+ All Categories
Home > Documents > Implementation of Sharing of Inter-State Transmission ...

Implementation of Sharing of Inter-State Transmission ...

Date post: 22-Oct-2021
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
11
--------------------------------------------- Corporate office--------------------------------------------------- Indian Energy Exchange Limited Unit no.3,4,5 & 6, Fourth Floor, Plot No.7, TDI Center, District Center, Jasola, New Delhi 110 025 Phone: 011 - 4300 4000 | Fax: 011 - 4300 4015 | www.iexindia.com CIN: U74999DL2007PLC277039 Circular No.: IEX/MO/379/2020 Date: 30 th November 2020 Implementation of Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 in STOA Collective and Bilateral Transactions Dear Members, As you may be aware, the Hon’ble CERC, vide notification No. L-1/250/2019/CERC dated 4 th May-2020 notified the Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020. Further CERC vide notification dated 08 th August-2020 communicated that the said Regulations shall come into force w.e.f 01 st November-2020. Clause 11 (2) and (5) of the above Regulations which has provided for the applicability of ISTS Transmission charges for STOA collective and bilateral transactions are reproduced below - “11 (2) Transmission charges for Short Term Open Access shall be payable by generating stations and embedded entities located in the State, as per the last published Short Term Open Access Rate for the State, along with other charges or fees as per Open Access Regulations, 2008 and the Transmission Deviation charges, if any, as per these regulations. 11(5) No transmission charges for Short Term Open Access for inter-State transmission system, shall be payable by a distribution licensee which has Long Term Access or Medium Term Open Access or both, or by a trading licensee acting on behalf of such distribution licensee: Provided that other charges or fees as per Open Access Regulations, 2008 and the Transmission Deviation charges, if any, as per these regulations shall be payable.In pursuance of the above Regulations, NLDC vide letter dated 29 th November-2020 has intimated the Exchanges to make the applicability of STOA rates in the collective transactions (DAM and RTM) in line with the Sharing Regulations 2020 w.e.f. delivery date 02 nd December-2020 . Based on the above the members are requested to please take note of the following 1. Computation of STOA rates of the States shall be done along with the computation of transmission charges for LTA/MTOA in line with Sharing Regulations 2020 which shall be made effective from 01 st January-2021. 2. Till 01 st January-2021, last published STOA rates (2020-21 Q2) as approved by CERC shall be applicable. 3. No transmission charges for STOA under collective transactions (DAM and RTM) shall be payable by Discoms with LTA/MTOA or the trading licensees applying on behalf of Discoms with LTA/MTOA. However, other charges or fees as per Open Access Regulations 2008 shall be payable.
Transcript

--------------------------------------------- Corporate office---------------------------------------------------

Indian Energy Exchange Limited

Unit no.3,4,5 & 6, Fourth Floor, Plot No.7, TDI Center, District Center, Jasola, New Delhi 110 025

Phone: 011 - 4300 4000 | Fax: 011 - 4300 4015 | www.iexindia.com CIN: U74999DL2007PLC277039

Circular No.: IEX/MO/379/2020 Date: 30th November 2020

Implementation of Sharing of Inter-State Transmission Charges and Losses

Regulations, 2020 in STOA Collective and Bilateral Transactions

Dear Members,

As you may be aware, the Hon’ble CERC, vide notification No. L-1/250/2019/CERC dated 4th May-2020

notified the Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020. Further CERC vide

notification dated 08th August-2020 communicated that the said Regulations shall come into force w.e.f 01st

November-2020.

Clause 11 (2) and (5) of the above Regulations which has provided for the applicability of ISTS Transmission

charges for STOA collective and bilateral transactions are reproduced below -

“11 (2) Transmission charges for Short Term Open Access shall be payable by generating stations and

embedded entities located in the State, as per the last published Short Term Open Access Rate for the State,

along with other charges or fees as per Open Access Regulations, 2008 and the Transmission Deviation

charges, if any, as per these regulations.

11(5) No transmission charges for Short Term Open Access for inter-State transmission system, shall be

payable by a distribution licensee which has Long Term Access or Medium Term Open Access or both, or by

a trading licensee acting on behalf of such distribution licensee:

Provided that other charges or fees as per Open Access Regulations, 2008 and the Transmission Deviation

charges, if any, as per these regulations shall be payable.”

