federation

Page 5 of 172

Page 6: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Ministry of Aviation Resident Auditors

Agency’s External Auditors

International Organizations

Advertising Agencies/Publication Companies.

Media Houses (Print & Electronics)

Relevant Government Agencies

Industry Stakeholders

Travel Agencies

Embassies and High Commissions

Stock Verifiers

National Assembly Commission

Training consultants

Project Consultants

Pension Fund Administrators

Contractors

Consultants

Builders

Page 6 of 172

Page 7: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Fluid & Hydraulic Expatriates

Developers

Cleaning outfits

Security outfits

State Airports

Federal Inland Revenue Services (FIRS)

• Federal Ministry of Agriculture

• Rural and Urban Nigerians• Contiguous FIRS• EUROCONTROL• BELGOCONTROL Port Health Services (FMH)• National Geospatial Intelligence Agency (Germany)• European Aeronautical Services• SAS Flight Support Inc.• Royal Airforce England• Lufthansa Aeronautical Services

• Jespersen GMBH

Page 7 of 172

Page 8: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

12.0 SERVICE PROVISIONS OF NAMA

S/N PRINCIPAL SERVICE

ROLE /DIVISION UNIT RESPONSIBLE/ STAFF /CONTACT/ DETAILS (EMAILS,PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY/ STANDARD/ TURN-AROUND TIME FOR DELIVERY

CUSTOMERS OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL/OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/ PERFORMNACE TARGET QUANTITATIVELY/QUALITATIVELY

COMMUNI-CATION REPORT ON (KEY PERFORMANCE INDICATORS) OUTCOMES OR IMPACTS

MONITORING ACTIVITIES (HOW COMPLAINTS/CONFLICTS WILL BE DEALTH WITH)

1 Efficient Air Traffic Management in Nigeria Aerodrome Control Services

Approach Control Services

Terminal Radar Control Services

Area/Airways Procedural Control

Area Radar Control Service

Procedural Air Traffic Controller with Aerodrome Rating [email protected]

Within 24 hours

Reports/feedback from ATC Units Nationwide

ICAO Doc 9426 ATC UNITS design and Ergonomics; NCAR

Through NAMA Head quarters’ Commercial Department

Delivery of items within agreed timeframe (usually 24 hours)

Efficient Ergonomic and environment for ATCOs.

A continuous review and inspection of ATC facilities on a regular basis.

Page 8 of 172

Page 9: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Alerting Services Advisory Service

2 Processing and granting of Clearance /Permits for Ad-hoc, non-schedule operations

DGM Aircraft Clearance Office.

Email: [email protected] or [email protected]

95% Customer is expected to submit all the necessary documents required to facilitate the approval and granting of the required Clearance/Permit and on time too.

ICAO Standards and Recommended Practices as domesticated in Nigerian civil Aviation Regulations.

Fees/ Charges are administered using the Standard Procedure and Billing rates approved by NCAA. The Commercial Department has the Template.

95% Availability Daily Reports/Assessment from our Customers show the Service Delivery is very excellent and the E-Clearance Portal very effective.

All complaints pertaining our E- Clearance Portal from the Customers are always being addressed by the NAMA ICT Dept. that is up and doing in ensuring a seamless service delivery. In addition, there is a Complaint /Service Log kept in the office where every customer logs in His/her complaints/Commendation. Any complaints received is always treated with dispatch.

3 e-Flight Plan ATS Reporting office

Email: gmais@nama.

Within 24 hours at Major Airports, other

Proper and timely filling of flight plan

ICAO DOC. 8126, 7910 AND 4444.

Not applicable

As many as possible in accordance with ICAO standards and

Corrupt erroneous, late or missing flight plan can potentially

Post Flight Information Report is channeled to appropriate

Page 9 of 172

Page 10: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

gov.ng Airports based on hours of operation.

Recommended practices

affect the safety of Air Navigation.

quarters.

4 E-NOTAM is a notice filed with an aviation authority to alert aircraft pilots of potential hazards along a flight route or at a location that could affect the safety of the flight. ...

International NOTAM OFFICE (NOF)/Centres

Email: [email protected]

Timely provision of integrated Aeronautical Information Package (IAIP)

Feedback from Customers. Subscription on to AIS products such as AIP and CHARTS.

ICAO Standards and recommended Practice

Not Applicable

High quality standard in syntax and semantics verification for the safety, regularity, efficiency and economic Air Navigation in accordance with ICAO standards and Recommended Practices.

Through the implementation of Area Navigation (RNAV). Performance Based Navigation (PBN) and Data Link System. Corrupt erroneous, late or missing aeronautical data can potentially affect the safety of Air Navigation.

Through quality control and qualitative system.

5 Aeronautical information publication (AIP) – It contains details of regulations, procedures and other information pertinent to

Publication

Email ; [email protected]

AIRAC Dates Subscription and purchase

ICAO Standard recommended Practice

Standard rates

In compliance with AIRAC Dates and ICAO SARPS.

Aeronautical Information of a lasting character essential to air navigation is issued by or with the authority of a State.

Through quality control and qualitative system

Page 10 of 172

Page 11: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

the operation of aircrafts in a particular country to which it relates.

6 Maps and Charts

Aerodrome survey

Enroute chart (ICAO)

Survey Unit email [email protected]

12 weeks Evidence of payment

ICAO DOC 9674 N30 Million Naira

Report Aerodrome, Approach Charts

Customer to GM

7 Conventional and Performance Based Navigation Procedures, point in space procedures. Periodic obstacle evaluation ATS routes

Airspace Planning (GM or as directed by him) [email protected]

Available within the time frame set by NCAA/NAMA

NIL

Necessary approval from NCAA

Not Applicable

ICAO/NCAA Standard

Efficient air space utilization/ cost saving measures for airlines

Corrections and amendments will be dealt with immediately as reported

8 Alerting, co-ordination and imple-mentation of

Search and Rescue Department

Prompt notification to all relevant Aero

Maintain and update database of all available SAR

Effective checklist

Page 11 of 172

Page 12: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Aeronautical Search and Rescue

Directorate: Operations

SAR stakeholders equipment.

Conduct physical verification of services

Drills and exercises.

9 Transmission and reception of ATS messages through Radio telephony, digital and Data Communica-tion systems among airports and between ICAO Contracting States.

Aeronautical Communica-tion Centres at designated airports.

EMAIL: [email protected]

Prompt transmission of the filed aeronautical messages to their appropriate addresses.

Acknowledgement of receipt and timely dispatch of the message to its addressee(s).

In accordance with ICAO Standard and recommended practices (SARPs) (CAO Annex 10 and ICAO transit time criteria.

Not applicable

Optimal standard for safety of air navigation in compliance with ICAO Standard and Recommend Practices (SARPS)

Communication system equipment and periodic checks on channel check transmission.

Through daily and monthly service message by competent supervisor.

10 Provision of bills and invoices for services rendered to Domestic Scheduled and Non-scheduled Airline operators on receipt of flight data

Domestic Billing Unit HOU

Email: [email protected]

Process bills electronically using the Air Traffic Data (AD16) received from ATC outstations, monthly bills and invoice to Domestic operators on/or before

Prompt settlement of bills within 30 days of receipt of invoice. Qualitative flight data (AD16)

NAMA Act of 1999, NAMA billing Manual AIP

Enroute and Terminal Navigation Charges for domestic Operations.

Accurate monthly bills and invoices for payments. Zero tolerance for error and meeting the turnaround time.

Dedicated staff, positive and sustained relationship with the Airlines Aggressive debt recovery. Weekly and monthly reports.

Reconciliation with Airlines.

Page 12 of 172

Page 13: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

AD16) daily and weekly for all Airports.

30th of the succeeding month.

11 Monitoring and Evaluation

SERVICOM Department

Email: [email protected]

24/7 Ensure that clients oblige to our rules and regulations.

SERVICOM Mandate/ Executive orders

Not applicable

Ensure our clients get the best services they deserve in an effective and timely manner.

Feedback from customers via Email, phone call and S.M.S.

Continuous monitoring and report to the General Manager for further recommendation to Management.

13. 0 OBLIGATIONS OF:

CUSTOMERS

Pay promptly all charges for services received. Provide reliable and timely information relating to their operations Refrain from any unethical arrangement either with staff of the Agency or with any third party in relation to

transactions. Display courtesy in dealing with NAMA staff. In seeking redress for service failure, adopt the prescribed complaint procedures.

STAFF

Discharge responsibilities with high level of professionalism

Page 13 of 172

Page 14: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Act with utmost respect and cordiality. Speedy response to customer’s needs. Attend to customers’ request within 48 hours. Provide guidance and assistance to customers where necessary.

NAMA MANAGEMENT

Setting safety standards and policies for operation. Allocation of sufficient resources to the various departments of the Agency Training and retraining of staff at all levels. Provide necessary enabling environment to staff Motivate staff for high performance Early approval directives. Recognise and reward outstanding performance and high quality service delivery.

14.0 COMPLAINTS/GRIEVANCE REDRESS MECHANISM We shall redress grievances and complaints in a timely and responsible manner through the following offices: The MD/CEO – 08150400005, 08035662020 The Nodal Officer/General Manager SERVICOM – 08033322340, 08055096217

The Deputy Nodal Officers- 08091542777, 08024190322, 08055096220The Charter Desk Officer - 08023583221The Complaints Desk Officer- 08033048548The Service Improvement Officer - 08055096223Offices of Airspace Managers located at the various airports in Nigeria

Through NAMA WEBSITE: www.nama.gov.ng and e-mail address: [email protected]; [email protected]

Page 14 of 172

Page 15: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

The office of the Complaints Desk Officer (SERVICOM) shall require clients to provide full and complete information on grievances/complaints. Complaints can be lodged through the following procedures: - in person, in writing or through e-mail. A maximum of two (2) working days shall be required to acknowledge and dispose of the complaint from clients and the public.

We have provided complaints/suggestion boxes at designated places within the Agency. The SERVICOM Office of NAMA shall on a daily basis access these boxes and promptly respond to complaints/grievances therein within 24 hours and ensure that useful suggestions are implemented promptly.

Air Traffic Services Incidents: By their nature, grievances arising from Air Traffic Services incidents have to be referred to the Air Traffic Services Incident Investigation Panel (ATSIP), membership of which includes representatives of stakeholders in the aviation industry and has been set up to investigate reports filed by Airlines, Pilots, Air Traffic Controllers and other airspace users. The Panel should normally conclude its investigation and send its findings to the complainant, the appropriate Regional office of the International Civil Aviation Organization (ICAO) and International Air Transport Association (IATA) within a period of three (3) months.

15.0 POSITIVE FEEDBACK AND SUGGESTIONS FOR IMPROVEMENTS

We always welcome and value positive feedback too. If you have enjoyed a positive experience from a particular service or member of staff from NAMA, or have any suggestions for further improvements, we would like to hear from you.

16.0 STAKEHOLDERS’ PARTICIPATION IN SERVICE DELIVERY

Meets quarterly with the Armed Forces on Nigeria’s international obligations as they relate to civil and military co-ordinations.

Maintains permanent liaison between the civil Air Traffic Services unit and all relevant air defence units to ensure the daily integration or segregation of civil and military air traffic operating within the same or immediate adjacent portions of the Nigerian airspace employing civil or military radars as necessary.

Co-operate with FAAN, NCAA, NEMA, Navy, Air Force, Police, Immigration, Customs, etc for purposes of aeronautical search and rescue services.

Hold regular consultations with airline operators, Pilots and other stakeholders on issues affecting safe air traffic operations, e.g. airspace redesign, introduction of new airspace procedure.

Page 15 of 172

Page 16: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Meets biannually with stakeholders to evaluate, analyse and draw up modalities on service improvement.17.0 NAMA EXISTING LIMITATIONS

Weather – NAMA receives weather report from NIMET and passes it to other airspace users. Temporary closure of aerodromes due to VIP movements and other operational reasons are beyond the scope of ATC. Two-way communication is often unreliable as communication equipment are sometimes erratic. Interconnectivity between ATS units nationwide may fail at the time of need. The professional staff strength is inadequate. Power supply is often erratic and poses a great threat to safe operations. Absence of organizational culture to make our environment safety conscious. Inadequate office space/ furniture and inadequate cooling systems. Non Automation of AIS in all her functions Shortage of specific equipment in relevant areas example AIP management systems, NOTAM and briefing facilities. Lack of regular departmental staff training and retraining in order to meet up with its counterpart in other part of the

world. Insufficient funding for operations Inadequate /Insufficient operational, patrol vehicles Insufficient Operational communication between users and providers. Inadequate working tools/equipment (hardware/software) Inadequate recognition cum reward Proper first aid treatment for staff Inadequate funds on the part of the agency to independently carry out the development of their landed properties Navigation and Landing Aids malfunction and power outages. Limited access to information and exposure to key areas of operation. Lack of E-Library and ill-equipped Library

18.0 CHARTER REVIEWThis Charter as is set out is by no means conclusive and shall continuously be subject to review and improvement taking into account customer feedback. Printing and publication will be within a two year period.

Page 16 of 172

Page 17: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

19.0 SOME AVIATION RELATED ACRONYMS

TERM DEFINITION

AFTN AERONAUTICAL FIXED TELECOMMUNICATION NETWORK

AIS AERONAUTICAL INFORMATION SERVICES

ANRs AIR NAVIGATION REGULATIONS

ATC AIR TRAFFIC CONTROL

ATNS AIR TRAFFIC NAVIGATION SERVICE

ATS AIR TRAFFIC SERVICES

ATN AERONAUTICAL TELECOMMUNICATION NETWORK

BASA BILATERAL AIR SERVICES AGREEMENT

CNS COMMUNICATION, NAVIGATION SURVEILLANCE

DME DISTANCE MEASURING EQUIPMENT

FAAN FEDERAL AIRPORTS AUTHORITY OF NIGERIA

FMA FEDERAL MINISTRY OF AVIATION

ICAO INTERNATIONAL CIVIL AVIATION ORGANIZATION

IATA INTERNATIONAL AIR TRANSPORT ASSOCIATION

HR HUMAN RESOURCESPage 17 of 172

Page 18: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

ICT INFORMATION AND COMMUNICATION TECHNOLOGY

ILS INSTRUMENT LANDING SYSTEM

LB LOCATOR BEACON

NAMA NIGERIAN AIRSPACE MANAGEMENT AGENCY

NAVAIDS NAVIGATIONAL AIDS

NCAA NIGERIAN CIVIL AVIATION AUTHORITY

NCAT NIGERIAN COLLEGE OF AVIATION TECHNOLOGY

NDB NON DIRECTIONAL BEACON

NEMA NATIONAL EMERGENCY MANAGEMENT AGENCY

NIMET NIGERIAN METROLOGICAL AGENCY

NOTAM NOTICE TO AIRMEN

SAR SEARCH AND RESCUE

SARPs STANDARD AND RECOMMENDED PRACTICES

SES SAFETY ELECTRONICS SERVICES

VOR VERY HIGH FREQUENCY OMNI-DIRECTIONAL RADIO RANGE

VSAT VERY SMALL APERTURE TERMINAL

ANSP AIR NAVIGATION SERVICE PROVIDER

Page 18 of 172

Page 19: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

ATM AIR TRAFFIC MANAGEMENT

ATAS AIR TRAFFIC AUTOMATION SYSTEM

ATMS AIR TRAFFIC MANAGEMENT SYSTEMS

CPDLC CONTROLLER PILOT DATA LINK COMMUNICATION

GNSS GLOBAL NAVIGATION SURVEILLANCE SYSTEM

GPI GLOBAL PLAN INITIATIVE

20.0 NAMA SERVICOM COMMITTEE MEMBERS’ EMAIL ADDRESSES AT THE VARIOUS AIRPORTS IN NIGERIA

S/NO DESIGNATION EMAIL

1 ASM MMIA LAGOS [email protected] ASM ABUJA [email protected] ASM PORT-HARCOURT [email protected] ASM MAKIA KANO [email protected] ASM CALABAR [email protected] ASM ENUGU [email protected] ASM AKURE [email protected] ASM YOLA [email protected]

Page 19 of 172

Page 21: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

28 ASM FORCADOS [email protected] ASM BONNY [email protected]

21.0 DEPARTMENTAL LOCAL CHARTER The Nigerian Airspace Management Agency (NAMA) is the aviation parastatal in Nigeria bestowed with the responsibility for Air Traffic management within the Nigerian Airspace. The Agency is present in twenty seven (27) Airports, five (5) aerodromes, and (9) en-route stations nationwide and has 34 departments through which services are rendered to her esteemed customers.

ATC OPERATIONS DEPARTMENT 1.0 INTRODUCTION

The Air Traffic Control (ATC) Operations department is responsible for the overall Air Traffic Control Operations within the Nigerian airspace. It interprets and applies the ICAO (International Civil Aviation Organization) Standards and Recommended Practices (SARPS) in its daily operations. It formulates policies in respect of air traffic control and ensures implementation of such policy matters through directives to the field operators.

2.0 MISSION STATEMENT

To ensure safe, expeditious, efficient and cost effective ATC operations that would meet the satisfaction of all users of the Nigerian Airspace.

3.0 SERVICE PROVISION FOR ATC OPERATIONS DEPARTMENT

S/N PRINCIPAL SERVICE

ROLE/DIVISION(UNIT)RESPONSIBLE/

SERVICEAVAILABILITY

CUSTOMEROBLIGATION/WHAT IS

LEGAL/OTHER REGULATIO

FEES/CHARGESFOR

DELIVERYSTANDARDS/PERFORMANC

COMMUNICATION/REPORT ON PERFORMANCE

MONITORINGACTIVITY (HOW

Page 21 of 172

Page 22: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

STAFF/CONTACT DETAILS (EMAIL)

/ QUALITYSTANDARD/TURNAROUNDTIME FOR DELIVERY

NEEDED TO DELIVER EFFECTIVESERVICE

NSTO BE COMPLIEDWITH

SERVICEANDPRODUCTWHEREAPPLICABLE

ETARGETQUANTITATIVE/QUALITATIVELY

(KEY PERFORMANCE INDICATORS/OUTCOMES OR IMPACTS)

COMPLAINTS/CONFLICTS WILL BE DEALT WITH)

1 Provision of Air Traffic Services (Aero-drome Control)

AerodromeControl Service by Aerodrome Procedural Air Traffic Controller with Aerodrome Rating License (A).Supervision of services provided in Ensuring Safety. Email:[email protected]

Shift Duty /watchSubject to Airport Hours of Operation

Payment of appropriate NavigationalCharges/VHF Radios;Navigation Equipment;Radar Equipment;Aldis Lamb; Binoculars, etc.;Requisite ATCOs trainings

Nigerian Civil Aviation Regulation / ICAO standards, recommended practices and Annexes and other relevant Aviation documents ie; 4444ATM Operations Manual

Standard Navigational charges computed by Commercial department

Flight Safety / Error & system failure prevention

System Evaluation; Incident/Accident evaluation; Just culture Model: Engineering, Human factors & Legal.

GM ATC (Operation); Air Traffic Operations Managers& Quality Assurance Managers for local Administration in consonance with ICAO just culture as imbibed by NAMA; Supervisors; Watch Leaders with higher years of Ratings,

2 Provision of Air Traffic Services (Terminal Approach Control)

Terminal Approach Procedural Control Service by Air Traffic Approach Procedural Controller with Approach service procedural rating License (B)

Shift Duty /watchSubject to Airport hours of Operation

Payment of appropriate NavigationalCharges/VHF Radios;Navigation Equipment;Radar Equipment;Aldis Lamb; Binoculars, etc.;Requisite ATCOs

Nigerian Civil Aviation Regulation/ ICAO standards, recommended practices and Annexes and other relevant Aviation documents ie;4444ATM

Standard Navigational charges computed by Commercial department

Flight Safety / Error & system failure prevention

System Evaluation; Incident/Accident evaluation; Just culture Model: Engineering, Human factors & Legal.

GM ATC (Operations); Air Traffic Operations Managers, Quality Assurance Managers for local Administration in consonance with ICAO just culture as imbibed by

Page 22 of 172

Page 23: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

trainings Operations Manual

NAMA; Supervisors; Watch Leaders with higher years of Ratings

3 Provision of Air Traffic Services (Terminal Radar Control)

-Terminal Approach Radar Control Service by Radar Air Traffic Controller with terminal Approach Radar service rating License (C).

Shift Duty /watchSubject hours of Operation

Payment of appropriate NavigationalCharges/VHF Radios;Navigation Equipment;Radar Equipment;Aldis Lamb; Binoculars, etc.;Requisite ATCOs trainings

Nigerian Civil Aviation Regulation/ ICAO standards, recommended practices and Annexes and other relevant Aviation documents ie;4444, manual of Operation

Standard Navigational charges computed by Commercial department

Flight Safety / Error & system failure prevention

System Evaluation; Incident/Accident evaluation; Just culture Model: Engineering, Human factors & Legal.

GM ATC (Operations); Air Traffic Operations Managers, Quality Assurance Managers for local Administration in consonance with ICAO just culture as imbibed by NAMA; Supervisors; Watch Leaders with higher years of Ratings,

4 Provision of Air Traffic Services (Airways Procedural Control)

-Area Airways Procedural Control by Area Airways Controller (D).(En-route Separation of Aircraft to avoid collision)

Shift Duty /watchHours of Operation

Payment of appropriate NavigationalCharges/VHF Radios;Navigation Equipment;Radar Equipment;Aldis Lamb; Binoculars, etc.;Requisite ATCOs

Nigerian Civil Aviation Regulation/ ICAO standards, recommended practices and Annexes and other relevant Aviation documents ie;4444ATM

Standard Navigational charges computed by Commercial department

Flight Safety / Error & system failure prevention

System Evaluation; Incident/Accident evaluation; Just culture Model: Engineering, Human factors & Legal.

GM ATC (Operations); Air Traffic Operations Managers& Quality Assurance Managers for local Administration in consonance with ICAO just culture as imbibed by

Page 23 of 172

Page 24: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

trainings Operations Manual

NAMA; Supervisors; Watch Leaders with higher years of Ratings,

5 Provision of Air Traffic Services (Airways Radar Control)

-Area Airways Radar Controller by Radar Controller (E).

Shift Duty /watchHours of Operation

Payment of appropriate NavigationalCharges/VHF Radios;Navigation Equipment;Radar Equipment;Aldis Lamb; Binoculars, etc.;Requisite ATCOs trainings

Nigerian Civil Aviation Regulation/ ICAO standards, recommended practices and Annexes and other relevant Aviation documents ie;4444

Standard Navigational charges computed by Commercial department

Flight Safety / Error & system failure prevention

System Evaluation; Incident/Accident evaluation; Just culture Model: Engineering, Human factors & Legal.

GM ATC (Operations); Air Traffic Operations Managers& Quality Assurance Managers for local Administration in consonance with ICAO just culture as imbibed by NAMA; Supervisors; Watch Leaders with higher years of Ratings,

6 Provision of Air Traffic Services (Specialist Service)

Airspace Planning

-Instrument Approach Design by Air Traffic Controller.

- PBN Procedures

- State weather minima

FederalGovernmentPublished hours of administrative duty (8-4pm), excluding call duties

Payment of appropriate NavigationalCharges/VHF Radios;Navigation Equipment;Radar Equipment;Aldis Lamb; Binoculars, etc.;Requisite ATCOs

Nigerian Civil Aviation Regulation/ ICAO standards, recommended practices and Annexes and other relevant Aviation documents ie;4444 Manual of

No charges for Federal government Aerodromes. Standardprices for state and private Aerodromes

Flight Safety / Error & system failure prevention

System Evaluation; Incident/Accident evaluation; Just culture Model: Engineering, Human factors & Legal.

GM (Airspace Planning); Team Leader (Deputy general Manager)

Page 24 of 172

Page 25: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

specialist trainings

operations

7 Provision of Air Traffic Services (Specialist Service)

-Search and Rescue/CMC by Air Traffic Controller

FederalGovernmentPublished hours of administrative duty (8-4pm), excluding call duties

Payment of appropriate NavigationalCharges/VHF Radios;Navigation Equipment;Radar Equipment;Aldis Lamb; Binoculars, etc.;Requisite ATCOs specialist trainings

Nigerian Civil Aviation Regulation/ ICAO standards, recommended practices and Annexes and other relevant Aviation documents ie;4444 Manual of operations

No charges Flight Safety / Error & system failure prevention

System Evaluation; Incident/Accident evaluation; Just culture Model: Engineering, Human factors & Legal.

General Manager (SAR/CMC) with ATCOs trained adequately for the provision of SAR

8 Provision of Air Traffic Services (Specialist Service)

-Airspace Design by Air Traffic Controller.

ATS Route Creation

Airspace Planning

FederalGovernmentPublished hours of administrative duty (8-4pm), excluding call duties

Payment of appropriate NavigationalCharges/VHF Radios;Navigation Equipment;Radar Equipment;Aldis Lamb; Binoculars, etc.;Requisite ATCOs specialist trainings

Nigerian Civil Aviation Regulation/ ICAO standards, recommended practices and Annexes and other relevant Aviation documents ie;4444 Manual of operations

Chart sales through Aeronautical Information Service(AIS)At standardPrice

Flight Safety / Error & system failure prevention

System Evaluation; Incident/Accident evaluation; Just culture Model: Engineering, Human factors & Legal.

GM (Airspace Planning); Team Leader (Deputy general Manager); with ATCOs adequately trained

9 Provision of Air Traffic Services (Specialist

-Safety Management System (SMS)

FederalGovernmentPublished hours of

Payment of appropriate NavigationalCharges/

Nigerian Civil Aviation Regulation/ ICAO

No charges Flight Safety / Error & system failure prevention

System Evaluation; Incident/Accident evaluation; Just culture Model:

General Manager (SMS); Team Evaluations of

Page 25 of 172

Page 26: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Service) administrative duty (8-4pm), excluding call duties

VHF Radios;Navigation Equipment;Radar Equipment;Aldis Lamb; Binoculars, etc.;Requisite ATCOs specialist trainings

standards, recommended practices and Annexes and other relevant Aviation documents ie;4444 Manual of operations

Engineering, Human factors & Legal.

Incidences/ Accidents

10 Provision of Air Traffic Services (ATS Administration)

Air Traffic Services Administration

FederalGovernmentPublished hours of administrative duty (8-4pm), excluding call duties

Payment of appropriate NavigationalCharges/VHF Radios;Navigation Equipment;Radar Equipment;Aldis Lamb; Binoculars, etc.;Requisite ATCOs specialist trainings

Nigerian Civil Aviation Regulation/ ICAO standards, recommended practices and Annexesand other relevant Aviation documents ie;4444, 9426 etc.

Charges arising from other services in line with NAMA Act.

Flight Safety / Error & system failure prevention; ATC personnel Management

System Evaluation; Incident/Accident evaluation; Just culture Model: Engineering, Human factors & Legal.

