Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator [email protected]
Transcript
Page 1: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

Impaired and TMDL Waterbody Listings Impacts on DoD Facilities

Bill Melville, Regional TMDL [email protected]

Page 2: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

Objectives

• Watershed Protection and Restoration

• DoD Facilities Potentially Impacting Impaired Waters

• Pollutant Sources Which Could be Addressed by a TMDL

• Permitted Discharges Causing or Contributing to a Water Quality Standards Violation

• Take Home Messages

Page 3: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

Watershed Protection and Restoration

Goal of the Clean Water Act- to restore and maintain the physical chemical, and biological integrity of the nation’s waters.

• Section 303(d) Impaired waterbody list identifies those waters with significant violations of water quality standards.

• Total Maximum Daily Load analyses document the allowable pollutant load under critical flow conditions and estimate the pollutant load reduction necessary to achieve water quality standards.

Page 4: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

Identify Impaired Waterbodies

Develop TMDLs

Monitoring Network

Implementation Plans

DemonstrationsWater Quality Targets

Watershed Management

Strategy

Adaptive Implementation Concept

Page 5: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

DoD Facilities

• Corps of Engineers Reservoirs• 28 lakes and reservoirs• Several interstate waterbodies• Nutrients, PCBs, DO

• Military Installations • 36 facilities• Pathogens, sediment, DO, nutrients, mercury,

metals

Page 6: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.
Page 7: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

Five States Have Court Ordered Schedules:

Georgia- Completed TMDL schedule requirements. 1560 TMDLs completed.

Contact- [email protected] Alabama- Anticipate TMDL schedule completion

in 2008. 225 TMDLs completed.

Contact- Daphne [email protected]

State TMDL Program Status

Page 8: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

State TMDL Program Status

Tennessee- On track to complete TMDL schedule requirements before 2011 deadline. 698 TMDLs completed.Contact – [email protected]

Mississippi- On track to complete TMDL schedule by 2011. 828 TMDLs completed.Contact – [email protected]

Page 9: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

State TMDL Program Status

Florida- On track to complete TMDL schedule by 2012. EPA has produced most of the 505 TMDLs.

Contacts: [email protected]@dep.state.fl.us

Kentucky- Working with State program to enhance production. 61 TMDLs completed.

Contact- [email protected]

Page 10: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

State TMDL Program Status

North Carolina- Working with State program to enhance TMDL production. 117 TMDLs completed.

Contact: [email protected]

South Carolina- Early focus on pathogen TMDLs, now addressing other pollutants. 317 TMDLs completed.

Contact- (Matt Carswell)

[email protected]

Page 11: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.
Page 12: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

Potential Sources Addressed by TMDLs • Total Maximum Daily Load Equation

TMDL = WLA + LA +MOS

TMDL- Allowable pollutant load under critical conditions

WLA – Waste Load Allocation sources covered by Clean Water Act NPDES regulations (Point sources, MS4 stormwater, general stormwater permits)

LA- Load Allocation sources include unregulated nonpoint sources, loads from RCRA, CERCLA, air deposition impacting the surface waterbody.

Page 13: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

Lake Weiss Alabama and Coosa River Georgia PCB TMDLs

• Coosa River predominant source of PCBs in Lake Weiss.

• Both TMDLs designed to meet fish consumption advisory criteria.

• Predominant source of PCBs from a RCRA permitted facility in Georgia. • TMDL required more stringent PCB removal. • High Volume Sampler enabled direct measure of PCB

instream concentrations and documented effluent and ground water contributions.

• RCRA permit revised to reflect TMDL target.

Page 14: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

Impaired Water Listing and TMDL Impacts on NPDES Discharges

• All NPDES dischargers must ensure that they do not cause or contribute to a water quality standards violation. 40 CFR 122.44(d)• Existing wasteload allocations may be reliant on inappropriate

water quality model assumptions.

• Stormwater permits, MS4s, and general permits presume appropriate best management practices will protect the receiving waterbody. 40 CFR 122.26(k)• Permits lack robust monitoring requirements to

document that they are not causing or contributing to a water quality standards violation.

Page 15: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

Facility Discharging Pollutant(s) of Concern to an Impaired Waterbody

PRE - TMDL• Facilities allowed to continue discharging under

current NPDES permit conditions.• States typically administratively continue permits.

• No net addition of pollutant(s) of concern is allowed from new or expanded NPDES facilities.

• An increase in discharge volume with treatment upgrades have been approved.

• A new discharge that can demonstrate that it does not cause or contribute to the degradation of the waterbody.

Page 16: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

Facility Discharging Pollutant(s) of Concern to an Impaired Waterbody

Post TMDL for Point NPDES Facilities The Wasteload Allocation (WLA) is defined. State

regulations vary on when NPDES permit is reopened to conform to the TMDL.

New NPDES permit limits and a compliance schedule typical result.

If the WLA requires stringent load reductions which are technically or economically unachievable, facility can apply for a variance.

TMDL analysis may identify a need for a site-specific water quality standard revision.

Page 17: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

Facility Discharging Pollutant(s) of Concern to an Impaired Waterbody

Post TMDL Stormwater NPDES Permit• TMDLs typically express stormwater wasteload

allocations as a percent reduction from estimated baseline conditions and “daily load” values.

• Status-quo is a no go. The existing MS4 permits, by analysis are not sufficient to achieve the water quality standards.• Enhanced best management practices and revised

stormwater implementation plans should be incorporated into the permit requirements.

• EPA will be working with States to ensure TMDL requirements are more clearly addressed in stormwater permits.

Page 18: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

Future Considerations

Impaired Waterbody Lists updated every two yearsNew pollutants of concern can be identified Change in water quality standards changes impairment status

TMDLs are “living” documentsTMDL load allocations can change based upon:

new analyses, data;change to water quality standards.

TMDLs typically allocate 100 percent of allowable load. Additional load has to come from other existing sources.

Page 19: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.

Take Home Messages

• Impaired Waterbody Lists are dynamic.• TMDL allocations can be revised.• TMDLs can impact facility RCRA permits and

CERCLA records of decision. • There are NPDES permit regulations that apply to

impaired waterbodies in the absence of a TMDL.• Stormwater permits need to address TMDL WLA. • A facility wasteload allocation under a TMDL may be

difficult to change to accommodate future growth.

Page 20: Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator melville.william@epa.gov.