In pursuance of the above Regulations, NLDC vide letter dated 29th November-2020 has intimated the

Exchanges to make the applicability of STOA rates in the collective transactions (DAM and RTM) in line

with the Sharing Regulations 2020 w.e.f. delivery date 02nd December-2020 .

Based on the above the members are requested to please take note of the following –

1. Computation of STOA rates of the States shall be done along with the computation of transmission

charges for LTA/MTOA in line with Sharing Regulations 2020 which shall be made effective from 01st

January-2021.

2. Till 01st January-2021, last published STOA rates (2020-21 Q2) as approved by CERC shall be applicable.

3. No transmission charges for STOA under collective transactions (DAM and RTM) shall be payable by

Discoms with LTA/MTOA or the trading licensees applying on behalf of Discoms with LTA/MTOA.

However, other charges or fees as per Open Access Regulations 2008 shall be payable.

--------------------------------------------- Corporate office---------------------------------------------------

Indian Energy Exchange Limited

Unit no.3,4,5 & 6, Fourth Floor, Plot No.7, TDI Center, District Center, Jasola, New Delhi 110 025

Phone: 011 - 4300 4000 | Fax: 011 - 4300 4015 | www.iexindia.com CIN: U74999DL2007PLC277039

4. In case of members having Discom as their portfolio, they are requested to furnish the following

information from their respective SLDCs regarding the Discoms’ LTA or MTOA to avail the exemption

provided under the 11(5) of the above Regulations latest by 11:00 hours of 01st December-2020 as the same needs to be applied w.e.f delivery date 02nd December-2020 in Collective (DAM and RTM) transactions. (a) Name of the Discom (name as mentioned in Standing Clearance)

(b) Whether DISCOM has LTA/MTOA (Yes/No)

(c) Quantum of LTA/MTOA (MW)

(d) Start date and expiry date of LTA/MTOA

In absence of above required details from SLDCs, we will continue to levy ISTS transmission charges

for respective Discoms.

5. Since no exemption is applicable to Power Exchanges applying on behalf of Discoms with LTA/MTOA

for Term Ahead Market (TAM) transactions, we will be applying on behalf of the Seller and accordingly

ISTS transmission charges will have to be borne by the Seller.

6. Transmission charges for STOA shall be payable by generating stations and embedded entities located in

the state as per the available published withdrawal rate of the state in which they are geographically

located. In this regard, Annexure-III of the Hon’ble Commission’s order no. L-1/44/2010-CERC dated

01st August-2020 available at http://www.cercind.gov.in/2020/orders/L-1-44-2010-01-08.pdf may be

referred.

7. As it has been decided to implement the applicability of STOA rates w.e.f. 01st Nov-2020, retrospective

revision with regard to transmission charges for the approved transactions for which application was made

on or after 01st Nov-2020 shall be carried out and accordingly settlement will be done.

For and on behalf of

Indian Energy Exchange Limited Sd/- Amit Kumar

Senior Vice President (Market Operations)

पावर सिस्टम ऑपरेशन कारपोरेशन सिसमटेड (भारत िरकार का उपक्रम)

POWER SYSTEM OPERATION CORPORATION LIMITED (A Government of India Enterprise)

पंजीकृत एवं कें द्रीय कायाािय:बी-9, कुतुब इंस्टीट्यूशनि एररया, कटवाररया िराय, नई दिल्िी-110016

(CIN No: U40105DL2009GOI188682)

Registered Office: B – 9, 1st Floor, Qutab Institutional Area, Katwaria Sarai, New Delhi - 110016 Website: www.posoco.in, Tel: 011 – 26536832, 26524522, Fax: 011 – 26524525, 26536901

POSOCO/NLDC/PX Date: 29th November 2020 To, 1. The Managing Director 2. The Managing Director

Indian Energy Exchange Limited Power Exchange India Limited Unit No. 3,4,5 and 6 9th Floor, 901, Sumer Plaza Fourth Floor, TDI Centre Marol Maroshi Road Plot No - 7, Jasola Marol Andheri (East), New Delhi – 110025 Mumbai – 400059

Subject: Applicability of STOA rates in collective transactions (Day Ahead Market and Real Time Market) in line with Sharing Regulations 2020.