GM (ATC Operations) with Operational highly skilled ATCOs

4.0 MECHANISM TO MONITOR PERFORMANCE 4.1 General Application: A more experienced ATOM (the Air Traffic Operation Manager) oversees the overall ATC operations in a particular aerodrome and monitors the communication frequencies with a portable VHF radio to ensure high operational standards. While a watch supervisor who is normally a more experienced and most senior ATCO manages the ATC Services being provided by various ATC Teams. Similarly, General Managers (Licensed and Experienced Senior ATCOS) at the Headquarters also monitor some selected communication frequencies.4.2 Publishing Arrangements

Page 26 of 172

Page 27: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

i. Each control position or ATC Unit has a log-book wherein details of minute-by-minute occurrences are recorded in a chronological order including air traffic incidents, air-safety reports, incidents of indiscipline or equipment failure, severe weather occurrences etc.ii. Special reports on air traffic incidents are however made and sent first to the ATOM (Air Traffic Operations Manager), then to the ASM (Airspace Manager) and eventually to the Headquarters. These are analysed and reviewed by a body known as Air Traffic Services Incidents Investigation Panel (ATSIP), documented and results published and circulated to all concerned including ICAO as well as to concerned stakeholders.iii. Other reports requiring administrative attention are channelled accordingly for proper attention to be given to them.iv. Equipment status reports are published daily in all stations and sent to Headquarters for necessary attention v. Monthly reports from the stations to Headquarters reflect operational status of facilities, including aircraft and

passenger movements in all the stations.5.0 OBLIGATIONS OF CUSTOMERS

Display courtesy in dealing with NAMA Staff.In seeking redress for service failure adopt the prescribed complaints procedures.Provide adequate, correct information and genuine prescribed supporting document(s) when applying for our services.

5.1 NAMA ATC STAFFAll NAMA ATC staff must exhibit high level of professionalism, be firm in enforcing safety standards, courteous, responsive, reliable, and competent in dealings with customers - Pilots (The Airspace users)

5.2 NAMA MANAGEMENT OBLIGATIONAppreciate and reward quality service delivery, efforts and results.

6.0 FEEDBACK/COMPLAINTS/GRIEVANCE REDRESS MECHANISM• Safety assurance is our primary duty

• All NAMA customers – airline operators, pilots, NCAA, FAAN, NIMET and others shall be treated with dignity.

• Any aggrieved customer shall be adequately attended to in order to meet customers’ expectation.

• Complaints relating to air traffic operations shall be addressed promptly. Others relating to air traffic incidents reports and other administrative lapses shall be addressed within two (2) weeks. Complaints redress procedure shall be published and made available at all service points.

Page 27 of 172

Page 28: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

All Complaints shall be directed to the following Officers: MD/CEO; Nodal Officer/General Manager SERVICOM, NAMA Headquarters; [email protected] and Airspace Managers at the various Nigerian airports. Complaints can be lodged through the following procedures: - in person, in writing or through e-mail.

ATC STANDARDS DEPARTMENTPage 28 of 172

Page 29: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

1.0 INTRODUCTIONThe department of ATC Standards is responsible for interpreting and ensuring strict compliance with international civil Aviation Organizations’ (ICAO) Standards and Recommended Practices (SARPS) for effective provision of Air Traffic Control Management within the Nigerian airspace.

2.0 MISSION STATEMENTTo ensure strict compliance with ICAO SARSPs, NCAR and other relevant rules and regulations in daily Air Traffic Management Operations. To also ensure that all ATM technical equipment, tools and consumables including the ATC work environment are in conformity with the requirements as contained in ICAO Doc.4444 and Doc. 9426.

3.0 SERVICES RENDERED Ensuring that our field operations conform to the ICAO (International Civil Aviation Organization) Standards and

Recommended Practices (SARPS) as a baseline in all ATM procedures and processes; Ensuring strict compliance with the Nigerian Manual of Air Traffic Control Instructions (MATCI) and the Local Air Traffic

Control Instructions (LATCI) of the aerodrome concerned; Ensuring that ATCOS at various Airports adhere strictly to the standard operating procedures of their respective

aerodrome in handling emergencies and unusual traffic/conflict occurrences; Ensuring that ALL ATM Technical tools, equipment and consumables conforms with the requirements in Doc 9426 and

NCAR Part 2 and 14; Ensuring that the ATC work environment are conducive and satisfy published ergonomic requirements and also in

conformity with provisions in ICAO Doc. 9426, Doc. 4444 and NCAR Part 14.

SERVICE PROVISIONS OF ATC STANDARDSS/N PRINCIPAL

SERVICE ROLE/ DIVISION (UNIT) RESPONSIBLE / STAFF / CONTACT DETAILS (EMAIL)

SERVICE AVAILABILITY/ QUALITY STANDARD / TURN AROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION / WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL/ OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS / PERFORMANCE TARGET QUALITATIVELY / QUANTITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE (KEY) PERFORMANCE INDICATORS / OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS WILL BE DEALT WITH)

1. Standards in equipment in

General Manager Email;

Within 24 Hrs.

Reports / Feedback

ICAO Doc 9426 – ATC

Through NAMA HQ

Delivery of Items within

Efficient Ergonomic and environmentally

A continuous review and

Page 29 of 172

Page 30: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

ALL Air Traffic Control units

[email protected]

from ATC Units nation wide

Units Design and Ergonomics; NCAR

Procurement Unit

agreed timeframe (usually 24 Hrs.)

sustainable working environment for ATCOs.

inspection of ATC facilities on a regular basis

2. Ensuring strict compliance with the Nigerian Manual of Air Traffic Control and Local Air Traffic Control Instructions (LATCI) of the various aerodromes concerned

General Manager Email;[email protected]

Quarterly Reviews of ATC records of Operations (Log-books)

Reports / Feedback from ATC Units nation wide

ICAO Doc. 4444; Doc. 9426; NCAR Parts 14 & 2

Not Applicable

Quarterly Reports

Results of Proficiency Examinations and Station level Evaluation should indicate strict compliance with these requirements.

A continuous review and inspection of ATC facilities on a regular basis

3. Ensuring that ATC field operations conform to the ICAO Standards and Recommended Practices (SARPs)

General Manager Email ; [email protected]

Quarterly Reviews of ATC records of Operations (Log-books)

Reports / Feedback from ATC Units nation wide

ICAO Doc. 4444; Doc. 9426; NCAR Parts 14 & 2

Not Applicable

Quarterly Reports

Results of Proficiency Examinations and Station level Evaluation should indicate strict compliance with these requirements.

A continuous review and inspection of ATC facilities on a regular basis

4. Ensuring that ATCOs at various fields of operations maintain

General Manager Email; [email protected]

Quarterly Reviews of ATC records of Operations (Log-books)

Reports / Feedback from ATC Units nation wide

ICAO Doc. 4444; Doc. 9426; NCAR Parts 14 & 2

Not Applicable

Quarterly Reports

Results of Proficiency Examinations and Station level Evaluation should indicate strict compliance with these requirements.

A continuous review and inspection of ATC facilities on a regular basis

Page 30 of 172

Page 31: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

standard operating procedures of the aerodrome concern

5. Collate and maintain operational data including aircraft and passenger statistics

General Manager Email;[email protected]

Monthly Records

Reports / Feedback from ATC Units nation wide

ICAO Doc. 4444; Doc. 9426; NCAR Parts 14 & 2

Not Applicable

Quarterly Reports

Results of Proficiency Examinations and Station level Evaluation should indicate strict compliance with these requirements.

A continuous review and inspection of ATC facilities on a regular basis

6. Keeping up-to-date and comprehensive database of ATC [personnel including personal data, academic records, professional training and ATC ratings, career progression and staff disposition / movements

General Manager Email;[email protected]

Monthly Records

Reports / Feedback from ATC Units nation wide

ICAO Doc. 4444; Doc. 9426; NCAR Parts 14 & 2

Not Applicable

As the need arise.

Updating staff database regularly and after any posting, training or appointments.

A continuous review and comparing of data with ATC Ops and TE/MPD departments.

7. Preparing and presenting quarterly,

General Manager Email;[email protected]

Quarterly Reports / Feedback from ATC Units nation

ICAO Doc. 4444; Doc. 9426; NCAR Parts 14 & 2

Not Applicable

Quarterly, mid-year and annual Evaluation

Quarterly, mid-year and annual Evaluation reports to be submitted to management.

Updating staff database regularly and after any

Page 31 of 172

Page 32: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

mid-year and annual reports to Mgt.

ov.ng wide reports. posting, training or appointments.

MECHANISM TO MONITOR PERFORMANCE

General Application: Each of the control unit is supervised by a supervisor.i. Each of the control frequencies is monitored from the office of the ATOM (Air Traffic Control Manager) and the

ASM (Airspace Manager) using portable VHFS radios at the station levels to ensure Standards are not compromised.

ii. ATC equipment status is being monitored daily, as received as daily report through AFTN messages, in order to ensure their continued serviceability throughout the nation in conformity with required standards.

iii. Undertaking periodic/quarterly technical assessment of ATC Personnel. PUBLISHING ARRANGEMENTS

I. Periodic reports of unserviceability, irregularities and non-compliance, non-conformance or lack of adherence to specified standards are collated, investigated and redressed accordingly.II. Adequate steps are then taken, through the directorate to avoid a recurrence or to remedy the effects of the

outage or failure or ensure that adequate safeguards are in place to forestall such events.

SEARCH AND RESCUE/CIVIL-MILITARY CO-ORDINATION DEPARTMENT

Page 32 of 172

Page 33: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

1.0 INTRODUCTION

In line with international standards, the Agency has in place Search and Rescue department which is responsible for ensuring that appropriate policy and procedures are put in place for the coordination of Aeronautical SAR in all the Rescue Co-ordination Centres (RCCs), Rescue Sub-centres (RSC) and alerting posts, and collaborates with all relevant stakeholders to ensure timely response to aircraft incidents/accidents.

2.0 MISSION STATEMENT

To provide seamless aeronautical search and rescue operations that ensure timely, expeditious and coordinated reactions by all SAR response units to aircraft incident or accident.

3.0 SERVICE PROVISION OF SEARCH AND RESCUES/N PRINCIPAL

SERVICEROLE/UNIT

RESPONSIBLE/ STAFF/

CONTACT DETAILS

SERVICE AVAILABILITY/QAULITY STANDARD/

TURN AROUND TIME FOR DELIVERY

CUSTO-MER OBLIGATION/ WHAT IS NEEDED TO

DELIVER EFFECTIVE SERVICE

LEGAL / OTHER

REGULATIONS TO BE COMPLIED

WITH

FEES / CHARGES

FOR SERVICE

AND PRODUCT WHERE

APPLICABLE

DELIVERY STANDARDS/ TARGET QUANTITA

TIVELY/QUALITATIVELY

COMMUNICATION/ REPORT ON

PERFORMANCE INDICATORS/OUTCO

MES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS ARE RESOLVED

1 Aeronautical Search and Rescue (SAR)

NAMA develops and issues Aeronautical Search and Rescue (SAR), RCC & RSC tele-phone contact &email:[email protected]

24 hours of aero-sar service. A safe, efficient and economic ANS services, turnaround time of 3mins to activate search and rescue

prompt notification to all relevant aero-sar stakeholders.

Nigerian Civil Aviation Regulations (nigcars), icao annex 12 and iamsar vol. 1, 2&3.

Not applicable

Spontaneous response to distress calls 90% availability

maintain and update database of all available sar equipment

conduct physical verification of serviceability of equipment and ensure their availability at all timesconduct local and national sar exercisesorganizes public

effective checklistdrills/ exercisesbriefing and debriefingvisiting and oversight function

Page 33 of 172

Page 34: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

operations. enlightenment programmes to sensitize members of the public on their role in an event of accident

4.0 MECHANISM TO MONITOR PERFORMANCE Establishing and equipping of Rescue Coordination Centers (RCC), rescue sub-centers (RSC) and alerting posts. The establishment of joint-committee of NEMA, NIMASA, NAMA and other disaster response units, with a view to

realizing well-funded unified SAR structure. Establishment of Joint RCC by NAMA, NIMASA and NEMA. The establishment of CMC committees nationally and locally to formulate standard operating procedures in our joint

user airports for optimal operation of military flight without impeding on civil aviation operations. The conduct of mock exercises, and de-briefing of stakeholders on performance. Publication of public enlightenment materials. Enlightenment through print and electronic media.

5.0 EXPECTATIONSComplaints relating to air traffic operations shall be addressed promptly. Others relating to air traffic incidents reports shall be treated within 24 hours and other lapses shall be addressed within two (2) weeks.

6.0 STAKEHOLDERS PARTICIPATION IN SERVICE PROVISION Air incidents reports are analysed and evaluated at the Headquarters and causes addressed. The results which include representatives of some Airline Operators.

ATC TECHNICAL EVALUATION & MANPOWER DEVELOPMENT1.0 INTRODUCTION:

Page 34 of 172

Page 35: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

The Department of Technical Evaluation is responsible for coordinating the recruitment, training and re-training of ATS personnel with a view to providing astute professional Air Traffic Service workforce capable of meeting the challenges of modern Air traffic management. It is involved with the development, maintenance and improvement, on a continuous basis, (during the career of each controller) the technical skills and proficiency required by the ATS unit. The department also provides necessary guidelines and instructions for the administration and enforcement of the Civil Aviation Regulations as they relate to training, examination, rating and licensing of Air Traffic Controllers.

2.0 MISSION STATEMENT:

To assure the development of highly competent, medically fit and highly proficient ATCO’s operating in technically sound and well equipped Air Traffic Service (ATS) units in line with the International Civil Aviation Organization (ICAO) standards.

3.0 SERVICE PROVISION OF TECHNICAL EVALUATION S/N PRINCIPAL

SERVICEROLE/ DIVISION/ UNIT RESPONSIBLE STAFF CONTACT/ DETAILS (EMAILS)

SERVICE AVAILABILITY/QUALITY STANDARD/TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION ON WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL/ OTHER REGULATIONS TO BE COMPLIED WITH

FEES CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARD/PERFORMANCE TARGETQUANTITATIVELY/QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE(KPI) OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLIANTS/CONFLICT WILL BE DEALT WITH

1. ATC Manpower Development

GM TE

Email:[email protected]

Always available when required.Delivery time max 45 week.Quality Standard: According to ICAO/NCAA

Possession of required entry qualification and employment by NAMA Mgt.

NAMA employment letter and medical fitness

Not applicable ICAO/NCAA Obtain Diploma in various ATC course

Monthly/ Quarterly supervision

2. ATC OJT for rating

GM TE Available when required.

Success at training and punctuality

Completion of appropriate OJT forms

Not applicable ICAO/NCAA/LATCI

As contained in individual training logbooks

Monthly Progress Check

Page 35 of 172

Page 36: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Delivery time max 180hours of training

at OJT

3. ATC License Renewal

GM TE Available when required.Delivery time as per NCAA

Submission of ATC License with appropriate application forms

Attach Certificate of ATC Medicals

Not applicable NCAA Completion of renewal within 3 weeks of submission

Monthly Check

4. Medical Allowance Payment

GM TE Monthly as per NAMA MD/CE approval

Renewal of ATC License

Serving ATCOS and having current ATC license

Not Applicable NAMA Management

Nil omission for payment

Monthly Check

5. Manpower Placement

Available when required.Delivery time as per NAMA Management approval

Currency of ATC License

Liaison with ATC OPS & STD

Not Applicable NAMA Management

Placing ATCOS for local and foreign courses as captured in the approved NAMA budget.

Monthly checks with HR Department

4.0 MECHANISM TO MONITOR PERFORMANCE

i. ICAO Air Traffic Services Planning Manual Doc. 9426-AN/924. Chapters 3 and 4Description of ATM functions and monitoring through the use of proficiency. A check to determine the competency of individual ATCO. Technical evaluation examination by recognized Aviation Training Organization (ATO) in conjunction with NAMA for new intake into ATC profession is mandatory.

ii. ICAO Doc. 7192, Training manual, Part A – 1; General Considerations and Part D – 2; Air Traffic controller.ICAO training manual indicates required training for Air Traffic Controllers in line with ICAO requirements. This is to enable the appropriate ATS authority determines appropriate training for the provision of Air Traffic Services. E.g. On – The – Job training appraisal and pre-rating examinations for the appropriate Civil Aviation Authority Licence must be ensured. Adherence to local ATC instruction and monthly report to check compliance with training program is highly emphasized in the interest of safety.

Page 36 of 172

Page 37: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

iii. Air Traffic Control Training Manual – April 1991 Compliance with training manual is mandatory for the provision of separation between aircraft, between aircraft and obstruction, expediting and maintaining orderly flow of Air Traffic, provide information and advice useful for safe and efficient conduct of flight. Notify appropriate organization regarding Aircraft in need of search aids and assist such organization as required. They are monitoring references for safe and efficient provision of Air Traffic Management.

AIRSPACE PLANNING DEPARTMENT INTRODUCTION

Page 37 of 172

Page 38: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

The Airspace Planning department is responsible for the organizing and structuring the national airspace. It is charged with the planning the type of facilities needed, and traffic services to be provided in a specified volume of airspace and operating procedures to be adopted in the use of portion or entire national airspace. It designs instrument approach procedures for the Airports.1.0 MISSION STATEMENTTo establish dynamic airspace architecture for safe, expeditious, efficient and economic air navigation. SERVICE PROVISION OF AIRSPACE PLANNING S/N PRINCIPA

L SERVICEROLE/DIVISION (UNIT) RESPONSIBLE STAFF/CONTACT DETAILS(EMAIL; PHONE NUMBER)

SERVICE AVAILABLE /QUALITY/ STANDARD/ TURN AROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION / WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGALOTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/PERFOMANCE TARGET QUANTITTIVELY/QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE INDICATORS/OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/CONFICTS WILL BE DEALT WITH)

1 Developing the Air navigation masterplan for CNS /ATM System

Airspace planning(GM Airspace planning or as directed by him)Email [email protected]

Available within the time frame set by the NAMA/NCAA

NIL Necessary approval from NCAA

Not Applicable

ICAO/ NCAA Standard

Efficient airspace utilization/ cost saving measures for airlines

Corrections and amendments will be dealt with immediately as reported (within 48 hours)

2 Ensuring the safe and efficient utilization of National airspace

Airspace planning (GM Airspace planning or as directed by him

Available within the time frame set by the NAMA/NCAA

NIL Necessary approval from NCAA

Not Applicable

ICAO/ NCAA Standard

Efficient airspace utilization/ cost saving measures for airlines

Corrections and amendments will be dealt with immediately as reported

3 Development of various flight

Airspace Planning (GM Airspace planning or as

Available and in conjunction with Chart unit. Within 3 months

Agreement with NAMA

Necessary approval from NCAA

To be negotiated depending on the

ICAO/ NCAA standard

Efficient airspace utilization/safe operation of

Correction and amendments will be dealt

Page 38 of 172

Page 39: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

instrument approach procedure

directed by him)

after survey depending on the procedure required by the client

procedure required and terrain

flights into the aerodrome.

with immediately as reported.

4 Replies to queries

Airspace Planning(GM Airspace planning or as directed by him)

Available Immediately as received within 24 hours

Nil Nil Not applicable

ICAO/ NCAA Standard

Efficient air space utilization/safe operation of flights into the aerodrome

Correction and amendments will be dealt with immediately as reported. Within 24 hours

5 Arrangement for flight testing and surveillance of ATS procedure and Naiads

Calibration unit/Airspace Planning(GM Airspace Planning)

Available. Within the periodic scheduled time and subject to the availability of the calibration aircraft

Nil Nil Fees to be provided by the Calibration unit

ICAO/ NCAA Standard tolerance

Efficient airspace utilization/safe operation of flights into the aerodrome

Corrections and amendment will be dealt with immediately as observed during the exercise

6 Develop-ment of instrument approach landing operating weather minima for aerodrome

Airspace Planning(GM Airspace planning or as directed by him)

Available within the time frame set by NAMA/NCAA

Nil Nil Not Applicable

ICAO/ NCAA Standard

Efficient air space utilization/safe operation of Flights into the aerodrome

Corrections and amendments will be dealt with immediately as the need arises

7 Prepara-tion of letters of agreement between ATC units and contigu-ous

Airspace Planning(GM Airspace planning or as directed by him)

Available within the time frame set by NAMA/NCAA

Nil Necessary approval from NCAA AND Regional ATS Authorities

Not Applicable

ICAO/ NCAA/ Regional Authorities Standard

Efficient air space utilization/safe operation of Flights within the sub region

Corrections and amendments will be dealt with immediately as the need arises

Page 39 of 172

Page 40: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

ATS authorities

8 Allocation of mainte-nance and update of 5 NLC

Airspace Planning(GM Airspace planning or as directed by him

Available within the time frame set by NAMA/NCAA

Nil Necessary approval from ICAO

Not Applicable

NCAA/ ICAO standard

Efficient airspace utilization

Corrections and amendments will be dealt with immediately as reported

9 Ensuring the implementation of the AFI air navigation plan

Airspace planning(GM Airspace planning or as directed by him

Available within the time frame set by NAMA/NCAA

Nil Necessary approval from NCAA

Not Applicable

NCAA/ ICAO Standard

Efficient airspace utilization/cost saving measures for airlines

Corrections and amendments will be dealt with immediately as reported

10 Planning the automa-tion requirements for the national airspace

Airspace planning(GM Airspace planning or as directed by him

Available within the time frame set by NAMA/NCAA

NIL Necessary approval from NCAA

Not Applicable

NCAA/ ICAO Standard

Efficient airspace utilization/cost saving measures for airlines

Corrections and amendments will be dealt with immediately as reported

11 Coordina-ting air navigation service research and development activities

Airspace planning(GM Airspace planning or as directed by him

Available within the time frame set by NAMA/NCAA

NIL Necessary approval from NCAA

Not Applicable

NCAA/ ICAO Standard

Efficient airspace utilization/cost saving measures for airlines

Corrections and amendments will be dealt with immediately as reported

12 Developing ATS space requirement plan of ATS procedure

Airspace planning(GM Airspace planning or as directed by him

Available within the time frame set by NAMA/NCAA

NIL Necessary approval from NCAA

Not Applicable

NCAA/ ICAO Standard

Efficient airspace utilization/cost saving measures for airlines

Corrections and amendments will be dealt with immediately as reported

Page 40 of 172

Page 41: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

2.0 MECHANISM TO MONITOR PERFORMANCE

i Feedback from state owned airportsii Feedback from end users of our approach procedures, ATS routes and weather minima

AERONAUTICAL CHART SERVICES DEPARTMENT1.0 INTRODUCTION

The Aeronautical Chart Services is responsible for the Acquisition and the Management of Aeronautical Data and the Production of the Aeronautical Charts for the safety, regularity and efficiency of air navigation. The Department was established based on Annexes 4, 15 and Documents 8126 and 8697 of ICAO SARPs.

2.0 MISSION STATEMENTPage 41 of 172

Page 42: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

To be accurate and timely Aeronautical Chart/Data for safe, efficient, effective and economic air navigation through the development of new technologies and dedicated workforce.

3.0 SERVICE PROVISION OF AERONAUTICAL CHART SERVICES

S/N

PRINCIPAL SERVICE

ROLE/ DIVISION(UNIT)RESPONSIBLE/STAFF/CONTACTDETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVESERVICE

LEGAL/ OTHER REGULATIONS TO BE COMPLIED WITH

FEES/CHARGESFOR SERVICEAND PRODUCT WHEREAPPLICABLE

DELIVERY STANDARDS /PERFORMANCE TARGET QUANTITATIVELY /QUALITATIVELY

COMMUNICATION/REPORTON PERFORMANCEINDICATORS/ OUTCOMES OR IMPACTS

MONITORINGACTIVITY (HOW COMPLAINTS/CONFLICTSWILL BE DEALT WITH)

1 AERODROME SURVEY

SURVEY UNIT Email:

[email protected]

twelve(12) weeks

evidenceof payment

ICAO DOC9674

#30 millionnaira

report, aerodrome,approach charts

customerto GM

2ENROUTECHART(ICAO)

Cartographyon request evidence 

of payment ICAO ANNEX 4a2 size= $60US dollarsa0 size = $80US dollars

ICAO mandatory enroute chart

customer toGM

3 AIP Publication

4.0 MECHANISM TO MONITOR PERFORMANCE

Collect, edit and plot all aeronautical data collected from survey field work as stipulated in Doc. 8967 and Annex 4 of ICAO standard and recommended practices.

Ensuring that all aeronautical charts are produced in accordance to ICAO specifications As new information are provided through NOTAM action, affected charts are reviewed. Seasonal charts example Hajj operation charts are reviewed accordingly.

Page 42 of 172

Page 43: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

AERONAUTICAL COMMUNICATIONS DEPARTMENT 1.0 INTRODUCTION

The Aeronautical Communications department is responsible for the provision of Aeronautical Fixed Telecommunications Service, which entails timely exchange of all categories of messages and digital data necessary for the smooth, efficient, safe, regular and economical operation of air navigation services among the airports within Nigeria and between Nigeria and the neighbouring Countries; and beyond.

Page 43 of 172

Page 44: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

The Department is also responsible for the exchange of Aeronautical messages among corresponding ICAO contracting states in the world Aeronautical Fixed Telecommunications/Network (AFTN) System. Aeronautical Fixed Telecommunications Network is defined as a system of aeronautical fixed service for the exchange of messages/digital data between aeronautical fixed stations having the same or compatible communication characteristics.

It also formulates policies in respect of Aeronautical Telecommunications Services and ensures implementation of policy matters through directives to field offices. It maintains close liaison with Aeronautical Telecommunications Services of neighbouring Countries on matters concerning network availability, integrity, continuity and efficiency. It computes and forwards to ICAO Headquarters in Dakar, monthly circuit availability and performance reports on all our communications networks.

The Department is also responsible for the co-ordination and management of the Agency’s Telephone Services which is employed on the day-to-day administration of the Agency and as a means of immediate communication in the event of aircraft emergencies.

2.0 MISSION STATEMENT

Committed to ensuring timely and expeditious exchange of aeronautical messages/data for the safety, regularity, efficiency and economical operation of air navigation.

3.0 SERVICE PROVISION FOR AERONAUTICAL COMMUNICATION

S/NPRINCIPAL SERVICE

ROLE/DIVISION (UNIT) RESPONSIBLE/ STAFF/CONTACT DETAILS

SERVICE AVAILABILITY/QUALITY STANDARD/ TURNAROUND TIME FOR

CUSTOMER OBLIGATION/WHAT IS NEEDED TO DELIVER

LEGAL/ OTHER REGULATIONS TO BE COMPLIED WITH

FEES/CHARGES FOR SERVICE & PRODUCT

DELIVERY STANDARDS/PERFORMANCE TARGET QUANTITATIVELY/QUALITAT

COMMUNICATION/REPORT ON PERFORMANCE(KEY PERFORMANCE INDICATORS/

MONITORING ACTIVITY (HOW COMPLAINTS/CONFLICTS WILL BE

Page 44 of 172

Page 45: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

(EMAIL) DELIVERY EFFECTIVE SERVICE

WHERE APPLICABLE

IVELY OUTCOMES OR IMPACTS)

DEALT WITH)

1 Transmission and reception of ATS messages through Radio Telephony, Digital and Data Communication systems among airports within Nigeria and between ICAO contracting states

All Aeronautical Communications Centres at designated airports Email:[email protected]

Prompt transmission of the filed aeronautical messages to their appropriate addressees

Acknowledgement of receipt and timely dispatch of the message to its addressee(s)

In accordance with ICAO standard and recommended practices (SARPs), ICAO Annex 10 and ICAO transit time criteria

Not Applicable

Optimal standard for safety of air navigation in compliance with ICAO Standard and Recommended Practices (SARPs)

Communication system equipment and periodic checks on channel check transmission.

