+ All Categories
Home > Documents > Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

Date post: 17-Jan-2016
Category:
Upload: baldric-bradley
View: 217 times
Download: 0 times
Share this document with a friend
Popular Tags:
28
Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian
Transcript
Page 1: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

Implementation of WFD River Basin

Management Plans for Northern Ireland

Bridgeen Magorrian

Page 2: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

Introduction

• Background to the River Basin Management Plans.

• Update in the development of the plans.• Structure of the 2009 Plans• The results of the plans• Implementation of the plans• Future work

Page 3: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

What is a River Basin Management Plan?

The plan addresses: groundwaterwetlandsriverslakes/loughstransitional waters (eg estuaries)coastal waters

It sets out objectives to be achieved in water bodies and the actions or measures required to improve their status.

The plan is an integrated approach to protecting, improving and sustaining the water environment.

Page 4: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

Every 6 years

Classify water bodies HIGHHIGH

GOODGOOD

MODERATEMODERATE

POORPOOR

BADBAD

HIGHHIGH

GOODGOOD

MODERATEMODERATE

POORPOOR

BADBAD

Set objectives to deliver

improvements

Proportionate measures

The Planning Process

Page 5: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

Map of Northern Ireland River Basin Districts

Page 6: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.
Page 7: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.
Page 8: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.
Page 9: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.
Page 10: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.
Page 11: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.
Page 12: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.
Page 13: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.
Page 14: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

14

Page 15: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

15

Page 16: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

16

Page 17: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

17

Page 18: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.
Page 19: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.
Page 20: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.
Page 21: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

North East Projected change in Status

NE Projected Change in Status for each 6 Year Cycle

0% 20% 40% 60% 80% 100%

2009

2015

2021

2027

Percentage Status

High Good M oderate Poor Bad GEP M EP PEP BEP

Page 22: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

North West Projected change in Status

NW Projected Change in Status for each 6 Year Cycle

0% 20% 40% 60% 80% 100%

2009

2015

2021

2027

Plan

Cyc

le

Percentage Status

High Good M oderate Poor Bad GEP M EP PEP BEP

Page 23: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

Neagh Bann Projected change in Status

Neagh Bann Projected Change in Status each 6 years

0% 20% 40% 60% 80% 100%

2009

2015

2021

2027

Percentage Status

High Good M oderate Poor Bad GEP M EP PEP BEP

Page 24: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.
Page 25: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

Local Management Area Documents

Description of catchment

Water quality status of water bodies in the LMA

Protected areas included

Pressures preventing good status

Objectives to be achieved

Measures planned and proposed

Local measures/initiatives

Page 26: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

Where to from here• Launch of plan 21 Jan 09• Report to WISE (Water Information System for

Europe) by 22 Mar 2010)• Meeting with local groups to further develop

localised measures – early in 2010• Catchment Stakeholder Group meetings -

Spring 2010 to set out a more detailed localised implementation plan

• Carry out investigations and site visits to take forward implementation.

• Increase liaison and education activities.

Page 27: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

Thank You

Page 28: Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.

Recommended