Sir,

Detailed deliberations were held between NLDC and CERC officials regarding the

issues involved in application of Short Term Open Access (STOA) charges for implementation

of Sharing Regulations 2020, wherein it was decided to implement the applicability of STOA

rates w.e.f. 01st Nov 2020 as per clause 11(5) of the said Regulations.

Accordingly, a meeting was held on 28th November 2020 at 17:00 hrs on Webex

between National Load Despatch Centre and Power Exchanges to decide the implementation

modalities of applicability in collective transactions. Based on the above discussions following

points have been finalized:

1. Computation of STOA rates of the states shall be done along with the computation of transmission charges for LTA/MTOA in line with Sharing Regulations 2020 which shall be made effective from 01st January 2021.

2. Till 01st January 2021, last published STOA rates (2020-21 Q2) as approved by CERC shall be applicable.

3. No transmission charges for STOA under collective transactions (DAM and RTM) shall be payable by Distribution licensees with LTA/MTOA or the trading licensees applying on behalf of distribution licensees with LTA/MTOA. However, other charges or fees as per Open Access Regulations 2008 shall be payable.

4. NLDC shall share the available information in respect of LTA/MTOA with the Power Exchanges. The Power Exchanges shall also seek the details of LTA/MTOA from the individual market participants and also get confirmation from State Load Despatch Centres (SLDCs) so as to identify which DISCOMs are exempted from payment of

पंजीकृत कार्ाालर्:बी - 9,कुतुब इंस्टीट्यूशनल एरिर्ा, कटवारिर्ा सिार्,नई दिल्ली - 110016, िूिभाष: 011-26536832,फैक्स:011-26524525

Registered Office: B-9, Qutub Institutional Area, Katwaria Sarai, New Delhi - 110016, Tel: 011-26536832, Fax:011-26524525

transmission charges. In this regard, the minimum information needed is as follows: (a) Whether DISCOM has LTA/MTOA (Yes/No) (b) Quantum of LTA/MTOA (MW) (c) Start date and expiry date of LTA/MTOA

5. No exemption is applicable to Power Exchanges applying on behalf of Distribution licensees with LTA/MTOA for Term Ahead Market (TAM) transactions and all charges shall be payable.

6. Transmission charges for STOA shall be payable by generating stations and embedded entities located in the state as per the available published withdrawal rate of the state in which they are geographically located. In this regard, Annexure-III of the Hon’ble Commission’s order no. L-1/44/2010-CERC dated 01.08.2020 available at http://www.cercind.gov.in/2020/orders/L-1-44-2010-01-08.pdf may be referred.

7. As already decided to implement the applicability of STOA rates w.e.f. 01st Nov 2020, retrospective revision with regard to transmission charges for the approved transactions for which application was made on or after 01st Nov 2020 shall be done and transmission charges are to be refunded.

Based on the various aspects mentioned above, Power Exchanges are requested to

implement the applicability of STOA rates in the collective transations (DAM and RTM) in line

with the Sharing Regulations 2020 w.e.f. trade date 01st December 2020 (delivery date 02nd

December 2020).

Thanking You,

Yours faithfully,

(S. C. Saxena) Sr. General Manager, NLDC

Ref. No.: WRLDC/MO/STOA/2020 Date: 29/11/2020

To,

All the STOA Applicants and Utilities.

Subject – Implementation of Sharing of Inter-State Transmission Charges and Losses

Regulations, 2020 in STOA Bilateral Transactions.

Dear Sir,

As you may be aware, the Hon’ble CERC, vide notification No. No.L-1/250/2019/CERC dated 4th

May 2020 notified the Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020.

As per clause 11 (5) of the above said Regulation, the applicability of ISTS Transmission charges

for STOA bilateral transactions is reproduced as below -

Quote

“No transmission charges for Short Term Open Access for inter-State transmission system, shall

be payable by a distribution licensee which has Long Term Access or Medium Term Open Access

or both, or by a trading licensee acting on behalf of such distribution licensee:

Provided that other charges or fees as per Open Access Regulations, 2008 and the Transmission

Deviation charges, if any, as per these regulations shall be payable.”