Through daily and monthly service message by competent duty supervisor(s)

2 Collates and computes monthly, quarterly and yearly circuit availability and performance reports in all our Networks, having predetermined circuit responsibility as required by NCAA and ICAO Regional Office in Dakar

AFTN/AMHS Statistical coordinating office in NAMA headquarters and all our formation.

Collation and accurate computation of statistical data received from all stations

Aviation regulatory body, NCAA

As required by ICAO Standard and Recommended Practices (SARPs) and the NCAA

Not applicable

Standard comprehensive and accurate statistical data for operational efficiency

Appropriate statistical data and performance reports determines effectual performance as required by ICAO

By the AFTN/AMHS coordinating office, NAMA Headquarters

Page 45 of 172

Page 46: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

3 Provision of Telephone Services and coordination through procurement of fixed desktop and distribution of Glo recharge cards to identified NAMA personnel on quarterly basis

Telephone Operation/Coordinating office, NAMA headquarters

Regular provision of recharge cards to staff on quarterly basis for ease of administration at headquarters and station level

Timely approval of this provision to enhance operation

As needed by deserved staff

Not applicable

Standard device as may be required

As an encouragement to staff

By the Telephone Operation/Coordinating office, NAMA headquarters and NAMA Management

4 Determines the acceptability of any aeronautical message brought for transmission on the AFTN/AMHS circuits

Duty Communicator/Officer at the traffic table

Ensures that the Routing Directory of the country’s Communication centres and those of the adjacent centres are in strict agreement with routing list for all categories of the AFTN/AMHS messages

Timely filling of messages and forward same for transmission

According to ICAO Standard and Recommended Practices (SARPs), Document 8585/FAA policies regarding acceptance of message for transmission

Not applicable

AFTN/AMHS message must carry predetermined addressee indicator

As required by ICAO

As would be directed by the duty communications officer and or watch supervisor

5 Provision of Telephone Services as rapid means of disseminating information relating to aircraft

Airport Telephone Operators domiciled at various airports

Timely response to calls for services as may be required

Modern PABX equipment to meet ICAO requirement

ICAO airport services manual, Part 3; Doc 9137 AN/898, Part 3

Not applicable

Effectual coordination of the relevant information as may be required

As applicable Regular maintenance of the equipment and replacement of warn-out ones to

Page 46 of 172

Page 47: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

incidents or distress situations and other emergencies within and around the airports

embellish and accord dignity to NAMA and personnel concerned

4.0 MECHANISM TO MONITOR PERFORMANCE TARGET

i. Monthly and continuous. To know systems performance by ICAO (International Civil Aviation Organization) Office.

ii. 24 hours continuous – for smooth, regular, efficient and economical operation of air navigation.iii. 24 hours continuous – To ensure immediate communication in the event of aircraft accident/incident or

emergencies, and the day-to-day administration in NAMA.iv. 24 hours continuous – To report status of equipment and systems in use.

Page 47 of 172

Page 48: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

AERONAUTICAL INFORMATION SERVICES DEPARTMENT

1.0 INTRODUCTIONThe basic purpose of Aeronautical Information Services (AIS) is to ensure seamless flow of Aeronautical data and Aeronautical information necessary for global Air Traffic Management System (ATM) safety, regularity, and efficiency in environmental sustainable manner. The management of seamless flow of Aeronautical data to ensure successful operation of Area of Navigation (RNAV) and Performance based Navigation (PBN), airborne computer-based Navigation system and data link system in such a manner that corrupt, erroneous, late or missing Aeronautical data and Aeronautical information would not affect the safety of air navigation.

2.0 MISSION STATEMENTCommitted to the efficient management and provision of aeronautical information necessary for the safety, regularity and efficiency of international air navigation.

Page 48 of 172

Page 49: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

3.0 SERVICE PROVISION FOR AERONAUTICAL INFORMATION SERVICE DEPARTMENT

S/N

PRINCIPAL SERVICE

ROLE/DIVISION (UNIT) RESPONSIBLE/ STAFF CONTACT DETAILS (E-MAIL/PHONE NUMBER

SERVICE AVAILABILITY/ QUALITY STANDARD/ TOURNAROUND TIME FOR DELIVERY.

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE.

LEGAL/ OTHER REGULATIONS TO BE COMPLIED WITH.

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/ PERFORMANCE TARGET QUANTITATIVELY/QUALITATIVELY.

COMMUNICATION/REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS)

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH )

1

Provision and Dissemination of Aeronautical data/Aeronautical information services.

International NOTAM Office (NOF)/ Centres.Email:

[email protected] or [email protected]

Timely Provision of Integrated Aeronautical Information Package (IAIP).

Feedback from Customers.Subscription to AIS products such as AIP and CHARTS.

ICAO STANDARDS AND RECOMMENDED PRACTICES (SARPS)ICAO ANNEXES15, 4 AND DOCUMENTS 8126, 7910.

Not applicable

High quality standard in syntax and semantics verification for the safety, regularity, efficiency and economic Air Navigation in accordance with ICAO Standards and Recommended Practices.

Through the implementation of Area Navigation (RNAV), Performance Based Navigation (PBN) and Data Link System, corrupt, erroneous, late or missing aeronautical data can potentially affect the safety of Air Navigation.

Through Quality Control and Qualitative System.

2Flight Planning Processing

ATS Reporting Office. (ARO)

24 Hrs. at the Major Airports.

Other Airports based on the hours of Operation.

Proper and timely filling of flight plan.

ICAO DOC. 8126, 7910 and 4444.

Not applicable

As many as possible in accordance with ICAO Standards and Recommended Practices.

Corrupt, erroneous, late or missing flight plan can potentially affect the safety of Air Navigation.

Post Flight Information Report is channeled to appropriate quarters.

3 Crew Briefing

ATS Reporting Office. (ARO)

24 Hrs. at the Major Airports.

Other Airports based on the hours of Operation.

Adherence to Pre-flight and Post-flight Information.

ICAO STANDARDS AND RECOMMENDED PRACTICES (SARPS)ICAO ANNEXES15, 4 AND

Not applicable

As many as possible in accordance with ICAO Standards and Recommended Practices.

Without Crew Briefing a Pilot could be flying into the unknown.

Pre-flight information in the ATS Reporting Office.

Page 49 of 172

Page 50: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

DOCUMENTS 8126, 7910.

4

Production and Distribution of Maps & Charts

Chart Services Working Hours, Monday to Friday.

Subscription and Purchase.

ICAO ANNEX 4 Standard Rates.

As many as possible in accordance with ICAO Standards and Recommended Practices.

Corrupt, erroneous, late or missing aeronautical data can potentially affect the safety of Air Navigation

Adequate scrutiny of raw data before production. Queries are promptly attended to.

5 NOTAM Promulgation

International NOTAM Office (NOF)/ Centres.

24 Hrs. at the NOF and Centres.

Acquisition and adherence to the information therein.

ICAO ANNEX 15 & DOC. 8126.

Not applicable

As many as possible in accordance with ICAO Standards and Recommended Practices.

A NOTAM is originated and issued promptly whenever the information to be distributed is of a temporary nature and of short duration for the safety of Air Navigation.

Through Quality Control and Qualitative System.

6 AIP Production

Publication [email protected] or [email protected]

AIRAC Dates.Subscription and Purchase.

ICAO STANDARDS AND RECOMMENDED PRACTICES (SARPS)

Standard Rates.

In compliance with AIRAC Dates and ICAO SARPs

Aeronautical Information of a lasting character essential to air navigation is issued by or with the authority of a State.

Through Quality Control and Qualitative System.

7 Flight Statistics

Statistics Units. Daily. Not

applicable.In accordance with AIS Manual of operations.

Not applicable

As many as possible and with regards to accuracy.

Hourly and Daily flight movements are computed for records and revenue purposes.

Records are cross checked with other departments.

Page 50 of 172

Page 51: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

4.0 MECHANISM TO MONITOR PERFORMANCE I. To collect, collate, edit and disseminate aeronautical information as specified by International Civil Aviation

Organization (ICAO ANNEX 15) three times in a year.II. To manage Aeronautical Information Publication (AIP), its amendment and supplement services and Aeronautical

Information Circulars (AIC) as specified by ICAO (ANNEX 15) example Hajj Operations. Iii To manage pre-flight and post-flight information bulletins.

Page 51 of 172

Page 52: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

ELECTRO-MECH DEPARTMENT1.0 INTRODUCTION

This department is set up with the responsibility of providing electromechanical services in terms of the followinga) Provision of reliable, regular and uninterruptible power supply b) Provision of serviceable, efficient and effective cooling systems, c) Ensuring serviceability of operational vehicles and pneumatic/hydraulic based equipment to enhance safe, efficient and

economic air navigation.d) Provision and maintenance of Tractor equipment for grass management to ensure noninterference with navigational

signals. 2.0 MISSION STATEMENTTo ensure a safe airspace through the provision of serviceable, usable and dependable electro-mechanical systems. 3.0 SERVICE PROVISION OF ELECTRO-MECH DEPARTMENT

S/N PRINCIPAL SERVICE

ROLE/ DIVISION (UNIT) RESPONSIBLE/ STAFF/CONTACT DETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL /OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/ PERFORMANCE TARGET QUANTITATIVELY/QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

1

PLANT

Email:[email protected]

200 HOURS OR THREE (3) MONTHS WHICH ONE COMES FIRST

AT REACH OF SERVICE HOURS OR 3 MONTHS WHICHEVER COMES FIRST

MANUFACTURER’S SPECIFICATION

PROVISION OF SERVICING MATERIALS/ SPARE PARTS FOR MAINTENANCE PURPOSE

3 HOURS

PROVISION OF SECONDARY POWER SUPPLY TO THE CNS FACIITIES AND ESSENTIAL OFFICES

THERE IS ALWAYS A FEEDBACK SYSTEM WHERE REPORTED FAULTS ARE FIXED IMMEDIATELY, DIRECTLY OR BY THE INTERVENSION Page 52 of 172

Page 53: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

OF TECHNICAL TEAM FROM HEADQUARTERS

2ELECTRICAL

[email protected]

DAILY ROUTINE MAINTENANCE AND CHECKS

REQUEST FROM AFFECTED OFFICE OR LOCATION

AS PER AGENCY NEED

STORE PROVISION OF MATERIALS

DEPENDING ON THE KIND OF FAULT

MEMO

FEEDBACK FROM THE USERS ARE RECORDED.

3REFRIGERATION AND AIRCONDITIONING

[email protected]

DAILY ROUTINE, MAINTENANCE AND CHECKS

ON REQUEST, PROMPT ATTENTION AND DEDICATED SERVICES

AS PER MANUFACTURER’S SPECIFICATION

STORE PROVISION OF MATERIALS

ON REGULAR BASIS DEPENDING ON DEMAND

MEMO

THE HEAD OF DEPARTMENT IN EACH STATION KEEP STATUS REPORT OF THE (SPS) WITH A VIEW TO ATTENDING TO ANY MALFUNCTIONING.

4. SOLAR POWER SYSTEM

[email protected]

DAILY ROUTINE MAINTENANCE AND CHECKS

AS MAY BE DEEMED NECESSARY DURING INSPECTION

AS PER MANUFACTURER’S SPECIFICATION

STORE PROVISION OF MATERIALS

ON REGULAR BASIS DEPENDING ON DEMAND

TO ENSURE CLEAN AND HEALTHY POWER SUPPLY TO CNS FACILITIES

THE HEAD OF DEPARTMENT IN EACH STATION KEEPS REPORT OF (SPS) WITH A VIEW TO ATTENDING TO ANY MALFUNCTIONING.

4.0 MECHANISM TO MONITOR PERFORMANCE System availability report Serviceability report Daily Report Monthly report.

Page 53 of 172

Page 54: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

ELECTRO-COMMS DEPARTMENT1.0 INTRODUCTION

Electronic-Communication department is responsible for the design, provision, Installation and maintenance of all Aeronautical Telecommunication Facilities and interconnection of such in line with ICAO Standard and Recommended Practices (SARP).

2.0 MISSION STATEMENT

To ensure a safe airspace through the provision of serviceable, available and reliable Communication Facilities.

3.0 SERVICE PROVISION OF ELECTRONIC-COMMUNICATION DEPARTMENT

S/N PRINCIPAL SERVICES

ROLE/DIVISION(UNIT)/STAFF RESPONSIBLE WITH CONTACT DETAILS(PHONE NO & E-MAIL)

SERVICE AVAILABILITY(QUALITY STANDARD & TURN AROUND TIME FOR DELIVERY

THE NEEDS FOR EFFECTIVE SERVICES

LEGAL/OTHER REGULATIONS TO COMPLY WITH

FEES/ CHARGES FOR SERVICES AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/PERFORMANCE TARGET (QUATITATIVE & QUALITATIVE)

REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATOR/OUTCOMES OR IMPACTS

HOW COMPLAINTS/CONFLICTS ARE DEALT WITH

1. RADIO COMMUNICATION BETWEEN AIRCRAFT & AIR TRAFFIC CONTROLLERS (REMOTE CONTROL AIR TO GROUND,127.3MHz SE & 120.9MHz SW). 128.5MHZ NW and 124.1MHZ

The HOD and STAFF of Electronic Communication Department at 4th floor MMIA.Email:[email protected]

This is dependent on various challenges that might arise which ranges from less than 24hrs to 2weeks max.

Prompt availability of respective spares and adequate equipment and on the job training backed with NCAA Doc on Licensed ATSEP Personnel.

NCAA Doc on Licensed ATSEP Officer.

Not Applicable

The services rendered are always in line with Standards and Recommended Practices as recommended by ICAO.

The output signal of communication between Controllers and pilots are interference free as recommended by ICAO.

Challenges are mostly resolved by knowledge and experience contribution of every licensed ATSEP Personnel

Page 54 of 172

Page 55: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

2. Aeronautical Fixed Telecommunication Network (AFTN) for data communication, i.e Flight Plan, NOTAM). Administrative messages.

The HOD and STAFF of Electronic Communication Department at 4th Floor Murtala Muhammed International Airport.Email:[email protected]

This is dependent on various degrees of challenges that might arise which ranges from less than 24hrs to 2weeks max.

Prompt availability of respective spares and adequate equipment and on the job training supported with NCAA Doc on Licensed ATSEP Personnel.

NCAA Doc on Licensed ATSEP Officer.

Not Applicable

The services provided are always in tune with Standards and Recommended Practices as recommended by ICAO.

The output signal of communication between Controllers and Pilots are interference free as recommended by ICAO.

Challenges are mostly resolved by knowledge and experience contribution of every Licensed ATSEP Personnel.

3. Controller-Pilot Data Link Communication for communication between Controller and pilot

The HOD and STAFF of Electronic Communication Department at 4th Floor Murtala Muhammed International Airport. Email:[email protected]

This is dependent on various degrees of challenges that might arise which ranges from less than 24hrs to 2weeks max.

Prompt availability of respective spares and adequate equipment and on the job training supported with NCAA Doc on Licensed ATSEP Personnel.

NCAA Doc on Licensed ATSEP Officer.

Not Applicable

The services provided are always in tune with Standards and Recommended Practices as recommended by ICAO.

The output signal of communication between Controllers and Pilots are interference free as recommended by ICAO.

Challenges are mostly resolved by knowledge and experience contribution of every Licensed ATSEP Personnel.

4 Air Traffic Service/ Direct Speech (ATS/DS). Between the Air traffic Controller and his counterpart on both international

The HOD and STAFF of Electronic Communication Department at 4th Floor Murtala Muhammed International Airport. Email:

This is dependent on various degrees of challenges that might arise which ranges from less than 24hrs to

Prompt availability of respective spares and adequate equipment and on the job training supported

NCAA Doc on Licensed ATSEP Officer.

Not Applicable

The services provided are always in tune with Standards and Recommended Practices as recommende

The output signal of communication between Controllers and Pilots are interference free as recommended by ICAO.

Challenges are mostly resolved by knowledge and experience contribution of every Licensed ATSEP

Page 55 of 172

Page 56: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

and local [email protected]

2weeks max.

with NCAA Doc on Licensed ATSEP Personnel.

d by ICAO. Personnel.

4.0 MECHANISM TO MONITOR PERFORMANCE

• In accordance with national ATM requirement, and in line with ICAO AFI CNS/ATM plan ICAO Annex 10, Vol. II & III

Page 56 of 172

Page 57: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

SURVEILLANCE DEPARTMENT1.0 INTRODUCTION

Surveillance department is responsible for the provision of efficient and effective radar coverage of the Nigerian Airspace and by so doing guarantees the safety of our airspace users.

2.0 MISSION STATEMENT

To ensure safety in Nigerian Airspace through the provision and sustenance of serviceable, usable, and reliable Surveillance Radar System that meets ICAO Standards and Recommended Practices for Air Traffic Management. (ATM)

3.0 SERVICE PROVISION OF SURVEILLANCE DEPARTMENTS/N PRINCIP

AL SERVICE

ROLE /DIVISION (UNIT) RESPONSIBLE /STAFF /CONTACT DETAILS (EMAIL, PHONE NUMBER)

SERVICE AVAILABILITY /QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION /WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL / OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS /PERFORMANCE TARGET QUANTITATIVELY /QUALITATIVELY

COMMUNICATION /REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS) OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS /CONFLICTS WILL BE DEALT WITH)

1 Provision of Radar Service

GM SurveillanceEmail:[email protected]

99.99% availability

Provision of adequate spare parts and training

ICAO SARPs Contact GM Commercial

(99.999% availability)

To achieve continuous availability of the Radar and allied services

There is continuous system monitoring and fault conditions observed are fixed immediately

4.0 MECHANISM TO MONITOR PERFORMANCE

Systems availability report Serviceability report

Page 57 of 172

Page 58: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

5.0 STAFF OBLIGATION

All staff of Surveillance Department must be accessible, courteous, responsive, reliable, and competent in all dealings with customers.

To ensure that all operational items of equipment are serviceable at all times.To ensure that the radar system is functional, reliable and available for Air Traffic Management

Page 58 of 172

Page 59: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

TERRESTRIAL SERVICES DEPARTMENT1.0 INTRODUCTION

Terrestrial Services department is responsible for the installation and effective maintenance of Aerodrome and Approach control Communication facilities for improved air Navigation. It undertakes systems engineering development implementation and Communications implementation in line with ICAO standards.

2.0 MISSION STATEMENT

Provision of safe and functional air navigation services (Total VHF/HF coverage) and air traffic voice network (ATCVN/VCS) that will meet international standards for effective and efficient Air traffic management

3.0 SERVICE PROVISION OF TERRESTRIAL SERVICES DEPARTMENT

S/N PRINCIPAL SERVICE

ROLE/ DIVISION (UNIT) RESPONSIBLE/STAFF/ CONTACT DETAILS (E-MAIL: PHONE NUMBER.

SERVICE AVAILABILITY/QUALITY STANDARD/TURNAROUND TIME FOR DELIVERY

CUSTOMERS OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL/ OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANARDS/ PERFORMANCE TARGET QUANTITATIVELY/ QUALITATIVELY

COMMUNICATION/ REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

1. Provision of VHF ground/ ground communication.

Email:[email protected]

*Services are rendered on a 24 hour basis.*The quality of the services provided are expected to be 99% efficient.*Complaints shall be addressed within a

*Cooperate with the authority of the Agency.*Channel their complaints to the appropriate authority.*Display courtesy in dealing with service providers.*Adopt the prescribed

*In accordance with national ATM requirement, and in line with ICAO AFI/CNS/ATM plan ICAO annex 10, vol. 1 v Total VHF/HF

Not Applicable

Clear ground/ ground conversation between airport users

*Reports can be made through; Phone calls, E- mails, through controller pilot conversation and reports to the maintenance officers on duty

Complaints should be forwarded to the Duty officer or HOD E/C In respective airport. Actions will be taken to address the complaints

Page 59 of 172

Page 60: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

maximum of 72 hours if genuine.

complaints procedures in seeking redress for service failure.

coverage of the nation airspace in line with CNS/ATM plan.

promptly.

2. Provision of VHF Air/Ground Communication.

Email:[email protected]

*Services are rendered on a 24 hour basis.*The quality of the services provided are expected to be 99% efficient.*Complaints shall be addressed within a maximum of 72 hours if genuine.

*Cooperate with the authority of the Agency.*Channel their complaints to the appropriate authority.*Display courtesy in dealing with service providers.*Adopt the prescribed complaints procedures in seeking redress for service failure.

*In accordance with national ATM requirement, and in line with ICAO AFI/CNS/ATM plan ICAO annex 10, vol. 1 v Total VHF/HF coverage of the nation airspace in line with CNS/ATM plan.

Not Applicable

Crystal clear conversation between Pilot and Air traffic controllers.

Phone calls, E- mails, through controller pilot conversation and reports to the maintenance officers on duty

Complaints should be forwarded to the Duty officer or HOD E/C In respective airport. Actions will be taken to address the complaints promptly.

3. Provision of HF ground/ground communication.

Email:[email protected]

*Services are rendered on a 24 hour basis.*The quality of the services provided are expected to be 99% efficient.*Complaints shall be addressed within a maximum of 72 hours if

*Cooperate with the authority of the Agency.*Channel their complaints to the appropriate authority.*Display courtesy in dealing with service providers.*Adopt the prescribed complaints procedures in

*In accordance with national ATM requirement, and in line with ICAO AFI/CNS/ATM plan ICAO annex 10, vol. 1 v Total VHF/HF coverage of the nation

Not Applicable

Clear ground/ ground conversation between airport users

Phone calls, E- mails, through controller pilot conversation and reports to the maintenance officers on duty

Complaints should be forwarded to the Duty officer or HOD E/C In respective airport. Actions will be taken to address the complaints promptly.

Page 60 of 172

Page 61: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

genuine. seeking redress for service failure.

airspace in line with CNS/ATM plan.

4. Provision of Airport- Wide Intercom Services.

Email:[email protected]

*Services are rendered on a 24 hour basis.*The quality of the services provided are expected to be 99% efficient.*Complaints shall be addressed within a maximum of 72 hours if genuine.

*Cooperate with the authority of the Agency.*Channel their complaints to the appropriate authority.*Display courtesy in dealing with service providers.*Adopt the prescribed complaints procedures in seeking redress for service failure.

*In accordance with national ATM requirement, and in line with ICAO AFI/CNS/ATM plan ICAO annex 10, vol. 1 v Total VHF/HF coverage of the nation airspace in line with CNS/ATM plan.

Not applicable

Intercom Telephone in offices within the airport must be serviceable

Phone calls, E- mails, through controller pilot conversation and reports to the maintenance officers on duty.

Complaints should be forwarded to the Duty officer or HOD E/C In respective airport. Actions will be taken to address the complaints promptly.

4.0 MECHANISM TO MONITOR PERFORMANCE

In accordance with national ATM requirement, and in line with ICAO AFI/CNS/ATM Plan ICAO annex 10, vol. iv; Total VHF/HF coverage of the nation airspace in line CNS/ATM plan.

WORKSHOP PLANNING AND LOGISTICS DEPARTMENT1.0 INTRODUCTION

Page 61 of 172

Page 62: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

The Workshop, Planning and Logistics (WPL) Department is one of the departments in the Directorate of Safety Electronics and Engineering Services. It was designed to Carry out third level maintenance of all faulty CNS/ATM facilities and oversee research, statistics, planning and maintenance logistics of CNS/ATM modules/ equipment to different locations in order to ensure continuous and consistent performance and increased operational efficiency of the Agency.

2.0 MISSION

To create continuous operational change that will rank NAMA among the best ANSPs globally, by setting standards and adopting industry best practices.

3.0 SERVICE PROVISION OF WORKSHOP PLANNING AND LOGISTICS DEPARTMENT

S/N PRINCIPAL SERVICE

ROLE/DIVISION (UNIT) RESPONSIBLE/ STAFF/CONTACT DETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL /OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/ PERFORMANCE TARGET QUANTITATIVELY/ QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

1 3rd level Repairs of CNS equipment

Repair of all CNS equipment for optimal performance of CNS facilities.

ICAO Central Workshop

GM (WPL)

Email: g

Services available on request

Serviceability of equipment through certification by customer

CNS Trained manpower with available advanced technological test gears

ICAO Standards and MOP

Not applicable

Certification

Performance Target is satisfactory

Quantity is measurable

Quality is good

Memo, logistics and feedback mechanism

The Timeline isOne to three daysDepending on the The availabilityof spare parts and the natureof the faults

General Manager and Director of Safety Electronic Engineering

Page 62 of 172

Page 63: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

[email protected]

and tools

2 CNS Planning, Research and Statistics

Monitoring of CNS equipment Status through daily / monthly collection of equipment availability status for planning and research purposes

CNS PRS Unit

GM (WPL) Email: Email: [email protected]

Daily service availability

CNS facilities Annual assessment and Evaluation.

Real time delivery of the CNS equipment availability services

Planning for Preventive and corrective maintenance routine.

Planning of maintenance procedures and planners

Information on the CNS service availability and equipment status at all the airport.

Real-time information on the CNS equipment status at all airports

Provision of Monthly reports from all stations.

Information on CNS Procurement

ICAO standards and MOP

Not applicable

Real-time

Availability and serviceability

Daily and Monthly reports on CNS equipment status.

Advise on CNS procurement

Supportive to CNS/ATM services for effective and efficient service delivery and a source of savings for the organization.

General Manager and Director of Safety Electronic Engineering

3 Spare Parts administration and Procurement Quality Control Assurance

Monitoring of CNS Spare parts/ equipment procurement for quality control assurance and its administration for accountability

Service on request Accountability and quality service delivery.

Collaborative equipment maintenance and repairs with

Effective maintenance of CNS facilities

Availability of Spares and adherence to

ICAO standards

Not applicable

Quality products Memo General Manager and Director of Safety Electronic Engineering

Page 63 of 172

Page 64: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

ICAO Central Workshop

GM (WPL) Email: Email: [email protected]

the Workshop. procurement procedures.

Non involvement with procurement on CNS facilities before and after procurement

4 CNS Logistics and Technical support in maintenance of CNS facilities

Movement of CNS spares to various station/location for maintenance purposes.

Logistics /Technical Support Unit

Email: [email protected]

Enhance maintenance of faulty CNS facilities at stations

Promote mean time maintenance

Coordination of site delivery for CNS Spare parts and equipment.

Good condition spare parts.

Conducive storage and packaging materials.

Adequate provision of fund

Availability of spare parts.

ATSES MOP and SOP

Payment of Logistics services.

Airborne and well packaged with feedback mechanism.

Satisfactory

Feedback mechanism.

Promote effectiveness and efficiency in the maintenance turn- around time for safety in the airspace

General Manager and Director of Safety Electronics & Engineering

5 CNS Data bank and Project documentation

Provision of CNS statistics for research and planning purposes.

Provision of Project/ equipment history with any modifications for future use.

Information on the CNS facilities their behavior with respect to downtime

ATSES MOP and SOP

Not Applicable

Authenticity of quality information

Memo and documents

Knowledge on the history and behavioral pattern

General Manager and Director of Safety Electronic Engineering

Page 64 of 172

Page 65: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Data bank and Documentation Unit.

Email: [email protected]

Maintaining an automated data bank for all CNS facilities at stations.

Documentation of all CNS maintenance activities of the directorates at the stations.

Documentation of CNS Calibrations records for all Navigational aids

Preparation of a business case for the AUTOMATED MAINTENANCE AND MANAGE MENT SYSTEM (AMMS) as part of the departments drive to re-engineer and automate the operational processes of the department

Information

rate.

Modifications on the system for adaptability to promote system efficiency and safety of the airspace.

of CNS facilities

Page 65 of 172

Page 66: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

given on request

4.0 MECHANISM TO MONITOR PERFORMANCE

Job Certification Form

Acknowledgment of Delivery Feedback

Availability of Statistical Report to internal and external customers

A reliable and one stop shop in CNS maintenance/ Repairs

NAVIGATIONAL AIDS DEPARTMENT1.0 INTRODUCTIONNavigational Aids Department is responsible for the provision of navigational aids for guidance of aircraft-in-flight for en-route, terminal approaches and landing aids by deployment of Conventional VHF Omni Directional Radio Range (CVOR), Distance Measuring Equipment (DME), Doppler VHF Omni directional Radio range (DVOR), Non-Directional Radio Beacons

Page 66 of 172

Page 67: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

(NDB), Instrument Landing Systems (ILS), VHF&UHF Direction Finders (VDF). Navigational Aids department procure, install, commissioned, operate and maintain the above navigational aids to meet ICAO SARPS as contained in Annex 10 Vol. I2.0 MISSION STATEMENT

To provide functional, safe and reliable air navigational aids services to users accurately at all times within the published service volumes in a cost effective manner.

3.0 SERVICE PROVISION OF NAVIGATIONAL AIDS DEPARTMENT S/N PRINCIPAL

SERVICEROLE /DIVISION (UNIT) RESPONSIBLE /STAFF /CONTACT DETAILS (EMAIL, PHONE NUMBER)

SERVICE AVAILABILITY /QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION /WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL /OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS /PERFORMANCE TARGET QUANTITATIVELY /QUALITATIVELY

COMMUNICATION /REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS) OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS /CONFLICTS WILL BE DEALT WITH)

1 Provision of terminal and enroute navigational aids by deployment of VOR/DME and NDB for provision of guidance signals to aircraft.

Navigational Aids Department

GM NAVAIDS

Email: [email protected]

Navigational aids services are available 24hrs/7 for major airports and en-route stations, and during operational hours only for other airports.

Turnaround Time of Delivery

From ≤30 minutes to 2 weeks depending on

The customer is expected to provide accurate reports to help deliver quality service to them.

Staff of the department are expected to respond promptly and courteously to customers and their needs.

The management is expected to provide tools, training and spares for effective service delivery to

NCARs

ICAO SARPS

ICAO DOCs and Bulletins.

NAMA MOPs & SOPs

Domiciled with NAMA Commercial department

Provide accurate, reliable and available navigational guidance signals complying with ICAO SARPS. Availability of 99.999%

Performance reports are channel through the air traffic control centres and through mails.

Monitoring achieved through Remote Control Systems/Status Displays in both Navaids office and ATC centre.

Reports from users of the facility and taking prompt actions for correction or rectifications

Page 67 of 172

Page 68: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

nature of fault. customers.

2 Provision of instrument landing systems collocated with distance measuring equipment (ILS/DME) for final approach and landing

Navigational Aids Department

Email:[email protected]

Navigational aids services are available 24hrs/7 for major airports and en -route stations, and during operational hours only for other airports

Turnaround Time of Delivery

From ≤30 minutes to 2 weeks depending on nature of fault.

The customer is expected to provide accurate reports to help deliver quality service to them.

Staff of the department are expected to respond promptly and courteously to customers and their needs.

The management is expected to provide tools, training and spares for effective service delivery to the customers.

NCARs

ICAO SARPS

ICAO DOCs and Bulletins.

NAMA MOPs & SOPs

Domiciled with NAMA Commercial department

Provide accurate, reliable and available navigational guidance signals complying with ICAO SARPS. Availability of 99.999%

Performance reports are channel through the air traffic control centres and through mails.

Monitoring is achieved through Remote Control Systems/Status Displays in both Navaids office and ATC centre.

Receiving reports from users of the facility and taking prompt actions for correction or rectifications

3 Provision of direction finders (VDF) for tracking of aircraft in flight which can also be used for search and rescue purposes.

Navigational Aids Department

Email:[email protected]

Availability

99.999%

Quality

Bearing errors ≤1º

Turnaround Time Of Delivery

From ≤30 minutes to 2 weeks depending on

Obligation

Making available the VDF for air traffic use in coordinating and controlling air traffic flows for enroute and approach phases of flights.

Effective delivery

Timely without

NCARs

ICAO SARPS

ICAO DOCs and Bulletins.

NAMA MOPs & SOPs

Domiciled with NAMA Commercial department

Provide accurate, reliable and available navigational guidance signals complying with ICAO SARPS. Availability of 99.999%

Performance reports are channel through the air traffic control centres and through mails.

Monitoring is achieved through Remote Control Systems/Status Displays in both Navaids office and ATC centre.

Receiving reports from users of the facility and taking prompt actions for correction or rectifications

Page 68 of 172

Page 69: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

nature of fault. delay at all times.

4.0 MECHANISM TO MONITOR PERFORMANCE The mechanism for monitoring performance of navigational aids is in accordance with NCAR and ICAO SARPS, which include the following

o Remote monitoring through the use of radio link/remote control systems, which continuously monitor a NAVAID system that is required to remain on air.

o Site monitoring involves physical visits to site in order to assess the operational status of the NAVAID during use, especially useful when the remote facility is inoperative.

o Automatic data logger on the NAVAID equipment monitor to provide detail times and duration of failures and changeovers occurring during the course of operation.

o The use of walkie-talkie sometimes to monitor the identity coding of the primary NAVAID system is an assurance of operational availability.

o Feedback from users provides a mechanism to monitor performance of the NAVAID infrastructure during operational use.Daily and Monthly reports from stations.

SAFETY MANAGEMENT SYSTEM /QUALITY ASSURANCE DEPARTMENT1.0 INTRODUCTION

The Safety Management System (SMS) department is responsible for ensuring that safety is maintained in the provision of Air traffic services within our airspaces and at aerodromes. The department manages the Agency’s safety improvement plan and ensures through proactive steps that “SAFETY CULTURE” is enthroned within the organization from TOP to BOTTOM.

Page 69 of 172

Page 70: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Furthermore, it aims at the adoption of “BEST PRACTICE” standards and partnership between “SAFETY and QUALITY” Management. It has a direct reporting line to the MD/CE on matters relating to safety.

2.0 MISSION

To ensure that air traffic incidents/accidents are reduced to as low as is reasonably practicable and acceptable level of safety is achieved in ATM operations.

3.0 SERVICE PROVISION OF SAFETY MANAGAEMENT SYSTEMS/N PRINCIPAL

SERVICEROLE/DIVISION (UNIT) RESPONSIBLE/ STAFF/CONTACT DETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL /OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS PERFORMANCE TARGET QUANTITATIVELY/ QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

1 To ensure that air traffic incidents/accidents are reduced to as low as is reasonably practicable and acceptable level of safety is achieved in ATM operations.

1. General SMS/QA Email:

[email protected]

24 Hours available/ 2 weeks turnaround time

Report any unusual circumstances and challenges encountered through mandatory occurrence reports (MOR), Unsatisfactory condition report (UCR) or air safety reports (ASR)

Nig. NCARS part 20, ICAO Annex 19 and NAMA SMS manual

Not Applicable

24 Hours available/ 2 weeks

NCAA, IATA and reporting airline. Email and hard copies

NCAA

Page 70 of 172

Page 71: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

4.0 MECHANISM TO MONITOR PERFORMANCE

When a change is made, further risk management is carried out to ensure that the hazard is effectively controlled and that the defense has not in itself created any new hazards. Hazard identification and risk assessment is an on-going process and is particularly important when:

o A major organizational change is being plannedo A new equipment or facility is being introducedo Existing equipment is being decommissionedo Introduction of new procedures is being plannedo Existing procedures are being revisedo Changes to key personnel are taking placeo There are changes to the legislation under which the agency operates

5.1 Records are kept of:

o Any reports received or issuedo Any safety recommendationso Any management action

SPECIAL DUTIES /TECHNICAL RESEARCH AND DEVELOPMENT DEPARTMENT1.0 INTRODUCTIONSpecial Duties/Technical Research and Development department is to routinely evaluate solutions that will lead to technology leap frog for the Agency and bring about accelerated and sustainable improvements in air traffic services provision. Also investigate why certain facilities or components fail often, find and develop solutions for the identified factors and perform other special functions (project management, budgeting, etc.) assigned by Management at any time.

Page 71 of 172

Page 72: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

2.0 MISSION STATEMENTChampion technical innovations and develop solutions to build a high performing organization.

3.0 SERVICE PROVISION OF SPECIAL DUTIES/TECHNICAL RESEARCH AND DEVELOPMENT DEPARTMENTS/N PRINCIPAL

SERVICEROLE/DIVISION(UNIT)/RESPONSIBLE STAFF/CONTACTDETAILS(EMAIL, PHONENUMBER)

SERVICEAVAILABILITY/QUALITYSTANDARD/TURN AROUN TIME FORDELIVERY

CUSTOMEROBLIGATION/WHAT IS NEEDED TO DELIVEREFFECTIVESERVICE

LEGAL/OTHERREGULATIONSTO BECOMPLIED WITH

FESS/CHARGESFORSERVICEANDPRODUCTSWHEREAPPLICABLE

DELIVERYSTANDARDS/PERFORMANCETARGETQUANTITATIVELY/QUALITATIVELY

COMMUNICATION/REPORT ONPERFORMANCE (KEY PERFORMANCE INDEX) OUTCOME OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/CONFLICTS WILL BEDEALTH WITH)

1 TECHNICALINNOVATIONAND DEVELOPMENT

GM SPD/TR&DEMAIL:[email protected]

TOP NOTCHTECHNICALSOLUTIONANDINNOVATION

RESEARCHGRANT,TRAININGANDMORALSUPPORT

ISO 9001: 2015ICAOANNEX 10AND SARPS

INTELECTUALPROPERTY

NUMBER OF TECHNICALRESEARCHREPORTS, INNOVATIONSAND SPECIALFUNCTIONSPERFORMED

CONTINUOUS IMPROVEMENT OF PROCESS AND SERVICES DUE TO TECHNICALRESEARCH AND DEVELOPMENT OUTCOMES

TECHNICALINNOVATIONANDIMPROVEMENTS

4.0 MECHANISM FOR MONITORING

Number and quality of research reports Quality of Special Duties leading to improvement of processes and services.

COMMERCIAL DEPARTMENT1.0 FUNCTIONS/STATUTORY BACKINGThe main function of the Commercial Department is to generate revenue for the Nigerian Airspace Management Agency (NAMA) in order to enable the Agency achieve its economic goals and objectives.

Page 72 of 172

Page 73: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Revenue generation in Air Navigation Service Provider (such as NAMA) is basically anchored on the Principle of Cost Recovery. ICAO Doc 9082 (ICAO’s Policies on Charges for Airports and Air Navigation Services) empowers every Service provider in Aviation to recover the cost of Services provided. Also Act 48 of 1999 (NAMA’s Act) drawing from the ICAO policy, states in Section III Paragraph 7 (r) that NAMA should ‘charge for all services’.The job of carrying out the above responsibilities is vested on the Commercial Department.Hence, the Commercial Department charges for all NAMA services, follows up on clients to ultimately ensure payment.It is therefore the duty of the Commercial Department to recover the cost of every Service rendered by NAMA.The Department is also responsible to recover all accruable revenues to the Agency even in form of debtsThe Commercial Department by this mandate represents NAMA globally on issues bothering on Charges i.e. - Policies, Implementation, Debt Recovery, Cost Recovery etc.

1.0 MISSION To actualize the economic objective of NAMA through efficient collation, assessment and invoicing of all NAMA Services/Properties and effective follow up on Clients to ensure the Agency receives payment.

2.0 VISION To make the Nigerian Airspace Management Agency (NAMA) one of the most economically viable and customer friendly Air Navigation Service Providers.

COST RECOVERY TECHNIQUES1. Identify the services rendered by NAMA2. Formulating a billing policy in line with International Best Practices3. Collection and collation of Data of services rendered (ADR16, EOL etc.)4. Quantifying service rendered in monetary terms by applying the billing formular (Billing and Invoicing)5. Raising Bills/Invoices to users of the services.6. Dispatching same Bills/invoices to clients7. Follow up on the Bills/Invoices to ensure payment.8. Ensuring full payment of all Bills/invoices e.g. Debt Recovery

Page 73 of 172

Page 74: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

3.0 SERVICE PROVISION OF COMMERCIAL DEPARTMENTS/N PRINCIPAL

SERVICEROLE/DIVISION (UNIT) RESPONSIBLE/ STAFF/CONTACT DETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL /OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS PERFORMANCE TARGET QUANTITATIVELY/ QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

1 Provision of bills and invoices for services rendered to Domestic scheduled & Non-scheduled Airline operators on receipt of flight data (AD16) daily & weekly for all Airports.

Domestic Billing UnitHOU.

Email:[email protected]

Process bills electronically using the Air traffic data (AD16) received from ATC outstations.Monthly bills and invoice to Domestic operators on/ or before 30th of the succeeding month.

Prompt settlement of bills within 30days of receipt of invoice.Qualitative flight data (AD16).Dedicated staff.Functional computers.

Operational Vehicle for dispatch of bills/invoices

NAMA Act of 1999.NAMA billing manual.AIP.

En-route and Terminal Navigation charges for Domestic operations.

Accurate monthly bills and invoices for payments.Zero tolerance for error and meeting the turnaround time.

Dedicated staff.Positive and sustained relationship with the Airlines.Aggressive debt recovery.Weekly and Monthly reports.

Reconciliation with Airlines.As also directed by GM Commercial.

2 Provision of Bills and Invoices for Overflight and En-route International Operators on IATA Invoicing & Settlement Platform

International Scheduled Billing Unit

Email:[email protected]

-Zero tolerance for error.

-On or before 14th of the succeeding month.

-Daily Electronic Flight Data rendition from Outstation.

-Serviceable and operational Computers

-NAMA ACT 1999 NO 48

-Aeronautical Information Circular (AIC)

-ICAO’s Policies Airport

-Overflight charge=USD75-International En-route =USD70-Terminal Nav Charge =USD199

-Accuracy and correctness of Bills

-Timeliness

Records of Transactions and Periodic monthly Reports

Reconciliationof Bills & Invoices through emails & Meetings as often as necessary.

Page 74 of 172

Page 75: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

and Printers for generating Data Reports and Bills.

-Availability of Network Internet Services.

Charges for Airport & Air Navigation Services.

3 Provision Of Bills and Invoices for Overflight and En-route International Operators on IATA Invoicing & Settlement Platform

International Scheduled Billing Unit

Email:[email protected]

-Zero tolerance for error.

-On or before 21st of the succeeding month.

-Daily electronic Flight Data rendition from Outstation.

-Serviceable and operational Computer and Printers for generating Data Reports and Bills.

-Availability of Network Internet Services.

-Operational Vehicle for Dispatch

-

-NAMA ACT 1999 NO 48

-Aeronautical Information Circular (AIC)

-ICAO’s Policies Airport Charges for Airport & Air Navigation Services.

-Overflight charge=USD75

-International En-route =USD70-Terminal Nav Charge =USD199

-Accuracy and correctness of Bills

-Timeliness

Records of Transactions and Periodic monthly Reports

Reconciliation of Bills & Invoices through emails & Meetings

4 Follow Up of International 7 days after -Serviceable -NAMA ACT Not Applicable -Timeliness -Acknowledged Reconciliation Page 75 of 172

Page 76: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Invoices for Payment

Scheduled Billing Unit.

Email: Email:[email protected]

delivery of Invoice

and operational Computers and Printers for generating Data Reports and Bills.

-Availability of Network Internet Services.

-Mobile Phone and Call cards.

-Operational Vehicle for Dispatch

1999 NO 48

-Aeronautical Information Circular (AIC)

-ICAO’s Policies Airport Charges for Airport & Air Navigation Services.

-Continuity& Persistence -Courtesy

-Excellent Relationship skills.-Excellent Presentation skills.

copies of letters.-Mail trails-Minutes of Meeting-Memorandum Of Understanding (M.O.U)

of Transaction Records.

5 Preparation of Records of Transactions

International Scheduled Billing Unit.

Email: Email:[email protected]

Immediately after invoicing

-Serviceable and operational Computers and Printers for generating Data Reports and Bills.

-NAMA ACT 1999 NO 48

-Aeronautical Information Circular (AIC)

-ICAO’s Policies Airport Charges for Airport & Air Navigation Services.

-Timeliness-Accuracy

Soft copy & Print-out of Airline Records of Transactions.

Reconciliationof Invoice andPayments, and Receipts withFinance Department.

Page 76 of 172

Page 77: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

6 Invoice Disputes Resolution

International Scheduled Billing Unit.

Email: Email:[email protected]

Within 30 days of receipt of the dispute by NAMA.

-Serviceable and operational Computers and Printers for generating Data Reports and Bills.

-Availability of Network Internet Services.

-Mobile Phone and Call cards.

-Operational Vehicle For Visitation to Clients’ Offices.

-NAMA ACT 1999 NO 48

-Aeronautical Information Circular (AIC)

-ICAO’s Policies Airport Charges for Airport & Air Navigation Services.

-Courtesy-Interpersonal skills-Professionalism-Firmness-

-Acknowledged copies of letters.-Mail trails-Minutes of Meeting-Memorandum Of Understanding (M.O.U)-Acceptance Report

Presentation of Primary data records to clients/to the Other Party.

7 Provision of Bills and Invoices for En-route for Non- Schedule/ Ad-hoc operators

Client Services unit

e-mail: [email protected]

Process bills electronically using the information provided on the Non-Schedules aircraft clearance documents received from the operators

Immediate settlement of bills for those payment at HQ, and settlement of bills at outstations for Payment On Landing (POL)/ Payment Before Departure (PBD) operations

NAMA Act of 1999, NAMA Billing Manual, AIP (Aeronautical Information Publication), ICAO’s policies, Airport charges for airports and Air Navigational Services

En- route and Terminal Navigation Charges

Accuracy and corrections of bills

Monthly report Reconciliation of bills and invoicing with airlines and outstations

Page 77 of 172

Page 78: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

8 Provisions of bills and invoices for En- route for Hajj Operations

Client Services unit

e-mail: [email protected]

Collection, collation and processing of reports submitted to GM Commercial by commercial officers that monitored the yearly Hajj flights combined with AD 16 of Hajj designated airports in conjunction with IATA Billing Unit

Settlement of the bills/ invoicing through the National Hajj Commission of Nigeria (NAHCON)

NAMA Act of 1999, NAMA Billing Manual, AIP (Aeronautical Information Publication), ICAO’s policies, Airport charges for airports and Air Navigational Services

En-route and Terminal Navigational Charge

Correctness and accuracy of bills

Agreed Hajj reconciliation bills report signed by both parties

Reconciliation of bills and invoicing with Hajj operators and signed MOU report by both parties

9 Provision of invoices for other charges for payment at HQ

Client Services unit

e-mail: [email protected]

Raising invoice for the revenue item based on the information provided and rates of the revenue item

Prompt settlement of the invoice at HQ

NAMA Act of 1999, NAMA Billing Manual, AIP (Aeronautical Information Publication), ICAO’s policies, Airport charges for airports and Air Navigational Services

Aeronautical and Non- Aeronautical revenues

Timely, accuracy and correctness of bills/ invoices

Monthly reports Reconciliation

10 Provision of invoices for agents, Annual

Client Services unit

e-mail:

Raising invoice for Annual Registration

Immediate settlement of the invoice by agents

NAMA Act of 1999, NAMA Billing Manual, AIP

Annual Registration Fee

Timely and accurate bills/invoice

Reminders for payment and monthly report

Reconciliation

Page 78 of 172

Page 79: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Registration Fee

[email protected]

Fee (Aeronautical Information Publication), ICAO’s policies, Airport charges for airports and Air Navigational Services

11 Liaises with all Airports, Departments, Units and other sister Organizations (like NCAA) to produce Overall Internally Generated Revenue (IGR) reports – Monthly, Quarterly and Annually.

Maintaining a durable and reliable Data Bank for the Department.

DATA BANK unit

e-mail: [email protected]

Prepare clear and concise revenue report.

Ensure that such reports and other deliverables are submitted in accordance with established schedule e.g. Monthly reports on or before 30th of the succeeding month.

Training needs.

KeepCoaching and mentoring of staff for greater efficiency.

Office space, furniture and deployment of latest technological facilities like computers, communication gadgets for Networking etc.

NAMA Act 48 of 1999.

AIC.

Provide precise and accurate information on Internally Generated Revenue (IGR) by sources.

Analytical and Pictorial chart records on the performance of revenue generation compared to a given annual target.

Budgetary allocation.

Policy guidelines on NAMA‘s expenditure outlay.

General Manager’s directives.

Page 79 of 172

Page 80: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Demonstrate knowledge and use of technology to improve services and operations.

12 Liaises with Nigerian Civil Aviation Authority(NCAA) for the collection of revenue generated on 5% includes:

a. IATA billing

b. Domestic Operations

c. Excess baggage international

d. Excess baggage Domestic

e. Cargo and mail International

5% TSC/CSCUnit

Email:[email protected]

All Billings are done in NCAA.Revenue on 5% shared by NCAA, NAMA, NIMET, NCAT and AIB.

Every Nigerian and Foreign carriers shall pay 5% of the total charge, in the currency in which they are being charged on air ticket, charter and cargo on monthly and weekly basis where applicable through IATA.

Civil Aviation Act 2006.

5% of all charges payable in Naira and Dollars.

Accurate monthly bills and invoices for payments. Zero tolerance for error and meeting the turnaround time.

Positive and sustained relationship with the management NCAA by NAMA management.Dedicated staff and provision of official vehicle to facilitate correspondence with NCAA.

Attend all meetings in NCAA on 5% particularly credit control committee meetings, involving visits to airlines for reconciliation on 5% charges outstanding debits.As also directed by GM Commercial.

Page 80 of 172

Page 81: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

f. Cargo and mail Domestic

g. Charter Operations

13 Provision of Invoices for Services rendered at both the Private and Government Aerodromes throughout the country

Aerodrome unit

e-mail: [email protected]

Raising of Invoices according to the M.O.U. duly signed by both NAMA and operators.

Prompt payment of Invoices raised.

Dedicated staff.

Functional Computers.

Adequate Staff Training.

NAMA Act 48 of 1999.

AIC.

Charges for Aerodromes as stipulated by their M.O.U.

Zero tolerance for errors.

Adequate meeting for reconciliation.

Positive and sustainable relationship with the airline.

Aggressive debt recovery.

Monthly report.

Reconciliation with operators.

Any other directives by the GM Commercial.

MECHANISM TO MONITOR PERFORMANCE o Assess Applications (requests) and charges for services being provided by the Agency as captured in the Airport Return

Data format (ADR16).o Prospect for additional sources of revenue such as Violation of Airspace, AFTN / Telephone, Sales of Aeronautical

Information Publication e.tc.o Offer commercial advice in respect of the agency’s activities on a monthly basis based on the revenue generation and

collection.o Reviewing and updating of revenue generation manuals e.g. billing manuals (As new Airports, route designation etc. are

established) and Commercial Bye Laws periodically.

Page 81 of 172

Page 82: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

INTERNAL AUDIT DEPARTMENT1.0 INTRODUCTION:The Internal Audit Department serves as a management control tool for financial and non-financial activities of the Agency. It ensures that the Agency carries out its operational activities in compliance with established rules and regulations. The Department also has the responsibility of ensuring that internal controls are adequate and effective to safeguard the assets of the Agency.2.0 VISIONTo ensure effective Internal Control System for the Agency.Committed to ensuring efficient management of the Agency’s resources through accountability without compromising safety in the Nigerian Airspace

3.0 SERVICE PROVISION OF INTERNAL AUDIT DEPARTMENT REVENUE AUDIT

S/N PRINCIPAL SERVICE

ROLE/DIVISION (UNIT) RESPONSIBLE/ STAFF/CONTACT DETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL /OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS PERFORMANCE TARGET QUANTITATIVELY/ QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

1. Over-flight gmaudi Checking is Timely submission -NAMA Act Not Ensuring that all Initiative, Discussing Page 82 of 172

Page 83: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Navigational charges

t @nama.gov.n g

done on daily basis. Monthly submission of Report

of Monthly IATA’s Report and AD 16 from billing units of Commercial Department

-Financial Regulations.

applicable overflights operation are captured on AD 16 and billed correctly.

Effective communication Team work and Compliance with financial Regulations.

Audit observations with relevant Officers for corrections.

2. International en-route charges

Checking is done on daily basis. Monthly submission of Report

Timely submission of Monthly IATA’s Report and AD 16 from billing units of Commercial Department

-NAMA Act-Financial Regulations.

Not applicable

Ensuring that all overflights operation are captured on AD 16 and billed correctly.

Initiative, Effective communication Team work and Compliance with financial Regulations.

Discussing Audit observations with relevant Officers for corrections.

3. Domestic Enroute/Terminal Navigational Charges

Checking is done on daily basis. Monthly submission of Report

Timely submission of Monthly IATA’s Report and AD 16 from billing units of Commercial Department

-NAMA Act-Financial Regulations.

Not applicable

Ensuring that all domestic operations are captured on AD 16 and billed correctly.

Initiative, Effective communication Team work and Compliance with financial Regulations

Discussing Audit observations with relevant Officers for corrections.

4. Unscheduled flight operators and Bulk Cash depositors

Checking is done on daily basis. Monthly submission of Report

Timely submission of Aircraft Clearance and AD 16 from billing units of Commercial Department

-NAMA Act-Financial Regulations.

Not applicable

Ensuring that all Unscheduled operation are captured on AD 16 and billed correctly.

Initiative, Effective communication Team work and Compliance with financial Regulations.

Discussing Audit observations with relevant Officers for corrections.

5. 5% Ticket Sales ChargesCargo sales charges (5% TSC/CSC)

Checking is done on daily basis. Monthly submission of Report

Timely submission of Monthly 5% TSC CSC Report from NCAA

-NAMA Act-Financial Regulations.

Not applicable

Ensuring that the amount made available for sharing in any Month is the total collections in the Month and that NAMA’s share is actually 23%.

Initiative, Effective communication Team work and Compliance with financial Regulations.

Discussing Audit observations with relevant Officers for corrections.

6. Aerodrome/ Air Traffic

Checking is done on

Timely submission invoices from the

-NAMA Act-Financial

Not applicable

Ensuring that all operations are

Initiative, Effective

Discussing Audit

Page 83 of 172

Page 84: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Service Charges

daily basis. Monthly submission of Report

Commercial Department.

Regulations. paid for. communication Team work and Compliance with financial Regulations.

observations with relevant Officers for corrections.

7. Fines, Sales of AIP and Licensing Fees etc.

Quarterly checking is done on daily basis. Monthly submission of Report.

Timely submission invoices from the Commercial Department.

-NAMA Act-Financial Regulations.

Not applicable

Ensuring that all operations are paid for.

Initiative, Effective communication Team work and Compliance with financial Regulations.

Discussing Audit observations with relevant Officers for corrections.