Unquote

In line with the Sharing Regulations 2020, a procedure was prepared by the implementing agency

(NLDC) which is available at

https://posoco.in/wp-content/uploads/2020/09/Addendum-to-Procedure-published-for-computation-

and-sharing-of-transmission-charges_final.pdf

and

https://posoco.in/final-procedures-for-implementation-of-sharing-regulations-2020/.

Your attention is drawn to the clause no. 9.2 & 9.5 of the above Procedure for Computation and

sharing of Inter-State Transmission System Charges and subsequent addendum to it.

Quote

“9.2 Transmission Charges for STOA transactions shall be payable by generating stations and

embedded entities located in the State, as per the last published STOA Rate for the State. In case

of drawee entities that are users of RLDC which have no Long Term Access or Medium Term

Open Access, STOA Rate of the state in which they are located shall be applicable.

9.5 STOA bilateral transactions where buyer and seller both are distribution licensees or traders

applying on behalf of such distribution licensees, one having Long Term Access or Medium Term

Open Access or both and the other licensee having no Long Term Access or Medium Term Open

Access, then the following shall apply:

(a) If distribution licensee with Long Term Access or Medium Term Open Access or both has

applied for STOA, then no transmission charges for STOA transactions shall be applicable

(b) If distribution licensee without any Long Term Access or Medium Term Open Access or both

has applied for STOA, then transmission charges for STOA transactions shall be applicable”

Unquote:

The above clauses are mapped in a tabular form by the Implementing Agency for ease of

understanding. The same is enclosed at Annexur-1 for reference.

It may be noted that all other applicable charges viz. state transmission charges, operating charges

and application fee etc. will continue as per the CERC(Open access in interstate transmission)

Regulations-2008 (as amended).

Further, vide notification no. L-1/250/2019/CERC dated 8.8.20 the effective date of implementation

for regulation was notified to be 01st Nov 2020. Accordingly, the philosophy of applicability of new

STOA bilateral rates in line with latest Sharing Regulation 2020 shall be effective for the

applications received on and after date of 01st Nov 2020.

The process of punching and processing of STOA applications in line with the latest Sharing

Regulation 2020 on the STOA software portals of RLDCs is under development and will be made

live at the earliest. Till the S/W is upgraded with all the above requirements, following methodology

will be adopted by RLDCs:

1. Till Jan’2021, only existing withdrawal charges of the respective states as per the order by

Hon’ble CERC shall be considered as the STOA rate for each transactions in line with latest

Sharing Regulation 2020. If any STOA application is punched by any utility or trader except

Regional entity distribution licensee with LTA/MTOA or on its behalf then the withdrawal

rate of the state where the generator is located shall be applicable.

2. The payments received against applications applied on and after 01/11/2020 shall be revised

in line with the latest Sharing Regulation 2020 and necessary refund shall be done by 15th

of

Dec’2020.

3. To assess the applicability of ISTS transmission charges for already approved STOA

Bilateral transactions (during the aforementioned period), the applicant, Trader/PX, shall

declare whether the application is made on behalf of seller/buyer. Approval wise declaration

shall be sent on < [email protected] > by 24 Hrs of 30th Nov 2020.

4. The above refund of STOA charges, on this account, if any, shall be made only after the

receipt of declaration.

5. Advance and FCFS applications received till deployment of upgraded STOA software, will

be approved manually in line with latest Sharing Regulation 2020. Accordingly, the

applicant, trader/PX, shall declare whether the application is made on behalf of buyer/Seller.

6. Day ahead and contingency approvals received till deployment of upgraded STOA software,

shall be done by applying the old rates (both injection and withdrawal), and necessary refund

in line with the latest Sharing Regulation 2020 shall be done by RLDC to the applicant. At

the end of the day Traders/PX shall submit the list of their respective approved approvals

with a declaration mentioning on who’s behalf they have submitted the application, Seller/

buyer.

Thanking you.