EXPENDITURE AUDIT

S/NO

PRINCIPAL SERVICE

ROLE/DIVISION (UNIT) OF CUSTOMERS RESPONSIBLECONTACT DETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL /OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/ PERFORMANCE TARGET QUANTITATIVELY/ QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

1 Assignment of responsibilities to staff of the department

gmaudit @nama.gov.ng

Staff completeness of required documentation and the MD/PTB/Ministerial

Condition of Service, Financial Regulation and other extant rules

Not applicable

8AM-4PM And has the need arises 1/100%

Reports to Management as the need arises

Discuss audit observations with relevant customers (officers)

Page 84 of 172

Page 85: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Approval/Federal Executive Council Approval and Budgetary provision

with a view to correcting errors observed.

2 STAFF/PENSION PAYROLL AUDIT

BUDGET DEPARTMENT, PENSION UNIT, ICT DEPT. SALARY/PENSION UNIT FINANCE/TREASURY DEPT.

-Microsoft payroll module (Ax dynamic) prompt submission of salary and pension inputs from outstations for Audit purpose

-Availability of reliable IT hardware Infrastructures with capacity to support Microsoft ERP

-NAMA CONDITIONS OF SERVICE (COS)-SALARY CHART

Not Applicable

24days /100% Reports to Management as the need arises

Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

3 EXPENSES AUDIT (PAYMENT VOUCHERS, STAFF CLAIMS,

User department, approving authorities i.e. MD/CEO, PTB, MTB, Budget Unit, Treasury Unit.

24hours except otherwise

Complete documentation: MD'S Approval Budgetary provision.

Procurements Act, Financial Regulation, NAMA COS

Not Applicable

24hours or as the case may be

Reports to Management as the need arises

Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

4 PROCUREMENT AUDIT

-Budget Unit,- User

72 HRS -Notice of procurement

-Procurement

Not Applicable

REPORT TO GM AUDIT

Reports to Management as

Discuss audit

Page 85 of 172

Page 86: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

department -Procurement department PPC/PTB-Stores department -Legal department -Accounts/Finance departments

planning committee completeness of bid submission, -Request for procurement of items from relevant department. Budgetary provision MD/CEO Approval PTB Approval, MTB or FEC Approval as the case May be, proof of compliance of the Public Procurements. Act provisions

Act,-Financial Regulation

the need arises observations with relevant customers (officers) with a view to correcting errors observed.

5 ACCOUNTS PAYABLE AUDIT

Budget department, Procurement department, PMO Dept, Stores Dept. Estate dept. Treasury Unit

Procurement advertisement for the year, Bid documents, letter of Award, Project Contract agreement, LPO or Job Order, Submission of Payment certificate as evidence of work carried out by the contractor, Evidence of Audit verification of supplies (goods, works or projects), Budgetary

FINANCIAL REGULATION/BPP/EXTANT RULES

Not Applicable

24Hrs Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

Page 86 of 172

Page 87: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Provision, Accurate deduction of relevant taxes from the contract sum, submission of Advance payment Guarantee for relevant project,

6 PERIODIC AUDIT OF OUTSTATION

STATION ASMs,ACCOUNTANTS AND OTHER HODs

QUARTERLY -Observations of previous audit, list of funds released, list of store items issued

-MGT DECISION-Financial Regulations

Not Applicable

REPORTING 5 working Days Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

7 Stores Audit User Depts., Stores Dept., Expenditure Audit unit

Monthly -LPOs-Goods Received Note (GRN)-Store Requisition with relevant approvals,-Bin Cards-Physical Stores

FINANCIAL REGULATION/EXTANT RULES

Not Applicable

24hours as the need arises

AUDIT REPORTS Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

8 Treasury Audit Expenditure Control Unit, Salary/Pension Unit, Payable Unit, Tax/Insurance

Quarterly -Audited payment vouchers-MD'S second approval-mandate list-cashbook

Condition of service, Financial Regulation and other extant rules

Not Applicable

quarterly REGULAR AND QUARTERLY REPORTS

Discuss audit observations with relevant customers

Page 87 of 172

Page 88: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Unit & Staff Account Unit

-Bank statements-Bank Reconciliation Statement

(officers) with a view to correcting errors observed.

9 Insurance Audit Procurement Dept. Budget Dept, Insurance/Tax Unit/Treasury Unit

Quarterly Fixed Asset schedule, Insurance Policy certificate for ‘workmen compensations and Fixed asset

Insurance Act and other Extant Rules.

Not Applicable

100% Annually Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

10 Tax Audit Procurement Dept., Insurance/Tax Unit/Treasury Unit & Account Payable Unit

Quarterly -Tax schedules for PAYE, stamp duty, WHT&VAT -Evidence of Tax remittance.-Tax clearance certificates

CITN and other Extant Rules

Not applicable

75% Quarterly. Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

11 Fixed Asset Audit

-User depts. -Procurement

Dept, -Expenditure Control Unit - Store Unit,

-Fixed Asset Unit, -Finance/Treasury

Units

Quarterly -Fixed asset Register for HQ and Outstations Depreciation Policy document-Net book values.-physical verification.

FINANCIAL REGULATION, IPSAS AND OTHER EXTANT RULES

Not Applicable

8AM – 4PM AS THE NEED ARISES

Reports to Management as the need arises

Discuss audit observations with relevant customers (officers) with a view to correcting

Page 88 of 172

Page 89: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

errors observed.

12 AGO/PMS SUPPLY

User depts. Procurement Dept, Expenditure Control Unit Store Unit, Expenditure Audit Unit, Finance/Treasury Dept./Logistics Dept.

-Stores records for receipt and issue of product-physical verification of balance.

Haulage bar

Procurement Acts-Financial Regulation

Not Applicable

Regular and Quarterly Report

Reports to Management as the need arises

Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

13 Capital Projects Audit

-Estate Dept.-Electro-Mechanical /Surveillance/ICT/Communications/ Legal Procurement Departments. -Project Contractor-Creditors unit-Expenditure Audit unit-Treasury and Budget Units.

Procurement Advertisement, Budgetary Provision, Bid documents, Technical and Financial Evaluation Reports, MD/PTB/MTB/FEC Approval as the case may be, Contract Award, project contract Agreement, Bill of Engineering Measurements and Estimate (BEME) OR Bill of Quantities (BOQ) for a project, Contractors' invoices, Job Completion Certificate , Evidence of

Procurement Act and other Extant Rules

Tender fee 8am – 4pmAs the need arises

Reports to Management as the need arises

Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

Page 89 of 172

Page 90: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Audit. Verification.

14 Final Account Audit

-Final Account Unit

Quarterly Provision of:-SJVs-Ledger Accounts-trial balance-Bank balances-Asset/other Schedules-Statement of financial position.-Comprehensive Income Statement.

IPSAS and Financial Regulation

Annual Not Applicable Reports to Management as the need arises

Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

15 Annual Staff/Pension Audit

Human Recourses Dept./Pension Unit/Pension payroll unit and Audit Dept.

3 Days STAFF AUDIT:Physical appearance of staff with identification e.g. Letter of Appointment, Confirmation and, ID Card PENSIONER AUDIT: Letters of Appointment, Confirmation and Retirement,Physical sighting of Pensioners.

C.O.SPension Act.

Not Applicable

Annual Reports to Management as the need arises

Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

16 End of Year Stock Taking

Audit , Finance and Stores Departments

3 days -Preprinted stock sheets.-Bin Cards-Physical Store Items.

Financial Regulation

Not applicable

Annual Reports to Management as the need arises

Discuss audit observations with relevant customers (officers) with a view to

Page 90 of 172

Page 91: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

correcting errors observed.

17 Interface with the office of Auditor General for the Federation

GM (Audit)/ Final Accounts, Branch Accounts Units

Quarterly Submission of Relevant Documents

Financial Regulation

Annual Reports to Management as the need arises

Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

18 Interface with the office of Accountant General for the Federation

GM (Audit)/Final Accounts, Branch Accounts Unit

Quarterly Submission of Relevant Documents

Financial Regulation

Annual Reports to Management as the need arises

Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

19 Interface with External Auditors

GM (Audit)/Final Accounts, Branch Accounts Unit

Annually Discussion of observation for appropriate action.

Financial Regulation

Not Applicable

30 days Reports to Management as the need arises

Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

20 Fraud MD/CEO, GM As the need Evaluate Internal Financial Not 5 working days 100% Discuss

Page 91 of 172

Page 92: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Investigation Audit/ HR Dept arises controls to access fraud /Risk arrears, Investigate Fraud and advise Management

Regulation Applicable audit observations with relevant customers (officers) with a view to correcting errors observed.

21 Evaluation of System of Internal Controls

Audit dept , ICT dept

Continuous Ensure the Controls Embedded in the system are not compromised

Financial Regulations, IPSAS and other Extant Rules

Not Applicable

75% Reports to Management as the need arises

Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

22 Operational/Compliance Audit

Audit Dept Continuous Monitor Adherence to regulatory rules eg -International Civil Organization(ICAO) standard-Extant Rules

C.O.S, Financial Regulations and other Extant Rules

Not Applicable

8am – 4pm/ as the need arises

Reports to Management as the need arises

Discuss audit observations with relevant customers (officers) with a view to correcting errors observed.

2.0 MECHANISM TO MONITOR PERFORMANCE

• Reviewing issues that require further necessary actions by management (periodically)

Page 92 of 172

Page 93: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

• Audit report to management (quarterly)

• Verification of expenditures to ensure compliance with financial rules and regulations (daily)

• Ensure compliance with contractual agreement and other terms (as voucher is being processed)

• Ensure goods supplied are of high quality/right quantities as stated in the LPO and ensure value for money.

• Stock taking (Bi-annually)

• Prompt processing of documents

• Completion of assignment within stipulated time.

• Adherence to the extant rules and regulation.

Page 93 of 172

Page 94: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

BUSINESS DEVELOPMENT AND INVESTMENT DEPARTMENT1.0 INTRODUCTION

The Business Development and Investment Department is responsible for exploring and developing aeronautical and non-aeronautical Business opportunities for the Agency.

2.0 MISSION STATEMENT

To increase revenue generation of the Agency through diversified Business ventures.

3.0 SERVICE PROVISION OF BUSINESS DEVELOPMENT

S/N PRINCIPAL SERVICE

ROLE/DIVISION (UNIT) RESPONSIBLE/ STAFF/CONTACT DETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL/ OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/PERFORMANCE TARGET QUANTITATIVELY/ QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

1 Identification of new Business Opportunities

Business planning &research Email:[email protected]

Gather relevant information from ICAO documents& publications, Business Journals/ requests, adverts in media, official requests/tender

Management's approval

Not applicable Not applicable

Quarterly Submission of findings/ recommendations via memo

Meetings &discussion with stakeholders

2 Review of Business Categorize tariffs & Negotiation with Provide To be Periodically New tariff/ rates Provision of

Page 94 of 172

Page 95: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

tariffs planning & research

analyze by effective date of implementation/ debt status /payment patterns/tariff class

Airline operators/ other customers/ partners & relevant stakeholders& Management's approval

Memorandum of Understanding

determined relevant information/data &relationship management

3 Preparation of Business cases

Business planning & research

Prepare business justification for proposals from i.e, stations, depts. & prospective business partners

Management's approval/ support & collaboration with relevant depts./stations

Not applicable To be determined

Periodically New Business/ investment/revenue

Meetings & discussion with stakeholders

4 Revenue evaluation & Analysis

Business planning & research

Collect revenue/investment statistics, make comparative analysis& set new targets

Submission of revenue data/statistics

Not applicable To be determined

Quarterly/Annually

Improved revenue

Meetings & discussion with stakeholders

5 Management of fixed assets

Marketing & Investment unit.

Lease, propose ways to utilize assets, regularize property status & managing data base on properties.

Submission of company profile & certificate of incorporation, tax returns, ICRC certification if need arises, &any other document required/ mgts. Support/ approval

Signing Memorandum of understanding after negotiations are concluded

To be determined

Periodically Increase in revenue

Meetings & discussion with stakeholders

6 Implementation of new Bus. Proposals

Marketing & Investment unit.

Determine Business options/evaluating prospective partners

Submission of company profile & certificate of incorporation, tax returns, ICRC certification if

Signing Memorandum of understanding after negotiations are concluded

To be determined

Periodically Increase in revenue

Meetings & discussion with stakeholders

Page 95 of 172

Page 96: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

need arises, &any other document required/ Management’s support/ approval

7 Marketing & promotion

Marketing & Investment unit.

Marketing & promoting services, meet with existing customers, designing of promotional strategies, receive & analyze feedback

Management's approval/ support &collaboration with relevant depts.

Not applicable Not applicable

Regularly Increase in patronage/revenue

Meetings & discussion with stakeholders

8 Determination of rates& charges

Business devt. & evaluation unit

Project cost, benchmark price/costs

Collaboration with other depts. & Mgt.'s approval

M.O.U when necessary

To be determined

Periodically Increase in revenue

Meetings & discussion with stakeholders

9 Evaluation of business proposals

Business devt. & evaluation unit

Develop criteria for evaluation & rank proposals for eligibility

Business proposal, company profile & cert. of incorporation& other relevant documents

Not applicable Not applicable

Regularly Increase in revenue

Meetings & discussion with stakeholders

10 Negotiation of equity

Marketing & Investment unit.

Valuation of Assets, cost assessment

Business proposal, company profile/proposed equity contribution & cert. of incorporation & other relevant documents

Signing Memorandum of understanding after negotiations are concluded

Not applicable

Periodically Increase in revenue

Meetings & discussion with stakeholders

11 Framework for Public Private

Identifying, prioritizing, selecting and

Going by global best practice

Managements Approval

Signing of MOU after negotiations

To be determined

Periodically Increase in patronage

Provision of relevant info/relations

Page 96 of 172

Page 97: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Partnership

deploying the appropriate PPP models.

PPP Unit

hip mgt

12 Financial and risk assessment in all PPP transactions

Assessing the policy, legal and institutional environment for involving the private sector in the provision of infrastructure.

PPP Unit

Gather relevant information from documents and publication and carry out risk analysis

Management’s Approval

To be determined

Quarterly Relationship Management

13 Negotiation of PPP

Use financial models to ensure viability. PPP Unit

Signing of agreement (MOU)

MGT Approval

Signing of MOU

To be Determined

Periodically Increase in Revenue

Meeting/ discussion with stakeholders

14 Project Monitoring

Ensure that necessary inputs are put in place.

Ensuring value for money

Review to ensure compliance

Not applicable Not applicable

Quarterly Increase revenue Meet with stakeholders

Page 97 of 172

Page 98: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

PPP Unit

4.0 MECHANISM TO MONITOR PERFORMANCE

Regular preparation of marketing strategies for departmental projects. Market survey and application of market Intelligence. Benchmark activities with other ANSPs and relevant Aviation and Allied organizations. Periodic reporting and assessment of departmental activities.

Page 98 of 172

Page 99: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

PLANNING, RESEARCH AND STATISTICS DEPARTMENT 1.0 INTRODUCTIONThe Planning, Research and Statistics Department is responsible for producing policy guidelines which will enable the delivery of positively defined services in NAMA and the Aviation Industry in consonance with ICAO (International Civil Aviation Organization’s) practices and procedures2.0 MISSION STATEMENTTo ensure timely collection, production and presentation of reliable data for planning and decision making, through the deployment of information Management Tools.3.0 SERVICE PROVISION

S/N PRINCIPAL SERVICE

ROLE /DIVISION (UNIT)RESPONSIBLE /STAFF/CONTACT DETAILS (EMAIL)

SERVICE AVAILABILITY/ QUALITY STANDARD /TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL/ OTHER REGULATIONS TO BE COMPLIED WITH

FEES / CHARGES FOR SERVICE AND PRODUCTS WHERE APPLICABLE

DELIVERY STANDARDS/ PERFORMANCE TARGET QUANTITATIVELY/ QUALITATIVELY

COMMUNICATION/REPORTING ON PERFORMANCE (KEY PERFORMANCE INDICATORS/OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

1 PLANNING Production of standard policy guidelines and framework that coordinates, evaluates and monitors management policies and programmes for effectivenessEmail:[email protected]

A) Ensuring quality projects with timely delivery B) Subject to Project need

Effective planning and delivery

Based on Contractual Agreements

Not Applicable

High quality based on scope of work and specification

The KPI’s are based on project deliverables

Head of Department

2 Research and

To establish differential in

It helps to underscore the

Through reliable and

Based on acceptable

Not applicable

Periodic assessment of

Improved service delivery

Head of Department

Page 99 of 172

Page 100: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Development

programmes and projects

extent of success of development programmes and projects of the Agency

adequate data for speculative and future uses

methods of information gathering

impact outcomes and output to ascertain effectiveness of the research

3 Maintain Data Bank

Collection, Collation, Organize, Analyze and Interprete.

A) Daily, Weekly, Monthly and Annually (Based on availability of data)B)24 working hours turnaround time

Accuracy and reliability of data

To ensure that only standard data collection techniques are applied

Not applicable

Sample survey, interview, questionnaires, observation, investigation and records study

Authenticity and reliability of data to enhance service delivery

Head of Department

4 Freedom of Information

To inform, make available and disseminate information about services provided

A) Providing available informationB) Maximum of seven (7) days

Prompt and timely release of information

FoI Act 2011 Charge only where applicable

1) Open and transparent release of information as requested 2)Prompt delivery of information required by FoIA 2011

Timeliness and reliability of information on released

Head of Department

5 Monitoring and Evaluation

Evaluation and assessment of Agency’s projects in line with core mandate

Follow up on project implementation and performance to ensure effectiveness and optimum results

Effective monitoring

In line with global best practices and contractual agreements

Not applicable

Very high standards in line with the design and based on globally acceptable standards of safety in Aviation

To be in sync with some strategic development goals (SDG,s) as it relates to Aviation

Head of Department

4.0 MECHANISM TO MONITOR PERFORMANCEPage 100 of 172

Page 101: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Establishment of data bank capable of serving the needs of the organization and that of the entire Aviation industry for safe, efficient, effective and Economic Air Navigation Services.

To assist Management in planning and to monitor planning implementation to ensure effective result and advise Management on areas of adjustment.

To advise the Organization on Economic, Social, Technical and Operational implication of its plans and objectives

STORES AND EQUIPMENT

Page 101 of 172

Page 102: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

1.0 INTRODUCTIONThe Equipment and Stores department is responsible for receipt, storage and issuing of quality materials and equipment to end users, with the view of achieving a seamless operation to ensure a safe airspace. The department consists of four (4) major stores, and three other units, namely:

1. GENERAL STORES2. ELECTRO-MECHANICAL STORES3. COMMUNICATION, NAVIGATIONAL & ICT STORES4. FURNITURE STORES5. INVENTORY CONTROL UNIT6. RECEIVING UNIT7. STORES ADMIN/REPLENISHMENT UNIT

2.0 VISION STATEMENTAssuring prompt receipt and issuing of items to end users without hindering operations3.0 MISSION STATEMENTTo ensure prudent management of NAMA’s material resources towards providing safe and functional air navigation services. 4.O SERVICE PROVISION OF STORES AND EQUIPMENT

S/N PRINCIPAL SERVICE

ROLE/DIVISION (UNIT) RESPONSIBLE/ STAFF/ CONTACT DETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL/OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/ PERFORMANCE TARGET QUANTITATIVELY/QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/CONFLICTS WILL BE DEALT WITH)

1 RECEIVING OF ITEMS INTO THE STORES

[email protected]

RECEIVING: (1HOUR) -(DEPENDING ON VOL OF ITEMS)

INSPECTION - (1HOUR)- DETERMINED

(EXTERNAL CUSTOMERS)PRESENTATION OF GENUINE AUTHORISED & APPROVED NAMA LPO OR JOB ORDER.

STORE PROCEDURAL MANUAL

STORE CHARTER SERVICE LEVEL

NIL TO ENSURE PRUDENT, EFFECT IVE AND EFFICIENT MATERIAL

MANAGEMENT IN THE AGENCY

FREE FLOW/AVAILABILITY OF ITEMS

ENSURING SEAMLESS AND SPEEDY FLOW OF ITEMS FOR AIR

ALL CUSTOMERS SHALL BE TREATED WITH DIGNITY.

ANY AGGRIEVED   

Page 102 of 172

Page 103: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

BY AUDIT & USER DEPARTMENT.

RAISING GRNS- (1HOUR)- DEPENDING ON VOL OF ITEMS

TRANSFER TO APPROPRIATE STORE - (2HOURS)

DOCUMENTATION (INVENT- ORY CONTROL POINT) (1 HOUR)

FINAL EXIT OF DOCUMENT FROM GM STORES TO AUDIT DEPT.- (10MINUTES)

ADHERENCE TO RIGHT SPECIFICATIONS.

ADHERENCE TO RIGHT QUALITY & QUANTITY

ADHERENCE TO RIGHT QUALITY & QUANTITY

ADHERENCE TO RIGHT QUALITY & QUANTITY

AGREEMENT

NAMA CONDITION OF SERVICE

FINANCIAL REGULATION

BUDGETARY PROVISION

NAMA MANAGEMENT CIR CULAR & APPROVALS.CIVIL SERVICE RULES.

FEDERAL GOVERNMENT

MEMOS & DIRECTIVES

FOR THE PURPOSE OF SUPPORTING THE PROVISION OF SAFE AND FUNCTIONAL AIR NAVIGATIONAL SERVICES IN LINE WITH ICAO STANDARD, OTHER RECOMMENDED PRAC TICES AND INTERNALLY SET STANDARDS.

ASSURING PROMPT RECEIPT AND ISSUING OF ITEMS TO END USERS WITHOUT HINDERING OPERATIONS.

SAFE TY PURPOSE IN ACCORDANCE TO INTERNATIONAL BEST PRACTICES (ICAO STANDARD).

CUSTOMER HAS THE RIGHT TO BE HEARD

COMPLAINT(S)/ GRIEVANCE SHALL BE ADDRESSED WITHIN A MAXI MUM OF SEVENTY- TWO HOURS (72)-

IF GENUINE AND PRESCIBED DOCUMENTS ARE PROVIDED IN GOOD TIME.

ALL COMPLAINT(S) SHALL BE DIRECTED TO GENERAL MANAGER (EQUIPMENT& STORE) IF COMPLAINT

2 ISSUANCE OF ITEMS FROM STORES

ISSUANCE : OTHER

DEPARTMENTS

(B) ISSUANCE DEPARTMENTAL REQUISITIONS TO STORES.

TREATMENT OF

(B) ISSUANCE INTERNAL CUSTOMER(STAFF)CLEAR AND LUCID STORE

Page 103 of 172

Page 104: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

REQUISITION BY THE GM (E&S)- (10MINUTES)

ALLOCATION OF ITEMS BY DGM (OPS) -(15MINUTES)

TREATMENT OF REQUISITION BY THE STORES CONCERNED (15 MINUTES)

REQUISITION

PROPER NAMING OF ITEM S FROM REQUISITIONING OFFICER

ADHERENCE TO STORE PRINCIPLE OF ITEM CLASSI FICATION

PROPER AND ADEQUATE

CNS STORE

MECHANICAL STORE

GENERAL STORE

FURNITURE STORE

INVENTORY CONTROL FOR FINAL POSTING INTO STORE LEDGERS & SYSTEMS - (30MINS)

FINAL APPROVAL FOR REL EASE AND ISSUANCE BY GM (E& S) (10MINUTES)

FINAL RELEASE OF THE ITEMS BY THE STORE CONCER NED TO THE AUTHORISED - RECIPIENT- (IHOUR)

IMPUTATION OF STOCK FOLIO AND NUMBERS

ELIMINATION OF AMBIG UITIES AND REPETITIVE REQUEST -

Page 104 of 172

Page 105: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

3

OTHER CORRESPONDENCES

GM AUDIT

GM E&S

EXTERNAL AUDITORS

(C) OTHER CORRESPONSES MONTHLY REPORTS 2ND WEEK OF EVERY NEW MONTH.

MEMO, LETTERS , FROM MANA

GEMENT & OTHER DEPT. - (1HR)DEPENDING ON THE NATURE & THE KIND OF INFORMATION REQUIRED.

END OF THE YEAR STOCK TAKING WITH BOTH INTERNAL & EXTERNAL AUDITORS. - (1 WEEK)

(C)OTHER CORRESPONDENCES CLARITY OF MEMOS & ACCESSIBILTY TO THE INFOR MATION REQUIRED.

4.0 MECHANISM TO MONITOR PERFORMANCE Budget estimates for control in line with the budgetary provision. Activities and duties of Inventory Control Unit Activities and duties of Replenishment Unit Effective monitoring and safety of items Equitable distribution of operational materials Reconciliation of variance(s) arising from posting errors. Annual stock taking. End of the year Store report and Inventory.

Page 105 of 172

Page 106: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

PROTOCOL DEPARTMENT1.0 INTRODUCTION

The Protocol department is designed to provide and process traveling documents for officers of the Agency nominated on official tours abroad, as well as Ministry of Aviation officials and Board Members as may be directed by the Managing Director/Chief Executive.2.0 MISSION STATEMENT

To offer a first class Protocol service in punctuality, comfort and convenience to staff of the Agency3.0 SERVICE PROVISION

S/N PRINCIPAL SERVICE

ROLE/DIVISION (UNIT) RESPONSIBLE/ STAFF/CONTACT DETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL/OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/PERFORMANCE TARGET QUANTITATIVELY/ QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/CONFLICTS WILL BE DEALT WITH)

1. Procurement/ Renewal of International Passport

Email:[email protected]

1.30minsImmigration will determine when the passport will be out.

Documents for renewal of passports.2 passports photos, NIN,Old passport, filled passport form.

Procurement of new passport.2 passport photos, NIN, birth certificate or age

N/A Not Applicable

All documents must be available.

Phone calls, SMS or email.

HOD. If there is any issue a meeting will be arrange.

Page 106 of 172

Page 107: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

declaration, local govt or state of origin certificate, filled passport form.

2 Visa Processing

Email:[email protected]

Depends the Location of the embassy. (2hrs)

DocumentsInt’l passport, Invitation letter, filled visa application form, receipt of payment of visa fees, 2 passports photos, marriage certificate, birth certificates of children, Introduction letter from NAMA, photocopy of staff I.D card

N/A Not Applicable

All visa requirements must be available.

Phone calls, SMS or email

HOD. If there is any issue we write to the embassy officially.

3 Procurement of air tickets for Local & International Trips

Email:[email protected]

30mins Ministerial Approval.

In accordance with NAMA COS.

Not Applicable

Ministerial approval/Visa

Phone calls, SMS or email

HOD. If there is any issue, a meeting will be arrange with the agent.

4. Provision of Hotel accommodation.

Email:[email protected]

10mins Official memo. N/A Not Applicable

Official memo must be written.

Phone calls, SMS or email.

HOD. If there is any issue a meeting will be arrange with the hotel.

Page 107 of 172

Page 108: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

5 Passage Facilitation including boarding passes immigration/ customs clearance for officials of the agency

Email:[email protected]

1hour. Official memo N/A Not Applicable

Early information.

Phone calls, SMS or email

HOD.

4.0 MECHANISM TO MONITOR PERFORMANCE i. Management decisionii. Upon information given (ODC/Vehicle are made available)iii. Providing transportation for guest(s).iv. Upon receipt of ministerial approval, Visa/ticket and boarding passes are procured.

v. Based on request to ensure valid documents are processed.

ESTATE DEPARTMENT

Page 108 of 172

Page 109: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

1.0 INTRODUCTIONThe Estate Department is saddled with the responsibility of Technical advice, design, construction and maintenance of the Agency’s Civil/Building infrastructures.2.0 MISSION STATEMENTProvides Technical advice/detail, supervision, construction and maintenance of facilities that accommodates ATM/CNS systems in NAMA in accordance with Standard and Recommended Practices (SARPS).3.0 SERVICE PROVISION OF ESTATE DEPARTMENTS/N PRINCIPAL

SERVICEROLE/DIVISION (UNIT) RESPONSIBILITY/STAFF/ CONTACT DETAILS (EMAIL, PHONE NUMBER)

SERVICE AVAILABILITY/QUALITY/STANDARD/TURNAROUND TIME FOR DELIVERY

CUSTOMEROBLIGATION/WHAT IS NEEDED TODELIVERY EFFECTIVE SERVICE

LEGAL/ OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FORSERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARD/ PERFORMANCE TARGET QUANTITATIVE/ QUALITATIVE

COMMUNICATION /REPORT ON PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMAPLAINTS WILL BE DEALT WITH

1 Provides design templates for proposed projects

[email protected]

90% availability.

Depends on proposed project.

Engineering standards.

Up to date training on latest softwares for designs.

Provide computers for design development.

ICAO

SARPS

ENGINEERING POLICY.

Contact gm estate.

90% Project end point must correspond with design details.

Architects/engineers when applicable.

2 Supervision and construction of civil engineering NAMA projects in -compliance to safety and standards

[email protected]

90% availability.

Engineering standards.

Safety standards.Depends on the project

Full access to site.P.P.E should be made available for site supervision.

Project vehicle to aid effective

Civil engineering policies.

ICAO

SARPS.

Contact gm estate.

75% Contractor and site representatives must always agree so as to achieve the design purpose.

Daily site inspection.Carried out by Architects/civil engineering/surveyors/builders/project managers.

Page 109 of 172

Page 110: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

type. mobilization.3 Facility

maintenance i.e staff offices /staffs quarter.

[email protected]

90% availability.

Excellent.

Delivery time depends on the nature of project.

Full access to area to be worked on and sometimes when full evacuation by occupant is required.

Engineering safety policies.

ICAO, SARPS.

Contact gm estate.

90% Problems reported are solved and office/quarters put in good condition safe to use.

Daily site inspection.

4 Project costing and evaluation for proper utilization of the agency financial resource

[email protected]

99% availability.

Delivery within 72hrs.

Desktop computer for costing and database sake..

Bill of engineering measurements and evaluation.Annual market price- index.

Contact gm estate

90% Costing are based on the most accurate material cost in the economic market.

Reviewed bi-annually.

5 Providing effective water and plumbing services for the agency.

[email protected]

90%

Satisfactory.

0 - 48hrs

(fresh projects not inclusive)

Continuous training.

Make working tools readily available.

Fluid mechanics.

SARPS.

Contact gm estate

75% Very effective and fast response.

The plumbing unit at receiving signals of faulty pipes or water seizure complaints, reports to site to access and seize the problems.

SERVICOM/CUSTOMER SERVICE DEPARTMENT

Page 110 of 172

Page 111: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

1.0 INTRODUCTION

SERVICOM/Customer Service Department is responsible for the following: Formulation, implementation and review of the Agency’s Service Charter; Managing the Agency’s customer relations policy and grievance redress mechanism including providing opportunities

for customer feedback on services; Instituting appropriate market research techniques in identifying customer needs and expectations; Ensuring the promotion of quality assurance and best practices in service delivery; Coordinating meetings of stakeholders’ consultation forum on service delivery; and, Carrying out sensitization programmes on effective customer service delivery in the Agency.

2.0 MISSION

Committed to ensuring quality service delivery and providing information to our esteemed customers through rendering excellent services without compromising safety.3.0 VISIONTo be a more institutionalized customer centric Department devoid of bureaucratic delays by ensuring timeliness and competence.

4.0 SERVICE PROVISIONS/N PRINCIPAL

SERVICEROLE/ DIVISION/ UNITRESPONSIBLE STAFF CONTACT DETAILS (E-MAIL)

SERVICE AVAILABILITY /QUALITY STANDARD TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL / OTHER REGULATIONS TO BE COMPLIED WITH

FEES / CHARGES FOR SERVICE & PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS / PERFORMANCE TARGETQUANTITATIVELY/QUALITATIVELY

COMMNICATION/ REPORT ON PERFORMANCE INDICATORS) OUTCOME OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS /CONFLICTS WILL BE DEALT WITH)

1 Complaints handling

Desk officerAll SERVICOM staff

24/7 Provision of adequate information

SERVICOM HANDBOOK

Public

NIL In line with ICAO standards & Public Service Rules

Monthly, quarterly, & annual reports are sent to

Analysis of complaints forms, suggestion

Page 111 of 172

Page 112: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Email: [email protected]

Service Rules (PRS) & other extant regulations

Management/ Presidency

boxes, customer satisfaction survey

2 Complaints facilitation/resolution

Nodal officerDesk officerAll SERVICOM staff

24/7 Submission of complaints with documents

Due process Nil On the spot, 48 hours

Resolution of complaints are done within 48 hours

Analysis of log book, complaints report, suggestion box,

3 Publication of service delivery reports

Nodal officerAll SERVICOM staff

MonthlyQuarterlyAnnually

Provision of adequate information

SERVICOM HANDBOOK

Public Service Rules (PRS) & other extant regulations

NIL MonthlyQuarterlyAnnually

Evidence of publication

4 Monitoring/ supervision of servicom staff

Nodal officer Daily Adherence to work ethics

SERVICOM HANDBOOK

Public Service Rules (PRS) & other extant regulations

NIL Daily Monitoring & supervision of staff

5 In house retreat/ training programmes

Nodal officerAssistant N.O.

Quarterly Attendance of programmes

Training materials

Nil As the need arises

Lectures,reports

6 Ease of Doing Business

Nodal officerAll SERVICOM staff

24/7 Publication of service charter

Executive Order 01

As stated in the service charter

As stated in the service charter

Feedback from customers

Regular consultations with clients

Page 112 of 172

Page 113: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

7 Sensitization programmes handling

All SERVICOM staff

Monthly All staff should attend the programme

SERVICOM HANDBOOK

Not applicable

MonthlyQuarterlyAnnually

Reports and feedback

Reports from the sensitization programmes are sent to Management on monthly basis for improvement

8 Activities of SERVICOM Committee

Representatives of all Departments

Monthly Attendance and Reports

SERVICOM HANDBOOK

QuarterlyAnnually

Reports and inspections

Follow ups & Reports

9 Implementation of local content policy

Deputy Nodal Officers

Monthly Monitoring & attending Procurement meetings

Executive Order 03

As stated in the letter of award of contract

As the need arises

Certificate of completion

Follow up inspection in Stores/Equipment

10 Promotion of quality assurance and best practices in NAMA

Service Improvement Officer

24/7 Adequate Information,NeedsAssessment,Reformation,Customer FORA,Feedback,Compliance

SERVICOM Mandate/ExecutiveOrders

NIL Quality standard isDelivered on a daily basis

Seek feedbackfrom customersVia email,Phone call,S.M.S

Report to GM for further recommendation to Management

11 Periodically conduct market research with a view to identifying customer needs and expectations of services

Nodal officerService Improvement Officer

72 hours Adequate Information,NeedsAssessment,Reformation,Customer FORA,Feedback,Compliance

SERVICOM Mandate/ExecutiveOrders

NIL Through use of questionnaires,Visitation of customers,Training, workshop and seminars on aWeeklyMonthly and Quarterly

Seek feedback from customers via email,Phone call,S.M.S.

Report to GM for further Recommendation to Management

12 Document Tracking

Service Improvement Officer

24 hours Adequate Information,Provision of Document,

SERVICOM Mandate/ExecutiveOrders

Not applicable

Quality standard isDelivered on a daily basis

Seek feedback from customers via email,Phone call,S.M.S. Internal memo

Report to GM for further Action

13 Formulation Charter Desk Quarterly A right to full SERVICOM Not Regularly Email, phone Handled by the

Page 113 of 172

Page 114: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

of service Charter

Officer

access toInformation

Mandate/ExecutiveOrders

applicable call or SMS GM

14 Service charter review

Nodal Officer Charter Desk OfficerCommittee MembersStake holdersStaff

Every two years

Timely provision of service charter by all Departments.

SERVICE Charter / Government regulations

Not applicable

Regularly Seek feedback from customers via email,Phone call,S.M.S. Internal memo

SERVICPM Charter Vetting by Min. of Aviation, SERVICOM office Presidency, Launching or Reviewed Service Charter.

15 Receiving Visitors

Complaints Desk Officer

Ensuring timely service.

Fill Visitors form. The front desk officer contacts the staff to be visited.If approved, tag is given to the visitor after signing in and tag received on signing out

SERVICOM Mandate/ExecutiveOrders

Not applicable

Visitors attended to timely void of delays

Email, SMS and phone

Handled by the GM

16 Sensitization Programs

Nodal OfficerSERVICOM Staff

Quarterly . SERVICOM Mandate

Not applicable

.

4.0 MECHANISM TO MONITOR PERFORMANCE

i. We strive for continuous improvement through effective sensitization and support for staff. Providing excellent customer service is a key measure of staff performance.

ii. We undertake regular customer surveys to ensure our continuous improvement programmes operate effectivelyiii. Produce, review charters on a two year period and monitor performance of the Agency’s Charters on a daily basis

Page 114 of 172

Page 115: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

iv. Evolve strategies for the improvement of service delivery; provide opportunities for customer feedback on services; institute a Complaints Procedure including grievance redress mechanism by checking our complaint boxes on a daily basis

v. Disseminate best practices on service delivery through SERVICOM enlightenment and education; manage links with strategic partners and other stakeholders on service delivery

vi. Interact with customers to ensure they receive adequate service through proper feedback mechanisms, fora and questionnaires.

vii. Institute appropriate market research technique in identifying customer needs and expectations viii. Provide comprehensive and effective training policy on customer relations and related matters on bi-annual basis.ix. Verify the authenticity of outstanding debts and ensure recovery of same.x. Ensuring that the Agency’s customers receive an adequate level of service or help for all their queries and concerns.xi. Ensure the promotion of quality assurance and best practices in the Agency’s performance of its functions.xii. Monitoring staff career and appraisal system.xiii. Collate reports and end of year activities and forward to Management and SERVICOM Presidency.

PUBLIC AFFAIRS DEPARTMENT1.0 INTRODUCTION

The Public Affairs department is set up to create and sustain goodwill for the Agency by ensuring that NAMA is continuously seen in good light by people, both internal and external to the Agency.

Page 115 of 172

Page 116: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

2.0 MISSION STATEMENT

To deploy effective public relations media in promoting the image of NAMA.

3.0 SERVICE PROVISION OF PUBLIC AFFAIRSS/N PRINCIPAL

SERVICEROLE/ DIVISION (UNIT) RESPONSIBLE/ STAFF/CONTACT DETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL / OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/ PERFORMANCE TARGET QUANTITATIVELY/ QUALITATIVELY

COMMUNICATION /REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

1 Drafting Press Releases for events that the public should know

Email:[email protected]

As occasion demands

Information from MD/CE

NAMA act Not applicable

Media industry standard

News mentions GM

2. Production of Airspace News magazine on a quarterly basis

Quarterly Attendance of NAMA events

NAMA act Not applicable

Aviation industry Standard

Feedback from staff

GM

3. Photo/Video Coverage of NAMA events

On written request

equipment upgrade in line with new trends

NAMA act Not Applicable

Industry standard

High standard pictures

GM

4. Provision of refreshments for all official meetings

On written request

Prompt payment

NAMA act Not applicable

In line with available funding

Staff satisfaction GM

5. Media monitoring

1 Hour Timely delivery by Vendor

NAMA act Not applicable

High standard Press cutting GM

6. Writing of feature

Quarterly Availability of material

NAMA act Not Applicable

Media industry standard

News mentions GM

Page 116 of 172

Page 117: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

articles on quarterly basis

7. Drafting speeches as required

As occasion demands

Availability of material

NAMA act Not Applicable

Global standard Good delivery by MD/CE

GM

8. Publishing NAMA handbook on yearly basis

Annually Availability of information

NAMA act Not Applicable

In line with ISBN standard

Standard print

9. Updating NAMA subscription to publications on quarterly basis

Quarterly Prompt payment for subscription

NAMA act Not Applicable

N/A N/A GM

10. Production of graphics and artworks for advertisements quarterly or on request

Quarterly Prompt payment for adverts

NAMA act Not Applicable

N/A N/A GM

11. Production of radio/tv documentaries quarterly

Quarterly funding NAMA act Not applicable

APCON standard

Increased mileage to NAMA

GM

12. Management of NAMA conference rooms

Always open N/A NAMA act Not applicable

High standard N/A GM

13. Management of NAMA website

Daily Interdepartmental synergy

NAMA act Not applicable

High standard More visits to website

GM

4.0 MECHANISM TO MONITOR PERFORMANCE

i. To collate and disseminate accurate and up to date information on the Agency after Management’s ratification and approval.

Page 117 of 172

Page 118: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

ii. To produce well-structured and articulated speeches on behalf of Management to suit specific occasions.iii. Provide well-researched, educative information on the Agency for reference and corporate image purposes.iv. Update information to conform to present day status of the Agency

INFORMATION COMMUNICATIONS TECHNOLOGY DEPARTMENT1.0 INTRODUCTION

The Information Communications Technology department is built and driven by information technology and computer-based systems. As part of the process of making NAMA an automated Agency, the department has developed and implemented amongst others the following:

Page 118 of 172

Page 119: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Metropolitan Area Network which comprises of Campus Area Network at Headquarters, Local Area Network at Murtala Muhammed International Airport (MMIA) and former Regional Office block as well as a node at Domestic terminal and TRACON site

Messaging and collaboration with intranet/corporate e-mail system. Provision of internet service and the design and construction of the Agency’s web site (www.nama.gov.ng) Continuous Capacity building programmes for all staff Provision of CNS/ATM Support Enterprise VPN Infrastructure Enterprise Resource Planning tool, that is, Microsoft Dynamics AX Unified Communication System Mobile application E-Payment Portal E-Clearance Portal, amongst others

1.0 ICT GUIDING PRINCIPLES:“The Nigerian Airspace Management Agency will use proven information technologies to deliver the best possible service to its customers and the public. Systems will be selected and deployed based on their effectiveness in improving the access to and exchange of information as well as the productivity of staff in furtherance of the Agency’s objective. Systems should be intuitive, easy to use, and integrated with other systems to eliminate duplication and redundant data entry. The Agency will commit the necessary resources to support these systems and ensure their security, reliability and accuracy. There will be appropriate backup and disaster recovery.”

2.0 VISION STATEMENTMaking Information Communication Technology wok for Air Safety

MISSION STATEMENT

Page 119 of 172

Page 120: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

To provide leadership and guidance, service and support, education and technical expertise required to establish and maintain best in class information communications technology systems for the Agency in accordance with the vision, mission, values and goals of the Nigerian Airspace Management Agency (NAMA).”

3.0 OPERATIONAL PRINCIPLES:The ICT department operates within the framework of its vision and mission enunciated above as well as the following as contained in the ICT charter.The deployment of information communications technology: characterized by both a strong service orientation and a readiness to respond to a rapidly changing aviation environment.

Technology guiding principles Technology Goals Strategies Technology Acquisition Process ICT Knowledge transfer Organizational Support

4.O SERVICE PROVISION OF ICTS/N PRINCIPAL

SERVICEROLE/DIVISION (UNIT) RESPONSIBLE/ STAFF/ CONTACT DETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION /WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL/OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE.

DELIVERY STANDARDS/PERFORMANCE TARGET QUANTITATIVELY/QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE/ KEY PERFORMANCE INDICATIONS/ OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/CONFLICTS WILL BE DEALT WITH)

1. E-FLIGHT PLAN AIS DEPARTMENT; ATC DEPT.;

24/7 DAILY PRESENCE WHEN NEEDED.

ICT POLICY/SLA

CHECK WEBSITE

QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

Continuous monitoring 24/7

Page 120 of 172

Page 121: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

2. E-NOTAM AIS DEPT.; 24/7 DAILY PRESENCE WHEN NEEDED.

ICT POLICY/SLA

CHECK WEBSITE

QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

Continuous monitoring 24/7

3. COMMERCIAL BILLING

COMMERCIAL 24/7 DAILY PRESENCE WHEN NEEDED.

ICT POLICY/SLA

CHECK WEBSITE

QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

Continuous monitoring 24/7

4. PAYROLL SOLUTION IN ACCOUNT

ACCOUNT DEPT

24/7 DAILY PRESENCE WHEN NEEDED.

ICT POLICY/SLA

Not applicable QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

Continuous monitoring 24/7

5 COMPUTER/HARDWARE MAINTAINANCE

Email:[email protected]

24/7 HARDWARE SPARE PART & ACCESSORIES

ICT POLICY/SLA

Not Applicable QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

Continuous monitoring 24/7

6 DESKTOP APPLICATION SUPPORT

BOS 24/7 CURRENT APPLICATION SOFTWARE

ICT POLICY/SLA

Not Applicable QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

Continuous monitoring 24/7

7 PRINTER MAINTANANCE & SERVICES

BOS 24/7 HARDWARE SPARE PART

ICT POLICY/SLA

Not applicable QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

Continuous monitoring 24/7

8 DSTV SUPPORT BOS 24/7 MONTHLY SUBSCRIPTION

ICT POLICY/SLA

Not applicable QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

Continuous monitoring 24/7

9 IT SERVICE MANAGEMENT: HELPD ESK

ITSM 24/7 ADEQUATE MANPOWER

ICT POLICY/SLA

Not Applicable QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

PERIODIC REVIEW & ANALYSIS OF CALL CENTRE ACTIVITIES

Page 121 of 172

Page 122: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

10 CONFRENCES MGT/MULTIMEDIA

ITSM 24/7 ADEQUATE MANPOWER

ICT POLICY/SLA

Not applicable QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

Continuous monitoring 24/7

11 ICT TRAININGS ITSM AS THE NEED ARISES

N/A ICT POLICY/SLA

Not Applicable QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

INFERED FROM OUR ANALYSIS AT THE CALL CENTRE

13 MANAGEMENT OF INTERNS

ITSM WITHIN OFFICIAL WORKING HRS 8AM – 4PM

N/A ICT POLICY/SLA

Not Applicable QOS GUARANTEED

ICT INTERACTIVE SESSIONS WITH INTERNS

REVIEW SESSIONS WITH INTERNS

13 NAMAHQR.NET DOMAIN SUPPORT

NETCOMMS 24/7 N/A ICT POLICY/SLA

$22/PER ANNUM

QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

Continuous monitoring 24/7

14 INTERNET SERVICES

NETCOMMS 24/7 N/A ICT POLICY/SLA

11MILLON NAIRA/ANNUM

QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

Continuous monitoring 24/7

Page 122 of 172

Page 123: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

15 EMAIL:MESSAGING

NETCOMMS 24/7 N/A ICT POLICY/SLA

$250/ANNUM QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

Continuous monitoring 24/7

16 WAN/LAN SUPPORT

NETCOMMS 24/7 N/A ICT POLICY/SLA

Not Applicable QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

Continuous monitoring 24/7

17 ENTERPRISE RESOURCE PLANNING SOLUTION

DYNAMICS AX TEAM

24/7 N/A ICTPOLICY/SLA

QOS GUARANTEED

ICT QUARTERLY CUSTOMER SERVICE FORUM

Continuous monitoring 24/7

5.0 MECHANISM TO MONITOR PERFORMANCE

I. ICT Customer Service Forum

II. Key Performance Indicators clearly stated in ICT SOP and SLA documents

Page 123 of 172

Page 124: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

PROCUREMENT DEPARTMENT1.0 INTRODUCTION

The Procurement Department is responsible for procuring relevant goods, works and consultancy services as well as disposal of Agency’s assets using the best procurement principles as enshrined in Public Procurement Act (PPA) 2007, Procurement Regulation and Manuals.

2.0 MISSION STATEMENT

To ensure Transparency, Competitive, Reliable, Economic and Expeditious procurement process for deployment of Communication, Navigation and Surveillance facilities/equipment for the safety of Nigerian airspace.

Page 124 of 172

Page 125: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

3.0SERVICE PROVISION FOR PROCUREMENT DEPARTMENT

S/N

PRINCIPAL SERVICE

Role/Division (Unit) Responsible/Staff/Contact Details (E-mail (procurement

Service Obligation /quality Standard/Turn-around time for delivery

CustomerObligation/ What is Needed to Deliver Effective Service

Legal/ Other Regulations to be Complied with

Fees/Charges for Service and product where applicable

Delivery Standard/Performance Target Quantitatively/ Qualitatively

Communication On Performance Indicators/ Outcomes Or Impacts

Monitoring Activities (How Complains/ Conflict Will Be Dealt with)

1 Budget Implementation in line with Overall Procure-ment Processes

Implementation/ Overall Supervision of Agency’s Procurement Processes and / StaffsEmail: [email protected]

The turnaround time depends on the procurement process/proceeding and procurement methods for award of Agency’s contract in compliance with public procurement Act, 2007.

Timely response to Solicitation Documents, Adverts, Standard Bidding Documents (SBD). andCompliance to Procurement Regulation Process From Both Service providers and the users department.

The Public Procure-ment Act,2007, Public Procure-ment Regulations/Manuals And compliance to relevant Federal Circulars

Fees are Charged for Standard Bidding Documents as the case may be. This Provision is contained in the PPA, 2007

Conflict/Complaints free during and after Award of Contract

Generating procurement Records, for Procurement /Budget Performance

The Procurement Records is used to monitor performance of all procurement proceedings to ensure compliance in conjunction with finance and users department.Conflict resolution is dealt with as stipulated in 2007 PPA.

2 Implemen-tation of Public Procure-ment Policies and the Public Procure-

Overall Supervision of Procurement Activities in the department and Procurement of Engineering Projects/ Services & Complying With

The turnaround time depends on the procurement process/proceeding and procurement methods for award of

Timely response to Solicitation Documents, Adverts, Standard Bidding Documents (SBD). and

The Public Procure-ment Act,2007,Public Procure-ment Regulations And

Fees are Charged for Standard Bidding Documents as the case may be. This Provision is contained in

Conflict/ Complaints free during and after Award of Contract

Generating procurement Records, for Procurement /Budget Performance

The Procurement Records is used to monitor performance of all procurement proceedings to ensure compliance in

Page 125 of 172

Page 126: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

ment Act, 2007

The LawsEmail: [email protected]

Agency’s contract in compliance with public procurement Act, 2007.

Compliance to Procurement Regulation Process From Both Service providers and the users department.

compliance to relevant Federal Circulars

the PPA, 2007

conjunction with finance and users department.Conflict resolution is dealt with as stipulated in 2007 PPA.

Overall Supervision of PTB Procurement proceeding /process in the department and administration Email: [email protected]

The turnaround time depends on the procurement process/ proceeding and procurement methods for award of Agency’s contract in compliance with public procurement Act, 2007.

Timely response to Solicitation Documents, Adverts, Standard Bidding Documents (SBD). andCompliance to Procurement Regulation Process From Both Service providers and the users department.

The Public Procurement Act,2007, Public Procure-ment Regulations And compliance to relevant Federal Circulars

Fees are Charged for Standard Bidding Documents as the case may be. This Provision is contained in the PPA, 2007

Conflict/Complaints free during and after Award of Contract

Generating procurement Records, for Procurement /Budget Performance

The Procurement Records is used to monitor performance of all procurement proceedings to ensure compliance in conjunction with finance and users department.Conflict resolution is dealt with as stipulated in 2007 PPA.

3 Project Implemen-tation for Award of The Agency’s IGR/ Capital Project and FGN Appropria-

Overseeing users department inputs/request for the development of BOQ, BEME and Specifications for contract packaging Email: [email protected]

The turnaround time depends on the procurement process/proceeding and procurement methods for award of Agency’s contract in

Timely response to Solicitation Documents, Adverts, Standard Bidding Documents (SBD). andCompliance to

The Public Procure-ment Act,2007,Public Procure-ment Regulations And compliance to relevant

Fees are Charged for Standard Bidding Documents as the case may be. This Provision is contained in the PPA, 2007

Conflict/ Complaints free during and after Award of Contract

Generating procurement Records, for Procurement /Budget Performance

The Procurement Records is used to monitor performance of all procurement proceedings to ensure compliance in conjunction with finance and

Page 126 of 172

Page 127: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

tion compliance with public procurement Act, 2007.

Procurement Regulation Process From Both Service providers and the users department.

Federal Circulars

users department.Conflict resolution is dealt with as stipulated in 2007 PPA.

4 Project monitoring and document-tation

Processing and Conveying all Procurement proceedings to appropriate approving Authorities, Procurement Planning and Procurement Records in line with extant rules and regulations. Email: [email protected]

The turnaround time depends on the procurement process/ proceeding and procurement methods for award of Agency’s contract in compliance with public procurement Act, 2007.

Timely response to Solicitation Documents, Adverts, Standard Bidding Documents (SBD). andCompliance to Procurement Regulation Process From Both Service providers and the users department.

The Public Procure-ment Act,2007, Public Procure-ment Regulations And compliance to relevant Federal Circulars

Fees are Charged for Standard Bidding Documents as the case may be. This Provision is contained in the PPA, 2007

Conflict/ Complaints free during and after Award of Contract

Generating procurement Records, for Procurement /Budget Performance

The Procurement Records is used to monitor performance of all procurement proceedings to ensure compliance in conjunction with finance and users department.Conflict resolution is dealt with as stipulated in 2007 PPA..

5 Handling and processing of Evaluation Committees, NTB and PPC procurement progress report

Email: [email protected]

The turnaround time depends on the procurement process/proceeding and procurement methods for award of Agency’s contract in compliance with public

Timely response to Solicitation Documents, Adverts, Standard Bidding Documents (SBD). andCompliance to Procurement Regulation

The Public Procure-ment Act,2007, Public Procure-ment Regulations And compliance to relevant Federal Circulars

Fees are Charged for Standard Bidding Documents as the case may be. This Provision is contained in the PPA, 2007

Conflict/ Complaints free during and after Award of Contract

Generating procurement Records, for Procurement /Budget Performance

The Procurement Records is used to monitor performance of all procurement proceedings to ensure compliance in conjunction with finance and users department.

Page 127 of 172

Page 128: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

procurement Act, 2007.

Process From Both Service providers and the users department.

Conflict resolution is dealt with as stipulated in 2007 PPA.

6 Administration and Management of Out Station procurement, processing and making provision for processing of documents for secretariat file. Email: [email protected]

The turnaround time depends on the procurement process/ proceeding and procurement methods for award of Agency’s contract in compliance with public procurement Act, 2007.

Timely response to Solicitation Documents, Adverts, Standard Bidding Documents (SBD). andCompliance to Procurement Regulation Process From Both Service providers and the users department.