(S Usha)

General Manager (MO & Regulatory)

S.No Region Regional Entity Regulatory codeRegional Entity

Code

ISTS Transmission

Charges Applicable (In

Rs./MWh)

1 Northern Chandigarh N0RCH0 CH0 133.7

2 Northern Delhi N0RDL0 DL0 210.4

3 Northern H.P. N0RHP0 HP0 57

4 Northern Haryana N0RHR0 HR0 363.9

5 Northern J&K N0RJK0 JK0 95.3

6 Northern Sewa-II Power Station N0RSW2 SW2 95.3

7 Northern Punjab N0RPU0 PB0 287.2

8 Northern Rajasthan N0RRJ0 RJ0 325.6

9 Northern U.P. N0RUP0 UP0 287.2

10 Northern Uttarakhand N0RUA0 UA0 210.4

11 Northern Nathpa Jhakri HEP N0RNJ0 NJ0 57

12 Northern Dulahasti HEP N0RDU0 DU0 95.3

13 Northern Chamera-I HEP N0RCM1 CM1 57

14 Northern Chamera-II HEP N0RCM2 CM2 57

15 Northern Chamera-III HEP N0RCM3 CM3 57

16 Northern Uri HEP N0RUR0 UR0 95.3

17 Northern Dhauliganga HEP N0RDG0 DG0 210.4

18 Northern Salal HEP N0RSL0 SL0 95.3

19 Northern Tanakpur HEP N0RTP0 TP0 210.4

20 Northern Baira Siul HEP N0RBS0 BS0 57

21 Northern Parbati-III N0RPA3 PA3 57

22 Northern AD Hydro N0RAD0 AD0 57

23 Northern Karcham Wangtoo N0RKW0 KW1 57

24 Northern Shree Cement Ltd N0RSC0 SC0 325.6

25 Northern Lanco Budhil HEP N0RLB0 LB0 57

26 Northern Adani Power Ltd Stage-3 HVDC N0RGU0 AS3 363.9

27 Northern URI-II_NHPC N0RUR2 UR2 95.3

28 Northern Malana_II_HEP N0RML0 ML2 57

29 Northern Singrauli STPS N0RSI0 SI0 287.2

30 Northern Dadri TPS N0RDA0 DA0 287.2

31 Northern Dadri Stage-II N0RDA1 DA1 287.2

32 Northern Unchahar-I TPS N0RUN1 UN1 287.2

33 Northern Unchahar-II TPS N0RUN2 UN2 287.2

34 Northern Unchahar-III TPS N0RUN3 UN3 287.2

35 Northern Rihand STPS N0RRI1 RI1 287.2

36 Northern Rihand-II STPS N0RRI2 RI2 287.2

37 Northern Rihand STPS-III N0RRI3 RI3 287.2

38 Northern NTPC_Ltd_Anta_GPS N0RAN0 AN0 325.6

39 Northern NTPC_Ltd_Auraiya_GPS N0RAU0 AU0 287.2

40 Northern NTPC_Ltd_Dadri_GPS N0RDD0 DD1 287.2

41 Northern Aravali Power Company Private Limited Jhajjar N0RJJ0 JJ0 363.9

42 Northern Sainj HEP N0RSJ0 SJ0 57

43 Northern Kishanganga HEP N0RKG0 KG0 95.3

44 Northern RAPP C 325.6

45 Northern Tehri N0RTE0 TE0 210.4

46 Northern Koteshwar N0RKT0 KT0 210.4

47 Northern SJVN (Rampur Hydro Power Station (RHPS)) N0RRP0 RP0 57

48 Northern BBMB 57

49 Northern Koldam N0RKD0 KD1 57

50 Northern NTPC Limited FGUTPS Stage-IV N0RUN4 UN4 287.2

51 Northern Tanda Stage-2 N0RTD0 TD1 287.2

52 Northern Kilaj Solar (Maharashtra) Private Limited N0RKS0 KS0 325.6

53 Northern NTPC_Ltd_Anta_GPS_RF N0RAN1 AN1 325.6

54 Northern NTPC_Ltd_Anta_GPS_CRF N0RAN2 AN2 325.6

55 Northern NTPC_Ltd_Anta_GPS_LF N0RAN3 AN3 325.6

56 Northern NTPC_Ltd_Auraiya_GPS_RF N0RAU1 AU1 287.2

57 Northern NTPC_Ltd_Auraiya_GPS_CRF N0RAU2 AU2 287.2

58 Northern NTPC_Ltd_Auraiya_GPS_LF N0RAU3 AU3 287.2

59 Northern NTPC_Ltd_Dadri_GPS_RF N0RDD1 DD4 287.2

60 Northern NTPC_Ltd_Dadri_GPS_CRF N0RDD2 DD2 287.2

61 Northern NTPC_Ltd_Dadri_GPS_LF N0RDD3 DD3 287.2

62 Northern Adani Solar Energy Jodhpur Two Limited Rawara N0SAG0 AG1 325.6

63 Northern Singoli Bhatwari HEP L&T Uttaranchal Hydro Power N0RSB0 SB0 210.4

IEX-SCHEDULE
Typewritten Text
ISTS Transmission charges (Rs/MWh)
IEX-SCHEDULE
Typewritten Text
IEX-SCHEDULE
Typewritten Text

64 Western ACB (India) Ltd W0RAB0 AB0 172.1

65 Western Chhattisgarh W0RCS0 CG0 172.1

66 Western Daman & Diu W0RDD0 DD0 133.7

67 Western Dadar Nagar Haveli W0RDN0 DN0 248.8

68 Western Goa W0RGO0 GA2 210.4

69 Western Gujarat W0RGU0 GJ0 210.4

70 Western Madhya Pradesh W0RMP0 MP0 172.1

71 Western Maharashtra W0RMS0 MH0 363.9

72 Western Jindal Power W0RJD0 JD0 172.1

73 Western LANCO Amarkantak W0RLA0 LA0 172.1

74 Western Dangamahua Captive Power Plant (DCPP) W0RJS0 JS0 172.1

75 Western Bharat Aluminium Co Ltd Power Plant 2 W0RBL2 BL2 172.1

76 Western Vandana Vidyut Ltd W0RVV0 VV0 172.1

77 Western GMR Warora Energy Ltd(EMCO) W0REM0 EM0 363.9

78 Western Essar_Power_M_P_Ltd W0REP0 EP0 172.1

79 Western KSK Mahanadi Power Company Ltd W0RKM0 KM0 172.1

80 Western Jindal Power Ltd Stage 2 W0RJD2 JD2 172.1

81 Western Raigarh Energy Generation Limited W0RKR0 KR0 172.1

82 Western DB Power Ltd W0RDB0 DB0 172.1

83 Western Dhariwal InfrastructureLtd W0RDW0 DW0 363.9

84 Western Jaypee Nigrie STPP W0RNI0 NI0 172.1

85 Western DGEN Mega Power Project W0RDM0 DM0 210.4

86 Western Raipur Energen Ltd W0RRE0 RE0 172.1

87 Western Jhabua Power Ltd W0RJB0 JB0 172.1

88 Western MB Power Ltd (Madhya Pradesh) W0RMB0 MB0 172.1

89 Western Adani Power Ltd Stage-1 W0RGU1 GJ1 210.4

90 Western Adani Power Ltd Stage-2 W0RGU2 GJ2 210.4

91 Western Adani Power Ltd Stage-3 W0RGU3 GJ3 210.4

92 Western Maruti Clean Coal And Power Ltd W0RMC0 MC0 172.1

93 Western Spectrum Coal and Power Ltd. W0RSP0 SP0 172.1

94 Western Sasan Power Ltd. W0RSA0 SA0 172.1

95 Western Vindhyachal STPS#1 W0RVI1 VI1 172.1

96 Western Vindhyachal STPS#2 W0RVI2 VI2 172.1

97 Western Vindhyachal STPS#3 W0RVI3 VI3 172.1

98 Western Vindhyachal STPS#4 W0RVI4 VI4 172.1

99 Western NTPC VINDHYACHAL STAGE-V W0RVI5 VI5 172.1

100 Western NTPC MOUDA STAGE- I W0RMD1 MD1 363.9

101 Western NTPC SIPAT STAGE -I W0RSI1 SI1 172.1

102 Western NTPC SIPAT STAGE -II W0RSI2 SI2 172.1

103 Western NTPC SAIL Power Company Pvt Ltd(NSPCL) W0RNS0 NS0 172.1

104 Western Korba STPS Stage-III W0RKO3 KO3 172.1

105 Western TRN Energy Pvt Ltd W0RTR0 TRN 172.1

106 Western Gandhar Gas Power Plant W0RGA0 GA0 210.4

107 Western NTPC Kawas Gas Power Project W0RKW0 KW0 210.4

108 Western RKM Power Gen Pvt Ltd W0RRK0 RK0 172.1

109 Western Korba STPS Stage-I and II W0RKO0 KO0 172.1

110 Western NTPC Ltd Mouda STPS Stage-II W0RMD2 MD2 363.9

111 Western Torrent Power W0RGU4 GJ4 210.4

112 Western SKS Power Generation (Chhattisgarh) Ltd W0RSK0 SK1 172.1

113 Western NTPC SOLAPUR (SSTPS) W0RSL0 SL1 363.9