The Public Procurement Act,2007, Public Procure-ment Regulations And compliance to relevant Federal Circulars

Fees are Charged for Standard Bidding Documents as the case may be. This Provision is contained in the PPA, 2007

Conflict/ Complaints free during and after Award of Contract

Generating procurement Records, for Procurement /Budget Performance

The Procurement Records is used to monitor performance of all procurement proceedings to ensure compliance in conjunction with finance and users department.Conflict resolution is dealt with as stipulated in 2007 PPA.

7 Processing and monitoring of e-procurement activities ICT Management, handling of requisitions and Collation of all procurement proceedings/ DocumentationEmail: [email protected]

The turnaround time depends on the procurement process/ proceeding and procurement methods for award of Agency’s contract in compliance with public procurement Act, 2007.

Timely response to Solicitation Documents, Adverts, Standard Bidding Documents (SBD). andCompliance to Procurement Regulation Process From Both Service

The Public Procure-ment Act,2007, Public Procure-ment Regulations And compliance to relevant Federal Circulars

Fees are Charged for Standard Bidding Documents as the case may be. This Provision is contained in the PPA, 2007

Conflict/ Complaints free during and after Award of Contract

Generating procurement Records, for Procurement /Budget Performance

The Procurement Records is used to monitor performance of all procurement proceedings to ensure compliance in conjunction with finance and users department.Conflict resolution is

Page 128 of 172

Page 129: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

providers and the users department.

dealt with as stipulated in 2007 PPA.

8 Handling of EOI and Prequalification Documents, processing of Procurement Record details and evaluation report among other responsibility in the GM Procurement office.

The turnaround time depends on the procurement process/proceeding and procurement methods for award of Agency’s contract in compliance with public procurement Act, 2007.

Timely response to Solicitation Documents, Adverts, Standard Bidding Documents (SBD). andCompliance to Procurement Regulation Process From Both Service providers and the users department.

The Public Procure-ment Act,2007 ,Public Procure-ment Regulations And compliance to relevant Federal Circulars

Fees are Charged for Standard Bidding Documents as the case may be. This Provision is contained in the PPA, 2007

Conflict/ Complaints free during and after Award of Contract

Generating procurement Records, for Procurement /Budget Performance

The Procurement Records is used to monitor performance of all procurement proceedings to ensure compliance in conjunction with finance and users department.Conflict resolution is dealt with as stipulated in 2007 PPA.

MECHANISM TO MONITOR PERFORMANCE

There is price monitoring/intelligent committee to ensure that the Agency’s procurement has value for money

Establishment of a system to continuously monitor all procurement and financial information related to procurement implementation

Provision of feedback mechanism for all procurement proceedings.

Page 129 of 172

Page 130: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

HUMAN RESOURCES DEPARTMENT1.0 INTRODUCTION

The Human Resources Department handles all matters relating to human resources and staff welfare which includes planning the Agency’s Human resource; Sourcing, Recruitment and Selection; Human Resource capacity building/evaluation; Salary Administration; Pension Administration; Motivation; Job enrichment, compensation and allowances. Evolving safety procedures and its implementation as well as managing the welfare requirements of the workers thereby maintaining a harmonious worker/management relationship

2.0 MISSION STATEMENT

To provide strategic Human Resources Services in Sourcing, Recruiting, Selecting, Training, Administration, Staff Welfare Services, Supporting and evaluating the required Personnel of NAMA.

3.0 SERVICE PROVISION OF HUMAN RESOURCESS/N

PRINCIPAL SERVICE

ROLE/DIVISION (UNIT) RESPONSIBLE/ STAFF/ CONTACT DETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURN AROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL / OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/ PERFORMANCE TARGET QUANTITATIVELY / QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS)

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

PERSONNEL Email:[email protected]

Page 130 of 172

Page 131: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

v.ng1 Upgrading and

Conversion DGM (Personnel)Email: [email protected]

7 days and maximum of 14 days.

Timely receipt of applications for upgrading and conversion, approvals from approving authorities and committee

Conditions of Service, Public Service Rules, Schemes of Service

Not applicable

Advice Mgt to enable it take informed decisions on Upgrading & Conversion of staff to enhance their career in service.

Dependent on policy on recruitment, appointments and extant guide on Upgrading/ conversion of staff.

(i) Applications are received from staff.(ii)Staff files are requested from the Registry unit.(iii) Applications are treated as soon as files are made available by recommendations based on Scheme of Service through a memo for Management approval. Complaints are treated minimum of 48 hrs.

2 Appointments/ Staff Transfers

DGM (Personnel)

7 days and maximum of 14 days

Timely release of approvals, computations of staff transfer, etc.

Conditions of Service, Public Service Rules, Schemes of Service

Not applicable

Execute Mgt’s decision on staff appointment, movement and ensure the transferred staff are adequately compensated in line with the agency’s conditions of service.

Memos based on Management’s decision and policy.

(i)Complaints from staff are resolved immediately the files are available from the Registry. (ii)For any complaint that comes in, submission are forwarded for Management’s approval and immediately Management approved it, response are also forwarded to the staff concerned.

3 Shortlist eligible staff and conduct promotion exercise.

DGM (Personnel)

Annually Submit APER forms, write promotion and attend interview

Conditions of Service, Public Service Rules, Schemes of Service

Not applicable

Circulars, Memos based on Management decision and policy.

Utilization of approved promotion criteria.

4 Offer/Renewable of

DGM (Personnel)

14 days Submission of application

Conditions of Service, Public

Not applicable

Management decision and

Records of supervision/SERVICOM

Page 131 of 172

Page 132: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

contract appointments

and relevant documents in accordance with PSR & COS.

Service Rules, Schemes of Service

policy Survey

RECORDS & REGISTRY

1 Documentation and update of Staff Records

Records and Registry /DGM (R/R)

3 days Update of Staff Records/ Input from appropriate Department

Public Service Rule (PSR), Conditions of Service (COS), Scheme of Service (SOS), Administrative Manual, Extant Govt. Circulars

Not Applicable

Ensure up-to-date employee records

Number of Complaints

Records of supervision/SERVICOM Survey

2 Nominal Roll Management & update.

Records and Registry /DGM (R/R)

Monthly Make observations if necessary

Conditions of Service, Public Service Rules, Schemes of Service

Not Applicable

Ensure up-to-date employee records

Email updated data to the HOD

System Audit and monitoring

3 Management of Staff Files

Records and Registry/DGM (R/R)

14 days Public Service Rule (PSR), Conditions of Service (COS), Scheme of Service (SOS), Administrative Manual, Extant Govt. Circulars

Not Applicable

Ensure protection of information data base for Management decisions

Give feedback at meetings

Records of supervision/SERVICOM Survey\

SALARY ADMINISTRATION

1 Preparation of Staff Salaries and Allowances

Salary Variation/ Administration /DGM (SA)

Monthly Timely Preparation of Salary Input/ Proper

Public Service Rule (PSR), Conditions of Service (COS),

Not Applicable

Timely Payment of Staff Salary and Allowance.

Phones Records of supervision/SERVICOM Survey

Page 132 of 172

Page 133: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Authorization Scheme of Service (SOS), Approved Salary Structure

INDUSTRIAL RELATIONS

1 Interface with Unions & Professional Associations

Industrial Relations & Discipline/DGM (IR) Email:[email protected]

Monthly Timely presentation of requests/complaints.

COS, SOS, PSR Not Applicable

Ensure the prevalence of Industrial Harmony within the Agency.

No of Industrial Actions within a specified period.

Continuous interaction with the various organizations.

2. Respond to intra and inter-Ministerial requests on staff issues.

Industrial Relations & Discipline/AGM (IR)

3 days Ministries and Agencies

COS & PSR Not Applicable

Ensure that qualified Staff /Ministerial issues are treated adequately.

Memos, emails. Records of supervision/SERVICOM Survey

3 Processing of Staff Request payment of COS Allowances

Industrial Relations (IR)

Weekly Timely presentation of requests.

Staff Conditions of Service

Not Applicable

Ensure that qualified Staff are recommended for payment.

Memos, emails. Records of supervision/SERVICOM Survey

DISCIPLINE

1 Staff DisciplineResolve and ratify disciplinary issues

Discipline/DGM (D) Email:[email protected]

2 days Speedy and formal reports of disciplinary issues.

COS & PSR Not Applicable

Maintain Discipline within the workforce.

No of Disciplinary Cases handled within a specified period.

Timely Investigations.3 months

2 Call and organize disciplinary Committee (DC) seating

Discipline/DGM (D)

3 days Attend DC sittings and ratify or review recommendations

COS & PSR Not Applicable

Maintain Discipline within the workforce.

Give feedback at meetings

Records of supervision/SERVICOM Survey

Page 133 of 172

Page 134: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

PENSION

1. All Pension related matters, coordinate all Pension Board activities

DGM PensionEmail:[email protected]

2 Weeks Pension Reform Act 2014 NAMA condition of service, Public Service rules and Extant circulars.

Not applicable

Ensure all pension matters and issues are addressed as timely as possible.

Memo, notification letters

The DGM calls for meeting where issues complaints are discussed and resolution is made.

2 Receives letter of notification of retirement by retirement officer, compilation of officers due for retirement. Reviews and check all computations, e.g. Pension and Death Benefits before it is forwarded to GMHR for endorsement to Management

Email:[email protected]

1 Week Submission of relevant documents

NAMA Condition of Service, Public Service Rule.

Not Applicable

Prompt and timely process of benefits within a week.

Memo, notification letters

The DGM calls for meeting where issues complaints are discussed and resolution is made

3 Acknowledgement of retirement letters, notification of retirement list of retired staff.

Email:[email protected]

2 weeks Submission of relevant documents

Pension Reform ACT 2014. Extant rules

Not Applicable

Prompt and timely process of benefits within two weeks.

Memos, email and phone.

The DGM calls for meeting where issues complaints are discussed and resolution is made.

4. Computation of Terminal Benefits.

Email:[email protected]

2 weeks Updated record of service.

NAMA Condition of Service and Public Service Rules.

Not applicable

Prompt and timely process of benefits within two weeks.

Memos, email and phone.

The DGM calls for meeting where issues complaints are discussed and resolution is made

Page 134 of 172

Page 135: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

TRAINING/MANPOWER DEVELOP-MENT

1 Training DGM (Training)Email: [email protected]

Annually Officers must fall within the Grade level or range for the training, courses, etc.

NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely process of training within the year.

Memo, AFTN, nomination letters

i. Carry out annual assessment using the APER form.ii. Staff Survey

2 Training needs Analysis

DGM (Training)Email: [email protected]

Annually Readiness to learn

NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely process of training within the year.

Email, letters of notification.

Identifying training gaps

3. Nomination/approval of courses

DGM (Training)Email: [email protected]

Annually Readiness to learn

NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely process of training within the year.

Email, letters of notification.

Undertake Annual audit checks to ensure that set targets are met.ii. Staff Survey

4. Implementing training programmes

DGM (Training)Email: [email protected]

Annually Readiness to learn

Readiness to learn

Not Applicable

Prompt and timely process of training within the year.

Create training action plan

Carry out constant evaluation for optimal performance.

5. Evaluating training programmes

DGM (Training)Email: [email protected]

Annually Readiness to learnFill evaluation forms

NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely process of training within the year.

Ensure training needs are met and send the report to Management

Staff Survey

6. Preparation of quarterly training report

DGM (Training)Email: [email protected]

Quarterly NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely process of training within the quarter.

Assess the effectiveness of staff training and send report to Management.

Monitoring of submission of report to Management by Log

7 Preparation of annual training Budget

DGM (Training)Email: [email protected]

Annually NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely process of training budget within the year.

Average training cost per employee is mailed to Management.

Monitoring of submission of report to Management by Log

Page 135 of 172

Page 136: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

8 Staff Development: Processing of study approval (full/Part time) acknowledgement of Academic transcripts, Certificates and Statement of results.

DGM (Training)Email: [email protected]

3 days Submission of application letter, admission letter, transcript and certificates.

NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely process of staff development within 3 days.

Email, letters of notification

Number of approval granted to staff. Notification of completion of studies by staff. Transcripts forwarded from institutions. Unit reports, supervision of incoming/outgoing registers. Interface with statutory bodies on study related matters. Phone calls, emails, follow-ups

9 Processing of education grant for acquisition of Masters degrees, HND, OND & NCE.

DGM (Training)Email: [email protected]

2 days Submission of duly APER Forms

NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely process of grant within 2 days.

Email, letters of notification

Register log of application received from staff. Ensuring that the course of study has Management’s approval and transcript received. Liaise with audit & Finance Dept to ensure prompt payment.

10 Processing of bond agreement for staff on full-Time study

DGM (Training)Email: [email protected]

2 days Signing of bond

NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely process of bond agreement within the year.

Email, letters of notification

Liaise with Legal Department to ensure bond Agreement is executed by staff.

11 Counselling of staff on study related matters.

DGM (Training)Email: [email protected]

24 hours Physical Presence of staff

NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely counselling of staff with 24 hours.

One on one, workshop.

Head/Assigned supervisors

12 Brief writing/minutes on study related matters

DGM (Training)Email: [email protected]

24 hours NAMA Conditions of Service, Public Service Rules

Not Applicable

Prompt and timely briefs within 24 hours.

Email, letters of notification

Head/Assigned supervisors

Page 136 of 172

Page 137: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

and NAMA Act13 Resumption

from study leave/reinstatement of salary

DGM (Training)Email: [email protected]

24 hours Physical Presence of staff

NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely process within 24 hours.

Email, letters of notification

Liaise with Finance/HR Dept to ensure reinstatement of salary. Certificates and transcripts.

14. Requisition/ Retrieval of staff personal files from Registry

DGM (Training)Email: [email protected]

24 hours Submission of application or request

NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely process within 24 hours.

Email, movement Registers

Unit Head, Assigned supervisor, Scheduled officer.

15. Processing of staff Annual Performance Evaluation report

DGM (Training)Email: [email protected]

2 days Submission of duly completed APER form

NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely process within 24 hours.

Memos. Suggestions for seminars, workshops lectures, Int/National programmes and redeployment of staff based on analysis received from APER Forms

16. Acceptance/ Processing of all matters on Corpers, Industrial attaches in NAMA

DGM (Training)Email: [email protected]

Annually Submission of application letter, IT letter from school, guarantor’s Letter and card.

NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely process within the year.

Memos Vetting of relevant documents. Monthly inspection. Monthly clearance from Departments.

17 Orientation programs for all NYSC& IT members in NAMA

DGM (Training)Email: [email protected]

Annually Physical presence of NYSC, IT Members.

NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely process within the year.

Email, letters of notification

Counselling, Lectures and follow-up on suggestions made & complaints raised.

18. Inspection/counselling of all NYSC IT members in NAMA

DGM (Training)Email: [email protected]

Monthly Physical presence of NYSC, IT Members

NAMA Conditions of Service, Public Service Rules and NAMA Act

Not Applicable

Prompt and timely counselling within a month.

Call, Email, letters of notification.

Regular Counselling

MANPOWER DEVELOPMENT

Page 137 of 172

Page 138: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

1 Manpower Development

DGM (Manpower Dev.) Email: [email protected]

Notification of Admission, Request for Education Grant, Submission of Certificate, Application for Study./48hrs except the file is not found immediately in the registry.

Administer letter for verification, seek for Management’s approval, and communicate to the officer of the approval, submission of first semester result that qualifies the officer for the education grant.

NAMA Conditions of Service, Public Service Rule.

Not Applicable

Part – time study, First Semester result, seek for course that is not readily available for study leave

Official letter, education grant through memo of approval.

The HOD communicates the officer with reason of disqualification

WELFARE UNIT

01 Medical Refund Financial Assistance (Medical).

DGM (Welfare) Email:[email protected]

On RequestTwo Days.

Must Be Staff Of NAMA.

COS, PRS/NAMA Policy.

Not Applicable Referral From AVMC/Management Approval

Memo, Phone No/Email

Request is sent to AVMC for Professional Advice/Evaluation and recommendation for Management Approval. Delay arises from noncompliance with rules guiding refund and letters are written to the affected officers

Page 138 of 172

Page 139: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

regarding that. When the issue is resolved application is forwarded for Management approval within 2dyas

02 NHF

Warm Clothing

Professional Allowance

Processing Cards For Retired Staff/Two Days.

Two Days

Two Days

Must Be A Retired Staff Of NAMA

Approval Must Be Given To A Staff For Foreign Trip From The Ministry Every 3years.

COS/PRS

COS

Not Applicable

Not Applicable

Updating And Processing Of Payment On Retirement.

Processing For Payment

Memo/ Email

Memo

Retired staff are required to fill the necessary forms for the refund of their contributions and forward for onward process and payment at the Federal Mortgage Bank of Nigeria. Any complaint are referred back to NHFWithin 24hours

Request for Warm clothing allowance is paid to staff sent on approved training abroad with temperate climate and is paid once in 3 years. Complaint arising from delay is

Page 139 of 172

Page 140: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Non-Operational Staff

NAMA Policy Not Applicable Processing For Payment Memo

resolved by asking the officer to forward necessary document needed to process the request within 24hours

Professional allowance is paid to staff that are awarded certificate from various professional bodies viz; CIPM, NIM, ICAN ANAN NIMN ETC in line with NAMA COS/Policy

Processing For Management Approval

PROCESSING FOR MANAGEMENT APPROVAL

03 Housing En- On Request . N/A Referral From Memo, Processing of

Page 140 of 172

Page 141: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Bloc ,Car Refurbishing And Motorcycle Loan

And Timely Response Within 24hours For Individual Request And One Week For Collation Of Group Request

Must Be A Staff Of NAMA

COS/PRS AVMC/Management Approval

Phone/ Email

these allowance is done monthly, based on the date of application in view of the numbers of request and considering the amount allocated for each month. Only staff who have spent 5years in the service of the agency are eligible FOR Management consideration and approval

04PALLIATIVERATING ALLOWANCE

INDUCEMENT SHIFT DUTY

ON REQUEST /TWO DAYS

MUST BE A STAFF OF NAMA

COS Not applicable a. AIRPORT IN NORTH EAST THAT ARE AFFECTED BY BOKO HARAM /INSURGENCY

b. RATING IN LINE WITH NCAA/ICAO REGULATION AND STANDARD

c.ENDORSEMENT

MEMO/ EMAIL

These allowance are paid to staff as stipulated in the COSCompliant which arises from non-payment of arrears are resolved sighting management new policy that all application on allowances are to be

Page 141 of 172

Page 142: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

PROCESSING OF REQUEST/MANAGEMENT APPROVAL

processed based on the date of application and without any recourse to arrears.

05 Bank Loan On Request /Two Days

Must Be A Staff Of NAMA

NAMA Policy Not applicable Forms To Staff/Management For Approval

Memo/ Email

Bank Loan Is Granted Only To Staff Who Are Not Indebted And Are Eligible. The Application Is Sent To Management For Consideration and Approval. After vetting and evaluation

06 Allocation Of Official Quarters /Restoration Of Housing Allowance

On Request/Two Days

A Staff Must Be Quartered or must have applied for Quarters accommodation and Mgt approval granted.

COS Not applicable Application/ Processing For Approval

Memo, Phone/ Email

For staff who are allocated official quarter a percentage of their housing allowance is deducted monthly while for those Staff Who Vacated The Official Quarters, their housing allowance are restored. Where complaint arises as a result of

Page 142 of 172

Page 143: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

continued deduction of a staff housing allowance when he/she is no longer quartered, a memo for refund of the deducted months in arrears will be forwarded to Management for approval within 24 hours.

07 LEAVE

MATTERSON REQUEST/24HOURS.

MUST BE A NAMA STAFF

COS Not applicable COLLATED AT THE HQ/ MANAGEMENT APPROVAL

Processing/ Management Approval for Payment Of Leave Grant On Monthly Basis.

08 Bereavement Assistance

On Request24hours

Must Be A Staff Of NAMA

COS Not applicable Application/ Death Certificate

Memo, Phone/Email

Bereavement Assistance Is Paid to Staff Who Losses Spouses, Father/MotherThese Request Can Only Be Granted When The Necessary Document Are Attached. Staff

Page 143 of 172

Page 144: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Burial Assistance

On Request24hours

Must Be A Staff Of NAMA COS Not Applicable

Notification Of Death

Memo, Phone/Email

Requesting For Bereavement Assistance After 2 Months Of The Incident Shall Not Be ConsideredAs Stipulated In NAMA COS.

Burial Assistance is Paid To The Next-Of Kin Of The Deceased Staff To Assist The Family For Burial Rite Including Transportation of The Corpse To The Place Of Final Rest. This Gesture is Part Of Management Contribution Towards The Burial Of The Demise Officer As Stipulated In The Agency’s COS /PSR

4.0 MECHANISM TO MONITOR PERFORMANCE

Page 144 of 172

Page 145: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

i. Criteria for promotion are based on vacancy, merit, performance, relevant qualifications and the provision of NAMA’s Scheme of service on career progression.

ii. Disciplinary procedures are initiated on the grounds of reported misconduct or an employee’s general incompetence or inefficiency. The Agency have senior and junior staff committees that review disciplinary cases in accordance with NAMA condition of service.

iii. Coordinate & Conduct In-service training, every year.iv. Maintain excellent relationship with all the trade unions representing the workers. Union and Management meet

frequently as a means of avoiding/resolving industrial dispute.v. Undertake daily/weekly/monthly dissemination of information through internal memos, circulars, the in-house journal,

Airspace News and through routine meetings with Unit Heads.

ADMINISTRATION DEPARTMENT1.0 INTRODUCTION

The Admin Department is saddled with the responsibility of coordinating security activities of man and material in NAMA and keeping the corporate environment clean and habitable for staff.

2.0 MISSION STATEMENT

The Admin Department is committed to effective, efficient affordable, safe and economic safety of Agency’s CNS (Communication Navigation Surveillance) Equipment as well as ensures a healthy, clean and secured office environment for the staff to perform their duties.

3.0 SERVICE PROVISION OF ADMIN DEPARTMENTS/N PRINCIPAL

SERVICEROLE/ DIVISION

SERVICE AVAILABILIT

CUSTOMER OBLIGATION/

LEGAL/ OTHER

FEES CHARGES

DELIVERY STANDARDS/

COMMUNICATION/ REPORT ON

MONITORING ACTIVITY HOW

Page 145 of 172

Page 146: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

(UNIT) RESPONSIBLE/ STAFF CONTACT DETAIL/EMAIL PHONE NUMBERS

Y/ QUALITY/ STANDARD/ TURNAROUND TIME FOR DELIVERY

WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

OBLIGATION TO BE COMPLIED WITH

FOR SERVICES AND PRODUCT WHERE APPLICABLE

PERFORMANCE TARGETQUANTITATIVE/QUALITATIVE

PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS

COMPLAINTS/ CONFLICT WILL BE DEALT WITH

1 Production of staff ID Card

ADMIN DEPARTMENTEmail:[email protected]

Commitment and dedication

Nil Not Applicable

Highest standard

For Newly Employed

1-hour

Renewal 1-hour Nil Updating to the present status of staff in line with promotion, upgrading and expiration

Missing Id Card Reprinting

1-hour Empathy Replacement of lost ID card

Agency Contractor & Consultant printing

1-hour Nil Highest standard

Providing means of identity and access to our facility for Contractors, Consultants and our Technical Partners,

Issuance of gate pass:-Industrial AttachésNYSC Members.

1-hour Access control Not applicable

Identity of IT students in the Agency

2 SECURITY ADMIN DEPARTMENT

Supervision of security operatives:-

1-day Focus For the outsourced security in

Highest standard

To ensure that critical safety equipment and

Page 146 of 172

Page 147: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

NAMA SecurityLegionnairesOutsourced SecurityArmed PoliceArmed AirmenSupernumerary Police

line with the contractual agreement

location are adequately manned.

Develop a robust relationship with the Police and Air force authority to get their timely support and response towards our security needs.

Posting and Deployment of security personnel

1-day Aptness Nil Not applicable

Highest standard

Preparation of monthly salary of the outsourced security operatives, Armed Police and Armed Airmen.

1-hour commitment Nil To ensure timely payment of salary to avoid compromise

Police/Airport Community relation Meetings

On invitation vigilance Synergy with the Police and the Airport community, sharing useful information

Keeping of register at the Security post for staff who work during the weekends

5-minutes Nil Not applicable

Highest standard

Ensuring security of personnel and office facility at weekends

Installation of Biometric Access control, CCTV and Body scanner

Period of contract

innovativeness Not applicable

Complementing physical security with application of modern security gadget and technology.

Page 147 of 172

Page 148: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Checking of car boots at closing hours

Momentarily Not applicable

To ensure full compliance of all the staff to security dictates.

NCAA/Other Parastatals periodic Aviation stakeholders security meeting

On invitation Not applicable

To meet up best practice in our security architecture in line with industry/ICAO standard.

Security patrol vehicle

Periodically Nil To ease transportation duty ad-hoc visit and supervision of security bits

Solid Waste Management and Refuse Disposal

Monthly Not applicable

Highest standard

Securing a healthy environment free of filth and epidemics

Fumigation and De-ratting of Offices and Management Residential Quarters.

Quarterly Nil In line with contractual agreement

working and safe free of rats, insect and dangerous reptiles

Office Allocation 1-day To create a conducive work spaces for all staff.

Office Cleaning, Environmental Upkeep

Admin Dept 2-hour, daily

For CENTREX in line with contractual agreement

Not applicable

To ensure that all offices, conveniences, and the Agency premises are tidy in order to have a healthy

Page 148 of 172

Page 149: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

environment.

Coordination of Reception-Lounge

2-hours Highest standard

Control the influx of visitors.

Effective supervision and control of human traffic into the premises Reduces loitering and prevent unwanted visitors during office hours.

Vehicular Control and Car-Park Manage-ment

Routinely Ensuring effective vehicular movement and utilization of parking space in conformity with the master plan.

Preparation of Reports and Monthly Bills of Temporary/Hired Cleaning Personnel

1-day Nil Not applicable

Highest standard

Better Service Delivery.

Avoiding compromise of any kind

Cleaners Duty Roster

Weekly Fixing cleaners for shift duties

Water supply Periodically Ensuring supply of water

Page 149 of 172

Page 150: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Cleaning of surroundings, weeding and trimming of flowers

Daily Nil Highest standard

Ensuring clean and healthy environment.

Fire Prevention and Safety

Daily Safety consciousness

Nil Not applicable

Ensuring that all fire alarms and fire prevention equipment are in good working condition.

Safety of Personnel and Equipment.

Access-Control at the Airport Toll-Gate

Annually Obligation Nil Access Permit of the Toll-Gate

4.0 MECHANISM TO MONITOR PERFORMANCE

• All Admin staff must work towards achieving the goals and the objectives of the department and the overall set goals and objectives of the Agency in general.

• They must be firm and fair to all.

• They must put on positive attitude, develop good interpersonal relationship and exploit effective communication with colleagues and superiors to help the job.

• Above all, staff must be alert to their job.

Page 150 of 172

Page 151: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

FINANCE AND ACCOUNTS DIRECTORATE1.0 INTRODUCTION

The Finance Department transcends payments of funds to staff and creditors. It consists of Budget and Vote Control, Treasury, Staff Salary, Computer Salary, Staff Accounts units, Debtors, Insurance, Fixed Assets Management and Stores Management units.

2.0 MISSION STATEMENT

To ensure prudent management of NAMA’s financial resources in the process of providing safe and functional air navigation services in line with ICAO and other international standards.