114 Western Coastal Gujarat Power Limited W0RCG0 CG1 210.4

115 Western Gadarwada W0RGD0 GD0 172.1

116 Western SSP 210.4

117 Western Tarapur Atomic Power Station 3&4 363.9

118 Western RGPPL_MSEB W0RRG0 RG1 363.9

119 Western Lara (LSTPP) NTPC Ltd W0RLR0 LR0 172.1

120 Western Khargone NTPC W0RKH0 KH0 172.1

121 Western Arcelor Mittal Nippon Steel India Limited W0RAM0 AM0 210.4

122 Western NTPC_Ltd_Jhanor_Gandhar_Gas_Power_Project_NAPM W0RGA1 GA4 210.4

123 Western NTPC_Ltd_Jhanor_Gandhar_Gas_Power_Project_RLNG W0RGA2 GA5 210.4

124 Western NTPC_Ltd_Jhanor_Gandhar_Gas_Power_Project_ComRLNGW0RGA3 GA3 210.4

125 Western NTPC_Ltd_Kawas_Gas_Power_Project_NAPM W0RKW1 KW5 210.4

126 Western NTPC_Ltd_Kawas_Gas_Power_Project_RLNG W0RKW2 KW2 210.4

127 Western NTPC_Ltd_Kawas_Gas_Power_Project_ComRLNG W0RKW3 KW3 210.4

128 Western NTPC_Ltd_Kawas_Gas_Power_Project_ZLIQ W0RKW4 KW4 210.4

129 Western RGPPL_IR W0RRG1 RG3 363.9

130 Western RGPPL_Others W0RRG2 RG2 363.9

131 Western Kakrapar APS W0RKA0 KA1 210.4

132 Western KAKRAPAR ATOMIC POWER STATION-3&4 W0RKA1 KA2 210.4

133 Southern Andhra Pradesh S0RAP0 AP0 363.9

134 Southern Goa S0RGO0 GA1 133.7

135 Southern Karnataka S0RKA0 KA0 325.6

136 Southern Kerala S0RKL0 KL0 133.7

137 Southern Puducherry S0RPO0 PY0 95.3

138 Southern Tamilnadu S0RTN0 TN0 172.1

139 Southern LANCO_KONDAPALLY_2 S0RLK2 LK2 363.9

140 Southern Simhapuri Energy Limited S0RSH0 SH0 363.9

141 Southern Meenakshi Energy Pvt Ltd S0RMX0 MX0 363.9

142 Southern Telangana S0RTG0 TG0 325.6

143 Southern Sembcorp Energy India Limited S0RTP0 TH0 363.9

144 Southern Coastal Energen Pvt Ltd S0RCE0 CE0 172.1

145 Southern IL & FS Tamail Nadu Power Company Ltd S0RIL0 IL0 172.1

146 Southern NLC TPS-I (Expn.) S0RNE0 NE0 172.1

147 Southern NLC TPS-II Stage-I S0RNL1 NL1 172.1

148 Southern NLC TPS-II Stage-II S0RNL2 NL2 172.1

149 Southern NTPC LTD SIMHADRI STG-II S0RSD0 SD0 363.9

150 Southern Lanco Kondapalli Power Limited Stage-3 S0RLK3 LK3 363.9

151 Southern Talcher STPS-II S0RTL2 TL2 210.4

152 Southern RSTPS Stage- I &II S0RRM1 RM1 325.6

153 Southern RSTPS Stage- III S0RRM3 RM3 325.6

154 Southern Sembcorp Energy India Limited Project-2 S0RSG0 SG0 363.9

155 Southern NTECL Vallur S0RVL0 VL0 172.1

156 Southern Simhadri STPS Stage-1 S0RSD1 SD1 363.9

157 Southern Kudgi STPS S0RKD0 KD0 325.6

158 Southern NTPL S0RNT0 NT0 172.1

159 Southern Kaiga 325.6

160 Southern Kudankulam 172.1

161 Southern NLC India Ltd.TPS-II Expansion S0RNX2 NX2 172.1

162 Southern SBG Cleantech Projecto Five Private Limited S0RSC0 SC1 325.6