3.0 SERVICE PROVISON FINANCE DEPARTMENT

S/N PRINCIPAL SERVICE

ROLE/ DIVISION (UNIT) RESPONSIBLE/ STAFF/CONTACT DETAILS (EMAIL; PHONE

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL/ OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE

DELIVERY STANDARDS/ PERFORMANCE TARGET QUANTITATIVELY/ QUALITATIVEL

COMMUNICATION/REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

Page 151 of 172

Page 152: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

NUMBER) APPLICABLE

Y IMPACTS

1 EFFECTIVE COORDINATION OF THE GENERAL FINANCIAL AND ACCOUNTING PROCESS OF THE AGENCY, IN LINE WITH BEST PRACTICE.

SUPPORT FOR POLICY DECISION MAKING

GMF- [email protected]

Daily Monthly. Quarterly and yearly as the case may be.

RELEVANT AND AUTHENTIC TRANSACTION DOCUMENTS AND PROPER AUTHORITY

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

Not Applicable

Production of Financial statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

All complaints/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time.complaints can be lodged in person, in writing or through email

2 Coordination of the activities of Accounts department to ensure timely preparation and production of periodic financial reports for management decision making to meet statutory requirements.

GM (ACCOUNTS)

[email protected]

Daily, Monthly. Quarterly and yearly as the case may be.

RELEVANT AND AUTHENTIC TRANSACTION DOCUMENTS AND PROPER AUTHORITY

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

Not applicable

Production of Financial statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

All complains/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time. Complaints can be lodged in person, in writing or through email.

3 Coordination of the activities of gmfinance@nam

Daily, Monthly.

RELEVANT AND

CONSTITUTION OF THE FEDERAL

Not applicable

Production of Financial

Accuracy of reporting

All complains/ grievances

Page 152 of 172

Page 153: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

budget, staff account, salaries/pension units to ensure that financial processes are in line with best practices

a.gov.ng Quarterly and yearly as the case may be.

AUTHENTIC TRANSACTION DOCUMENTS AND PROPER AUTHORITY

REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

/processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time. Complaints can be lodged in person, in writing or through email.

4 Coordination of the activities of Final accounts, management information Reporting and stores Accounts units to ensure that all relevant reports are produced accurately and timely as well as ensuring that the statutory financial audit of the Agency is carried out within required period.

[email protected]

Daily, Monthly. Quarterly and yearly as the case may be.

TIMELY INPUTS FROM THE VARIOUS UNITS AND BRANCHES;

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

Not applicable

Production of Financial statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

All complains/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time. Complaints can be lodged in person, in writing or through email.

5 Coordination of the activities of treasury, cash

[email protected]

Daily, Monthly. Quarterly and

RELEVANT AND AUTHENTIC

CONSTITUTION OF THE FEDERAL REPUBLIC OF

Not applicable

Production of Financial statement and

Accuracy of reporting /processing.

All complaints/ grievances shall be

Page 153 of 172

Page 154: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

office, Reconciliation and forex units to ensure a seamless payment system, sound financial planning architecture and reporting.

yearly as the case may be.

TRANSACTION DOCUMENTS AND PROPER AUTHORITY

NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time.complaints can be lodged in person, in writing or through email.

6 Coordination of the activities of Receivable and insurance units to ensure maintenance, update and reconciliation of debtors records

DGM CREDIT CONTROL

Daily, Monthly. Quarterly and yearly as the case may be.

RELEVANT AND AUTHENTIC TRANSACTION DOCUMENTS AND PROPER AUTHORITY

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS),PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

Not applicable

Production of Financial statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

All complains/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time. Complaints can be lodged in person, in writing or through email.

7 Coordination of the activities of payable and fixed Assets unit to ensure maintenance and update of

DGM PAYABLE

gmfinancenama.gov.ng

Daily, Monthly. Quarterly and yearly as the case may be.

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg

Production of Financial statement and information that reflect a true and fair view of the Financial

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse

All complaints/ grievances shall be addressed within a maximum of seventy two

Page 154 of 172

Page 155: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

creditors, other third party and Fixed assets records

IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

position and performance of the Agency in line with global best practices

reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

(72) hours if genuine and prescribed documents are provided in good time. Complaints can be lodged in person, in writing or through email.

8 Monthly reconciliation of all the Agency’s bank accounts with respective banks to make sure statements are in agreement with NAMA cashbooks.

HEAD, RECONCILIATION UNIT

Monthly. Quarterly and yearly as the case may be.

Monthly Reconciliation of Treasury Single Account (TSA) and Capital Bank Account With Central Bank of Nigeria (CBN).

Timely input from the Cash and Expenditures Unit as it relates to the Cash book and the Bank Statement from Central Bank of Nigeria (CBN).

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

Not Applicable.

Financial Statement that reflect the correct Bank reconciliation Reporting.

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

All complains/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time. Complaints can be lodged in person, in writing or through email.

9 Preparing Treasury performance reports and cash flow projection for management information

TREASURY MGT. UNIT

Monthly. Quarterly and yearly as the case may be.

Not applicable

Production of Financial statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global

All complaints/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents

Page 155 of 172

Page 156: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

best practices are provided in good time. Complaints can be lodged in person, in writing or through email.

10 Maintenance , update and reconciliation of debtors’ or Receivable records

HEAD, CREDIT CONTROL/RECEIVABLE UNIT.

Daily Monthly. Quarterly and yearly as the case may be.

TIMELY INPUTS FROM THE VARIOUS UNITS AND BRANCHES;

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

Not applicable

Production of Financial statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

All complaints/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time. Complaints can be lodged in person, in writing or through email.

11 Ensuring the maintenance of third party/contract-ors’ records and payment of bills through the preparation of payment vouchers

HEAD, PAYABLE UNIT

Daily Monthly. Quarterly and yearly as the case may be.

RELEVANT AND AUTHENTIC TRANSACTION DOCUMENTS AND PROPER AUTHORITY

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND

Not applicable

Production of Financial statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

All complaints/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time.Complaints can be lodged

Page 156 of 172

Page 157: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

MGT. ACTS in person, in writing or through email.

12 Preparation of staff related payment vouchers, last pay certificate (LPC) and ensuring retirement of cash advances

HEAD, STAFF ACCOUNTS UNIT

Daily Monthly. Quarterly and yearly as the case may be.

RELEVANT AND AUTHENTIC TRANSACTION DOCUMENTS AND PROPER AUTHORITY

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

Not applicable

Production of Financial statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

All complaints/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time. Complaints can be lodged in person, in writing or through email.

13 Preparation and Processing of the Agency’s staff monthly salaries and pension

HEAD,SALARY AND PENSION

ENSURES TIMELY AND ACCURATE PROCESSING OF PAYROLL AND PENSIONS LATEST 23RD OF EVERY MONTH.

MONTHLY UPDATE OF STAFF LOAN

MONTHLY UPDATE OF TAX AND PFA SCHEDULE/SU

TIMELY INPUT FROM HR, AUDIT, STATION ACCOUNTANT, CO-OPERATIVES AND A SERVICABLE INTERNENT.

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

Not applicable

FINANCIAL STATEMENT REFLECT THE ACCURATE STAFF LOAN BALANCE.

AVOIDANCE OF GHOST WORKERS

STRICT COMPLIANCE WITH PRA ON PENSION DEDUCTIONS

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

All complaints/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time. Complaints can be lodged in person, in writing or through email.

Page 157 of 172

Page 158: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

BMISSION TO THE VARIOUS PFA.

14 Processing of payments to outstations and checking of financial reports therefrom

HEAD,BRANCH UNIT

Monthly. Quarterly and yearly as the case may be.

RELEVANT AND AUTHENTIC TRANSACTION DOCUMENTS AND PROPER AUTHORITY

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

Not applicable

Production of Financial statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

All complaints/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time.Complaints can be lodged in person, in writing or through email.

15 Preparation of monthly financial report on internally generated revenue(IGR),actual personnel cost, overhead and capital cost and ensuring submission to Federal ministry of Aviation

HEAD,MGT. INFORMATION REPORTING UNIT

Monthly. Quarterly and yearly as the case may be.

TIMELY INPUTS FROM THE VARIOUS UNITS AND BRANCHES;

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

Not applicable

Production of Financial statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

All complaints/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time.Complaints can be lodged in person, in writing or through email.

16 Preparation of HEAD, FINAL Monthly. TIMELY CONSTITUTION Not Production of Accuracy of All complains/

Page 158 of 172

Page 159: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

the Agency’s Auditable management accounts /Financial statement and required financial information for decision making.

ACCOUNTS UNIT Quarterly and yearly as the case may be.

INPUTS FROM THE VARIOUS UNITS AND BRANCHES;

OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

applicable Financial statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time.complains can be lodged in person, in writing or through email.

17 Maintenance, update and reconciliation of stores’ records to ensure that the total quantity and value in monetary terms are ascertained at any given time.

HEAD, STORES ACCOUNT UNIT

Daily Monthly. Quarterly and yearly as the case may be.

TRANSACTION SOURCE DOCUMENTS FROM OTHERS UNITS AND STORE AND EQUIPMENT MGT. DEPT.

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

Not applicable

FINANCIAL STATEMENT REFLECT THE CORRECT INVENTORY VALUE,

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

All complaints/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time. Complaints can be lodged in person, in writing or through email.

18 Maintenance , update of Non- current Asset records, as well as monitoring of

HEAD,NON-CURRENT ASSETS UNIT

Daily Monthly. Quarterly and yearly as the case may be.

TRANSACTION SOURCE DOCUMENTS FROM OTHERS UNITS, STORE

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS.

Not applicable

Production of Financial statement and information that reflect a true

Accuracy of reporting /processing.Timeliness of reporting/process

All complaints/ grievances shall be addressed within a

Page 159 of 172

Page 160: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

the acquisition, movement and disposal of the Agency’s Assets

AND EQUIPMENT MGT. DEPT. AND PROCUREMENT DEPT.

ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

and fair view of the Financial position and performance of the Agency in line with global best practices

ing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time.Complaints can be lodged in person, in writing or through email.

19 Collection of all Revenues due to the Agency, prompt payment of staff claims/salaries/third parties and safe keep of security documents

HEAD,CASH OFFICE

Daily Monthly. Quarterly and yearly as the case may be.

RELEVANT AND AUTHENTIC TRANSACTION DOCUMENTS AND PROPER AUTHORITY

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

Not applicable

Production of Financial statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

All complaints/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time.Complaints can be lodged in person, in writing or through email.

20 Preparation of monthly salary and preparation of tax report for management decision making

HEAD,COMPUTER SALARY AND PENSION

Monthly. Quarterly and yearly as the case may be.

RELEVANT AND AUTHENTIC TRANSACTION DOCUMENTS AND PROPER AUTHORITY

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT

Not applicable

Production of Financial statement and information that reflect a true and fair view of the Financial position and performance of

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and

All complaints/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and

Page 160 of 172

Page 161: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

the Agency in line with global best practices

consultant.Reduction of queries and observation by Auditors and consultants.

prescribed documents are provided in good time.Complaints can be lodged in person, in writing or through email.

21 Processing and payment of foreign currency related transactions for staff and third parties

HEAD, FOREX UNIT.

Daily , Monthly. Quarterly and yearly as the case may be.

RELEVANT AND AUTHENTIC TRANSACTION DOCUMENTS AND PROPER AUTHORITY

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND FINANCIAL CONTROL AND MGT. ACTS

Not applicable

Production of Financial statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by Auditors and consultants.

All complaints/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time.Complaints can be lodged in person, in writing or through email.

22 Preparation and defense of the Agency’s annual budget and preparation of budget performance report for management consideration

HEAD,BUDGET AND VOTE

Monthly. Quarterly and yearly as the case may be.

TIMELY INPUTS FROM THE VARIOUS DIRECTORATES, UNITS AND OUTSTATIONS;

CONSTITUTION OF THE FEDERAL REPUBLIC OF NIG., FINANCIAL REGULATIONS. ACCOUNTING STANDARDS, (eg IPSAS), PROCUREMENT ACT, APPROPRIATION ACT, AND OTHER RELEVANT AND

Not applicable

Production of Financial statement and information that reflect a true and fair view of the Financial position and performance of the Agency in line with global best practices

Accuracy of reporting /processing.Timeliness of reporting/processing.Non adverse reports by Auditors and consultant.Reduction of queries and observation by

All complaints/ grievances shall be addressed within a maximum of seventy two (72) hours if genuine and prescribed documents are provided in good time.

Page 161 of 172

Page 162: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

FINANCIAL CONTROL AND MGT. ACTS

Auditors and consultants.

Complaints can be lodged in person, in writing or through email.

4.0 MECHANISM TO MONITOR PERFORMANCE

i. Reconciled Report must be accurate to measure financial performance.ii. Accurate estimation of commitments and discharge of the obligations. This is for financial projection which is vital for

effective planning.iii. Budget estimates for control in line with the budgetary provisions.iv. To meet unforeseen occurrence during the budgetary periodv. Effective and Achievable Budget Targets.vi. To measure performance with the preceding period and Management Decision taking.vii. To measure plans with the actual performance and Identifying Courses for Variance.

LEGAL SERVICES DEPARTMENT1.0 INTRODUCTIONThe Directorate of Legal Services is a central organ of the Nigerian Airspace Management Agency that provides critical support to the Agency in discharging its statutory role of providing Air Navigation Equipment, Air Traffic Services and managing the Nigerian Airspace to ensure the safety, efficiency and orderly operation of aircrafts in Nigeria.The Directorate plays a pivotal role in protecting the Agency’s interest and advancing its objectives by ensuring that there is compliance with regulatory requirements and guidelines as enshrined in the Agency’s Establishment Act, the Civil Aviation Act, NCARs, ICAO Convention, Annexes and Guidance Materials as well as other relevant Laws and Regulations.

Page 162 of 172

Page 163: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

The Directorate provides the necessary legal support to the Agency in all areas of its operations through proffering of robust legal opinions and advice on legal issues, effective and efficient management of litigation, drafting, vetting, review and documentation of contract transactions involving the Agency as well as quality representation and contribution of valuable ideas at meetings within and outside the Agency.The Directorate also ensures that the Agency complies with the dictates of due diligence, due process and transparency in conformity and consonance with principles of corporate governance and industry best practices.The Legal Adviser is the Head of the Directorate of Legal Services.2.0 MISSION STATEMENT

To provide qualitative legal support services to ensure seamless service delivery towards the achievement of the corporate vision of the Agency.

3.0 SERVICE PROVISON: LEGAL SERVICES DEPARTMENT

S/N PRINCIPAL SERVICE

ROLE/DIVISION (UNIT) RESPONSIBLE/ STAFF/CONTACT DETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL /OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/ PERFORMANCE TARGET QUANTITATIVELY/ QUALITATIVELY

COMMUNICATION /REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

1, Advisory- the department ensures that the Agency conducts its activities in line with the Legal requirement and regulatory guidelines as provided for in the NAMA Act,

Legal Adviser, DGM, AGM and other Legal Officers

48Hrs. from receipt of request.

Request from the MD. Management, other departments and the Ministry on staff matters and Agency’s relationship with 3rd parties.

NAMA Act, NCARs, Extant laws, Legal principles, Government Regulations, Rules, Policies and Procedures.

Not applicable

In line with Standard Operating Procedures (SOP)

Proffer Legal Opinion/Advise in order to ensure that the Agency is properly guided to reduce Penalties, Levies and unnecessary litigation to the barest minimum.

Report to the Legal Adviser.

Page 163 of 172

Page 164: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

NARs and International Standard and recommended practices.

2. Litigation Management- liasing with external solicitors on matters in court, monitoring the cases by attending proceedings and trials, and producing report of the proceedings.

DGM, AGM and all other Legal Officers

As requested, after every meeting with External Solicitors and after every court attendance

i)Receipt of court processes/ document.

ii)Review of processes/ document.

iii)Appointment of External Solicitor.

iv)Watching of legal Brief and Monitoring of the cases.

v) Liaising with Units/Depts in the Agency directly affected by the Litigation.

The NAMA Act, NAMA condition of Service, Public Service Rules Civil/Criminal Procedure Rules and Court Rules and Extant Government Regulations.

N/A. all litigation fees are paid to external Solicitors.

In line with SOP Report/Update on court proceedings are prepared and forwarded to the LA and filed appropriately.

The Legal Adviser reverts to the MD/CE on developments or issues arising from the litigation or court processes or outcome of the case(s).

3. Vetting of all documents, Drafting of Legal Documents such as SLA, MOU, Contract Agreement and

Legal Adviser, DGM, AGM and other Legal Officers

48hrs from receipt/confirmation of all relevant pre drafting documentation.

i) Receipt of request for drafting or vetting of Agreements or Legal documents.

In accordance with the NAMA Act, Procurement Act, the Public Service

Not applicable

In line with the SOP

Submission of final copies of documents/Agreements devoid of any implication or liability to the Agency before perfection.

Report to the Legal Adviser and the MD/CEO

Page 164 of 172

Page 165: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

all Agreements between the Agency and its Staff or third parties Perfection of Legal tittles.

ii)Reviews and assesses the request.

iii)Preparation of the contract or vetting of the contractual document.

iv)Pre execution of documents /Agreement

v) Execution of Documents/ Agreements

vi) Post Execution of these Documents/ Agreements

Rules, the COS and the use of standard forms and precedents to ensure uniformity

4. Repository of Legal Documents

Legal Adviser Within 24hrs After proper execution and delivery of the document.

All contractual Agreements and documents between the Agency and its staff or third parties are, after execution kept in safe custody for preservation and future

NAMA Act, COS, CAMA

Not applicable

In line with SOP The documents are properly recorded, filed and kept in safety.

Page 165 of 172

Page 166: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

reference.5. Regulatory

Compliance.The Department ensures that the Agency adheres to all regulatory/ legal requirements necessary for its operation

Legal Adviser, DGM, AGM and other legal officers

As soon as practicable

Review of relevant regulations, rules, and policies and laws that impact or guide on the operations of the Agency to ensure compliance and adherence thereto.

NAMA Act, COS, NCARs, ICAO, Court Rules and extant government rules, regulations and laws.

Not applicable

Report on the review/ interpretation is produced and sent to the department/ unit which it affects.

5.0 MECHANISM TO MONITOR PERFORMANCE

i) All legal documents must be vetted and approved by the Legal Adviser or a delegated official before final decision.ii) Maintenance of Professionalism and standards to achieve the Agency’s ultimate objective of provision of safe, reliable,

efficient and economic Air Navigational Services.iii) Ensuring compliance with Industry standard and practices and extant rules and regulations, policies and procedures.

OFFICE OF THE COMPANY SECRETARYThe functions of the office of the Company Secretary include but not limited to the following:

Serve as Secretary to the Board and Board Committees, including Management or Management Committee Meetings, providing guidance to both Board and Management on the Best Practices in the proper conduct of meetings and corporate governance.

Coordinate all administrative, financial and budgeting issues for Board activities and Board members including preparation and presentation of Board Papers, Memos and Minutes.

Coordinate, monitor and follow-up action points arising from Board, Management and Committee meetings to ensure due and timely compliance, reporting back to the Board or MD/CE on the compliance status of all such matters.

Page 166 of 172

Page 167: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Coordinate all reports of Management intended for preparation and presentation as Board Papers to the Board, including papers or reports intended for presentation at Management meetings.

Serve as custodian of the Agency's Corporate Seal, affixing same unto Agency's contracts and documents as duly authorized by the Board.

Assist the Board in the performance of all its statutory functions, compliance with all relevant laws, and adoption of Corporate Governance Best Practices, inviting input where considered necessary from other departments within the Agency.

Perform such other company secretarial services as may be required by the Board and Management of the Agency from time to time.

Assisting the MD/CE in coordinating Ministerial and Inter-Agency liaison, cooperation and communication, including interaction with local and international aviation industry and agencies.

Assisting the MD/CE in coordinating the domestication, dissemination and compliance within NAMA of policies and best practices received from the Ministry and relevant local and international Agencies.

Coordinating the design, development, implementation and continuous improvement of an effective Corporate Governance and Compliance Framework in line with international best practices.

Coordinating the framework for the Corporatization of NAMA and matters relating thereto. Full involvement and participation in the conceptualization, development and implementation of all Agency goals and

Strategic Impact Plans.And such other functions as maybe prescribed from time to time.

3.0 SERVICE PROVISON OFFICE OF THE COMPANY SECRETARY

S/N PRINCIPAL SERVICE

ROLE/DIVISION (UNIT) RESPONSIBLE/ STAFF/CONTACT DETAILS (EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL /OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/ PERFORMANCE TARGET QUANTITATIVELY/ QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

1. Conduct of the Board or its

Company Secretariat/

As requested and in line

Notice(s) to the Company

As provided in the NAMA Act

Not applicable

In line with SOP. Production of Records of

Report to the Board

Page 167 of 172

Page 168: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Committees’ meetings.

Company Secretary/

with the Notice(s) or requests.

Secretary from the Board Chairman

and extant Federal Govt. Circulars.

Proceedings/Minutes, extracts or Resolutions.

Chairman or the MD/CE.

2. Conduct of Management Meetings.

Company Secretariat/ Company [email protected]

As requested and in line with the Notice(s) or requests.

Instruction(s) to the Company Secretary from the MD/CE.

As provided in the NAMA Act and extant Govt. Circulars.

Not applicable

In line with SOP. Production of Records of proceedings/Minutes, extracts or Resolutions.

Report to the MD/CE.

3. Conduct the correspondence and keeping/ providing records of Board and Management meetings of the Agency.

Company Secretariat/ Company Secretary

As requested and in line with the request.

Correspondences must be provided to the Company Secretariat.

As provided in the NAMA Act, extant Govt, Circulars and the FOI Act.

Not applicable

In line with SOP. Response to the correspondence or provision of the records requested.

Report to the Board Chairman, MD/CE or the Company Secretary.

4. Performance of Adhoc duties from Management and Board.

Company Secretariat/ Company Secretary

Available and in line with the completion or delivery period for such tasks.

Specifics of the tasks or ad-hoc duties must be provided.

Determined by the task or duties assigned.

Not applicable

In line with SOP. Delivery of Reports or completion of the ad hoc duties within stipulated period.

5. Affixing the Agency’s Seal on documents.

Company Secretariat/ Company Secretary

Documents to be sealed must be duly vetted and made available to the Company Secretariat. 7 days

Compliance with the laws of the Federal Republic of Nigeria,

Not applicable

In line with SOP.

Affixing of the Agency’s seal on the document (s). “

6. Coordinate all reports / Documents of Management intended for preparation and

Company Secretariat/ Company Secretary

Available and up till 48 hours after the circulation of Notices for the meetings.

Early submission of the Reports or Memos for Consideration to the

Not applicable

In line with SOP. Presentation of the Reports or documents to the Board or Management meetings.

Report to the Board Chairman, MD/CE or the Company Secretary.

Page 168 of 172

Page 169: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

presentation as Board papers to the Board, including papers or reports intended for presentation at Management meetings.

Secretariat. Memos to the Board shall be submitted at least a week before the Board meetings while Management Memo shall be at least 48 hours to the meetings.

TRANSPORT AND LOGISTICS DEPARTMENT1.0 INTRODUCTION

The Transport Department is responsible for providing transportation management solutions to all departments in the Agency as well as managing the Agency’s logistics requirements. The Department is under the Office of the Director of Human

Page 169 of 172

Page 170: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

Resources/Administration and is charged with the responsibility of running and maintaining the Agency’s vehicles and providing other logistic support to other departments.

2.0 MISSION STATEMENT

To focus on the provision of credible, efficient and effective transport management solutions and logistics support to a

3.0 SERVICE PROVISON TRANSPOST AND LOGISTICS DEPARTMENT

S/N PRINCIPAL SERVICE

ROLE/DIVISION (UNIT) RESPONSIBLE/ STAFF/CONTACT DETAILS(EMAIL; PHONE NUMBER)

SERVICE AVAILABILITY/ QUALITY STANDARD/ TURNAROUND TIME FOR DELIVERY

CUSTOMER OBLIGATION/ WHAT IS NEEDED TO DELIVER EFFECTIVE SERVICE

LEGAL /OTHER REGULATIONS TO BE COMPLIED WITH

FEES/ CHARGES FOR SERVICE AND PRODUCT WHERE APPLICABLE

DELIVERY STANDARDS/ PERFORMANCE TARGET QUANTITATIVELY/ QUALITATIVELY

COMMUNICATION/REPORT ON PERFORMANCE (KEY PERFORMANCE INDICATORS/ OUTCOMES OR IMPACTS

MONITORING ACTIVITY (HOW COMPLAINTS/ CONFLICTS WILL BE DEALT WITH)

1 TRANSPORT AND LOGISTICS

TRANSPORT AND LOGISTICSEmail:[email protected]

TRANSPORT AND LOGISTICS

OUR DUTY IS TO ENSURE THAT LOGISTICS OF OPERATIONS PROPERLY ARTICULATED TO ENSURE OPTIMAL PERFORMANCE. THE DEPARTMENT REQUIRES ADEQUATE NUMBER OF VEHICLES IN THE FLEET AND PROMPT

ITS BASICALLY APPLICABLE TO TRANSPORT AND LOGISTICS IN THE INDUSTRY

Not applicable

PROMPT RESPONSE TO OPERATIONAL NEEDS

TIMELY RESPONSE AND QUALITY SERVICE DELIVERY

HOD REGULAR MEETINGS AND APPRAISALS

Page 170 of 172

Page 171: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

FUNDING2 Making fuel

and lubricants available to the Agency’s vehicles and other equipment as the need arises

The servicing of vehicle takes few hours i.e 3 hours especially it’s a routine type.

3 Managing all vehicles in the Agency and monitoring their movement

Fueling is dependent on the volume of assignment and distance covered in carrying out the assignment.

4 Providing logistic support to all departments in the Agency

ALLOCATION OF VEHICLES FOR OFFICIAL ASSIGNMENTS

ON REQUEST AND AVAILABILITY OF VEHICLE

COS, NAMA ACT

Not applicable

AVAILABILITY OF VEHICLE

SMS, EMAIL, CALL HOD

5 Ensuring that all the Agency’s vehicles remain serviceable through regular maintenance

WHEN VEHICLE REACHED SERVICE MILEAGE

REMINDER FROM DRIVER ON LAST SERVICE DATE

MANUFACTURERS STANDARD

PROVISION OF FUND BY MANAGEMENT

MANUFACTURERS SPECIFICATION

SERVICE CHAT HOD

6 Advising Management on the acquisition and

Page 171 of 172

Page 172: Image and Video Upload, Storage, Optimization and CDN · Web viewa2 size= $60US dollarsa0 size = $80US dollars ICAO mandatory enroute chart customer toGM 3 AIP Publication 4.0 MECHANISM

disposition of vehicles

7 Providing on-the-spot assessment of vehicular breakdown and accidents

8 Periodic report on the state and condition of all NAMA vehicles

The drivers are to carry out assignments as directed by the Transport Officer. They are also responsible for the monitoring of the conditions of the vehicles at all times which in turn the period of maintenance and servicing.

MECHANISM TO MONITOR PERFORMANCEi. Periodic performance evaluation and reports to the Managementii. Audit reportsiii. To ascertain that the Agency’s vehicles are serviceable at all times.

iv. The prompt availability of fuel and lubricants.

Page 172 of 172


Recommended