163 Southern Neyveli New Thermal Power Project (NNTPP) S0RNN0 NN0 172.1

164 Eastern Bihar E0RBI0 BR0 210.4

165 Eastern DVC E0RDV0 DV0 210.4

166 Eastern Orissa E0ROR0 OR0 210.4

167 Eastern Jharkhand E0RJS0 JH0 210.4

168 Eastern Sikkim E0RSM0 SK0 57

169 Eastern West Bengal E0RWB0 WB0 248.8

170 Eastern Rangit E0RRG0 RG0 57

171 Eastern Teesta E0RTE0 TS0 57

172 Eastern Maithon Power Limited E0RML0 ML0 210.4

173 Eastern Adhunik Power and Natural Resources Ltd E0RAP0 APN 210.4

174 Eastern Gati Infrastructure Ltd E0RCZ0 CZ0 57

175 Eastern GMR Kamalanga Energy Ltd E0RKN0 KN0 210.4

176 Eastern Jindal India Thermal Power Limited (JITPL) E0RJT0 JT0 210.4

177 Eastern Jorethang Loop HEP E0RJO0 JO0 57

178 Eastern Farakka Super Thermal Power Plant Stage-III E0RFK3 FK3 248.8

179 Eastern Barh Super Thermal Power Station Stage II E0RBH2 BH2 210.4

180 Eastern Kahalgaon STPP stg-II E0RKH2 KH2 210.4

181 Eastern Farrakka STPP E0RFK0 FK0 248.8

182 Eastern Kahalgaon STPP stg-I E0RKH1 KH1 210.4

183 Eastern TALCHAR 1 E0RTL1 TL1 210.4

184 Eastern Teesta Urja Limited E0RTE3 TE3 57

185 Eastern Dikchu Hydro Electric Project E0RDK0 DK0 57

186 Eastern Tashiding HEP E0RTD0 TD0 57

187 Eastern BRBCL E0RBL0 BL0 210.4

188 Eastern Injection from Bhutan 325.6

189 Eastern Bangladesh 95.3

190 Eastern Kanti Bijlee Utpadan Nigam Ltd (KBUNL) E0RKB0 KB0 210.4

191 Eastern Odisha Power Generation Corporation Limited Unit-4 E0ROP0 OP0 210.4

192 Eastern Nabinagar NPGC E0RNB0 NB0 210.4

193 Eastern Darlipalli E0RDP0 DP0 210.4

194 Eastern Muzaffarpur Thermal Power Station (MTPS) Stage-II E0RMZ0 MZ1 210.4

195 North Eastern Arunachal Pradesh A0RAR0 AR0 57

196 North Eastern Assam A0RAS0 AS0 248.8

197 North Eastern Manipur A0RMN0 MN0 172.1

198 North Eastern MeSEB A0RME0 ME0 172.1

199 North Eastern Mizoram A0RMZ0 MZ0 210.4

200 North Eastern Nagaland A0RNG0 NL0 210.4

201 North Eastern Tripura A0RTR0 TR0 95.3

202 North Eastern LOKTAK A0RLO0 LO0 172.1

203 North Eastern KOPILI A0RKP1 KP1 248.8

204 North Eastern KOPILI-II A0RKP2 KP2 248.8

205 North Eastern Ranganadi HEP A0RRN0 RN0 57

206 North Eastern Agartala GTPP A0RAG0 AG0 95.3

207 North Eastern Assam GBPP A0RKT0 ASG 248.8

208 North Eastern Doyang HEP A0RDY0 DY0 210.4

209 North Eastern ONGC Tripura Power Company Ltd (Palatana) A0RPL0 PL0 95.3

210 North Eastern KHANDONG A0RKK0 KK0 248.8

211 North Eastern NTPC Ltd. Bongaigaon Thermal Power Project A0RBG0 BG0 248.8

212 North Eastern NEEPCO Pare HEP A0RPA0 PA0 57

213 North Eastern Kameng HEP A0RKM0 KM1 57